Key Benefits:
Law 17/2007, dated 4 July, amended Law 54/1997 of 27 November of the Electrical Sector to adapt it to the provisions of Directive 2003 /54/EC of 26 June 2003 of the European Parliament and of the Council on common rules for the internal market in electricity and repealing Directive 96 /92/EC.
Article 17.1 of the Law 54/1997, of 27 November, of the Electricity Sector, states that the Minister of Industry, Tourism and Trade, after the Agreement of the Government Delegation for Economic Affairs, will dictate the necessary provisions for the establishment of the tolls for access to the networks, which will be established on the basis of the costs of the regulated activities of the system that correspond, including between them the permanent costs and the costs of diversification and security of supply.
Royal Decree 1202/2010, of 24 September, establishing the deadlines for the revision of the tolls for access to the transmission and distribution networks of electrical energy, determines the periodicity so that the Minister of Industry, Tourism and Trade can carry out the revision of the tolls of access to the networks of transport and distribution of electrical energy, having in its article 2.1, in general its review with annual character.
The second transitional provision of Law 17/2007, of July 4, determines that the Minister of Industry, Tourism and Trade will establish the mechanism for the transfer of customers from the system to the tariff system of the last resort that corresponds to them.
Thus, in Royal Decree 485/2009 of April 3, the implementation of the supply of last resort in the electricity sector is regulated. Article 7 of the same royal decree sets out the methodology for calculating and reviewing the last resort's tariffs, in which the Minister of Industry, Tourism and Trade will dictate the provisions necessary for the establishment of these last resort tariffs by determining their structure in a manner consistent with the access tolls. For these purposes, the Minister of Industry, Tourism and Trade may review the structure of the low voltage access tolls to adapt them to the last resort rates and ensure their additivity.
Royal Decree-Law 6/2010 of 9 April 2010 on measures for the promotion and economic recovery and employment changes, in Article 21, to the additional twenty-first provision of Law 54/1997 of 27 November 1997 on the Electricity Sector, so that, as from 1 January 2013, access tolls will be sufficient to cover all the costs of regulated activities without the possibility of a former deficit arising, by fixing a timetable to that date with the upper limit each year of the revenue deficit in the liquidations of the regulated activities of the electrical sector. It also provides for the transfer of the deficit recovery rights to the Electricity System Deficit-Titling Fund and, in addition, Article 22 establishes the transitional deficit financing mechanism to the securitisation.
On the other hand, the additional provision of Royal Decree-Law 6/2009 of 30 April 2009, whereby certain measures are adopted in the energy sector and the social bond is approved establishes the extraction of generation in the island and extra-island regime.
In this order, the provisions of Article 2 of the aforementioned Royal Decree 1202/2010 of 24 September 2010 are developed, taking into account the provisions of Order ITC/1659/2009 of 22 June 2009, in which access tolls are concerned in order to comply with the additional twenty-first provision of Law 54/1997 of 27 November 1997, of the Electrical Sector, in the wording given by Article 21 of the aforementioned Royal Decree-Law 6/2010 of 9 April 2010 on the sufficiency of access tolls and revenue mismatches of regulated activities in the electricity sector.
Royal Decree 2819/1998, of 23 December, regulating the activities of transport and distribution of electric power and Royal Decree 325/2008 of 29 February, establishing the remuneration of the activity of transport of electrical energy for installations put into service from 1 January 2008, define the elements that integrate the transport networks and develop the remuneration regime applicable to them by establishing the methodology for the calculation and revision of the remuneration of the activity of electric energy transport.
For its part, the Royal Decree 222/2008 of 15 February, establishing the remuneration scheme for the activity of distribution of electrical energy, determines the way in which the remuneration of this activity is calculated and revised.
For all this, the costs are revised by this order and the tolls for access to the electricity transmission and distribution networks that the companies apply from 1 January 2011 are adjusted.
