Royal Decree 413/2014 seen of 6 June, the production activity is regulated electricity from renewable energy sources, cogeneration and waste, whose fourth additional provision establishing a remuneration system is regulated specific to a maximum of 120 MW applicable to facilities or modifications of facilities of different technologies for wind, solar thermoelectric and photovoltaic under additional provision of Law 24/2013 fourteenth of December 26, the Electricity Sector.

View Order IET / 1045/2014 of 16 June, establishing the remuneration parameters of the type applicable to certain facilities producing electricity from renewable energy sources, cogeneration and waste facilities are approved, whose third additional provisions and fourth the time and manner of submission, the documentation to be submitted and other requirements of applications for registration of specific remuneration regime in state Pre-allocation of facilities defined in additional provision four of Royal Decree 413/2014, of June 6.

Considering Law 30/1992 of 26 November on the Legal Regime of Public Administrations and Common Administrative Procedure.

Having regard to the content and the documentation of the applications submitted in a timely manner, in accordance with the provisions of the third additional provision of Order IET / 1045/2014 of 16 June and, where appropriate, subsanatoria documents submitted by the interested parties within the deadline.
Whereas
have been met legal deadlines granted to those concerned to rectify their applications.

Considering the capacity quota of 120 MW included in section 1 of the fourth additional provision of Royal Decree 413/2014, of June 6, for the establishment of a specific remuneration regime for facilities that not having been entered in the registration of pre-allocation or the first section of log production facilities of electricity, are in one of the following situations:

A) they had submitted application for registration of pre-allocation, under the provisions of Article 4 of Royal Decree-Law 6/2009, of April 30, laying down certain measures are taken in the energy sector and the social bond is approved, that the application had been entered in the administrative register of the Ministry of Industry, Energy and Tourism, and that met the requirements of Article 4.3 of Royal Decree law 6/2009 of 30 April , all before the date of entry into force of Royal Decree-law 1/2012 of 27 January.

B) they must have record of commissioning, definitively, for all the power for which registration is requested in the registration of remuneration regime in state preallocation in thirty calendar days after the entry into force of Law 24/2013 of 26 December.

Considering the prioritization of applications referred to in paragraph 6 of the fourth additional provision of Royal Decree 413/2014, of June 6, according to the following criteria:
1st
compliance with paragraph 1 a) of the fourth additional provision of Royal Decree 413/2014, of June 6.

2nd compliance with paragraph 1 a), unless the requirements of Article 4.3 of Royal Decree Law 6/2009 of 30 April, and compliance with paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014, of June 6.

3.º compliance with paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014, of June 6.

Whereas as a result of the implementation of the prioritization criteria in case of equal number of requests supusiese overcoming planned quota will be established within each of these criteria prioritization according to the date of administrative authorization, the case of 1st prioritization criteria and the date of a final operating license for the prioritization criteria 2nd and 3rd, as provided in paragraph 6 of the fourth additional provision of Royal Decree 413/2014, of June 6th.

Whereas as provided for in paragraph 6 of the fourth additional provision of Royal Decree 413/2014, of June 6, coverage quota of 120 MW power will default, ie, the first application other than It is estimated that, for which consideration would overcome the expected quota.

The Directorate General under the powers conferred by law, it resolves:


1. Register, the register of specific remuneration regime in state preallocation regulated by Royal Decree 413/2014, of June 6, installations or facilities projects listed in Annex I to this resolution.

2. Declare not registered in the register of specific remuneration regime in state preallocation regulated by Royal Decree 413/2014, of June 6, facilities or facilities projects listed in Annex II of this resolution.

3. Declare not admitted applications for registration of specific remuneration regime in state preallocation processed under the provisions of the fourth additional provision of Royal Decree 413/2014, of June 6, installations or facilities projects listed in Annex III of the present resolution.

Accordance with the provisions of paragraph 7 of the fourth additional provision of Royal Decree 413/2014, of June 6, this resolution shall be published in the "Official Gazette".

Against this resolution may be brought an appeal before the Secretary of State for Energy, within one month of its publication in the Official Gazette, in accordance with the provisions of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and Common Administrative Procedure, amended by Law 4/1999, of January 13, and Article 14.7 of Law 6/1997 of 14 April, Organization and Functioning of the General State Administration.

