Order Pre/1616/2015, 23 July, Which Are Updated Three Vocational Family Vocational Building And Civil Works, Listed In The National Catalogue Of Professional Qualifications, Established By Royal Decree 87...

Original Language Title: Orden PRE/1616/2015, de 23 de julio, por la que se actualizan tres cualificaciones profesionales de la familia profesional Edificación y Obra Civil, recogidas en el Catálogo Nacional de Cualificaciones Profesionales, establecidas por Real Decreto 87...

Read the untranslated law here: http://www.boe.es/buscar/doc.php?id=BOE-A-2015-8715

Organic law 5/2002, of 19 June, qualifications and vocational training, aims in the management of an integrated system of vocational training, qualifications and accreditation, to respond with efficiency and transparency to the social and economic demands through training practices. To do so, creates the national system of qualifications and vocational training, defining it in article 2.1 as a set of instruments and actions necessary to promote and develop the integration of offers of training, through the national catalogue of professional qualifications, as well as the evaluation and accreditation of the corresponding professional skills, in such a way that it promotes professional and social development of the people and the needs of the production system are covered.

The national catalogue of professional qualifications, according to article 7.1, is created with the purpose of facilitating the integrated nature and the adequacy between vocational training and the labour market, as well as lifelong training, the mobility of workers and the labour market unit. This catalogue is constituted by the qualifications identified in the productive system and the training associated with them, which is organised in training modules.

Article 5.3 of the organic law 5/2002, of 19 June, attributed to the National Institute of qualifications, the responsibility to define, develop and keep updated the national catalogue of professional qualifications, in his capacity as technical support body to the Council General of vocational training, whose regulatory development contained in article 9(2) of the Royal Decree 1128 / 2003 , 5 September, which regulates the national catalogue of professional qualifications, establishing in its article 9.4, the obligation to keep it permanently updated through periodic review which, in any case, must be made within a period not exceeding five years from the date of inclusion of the qualification in the catalog.

This order is issued pursuant to the Royal Decree 817/2014, of 26 September, which lays down the specific aspects of professional qualifications for as amended, procedure of approval and effects is therefore implementation article 7.3 of the organic law 5/2002, of 19 June, qualifications and vocational training who in their processing obtained opinion of the Council of State number 618/2014, July 23, 2014.

Thus, in this order is updated, by replacing complete its annexes, three professional qualifications of the professional family building and Civil works with an antique in the national catalogue of professional qualifications equal to or more than five years, that is applicable the Royal Decree 817/2014, of 26 September. In addition, modify partially certain professional qualifications, by replacing certain transversal competence units and training modules associated, included in up-to-date professional qualifications listed in the annexes of this order.

In the process of elaboration of this order the autonomous communities have been consulted and they have issued report the General Council for vocational training and the State School Board.

In his virtue, a joint proposal from the Minister of education, culture and sport and Minister of employment and Social Security, have: article 1. Object and scope of application.

This ministerial order aims to upgrade three professional qualifications corresponding to the professional family building and Civil works, leading to the replacement of the relevant annexes, and modify partially certain professional qualifications through the substitution of certain units of competence and training modules associated, in application of the Royal Decree 817/2014, of 26 September, which establishes the specific aspects of professional whose modification qualifications procedure of approval and effects of application article 7.3 of the organic law 5/2002, of 19 June, qualifications and vocational training.

Up-to-date professional qualifications and the partially modified by this procedure are valid and are applicable throughout the national territory, and do not constitute a regulation of professional practice.

Article 2. Update of certain professional qualifications of the professional family building and Civil works, established by Royal Decree 872/2007, of July 2, whereby the national catalogue of professional qualifications, is complemented by the establishment of four professional qualifications corresponding to the family professional building and Civil works.

Pursuant to the sole additional provision of Royal Decree 872/2007, of July 2, proceed to the updating of professional qualifications whose specifications are contained in annexes CCLXXI, CCLXXII and the Royal Decree CCLXXIII: one. A new wording is given to annex CCLXXI, professional qualification «Auxiliary masonry of factories and covers operations». Level 1. EOC271_1, appearing as annex I to this order.

Two. A new wording is given to annex CCLXXII, professional qualification «Operations in support of continuous linings under construction». Level 1. EOC272_1, which appears as annex II to this order.

3. A new wording is given to annex CCLXXIII, professional qualification 'Control of projects and construction'. Level 3. EOC273_3, which appears as annex III to the present order.

Article 3. Partial modification of certain professional qualifications of the professional family building and Civil works laid down by Royal Decree 295/2004 of 20 February, which establishes certain professional qualifications that are included in the national catalogue of professional qualifications, as well as its relevant training modules which are incorporated into the catalogue modular vocational training.

Pursuant to the sole additional provision of Royal Decree 295/2004 of 20 February, proceed to the update of professional qualifications whose specifications are contained in annexes LI and LII of the aforementioned Royal Decree: one. Professional qualifications amending established as «annex LI: concrete operations.» Level 1. EOC051_1» respectively, replacing the unit's competition «UC0276_1: auxiliary jobs in construction» and associated training module «MF0276_1: auxiliary work of work (120 h)» by the competition unit «UC0276_1: auxiliary jobs in construction» and associated training module «MF0276_1: auxiliary work of work (90 h)», as well as replacing respectively , unit competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)», corresponding to annex I «auxiliary masonry of factories and covers operations. Level 1. EOC271_1» of this order, also changed the total duration of training associated with the qualification from 390 to 360 hours.

Two. Professional qualifications amending established as «annex LII: factories of masonry. " Level 2. EOC052_2» respectively, replacing the unit's competition «UC0142_1: build factories to» and associated training module «MF0142_1: structures to cover (120 h)» by the competition unit «UC0142_1: build factories to» and associated training module «MF0142_1: structures to cover (90 h)», as well as respectively, replacing the unit's competition «UC0869_1 «: Prepare pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)», corresponding to annex I «auxiliary masonry of factories and covers operations. Level 1. EOC271_1» of this order, also changed the total duration of training associated with the qualification from 540 to 510 hours.

Article 4. Partial modification of professional qualification of the professional family building and Civil engineering works established by Royal Decree 1179 / 2008, of 11 July, whereby the national catalogue of professional qualifications, is complemented by the establishment of seventeen qualifications professional level 1, corresponding to specific professional families.

Pursuant to the sole additional provision of the Royal Decree 1179 / 2008, of 11 July, proceed to the update of the professional qualification whose specifications are contained in annex CDIX of the aforementioned Royal Decree:
Professional qualifications amending established as «annex CDIX: auxiliary operations of rigid finishes and urbanization. " Level 1. EOC409_1» respectively, replacing the unit's competition «UC0276_1: auxiliary jobs in construction» and associated training module «MF0276_1: auxiliary work of work (120 h)» by the competition unit «UC0276_1: auxiliary jobs in construction» and associated training module «MF0276_1: auxiliary work of work (90 h)», as well as replacing respectively , competition unit «UC0869_1: prepare pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the unit's competition «UC0869_1: prepare pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)», corresponding to annex I to this order «Operations in support of walling factories and covers». Also replaced the «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for coating in construction» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order, also changed the total duration of training associated with the qualification from 360 to 330 hours.

Article 5. Partial modification of professional qualifications established by Royal Decree 1956 / 2009 of 18 December, whereby the national catalogue of professional qualifications, is complemented by the establishment of eight professional qualifications of the extractive industries professional family.

Pursuant to the sole additional provision of the Royal Decree 1956 / 2009, December 18, proceed to the update of the professional qualification whose specifications are contained in annex CDXXVII of the aforementioned Royal Decree: the professional qualifications amending established as «annex CDXXVII: natural stone.» Level 2. IEX427_2» respectively, replacing the unit's competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)», corresponding to annex I «auxiliary masonry of factories and covers operations. Level 1. EOC271_1» of this order.

Article 6. Partial modification of certain professional qualifications established by the Royal Decree of 1548 / 2011, on 31 October, whereby the national catalogue of professional qualifications, is complemented by the establishment of thirteen professional qualifications of the professional family building and civil works, and updated certain professional qualifications from those laid down in the Royal Decree 1958 / 2009 of 18 December.

Pursuant to the sole additional provision of the Royal Decree of 1548 / 2011, on 31 October, proceeds to the updating of professional qualifications whose specifications are contained in annexes DLXXVIII, DLXXX, DLXXXII, DLXXXIV, DLXXXVI, DLXXXVII, DLXXXVIII, DLXXXIX and DLXC of the aforementioned Royal Decree: one. Professional qualifications amending established as «annex DLXXVIII: basic operations of light and technical coatings in construction. " Level 1. EOC578_1» respectively, replacing the unit's competition «UC0276_1: auxiliary jobs in construction» and associated training module «MF0276_1: auxiliary work of work (120 h)» by the competition unit «UC0276_1: auxiliary jobs in construction» and associated training module «MF0276_1: auxiliary work of work (90 h)», corresponding to annex I «Operations in support of walling factories and covers» of this order; as well as respectively, replacing the unit's competition «UC0871_1: clean up and regularize stands for coating in construction» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order, also changed the total duration of training associated with the qualification from 360 to 330 hours.

Two. Professional qualifications amending established as «annex DLXXX: sloping roofs.» Level 2. EOC580_2» respectively, replacing the unit's competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)», as well as replacing the unit's competition «UC0870_1 «: Build panels for roofs» and associated training module «MF0870_1: coattails of covers (120 h)» by the unit's competition «UC0870_1: build panels for roofs» and the associated training module «MF0870_1: coattails of covers (90 h)» corresponding to annex I «auxiliary masonry of factories and covers operations. Level 1. EOC271_1» of this order, modifying the total duration of training associated with the qualification from 690 to 660 hours also.

3. Professional qualifications amending established as «annex DLXXXII: waterproofing membrane formed sheet.» Level 2. EOC582_2» respectively, replacing the unit's competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» corresponding to annex I «auxiliary masonry of factories and covers operations. Level 1. EOC271_1» of this order.

Four. Professional qualifications amending established as «annex DLXXXIV: technical installation of flooring, panelling and screens. " Level 2. EOC584_2» respectively, replacing the unit's competition «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for coating in construction» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order.

5. Professional qualifications amending established as «annex DLXXXVI: flooring and walling estate.» Level 2. EOC586_2» respectively, replacing the unit's competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» corresponding to annex I «auxiliary masonry of factories and covers operations. Level 1. EOC271_1» of this order.

6. Professional qualifications amending established as «annex DLXXXVII: decorative painting under construction.» Level 2. «EOC 587_2» respectively, replacing the unit's competition «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for coating in construction» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering»; as well as respectively, replacing the unit's competition «UC0873_1: apply primers and protective paints in construction» and associated training module «MF0873_1: paint and primer materials and construction (150 h) protectors» by the unit's competition «UC0873_1: apply primers and protective paints in construction» and associated training module «MF0873_1: paint and primer materials and guards in construction (90 h)» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order, also changed the total duration of training associated with the qualification of 630 hours to 570 hours.
7. Professional qualifications amending established as «annex DCLXXXVIII: industrial paint construction.» Level 2. EOC588_2» respectively, replacing the unit's competition «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for coating in construction» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering»; as well as respectively, replacing the unit's competition «UC0873_1: apply primers and protective paints in construction» and associated training module «MF0873_1: paint and primer materials and construction (150 h) protectors» by the unit's competition «UC0873_1: apply primers and protective paints in construction» and associated training module «MF0873_1: paint and primer materials and guards in construction (90 h)» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order, also changed the total duration of training associated with the qualification of 630 hours to 570 hours.

8. Professional qualifications amending established as «annex DLXXXIX: finishes with pastes and mortars in construction. " Level 2. EOC589_2» respectively, replacing the unit's competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)», corresponding to annex I to this order «Operations in support of walling factories and covers». Also, is replaced respectively the «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» , as well as the unit's competition «UC0872_1: perform unclad and trimmed «to buena vista»» and associated training module «MF0872_1: unclad and trimmed «to buena vista» (60 h)», by the competition unit «UC0872_1: perform unclad and trimmed «to buena vista»» and associated training module «MF0872_1: unclad and trimmed «to buena vista» (60 h)» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order.

9. Professional qualifications amending established as «annex DXC: finishes with rigid pieces by adhesion in construction» respectively, replacing the unit's competition «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1: pastes, mortars, adhesives and concrete (30 h)» by the competition unit «UC0869_1: develop pastes, mortars, adhesives and concrete» and associated training module «MF0869_1 «: Pastes, mortars, adhesives and concrete (30 h)», corresponding to annex I «Operations in support of walling factories and covers» of this order; as well as replacing respectively the «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» competition unit «UC0871_1: clean up and regularize stands for construction covering» and associated training module «MF0871_1: treatment of supports for construction (60 h) covering» corresponding to annex II «auxiliary continuous linings in construction operations. Level 1. EOC272_1» of this order.

First final provision. Skill-related title.

This order is issued by virtue of the powers which attributes to the State the article 149.1.1. 2nd and 30th of the Constitution, on regulation of the basic conditions that guarantee the equality of all Spaniards in the exercise of rights and in the fulfilment of the constitutional duties, and for the regulation of the conditions of procurement, issuance and recognition of academic and professional qualifications.

Second final provision. Entry into force.

This ministerial order shall enter into force the day following its publication in the "Official Gazette".

Madrid, 23 July 2015.-the Vice-President of the Government and Minister of the Presidency, Soraya Sáenz de Santamaría Antón.

Annex I professional qualification: auxiliary operations of masonry of factories and covered family professional: construction and Civil work level: 1 code: EOC271_1 competition general lifting construction of factory to invest, build factory for sloping roofs coverage stands, and auxiliary tasks at work chopping, fulfilling the requirements laid down in the field of health and safety and environmental protection for each specific project.



Competition UC0276_1 units: perform auxiliary construction UC0869_1: elaborate pastries, mortars, adhesives and concrete UC0142_1: build factories for UC0870_1: build panels for roofs environment professional scope professional develops its activity in the area of production dedicated / or ancillary operations in factories and works covered, in entities of a private nature, in small or micro enterprises with legal form of commercial company, but also as a self-employed worker. It develops its activity depending on your case, functional and/or hierarchical from a superior. In the development of the professional activity apply the principles of universal accessibility in accordance with the applicable legislation.



Productive sectors is located in the building industry, in the subsector relating to works of walls and partitions of factory, both for new construction and rehabilitation.



Occupations and jobs relevant terms from the following list of occupations and jobs are used with generic and all-inclusive nature of women and men.

Masons workers helpers of bricklayer factories helpers of Mason's sloping roofs pawns in the construction of buildings pawns of public works training associate (300 hours) training modules MF0276_1: auxiliary work of work (90 hours) MF0869_1: pastes, mortars, adhesives and concrete (30 hours) MF0142_1: structures to cover (90 hours) MF0870_1: coattails of covers (90 hours) unit of competition 1 : Work auxiliary in works of construction level: 1 code: UC0276_1 realizations professionals and completion criteria: RP 1: prepare the spaces and equipment work, within its sphere of competence, performance and quality required in carrying out entrusted auxiliary works, fulfilling instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each slave work and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 personal protection for auxiliary work teams to carry out, are selected according to the indications of the upper or Manager and the risks of the concrete pit, checking are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life, asking if his replacement.

CR 1.3 auxiliary and collective protection means installed by third-party, necessary in the pits where it is working, it is checked that are arranged in locations necessary to fulfill its function and which are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.4 the operations of installation, maintenance and removal of elements and parts of the auxiliary means and means of collective protection are carried out according to the training received to effect, following the instructions of the upper or Manager mode, disposition, term and conditions of health and safety.

CR 1.5 the ladders are used to checking that the contact points are stable, resistant and not sliding, fixing the locking mechanisms to prevent the opening or movement of its parts, and so avoid carrying heavy/bulky loads how to perform tasks that make it hard to support and decrease the stability of the worker.

CR 1.6 measures of safety and health for the auxiliary to develop work is collected requesting instructions – verbal and written - and confirming their understanding, consulting the documentation from the manufacturer of the equipment where appropriate.
CR 1.7 detected in the Tagus contingencies are resolved within its sphere of competence, and in your case by communicating to the superior or responsible required to enable monitoring and resolution promptly, especially which compromise safety and health itself or to third parties, in particular to gaps and edges without protection.

CR 1.8 the pits cleaning is carried out using the indicated means of escape and complying the frequency established, waste and debris in the container specified for each type of waste, and immediately removing objects and debris that can cause injury.

CR 1.9 of enclosure and signalling of work maintenance operations, according to instructions, checking that they limit other than the specified access and ensuring the visibility of signals.

CR 1.10 maintenance of end of day assigned to it are applied to different work teams used, compliance received indications and the manufacturer's instructions.

2 RP: Handling and hauling loads to supply and to order cuts and stockpiles, fulfilling the instructions and established safety and health measures.

CR 2.1 the lifting and lowering of loads with manual means are performed according to the instructions on ergonomics received, without exceeding the established load values corresponding to each case.

CR 2.2 distribution of materials is carried out according to established routes, respecting the signs of work and avoiding the dulling of other works.

CR 2.3 stockpiles of materials are made available and maximum height specified by the manufacturer and snapping those materials that require it.

CR 2.4 supplies required you are delivered at foot of Tagus carrying characteristics, quantities and requested.

CR 2.5 indications to lifting and transport machinery operators are staying outside the radius of action of the load, and adjusting to the space available for the displacement of the load and the maneuver of the handling equipment.

2.6 CR slings, straps, chains and fastening accessories are used by selecting them according to instructions regarding the load to lift and transport, clamping them at the points indicated, in a sufficiently safe manner and by activating the locking hooks and stopping mechanisms.

CR 2.7 of materials with maquinillos and elevators lift operations compliance procedures, yields, and established safety and health measures.

3 RP: Make trades and manual excavation AIDS to prepare and complete the corresponding cuts, operating with the tools and light machinery required and serving instructions and established safety and health measures.

CR 3.1 machines are visually checked regarding its state of conservation and installation, check the status of the pins and the insulation of the wires in the electrical machinery, as well as to have guards and frameworks for protection the operator, and if riding them to the effect.

CR 3.2 materials with cutting and miter cutting operations are carried out compliance procedures, yields and suitable safety and health measures.

CR 3.3 of partial demolition hammers groundbreaking operations compliance procedures, yields and provided health and safety measures.

CR 3.4 of slash- and -Groove cutters and drills drilling operations compliance procedures, yields and suitable safety and health measures.

CR 3.5 tubes of protection of lines and boxes of facilities, and back filling the rozas and holes are made using materials and procedures.

CR 3.6 ditches and wells that are excavated present plant dimensions adjusted to layout and guides the depth with respect to the reference level.

3.7 CR funds and surfaces of the castings have cleaning, leveling and inclination required conditions.

CR 3.8 of lands with trays and rammers compaction operations compliance procedures, yields and suitable safety and health measures.



Professional context: means of production: cleaning supplies. Useful for lifting and transportation: buckets, baskets and containers, hand trucks, slings, cables, tape, slings, hooks. Useful and geometrical control tools: levels, Plumb lines, brackets and tape measures. Tooling and Assembly tools: pliers, pliers. Manual excavation tools and tooling: shovels, picks, mattocks. Tools for demolition, roza and filling: cold chisel, hammers and mallets, pallets. Light machinery: maquinillos and cargo elevators, tables of cut and grinders, hammer breakers, Groove cutters and drills, trays and rammers. Pastes and mortars for rozas and holes filled. Protective pipes and facilities boxes. Personal protective equipment, means of collective protection, auxiliary means and temporary installations.



