Resolution Of June 2, 2015, Of The Ministry Of Energy, By Which Certain Operating Procedures For The Treatment Of The Data From The Measurement Type 5 For Purposes Of Billing And Li Teams Approve...

Original Language Title: Resolución de 2 de junio de 2015, de la Secretaría de Estado de Energía, por la que se aprueban determinados procedimientos de operación para el tratamiento de los datos procedentes de los equipos de medida tipo 5 a efectos de facturación y de li...

Read the untranslated law here: http://www.boe.es/buscar/doc.php?id=BOE-A-2015-6203

Article 3.10 of the law 24/2013, of 26 December, the Electricity Sector, establishes, among the competences that correspond to the General Administration of the State, regular terms which has to develop the economic and technical management of the electrical system, approving the rules of market and operation of instruments and technical procedures necessary.

Moreover, article 31 of the Royal Decree 2019 / 1997, of 26th December, that organizes and regulates the electricity production market, establishes that the operator of the system and the National Energy Commission, currently National Commission of markets and competition, may be proposed for approval by the Ministry of industry, tourism and trade Ministry of industry, energy and tourism, the operation of technical and instrumental procedures necessary to perform adequate technical management of the system, who will solve the abovementioned Commission report.

The Royal Decree 1110 / 2007, 24 August, which approves the unified regulation of points of measurement of the electrical system, regulates the conditions of functioning of the system of measures of the national electricity system, teams that integrate it and its characteristics, in order to ensure the correct technical management of the electrical system and the data required for the liquidation of the power and associated services as well as for the calculation of the turnover of the access rates and supply, in application of the economic system of the activities of such a system.

The own Royal Decree 1110 / 2007 August 24, envisaged in its third final provision the presentation to the then Ministry of industry, tourism and commerce by the system operator of new procedures for the operation of the system or the modification of existing ones which were necessary to the adaptation of the system of electrical measurements to the new regulation.

Thus approved the resolution of November 16, 2009, of the Ministry of energy, which approve the procedures of operation of the system 10.4, 10.5, 10.6, 10.7 and 10.8 and 10.11 for their adaptation to the new electric regulation.

Subsequently, the Royal Decree 216/2014, 28 March, which establishes the methodology of calculation of prices volunteers for the small consumer of electric power and its status of recruitment, determines in its eleventh additional provision that proposals for operation of technical and instrumental procedures presented by the system operator shall be accompanied by the report of the representatives of all the subjects of the system defined in article 6 of the law 24/2013, of 26 December, the Electricity Sector.

This resolution aims at the adoption of two new procedures in operation and four existing modification to adapt to in the Royal Decree 216/2014, of 28 March, article 6 of which determines in the case of supplies that have equipment measured with telemetry and remote management, capacity and effectively integrated in the corresponding systems you will be invoiced whereas hourly consumption values made available or if sent by the Manager of reading.

The fifth additional provision of the mentioned Royal Decree 216/2014, 28 March, provides that the procedure which regulate the verification, validation and closing data from the measuring equipment connected to the remote management system, as well as the protocols of exchange of information, security and confidentiality among agents for the purpose of billing and settlement of energy will be established by a decision of the Secretary of State for energy. For these purposes, is urged to the National Commission of markets and competition to be submitted to the Secretary of State for energy, within a maximum period of two months from the entry into force of the Royal Decree, a proposal of the above procedures as well as any other provision that is necessary to develop for the purpose of the management of the time measurement of the measuring equipment connected to the remote management system.

Taking into account the above, room of monitoring regulatory of the Commission national markets and competition at its meeting on May 29, 2014, approved the "proposal of procedures for checking, validation and closing data from the measuring equipment connected to the remote management system, and about the protocols of exchange of information for the purpose of billing and settlement of energy» which was forwarded to the Secretary of State for energy.

Meanwhile, electrical network of Spain, S.A., as the system operator, forwarded to the Ministry of industry, energy and tourism, dated August 4, 2014, proposal of approval of modification of the following operating procedures: P.O. 10.4 «Hubs of electrical measurement and communication systems».

P.O. 10.5 «Calculation of best value of border points energy and power of the information system of electrical measurements closures».

P.O. 10.6 «Aggregations of measurement points».

P.O. 10.11 'Treatment and information exchange between the system operator, managers of reading, marketers and other agents'.

The above proposals were sent on 5 September 2014 to the National Commission of markets and competition along with the procedures approved by the Committee on 29 may 2014, for their joint assessment and issuance of the report in accordance with that laid down in article 5(2) and the tenth transitional provision of law 3/2013 , June 4, creation of the National Commission of markets and competition, and considering the provisions of article 31 of the Royal Decree 2019 / 1997, of 26th December, which organizes and regulates the electricity production market.

On November 13, 2014 Hall of monitoring regulatory of the Commission national markets and the competition agreed to issue the ' report on the proposal for amendment of 10.4, 10.5, 10.6 operating procedures and 10.11 and the proposal of procedures for checking, validation, closure and provision of data from the measuring equipment connected to the remote management system».