According to the provisions of additional provision four of Order IET / 1045/2014, of June 16, that appeal must be submitted exclusively electronically, with electronic certificate, through the application accessible from www.minetur .gob.es in the electronic office of the ministry, under the heading procedures and electronic services, option all types of proceedings, appeals and complaints option, or directly through the following link:

https://sede.minetur.gob.es/es-S/procedimientoselectronicos/Paginas/Administrativos.aspx?ShowResults=True&SortExpression=Titulo&SortDirection=Ascending&Page=0&Source=listadoProcedimientos.aspx&CommandName=Search&Titulo=recurso

Should quote the file number in communications or resources concerning this resolution.

Madrid, July 15, 2015.-The Director General for Energy Policy and Mines, Maria Teresa Martin Baquedano.
ANNEX I


Facilities registered in the register of specific remuneration regime in state preallocation in the quota provided for in the fourth additional provision of Royal Decree 413/2014, of June 6, by which the activity of electricity production is regulated from renewable energy sources, cogeneration and waste




Prioritization criteria (1)





Installation holder





Facility name





registered power (kW)





Technology subgroup





associated installation type (2)






Final operating license




Identification number of the request






1st





EMAYA, SA





CENTRAL ELECTRIC BIOGAS EDAR PALMA 1.





2,130.00





B.7.2





IT-00936





13/12/2011





PER-000085-2014-E






1st





JULIA GARCIA HENAREJOS.





Cogeneration PACHECA.





500,00





A.1.1





IT-01472





19/12/2011





PER-000039-2014-E






1st





Berioska, SL





COGENERACION Berioska.





1.000,00





A.1.1





IT-01475





22/02/2012





PER-000045-2014-E






1st





SEAT, SA





CG SEAT (PHASE # 2).





1,030.00





A.1.1





IT-01496






28/02/2012





PER-000032-2014-E






1st





INDUSTRIAS ROKO, SA





EDIT. INST. BY INCREASING POWER COGENERACION RIPRE-23.





282,00





A.1.1





IT-01508





06/03/2012





PER-000060-2014-E






1st





CHILDREN OF FEDERICO LIS SA





CHILDREN OF FEDERICO LIS SA





1.000,00





A.1.1





IT-01475





27/04/2012





PER-000006-2014-E






1st





Ferrovial Servicios SA





COGENERATION POLIDEPORTIVO TXURDINAGA.





500,00





A.1.1





IT-01472





05/07/2012





PER-000040-2014-E






1st





Ferrovial Servicios SA





SAN IGNACIO COGENERACIÓN POLIDEPORTIVO.





500,00





A.1.1





IT-01472





05/07/2012





PER-000041-2014-E






1st





CITY COUNCIL PEÑAFIEL.





Microcogeneration PEÑAFIEL.





50,00





A.1.1





IT-01472





03/04/2013





PER-000112-2014-E






1st





Cogeneradora BURGALESA, SL





CAMPOFRÍO.





2838.00





A.1.1





IT-01511





12/19/2013





PER-000089-2014-E






1st





SILEX DIEL BIOMASS, SL





CENTRAL BIOMASS TERMOELECTRICA PIEDRABUENA.





15,000.00





B.6





IT-00848





...




PER-000072-2014-E






1st





BIOMASS GESTAMP 6 SL





THERMAL PLANT BIOMASS TORREDONJIMENO.





15,000.00





B.6





IT-00848





...




PER-000074-2014-E






1st





ENERGIES Margua, SA





ENERGIES Margua ICMA.





500,00





A.1.1





IT-01473





...




PER-000079-2014-E






1st





ENERGIES Margua, SA





MAGUA ENERGY CENTER.





500,00





A.1.1





IT-01473





...




PER-000080-2014-E






1st





Guadalquivir River Basin.





HYDROELECTRIC EL PORTILLO.





2,800.00





B.4.2





IT-00771





...




PER-000084-2014-E






1st





ENERGY EFFICIENCY COGENERATION, SL





FITNESS CENTER COGENERACION ILLES MARRATXI.





500,00





A.1.1





IT-01474






...