Products and results: spaces and prepared teams. Cliffs equipped and supplied. Aid offices and executed manual excavation.



Used or generated information: parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Technical and product security tabs. Verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



Unit 2 competition: Elaborate PASTRIES, MORTARS, adhesives and concrete level: 1 code: UC0869_1 realizations professionals and completion criteria: RP 1: prepare the teams, within its sphere of competence, to achieve performance and quality required in the preparation of mixtures, fulfilling the instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each mixture to develop and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 equipment for individual protection for the preparation of mixtures, are selected according to the indications of the upper or Manager and the risks of each processing in particular, checking are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life asking if his replacement.

CR 1.3 measures of safety and health for the preparation of mixtures is collected requesting instructions – verbal and written - and confirming their understanding, consulting the documentation from the manufacturer of the equipment where appropriate.

CR 1.4 detected in the Tagus contingencies are resolved within its sphere of competence, and if communicating them to the upper or Manager promptly required to enable monitoring and resolution, especially which commit own or third-party health and safety.

CR 1.5 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.6 maintenance of end of day assigned to it are applied to different work teams used, compliance received indications and the manufacturer's instructions.

RP 2: Develop all kinds of mixtures of work and pre-dosed - pastes, mortars, concretes, adhesives and materials for grouting-, both with manual means such as mechanics, to execute works of walling and cladding, serving both the instructions and the established health and safety and environmental protection measures.

CR 2.1 use products are used in conditions of safety and health indicated or recommended by the manufacturer as to their handling, storage, and storage.

CR 2.2 components used are specified according to the types, sizes and shapes of the aggregate, Binder class, class of additives, environmental conditions and conditions of commissioning work - manual, screening, pumping or others.

CR 2.3 components and the volume of water will provide the mixture according to the specifications set forth according to required consistency and resistance, and the settings that are required for workability.

CR 2.4 cementitious adhesives are mixed with the volume of water set, using potable or absence of organic matter or other foreign materials, water pouring the product dry on the water in the proportions indicated by the manufacturer and in the event of partial or total replacement of water by emulsions, serving also the proportion of substitution intended by the manufacturer.

2.5 CR adhesives and materials for grouting of reaction resins are obtained by mixing the components and using all of the content of the respective containers.

CR 2.6 kneading develops compliance specifications regarding equipment, speed, time of agitation, times of adjustability to add more quantity of any component, waiting time prior to re-knead and environmental conditions favourable.

CR 2.7 mixtures are prepared with the appropriate homogeneity and in demanded quantities.
CR 2.8 mixture is delivered, within the time frame specified respecting the above-mentioned conditions of workability, the period of maturation - or prior reaction time - and life.



Professional context: means of production: concrete mixers, blenders and mixers. Trowels, shovels, wheelbarrows, sieves, drawers, baskets, buckets, cuezos, troughs, pastera. Binders: lime, gypsum and cement. Aggregates: gravel, sand, expanded clay. Water. Additives. Components of the preloaded mixtures. Adhesives, cementitious and resin - reaction and dispersion-. Material of Grouting for coatings with rigid pieces. Personal protective equipment.



Products and results: prepared teams. Pastes, mortars, adhesives, materials for grouting and elaborated concretes, with application in: factories, coatings, sealing, reinforcement, gluing, sealing, grout, filling, levelling, anchor.



Used or generated information: parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Chips technical and security products verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Verbal and written instructions of head of team. Signalling of work.



Unit 3 competition: Build factories to take level: 1 code: UC0142_1 realizations professionals and completion criteria: RP 1: prepare spaces and teams, within its sphere of competence, as well as materials to place, for performance and quality required in the implementation of factories to re-dress, fulfilling the instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each factory to build and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 equipment individual protection for the construction of factories for coating, are selected according to the indications of the upper or Manager and the risks of the concrete pit, making sure are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life asking if his replacement.

CR 1.3 auxiliary and collective protection means installed by third parties, necessary in the cliffs of factories for coating, it is checked which are arranged in locations necessary to fulfill its function and that are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.4 measures of safety and health for workers to develop is collected requesting instructions – verbal and written - and confirming their understanding, by referring in its case the documentation from the manufacturer of the equipment and products.

CR 1.5 detected in the Tagus contingencies are resolved within its sphere of competence, and in your case by communicating to the superior or responsible required to enable monitoring and resolution promptly, especially which compromise safety and health itself or to third parties, in particular to gaps and edges without protection.

CR 1.6 cutting of parts - large format bricks, landings, unassembled or others - by cutting table or radial cutters rushing checking that the machines have protective housings and the disc is in good condition for use, making the cut without the disc to excessive pressure or excessive lateral or torque holding the element to be cut and controlling your mobility during cutting.

CR 1.7 bricks and blocks get wet in the collection or if checks that they have been conveniently spotted, before placement, according to the technical recommendations of the manufacturers.

CR 1.8 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.9 maintenance of end of day assigned to it are applied to different work teams used, compliance received indications and the manufacturer's instructions.

2 RP: Lift factories to brick, to obtain resistant elements, walls and partitions defined in project, fulfilling the instructions and established safety and health measures.

CR 2.1 elements are built with bricks of the specified type, using the special parts that you have indicated in your case for the resolution of singular points.

CR 2.2 the first course is partitioned according to the layout that defined you in terms of alignment and holes, having parts in dry and getting lock and rigging that have indicated minimizing parts trimming.

CR 2.3 bricks of small format or medium are always placed to rubs, having established grip mix.

CR 2.4 employees in non-resistant cloths large format bricks, are placed with adhesive provided songs and heads, pushing to ensure the grip between parts and, where appropriate, consolidate them temporarily to the sights.

CR 2.5 sores and horizontal joints obtained during placement mixture of grip inserts are adjusting the to the indicated thickness and, where appropriate, have the reinforcement of reinforcement in bed joints.

CR 2.6 element is built with the rig, flatness and aplomado specified, keeping the clearance specified between slab and upper course, and in the case of partitions also keeping the discontinuity on the structural joints that have restated it.

CR 2.7 encounters between brick elements are executed through the grasp of cloths across its thickness and the number of courses established.

CR 2.8 the cladding of walls is done having verified that the isolates have been applied and if any has plaster the inside of the outer leaf, obtaining the right thickness of air chambers, and locking meetings between cloths and mochetas.

CR 2.9 the mochetas avoiding the encounter of the sheeting with pillars running keeping the thickness of the air Chamber without leaving bridges - thermal/acoustic.

3 RP: Lift factories to clad block for the resistant elements, enclosures and partitions defined in project, fulfilling the instructions and established safety and health measures.

CR 3.1 the first course is partitioned according to the layout that defined you in terms of alignment and holes, having parts in dry and getting lock and rigging that have indicated minimizing parts trimming.

CR 3.2 blocks are placed with suitably moist surface of contact with the mortar, and in such a way that holes coincide in the entire height of the element.

CR 3.3 sores and horizontal joints obtained during placement are filled with mortar meets the thicknesses indicated, and in his case have armatures of reinforcement in bed joints.

CR 3.4 element is built with the rig, flatness and aplomado specified, keeping the clearance specified between slab and upper course and, in the case of partitions, also maintaining the discontinuity on the structural joints that have restated it.

CR 3.5 elements are built with blocks of the specified type, using the special parts that you have indicated in your case for the resolution of singular points.

CR 3.6 lightened blocks are arranged according to the procedure indicated by the manufacturers, if joining the tile and arranging mortar laces double in bed joints.

CR 3.7 encounters between factory of block elements are executed fulfilling specified the procedure and interlocking, and arranging the corresponding reinforcement reinforcement.

CR 3.8 the lintels in block factories are resolved according to the provisions in the construction system in terms of special parts and armour replace, supports amplitude and height, according to the whole.

CR 3.9 parts provided for according to the design of factory - lintels, pilasters, or other - elements, filled with concrete, prior placement of corresponding armatures, reaching the established level and compacted by manual means.

4 RP: Place complementary elements of the factories - elastic bands, landings, unassembled, fencing, insulation, plaster-to complete the construction solutions defined in project, fulfilling the instructions and established safety and health measures.

CR 4.1 soundproofing bands are placed in the spurt and meetings of factories for covering brick, following the reconsideration of alignments and voids, and fulfilling the established procedure for the establishment and the crowded together.

CR 4.2 reinforcement armatures are placed following the instructions received in terms of location, type, number, arrangement and procedure indicated.

CR 4.3 anchoring elements of factory pillars and slabs is executed following the instructions in terms of location, type and number of anchors and fixation procedure.

CR 4.4 the prefabricated landings of the lintels are placed aligned, centered in the hole, with planned deliveries and the indicated height.
CR 4.5 the frames and fences are placed in locations that have indicated, using the procedure of fixing or anchor and obtaining the leveling, plumbing and bracing required.

CR 4.6 the plastering by manual means to the inside of the outer leaf of double leaf walls, is performed with the mixture provided, reaching the stated thickness and without thermal bridges between both sides of the camera.

CR 4.7 panels and sheeting walls insulation blankets are placed to overlap or overcrowded and fixation procedure established.

CR 4.8 insulating panels layer places separated from the outer foil by elements of separation, or in your case featuring panels on the wall covering, with edges in contact with each other, fulfilling the fixation procedure laid down, forming a continuous, flat surface along all the cloth.

CR 4.9 insulation in the form of blankets is placed the overlap and fixation procedure established.

CR 4.10 filling the gap between slab and upper course is carried out once after the deadline, using the material for specified joint filler.



Professional context: means of production: useful and geometrical control tools: levels, Plumb lines, brackets and tape measures, miras and Twine. Useful and masonry tools: trowels, shovels, saws and saws. Containers: trucks, drawers, baskets and buckets. Light machinery: cutting tables, radial cutting. Grip and filling mixtures: mortars of work and industrial, gypsum pastes. Bricks to cover: perforated, conventional holes and hollows of large format. Blocks of concrete and ceramic. Special parts. Thermal and acoustic insulation for wall covering of walls. Elastic bands for landings, frames and fences dividing and separating walls. Anchors structural elements. Personal protective equipment, means of collective protection, auxiliary means and temporary installations.



Products and results: spaces and prepared teams. Built factory for brick and block elements: resistant elements, walls, partitions. Factory to be built elements: resistant elements, walls, partitions.



Used or generated information: sketches of work related factories of masonry. Parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Technical and product security tabs. Verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



Unit 4 competition: Build panels for covered level: 1 code: UC0870_1 realizations professionals and completion criteria: RP 1: prepare the spaces and work teams, within its sphere of competence, as well as materials to place, for performance and quality required in the execution of coattails of factory for sloping roofs, fulfilling the instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each skirt to build and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 the individual protection equipment for the construction of factory panels, are selected according to the indications of the upper or Manager and the risks of the concrete pit, making sure are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life asking if his replacement.

CR 1.3 media assistants and installed by third parties, required collective protection in the cliffs of covers, checks that are available at the locations needed to fulfil its role and that they are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.4 measures of safety and health for workers to develop, is collected requesting instructions – verbal and written - and confirming their understanding, by referring in its case the documentation from the manufacturer of the equipment and products.

CR 1.5 detected in the Tagus contingencies are resolved within its sphere of competence, and in your case by communicating to the superior or responsible required to enable monitoring and resolution promptly, especially which compromise safety and health itself or to third parties, in particular to gaps and edges without protection.

CR 1.6 cutting of parts - bards, concrete slabs or other - by cutting table or radial cutters rushing checking that the machines have protective housings and the disc is in good condition for use, making the cut without the disc to excessive pressure or excessive lateral or torque holding the element to be cut and controlling your mobility during cutting.

CR 1.7 bricks and Bards are moistened in the collection or if checks that they have been conveniently spotted, before placement, according to the technical recommendations of the manufacturers.

CR 1.8 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.9 maintenance of end of day assigned to it are applied to different work teams used, compliance received indications and the manufacturer's instructions.

2 RP: Lift partitions partition bricks iron for sloping roofs boards supports defined in project, fulfilling the instructions and established safety and health measures.

CR 2.1 the first course is partitioned according to the layout that defined you in terms of alignment and holes, having parts in dry and getting lock and rigging that have indicated minimizing parts trimming.

CR 2.2 bricks are always placed to rubs, having established grip mix.

CR 2.3 SEPTA are constructed with the rig, flatness and aplomado specified, reaching the descent of upper cord indicated and, where appropriate, also maintaining the discontinuity on the structural joints that have restated it.

CR 2.4 meetings between partitions are executed through the grasp of cloth across their thickness and the number of rows set.

CR 2.5 elements that emerge from the cover and the holes are protected during the execution of the works, allowing to keep its functionality.

3 RP: Build in ceramic material and with concrete plates, boards for the coattails of sloping roofs defined in project, fulfilling the instructions and established safety and health measures.

CR 3.1 bards and precast concrete plates partition iron stable way, and with parallel parts, level and rejuntadas, and in his case are arranged on SEPTA Groove.

CR 3.2 the burden-sharing of the compression layer mesh available previously to the dumping of concrete, with spacers to lift it over the level of the Board, and occupying the entire surface to counter-boring.

CR 3.3 compression layer runs regleando or maestreando, having in its case the mesh of burden-sharing, and its surface reaches the thickness and flatness.

CR 3.4 elements that emerge from the cover and the holes are protected during the execution of the works, allowing to keep its functionality.

4 RP: Place the thermal/acoustic insulation of sloping roofs to complete building solutions defined in project, fulfilling the instructions and established safety and health measures.

4.1 CR insulating material on lagging in the form of blankets spreads covering the entire surface between partitions partition iron, with the part that constitutes the vapor barrier facing the inside of the building.

4.2 CR insulation blankets-shaped stands covering the entire surface between partitions partition iron and tracing the perimeter deliveries until the height of overlap is indicated.

CR 4.3 layer of insulation panels stands featuring panels with edges in contact each other or rafters – if they are interspersed among them - and the courses to staggered, forming a continuous, flat surface along the entire roof.

CR 4.4 insulation panels are attached to boards or sloping floors, according to instructions received in terms of type of fixation - mechanical or using adhesives-, and number of postings by panel or allocation of adhesive to apply.

CR 4.5 elements that emerge from the cover and the holes are protected during the execution of the works, allowing to keep its functionality.



Professional context: means of production:
Useful and geometrical control tools: levels, Plumb lines, brackets and tape measures, miras and Twine. Useful and masonry tools: trowels, shovels, tongs, pliers, hammers, maces. Equipment and mechanical fixing elements: nail gun by drive, taladro-percutor, Bosch, nails, screws and plugs. Containers: trucks, drawers, baskets and buckets. Light machinery: cutting tables, radial cutting. Grip and filling mixtures: mortars of work and industrial, gypsum pastes, light mortars. Bards, single and double hollow brick, precast concrete plates and hollow planks. Insulating materials: blankets and panels. Personal protective equipment, means of collective protection, auxiliary means and temporary installations.



Products and results: spaces and prepared teams. Partitions partition built iron. Built in ceramic material sloping roof and precast concrete, boards. Layers of blankets or panels, placed inclined roof heat insulation.



Used or generated information: sketches of work associated with sloping roofs. Parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Technical and product security tabs. Verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



TRAINING module 1: LABORES auxiliary of work level: 1 code: MF0276_1 associated with UC: auxiliary jobs in construction duration: 90 hours capabilities and evaluation criteria: C1: describe occupational hazards on construction sites, identifying basic criteria of prevention, rules of correct use of work equipment and means of collective protection functions, and interpreting the signs of work.

CE1.1 identify the most frequent construction risks, associating prevention and protection measures related to these.

CE1.2 interpret frequency and incidence of work accidents rates total and individuals from the construction industry, on the basis of actual statistics presented.

CE1.3 to relate the causes and consequences of accidents in the construction sector, differing according to the kinds of injuries: mild, serious, very serious or deadly.

CE1.4 list the causes of fatal and serious accidents that occurred in the sector of construction recently, using the published statistics of the last period.

CE1.5 interpret works signage identifying it in different situations presented.

C2: Applied techniques of installation and maintenance of auxiliary means and collective protection common in construction, own your competition, fulfilling the safety conditions laid down.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.

CE2.2 in a so-called practical of a particular representative of a building construction pit, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a so-called practical of a particular representative of a work of estate tajo, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.4 in a practical case of a pit representative of construction, to check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.

CE2.5 in a practical course of a cut of construction, assemble and disassemble the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Handling and hauling loads, according to the instructions received in terms of working methods and conditions of security.

CE3.1 relate the forms of delivery standard for each type of building materials, specifying download, transport and collection processes recommended for them.

CE3.2 interpret the parts of request and receipt of materials, estimating the volume and weight of a stated amount of material.

CE3.3 lifting loads manually implemented procedures to prevent injury from overexertion.

CE3.4 in a practical course of a cut of construction supply, supply materials and equipment meet the requirements requested type, quantity, location, layout and time, by selecting the working and personal protective equipment required, and applying maintenance tasks that we indicate it upon completion of the activity.

CE3.5 in a practical case of displacement of loads, instruct the operator of lifting machinery required maneuvers, with the clarity and precision required and complying with the security measures established.

C4: Operate tools and light machines in support trades work, following the instructions received in terms of working methods and conditions of security.

CE4.1 in a practical course of made up of different materials, cuts by selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of method, geometry and term.

CE4.2 in a practical course of demolition manual, carry out partial demolitions of building elements, selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of method, surface, fragmentation and term.

CE4.3 in a practical course of AIDS facilities, make rozas on constructive elements, selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of method, geometry and term.

CE4.4 in a practical course of earthmoving by manual means:-select the required work and personal protective equipment.

-Dig a ditch from the dimensions shown, leveling the funds shaping up the sides with manual means, and fulfilling the requirements in terms of method, geometry and term.

-Fill the trench with part of the excavated earth, compacting it by manual means, fulfilling the requirements in terms of method, arrangement and composition of layers of filling and term.

-Apply operations of end of day indicated to the equipment used.

Skills whose acquisition must be completed in a real work environment: C2 concerning CE2.2, CE2.3, CE2.4 and CE2.5; C3 on CE3.4 and CE3.5; C4 complete.

Other skills: be responsible for the work that develops.

Complete the work according to criteria of fitness, speed, economy and efficiency.

Communicate effectively with the right people at any given time, respecting the channels established in the organization.

Interpret and execute work instructions.

Keep the work area with the degree of order and cleanliness required in the organization.

Adapt to the Organization, to its organisational and technological changes; as well as to new contexts or situations.



Contents: 1. basic security in construction law relating to prevention and safety and health on construction sites.

Occupational accidents and diseases: types, causes, effects, and statistics.

Risk and prevention in open pits, machines, equipment and auxiliary means.

Performance and first aid in case of accident procedures.

Personal protective equipment. Types, standards and criteria of use.

Security tools, tooling, and material handling.

Safety signage and fencing works.

Safety in installations and electrical equipment.

Safety in use of scaffolding, platforms and stairs.

Security in operation maquinillos, hoists, cranes and conveyors.

Security in light of works machinery.

Security in landslides, rockfalls and contentions.



2. conditioning of cliffs, gorges and billets for cleaning, maintenance of pits, disposal of waste.

Installation and removal of auxiliary means and collective protection.

Materials, features, densities, and forms of supply: bulk, packaging and palletizing.

Conditions of storage: resistance of the bracket, height of stacking and environmental factors.

Recommendations of discharge, transport and storage, codes and symbols.