Also cited nursing date 5 September 2014 indicated that taking into account that these procedures indicated some aspects that could be linked with the metrological control of State, requesting that, for the process of hearing, be included to the Spanish Metrology Centre.

View the law 24/2013, of 26 December, the Electricity Sector, and article 31 of the Royal Decree 2019 / 1997, of 26th December, which organizes and regulates the electricity production market, and the Royal Decree 1110 / 2007 of 24 August, which approves the unified rules of electrical measurement points;

Having regard to the proposal made by the system operator of modification of the procedures of operation 10.4, 10.5, 10.6 and 10.11;

Having regard to the proposal made by the CNMC's procedures for checking, validation and closing data from the measuring equipment connected to the remote management system, and about the protocols of exchange of information for the purpose of billing and settlement of energy;

Having seen the report of November 13, 2014 the CNMC in which values together both proposals, this Secretary of State meets: first. Adoption of procedures for the operation of the electricity system.

Approve the procedures for the operation of the power system following: to) P.O. 10.4 «Hubs of electrical measurement and communication systems».

b) P.O. 10.5 «Calculation of best value of border points energy and power of the information system of electrical measurements closures».

c) P.O. 10.6 «Aggregations of measurement points».

d) P.O. 10.11 'Treatment and information exchange between the system operator, managers of reading, marketers and other agents'.

e) P.O. 10.12 'Procedure for verification, validation, and calculation of the best energy value of data from equipment of measurement type 5 effectively integrated in the system of remote management'.

f) P.O. 10.13 'Procedure whereby dealers exchanged information with marketers of electric power, and put data coming from teams measure type 5 effectively integrated into the remote management system available to marketers and consumers'.

Such procedures are then inserted.

Second. Effectively integrated measuring equipment.

Means that a computer is effectively integrated into the system of remote management when computers meet the minimum functional specifications of the systems remote management laid down in article 9.8 of the unified rules of measurement points approved by the Royal Decree 1110 / 2007, 24 August, and should be able to read schedules records of active power of remotely through this system.

Third party. Files for the exchange of information.
In the period of 7 working days since it provided under this resolution, the National Commission of markets and competition will publish on its website formats defined in the third paragraph of the P.O. 10.13, information exchange files as well as the flow charts and procedures associated with these files.

Information concerning these files and their associated procedures should keep updated on its website.

Room. Applicability.

1 a starting from 1 July 2015 shall apply as follows: to) the P.O. 10.12. Despite the above, until the 1 October 2015 the recruitment process of the time by TeleManagement systems curve regulated in paragraph 6 of the aforementioned 10.12 P.O., must begin, as too late, the third day before the end of a month counting from the last row of the realized consumption.

(b) the making available by distributors to the marketers of the CCH_FACT that have the formats provided in the P.O 10.13.

((c) the use, where appropriate, exchange of information F5D defined in paragraph 3.1 file. b) of P.O. 10.13.

(d) paragraph 3.2 of the P.O. 10.13 on 'Communication from the Distributor to the marketer on the State of the measuring equipment of consumers connected to their networks'.

(e) paragraph 3.3.1 "Placed at the disposal of the CCH_FACT» of P.O. 10.13.

(f) paragraph 3.3.2 «Communication protocols and channels» of the P.O. 10.13, with the exception of the use of the same FTP server for the information that is put at the disposal of consumers with custom type 5 teams and consumers measure type 1, 2 and 3 teams.

2 starting from October 1, 2015 marketers referred to in section 2.1 of the P.O.10.13 be billed with data from CCH_FACT hourly load curve provided that the start of the billing period date is subsequent to the August 31, 2015.

Agreement between the Distributor and the retailer, before the 1 October 2015 the marketer may charge with the data coming from the curve of load time, fulfilling provisions of 10.12 and 10.13 operating procedures. In this case, the Distributor will not have obligation to use data from the CCH_FACT for the purpose of sending to the system operator of the data needed to liquidate the energy in the market until the date referred to in the following paragraph of this resolution.

3. the system operator shall publish on its website the timetable for implementation of the different sections of the procedures of operation 10.4, 10.5, 10.6 and 10.11. This timetable shall comply with the provisions of this section.

For borders 5 types of customers with time measurement: to) the Distributor must send to the operator of the system for the settlement of the energy market aggregate time measurement obtained from the CCH_FACT, according to the definition given in the procedure of operation 10.12, for all supplies with invoices issued from October 1, 2015 and date back to August 31, 2015 consumption.

(b) procedures for the operation of the system 10.4, 10.5, 10.6 and 10.11 shall apply as it is go meeting calendar for the measurement system established in such proceedings to the measures referred to in the preceding paragraph.

Those changes to operating procedures that are not related to borders customers with time measurement type 5 will apply from October 1, 2015.

Still the above: to) the sending of measures from the hub side to the hub of the main channel and communication protocol defined in the PO 10.11 by point border customers type 5 according to as contemplated in section 4.1 of the 10.4 P.O, shall apply to the consumption of such points border after December 31, 2015 , and may, however, be sent on a voluntary basis from 1 July 2015.