PER-000103-2014-E






1st





ALGABAEN, SL





CG BM ALGABAEN.





99.00





B.6





IT-00848





...




PER-000132-2014-E






2nd





E-COGENERACION CABANILLAS, SL





BIOGAS PLANT E-COGENERACION CABANILLAS.





349.00





B.7.2





IT-00914





29/02/2012





PER-000117-2014-E






2nd





EGICAM YOUNG PLAN, SL





INSTALLATION HOUSING Microcogeneration 240 GETAFE PARC. B-10.





30.00





A.1.1





IT-01472





09/07/2012





PER-000009-2014-E






2nd





EGICAM YOUNG PLAN, SL





PAU MOSTOLES 268 VIV-4.





99.00





A.1.1





IT-01472





11/09/2012





PER-000008-2014-E






3rd





FINANCIAL MADERERA, SA





FINSA PADRÓN.





3,740.00





A.1.1





IT-01511





28/07/2011





PER-000099-2014-E






3rd





HC-NATURGAS ENERGY SERVICES COMPANY, SL





MICRO_BENITO_OTERO_175.





5.50





A.1.1





IT-01472





13/10/2011





PER-000050-2014-E






3rd





Tanneries, SA





INCUSA II.





995.00





A.1.1





IT-01475





17/01/2012





PER-000010-2014-E






3rd





SAT NUM 7995 THE RITAS LAHORADADA pillar.





COGENERACION THE RITAS.





500,00





A.1.1





IT-01472





09/03/2012





PER-000024-2014-E






3rd





Viscofan, SA





VISCOFAN.





2146.00





A.1.1





IT-01514





16/03/2012





PER-000086-2014-E






3rd





TORRE SANTAMARIA SCOOPCL.





BG TORRE SANTAMARIA.





220.00





B.7.2





IT-00914





13/04/2012





PER-000019-2014-E






3rd





SPAIN NESTLE SA





NESTLE (PHASE # 3).





1396.00





A.1.1





IT-01493





23/04/2012





PER-000030-2014-E






3rd





Solvida SANXENXO SL





Solvida SANXENXO SL





100.00





A.1.1





IT-01505





23/05/2012





PER-000027-2014-E






3rd






HC-NATURGAS ENERGY SERVICES COMPANY, SL





MICROGRANDIELLA_25.





5.50





A.1.1





IT-01472





24/05/2012





PER-000058-2014-E






3rd





SALE OF GREEN ENERGY NAVA, SL





NAVA 1.





100.00





B.6





IT-00846





28/05/2012





PER-000115-2014-E






3rd





TEJIDOS ROYO, SL





TEJIDOS ROYO I.





1.000,00





A.1.1





IT-01475





04/06/2012





PER-000052-2014-E






3rd





UNILEVER FOODS INDUSTRIAL SPAIN SL





UNILEVER FOODS INDUSTRIAL, SLU





2677.00





A.1.1





IT-01478





06/07/2012





PER-000092-2014-E






3rd





PEROXYCHEM SPAIN, SL





Cogeneration OF ZAIDA.





5330.00





A.1.1





IT-01493





22/08/2012





PER-000033-2014-E






3rd





JGC COGENERACION DAIMIEL, SL





JGC COGENERATION COGENERATION PLANT DAIMIEL SL.





8350.00





A.1.1





IT-01478





23/08/2012





PER-000023-2014-E






3rd





ENERGYWORKS ARANDA, SL





MICHELIN ARANDA PHASE NO: 2.





945.00





A.1.1





IT-01460





24/09/2012





PER-000073-2014-E






3rd





MARBLE GRANITE AND NATURAL STONE SALAZAR BROTHERS, SL





MILL.





400,00





B.4.2





IT-00744





02/10/2012





PER-000119-2014-E






3rd





FONT SALEM, SL





CENTRAL ELECTRIC PRODUCTION WITH MOTOR GENERATOR BIOGAS IN FONT SALEM.





500,00





B.7.2





IT-00914





11/10/2012





PER-000118-2014-E






3rd





PEQUECHIN, SL





Biomethanization plant 350 KW.