Transport of loads in works, means manual and mechanical means; lifting works, means manual and mechanical means.

Equipment for packaging of pits: types, functions; selection, testing and management.

Equipment for supply of pits: types and functions; selection, testing and management; maintenance, preservation and storage.

Individual protection, collective protection, auxiliary means; maintenance, preservation and storage.

Temporary work facilities.

Works signage.
Occupational and environmental-specific conditioning and supply cuts, preventive measures.

Materials, techniques and innovative recent implementation.



3 operations support offices and excavation by means of manual processes and conditions of aid with light machinery: materials with cutting and miter cutting; partial demolition of elements with groundbreaking hammers; compaction of fillers with vibrating plates and rammers; Roza and elements with Groove cutters and drills drilling, protective cables and rozas filling tubes.

Processes and conditions of execution of excavations, profiled and refiners of ditches and pits: plant layouts and depths, excavation with manual means; refiners with earrings, put in layers of concrete cleaning work, profiled lateral and horizontal funds. Equipment: types and functions; selection, testing and management; maintenance, preservation and storage.

Occupational and environmental-specific aid operations offices and digging with hand tools, prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to auxiliary work in construction, which will be using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 2: pastes, MORTARS, adhesives and concrete level: 1 code: MF0869_1 associated with UC: elaborate pastries, mortars, adhesives and concrete duration: 30 hours capacity and evaluation criteria: C1: describe the processes of mixes of work and pre-dosed, identifying components, linking the different types of applications, and specifying methods of work.

CE1.1 describe the scope of a given mixture, knowing their composition.

CE1.2 interpret the meaning of technical terms used in work on mixtures of grip, screed and finish construction, specifying if the differences between different mixtures.

CE1.3 recognize the type of a mixture of work submitted, identifying the components - which are appreciable to simple view-which is made up of and describing processing.

CE1.4 describe the materials and innovative techniques in preparation of mixtures of grip, screed and finish construction, appreciating its importance.

C2: Prepare work blends and pre-dosed, fulfilling the instructions received in terms of working methods and conditions of health and safety.

CE2.1 set composition and dosage of a mixture determined by their strength, consistency, adherence or workability, conditions following tables and nomograms indicated.

CE2.2 set the correction at the dosage of a mixture of cementitious adhesive for the partial or total replacement of water by a given emulsion, following the manufacturer's instructions.

CE2.3 specify conditions of kneading, reamasado, time of adjustability, maturation and lifespan of a given mixture, starting with the manufacturer's instructions.

CE2.4 describe the effect of conditions on the preparation and properties of mixtures, specifying under what circumstances will be contraindicated to proceed with the development.

CE2.5 in a so-called practical preparation of mixtures of work, prepare the mixtures requested by selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of procedure, volume and term.

Skills whose acquisition must be completed in a real work environment: C2 with respect to CE2.5.

Other capabilities: interpret and execute work instructions.

Comply with the rules of production set by the organization.

Responsible for the work that develops.

Keep the work area with the degree of order and cleanliness required by the organization.

Learn new concepts or procedures and to effectively leverage the training, using the knowledge acquired.

Get used to the pace of work of the organization.



Contents: 1. work blends and pre-dosed in building mortars and pastes from work.

Pre-dosed mortar and pasta.

Drawn on the tajo and prepared concrete.

Types of concrete: concrete mass, armed, prestressed and reinforced; high-strength concretes, lightened and special.

Components of mixtures of work: binders, additives, gravel, sand, water, reinforcement and reinforcing fibers.

Cementitious adhesives. Adhesive resins in dispersion. Adhesives and materials for grouting of reaction resins.

Components of the preloaded mixtures: binders, additives, sand, water and emulsions.

Dosage: type, characteristic strength, consistency, maximum size of aggregate and ambient, plasticity and strength. Applications.

Main obligations of the regulations.

Trials to be carried out on mixtures of work.

Quality seals and approved brands.



2 processes of mixes of work and pre-dosed in construction processes and conditions of manufacture of pastes and mortars: identification and control of components, in weight and volume dosing, dosing corrections; kneading with manual and mechanical means, and water intake; filling shipping containers; environmental conditions for the preparation of mortars and pastes.

Processes and conditions of manufacture of concrete: identification and control of components; dosage in weight and volume, corrections of dosage; kneading with manual and mechanical means, and water intake; filling shipping containers; environmental conditions for the elaboration of concretes.

Processes and conditions of manufacture of adhesives and materials for grouting: identification and control of components; corrections of dosage; kneading with manual and mechanical means; filling shipping containers; environmental conditions for the production of adhesives and materials for grouting.

Equipment: types and functions; selection, testing and management; personal protective equipment.

Risk labor and environmental; prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the development of pastes, mortars, adhesives and concrete, will be credited by using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 3: works from factory to take level: 1 code: MF0142_1 associated with UC: build factories for duration: 90 hours capabilities and evaluation criteria: C1: describing the processes of factory works for, identifying types of factories and specifying materials and working methods of these pits.

CE1.1 interpret the meaning of technical terms used in masonry work according to the situation of work in which they are presented.

CE1.2 list the types of factories of masonry coating, classifying them according to components and functions.

CE1.3 describe the work required to raise a certain factory of masonry coating on a defined layout, specifying the method and sequence of the same.

CE1.4 describe common defects in the execution of factories to cover, by associating its causes and effects.

CE1.5 identify components, mixtures, indicated for a given factory grip and tackle recoating, describing the grasp meetings and singular points.

CE1.6 describe materials, equipment and technical innovators in factories works for, assessing their importance.
C2: Apply mounting techniques and maintenance of auxiliary means and collective protection common in works of factories to take, within its competence, fulfilling the established health and safety conditions.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.

CE2.2 in a practical course of a particular representative of a factory work run for cover, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a practical course of a representative of a factory work run for cover, check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.

CE2.4 in a practical case of a representative of a brickwork Tagus for coating, mounting and dismounting the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Apply to factories, brick and block construction techniques, following the instructions received in terms of working methods and conditions of health and safety.

CE3.1 define the conditions of execution and quality of a given stumps for factories to re-dress, interpreting the instructions received.

CE3.2 in a practical course of construction of a factory for brick:-identify references for reconsideration, and place the band of soundproofing, proceeding to deal the first course according to the specified store dry.

-Select the work and personal protective equipment required, justifying the choice of the cutting equipment.

-Lift the element with dimensions and certain thicknesses, fulfilling the conditions and tolerances specified in terms of rig, horizontal courses, flatness and Plumb.

-Make an encounter with another element of factory for brick, obtaining the specified locking.

-Place loading bays a factory element fulfilling the instructions received.

-Place insulation panels in lined a factory item according to the conditions of fixation and overlap.

-Apply operations of end of day indicated to the equipment used.

CE3.3 in a practical course of construction of a factory to block:-identify references for reconsideration, and proceed to cast the first course according to the specified store dry.

-Select the work and personal protective equipment required, justifying the choice of the cutting equipment.

-Lift the element with dimensions and certain thicknesses, fulfilling the conditions and tolerances specified in terms of rig, horizontal courses, flatness and Plumb.

-Make an encounter with another element of factory for brick, obtaining the specified locking.

-Place loading bays a factory element fulfilling the instructions received.

-Place insulation panels in lined a factory item meeting the above-mentioned conditions of distribution and fixing.

-Apply operations of end of day indicated to the equipment used.

Skills whose acquisition must be completed in a real work environment: C2 concerning CE2.2, CE2.3, and CE2.4; C3 CE3.2 and CE3.3.

Other capabilities: get used to the pace of work of the organization.

Interpret and execute work instructions.

Responsible for the work that develops.

Keep the work area with the degree of order and cleanliness required by the organization.

Demonstrate interest and concern by satisfactorily meet the needs of customers.

Identify the production process of the organization.



Contents: 1. works of factories to cover masonry types of factories of masonry: factories for covering, views factories.

Constructive solutions: sections; starts; meetings; hollow; other singular points.

Relations of factories and other work items.

Materials for factories to be coated: mixtures of grip and filling; mortars for plaster; bricks punched and hollow; ceramic blocks and Hollow bricks in large format; blocks, concrete items and lightened; Special parts, armatures, sound-proofing, insulation bands.

Quality seals and markings approved masonry materials.

Equipment for factories to be coated: types and functions; selection, testing and management; personal protective equipment, media assistants and collective protection; maintenance, preservation and storage.

Materials, techniques and innovative recent implementation.



2. performance of factories for covering brick processes and conditions for performance of factories to brick: supply; preparation and humidification of parts; placement of soundproofing, cast dry bands; placement; enjarje; Anchorage to the structure; received landings, fences and frames; temporary bracing; Filling joints with floor slabs; placement of insulation in dry lining; cleaning; rendered in chambers; protection against rain, Frost and heat.

Conditions of factories for covering brick quality: adjust layout; rig; flatness; crash; horizontality of courses; thickness of boards; Plumb sores; fixing of insulation; expansion joints; enjarjes meetings; cleaning and appearance.

Common implementation defects in factories to brick: causes and effects.

Safety and health in construction of factories for coating: risks and prevention measures; installation and removal of auxiliary means and collective protection.



3. performance of factories to block processes and conditions for performance of factories to block: supply; preparation and humidification of parts; placement of bands of soundproofing; cast dry; placement; Anchorage to the structure; enjarje; meetings, placement of reinforcement and Pack; execution of landings received from fences and frames; temporary bracing; cleaning, protection against rain, Frost and heat.

Quality in factories to block: set to layout; rig; flatness; crash; horizontality of courses; thickness of boards; separation of mortar in the same horizontal joint lines; Plumb sores; fixing of insulation; expansion joints; meetings; placement of reinforcement and Pack, cleaning and appearance.

Common implementation defects in factories to block: causes and effects.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the construction of factories for coating, which will be credited by using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 4: COATTAILS of covered level: 1 code: MF0870_1 associated with UC: build panels for roofs duration: 90 hours capabilities and evaluation criteria: C1: describe the processes of execution of works of sloping roofs, specifying materials and methods of construction of different types of skirts and their components.

CE1.1 recognize the type and components of a given sloping roof, pointing out the same function.

CE1.2 interpret the meaning of technical terms used in works of pitched roof according to the situation of work in which they are presented.

CE1.3 describe the work required to lift a septum popcorn on a defined layout, specifying method and sequence of the same.

CE1.4 identify components, mixtures of grip and tackle suitable for partitions partition a cover certain iron, describing the grasp meetings and singular points.

CE1.5 specify method and sequence of work required to build the boards of sloping roofs and place insulation, differing according to the material - ceramic, concrete - to use.

CE1.6 identify components, layout and fixing indicated for boards and the thermal insulation of roofs, describing the grasp meetings and singular points.

CE1.7 describe common implementation defects in skirts of factory for sloping roofs, their causes and effects.
CE1.8 describe the materials, equipment and technical innovators in works of coattails of sloping roofs, evaluating its importance.

C2: Apply mounting techniques and maintenance of auxiliary means and collective protection common in works of slashes, typical of their competence covers skirts, fulfilling the established health and safety conditions.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.

CE2.2 in a so-called practical of a particular representative of a work of factory skirts tajo, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a practical case of a pit representative of a coattails of factory work, to check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.

CE2.4 in a practical case of a pit representative of a work of factory panels, mounting and dismounting the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Applying techniques of construction of factories for lifting partitions partition iron and running boards of the aprons of different types of sloping roofs, with insulating material and following the instructions received in terms of working methods and conditions of health and safety.

CE3.1 describe the conditions of execution and quality of a given run, interpreting the instructions received.

CE3.2 in a practical course of construction of partitions partition iron:-identify references for reconsideration, and proceed to cast the first course according to the specified store dry.

-Select the work and personal protective equipment required, justifying the choice of the cutting equipment.

-Lift the partition (s) with dimensions and certain thicknesses, fulfilling the conditions and tolerances specified in terms of rig, horizontal courses, flatness, poised and tilt of the top chord.

-To make a meeting between partitions partition iron obtaining the specified locking.

-Put blankets of insulation on the lagging between partitions partition iron making matches and overlaps in the conditions laid down.

-Apply operations of end of day indicated to the equipment used.

CE3.3 in a practical course of construction of boards with different materials:-select the work and personal protective equipment required, justifying the choice of the cutting equipment.

-Build ceramic Panel in one of the aprons, and concrete, plate serving both the quality conditions.

-Run the compression layer on any of the boards placed previously, fulfilling the conditions of quality.

-Place and attach panels of thermal insulating material on some of the skirts, fulfilling the conditions of quality.

-Apply operations of end of day indicated to the equipment used.

Skills whose acquisition must be completed in a real work environment: C2 concerning CE2.2, CE2.3, and CE2.4; C3 CE3.2 and CE3.3.

Other capabilities: get used to the pace of work of the company.

Interpret and execute work instructions.

Responsible for the work that develops.

Keep the work area with the degree of order and cleanliness required by the organization.

Comply with the rules of production set by the organization.

Respect the procedures and the internal rules of the organization.



Contents: 1. factory types of roofs pitched roof panels.

Constructive solutions: heavy duty stand, startups, meetings, other singular points.

Covers elements and other elements of work relations.

Pitched factory roof components: partitions partition iron, boards, layers of formation of common materials and outstanding function.

Materials for pitched factory roof panels: mixtures of grip and screed; single and double Hollow bricks, bards and hollow-planks; prefabricated concrete slabs; reinforcement for compression, insulation layer. Quality stamps and trademarks approved in skirts of pitched factory roof materials.

Equipment for execution of pitched factory roof panels: types and functions; selection, testing and management; personal protective equipment, media assistants and collective protection; maintenance, preservation and storage.

Materials, techniques and innovative recent implementation.



2. performance of panels covers inclined factory processes and conditions of construction of partitions partition iron: supply; preparation and humidification of parts; cast dry; placement; enjarjes meetings; placement of blankets of insulation on lagging; protection against rain, Frost and heat.

Processes and conditions for performance of boards of factory: supply; preparation and humidification of parts; placement of armour reinforcement, implementation of master and walling of the compression layer; placement of insulation on the finished board panels; protection against rain, Frost and heat.

Placement of insulation: preparation of parts; placement; fixing.

Quality: adjust to redesign, pending lace upper; flatness; crash and horizontality of courses of SEPTA; flatness of Board and the layer of compression, distribution of isolation, distribution and fixing of insulation blankets.

Common implementation defects: causes and effects.

Safety and health at works of pitched factory roof panels: risks and prevention measures; installation and removal of auxiliary means and collective protection.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the construction of panels for roofs, which will be using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.

Annex II professional qualification: operations in support of continuous construction family professional finishes: construction and Civil work level: 1 code: EOC272_1 general competition prepare brackets to make coatings with mortars, pastes, and paints, execute ' buena vista' unclad and trim, apply primers and protective paints, and auxiliary in chopping work, fulfilling the technical instructions and requirements laid down in the field of health and safety tasks.



Competition UC0276_1 units: perform auxiliary construction UC0869_1: develop pastes, mortars, adhesives and concrete UC0871_1: clean up and regularize stands for coating in construction UC0872_1: perform unclad and trimmed «to buena vista» UC0873_1: apply primers and protective paints in construction environment professional scope professional develops its activity in the area of production, dedicated / or ancillary operations in works of continuous linings in private entities, enterprises of small or micro-enterprises, with legal form of commercial company, but also as a self-employed worker. It develops its activity depending on, where appropriate, functional and/or hierarchical from a superior. In the development of their professional activity apply the principles of universal accessibility in accordance with the applicable legislation.



Productive sectors lies in the construction sector, mainly in the subsectors of conventional and finishes finishes with special construction, both for new construction and rehabilitation benefits.



Occupations and jobs relevant terms from the following list of occupations and jobs are used with generic and all-inclusive nature of women and men.

Aides of masons of continuous linings helpers of painters of the construction laborers in the construction of buildings pawns of public works training associate (330 hours) training modules MF0276_1: auxiliary work of work (90 hours) MF0869_1: pastes, mortars, adhesives and concrete (30 hours) MF0871_1: treatment of supports for coating in construction (60 hours)
MF0872_1: Coverings and trimmed «to buena vista» (60 hours) MF0873_1: paint and primer materials and guards in construction (90 hours) unit of competition 1: perform work auxiliary in works of construction level: 1 code: UC0276_1 realizations professionals and completion criteria: RP 1: prepare the spaces and equipment work, within its sphere of competence, performance and quality required in the commissioned auxiliary work fulfilling the instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each slave work and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 personal protection for auxiliary work teams to carry out, are selected according to the indications of the upper or Manager and the risks of the concrete pit, checking are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life, asking if his replacement.

CR 1.3 auxiliary and collective protection means installed by third-party, necessary in the pits where it is working, it is checked that are arranged in locations necessary to fulfill its function and which are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.4 the operations of installation, maintenance and removal of elements and parts of the auxiliary means and means of collective protection are carried out according to the training received to effect, following the instructions of the upper or Manager mode, disposition, term and conditions of health and safety.

CR 1.5 the ladders are used to checking that the contact points are stable, resistant and not sliding, fixing the locking mechanisms to prevent the opening or movement of its parts, and so avoid carrying heavy/bulky loads how to perform tasks that make it hard to support and decrease the stability of the worker.

CR 1.6 measures of safety and health for the auxiliary to develop work is collected requesting instructions – verbal and written - and confirming their understanding, consulting the documentation from the manufacturer of the equipment where appropriate.

CR 1.7 detected in the Tagus contingencies are resolved within its sphere of competence, and in your case by communicating to the superior or responsible required to enable monitoring and resolution promptly, especially which compromise safety and health itself or to third parties, in particular to gaps and edges without protection.

CR 1.8 the pits cleaning is carried out using the indicated means of escape and complying the frequency established, waste and debris in the container specified for each type of waste, and immediately removing objects and debris that can cause injury.

CR 1.9 of enclosure and signalling of work maintenance operations, according to instructions, checking that they limit other than the specified access and ensuring the visibility of signals.

CR 1.10 maintenance of end of day assigned to it are applied to different work teams used, compliance received indications and the manufacturer's instructions.

2 RP: Handling and hauling loads to supply and to order cuts and stockpiles, fulfilling the instructions and established safety and health measures.

CR 2.1 the lifting and lowering of loads with manual means are performed according to the instructions on ergonomics received, without exceeding the established load values corresponding to each case.

CR 2.2 distribution of materials is carried out according to established routes, respecting the signs of work and avoiding the dulling of other works.

CR 2.3 stockpiles of materials are made available and maximum height specified by the manufacturer and snapping those materials that require it.

CR 2.4 supplies required you are delivered at foot of Tagus carrying characteristics, quantities and requested.

CR 2.5 indications to lifting and transport machinery operators are staying outside the radius of action of the load, and adjusting to the space available for the displacement of the load and the maneuver of the handling equipment.

2.6 CR slings, straps, chains and fastening accessories are used by selecting them according to instructions regarding the load to lift and transport, clamping them at the points indicated, in a sufficiently safe manner and by activating the locking hooks and stopping mechanisms.

CR 2.7 of materials with maquinillos and elevators lift operations compliance procedures, yields, and established safety and health measures.

3 RP: Make trades and manual excavation AIDS to prepare and complete the corresponding cuts, operating with the tools and light machinery required and serving instructions and established safety and health measures.

CR 3.1 machines are visually checked regarding its state of conservation and installation, check the status of the pins and the insulation of the wires in the electrical machinery, as well as to have guards and frameworks for protection the operator, and if riding them to the effect.

CR 3.2 materials with cutting and miter cutting operations are carried out compliance procedures, yields and suitable safety and health measures.