On the other hand, according to the provisions of Article 44.1 and the second transitional provision of Royal Decree 661/2007, of 25 May 2007, which regulates the activity of energy production in a special regime, the quarterly updates for the fourth quarter of 2010 and the first of 2011, of the tariffs and premiums for the facilities of the subgroups a.1.1 and a.1.2 (cogenerations using natural gas, diesel, fuel-oil or LPG), of the group c.2 (waste facilities) and of the hosts to the second transitional arrangement of the said royal decree are applicable. (cogeneration facilities for the treatment and reduction of waste).
The quarterly variations of the benchmark indices used for the update have been, an increase of 147.1 basis points for the CPI as of October 1 and a decrease of 12.8 basis points from January 1, an increase of 6.579 percent for the price of natural gas and an increase of 10.350 percent for the price of diesel, LPG and fuel oil as of October 1 and an additional decrease of 0.525 percent and 2.068 percent, respectively, as of January 1.
The annual updates of the remaining facilities in category (a) and (c) and of category (b) facilities in accordance with Article 44.1, as well as of the facilities under the sixth additional provision (installed capacity of more than 50 MW and not more than 100 MW) and the transitional provision (installations using cogeneration for the drying of the by-products of olive oil production) of the said Royal Decree 661/2007 of 25 May 2007, are to be carried out in the same way.
Annual changes in the benchmark indices used have been an increase in the CPI of 233.2 basis points and an increase in the price of coal of 26.29 percent.
Similarly, in accordance with the provisions of Article 12 of Royal Decree 1578/2008 of 26 September 2008, of remuneration for the production of electricity by photovoltaic solar technology for installations after the date of maintenance of the remuneration of Royal Decree 661/2007 of 25 May 2007, for that technology, the annual rate update for the PV installations entered in the Register of Preallocation of Pay in the corresponding calls for the year 2009 is appropriate.
It is necessary to incorporate the remuneration changes for the photovoltaic and wind technologies incorporated by Royal Decree 1565/2010, of 19 November, in which certain aspects relating to the activity of production of electrical energy are regulated and modified by Royal Decree 1614/2010, of December 7, by which certain aspects relating to the activity of production of electrical energy from thermoelectric and wind solar technologies are regulated and modified, respectively.
Finally, it is necessary to comply in this order with the provisions of the Additional Twenty-First Disposition of Law 54/1997, of 27 November, according to the wording given by Royal Decree-Law 14/2010 of 23 December, establishing urgent measures for the correction of the tariff deficit in the electricity sector.
According to the provisions of the 11th additional provision of Law 34/1998 of 7 October of the Hydrocarbons Sector, this order has been the subject of a report by the National Energy Commission. This report takes into account the arguments put forward in the proceedings of an evacuated hearing to the representatives of the Electricity Advisory Board.
By agreement of 27 December 2010, the Government's Delegation for Economic Affairs has authorised the Minister of Industry, Tourism and Trade to issue this order.
Under the agreement of the Government's Delegation for Economic Affairs, I have:
Article 1. Forecast of transport costs for 2011.
According to the provisions of Royal Decree 325/2008 of 29 February establishing the remuneration of the activity of transport of electrical energy for installations put into service from 1 January 2008 and Royal Decree 2819/1998 of 23 December 1998 on the activities of transport and distribution of electric energy remuneration for transport activity is established as a forecast of the remuneration of the transport activity for 2011, which is set out in the attached table:
Pay | (Thousands of Euros) |
---|---|
ELECTRIC NETWORK OF SPAIN, S.A. | 1.299.545 |
IBERDROLA ELECTRICAL DISTRIBUTION, S.A.U. | 22 |
GAS NATURAL FENOSA, S.A. | 51.198 |
ENDESA, S.A. (peninsular) | 32.353 |
HYDROTALABRICO ELECTRICAL DISTRIBUTION, S.A. | 7.432 |
Total Peninsular | 1.390.550 |
ENDESA, S.A. (extrapeninsular) | 143,876 |
Total extrapeninsular | 143,876 |
Total | 1.534.426 |
Article 2. Review of the distribution costs for 2009 and 2010 and forecast the distribution and commercial management costs for 2011.