350,00





B.7.2





IT-00914





25/10/2012





PER-000046-2014-E






3rd





ESPUÑA ESTEBAN, SA





CG ESPUÑA.





196.00





A.1.1





IT-01505





31/10/2012





PER-000037-2014-E






3rd





FARMHISPANIA, SA





COGENERACION FARMHISPANIA.





3,350.00





A.1.1





IT-01478





09/11/2012





PER-000026-2014-E






3rd






PIG FARMING INVESTMENTS, SL





Biomethanization plant 350 KW.





350,00





B.7.2





IT-00914





15/11/2012





PER-000070-2014-E






3rd





BECTON DICKINSON, SA





BECTON DICKINSON COGENERACION FRAGA.





999,00





A.1.1





IT-01475





26/11/2012





PER-000100-2014-E






3rd





HC-NATURGAS ENERGY SERVICES COMPANY, SL





MICRO_MAESE_ALONSO_400.





5.50





A.1.1





IT-01472





05/12/2012





PER-000057-2014-E






3rd





COGENERACIÓ BEGUDA, SAU





CG NOEL (Plant II).





4995.00





A.1.1





IT-01478





11/12/2012





PER-000034-2014-E






3rd





CAILA & PARES, SA





Caypa.





2498.00





A.1.1





IT-01493





12/13/2012





PER-000028-2014-E






3rd





SA LLENSA.





SA LLENSA.





714.00





A.1.1





IT-01505





12/13/2012





PER-000059-2014-E






3rd





HC-NATURGAS ENERGY SERVICES COMPANY, SL





MICROVALPARAISO_15.





5.50





A.1.1





IT-01472





19/12/2012





PER-000051-2014-E






3rd





HIDROPALANCAR, SL





PALANCAR PONT DE BAR.





4945.00





B.4.1





IT-00718





28/12/2012





PER-000125-2014-E






3rd





URBAN SERVICES CESPA MURCIA, SAU





COGENERACION CESPA.





1413.00





B.7.1





IT-00892





08/01/2013





PER-000146-2014-E






3rd





BONNYSA AGROALIMENTARIA, SA





NORTH Melenchones Cogeneration Plant.





4044.00





A.1.1





IT-01478





10/01/2013





PER-000003-2014-E






3rd





COMPANY MUNICIPAL WATER AND SANITATION OF MURCIA, SA





CENTRAL Minihydraulic the break.





56,00





B.4.2





IT-00744





10/01/2013





PER-000093-2014-E






3rd





RIBPELLET limited company.





COGENERATION RIBPELLET.





1255.00





B.6





IT-00846





01/18/2013





PER-000078-2014-E






3rd






HC-NATURGAS ENERGY SERVICES COMPANY, SL





MICROGRANDIELLA_6.





5.50





A.1.1





IT-01472





04/02/2013





PER-000049-2014-E






3rd





HC-NATURGAS ENERGY SERVICES COMPANY, SL





MICRO_MAESE_ALONSO_110.





5.50





A.1.1





IT-01472





04/02/2013





PER-000056-2014-E






3rd





Elèctriques TANQUEL, SL





CH barbens.





100.00





B.4.2





IT-00744





13/02/2013





PER-000114-2014-E






3rd





SYRAL IBERIA, SA





AMYLUM IBERICA.





13600.00





A.1.1





IT-01496





01/03/2013





PER-000069-2014-E






3rd





DIAZ HERMANOS REDONDO, SA





DIAZ HERMANOS REDONDO COGENERACION.





999,00





A.1.1





IT-01505





01/03/2013





PER-000083-2014-E






3rd





Fomento de Construcciones y Contratas, SA





Cogeneration Plant COMPLEX OF ENVIRONMENTAL BARBANZA.





130,00





B.7.1





IT-00892





03/07/2013





PER-000105-2014-E






3rd





BONNY, SA





PLA DE BENET Cogeneration Plant.





6066.00





A.1.1





IT-01478





12/03/2013





PER-000002-2014-E





(1) In accordance with the provisions in paragraph 6 of the fourth additional provision of Royal Decree 413/2014, of June 6.

(2) The type codes are provisional installation related to the installation step registration of specific remuneration regime in state of exploitation.