CR 3.3 of partial demolition hammers groundbreaking operations compliance procedures, yields and provided health and safety measures.

CR 3.4 of slash- and -Groove cutters and drills drilling operations compliance procedures, yields and suitable safety and health measures.

CR 3.5 tubes of protection of lines and boxes of facilities, and back filling the rozas and holes are made using materials and procedures.

CR 3.6 ditches and wells that are excavated present plant dimensions adjusted to layout and guides the depth with respect to the reference level.

3.7 CR funds and surfaces of the castings have cleaning, leveling and inclination required conditions.

CR 3.8 of lands with trays and rammers compaction operations compliance procedures, yields and suitable safety and health measures.



Professional context: means of production: cleaning supplies. Useful for lifting and transportation: buckets, baskets and containers, hand trucks, slings, cables, tape, slings, hooks. Useful and geometrical control tools: levels, Plumb lines, brackets and tape measures. Tooling and Assembly tools: pliers, pliers. Manual excavation tools and tooling: shovels, picks, mattocks. Tools for demolition, roza and filling: cold chisel, hammers and mallets, pallets. Light machinery: maquinillos and cargo elevators, tables of cut and grinders, hammer breakers, Groove cutters and drills, trays and rammers. Pastes and mortars for rozas and holes filled. Protective pipes and facilities boxes. Personal protective equipment, means of collective protection, auxiliary means and temporary installations.



Products and results: spaces and prepared teams. Cliffs equipped and supplied. Aid offices and executed manual excavation.



Used or generated information: parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Technical and product security tabs. Verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



Unit 2 competition: Elaborate PASTRIES, MORTARS, adhesives and concrete level: 1 code: UC0869_1 realizations professionals and completion criteria: RP 1: prepare the teams, within its sphere of competence, to achieve performance and quality required in the preparation of mixtures, fulfilling the instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each mixture to develop and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 equipment for individual protection for the preparation of mixtures, are selected according to the indications of the upper or Manager and the risks of each processing in particular, checking are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life asking if his replacement.

CR 1.3 measures of safety and health for the preparation of mixtures is collected requesting instructions – verbal and written - and confirming their understanding, consulting the documentation from the manufacturer of the equipment where appropriate.
CR 1.4 detected in the Tagus contingencies are resolved within its sphere of competence, and if communicating them to the upper or Manager promptly required to enable monitoring and resolution, especially which commit own or third-party health and safety.

CR 1.5 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.6 maintenance of end of day assigned to it are applied to different work teams used, compliance received indications and the manufacturer's instructions.

RP 2: Develop all kinds of mixtures of work and pre-dosed - pastes, mortars, concretes, adhesives and materials for grouting-, both with manual means such as mechanics, to execute works of walling and cladding, serving both the instructions and the established health and safety and environmental protection measures.

CR 2.1 use products are used in conditions of safety and health indicated or recommended by the manufacturer as to their handling, storage, and storage.

CR 2.2 components used are specified according to the types, sizes and shapes of the aggregate, Binder class, class of additives, environmental conditions and conditions of commissioning work - manual, screening, pumping or others.

CR 2.3 components and the volume of water will provide the mixture according to the specifications set forth according to required consistency and resistance, and the settings that are required for workability.

CR 2.4 cementitious adhesives are mixed with the volume of water set, using potable or absence of organic matter or other foreign materials, water pouring the product dry on the water in the proportions indicated by the manufacturer and in the event of partial or total replacement of water by emulsions, serving also the proportion of substitution intended by the manufacturer.

2.5 CR adhesives and materials for grouting of reaction resins are obtained by mixing the components and using all of the content of the respective containers.

CR 2.6 kneading develops compliance specifications regarding equipment, speed, time of agitation, times of adjustability to add more quantity of any component, waiting time prior to re-knead and environmental conditions favourable.

CR 2.7 mixtures are prepared with the appropriate homogeneity and in demanded quantities.

CR 2.8 mixture is delivered, within the time frame specified respecting the above-mentioned conditions of workability, the period of maturation - or prior reaction time - and life.



Professional context: means of production: concrete mixers, blenders and mixers. Trowels, shovels, wheelbarrows, sieves, drawers, baskets, buckets, cuezos, troughs, pastera. Binders: lime, gypsum and cement. Aggregates: gravel, sand, expanded clay. Water. Additives. Components of the preloaded mixtures. Adhesives, cementitious and resin - reaction and dispersion-. Material of Grouting for coatings with rigid pieces. Personal protective equipment.



Products and results: prepared teams. Pastes, mortars, adhesives, materials for grouting and elaborated concretes, with application in: factories, coatings, sealing, reinforcement, gluing, sealing, grout, filling, levelling, anchor.



Used or generated information: parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Chips technical and security products verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Verbal and written instructions of head of team. Signalling of work.



Unit 3 competition: RESTRUCTURE and REGULARIZE stands for coating in construction level: 1 code: UC0871_1 realizations professionals and completion criteria: RP 1: prepare the spaces and equipment work, within its sphere of competence, performance and quality required in the treatment of lining supports, fulfilling the instructions and the applicable regulations of health and safety and environmental protection.

1.1 CR machines, tools and tooling to be used for each bracket to try and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

CR 1.2 supports treatment for individual protective equipment, are selected according to the indications of the upper or Manager and the risks of the concrete pit, checking that certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life, they are asking if their replacement.

CR 1.3 media assistants and installed by third parties, required collective protection in the cliffs of cladding, checks that are available at the locations needed to fulfil its role and that they are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.4 measures of safety and health for workers to develop, is collected requesting instructions – verbal and written - and confirming their understanding, consulting the documentation from the manufacturer of the equipment where appropriate.

CR 1.5 detected in the Tagus contingencies are resolved within its sphere of competence, and in your case by communicating to the superior or responsible required to enable monitoring and resolution promptly, especially which compromise safety and health itself or to third parties, in particular to gaps and edges without protection.

CR 1.6 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.7 assigned end-of-day peacekeeping operations apply to the different work teams used, compliance received indications and the manufacturer's instructions.

2 RP: Protect elements, both the support in your environment, so that they may be affected during treatment and rear cladding, work instructions and established safety and health measures.

CR 2.1 instructions regarding the protection of elements of the support and its environment are collected, specifying the elements to dismantle or remove, as well as places of temporary storage for the same elements and perimeters to mask or protect, masking and protection material, means of signalling and marking or others.

CR 2.2 not removable elements which limit surfaces to be treated and coated, or who may be affected during the works, are protected and masked with the products listed, conforming to the contours with precision, according to the instructions received, and without damaging them.

CR 2.3 removable elements interfering in treatments of the support and its coating, removed and stored, and become to assemble in its initial state at the end of the coating, according to the instructions received work and without damaging them.

CR 2.4 treated brackets and applied coatings are protected both during the execution of the works and during the subsequent curing of coatings, according to the instructions received.

3 RP: Applying treatments of sanitation and cleaning the brackets and your environment to obtain the qualifications required for the subsequent coating, fulfilling instructions and established safety and health measures.

CR 3.1 instructions regarding sanitation and cleaning treatments are collected, specifying the treatments and products to implement, equipment you use or others, requesting confirmation that fixed the problems - condensation, leak, loss of networks or otherwise - that have produced stains and corrosion to be treated, by referring to the upper or Manager and checking it visually or touch.

CR 3.2 stains caused by greasy products, mold, dampness, efflorescences and particles deposited on surfaces, are detected by eliminated by washing with detergents, planing, sanding or other techniques, according to the instructions received, until the required conditions.

CR 3.3 the remains of paints, adhesives papers are detected and eliminated by grinding, thermal or chemical, pickling, planing, sanding, sandblasting or other techniques, according to the instructions received, until the required conditions.

CR 3.4 concentrations of oxides, rust and corrugated panels are detected eliminated through application of neutralizing products of oxide, brushing, sanding, sandblasting or other techniques, without affecting weld of steel structures and proceeding to a final cleaning of the surface according to the instructions received, until the required conditions.

3.5 CR adhesion of parts of existing rigid cladding which constitute the support of new coatings are checked, extracting the unstable and leveling the hollow remnants with a similar or using part filled with the indicated product, according to the instructions received, until the required conditions.
CR 3.6 near the support spaces are cleaned or aspire, ensuring that liners do not come into contact with foreign particles that may be stuck.

4 RP: Applying treatments of regularisation and improvement of adhesion of the support for the conditions required for the subsequent coating, fulfilling instructions and established safety and health measures.

CR 4.1 instructions regarding treatment of regularisation and improvement of adhesion are collected, specifying the treatments and products to implement, equipment you use or others.

CR 4.2 crests and attached Burr, as well as occasional irregularities are detected, they bite, bark or sand, and are retouched, according to the instructions received, until the required conditions.

4.3 CR fissures, cracks, hollows or support discontinuities are detected and covered with the products listed, respecting the structural joints, according to the instructions received, until the conditions required.

4.4 CR expansion joints filled with material little suitable for coatings to run empty and replaced by the indicated product, according to the instructions received, until the required conditions.

CR 4.5 adherence on the support is improved by applying treatments physical or chemical indicated, such as chopped, sanding, fastening of nets, sprinkled, application by manual means of adhesion bridges, or other similar techniques, according to the instructions received, until the required conditions.

CR 4.6 levelling in interior flooring coating is done with self-leveling material indicated, covering the required space and respecting the movement joints in its entire length and width according to the instructions received, until thick, horizontal position and flatness required conditions.

CR 4.7 the lateral contours aploman and receive strongly, according to the instructions received, until the required conditions.

CR 4.8 deliveries to unique elements and other constructive elements are executed when otherwise the upper or Manager, following the same instructions, to obtain conditions required.



Professional context: means of production: useful and geometrical control tools: levels, Plumb lines, brackets and tape measures. Masonry tools and supplies: pallets, floats, plain, rules, fratases, planters, pointers, chisels, rubber mallets, pegs, martillinas. Tools and supports treatment tools: scrapers, scrapers, spatulas, sandpapers, cutters, brushes for cleaning. Containers: drawers, baskets, bins, cuezos, troughs, pastera. Treatment of media products: strippers, detergents, water repellents, fungicides, mastics and scale removers, meshes, adhesive bandages, blankets, adhesive tapes, rags. Brushes, brushes, rollers. Light machinery: Sanders, strippers guns, high pressure cleaners. Portable sandblasting, abrasive machines. Grip and filling mixtures: coating products, mortars and pastes of work, mixing pre-dosed, self-carrying and self-leveling. Corner guards and strips. Personal protective equipment, means of collective protection, temporary installations and auxiliary.



Products and results: stands for coverings of varying composition - plaster, mortar, concrete, brick, wood, metal, or others, with or without coverings previous-, treated by cleaning, healthy, sandblasting, pickling, leveling, masking, scraping, sanding, plastecido, chopped, dotted with grout or mortar cement, placement of mesh and bandages, application of bridges of adhesion and placement of corner guards.



Used or generated information: parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Technical and product security tabs. Verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



Unit 4 competition: Making plaster and trim «To BUENA VISTA» level: 1 code: UC0872_1 realizations professionals and completion criteria: RP 1: prepare the spaces and equipment of work, within its sphere of competence, performance and quality required in the execution of the plaster and trim, fulfilling the instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each liner to run and specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance, and in particular checks that the rules are right and present no deformations.

CR 1.2 selected screening machines are planned for each type of mixture according to the manufacturer's instructions, especially avoiding the use of machines of projecting plaster on the projection of mortars, to avoid an insufficient blending of the components.

CR 1.3 the individual protection equipment for the execution of the plaster and trim, are selected according to the indications of the upper or Manager and the risks of the concrete pit, making sure are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life requesting, in his case, his replacement.

CR 1.4 media assistants and installed by third parties, required collective protection in the cliffs of plaster and trim, checks that are available at the locations needed to fulfil its role and that they are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.5 the ladders are used to checking that the contact points are stable, resistant and not sliding, fixing the locking mechanisms to prevent the opening or movement of its parts, and so avoid carrying heavy/bulky loads how to perform tasks that make it hard to support and decrease the stability of the worker.

CR 1.6 scaffolds of axle stands and reduced height work towers, are meeting safety conditions in terms of width, stability, immobilization of the base, separation of the facing which is working and need for perimeter protection, respecting in any case statutory regulations for temporary work at height work equipment.

CR 1.7 measures of safety and health for workers to develop, is collected requesting instructions – verbal and written - and confirming their understanding, by referring in its case the documentation from the manufacturer of the equipment and products.

CR 1.8 detected in the Tagus contingencies are resolved within its sphere of competence, and if necessary are communicated to the upper or responsible required to enable monitoring and resolution promptly, especially which compromise safety and health itself or to third parties, in particular to gaps and edges without protection.

CR 1.9 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.10 end of day assigned peacekeeping operations are applied to the different work teams used, following the instructions received and the manufacturer's instructions, and in particular cleaning hoses the machines for both the completion of the day after prolonged in the pit stops.

2 RP: Plastering 'more win and buena vista' for coating walls not trafficable, fulfilling the instructions and established safety and health measures.

CR 2.1 stand moisture is checked prior to execution of the plaster, referring where appropriate to the upper or Manager and, where appropriate, by dampening effect.

CR 2.2 rules or view are placed on edges and corners, plumbing them and receiving them with mortar, to achieve required stability and verticality.

CR 2.3 the coating runs on time, projecting with manual and mechanical means, respecting the structural joints and the received from facilities, until reaching the required thickness.

CR 2.4 the plastered surface rasea through regleado until you reach the flatness required.

CR 2.5 the plastered surface is fratasa according to the instructions received, until the required texture.

CR 2.6 risks to avoid premature drying of the coating are indicated for the existing environmental conditions and produce no Washout, applied according to the instructions received.

CR 2.7 the joint between the cliffs of successive days is made by cutting and removing the excess material.

CR 2.8 the joint between the cliffs of successive days returns to wetting the Board and without mounting the made part.

3 RP: Garnish with black plaster 'more win and buena vista' paste, coating walls not trafficable, fulfilling the instructions and established safety and health measures.

CR 3.1 stand moisture is checked trim execution, referring where appropriate to the upper or Manager and, where appropriate, by dampening effect.

3.2 CR rules or view are placed on edges and corners, plumbing them and receiving them with mortar, to achieve required stability and verticality.
CR 3.3 the coating runs on time, projecting with manual and/or mechanical, until reaching the required thickness.

CR 3.4 the coating is executed respecting the structural joints and received the facilities, keeping to the orthogonality of the boxes of registration completion, and still visible material masking that protects them.

CR 3.5 trim surface rasea through regleado until you reach the flatness required.

CR 3.6 the decorated surface is scraped or texturized according to the instructions received, until the required texture.

CR 3.7 structural joints are protected by flashing set on one of its sides, to not hinder the movement of the same.

CR 3.8 the joint between the cliffs of successive days is made by cutting and removing the excess material.

CR 3.9 joint between the cliffs of successive days returns to wetting the Board and without mounting the made part.



Professional context: means of production: useful and geometrical control tools: levels, Plumb lines, brackets and tape measures. Masonry tools and supplies: pallets, floats, sticks, rules, fratases, miras and Twine, shovels, wheelbarrows. Projection of mortars and pasta machines. Containers: drawers, baskets, bins, cuezos, troughs, pastera. Grip and filling mixtures: coating products, mortars and pastes of work, mixing pre-dosed and self-carrying. Personal protective equipment, means of collective protection, temporary installations and auxiliary.



Products and results: coverings and trim executed at buena vista.



Used or generated information: parts work, parts of incidents, parts ordering and receipt of materials. Manuals for operation and maintenance of machines and equipment, supplied by manufacturers. Technical and product security tabs. Verbal and written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



Unit 5 competition: Apply PRIMERS and paints protective in construction level: 1 code: UC0873_1 realizations professionals and completion criteria: RP 1: prepare the spaces and in teams, within its sphere of competence, to achieve performance and quality required in the application of primers and paints and protective compliance instructions and established safety and health measures.

1.1 CR machines, tools and tooling to be used for each primer or paint to apply and each specific activity are selected among the available ones, according to criteria of quality, safety and health, and performance optimization.

1.2 CR brushes, rollers or other selected application tooling as well as projection equipment, are provided for each type of mix/emulsion according to the manufacturer's instructions.

CR 1.3 the individual protection equipment for the application of emulsions mixtures, are selected according to the indications of the upper or Manager and the risks of the concrete pit, making sure are certificates, which are adapted to the needs of the activity and that are in good condition and within the period of useful life asking if his replacement.

CR 1.4 media assistants and installed by third parties, required collective protection in the cliffs of painting, checks that are available at the locations needed to fulfil its role and that they are operating, by detecting the apparent defects of installation and maintenance, and avoiding modify them without proper authorization.

CR 1.5 the ladders are used to checking that the contact points are stable, resistant and not sliding, fixing the locking mechanisms to prevent the opening or movement of its parts, and so avoid carrying heavy/bulky loads how to perform tasks that make it hard to support and decrease the stability of the worker.

CR 1.6 scaffolds of axle stands and reduced height work towers, are meeting safety conditions in terms of width, stability, immobilization of the base, separation of the facing which is working and need for perimeter protection, respecting in any case statutory regulations for temporary work at height work equipment.

CR 1.7 measures of safety and health for workers to develop, is collected requesting instructions – verbal and written - and confirming their understanding, by referring in its case the documentation from the manufacturer of the equipment and products.

CR 1.8 detected in the Tagus contingencies are resolved within its sphere of competence and, where appropriate, communicate to the superior or responsible for promptly required to enable monitoring and resolution, especially which compromise the safety and health of the worker or to third parties, in particular in the event of inadequate or poorly installed auxiliary means , to gaps unprotected, poor ventilation and lack of fire extinguishers at the warehouse of chemicals.

CR 1.9 generated waste is dumped or accumulate in the spaces for this purpose, and accordance with the established health and safety and environmental protection regulations.

CR 1.10 end of day assigned peacekeeping operations are applied to the different work teams used, following the instructions received and the manufacturer's instructions, and in particular cleaning hoses of the projection equipment both to the completion of the day and after stops longer at tajo.

2 RP: Manipulate different products to use - such as the components of mixtures/emulsions, diluents, the plastecidos and the processed ready - to dispose of them in the conditions of quality and safety required, storing them, mixing them and preserving them after use, fulfilling both the established instructions and safety and health and environmental protection measures.

CR 2.1 components - bases, pigments, catalysts, solvents, or other - mixtures/emulsions, their quantities and their State of conservation, is asked for confirmation that are suitable for the characteristics required.

CR 2.2 download, gathering, mixing and storage of containers of products and mixtures/emulsions prepared, is carried out according to the instructions received and the manufacturer's specifications.

CR 2.3 emulsions mixtures are produced following the instructions received as a removed and reaction time prior, with environmental conditions within those recommended by the manufacturer.

CR 2.4 mixtures/emulsions dosage is adjusted to environmental conditions and the type of application - manual or by gun-using viscometers if necessary, according to the instructions received.

Elaborate mix/emulsion 2.5 CR presents the appropriate homogeneity and responds to the claimed amount.

CR 2.6 mix/emulsion is delivered within the time allocated according to the period of useful life or pot-life.

3 RP: Apply primers, hands of fondo and paints or similar protection products, both walls and other supports of different materials in construction, for the conditions required for the application of finishes and to protect these, serving both the instructions laid down as measures of health and safety and environmental protection.

