Introductory provision
paragraph 1 of this regulation are supplementary provisions to the
Electricity Act (1997:857).
Definitions
section 2 of the terms and expressions used in this regulation were
the same meaning as in the electricity Act (1997:857).
paragraph 3 of the energy market Inspectorate shall be net authority under 1
Cape. section 7 of the electricity Act (1997:857) and deal with the matters referred to
in this regulation.
Network licence
The Government's examination of applications
4 section in Chapter 2. paragraph 1 (b), paragraph 4 (a), paragraph 5, second subparagraph,
15 a of j, paragraph 15, paragraph 16, article 16
the third paragraph and the third paragraph of section 17 of the electricity Act (1997:857)
There are provisions that the Government examines issues of
Online concession in some cases. An application in such a case
shall be submitted to the authority. The power authority will investigate
the question and then with private opinion refer the matter to the
the Government's review.
According to Chapter 2. paragraph 15 (b) of the electricity act review
the Government is a net concession relating to international relations.
Of Chapter 2. § 15 c electricity law stipulates that a request for reconsideration
even in such a case shall be submitted to the authority.
Application of net concession for the line
section 5 an application for a network licence for line should be written
and submitted to the power authority. It should contain information
about the following:
1. The transfer requirement that management is intended to
cater. If management is intended to strengthen the existing
wires, this should be indicated as well as the disclosure of the
load existing wires can withstand, on the one hand, on the need for
further management expansion in response to the management
which the application relates.
2. The voltage for which the management is intended.
3. If management is designed for a voltage not exceeding
maximum voltage for the regions with net concession
concerned by the management, to the specific reasons cited for
the application specified.
4. How the General rules of consideration in Chapter 2. the environmental code
observed.
5. alternative management routes to which the applicant
examined.
6. the consultation that has taken place in accordance with Chapter 6. 4 and 6 §§
the environmental code.
According to Chapter 2. 8 a of the electricity Act (1997:857), the application shall contain
an environmental impact assessment.
section 6 Of the application form in accordance with paragraph 5 of the following shall be annexed:
1. a technical description of the proposed pipeline and a
cost calculation. The description should include, among other things. a
drawing of the management's structure and its connection to the
production plant, station or existing management.
2. Map of the leadership's proposed route and
description of the land to be used for
the management.
3. Certified lists of owners and holders of
particular the right to property that the management shall be drawn up
over or of properties otherwise concerned by
plant.
4. indication of the agreements reached on leasing
of land management or the barriers against such
agreements.
Application of net concession area
section 7 of the application for a network licence for area shall be in writing
and submitted to the power authority. It should contain the following:
1. A plan of the area's future needs for transfer of
El.
2. A map of the area.
3. An indication of the maximum voltage for the area in which the applicant
would have been established.
Handling cases of net concession
If an application for section 8 online concession did not immediately rejected,
the opinion shall be obtained from
1. The armed forces,
2. the county administrative boards concerned by the application,
3. the municipalities concerned by the application,
4. owners and holders of special rights to real estate
concerned by the application, if the matter relates to network concession for the line,
5. other known interested parties concerned by the application, and
6. marketing network concession concerned by the application.
In cases where the opinion referred to in the first subparagraph shall
the power authority will also inform the national defence radio establishment if
the application.
§ 9 the power authority may grant a derogation in the case
from the provisions of §§ 5-7 or to request the additional
information necessary for the matter to be settled.
section 10 in a case if notice of the network licence according to 2
Cape. section 1 of the electricity Act (1997:857), decision of the
the power authority within three years after a complete
the application came in to the Office. If the matter should be considered by the
Government pursuant to Chapter 2. 1 b of the electricity Act, the decision is communicated
within five years after the date of a complete application came in to
the power authority.
In a case if extension of a network licence
period of validity referred to in Chapter 2. 14 or 15 of the electricity Act, the decision
announced by the power authority within eight years after a
complete application came in to the Office. If the matter should
be reviewed by the Government pursuant to Chapter 2. 15 a of the electricity Act, the decision
within ten years after it came a complete application
to the power authority.
If it is necessary on account of the investigation of the case,
the processing time for a maximum of one time extended for
no more than the original length of the time limit. The applicant shall
be informed of the reasons for the turnaround time is extended
before the original deadline has expired.
section 11 of the Act, section 8 (2009:1079) on services in the internal
the market provides for an acknowledgement of receipt shall
be sent to the applicant when the complete application has been received and
If the content of such evidence.