1. The final costs for 2009 for the distribution companies with more than 100,000 customers and FEVASA and SOLANAR, deducted the other revenues derived from the rights of the affected, hooks, verification and rental of measuring devices, including the incentive or penalty to the quality of the service are set out in the following amounts:
or business group | (Thousands of Euros) | |
---|---|---|
IBERDROLA DISTRIBUTION ELECTRICAL, S.A.U. (****) | 1.498.535 | |
UNION FENOSA DISTRIBUTION, S.A. | 704.218 | |
HYDROTALABRIC ELECTRICAL DISTRIBUTION, S.A. | 140.650 | |
E.ON DISTRIBUTION, S.L. (*) | 137.080 | |
PENINSULAR ENDESA (**) | 1.647,616 | |
EXTRAPENINSULAR ENDESA | 309.032 | |
FEVASA (***) | 189 | |
solanar (***) | 310 | |
Total | 4.437.630 |
(*) As a result of the integration of the distribution companies Electra del Nansa, S.L., and Electra Camijanes, S.L., in E. ON Distribution, S.L., and once the report has been seen with respect to the National Energy Commission, the remuneration of Electra del Nansa, S.L., and Electra Camijanes, S.L., corresponding to the second semester of 2009, amounting to 43,204 euros, is added to the remuneration corresponding to E. ON Distribution, S.L., for the year 2009.
(**) The incentive of quality of the extra-island Endesa is included in that of Endesa peninsular.
(***) According to Article 8.4 of the RD 222/2008 companies FEVASA and SOLANAR do not apply the incentives of quality and losses.
(****) According to the unique additional provision of Order ITC/1732/2010 of 28 June 2010 and as a result of the integration of the distribution company Enermuelas, S.L., in Iberdrola Distribution Electrica, S.A., the remuneration of Enermuelas, S.L., corresponding to the second half of 2009, amounting to 48,167 euros is added to the remuneration corresponding to Iberdrola Distribution Electrica, S.A.U.
2. The final costs for 2010 for the distribution companies with more than 100,000 customers and FEVASA and SOLANAR, deducted the other revenues derived from the rights of the affected, hooks, verification and rental of measuring devices, including the incentive or penalty to the quality of the service are set out in the following amounts:
or business group | (Thousands of Euros) | |
---|---|---|
IBERDROLA DISTRIBUTION ELECTRICAL, S.A.U. | 1.593.124 | |
UNION FENOSA DISTRIBUTION, S.A. | 753.030 | |
HYDROTALABRIC ELECTRICAL DISTRIBUTION, S.A. | 151,939 | |
E.ON DISTRIBUTION, S.L. (*) | 145.472 | |
peninsular ENDESA (**) | 1.734,739 | |
ENDESA extrapeninsular | 308.528 | |
FEVASA (***) | 324 | |
solanar (***) | 338 | |
Total | 4.687.494 |
(*) As a result of the integration of the distribution companies Electra del Nansa, S.L., and Electra Camijanes, S.L., in E. ON Distribution, S.L., the remuneration of Electra del Nansa, S.L., and Electra Camijanes, S.L., corresponding to 2010, amounting to 92,548 euros, is added to the remuneration corresponding to E. ON Distribution, S.L., for the year 2010.
(**) The incentive of quality of the extra-island Endesa is included in the one of Endesa peninsular
(***) According to Article 8.4 of the RD 222/2008 companies FEVASA and SOLANAR do not apply the incentives of quality and losses.