CR 3.1 ambient conditions, and the temperature and humidity of the support, existing at the time of application of the treatment or in the curing period, is asked for confirmation that permit prior application to the same.

CR 3.2 cleaning stand and if the dryness level reached in the hands applied prior requests confirmation that enable a new application before the same.

CR 3.3 the primers and hands of fondo apply with manual means or teams of screening, according to the instructions received and the manufacturer's specifications.

3.4 CR paints and related products - waxes, polishes, or other - apply with manual means or teams of screening, according to the instructions received and the manufacturer's specifications.

CR 3.5 the yields obtained in the application of the product is within the established margins of tolerance of the performance or the performance recommended by the manufacturer.



Professional context: means of production: spatulas, brushes, brushes, bristle brushes, rollers, extension cords. Containers: mixers, feeders, troughs, bowls and buckets. Projection equipment: guns atomizing by air, without air and mixed, and electrostatic. Coating products, solvents. Components for paints to mix in work. Prepared mixes/emulsions of paintings. Primers: sealers, reactive, corrosive and other. Special paints of protection and related products: waterproofing, water resistant, flame retardant, fungicides, graffiti, polishes and others. Personal protective equipment, means of collective protection, AIDS, temporary installations, signaling and marking.



Products and results: spaces and prepared teams. Mixed paints. Primers, hands of Fund and protection paints, applied on all types of brackets and finishes in construction.



Used or generated information:
Parts work, parts of incidents, parts ordering and receipt of materials. Chips technical and safety of products, quality certificates, instructions of the manufacturer of the products. Manuals for operation and maintenance of light machines and equipment, supplied by manufacturers. Verbal or written instructions of head of team, superior or Manager. Assessments of risks in the workplace. Signalling of work.



TRAINING module 1: LABORES auxiliary of work level: 1 code: MF0276_1 associated with UC: auxiliary jobs in construction duration: 90 hours capabilities and evaluation criteria: C1: describe occupational hazards on construction sites, identifying basic criteria of prevention, rules of correct use of work equipment and means of collective protection functions, and interpreting the signs of work.

CE1.1 identify the most frequent construction risks, associating prevention and protection measures related to these.

CE1.2 interpret frequency and incidence of work accidents rates total and individuals from the construction industry, on the basis of actual statistics presented.

CE1.3 to relate the causes and consequences of accidents in the construction sector, differing according to the kinds of injuries: mild, serious, very serious or deadly.

CE1.4 list the causes of fatal and serious accidents that occurred in the sector of construction recently, using the published statistics of the last period.

CE1.5 interpret works signage identifying it in different situations presented.

C2: Applied techniques of installation and maintenance of auxiliary means and collective protection common in construction, own your competition, fulfilling the safety conditions laid down.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.

CE2.2 in a so-called practical of a particular representative of a building construction pit, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a so-called practical of a particular representative of a work of estate tajo, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.4 in a practical case of a pit representative of construction, to check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.

CE2.5 in a practical course of a cut of construction, assemble and disassemble the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Handling and hauling loads, according to the instructions received in terms of working methods and conditions of security.

CE3.1 relate the forms of delivery standard for each type of building materials, specifying download, transport and collection processes recommended for them.

CE3.2 interpret the parts of request and receipt of materials, estimating the volume and weight of a stated amount of material.

CE3.3 lifting loads manually implemented procedures to prevent injury from overexertion.

CE3.4 in a practical course of a cut of construction supply, supply materials and equipment meet the requirements requested type, quantity, location, layout and time, by selecting the working and personal protective equipment required, and applying maintenance tasks that we indicate it upon completion of the activity.

CE3.5 in a practical case of displacement of loads, instruct the operator of lifting machinery required maneuvers, with the clarity and precision required and complying with the security measures established.

C4: Operate tools and light machines in support trades work, following the instructions received in terms of working methods and conditions of security.

CE4.1 in a practical course of made up of different materials, cuts by selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of method, geometry and term.

CE4.2 in a practical course of demolition manual, carry out partial demolitions of building elements, selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of method, surface, fragmentation and term.

CE4.3 in a practical course of AIDS facilities, make rozas on constructive elements, selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of method, geometry and term.

CE4.4 in a practical course of earthmoving by manual means:-select the required work and personal protective equipment.

-Dig a ditch from the dimensions shown, leveling the funds shaping up the sides with manual means, and fulfilling the requirements in terms of method, geometry and term.

-Fill the trench with part of the excavated earth, compacting it by manual means, fulfilling the requirements in terms of method, arrangement and composition of layers of filling and term.

-Apply operations of end of day indicated to the equipment used.

Skills whose acquisition must be completed in a real work environment: C2 concerning CE2.2, CE2.3, CE2.4 and CE2.5; C3 on CE3.4 and CE3.5; C4 complete.

Other skills: be responsible for the work that develops.

Complete the work according to criteria of fitness, speed, economy and efficiency.

Communicate effectively with the right people at any given time, respecting the channels established in the organization.

Interpret and execute work instructions.

Keep the work area with the degree of order and cleanliness required in the organization.

Adapt to the Organization, to its organisational and technological changes; as well as to new contexts or situations.



Contents: 1. basic security in construction law relating to prevention and safety and health on construction sites.

Occupational accidents and diseases: types, causes, effects, and statistics.

Risk and prevention in open pits, machines, equipment and auxiliary means.

Performance and first aid in case of accident procedures.

Personal protective equipment. Types, standards and criteria of use.

Security tools, tooling, and material handling.

Safety signage and fencing works.

Safety in installations and electrical equipment.

Safety in use of scaffolding, platforms and stairs.

Security in operation maquinillos, hoists, cranes and conveyors.

Security in light of works machinery.

Security in landslides, rockfalls and contentions.



2. conditioning of cliffs, gorges and billets for cleaning, maintenance of pits, disposal of waste.

Installation and removal of auxiliary means and collective protection.

Materials, features, densities, and forms of supply: bulk, packaging and palletizing.

Conditions of storage: resistance of the bracket, height of stacking and environmental factors.

Recommendations of discharge, transport and storage, codes and symbols.

Transport of loads in works, means manual and mechanical means; lifting works, means manual and mechanical means.

Equipment for packaging of pits: types, functions; selection, testing and management.

Equipment for supply of pits: types and functions; selection, testing and management; maintenance, preservation and storage.

Individual protection, collective protection, auxiliary means; maintenance, preservation and storage.

Temporary work facilities.

Works signage.

Occupational and environmental-specific conditioning and supply cuts, preventive measures.

Materials, techniques and innovative recent implementation.



3 operations support offices and excavation by means of manual processes and conditions of aid with light machinery: materials with cutting and miter cutting; partial demolition of elements with groundbreaking hammers; compaction of fillers with vibrating plates and rammers; Roza and elements with Groove cutters and drills drilling, protective cables and rozas filling tubes.

Processes and conditions of execution of excavations, profiled and refiners of ditches and pits: plant layouts and depths, excavation with manual means; refiners with earrings, put in layers of concrete cleaning work, profiled lateral and horizontal funds. Equipment: types and functions; selection, testing and management; maintenance, preservation and storage.
Occupational and environmental-specific aid operations offices and digging with hand tools, prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to auxiliary work in construction, which will be using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 2: pastes, MORTARS, adhesives and concrete level: 1 code: MF0869_1 associated with UC: elaborate pastries, mortars, adhesives and concrete duration: 30 hours capacity and evaluation criteria: C1: describe the processes of mixes of work and pre-dosed, identifying components, linking the different types of applications, and specifying methods of work.

CE1.1 describe the scope of a given mixture, knowing their composition.

CE1.2 interpret the meaning of technical terms used in work on mixtures of grip, screed and finish construction, specifying if the differences between different mixtures.

CE1.3 recognize the type of a mixture of work submitted, identifying the components - which are appreciable to simple view-which is made up of and describing processing.

CE1.4 describe the materials and innovative techniques in preparation of mixtures of grip, screed and finish construction, appreciating its importance.

C2: Prepare work blends and pre-dosed, fulfilling the instructions received in terms of working methods and conditions of health and safety.

CE2.1 set composition and dosage of a mixture determined by their strength, consistency, adherence or workability, conditions following tables and nomograms indicated.

CE2.2 set the correction at the dosage of a mixture of cementitious adhesive for the partial or total replacement of water by a given emulsion, following the manufacturer's instructions.

CE2.3 specify conditions of kneading, reamasado, time of adjustability, maturation and lifespan of a given mixture, starting with the manufacturer's instructions.

CE2.4 describe the effect of conditions on the preparation and properties of mixtures, specifying under what circumstances will be contraindicated to proceed with the development.

CE2.5 in a so-called practical preparation of mixtures of work, prepare the mixtures requested by selecting, using and keeping work and personal protective equipment required, and fulfilling the requirements in terms of procedure, volume and term.

Skills whose acquisition must be completed in a real work environment: C2 with respect to CE2.5.

Other capabilities: interpret and execute work instructions.

Comply with the rules of production set by the organization.

Responsible for the work that develops.

Keep the work area with the degree of order and cleanliness required by the organization.

Learn new concepts or procedures and to effectively leverage the training, using the knowledge acquired.

Get used to the pace of work of the organization.



Contents: 1. work blends and pre-dosed in building mortars and pastes from work.

Pre-dosed mortar and pasta.

Drawn on the tajo and prepared concrete.

Types of concrete: concrete mass, armed, prestressed and reinforced; high-strength concretes, lightened and special.

Components of mixtures of work: binders, additives, gravel, sand, water, reinforcement and reinforcing fibers.

Cementitious adhesives. Adhesive resins in dispersion. Adhesives and materials for grouting of reaction resins.

Components of the preloaded mixtures: binders, additives, sand, water and emulsions.

Dosage: type, characteristic strength, consistency, maximum size of aggregate and ambient, plasticity and strength. Applications.

Main obligations of the regulations.

Trials to be carried out on mixtures of work.

Quality seals and approved brands.



2 processes of mixes of work and pre-dosed in construction processes and conditions of manufacture of pastes and mortars: identification and control of components, in weight and volume dosing, dosing corrections; kneading with manual and mechanical means, and water intake; filling shipping containers; environmental conditions for the preparation of mortars and pastes.

Processes and conditions of manufacture of concrete: identification and control of components; dosage in weight and volume, corrections of dosage; kneading with manual and mechanical means, and water intake; filling shipping containers; environmental conditions for the elaboration of concretes.

Processes and conditions of manufacture of adhesives and materials for grouting: identification and control of components; corrections of dosage; kneading with manual and mechanical means; filling shipping containers; environmental conditions for the production of adhesives and materials for grouting.

Equipment: types and functions; selection, testing and management; personal protective equipment.

Risk labor and environmental; prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the development of pastes, mortars, adhesives and concrete, will be credited by using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 3: treatment stands for coating in construction level: 1 code: MF0871_1 associated with UC: clean up and regularize stands for coating in construction duration: 60 hours capabilities and evaluation criteria: C1: describe treatment of supports for coating processes, identifying elements and materials to be coated, relating the different types of treatments and their properties, and specifying methods of work.

CE1.1 explain function stands for construction covering treatments, specifying conditions to obtain.

CE1.2 recognize support presented - appreciably to simple view-material identifying the type of treatment that would require depending on the coating applied on it and describing the conditions of sanitation and regularization to obtain.

CE1.3 interpret the meaning of technical terms used in treatment of media works for coverings, specifying if the differences between the different techniques to apply.

CE1.4 describe the operations of preparation of a known type and State support which will be a particular finish, pointing out the preconditions for support, and the method and sequence of works.

CE1.5 describe common defects in the treatment of lining supports, their causes and effects.

CE1.6 describe the materials, equipment and technical innovators in treatment of lining supports, evaluating its importance.

C2: Apply mounting techniques and maintenance of auxiliary means and collective protection common in coating in construction work, within its competence, fulfilling the established health and safety conditions.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.
CE2.2 in a so-called practical of a particular representative of works by coating cut, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a practical case of a pit representative of a coating work, to check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.

CE2.4 in a practical case of a pit representative of a work of coating, mounting and dismounting the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Apply various supports that apply coatings, fulfilling the conditions of quality and safety and Health established sanitation and cleaning techniques.

CE3.1 define the conditions of implementation, quality and protection of environment in the execution of blasting of water treatments or mixed, interpreting the instructions received.

CE3.2 in a practical course of rehabilitation of a facade with woodwork:-select the work and personal protective equipment required, applying the maintenance tasks that we indicate it after the execution.

-Apply a protective treatment by masking or covering of surfaces in contact or next with elements to be treated.

-Apply a treatment by cleaning air, scraped, brushed, or degreasing, blasting to elements of mortar with stains of oils and fats.

-Apply a treatment of cleaning, abrasive blasting, walls painted or wallcoverings retail.

-Remove loose paint and oxides of the steelwork.

-Remove the paint and varnish of the wooden frames.

C4: Apply techniques of regularisation and improvement of adhesion to various supports that apply coatings, fulfilling the established quality and health and safety conditions.

CE4.1 describe the conditions of implementation, quality and environmental protection in a pit of regularisation and improvement of adhesion.

CE4.2 in a practical course of rehabilitation of a building:-select the work and personal protective equipment required, applying the maintenance tasks that we indicate it after the execution.

-Apply regularization using plastecidos and bandages treatment to irregular and degraded, factory elements received instructions and identifying the structural joints present.

-Apply a treatment of adherence by chopping, mesh or dotted with cement to smooth concrete panelling.

-Sand and plastecer the carpentry of wood.

-Run a layer of leveling for an interior flooring.

-Have lateral contours on the edges of elements to be relined, following the instructions received.

Skills whose acquisition must be completed in a real work environment: C2 with regard to CE2.3 and CE2.4; C3 on CE3.2; C4 regarding CE4.2.

Other capabilities: keep the work area with the degree of order and cleanliness required by the organization.

Interpret and execute work instructions.

Responsible for the work that develops.

Complete the work according to criteria of fitness, speed, economy and efficiency.

Learn new concepts or procedures and to effectively leverage the training using the knowledge acquired.

Respect the procedures and the internal rules of the organization.



Contents: 1. treatment of supports for cladding coatings according to the material types: continuous, discontinuous, sliced, paintings.

Types of finishes according to the use of the support: trafficable and not trafficable.

Composition of surfaces for coating: blocks and elements in situ concrete or precast, brick, plasters, trim and plaster of gypsum, plasterboard, metal, wood, other previous coatings.

Liners relationships with other elements and work pits.

Preconditions of support: stability, resistance, tightness, temperature.

Conditions to get to finish: sanitation, cleaning, regularity and adhesion.

Treatment of contours: protection, masking and covering.

Sanitation treatments: fungal and waterproofing.

Treatments of cleaning: washing, brushing, scraping, sanding, hot air sandblasting, sandblasting water, mixed agua-abrasivo sandblasting, pickling.

Treatments of regularization: scraping, sanding, plastecido, bandaged, soil leveling, placement of lateral contours.

Treatment adherence: chopped, meshes, sprinkled with cement grout.

Equipment for stands for coating treatments: types and functions; selection, testing and management.

Individual protection, collective protection, auxiliary means; maintenance, preservation and storage.



2. performance of treatments of sanitation and cleaning of coating State and preconditions of the support brackets: humidity, cleaning, pre-existing finishes, contours and facilities.

Pathology of brackets: stains, moisture, mildew, efflorescence, oxides, rust, corrugated panels.

Execution of treatment of contours: masking, mating.

Treatments for sanitation and cleaning materials: types, functions, and properties.

Implementation of sanitation treatment: fungicide, waterproofing.

Implementation of treatments of cleaning: washing, brushing, scraping, sanding, blasting hot air, water blasting, pickling.

Execution of sags with sand blasted and mixto-abrasivos.

Processes and conditions of handling and waste treatment.

Common implementation defects: causes and effects.

Occupational and environmental hazards. Prevention measures.

Materials, techniques and innovative recent implementation.



3 execution of treatments of regularization and adhesion of coating State and preconditions of the support brackets: continuity, regularity, flatness, level, Plumb and verticality, roughness, previous finishes.

Conditions for adhesion and grip of the mixtures.

Pathology: cracks and fissures, chips, DT parts (tiles, plates, or other).

Materials for regularization and adhesion treatments: types, functions, and properties.

Implementation of treatments of regularization: scraping, sanding, plastecido, bandaged, soil leveling, placement of lateral contours.

Execution of treatment adherence: chopped, meshes, sprinkled with cement grout.

Processes and conditions of handling and waste treatment.

Common implementation defects: causes and effects.

Occupational and environmental hazards. Prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to sanitation and regularization of supports for coating in construction, which will be using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to this professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 4: coverings and trim «To BUENA VISTA» level: 1 code: MF0872_1 associated with UC: perform unclad and trimmed «to buena vista» duration: 60 hours capabilities and evaluation criteria: C1: describing the processes of execution of coatings with pastes and mortars on walls not trafficable, identifying the needs of treatment of the different types of brackets, linking the different types of materials to be applied and its properties , and specifying working methods of these pits.

CE1.1 explain the function of the different finishes on walls not trafficable, appreciating its importance.

CE1.2 identify the type of mixture that forms a particular finish, describing the properties of the same.

CE1.3 relate different types of coatings with pastes and mortars existing, specifying its field of application.

CE1.4 interpret correctly the meaning of technical terms used in coatings work with pastes and mortars, specifying if the differences between the different techniques to apply.

CE1.5 describe method and sequence of works required for plaster or trim, specifying the conditions and support.

CE1.6 describe the operations of preparation of a support of certain, necessary to apply a plaster or trim type and condition.

CE1.7 describe common defects in the execution of plaster and trim ' buena vista', their causes and effects.
CE1.8 describe the factors of technological innovation in works of conglomerates continuous linings, evaluating its importance.

C2: Apply standard techniques of installation and maintenance of auxiliary means and collective protection in coatings with pasta works and mortar on walls not trafficable, within their competence, fulfilling the established health and safety conditions.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.

CE2.2 in a practical case of a certain Gash representative works of cladding on walls not trafficable, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a practical case of a pit representative of a piece of cladding on walls not trafficable, check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.

CE2.4 in a practical case of a pit representative of a piece of cladding on walls not trafficable, assemble and disassemble the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Apply the technique of «to buena vista» to the realization of plaster and trim, fulfilling the established quality and health and safety conditions.

CE3.1 define the conditions of execution and quality of a given run, interpreting the instructions received.

CE3.2 describe the treatment in the joints between cliffs of days successive, specifying the conditions to obtain.

CE3.3 describe the treatment to be in structural joints affected by plaster or trim, specifying conditions to obtain.

CE3.4 explain the effect of environmental conditions on the execution of the plaster and trim, evaluating its importance.

CE3.5 in a practical course of execution of a plaster on a wall:-select the work and personal protective equipment required, applying the maintenance tasks that we indicate it after the execution.

-Make the projection manually or mechanically, adjusting to the required thickness.

-Rasear and manual Trowelling, addressed the edges and corners.

-Apply a first irrigation curing.

CE3.6 in a practical course of execution of a trim on a wall:-select the work and personal protective equipment required, applying the maintenance tasks that we indicate it after the execution.

-Perform the projection in a part of the same, or mechanics, adjusting to the required thickness.

-Perform the mechanical projection in the remaining part of it, adjusting to the required thickness.

-Rasear it addressed the edges and corners.

-Scrape a portion of the wall.

-Apply a first irrigation curing.

Skills whose acquisition must be completed in a real work environment: C2 concerning CE2.2, CE2.3, and CE2.4; C3 on CE3.5 and CE3.6.