Cases of prior consent
section 12 of the application for the consent referred to in Chapter 2. section 5 of the electricity Act
(1997:857) that until further notice, for a maximum of 3 years using a
heavy duty pending an application for
Online concession proceed to judgment shall be made in writing and filed
to the power authority. It shall be accompanied by a map where
pipeline and related facilities are excellent.
Review of net concession for the line
section 13 an application for review of network concession pursuant to Chapter 2.
15 b of the electricity Act (1997:857) must be in writing and submitted to the
the power authority. It should contain
1. the name and address of the applicant,
2. the network licence to which it relates,
3. indication of the relevant network concessionaire, and
4. the reasons for his request.
The application document shall be accompanied by a map of the
route applied for.
Modification of terms and conditions
section 14 of the application for modification of the conditions for a network licence
According to Chapter 2. 15 j § electricity Act (1997:857) must be in writing
and submitted to the power authority. It should contain
1. the name and address of the applicant,
2. the network licence to which it relates,
3. applicable conditions,
4. the reasons for the application, and
5. other information required for the examination.
The application shall be accompanied by a map that specifies the direction
or the wires covered by network concession.
The boundaries of a network licence for area
15 § the power authority may notify the
conditions for changing the boundaries of a
Online concession area pursuant to Chapter 2. section 12 of the electricity Act
(1997:857).
Good quality of the transmission of electricity
section 16 of the power authority may provide for the requirements
must be met in order for the transfer of electricity shall be of good
quality as defined in Chapter 3. section 9 of the electricity Act (1997:857).
Documentation and information about delivery
17 § reporting of electricity referred to in Chapter 3. 9 e § 3
Electricity Act (1997:857) should be made to the power authority.
section 18 Online Authority may provide for
1. content of risk and vulnerability analyses and
action plans as referred to in Chapter 3. 9 c § electricity Act (1997:857) and if
report and publication of these,
2. the information provided to consumers under Chapter 3. paragraph 9 (d)
Electricity Act,
3. obligation to report power outages to the power authority,
and
4. exemption from the requirements of Chapter 3. 9 c and 9 d of the electricity Act in
question about wires that essentially feeds electricity from
installations for the production of renewable electricity.
Compensation for input of electricity
Article 19 compensation under Chapter 3. 15 of the electricity Act
(1997:857) shall be calculated as follows.
The values referred to in Chapter 3. 15 paragraph 1 el law
shall be calculated on the basis of the reduction of energy losses in
the power grids of the concessionaire that occurs because of
the plant feeds electricity to the grid and be replaced in
relation to the amount of input electricity as well as to when this
data entry is done.
When calculating the values referred to in Chapter 3. section 15 of the first
paragraph 2, the following criteria shall be taken into account electricity Act:
1. the power supply capacity,
2. the operational safety and the
agreement that may exist between network concessionaire
and fixed holder when the production plant
is planned to be in operation, and
3. the amount of the input electrical energy and when this input
takes place.
Efterfrågeflexibilitet
19 a of the power authority shall annually compile and
publish the technical requirements and other conditions
for the provision of services in the form of the amended
electricity consumption. Regulation (2014:354).
The establishment of a monitoring plan
section 20 of the power authority may provide for
1. contents of the monitoring plan as referred to in Chapter 3. section 17 of the law on electricity
(1997:857),
2. appointment of the compliance officer and his duties
According to Chapter 3. 17 a of the electricity Act,
3. the publication of the annual report referred to in Chapter 3. 17
(a) paragraph electricity Act, and
4. exemption from the requirements of Chapter 3. section 17 of the law on electricity in case of
nets concessionaires whose lines essentially input power
from installations for the production of renewable electricity, but not in
question about network companies as referred to in Chapter 3. 1 b of the first
paragraph.
Foreign relations
section 21/expires U: 2016-01-01/
Connection fee paid for the electricity network in Sweden gives the correct
to use even foreign relations with a voltage of 220
kilovolts or more to
-Denmark,
-Finland,
-Norway,
– Poland, and
– Germany.
section 21/entry into force: 01/01/2016
Connection fee paid for the electricity network in Sweden gives the correct
to use even foreign relations with a voltage of 220
kilovolts or more. Regulation (2015:691).
Right to information relating to network tariffs, etc.
section 22 Online Authority may provide for
1. the obligation of the person who has the power to licence to
publish its online tariff pursuant to Chapter 4. the third paragraph of section 11
Electricity Act (1997:857), and
2. the formulation of a timetable pursuant to Chapter 4. section 12 of the electricity Act.