In accordance with paragraph 8 of the fourth additional provision of Royal Decree 413/2014, of June 6, the facilities provided for in paragraph 1 a) of that provision have a period of thirty-six months since the publication in the "Official Gazette" of the present resolution registration of specific remuneration regime in state preallocation for compliance with the requirements for the registration of remuneration regime in state of exploitation regulated Article 46 of the royal decree.
ANNEX II


Facilities not included in the register of specific remuneration regime in state preallocation in the quota provided for in the fourth additional provision of Royal Decree 413/2014, of June 6, by which the activity of electricity production is regulated from renewable energy sources, cogeneration and waste

According to the prioritization set out in paragraph 6 of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, the final operating license of the last request that falls within the planned quota is dated March 12 2013

The requests contained in this Annex have not been registered in the register of specific remuneration regime governing the Royal Decree 413/2014, of June 6, according to said prioritization, for the following reasons:


- Not fall within the criteria for prioritizing 1st and 2nd, not having submitted applications for registration in the register of pre-allocation pursuant to the provisions of Article 4 of Royal Decree Law 6 / 2009 of April 30, dated entry in the registry of the Ministry of Industry, Energy and before the entry into force of Royal Decree-law 1/2012, of 27 January Tourism, as set out in paragraph 1 .a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Fall within the 3rd prioritization criteria, but have a final operating license, or, where applicable Certificate Low Voltage filled, subsequent to the last request that falls within the date scheduled quota.




Identification number of the request





Installation holder





Facility name





Requested power (kW)






Final operating license





PER-000144-2014-E





COGENERACIÓ BEGUDA, SAU





CG NOEL (PLANT I).





4040.00





13/03/2013






PER-000053-2014-E





MaterialScience, SL





MaterialScience, SL





933,00





27/03/2013






PER-000090-2014-E





ROBLEGAL AGRICULTURAL HOLDINGS, SL





COGENERATION 500 KW OF AGRICULTURAL HOLDINGS SL ROBLEGAL





500,00





05/04/2013






PER-000036-2014-E





GENERAL COMMUNITY OF IMPERIAL IRRIGATION CANAL DE ARAGON.





JALON Hydroelectric Plant.





550,00





04/11/2013






PER-000044-2014-E





ROQUETTE LAISA SPAIN, SA





ROQUETTE LAISA SPAIN, SA (PHASE # 2).





4,320.00





03/05/2013






PER-000071-2014-E





FARM VES, SL





COGENERATION PLANT 250 KW.





250,00





05/13/2013






PER-000081-2014-E





Mondelez PRODUCTION SPAIN, SL





KRAFT COGENERACIÓN FODDS.





2,000.00





29/05/2013






PER-000004-2014-E





BONNYSA AGROALIMENTARIA, SA





Cogeneration Plant Pantanet.





5044.00





19/06/2013






PER-000091-2014-E





CANAL DE NAVARRA, SA





Group I CH TOMA.





10,000.00





07/05/2013






PER-000022-2014-E





POLIPROPILENO DE GALICIA, SAU





COGENERACION Poligal.





1.000,00





21/08/2013






PER-000054-2014-E





IKEA IBERICA, SA





COGENERATION IKEA STORE OF ARROYO DE LA ENCOMIENDA (VALLADOLID).





500,00





07/10/2013






PER-000064-2014-E





CARTONAJES IZQUIERDO SA





COGENERATION CARTONAJES IZQUIERDO.





1.000,00





09/10/2013






PER-000143-2014-E





CERAMICS RIOBOO, SL





CERAMICS RIOBOO, SL





500,00





18/10/2013






PER-000017-2014-E






GAS NATURAL FENOSA RENOVABLES, SLU





CENTRAL HYDRAULIC BELESAR II.





20780.00





10/24/2013






PER-000018-2014-E





GAS NATURAL FENOSA RENOVABLES, SLU





CENTRAL HYDRAULIC Peares II.





18150.00





10/24/2013






PER-000067-2014-E





MILES CHILDREN CERAMICA, SA





CERAMIC MILES AND CHILDREN.





5190.00





20/12/2013






PER-000082-2014-E





LINGEGAS BV.





LINGEGAS BV.