Other capabilities: keep the work area with the degree of order and cleanliness required by the organization.

Interpret and execute work instructions.

Responsible for the work that develops.

Complete the work according to criteria of fitness, speed, economy and efficiency.

Learn new concepts or procedures and to effectively leverage the training using the knowledge acquired.

Respect the procedures and the internal rules of the organization.



Contents: 1. unclad and trimmed «to buena vista» coatings in construction: generic types - continuous, discontinuous, in foils, paints-; functions.

Types of cluster continuous finishes: plasters, plasters, stucco, Sgraffito, trim, laying of plaster, plaster, synthetic finishes, monolayer and bilayer.

Properties and functions of the conglomerates continuous linings.

The plaster and trim adapting to different types of stands.

Relations of the plaster and trim work chopping and other elements.

Preconditions of support: stability, resistance, tightness, temperature.

Environmental conditions for the implementation of continuous linings conglomerates.



2. processes of execution of plaster and trim to buena vista» plaster «to buena vista» implementation process: supply, stand humidity control; posting rules or view; mass screening; extended; coping; treatment of joints; Joint; floated; curing.

Implementation of trim to buena vista»: supply; stand humidity control; posting rules or view; projection of the pasta; extended; coping; treatment of joints; texturing; joint.

Quality of the plaster and trim conditions: thickness; flatness; crash, texture.

Processes and conditions of handling and waste treatment.

Equipment for execution of plaster and trim: types and functions; selection, testing and management.

Individual protection, collective protection, auxiliary means; maintenance, preservation and storage.

Common implementation defects: causes and effects.

Occupational and environmental hazards. Prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the realization of plaster and trim to buena vista», which will be using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to this professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 5: paint and materials of primer and guards in construction level: 1 code: MF0873_1 associated with UC: apply primers and protective paints in construction duration: 90 hours capabilities and evaluation criteria: C1: describing the processes of application of paints and related products in construction, identifying the needs of treatment of the different types of brackets, relating the different types of paints and their properties , and specifying working methods of these pits.

CE1.1 explain the function of construction paints, valuing the differences with other types of coatings.

CE1.2 relate the different types of primers and paints of protection existing in the construction sector, by associating its field of application.

CE1.3 relate different types of finished paintings in the construction sector, by associating its field of application.

CE1.4 describe method and sequence of works required to apply paint in construction, specifying required pre-and stand conditions.

CE1.5 interpret correctly the meaning of technical terms used in paintings of construction works, specifying if the differences between the different techniques to apply.

CE1.6 describe the operations of preparation of a certain type and State support, which will be a painting of a given type.

CE1.7 describe the common defects in paint primer and protective prior to the paint finish, associating causes and effects.

CE1.8 describe the factors of technological innovation in construction painting, evaluating its importance.

C2: Apply mounting techniques and maintenance of auxiliary means and collective protection common in paint on construction work, within its competence, fulfilling the established health and safety conditions.

CE2.1 describe the function, composition and use - installation, testing, maintenance, removal and storage-the auxiliary means and collective protection required in a particular activity, specifying the relationship between the two types of media.

CE2.2 in a so-called practical a certain Gash representative of works of painting, characterized by schemes or plans, locate the main risks, suggesting corresponding prevention and collective protective measures and drawing them on paper.

CE2.3 in a practical case of a pit that is representative of a painting in construction work, to check the status of the auxiliary means and collective protection installed, detecting defects and malfunctions and applying the necessary maintenance operations.
CE2.4 in a practical case of a pit representative of a work of painting, mounting and dismounting the auxiliary and collective protection means, acting under supervision and observing the instructions received.

C3: Apply techniques of manipulation of the products used in paint jobs in construction of paints, varnishes and plastecidos, serving the processing instructions and the conditions of health and safety.

CE3.1 classify components according to their function (binders, solvents, pigments and additives) paintings, describing it and distinguishing the evolution of these elements in the interval between mixing and drying.

CE3.2 describe the generic conditions that indicate the poor state of mixtures and stored products, specifying how to proceed with them.

CE3.3 explain the generic conditions for handling and storage of mixtures, specifying the consequences of not respecting them.

CE3.4 describe the effect of conditions on the preparation and properties of mixtures.

CE3.5 in a practical course of mixing of products for paint jobs:-select the work and personal protective equipment required, applying the maintenance tasks that we indicate it after the execution.

-Determining the useful life of mixtures required, the time of rest before starting work and enough of it to coat a surface and support nature given, according to the technical data sheet of the manufacturer.

-To develop required mixtures adjusted to the volume and in the indicated term.

C4: Define and apply primers and protective paints using techniques to gun, roller or brushes.

CE4.1 describe the conditions of implementation, quality and environmental protection in a given run, interpreting the instructions received.

CE4.2 define the effect of environmental conditions on the application of primers and paints, and depending on the equipment used.

CE4.3 in a practical course of application of primers or paints of elements or certain media protection:-select the work and personal protective equipment required, applying the maintenance tasks that we indicate it after the execution.

-Make the treatment or application of a portion of the element or support by brush or roller, following the instructions received in terms of means of implementation and performance.

-Make the treatment or application on the remaining part of the item or support using gun, following the instructions received in terms of means of implementation and performance.

Skills whose acquisition must be completed in a real work environment: C2 concerning CE2.2, CE2.3, and CE2.4; C3 on CE3.5; C4 on CE4.3.

Other capabilities: comply with the rules of production set by the organization.

Keep the work area with the degree of order and cleanliness required by the organization.

Interpret and execute work instructions.

Responsible for the work that develops.

Complete the work according to criteria of fitness, speed, economy and efficiency.

Learn new concepts or procedures and to effectively leverage the training using the knowledge acquired.



Contents: 1. priming treatments and protective paints and products and related types of inks used in construction: aqueous paints (tempera; lime; cement; silicate; plastic - vinyl and acrylic-); Non aqueous paints (FAT; synthetic; translucent; nitrocellulose; polyurethane - monocomponent-; to chlororubbers); Resinous paints (epoxy and polyurethane - BI-).

Special treatments: waterproof, fireproof, protective facade, bituminous.

Primers.

Components, pigments, catalysts, thinners for paints to produce work.

Properties of paints.

Types of suitable brackets: scope of the different types of paintings in construction.

Paintings relationships with other elements and work pits.

Preconditions of support: stability, resistance, tightness, temperature.

Composition and dosage according to manufacturers recommendations and applications.

Quality seals and markings approved components and construction paints.



2. application of priming treatments and protective processes and conditions of handling and storage of paints and mixtures: identification and control of components; dosage in weight and volume, corrections of dosage; agitation; mixed media manual and mechanical; filling shipping containers; storage and handling of containers; environmental conditions for the preparation and development of mixtures; processes and conditions of handling and waste treatment.

Processes and conditions of application of protective paints and primers: supply; stand humidity control; application by spray gun, roller or a brush; drying; film thickness; regularity; environmental conditions for the application of primers and protective paints.

Priming treatments and protective equipment: types and functions; selection, testing and management.

Individual protection, collective protection, auxiliary means; maintenance, preservation and storage. Individual protection, collective protection, auxiliary means; maintenance, preservation and storage.

Common implementation defects: causes and effects.

Occupational and environmental hazards. Prevention measures.

Materials, techniques and innovative recent implementation.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the application of primers and protective paints in construction, which will be using one of the following ways:-academic training level 1 (Spanish higher education qualifications framework) or other upper level related to this professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.

Annex III professional qualifications: Control of projects and construction professional family: building and work Civil level: 3 code: EOC273_3 competition general tasks of development, monitoring and updating, planning, cost control and document control systems applied to projects and construction sites, throughout all phases of the process.



Competition UC0874_3 units: track planning in construction UC0875_3: process the control of cost in construction UC0876_3: manage environment professional scope professional develops construction projects documentation systems its professional activity in technical offices of works, and technical departments whose function is the management of projects, dedicated / or planning control costs and documentation linked to projects of various kinds, as well as construction sites, in entities of private nature, mainly in small and medium-sized enterprises, both on their own as others, irrespective of their legal form. It develops its activity depending on at all times, functional or hierarchically, from a superior. In the development of the professional activity apply the principles of universal accessibility in accordance with the applicable legislation.



Sectors production is located in the sector of construction, in the subsector relating to building, construction and civil works, mainly in developers and construction companies, as well as companies specializing in project management.



Occupations and jobs relevant terms from the following list of occupations and jobs are used with generic and all-inclusive nature of women and men.

Head of technical department aides aides planning assistants control technician costs technicians of documentary control works training associate (510 hours) training modules MF0874_3 technical assistants: planning in construction (270 hours) MF0875_3: Control cost in construction (150 hours) MF0876_3: documentary Control in construction (90 hours) unit of competition 1: perform monitoring of the planning in construction level : 3 code: UC0874_3 professional accomplishments and performance criteria: RP 1: propose an initial plan/program of study, project or work raised, to establish its Base Plan/programme, performing basic calculations of performance.

CR 1.1 the starting situation is analyzed according to an established model of the processes (phases and subphases), detecting the information necessary for the complete definition of the same.
CR 1.2 threads (activities) performance data, are determined from data bases or estimates given by the Manager or higher.

CR 1.3 duration calculations are performed using the baseline data, using formulas prescribed by the model or those indicated.

CR 1.4 estimates the relationship between paragraphs of the initial plan/programme, are developed without errors or mistakes, respecting the logic of the design or construction process raised by the model or those indicated.

CR 1.5 the initial plan/program is generated by computer specific application, incorporating the sections or threads in the model and by introducing the results of durations and relationships.

CR 1.6 the resulting plan/programme is presented together with supporting calculations Manager or higher, according to the established formats.

CR-1.7 El Plan/program basis generates incorporating amendments raised and agreed upon by all the agents responsible for intervening in this phase, by filing with established format and encoding.

2 RP: Concrete design Plan/program to allow control of the phase of the project, keeping correspondence with the initial plan.

CR 2.1 the starting situation is analyzed according to the strategies are set serial and recruitment, detecting the information necessary for the complete definition of the sequence of activities and establishing the necessary coding according to the associated guidelines.

CR 2.2 durations are set conforming to the established standard and reference calendars, or in his case being replaced by those indicated.

CR 2.3 relationships between activities developed respecting the logic--or their groupings possible-from the design phase, and these with the phase of recruitment, of the processes to develop.

CR 2.4 design Plan/program proposals are generated by computer specific application, incorporating the activities - and their possible groupings – identified by established coding.

CR 2.5 proposals and Plan/program design resulting are checked against the corresponding section of the Base program, presenting to the Manager or higher according to the established format.

CR-2.6 the Plan/program of final design that is obtained, incorporates the modifications raised and agreed upon by all the agents responsible for intervening in this phase, by filing with established format and encoding.

3 RP: Realize the procurement Plan/program to allow control of the process of contracting of works, following the guidelines concerning recruitment strategy.

CR 3.1 the starting situation is analyzed according to the strategy of hiring established, detecting the information necessary for the complete definition of the sequence of activities corresponding to each batch of procurement, and establishing the necessary coding according to the associated guidelines.

3.2 CR recruitment program is developed, if necessary, with more detail than that is included in the initial program for the construction phase, including facilities and temporary access needs.

CR 3.3 times conform to the established standard and reference calendars, or shall be replaced by the indicated lot eliminating activities that are not necessary.

CR 3.4 relationships between the activities are developed in a way that respected the logic--or their possible groupings-the phase of recruitment, and these of the phases of design and implementation of processes to develop.

CR 3.5 procurement Plan/program proposals are generated by computer specific application, incorporating the activities and their possible groupings identified by established coding.

3.6 CR proposals and procurement Plan/program resulting are checked against the corresponding section of the Base program, presenting to the Manager or higher according to the established format.

CR 3.7 the procurement Plan/program that you get as definitive, incorporates the modifications raised and agreed upon by all the agents responsible for intervening in this phase, by filing with established format and encoding.

RP 4: Develop a draft Implementation Plan/program to proceed to their review by responsible for planning, carrying out data collection and identifying activities, estimating resources and durations and relationships, according to the direction of the project/project execution.

CR 4.1 data collection is carried out previously by verifying that the sources are responsible for skilled guidance of the implementation of the project work.

CR 4.2 data collection is performed by determining the specific conditions and the scheme of the project/work in progress on the basis of previous experiences in projects and similar works, and plasma using established formats.

CR 4.3 activities data discretize in subdivisions established according to criteria of the project/work (organizational, geographical, typological and other).

CR 4.4 activities are suggested, determined and agreed with the responsible for execution, in accordance with the characteristics of the project/work, following planning guidelines on the definition of the same.

CR 4.5 durations are calculated, determined and agreed with the responsible for execution, according to measurements, estimated income and resources for each activity.

CR 4.6 relationships between activities developed respecting the logic--or their groupings possible-recruitment phase, and these of the phases of design and implementation of processes to develop.

CR 4.7 the definition of planning scheme is completed by establishing the necessary coding and applying it to defined activities, following the established subdivisions and the needs of monitoring of critical units.

CR 4.8 planning scheme is introduced into the computer specific application, incorporating activities and their possible groupings identified by established coding, as well as the resources provided for its execution and cost associated with each activity.

RP 5: Finalize the implementation Plan/program to allow control of the phase of work, on the basis of the draft established from data and incorporating the adjustments required by those responsible for planning the project/work.

5.1 CR activities carried out are those determined by the draft or the indicated after adjusting, applying established for draft encoding.

5.2 CR durations estimated are those determined by the draft or the indicated after adjusting fulfilling the targets set in the program Base.

CR 5.3 activities - or their groupings possible-of the implementation phase, and relationships between these with the phase of recruitment, are determined by the draft or the indicated after adjustment, whereas here the shared use of resources by the different activities.

CR 5.4 the implementation Plan/program is generated by specific computer application, incorporating activities and their possible groupings identified by established coding, as well as the resources provided for execution and the cost associated with each activity.

5.5 CR proposals and implementation Plan/program resulting are checked against the corresponding section of the Base program, presenting to the Manager or higher according to the established format.

CR 5.6 the Plan/programme of execution is carried out as definitive, incorporates the modifications raised and agreed upon by all the agents responsible for intervening in this phase, which includes a forecast of curve of costs for the project, archiving with established format and encoding.

6 RP: Track works in different phases for the regular updating of planning by issuing reports on the progress of the activities and their impact on the scheduled dates.

CR 6.1 starting tracking form is generated according to established format, adjusting it to the existing plan/program activities and established time horizon.

CR 6.2 starting form is sent to those responsible for implementation to allow monitoring of the tasks under his command, adding dates of beginning and end of the activities and their clearance.

6.3 CR real dates of start and end of the activities, as well as the percentage/extent of its advance, are collected from those responsible for execution of each phase, or other involved indirect, periodically and at the end of the set time interval for monitoring, adjusting to the instructions received.

6.4 CR forms of monitoring that are used, are relied upon the update of the plan/programme collecting additional information on how long remnant of ongoing activities.

CR 6.5 form is completed with the data collected and analysed the progress of activities - and their groupings-in the time interval set, detecting deviations on expectations the plan/program, and real work with anticipated resources, quantifying their impact on deadlines established by the Base program.

CR 6.6 monitoring results report manager or higher, generating the necessary reports according to established formats.
7 RP: Upgrade planning in different phases to suit the plan/program to the real progress of the works, based on conducted regular monitoring and issuing reports produced deviations and their impact on the terms established by the Base program.

CR 7.1 update rushes once fulfilled the number established intervals of monitoring, to the potential risk of significant deviations, or at the suggestion of the head or upper, extracting the information generated after the most recent follow-up interval.

CR 7.2 plan/program is updated by using the same software application that is generated, incorporating real data from start and end of the activities, or their possible groupings, as well as the remaining duration of the ongoing activities and economic certification associated to each activity or the total of the project.

CR 7.3 the coherence of the plan/programme analysed, detecting logical anomalies of the process and the process of debugging.

CR 7.4 refined the proposals and plan/program are matched with data from the previous update, presented to the Manager or higher according to the established format.

7.5 CR the final version of the plan/program that is updated, incorporating modifications raised and agreed upon by all the responsible agents involved, filing with established format and encoding.

CR 7.6 upgrade result is concrete generating required reports according to established formats and incorporating the analysis of Manager or higher.

8 RP: Finalize the revision of the planning in different phases to adjust it to the new needs arising from changes or unforeseen, incorporating the necessary modifications and graphics or written reports on the changes.

CR 8.1 the new situation generated after the suffered changes, is analyzed from the indications of the person in charge or superior identifying changes in the plan/programme.

CR 8.2 modifications in terms of activities, durations, relations and coding, are incorporated into the plan/program using the same computer application where it generates.

CR 8.3 new relations between activities that are maintained and the new addition discussed checking established execution processes are respected.

CR 8.4 revised proposals and plan/program are checked against the program Base, performing at the head or above according to the established format.

CR 8.5 the final version of the plan/program that is reviewed, incorporates the modifications raised and agreed upon by all the agents responsible for intervening in this phase, by filing with established format and encoding.

CR 8.6 the already revised the plan/programme arises as a result of--newspaper or extraordinary--back to the revision update process.



Professional context: means of production: yields on building databases. Construction-related Internet sites. Computers and computer networks. Generic and specific planning/programming applications in construction. Applications and environments specific measurements and budgets. Office applications.



Products and results: initial proposal of Plan/program basis of proposed studies, projects or works. Design Plan/program proposal. Procurement Plan/program proposal. Draft, taking data and proposal for the implementation Plan/program. Monitoring of the progress of work and update of the planning proposal. Monitoring reports, verbal, written, and graphic. Proposal for revision of the planning.



Used or generated information: documents from studies and projects. Process models: studies, projects and works. Income from activities and threads. Duration of activities. Relationships between activities. Forms of follow-up. Plans/programs of construction processes. Verbal and written instructions of head of team.



Unit 2 competition: Process CONTROL of costs in construction level: 3 code: UC0875_3 realizations professionals and completion criteria: RP 1: generate a reference budget - estimate initial of costs--to know the economic scope of the proposed project/work, completing and shaping information chapters and headings and applying the established coding system.

CR 1.1 departure information is analyzed and adapted to the established budget model, detecting the information necessary for the complete definition of the same and establishing the necessary coding according to the associated guidelines.

CR 1.2 headings and chapters are coded according to the coding system adopted.

CR 1.3 budget is generated by computer calculation or application specific, incorporating both headings and chapters and other possible groups identified by the adopted encoding.

CR 1.4 the resulting budget is presented according to the established formats and accompanied by clarifications concerning origin of data and indeterminacy of items.

Budget reference - or initial estimate of cost 1.5 CR - generated incorporating amendments raised and agreed upon by all the agents responsible for intervening, archiving with established format and encoding.

2 RP: Distribution units of the budget in the lots determined by the head of the project to proceed with recruitment, determining the economic reach of the raised lots.

CR 2.1 reference budget is analyzed and adapted to the established recruitment strategy, determining headings and chapters that make up each batch and by establishing the necessary coding according to the associated guidelines.

CR 2.2 headings of the budget assigned to the lots are grouped into the same computer application, applying the planned codification associated with the batch.

CR 2.3 composition made of lots is analyzed, checking that all games have a batch code and that all lots have at least one game, and making the necessary adjustments according to directions of the upper or Manager.

CR 2.4 budget organized by lots is presented according to the established formats and accompanied by clarifications concerning criteria for attachment of items, filing after your acceptance with established format and encoding.

3 RP: Prepare documentation to suppliers, contractors or subcontractors for the request of offers (contest), generating it using established formats and presenting it to the person in charge of the project.