Notice of protection measures
section 23 of the power authority shall without delay notify such
safeguard measures referred to in article 42 of the European Parliament's
and Council directive 2009/72/EC of 13 July 2009 on the
common rules for the internal market in electricity
repeal of Directive 2003/54/EC to the other Member States in
The European Union and to the European Commission.
Balance responsibility, etc.
24 §/expires U: 2016-01-01/
The power authority may provide for
1. publication of the terms and conditions of balance agreements in accordance with Chapter 8. 4
b of the electricity Act (1997:857),
2. elleverantörers information obligation under Chapter 8. paragraph 5 of the
third subparagraph, electricity Act,
3. the information that a notification under Chapter 8. § 8 other
subparagraph electricity Act should contain, and
4. elleverantörers duty to disclose information under 8
Cape. 11 b of the el Act.
24 §/entry into force: 01/01/2016
The power authority may provide for
1. publication of the terms and conditions in accordance with Chapter 8. 4 b of the electricity Act
(1997:857),
2. elleverantörers information obligation under Chapter 8. paragraph 5 of the
third subparagraph, electricity Act,
3. the information that a notification under Chapter 8. § 8 other
subparagraph electricity Act should contain, and
4. elleverantörers duty to disclose information under 8
Cape. 11 b of the el Act. Regulation (2015:601).
An indication of the countries of origin
section 25 of the power authority may provide for
1. how the information referred to in Chapter 8. 12 § first-fourth
subparagraphs electricity Act (1997:857) should be calculated and reported for
consumers,
2. the obligation for electricity producers to publish information
in accordance with Chapter 8. 13 of the electricity Act, and
3. the obligation for suppliers to provide information according to
Chapter 8. second subparagraph of paragraph 13 of the electricity Act.
/Rubriken entry into force: 04/01/2016
Bidding zone configuration
25 a section/entry into force: 04/01/2016
The power authority will take a position on the proposal to maintain or modify a bidding zone configuration in accordance with article 32 (4) (c) of Commission Regulation (EC) No 2015/1222 of 24 July 2015 establishing guidelines for capacity allocation and congestion management.
Regulation (2016:26).
/Rubriken entry into force: 04/01/2016
Force majeure
25 b/entry into force: 04/01/2016
The power authority assesses whether an event should be denoted as force majeure in accordance with article 72(5) of Regulation (EC) No 2015/1222. Regulation (2016:26).
Notice to consumer and communication to
Social Welfare Committee
section 26 notice to the consumer and a
message to the social welfare Board under Chapter 11. paragraph 4(1)
Electricity Act (1997:857) shall be drawn up in accordance with Annex 1
and annex 2 to this regulation.
Preservation of information
section 27 of the power authority may provide for the obligation
for electricity suppliers to document and preserve the data on
supply contracts and derivative instruments, as well as of transactions
for such agreements or instruments.
section 28 of an electricity supplier shall, on request, provide information about
supply contracts and derivative instruments, as well as of transactions
for such agreements or instruments to the European
the Commission and the power authority. However, this applies only
such indications in trade in electricity is
accounting information according to the accounting Act (1999:1078)
or who shall be documented and retained according to regulations
given under section 27.
Appeal
the power authority's decision under section 29 of Chapter 3. 20 and 21 § §
Electricity Act (1997:857) may be appealed to the Government.
section 30 of the Decision pursuant to this Regulation may not be appealed.
Transitional provisions
2013:208
1. This Regulation shall enter into force on 1 June 2013, when
electricity regulation (1994:1250) is repealed.
2. Older rules still apply in the case of
appeal against a decision given before the
the entry into force.
3. the provisions of section 10 shall not apply in the case of
applications that have been submitted to the power authority before 27
December 2009.
Annex 1
Notification to the consumer in the event of non-payment for electricity
or network fee
Because you have not paid the electricity grid fee or fee
for delivered electricity timely transmission of your electricity may be
shut down in accordance with the provisions of the Act. electricity, you can prevent
the suspension by paying the debt within three weeks from the
you have been part of this message.
The Social Welfare Board in your community will get a message if
the non-payment.
Annex 2
Message to the social welfare Committee on consumer who are at risk of
the transfer of power interruption
1. network concessionaire/electric company's name, postal address
and phone number ... ... ... ... ... ... ... ... ... ... ... ... ... ....
2. The consumer's name and address.........................
3. Amount, with an indication of the maturity date, the consumer shall
pay to prevent the transmission of electricity is interrupted. ....
4. network concessionaire/electric company's money order or
Bank giro account or other indication of the arrangements for payment.