Resolution Of 30 Of Mayo Of 2012, Of The Secretariat Of State Of Power, By Which Is Publishing Them Values Of The Cost Of The Matter Prima And Of The Cost Base Of The Matter Prima Of The Gas Natural For The Second Quarter Of 2012, To Them Effects Of Th...

Original Language Title: Resolución de 30 de mayo de 2012, de la Secretaría de Estado de Energía, por la que se publican los valores del coste de la materia prima y del coste base de la materia prima del gas natural para el segundo trimestre de 2012, a los efectos del cál...

Read the untranslated law here: http://www.boe.es/buscar/doc.php?id=BOE-A-2012-7254

View the order ITC/3519/2009, of 28 December, that toll access as of January 1, 2010 and rates and premiums of the special regime installations are reviewed.

Such order modifies, in its available additional fifth, the formula established in the article 28.1 of the Real Decree 661 / 2007, of 25 of mayo, by which is regulates the activity of production of energy electric in regime special, introducing for its calculation a new variable called Cn, cost of it matter prima, calculated in accordance with it formulation collected in the article 8 of the order ITC / 1660 / 2009 , 22 June, which establishes the methodology of calculation of the last resort of natural gas tariff, modified by the order ITC/1506/2010, of 8 June, amending the order ITC/1660/2009, of 22 June, which settles the last resort of natural gas tariff calculation methodology taking how null values of the terms PRQ and α, and the values of application in the corresponding quarter for the rest of the terms.

In the available end first of the cited order ITC / 3519 / 2009, is modifies the annex VII of the Real Decree 661 / 2007, of 25 of mayo, relative to the update of rates and raw for them subgroups a.1.1 and a.1.2, equating the parameter IComb, index of price of fuel, to a new variable called CbmpGN, cost base of the matter prima of the gas natural obtained as the sum of the cost of premium Cn matter and the term of toll road TPdefinido in the own order.

View the order ITC/1660/2009, of 22 June, which establishes the methodology of calculation of the rate of last resort of natural gas and the order ITC/1506/2010, of 8 June, amending the order ITC/1660/2009, of 22 June, which settles the last resort of natural gas tariff calculation methodology.

In this last is collects the term βSB, proportion insofar as by one of the amount auctioned of Gas of Base relative to the forecast of demand of Gas of Base associated to the rate of last resource, whose value is 0.5.

View the order EIT/3587/2011, of 30 December, by which establish tolls and fees associated with third-party access to installations gas and the remuneration of the regulated activities, in particular its article 18 and annex I, which are extracted the values relating to the following terms of losses and tolls, respectively , and the order EIT / 849 / 2012, of 26 of April, by which is updated them tolls and cannons associated to the access of third to them facilities gas and is adopt certain measures relating to the balance financial of the system gas, in particular its article 5, that modifies them values of them tolls starting from the date of its entry in force that is, on April 28. Effected an apportionment for them days of April that has State in force each an of them orders earlier are it following values of terms of losses and tolls: mT diminishes of transport primary 0,0020 mR diminishes of regasification 0.0001 mD reduces of distribution to pressure top to 4 bar 0,0039 Tfr term fixed of the toll regasification 1,8167 cent€ /(kWh/día) / month.






TVR term variable toll of regasification 0,0108 cent€ / kWh.






TRC term fixed in reserve of capacity 1,0049 cent€ /(kWh/día) / month.






TF fixed term driving the toll of transport and distribution firm for consumers not fed by satellite plant for the design 2.4 pressure step 3,8175 cent€ /(kWh/día) per month.






TCV term variable of conduction of the toll of transportation and distribution firm for consumers not fed through plant satellite, for the step of pressure of design 2.4 0,1038 cent€ / kWh.






TGNLv term variable toll corresponding to storage of LNG 3,0315 Canyon cent€ / MWh/day.





Views the resolution of 30 of December of 2011, of the address General of political energy and mines, by which is publishes the rate of last resource of gas natural, and the resolution of 27 of April of 2012, of the address General of political energy and mines, by which is publishes the rate of last resource of gas natural , from which are obtained, by assessment of the days of the month of April in which each one of them has been in force, the values of the following terms, defined in the order ITC/1660/2009, of 22 June, amended by the order ITC/1506/2010, June 8: • Pbn, price to apply to product Base Gas supplies made in the quarter of reference = 3,010800 c€ / kWh.

• An, modification of the price as a result of revisions to the tolls == 0,130489 c€ / kWh.

• % LNG, percentage of supplies in form of LNG, expressed as by one = 0.74.

Seen of the contributions of the Brent crude in the semester prior to the quarter of reference values, expressed in $/Bbl and published in Platts Oilgram Price Report.

Seen them values of the type of change $/ € in the quarter earlier to the quarter of reference, published by the Bank Central European: period type of change $/ € January 2012 1,2905 February 2012 1,3224 March 2012 1,3201 view the law 30 / 1992, of 26 of November, of regime legal of the administrations public and of the procedure administrative common.

This secretariat of State, under them powers that you gives the legislation current, resolves: establish as value of Cn, cost of the matter prima, and CbmpGn, cost base of the matter prima of gas natural, for the second quarter of 2012, them values following: Cn = 2,9291 c€ / kWh.

CbmpGn = 3,3728 c€ / kWh PCS.

Against this resolution, which does not exhaust administrative remedies, it is worth filing, under cover of the provisions in articles 114 and 115 of the law 30/1992, of 26 November, legal regime of public administrations and common administrative procedure, appeal to the Minister of industry, energy and tourism in within a month, counted from the day following its publication.

Madrid, 30 may 2012.-the Secretary of State for energy, Fernando Martí Scharfhausen.