CR 3.1 contacts with contractors and suppliers are managed, preparing the invitation to competition according to the established model, directing it to the indicated by the head of the project, and processing responses for submission to the superior.

CR 3.2 the competition rules are generated based on the established model and collecting the indications of the person in charge of the project.

CR 3.3 the competition documents are collected and have, according to the head of the project.

3.4 CR the letter's delivery of documents produced, corresponds with confirmed contestants, adjusting to the established model and collecting the indications of the person in charge of the project.

4 RP: Evaluate bids received for its comparative, detecting errors and omissions and requesting the relevant clarifications to homogenize them according to the directions of the person in charge of the project.

CR 4.1 comparison form is generated by inserting headings and chapters of each lot of recruitment, and for each description of the game, planned measurement, its estimated unit price and the total anticipated price.

CR 4.2 the offers received data are introduced in form reflecting the total and unit prices offered.

CR 4.3 offers processed by the form are analyzed and presented to the responsible for review, by detecting and recording the deviations concerning measurements, omitted or expanded items and deadlines with respect to the stipulated by the invitation to tender.

CR 4.4 the information/clarifications arising from the analysis of deviations of bids, are requested at the behest of the head of the project, according to established formats and channels and requiring a deadline deadline for receipt.

CR 4.5 bids that do not include certain items or chapters are removed from the form or are maintained, following the indications of the upper, or responsible, and if keep them redo the comparative table, to reflect the common fraction from the request for offers batch and creating a new batch with the part not offered.

CR 4.6 the form data are processed with bids homogenized, making comparisons between them to determine the best according to consignment, chapter or global lot, and establishing the percentage of deviation from the initial data.

CR 4.7 comparison results are presented to the Manager or higher, generating a comparative table according to the established formats and incorporating changes resulting from the analysis and negotiation with contractors.

RP 5: Write the certifications to proceed to their issuance and billing, adjusting measurements adopted by the head of the project and the clauses of the same valued relationships.
CR 5.1 headings and chapters of the contracted scope are introduced in a form of certification, introducing heading description and measurements both unit and total prices contracted for each of them.

CR 5.2 certification form is filled by incorporating data from the measurements of the executed work approved by the person in charge of the project.

CR 5.3 valued relations received from contractors, corresponding to the period of certification, are processed through the form, checking errors and detecting alterations prices and items concerning the contract.

CR 5.4 certifications for the contractor are generated according to the formats established, incorporating the directions of the person in charge of the project.

6 RP: Perform the monitoring and updating of costs arising from changes in the project for cost reports, checking the formalization of the proposed changes and their correspondence with the terms of the existing contract.

CR 6.1 unit prices applied to changes in measurement of existing items are checked that they correspond to the contract prices agreed upon between the contractor and the project.

CR 6.2 requests or proposals for change involving the modification of the contract is formalized in orders/agreements, verifying their submission and acceptance by those responsible for the project.

CR 6.3 documentation accompanying orders modification or supplementary agreements are collected and orders, generating charts and accompanying documents to the processing according to the established formats and indications of Manager or higher.

CR 6.4 categorization of causes system conforms to the changes adopted, according to the established guidelines.

CR 6.5 headings and chapters of the new scope of work contracted, as well as existing ones, are encoded according to the revised coding system.

CR 6.6 headings and chapters of the new contracted scope are incorporated in the certification form, introducing to each game description and measurements both unit and total prices of the new hiring.

7 RP: Develop and process cost sheets to keep informed the person in charge of the project, reflecting hiring, changes and certification States and issuing periodic reports of the State of the overall project costs.

CR 7.1 costs sheet is generated by inserting a form chapters and groups of items by subcontractors, and introducing the totals for each of them, relating to the budget, hired initial and after review, and certified.

CR 7.2 cost sheet is updated, adjusting to the changes and new hires.

CR 7.3 cost sheet is set facing columns for comparison between the budgeted and contracted and the contracted and certified, presenting it for analysis to the project manager and by applying the proper coding to facilitate such analysis.

CR 7.4 cost reports are produced by computer applications with data of actual and planned, certification changes approved budget, subdivision of the reasons for change or contracting provided on real, according to established formats of curves or charts and indications of Manager or higher.

CR 7.5 monthly cost report is generated by introducing the changes indicated in information costs and according to established formats and guidelines of the project manager.

CR 7.6 monthly cost report is archived by having applied the format and encoding set.



Professional context: means of production: database of prices in construction. Construction-related Internet sites. Computers and computer networks. Applications and environments specific measurements and budgets. Office applications.



Products and results: initial estimate of costs. Lots of project engagement. Offers request documentation. Comparison of the tenders received. Certification of studies, projects and works. Tracking, updating and revision of cost sheets. Reports for tracking, updating and revision of costs, verbal, writing and graphics.



Used or generated information: documents from studies and projects. Models of budgets: studies, projects and works. Prices in construction. Documentation of the basis of contests. Relationships valued and budgets. Documentation of agreements, supplementary agreements, modification orders. Verbal and written instructions of head of team.



Unit 3 competition: Manage systems of documentation of projects of construction level: 3 code: UC0876_3 realizations professionals and completion criteria: RP 1: establish an index of documents control to be consolidated, identifying and classifying the documents involved in the project/work and its relationship with the agents involved in the development of the same.

CR 1.1 the starting situation is analyzed according to the model of documentation established for the type of project control, detecting the information necessary for the complete definition of the same.

CR 1.2 final of the document types list to reference, is determined to gathering information from the project team about the types of specific documents from the project/work in progress, and plasma using established formats.

CR 1.3 documents from the list are classified by bringing them into three groups, those generated by those participating in the project/work, which do not belong to the first type are managed by the team responsible for the project/work, and a third kind correspond to which the documents outside of the scope of management of the documentation system, but which is referenced by intervening in the project work.

CR 1.4 different types of documents relate to associating them with the agents responsible for its creation, approval, issuance, registration or use, generating or adapting a matrix of responsibilities.

1.5 CR index of document types archived occurs or adapted from a standard model, ensuring physical and computer file of all documents and referencing.

CR 1.6 proposals for classification and indexing are presented to the upper or Manager according to the established formats.

CR 1.7 is generated, the final version of the list of documents to control and file system incorporating the indications of the upper or Manager, and is broadcast to all agents responsible for the generation, modification and file them.

RP 2: Establish and implement a system of encoding, recording all the documents involved in the project in order of priority, to allow oneness and traceability of documentation.

CR 2.1 critical documentation registration priority is given, applying an interim coding system adapted from a standard model for the given project/work type.

CR 2.2 encoding levels is reflected in the type of project and the same phase, settling with the consensus of those responsible for implementation.

CR 2.3 the encoding of text documents (meeting minutes, letters, faxes, shipping, changes, requests for information, among others) is reflected in the type of project and the phase of the same, settling with the consensus of those responsible for implementation.

CR 2.4 proposals relating to the coding system are presented to the upper or Manager according to the established formats.

CR 2.5 the final coding system version is generated, incorporating the indications of the upper or Manager, and broadcast it to all agents responsible for the generation and modification thereof.

3 RP: Represented by diagrams of flow management more complex processes, required by the documents included in the document management system, to facilitate their understanding and application by the agents involved.

CR 3.1 the starting situation is analyzed by consulting with the upper or Manager, appreciating the complexity and importance of the processes of filing of documents and concluding the need or not of its representation through diagrams.

CR 3.2 to represent process flow diagram is generated, adapting the standard models of diagrams representing processes similar to the project.

CR 3.3 diagram is represented, including the description of the processes, references to the responsibilities of the agents involved, keeping correspondence with the matrix of responsibilities and picking up changes in processes throughout the different stages of the project.

CR 3.4 proposals to process diagrams are presented to the upper or Manager, following the established formats.

CR 3.5 the final version of processing procedures and their associated diagrams generated, incorporating the indications of the upper or Manager and issued to all the agents involved in the process of processing.

RP 4: Apply the standard for each type of document formats to generate in the system and each report required from the system, designing which are specific to the project and not included in the standard model.
CR 4.1 the starting situation is analyzed by consulting with the upper or Manager, distinguishing between the types of documents that are adapted to the standard formats of application and requiring the development of new formats.

CR 4.2 formats applicable to the project documents are generated, adapting existing standard models or designing new formats with continuity of the corporate image.

CR 4.3 seals necessary to be used in documents are generated, adapting existing standard models or designing new formats with continuity of the corporate image.

CR 4.4 formats of those types of documents which are necessary to incorporate into the system or they need to adapt to the needs of the project, are generated in the same way that the initial, transforming formats available or if necessary by designing them with continuity of the corporate image.

CR 4.5 proposals relating to the formats of documents or seals are presented to the upper or Manager for approval.

CR 4.6 the definitive version of the formats of documents and seals is generated, incorporating the indications of the upper or Manager, and is broadcast to all agents responsible for the generation and/or approval of the same.

5 RP: Operate the document management system to ensure its implementation and entry into force, in accordance with established procedures and methodology.

CR 5.1 the starting situation is analyzed by consulting with the upper or Manager, evaluating the features and power of the necessary computer equipment that support documentation system.

CR 5.2 equipment and computer systems are installed and configured user, adjusting to the needs of the documentation system-level.

CR 5.3 documentation system discharge is made, following the guidelines of the upper or Manager, ensuring the full operation of the same.

CR 5.4 contacts and agents involved are coded and entered into the system, ensuring the uniqueness and traceability of the contacts.

CR 5.5 documents necessary for the proper functioning of the system are generated and/or filed, using established procedures, coding and format.

5.6 CR plans and technical information are archived and forwards, ensuring its validity at the points of use in the shortest possible time from approval or reception.

CR 5.7 proposals relating to the formats of documents or seals are presented to the upper or Manager for approval.

CR 5.8 the definitive version of the formats of documents and seals is generated, incorporating the indications of the upper or Manager, and is broadcast to all agents responsible for the generation and/or approval of the same.

CR 5.9 operating system communicates to Manager or higher, generating reports on aspects of project control diagnosable from the tracking system of documentation.



Professional context: means of production: computers and computer networks. Applications and documentary control specific environments. Office applications. Material documentation file systems.



Products and results: index of documentation of the project/work control. Coding system for documents. Management process flow diagrams. Standard formats of documents, designed and applied. Document management system implemented. Reports of documents and processes, verbal, writing and graphics.



Used or generated information: documents from studies and projects. Documentation model established for the type of project. Standard models of diagrams representing processes similar to the project. Sheet of specifications of the project that defines the documents to generate.



TRAINING module 1: planning in construction level: 3 code: MF0874_3 associated with UC: track planning in construction duration: 270 hours capabilities and evaluation criteria: C1: analyze planning/programming processes, assessing their usefulness, by comparing the different methods used, and performing calculations of programs without using specific software applications.

CE1.1 explain the difference between the notion of project as technical document and planned and directed action, specifying the relationship between both notions.

CE1.2 explain why it is useful and necessary planning projects, formulating a definition of the concept of planning tailored to the development of projects.

CE1.3 explain the elements common to all methods of planning, defining the following concepts: model of the process, threads, phases and subphases, activities, relationships.

CE1.4 classify and compare the different types of planning - diagram of Gantt, critical path methods - methods, differing objectives, scope and calculation procedures.

CE1.5 explain the difference between activities (tasks), hammocks, milestones, structure of disaggregation of the project, specifying the relationship between these concepts.

CE1.6 explain the different types of relationships between activities, deducing what is the critical path.

CE1.7 in a practical case of a process everyday, calculate the precedence network and perform its equivalent representation in Gantt chart, solving the duration of the network and its critical path without using specific computer applications.

CE1.8 explain the needs for monitoring, updating and revision of the planning, describing the changes suffered by the project during its development.

CE1.9 describe common implementation of the planning/programming defects, their causes and effects.

CE1.10 describe the factors of technological and organizational innovation in the work of planning projects and works, assessing its impact.

C2: Analyze the processes associated with the development of projects and construction works, defining phases that compose them and determining the activities needed to be included in its program Base.

CE2.1 relate the phases involved the procurement of a building (initial definition, design, procurement, execution) project, determining the purpose of each phase, the outcome (Base, design program, hiring program and program execution program respectively) and the temporal relationships that bind them.

CE2.2 explain the level of detail that is reached in the previous definition of a performance, and its corresponding program basis, identifying the agents involved and/or consulted during its preparation and the roles played by.

CE2.3 in a practical case of a project given, determine the activities necessary to generate the Base program, covering all the phases that make up that same project.

CE2.4 identify the (plan, study, preliminary design, project) stages that can compete in the elaboration of a project of construction and the documents that comprise it, specifying the degree of definition which achieves the design in each of these stages.

CE2.5 describe the process of procurement or contracting (contest and procurement), ordering the stages involved.

CE2.6 describe deviations usual in the temporal development of the construction works/projects, involving measures to reduce them.

C3: Analyze works and formalities necessary in the development of phases of design and contracting of projects, describing how and when are performed.

CE3.1 exhibit works and usual formalities involved in the design of a project, determining their development in time.

CE3.2 identify officials involved or consulted in the process of elaboration of a project, describing its intervention.

CE3.3 explain what are the strategies of delivery and recruitment, describing what are deliveries of design and common recruitment packages.

CE3.4 explain how design and procurement strategies influence both design processes such as procurement, describing the relationship between both processes.

CE3.5 exhibit works and usual procedures involved in the hiring of a project work, determining their development in time.

CE3.6 identify officials involved or consulted in the process of contracting of works of implementation of a project, describing its intervention.

CE3.7 in a practical case of a project given, determine the activities necessary to generate the programs design and procurement, establishing its correspondence with each stage works and establishing the temporal relationships between the activities of its same phase and other phases.

CE3.8 describe deviations usual in the temporal development of the design and procurement processes, involving measures to reduce them.

C4: Analyze units that integrate the execution of construction works, describing how, when and by who run.

CE4.1 relate common chapters involved in the execution of a building project and another of urbanization, determining their development and temporal relationships that bind them, and comparing both cases.

CE4.2 relate typical work units within the chapters that make up the execution of buildings and works of urbanization, differentiating according to different types of buildings (residential, offices, shopping center, and others), explaining its nature and temporary relationships that bind them.
CE4.3 classify civilian infrastructure according to their functions, differentiating between types and describing its characteristics.

CE4.4 explain the hierarchical structure that regulates the works (operators, leaders of team, foremen, managers, general manager, production manager and project manager), specifying the prevalence.

CE4.5 in a practical case of a construction site, identify resources (materials, crafts and machinery) that are used in the execution of units, using the same description.

CE4.6 identify the interim facilities, the usual auxiliary and collective protection means works type of construction and urbanization, differentiating their types.

CE4.7 describe the methods and procedures of implementation for the most significant units in building and estate type, specifying the different resources used.

CE4.8 describe deviations usual in the temporal development of the works, involving measures to reduce them.

C5: Determine the activities that integrate the implementation programme of a particular project, comparing with breakdown structure and work programme type, establishing and obtaining the information needed to define the program.

CE5.1 relate the usual construction activities in building and construction works, establishing its correspondence with the work of the budget and its measurement units.

CE5.2 identify the teams involved in the implementation of construction activities and average yields obtained, using descriptions of units and equipment.

CE5.3 describe the common content and the process for completing the forms of data that define the execution program, evaluating the periodicity with which must be performed.

CE5.4 identify sources of information, resources and performance in construction, assessing their accuracy.

CE5.5 in a practical case of a work of building or estate easily dispose of their project documents and by comparison with other similar work whose program serves as a model:-determine its breakdown structure.

-To obtain the list of activities and encode them.

-Calculate the duration of the activities by allocating resources and applying standard yields.

-Establish relations between activities and set the precedence network.

CE5.6 explain the importance of calendars of reference in the elaboration of a programme, describing the problems that can arise when they are ill-defined.

C6: Describe the procedures for monitoring, updating and revision of the planning, interpreting the available information.

CE6.1 describe how to use the graphic information (reports, drawings, photographs) to display the progress of a work, valuing differences.

CE6.2 describe the procedure with which take place the tracking projects and construction sites, describing the usual contents of forms of monitoring and evaluating the periodicity with which must be.

CE6.3 explain the update of the programme into projects and construction, associating the causes that make it necessary and describing the procedures that apply.

CE6.4 describe the reports and graphs used to illustrate the progress of a project/work, associating software applications which are made of, and identifying the variables to represent.

C7: Operate specific planning and office computer applications developed and calculating programs of projects and works, carrying out monitoring, updating and revision of the same, as well as reports on the State of progress of the projects or works to control.

CE7.1 in a practical case of a work of edification or simple urbanization, which is known in its programme activities and fully established relationships, and operating Planning Office and specific computer applications:-create resources, codes and timetables within the specific computer application dictionaries.

-Determine a structure of ID (number) intuitive to provide the location of the activities within the work.

-Insert the list of activities by assigning their numbers, descriptions and codes established in dictionaries.

-Insert the relationships between activities.

-Assign schedules appropriate according to the specific needs and the sector generic calendars.

-Calculate the resulting program determining the end date, the critical path, and the total hours and the weekly average of resources.

-Debug program eliminating activities without predecessors or successors and of relations to obtain a program with a critical path logical and justifiable or coding errors.

-To determine the critical path and the period of execution provided.

-Level resources to avoid the inefficient use of them.

-Generate the necessary forms to keep track of the program in the work.

-Insert tracking information resulting from the analysis of the progress of the work.

-Debug the program and eliminate progress out of sequence to obtain a program with a critical path logical and justifiable.

-Determine the deviations and the new end date.

-Develop a matrix report and a progress curve.

-Introduce the activities resulting from a modification to the project, reviewing the planned end date.

Skills whose acquisition must be completed in a real work environment: C1 with respect to CE1.7; C2 regarding CE2.3; C3 on CE3.7; C4 on CE4.5; C5 regarding CE5.5; C7 respect CE7.1.

Other capabilities: convey information with clarity, orderly, structured, clear and precise respecting the channels established in the organization.

Demonstrate a degree of autonomy in the resolution of contingencies related to its activity.

Communicate effectively with the right people, at all times; respecting the channels established in the organization.

Act quickly in problematic situations and not just waiting.

Adapt to the Organization, to its organisational and technological changes; as well as to new contexts or situations.

Participate and collaborate actively in the task force.



Contents: 1. planning/scheduling of meanings of the term construction project. The planning/programming function. Standard deviations in deadlines for projects and construction works. Implementation of the planning/programming defects. Factors of technological and organizational innovation: organizational systems of recent implementation, procedures and techniques of recent implementation, applications and computers of recent implementation.



2 methods of representation and calculation in planning concepts: tasks, hammocks, milestones, activities, road and critical path, model of the process, threads, phases and subphases, breakdown of the project structure. Relations temporary activities (comienzo-comienzo, endlevel, fin-fin, fin-comienzo), total and free play. Gantt chart: representation, calculation, advantages and disadvantages. Critical path (CPM) methods: types, precedence network, method of arrows or PERT; representation; calculation; advantages and disadvantages. Reference calendars.



3. development of projects/works of construction initial phase: objectives, agents involved; relationship with the phases of design and implementation; Basic program. Design phase: objectives, agents involved; procedures, simultaneous and the design phase. Stages in the development of projects: building (previous study, preliminary design, Basic project, implementation project), civil engineering (plan, preliminary study, preliminary design, projects); degree of definition; delivery of lots of design strategy; relationship with the contracting and execution phases; program design; standard deviations in deadlines (causes and effects). Phase of recruitment: objectives, agents involved; systems for the supply of products and services in construction; strategy and lots of recruitment; stages of the process of procurement and Contracting; related to the design and implementation phases; Recruitment program; standard deviations in deadlines (causes and effects). Implementation phase: objectives, agents involved; related to the design and implementation phases; program execution. Deactivation phase.