3120.00





20/12/2013






PER-000029-2014-E





SOLUTEX GC, SL





SOLUTEX.





1.000,00





12/26/2013






PER-000106-2014-E





ENERGY EFFICIENCY COGENERATION, SL





COGENERACION PONENT MAR.





500,00





17/01/2014






PER-000025-2014-E





CANNED CERQUEIRA, SA





CANNED COGENERACION CERQUEIRA SA





950.00





01/22/2014






PER-000126-2014-E





BIOGAS FUEL CELL, SA





BIOGAS PLANT. BIOGAS FUEL CELL, SA





248.00





01/23/2014






PER-000007-2014-E





ELPOZO FOOD, SA





COGENERATION ELPOZO.





17200.00





24/01/2014






PER-000012-2014-E





PENINSULAR ELECTRICITY GENERATION, SA





GEGSA II.





37.000,00





24/01/2014






PER-000013-2014-E





PENINSULAR ELECTRICITY GENERATION, SA





GEGSA I.





37.000,00





24/01/2014






PER-000014-2014-E





PENINSULAR ELECTRICITY GENERATION, SA





GETESA.





38559.00





24/01/2014






PER-000095-2014-E





CARTONAJES BERNABEU, SA





CARTONAJES BERNABEU, SA





1,044.00





24/01/2014






PER-000104-2014-E





CONSORTIUM OF WATER AND WASTE RIOJA.





COGENERATION EDAR CIDACOS.





347.00





24/01/2014






PER-000120-2014-E





TECHNOLOGY AND ENGINEERING SYSTEMS AND TELECOMMUNICATIONS ADVANCED SERVICES.





WALHALLA CASTELLON.





3,000.00





24/01/2014






PER-000075-2014-E





JUAN Y JUAN INDUSTRIAL, SLU (EN Constitution).





Cogeneration Plant MOTOR WITH ALTERNATIVE 1 MW JUAN Y JUAN INDUSTRIAL, SLU





1.000,00





01/27/2014




ANNEX III

Facilities
not allowed in the call for the distribution of the quota provided for in the fourth additional provision of Royal Decree 413/2014, of June 6, by which production activity is regulated electric power from energy sources renewables, cogeneration and waste




Identification number of the request





Installation holder






Facility name





Reason for rejection






PER-000011-2014-E





ENERGY SERVICES HIGH EFFICIENCY, SA





GEGSA II.





- Having expressly waived its application.






PER-000102-2014-E





ENERGY HOLDINGS COMPANY, SL





CDAMM.





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000133-2014-E





INSULATION decalidad, SL





24. WAITING





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000134-2014-E





INSULATION decalidad, SL





PHOTOVOLTAIC ROOF WAITING 22.





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000135-2014-E





ENGINEERING CORK, SL





FIXED ROOF PHOTOVOLTAIC ALGODONALES 1.





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000136-2014-E





ENGINEERING CORK, SL





PHOTOVOLTAIC ROOF 12 KW THE BARBUO.





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000055-2014-E





AUTHENTIC DISTRIBUTED GENERATION AND LEON CASTILLA, SL





COGENERACION CEDEIRA AGDS.





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000129-2014-E





CLEAN ENERGY, SL





Mini LALUEZA.





- According to the provisions of Article 71 of Law 30/1992 of 26 November on the Legal Regime of Public Administrations and the Common Administrative Procedure, your request is given to not respond within the period established for that purpose by desisted to correction requirement.






PER-000123-2014-E





Council of Huesca.





ALQUEZAR hydroelectric power.





- Breach of the provisions of Article 11.9 of Royal Decree 413/2014, of June 6.






PER-000128-2014-E





THE MAESTRAZGO, SL





Mini-hydro "JUMPING THE MIDDLE".





- Breach of the provisions of Article 11.9 of Royal Decree 413/2014, of June 6.






PER-000130-2014-E





UBE CHEMICAL EUROPE SA





UBE CHEMICAL EUROPE SA






- Breach of the provisions of paragraph 10 of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, to be considered substantial modification.

- Breach of the provisions of Article 11.9 of Royal Decree 413/2014, of June 6.






PER-000131-2014-E





PLACIDO BAYO OVIEDO.