(b) starting from July 1 and until 31 December 2015 the system attendant will have access to the same servers enabled to put the CCH_FACT available to marketers, with the same channel and the same communication protocol, defined in the P.O. 10.13.

4 also, from October 1, 2015 shall apply the following sections of the P.O. 10.13: a) the paragraph 3.3.4 on updates of the CCH_FACT and the use, where appropriate, the RF5D file defined in paragraph 3.1. b).

(b () paragraph 3.4 'Placing at the disposal of the Distributor to the marketer of the CCH_VAL' and the use, where appropriate, from the P5D file defined in paragraph 3.1. b).

(c) paragraph 4 'Placing available distributor to the consumer of the hourly load curve'.

((d) the use, where appropriate, the CCH_CONS file, which is defined in paragraph 3.1. b).

5 before January 1, 2016 shall apply: to) the use of the files for the exchange of information collected under 3.1. to) of the P.O. 10.13, without prejudice to the use of the files that are necessary for the application of paragraphs.

(b) the use of the same FTP server for the availability of the CCH_FACT consumer equipment measure 5 type and information concerning consumers measure type 1, 2 and 3 teams with marketers, as available in the paragraph 3.3.2 of the P.O. 10.13.

Fifth. Submission of information.

1. within seven days since it provided under this resolution, the Distributor will send to the marketer that matches a listing of all supplies connected to the network of the Distributor that have effectively integrated in the system of remote management teams, indicating the criteria followed by the Distributor so far to communicate such information on the D1 file. This list will be sent in a flat type format and will contain a single field that corresponds to the CUPS.

2. on July 1, 2015 the Distributor will send a list updated in flat format to the marketer and the National Commission of markets and competition, all supplies with existing contract connected to the network of the Distributor that have effectively integrated TeleManagement system as equipments.

The Directorate-General of energy policy and mining of the Ministry of industry, energy and tourism will have access at any time to the information, which must be provided by the National Commission of markets and competition.

3. the National Commission of markets and competition may request information deemed timely subjects in accordance with the format and within the time limits determined by this. Among other things, until January 1, 2020, distributors shall send the Commission cited the following information on a quarterly basis: to) report in which you specify the number of supplies that has been available to hourly load curves, disaggregating data by toll access and marketer.

(b) information on the number of estimated and actual hours published. In this case, you should refer to the method of measurement in accordance with the table in paragraph 6 of the P.O. 10.12 'Procedure for verification, validation, and calculation of the best energy value of data from equipment of measurement type 5 effectively integrated in the system of remote management'.

For this purpose, the CNMC will publish in electronic based format that the information must be made.

4. the National Commission of markets and competition will send to the Ministry of industry, energy and tourism a report based on the information received, for the purposes of the monitoring and implementation of provisions in the present resolution and operating procedures which are approved.

Sixth. Access to the time load curves of points of information system of supply.

From 1 January 2016, distributors will be made available in the information system of points of supply regulated in article 7 of the Royal Decree 1435 / 2002, of 27 of December, which regulates the basic conditions of contracts for the acquisition of power and access to networks in low voltage, the information provided for by article referred. Until that date, dealers shall make available in the same consumption measures discriminated against by periods and months.

Time load curves which may be made available in the information system of supply points will match the CCH_FACT that dealers made available to marketers to consumers who apply such information.

Seventh. Monthly invoicing of supplies that have measuring equipment with capacity for telemetry and remote management that are not effectively integrated in appropriate systems.
The supplies that have measuring equipment with capacity for telemetry and remote management that are not effectively integrated in the corresponding systems according to the definition given in the second paragraph at the time on which this resolution takes effect and whose reading and billing are doing a monthly, by virtue of the provisions of article 2.1 of the Royal Decree 1718 / 2012 of 28 December, which determines the procedure for reading and billing of energy supplies at low voltage with power not exceeding 15 kW, they can continue being billed monthly, unless the consumer otherwise.

Eighth. Efficiency.

This resolution shall take effect on the day following its publication in the "Official Gazette".

Ninth. Loss of effects.

1. from the date on which are applicable amendments to the corresponding operating procedures approved by the present resolution void following system operation procedures approved by resolution of November 16, 2009, of the Secretary of State for energy: P.O. 10.4 «Hubs of electrical measurement and communication systems».

P.O. 10.5 «Calculation of best value of border points energy and power of the information system of electrical measurements closures».

P.O. 10.6 «Aggregations of measurement points».

P.O. 10.11 'Treatment and information exchange between the system operator, managers of reading, marketers and other agents'.

2 starting from the date on which it takes effect this resolution is without effect the resolution of April 29, 2010, of the Secretary of State for energy, which is authorized to the system operator the realization of an exceptional procedure of closure and estimation of actions of customers.

Madrid, 2 June 2015.-the Secretary of State for energy, Alberto Nadal Belda.

Here are several images in the original. See the PDF document official and authentic.