4. follow-up, updating and revision of the planning of projects/works of construction monitoring of planning: objectives and periodicity, procedures; forms of follow-up. Update of planning: objectives, procedures. Review of planning: changes to the project (changes in project scope, methods of execution, sequence, time limits). Planning reports: progress of the project, periodic and cumulative variables; graphics project progress (curves, espacios-tiempos, dot-matrix, flat marked with colors); written reports.



5 construction works: General difference between activity and work unit. Resources: materials, labor and equipment. Organizational charts in works. Notions of civil works: kinds and types of works, functions; common elements with building and urbanization.



6 construction works
Kinds of building works. The building technical code: scope, structure. Breakdown structures. Common chapters on building works (demolition and shoring, earthmoving, network of buried sanitation foundations, structures, enclosures and partitions, finishes and ceilings, roofs, insulation and waterproofing, flooring, tiled and veneers, woodwork, carpentry of aluminium and pvc, locksmith, glassware and translucent, electricity installations, lighting installations, audiovisual facilities, plumbing, plumbing fixtures, heating systems) (, facilities of air conditioning, gas installations, lifts, installations for protection against fire, special facilities, paints and finishes, rehabilitation and restoration): objectives, methods of execution according to function, media employees, building systems and/or type of material; units of measurement; activities and temporary relations; resources, yields and building databases. Collective protection, temporary installations and auxiliary means.



7. works of urbanization classes of works. Breakdown structures. Common chapters on urbanization works (earthworks, drainage, firm, pedestrian areas, walls and defence, factory and structures works works, supply of water, sanitation and water purification, networks and gas tanks, electricity grids and transformation centers, lighting public, traffic signals and telephone network, networks of irrigation and fountains, gardening and treatment of the landscape, street furniture and playgrounds, sports facilities) (, signalling and marking): objectives, methods of execution according to function, media employees, building systems or type of material, units of measurement; activities temporal relationships, resources, yields and building databases. Collective protection, temporary installations and auxiliary means.



8. planning software applications in construction management of import and export formats. Resource dictionary. Encoding and description of activities. Calendars. Calculation features: debugging the program, critical path, end date, total hours, average weekly resources, resource leveling. Presentation functions: tracking forms, reports, progress curves and matrix reports.



9. office applications used in planning of construction use of office applications in planning: editing of texts, spreadsheets and databases. Management of import and export formats. Editing and operation of spreadsheets and databases. Obtaining graphics. Editing of presentations. Edition of reports. File.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the realization of the monitoring of planning in construction, which will be using one of the following ways:-academic education of level 2 (Spanish framework for higher education qualifications), engineering, technical architecture, diploma or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 2: CONTROL of costs in construction level: 3 code: MF0875_3 associated with UC: process the control of cost in construction duration: 150 hours capabilities and evaluation criteria: C1: analyzing a company cost control activities, assessing their usefulness, describing concepts, methods and procedures, and detecting common defects in your application.

CE1.1 explain why is useful and necessary to control costs, referring customary deviations in the costs of projects and construction work and assessing its severity depending on the available time and work remaining.

CE1.2 explain the elements common to all methods of cost control, define the following concepts: decomposed and unitary prices, classification and structure of costs, estimation of costs (budget), margins and results and others.

CE1.3 explain the difference between posting a company's operations and control costs of a given project/work, specifying the relationship between both notions.

CE1.4 classify the different types of budgets, relating them to each phase of development of the project and the information available in each phase.

CE1.5 describe the cost sheets, identifying the usual content of their rows and columns, and its level of detail, and explaining its utility to measure compliance with the budget forecasts compared with the actual progress of the project.

CE1.6 describe the costs and usual graphics reports to determine the progress of a project, associating software applications which are made of, and identifying the variables to represent.

CE1.7 interpret the meaning of the terms of cost-control efforts, defining them precisely.

CE1.8 describe usual defects of implementation of cost control, their causes and effects.

CE1.9 describe the factors of organizational and technological innovation in the cost of projects and construction control, assessing its impact.

C2: Describe the process of cost control within the environment of a construction project from its conception to its realization, differentiating its scope according to the different phases of the project.

CE2.1 list centers common costs in a project design and initial construction in phases, pointing out its importance.

CE2.2 list the chapters and sub-chapters regular budgets of building and development, specifying the relative order in which they are presented.

CE2.3 relate the usual units of work within the chapters that make up the execution of various types of buildings (residential, offices, shopping center, and others) and urbanization works, explaining its nature.

CE2.4 explain why you must update the cost control during the design phase, defining the control points.

CE2.5 explain the need for the cost control during the recruitment phase, describing the deviations for quantity, quality or amount of the services/products offered.

CE2.6 identify the components necessary for the periodic closure of costs of a construction site, define the following concepts: direct and indirect costs, amortizations, staff, equipment and other overhead costs.

C3: Analyze the process of contracting of works and services in the construction sector, specifying both the stages in their development as the documentation managed during the same, and formulating criteria for comparison of offers.

CE3.1 describe systems of contracting of works and services in the construction sector, pointing out their differences.

The CE3.2 is describing the process of procurement or contracting (contest and procurement), ordering the stages involved.

CE3.3 explain the need to divide the contracting of work in batches, listing the usual works of building or estate lots.

CE3.4 identify the documentation associated with the request of offers, specifying the function of each document and its contents.

CE3.5 describe the mechanics of making a comparison of tenders form, identifying the usual content of the rows and columns.

CE3.6 exposure criteria for comparison of offers, describing as they apply to raise recommendations for the award.

CE3.7 list administrative documentation that a contractor must be provided prior to the signature of the contract, specifying the function of each document.

CE3.8 describe the relevant clauses of contracts of construction works, evaluating its importance.

C4: Explain payment procedures to suppliers in the construction sector, specifying the fractions and common terms.

CE4.1 explain the fractionation of the payment procedure by certifications in construction work, interpreting the meaning of the terms of the certification process.

CE4.2 describe certifications sheet structure, specifying how they are sorted the included concepts.

CE4.3 describe the procedure for billing and collection, identifying deadlines and usual terms.

CE4.4 interpret the contents that make up the Bills, identifying them in examples of invoices presented.

CE4.5 explain the deviation between the calculated certifications and valued relationships submitted by suppliers (subcontractors), indicating the common causes and describing how they are resolved.
CE4.6 describe the final certification of work, indicating the usual procedure for refund of deductions is formalised.

C5: Analyze how affect changes to project cost control system, describing the resolution and the associated documentation procedures, and criteria for the evaluation of new units.

CE5.1 reference the common causes for the emergence of modifications/reformed/claims, by associating the effects resulting.

CE5.2 describe the dispute settlement procedure at the level of control of costs of the changes affecting a project, identifying the associated documentation, and differentiating between public administrations and private clients.

CE5.3 reference criteria for the evaluation of common modifications in construction, appreciating their differences.

CE5.4 describe the process of contractual formalisation of amendments, specifying the risks posed by potential claims and compensation.

C6: Generate budgets, lots of procurement, comparative tables, sheets of costs, certifications and reports, operating with spreadsheets and applications of measurement.

CE6.1 in a practical case of a project/work of building or estate, defined by the available information regarding the needs of the client, supplemental information ratios and prices and measurements contained in specific computer application databases:-make your budget in initial phase.

-Generate an execution budget worksheet, by applying a given model and defining the coding of units.

-Perform the allocation of units to defined procurement lots to proceed with the request of offers.

-Carry out the comparative table of some single tenders submitted, determining the necessary explanatory information to standardize such offers, by selecting the appropriate offer.

-Generate a list of contract items.

-Generate a certification given measurements to origin and prior certification.

-Given a monthly certification, generate a sheet of costs and an associated report.

-Perform the usual graphics of a work in relation to costs/charges and monthly and cumulative planned/actual certification.

Skills whose acquisition must be completed in a real work environment: complete C6.

Other capabilities: convey information with clarity, orderly, structured, clear and precise respecting the channels established in the organization.

Communicate effectively with the right people, at all times; respecting the channels established in the organization.

Respect the procedures and internal rules of the organization.

Demonstrate flexibility to understand changes.

Demonstrate a good make professional.

Complete the work according to criteria of fitness, speed, economy and efficiency.



Contents: 1. Control cost in construction function. Differences between accounting and cost control. Standard deviations in the cost of projects and construction works. Notions: decomposed and unitary prices, concepts and items, items raised, cost classification, structure costs, budgets, margins, results. Types of budgets: budget initial by ratios, budget target, budget execution, others. Costs sheets: function, usual structure of leaves of costs in construction, level of detail. Reports of costs: progress of the project, variables periodic and cumulative, curves and graphics for control of costs, contained regular reports of costs. Application of cost control defects: lack or information errors, miscalculations, errors of attribution, unauthorized manipulations and others. Factors of technological and organizational innovation: organizational systems, procedures, techniques, applications and computers of recent implementation.



2. the process of the cost control in projects/construction costs in initial phase: activities of management, feasibility studies, soils, appraisals, and others. Design phase costs: cost centers; control points of the design phase. Costs in the recruitment phase. Deviations: settings improvements/alternatives to the specified products/services, measurement, deviations in variations on planned unit prices, low. Costs in implementation phase: direct and indirect costs, staff costs, material and equipment; prices and building databases. Chapters, sub-chapters common in construction works: work, form and units of measurement. Chapters, common sub-chapters in urban development: work, form and units of measurement. Review of costs: causes; resolution, conflicting prices; criteria for the evaluation of modifications; associated documentation.



3. process of hiring in construction systems of procurement of works and services in construction: direct award, contest and auction; purchase and rental of materials and equipment; Contracting and subcontracting of services, projects and works; Regulation of subcontracting in construction. Stages of the procurement and contracting process: creation of lots; invitation to the competition or bidding; preparation of contest rules; collection and sending of documents of competition / offers request; offering period; elucidation and evaluation of tenders, comparative table; recommendation for the award; awarding and signing the contract. Lots of recruitment: recruitment strategies; common building lots; usual lots in urban development. Offers request documentation: for the invitation; for the contest; for the award. Clauses in contracts of suppliers in construction: bonuses and penalties; payment schedule; termination of the contract; revision of the agreement; non-conformities; order of prevalence of documents; force majeure and others. Comparison of offers: full scope of supply; homogeneity; separation of variants; deadlines; Organization; execution systems and others.



4. procedures of payment in construction certifications: concepts; leaf certifications; certification deadlines; incorporation of amendments to scope of the project, final certification of work. Invoicing: process; contents of invoices; expiration times.



5. applications of budgeting and spreadsheet management of import and export formats. Editing of texts, graphs and tables. Editing and operation of spreadsheets. Presentation of results. Graphical output. File.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to the processing of the cost control in construction, which will be using one of the following ways:-academic education of level 2 (Spanish framework for higher education qualifications), engineering, technical architecture, diploma or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.



TRAINING module 3: CONTROL documentary on construction level: 3 code: MF0876_3 associated with UC: managing construction duration projects documentation systems: 90 hours capabilities and evaluation criteria: C1: analyze the techniques of documentary control applicable in projects of a varied nature, assessing their usefulness, describing concepts, methods and procedures, and detecting common defects in your application.

CE1.1 explain why it is useful and necessary documentary control, referring to the problems posed by the absence of the same projects and construction works.

CE1.2 sequence the stages in the creation and filing of documents, identifying different makers.

CE1.3 describe available documentary control, with physical or computer support systems, evaluating their characteristics.

CE1.4 describe the common physical file systems and their applications depending on the type of documents and media, valuing its characteristics.

CE1.5 describe the systems and structures of computer file and backup copies, specifying the factors that determine the scope and periodicity.

CE1.6 describe the document management systems required within an ISO quality system, characterizing its application in projects/construction.

CE1.7 describe usual defects of application of documentary checks, their causes and effects.

CE1.8 describe the factors of technological and organizational innovation in documentary projects and construction control, assessing its impact.
C2: Determine applications of documentary checks within the environment of a construction site/project, from conception to execution, identifying actions at each stage.

CE2.1 describe the process of documentary checks during the initial phase, identifying the documents associated with this phase and the agents involved in its processing.

CE2.2 describe the process of documentary checks during the design phase, identifying checkpoints during the same, the documents associated with this phase and the agents involved in its processing.

CE2.3 describe the processes of documentary checks during the recruitment phase, identifying the documents used during recruitment and administrative documentation that a contractor must be provided prior to the signature of contract.

CE2.4 describing the processes of documentary control relative to the phase of execution, identifying critical points in their control, the documents associated with this phase, and agents involved in its processing.

CE2.5 evaluate the importance of the documents in the implementation phase on the other phases, justifying the need for their proper control.

CE2.6 describing the processes of documentary checks relating to quality Integral system, identifying the documents associated with the fields of quality, environment and risk prevention, as well as agents involved in its processing.

CE2.7 describe the typical structure of a physical or computer file of a project/construction site, indicating the factors that condition the divisions.

CE2.8 explain the need for necessary seals in the registration of physical documents, identifying them in projects submitted documents.

C3: Analyze and describe the exchanges of information and documentation involved in the various processes of projects/works of construction using flowcharts.

CE3.1 explain the usefulness of the flow diagrams of processes related to documentary checks, assessing your need.

CE3.2 identify basic shapes used in a flowchart of the process on the basis of presented examples.

CE3.3 in a practical course of a process type of a project/construction site, such as the modification of the scope of a project, or a certification, defined in such a way that referred to the agents involved, represented by a flow chart the process required for processing.

CE3.4 in a so-called practical of diverse processes agents certain type of a project/construction works, such as that set forth below, characterized by the flowcharts for processes of exchange of information, to interpret them by setting the actions to be carried out:-approval process samples, detailed drawings and specifications by the design team.

-Processing of non conformities/list of auctions or defects.

CE3.5 describe the process of updating documents and their dissemination, identifying the common media in works.

C4: Identify the specific formats used in construction and the essential elements of their identification and coding, describing properties that must follow the systems of coding.

CE4.1 explain the need for consistency/continuity in the formats in the various documents of a project, evaluating its importance.

CE4.2 determine function and the presentation of the most important documents of the work (memory, plans, budget, statement of requirements techniques), specifying what are its contents and which aspects of management are you own.

CE4.3 determine the function and the presentation of the documents most important specific of a quality integrated system (quality, environment and risk prevention), specifying what are its contents and which aspects of management are you own.

CE4.4 stating the essential elements which constitute the identification of the technical documentation which is involved in the project, assessing your need.

CE4.5 stating the essential elements which constitute the identification of no technical documentation that is involved in the project, assessing your need.

CE4.6 describe the properties of a codification system covering all documents to control in a work, evaluating its importance.

C5: Describe the reports that controls the exchange of documentation and used both tabular and graphical representations, valuing the role of information and communication in document management technologies.

CE5.1 identify the factors that condition the need for producing reports on the State of exchange of information on projects/construction sites, evaluating its importance.

CE5.2 reference the content of the most common reports in projects/construction in relation to the flow of information, identifying the variables employed.

CE5.3 describe the graphics used to control the exchange of information, identifying the variables used.

CE5.4 analyze the minimum content of a monthly report of project/work, its structure, describing how includes control information document regarding costs and planning information, and how it is made in digital media.

CE5.5 describe the use of information technologies and communication in communication and document management of projects and construction sites, assessing the importance of the different modalities.

C6: Operate a documentary control system performing the physical and computer file of documents and generate basic reports and formats, using document management office or specific applications.

CE6.1 in a practical case of project/work of building or estate, defined by the technical documents and relevant management, and knowing the status of processing of the same at a given time:-perform a file index that covers all the needs of the project/project and its corresponding structure of folders and subfolders in a computer.

-Register and archive documents, according to the index and seals of the project work.

-Generate, using a word processor, formats of letter, fax, minutes of meeting, with in-demand features.

-Generate with spreadsheet or database manager a register containing information on the plans of the project: general information, latest revision of the plane, who has been sent and on what date.

-Perform graphics, and a tabular report showing the status of approvals, technical clarification and non-conformities.

-Make a word processor through monthly report, which includes information about costs and planning in different formats for transmission by email in a single file.

Skills whose acquisition must be completed in a real work environment: C3 with respect to CE3.3 and CE3.4; Complete C6.

Other capabilities: convey information with clarity, orderly, structured, clear and precise respecting the channels established in the organization.

Communicate effectively with the right people, at all times; respecting the channels established in the organization.

Respect the procedures and internal rules of the organization.

Act quickly in problematic situations and not just waiting.

Adapt to new contexts or situations.

Demonstrate creativity in the development of the work performed.



Contents: 1. documentary Control of projects and construction function. Common errors associated with the lack of documentary checks at construction sites and projects. Stages in the creation and filing of documents: generation, review, approval, dissemination, file modification/cancellation. Documentary control systems: physical media; computer storage media. Physical file types available. Computer systems for archiving and backup: supports; backup systems; methodology of file management in computer operating systems. Application of the requirements of a quality system ISO projects/works of construction. Application of documentary control defects: defects in the structure of encoding, lack or information errors, errors in identification or sequence of documents, the process of handling, processing errors and other defects. Factors of technological and organizational innovation: organizational systems, procedures, techniques, applications and computers of recent implementation.



2. the process of documentary checks in projects/construction
Kinds of documents subject to documentary checks: general index of documents, documents generated by those participating in the project, documents generated outside the scope of the project and managed within the same, reference documents generated and managed outside the scope of the project; communication documents; economic documents; design documents; management documents; legal documents; specific total quality system documents. Initial phase: process; documents and agents involved in its creation and processing. Design phase: process; documents and agents involved in its creation and processing; control points of the design phase. Phase of recruitment: recruitment process; documents and agents involved in its creation and processing. Implementation phase: processes; documents and agents involved in its creation and processing, importance of the documents; seals; structure of physical and computer files. Deactivation phase. Quality Integral system: scope of application; processes; documents and agents involved in its creation and processing. Process flow diagrams: functions; Basic forms; structure and flow charts formats; flow charts of decision, changes, certification, approval of documents and others. Update the documentation of project and work: objectives; diffusion process; common media in projects/construction. Formats used in construction: documents and structure of projects; elements of identification by document types; technical and non-technical documents coding systems. Reports produced to reflect the exchange of information: basic information of reports; report types: tabular and others; graphics state of the exchange of information; monthly report of project/work.



3. computer applications used in documentary control applications of document management and office applications: formats and reporting, data entry, list of documents; editing and operation of spreadsheets and data bases; editing of presentations. File. Design of flow charts software applications: creation of flow charts; Edit flow charts; presentation, file.



Parameters of the training context: spaces and facilities: the spaces and facilities will answer, in the form of classroom, classroom workshop, workshop practice, laboratory, or space, to training needs, in accordance with the professional context established in the competition unit associated, taking into account the applicable regulations of the productive sector, risk prevention, occupational health, universal accessibility and environmental protection.



Professional profile of the trainer or trainer: 1. domain of knowledge and techniques related to management systems of documentation of building projects, which will be using one of the following ways:-academic education of level 2 (Spanish framework for higher education qualifications), engineering, technical architecture, diploma or other upper level related to the professional field.

-Professional experience of minimum 3 years in the field of skills related to this training module.

2. accredited educational competition in accordance with it to establish the competent administrations.