Encinedo mini hydroelectric plant.





- Breach of the provisions of Article 11.9 of Royal Decree 413/2014, of June 6.






PER-000121-2014-E





BIOELECTRICA OF GARRAY, SL





BIOMASS CITY ENVIRONMENT.





- Breach of the provisions of paragraph 10 of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, to be considered substantial modification.

- Breach of the provisions of Article 11.9 of Royal Decree 413/2014, of June 6.






PER-000005-2014-E





Norvento, SL





BIOGAS PLANT EXPERIMENTAL XUSTÁS.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000038-2014-E





GENERAL COMMUNITY OF IMPERIAL IRRIGATION CANAL DE ARAGON.





VALDEGURRIANAN hydroelectric power.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000031-2014-E





SONS OF LUIS MARTINEZ NOREÑA, SL





THE MOURIENTE.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000015-2014-E





PROJECTS MORAL 2002 SL





Trigeneration INSTALLATION IN HOSPITAL OF MADRID NORTE SANCHINARRO.





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance with paragraph 2.a) 5 Additional Provision Three Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.


- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000042-2014-E





ALDEBARAN GUADALQUIVIR ENERGIA, SL





ELECTRIC GENERATING PLANT BIOMASS AGRICULTURAL GROUP B.6.





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance with paragraph 2.a) 4 of Additional Provision Three Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000043-2014-E





INSTITUTE FOR DIVERSIFICATION AND SAVING ENERGY.





HYDROELECTRIC 'ALBA MILL BRIDGE. "





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance with paragraph 2.a) 3 Additional Provision Three Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000068-2014-E





BIOMASS MIRANDA I, SL





THERMAL PLANT BIOMASS OF MIRANDA DE EBRO.





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance 2.a) and 2nd paragraphs 3 ) 4 third additional provision of Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000076-2014-E





SOTEMED, SL (EN Constitution).





CER ESPARTINAS.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000077-2014-E





SERLASA, SA





SERLASA, SA





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance with paragraph 2.a) 4 of Additional Provision Three Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000087-2014-E






HIDROESCARPS, SLU





HIDROESCARPS.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000088-2014-E





LAUNDRY INDUSAL CANTABRIA, SA





LAUNDRY INDUSAL CANTABRIA SA.





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance with paragraph 2.a) 3 Additional Provision Three Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000101-2014-E





SA LLENSA.





CG-GN LLENSA.





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance with paragraph 2.a) 10 Additional Provision Three Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000116-2014-E





PLA URGELL County Council.





PL. LANDFILL BIOGAS energy use.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000122-2014-E





CHILDREN OF VALENTIN GANGOSO, SA





CH HARINAS THE WINDY.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000124-2014-E





REDONDO HERMANOS, SL





FOOT OF PREY SWAMP Uzquiza.






- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000127-2014-E





CLEAN ENERGY, SL





Minicentral RAFT THE BOULEVARD.





- Failure to meet the requirements of paragraph 1a) of the Fourth Additional Provision of Royal Decree 413/2014, of June 6, by failing to provide documentation proving compliance 2.a) and 2nd paragraphs 2 ) 10 third additional provision of Order IET / 1045/2014, of June 16, prior to the entry into force of Royal Decree-law 1/2012 of 27 January.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000145-2014-E





PAPELERA ECKER SA





PAPELERA ECKER COGENERACIÓN.





- Not have provided registration application in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April, with entry into the Register of the Ministry of Industry, Energy and former Tourism to the entry into force of Royal Decree-law 1/2012, of January 27, as set out in paragraph 1a) of the fourth additional Provision of Royal Decree 413/2014, of June 6.

- Not have provided a final operating license, or in case of Low Voltage Certificate filled, date preceding the deadline as set out in paragraph 1 b) of the fourth additional provision of Royal Decree 413/2014 of 6 of June.






PER-000035-2014-E





Unibail-Rodamco SPAIN, SL





ARCHES cogeneration plant.





- Breach of paragraph 1 of the Fourth Additional Provision of Royal Decree 413/2014, of June 6. The facility is registered in the register of pre-allocation under the provisions of Article 4 of Royal Decree Law 6/2009 of 30 April.