3. The provisional costs for 2011 for the distribution companies with more than 100,000 customers and FEVASA and SOLANAR, deducted the other income derived from the rights of the undertaking, hooks, verification and rental of measuring devices, including the incentive or penalty for the reduction of losses are set out in the following amounts:
or business group | (Thousands of Euros) | |
---|---|---|
IBERDROLA DISTRIBUTION ELECTRICAL, S.A.U. | 1.667.504 | |
UNION FENOSA DISTRIBUTION, S.A. | 806,754 | |
HYDROTALABRIC ELECTRICAL DISTRIBUTION, S.A. | 158,522 | |
E.ON DISTRIBUTION, S.L. (*) | 151,762 | |
ENDESA (peninsular) | 1.766.292 | |
ENDESA (extrapeninsular) | 309,700 | |
FEVASA (**) | 363 | |
SOLAR (**) | 340 | |
Total | 4.861.238 |
(*) As a result of the integration of the distribution companies Electra del Nansa, S.L., and Electra Camijanes, S.L., in E. ON Distribution, S.L., the remuneration of Electra del Nansa, S.L., and Electra Camijanes, S.L., is added to the remuneration corresponding to E. ON Distribution, S.L.
(**) According to Article 8.4 of the RD 222/2008 companies FEVASA and SOLANAR do not apply the incentives of quality and losses.
4. For distributors with less than 100 000 customers, the estimated cost of the remuneration for the distribution and commercial management activity shall be EUR 359,320,012 000 for the year 2011, according to the breakdown set out in Annex I.
5. At these distribution costs, 10,000 thousand euros will be incorporated as costs for plans to carry out the cleaning of the vegetation of the margins where the electrical lines of distribution, referred to in Article 10 of this order, are carried out.
6. The costs recognised for 2011 for the remuneration of the commercial management carried out by the distribution companies with more than 100,000 customers and FEVASA and SOLANAR, amount to EUR 226,591 thousand, broken down by distribution companies as set out in the attached table:
Cost GCi2011 | |
---|---|
IBERDROLA DISTRIBUTION ELECTRICA, S.A.U. | 88,808 |
UNION FENOSA DISTRIBUTION, S.A. | 30.721 |
HYDROTALABRIC ELECTRICAL DISTRIBUTION, S.A. | 5,773 |
E.ON DISTRIBUTION, S.L. | 4,973 |
ENDESA (peninsular) | 81,899 |
ENDESA (extrapeninsular) | 14,380 |
FEVASA | 30 |
SOLANAR | 7 |
Total | 226.591 |
Article 3. Annuities of income mismatch for 2011.
1. Under the terms of the additional twenty-first provision of Law 54/1997 of 27 November 1997, of the Electricity Sector, and without prejudice to the annuities that correspond to the payment entitlements of the electricity system pending the entry into force of this order, the amounts intended to satisfy those duties are as follows:
mismatch | (Miles |
---|---|
2003 to 2005 (extrapeninsular) | 47.914 |
2006 to 2008 (extrapeninsular) | 117,639 |
Year 2005 | 311.661 |
Year 2006 | 174.563 |
Year 2007 | 100.923 |
327.466 | |
Year 2009 | 257,385 |
deficit revenue mismatch forecast for 2009 (R. D-L 6/2010) to Euribor nov. | 814,465 |
Year 2010 | 231,660 |
Year 2011 | 217.327 |
Total | 2.601.003 |
For the purposes of its settlement and recovery, these costs shall be considered as costs of the regulated activities.
2. In accordance with paragraph 4 of the additional twenty-first provision, of Law 54/1997 of 27 November 1997, of the Electricity Sector, a revenue shortfall is provided for in the liquidations of the regulated activities in the electricity sector from 1 January to 31 December 2011, inclusive, amounting to EUR 3 billion.
Article 4. Forecast of the costs of management of the demand for interruptibility for 2011.
A consignment of EUR 522,000 000 is provided for in the service of management of the demand for interruptibility for consumers who acquire their energy in the production market regulated in Order ITC/2370/2007 of 26 July 2007, which regulates the service of management of the demand for interruptibility for consumers who acquire their energy in the production market.
Article 5. Costs with specific destinations.
1. The amount of the costs with specific destinations which, in accordance with Chapter II of Royal Decree 2017/1997 of 26 December 1997, must be met by direct consumers on the market and marketed by the contract for access to tariff, are established from 1 January 2011 at the following percentages:
| Percentage |
---|---|
Costs: |
|
Energy Commission Rate | 0.185 |
and extrapenisland compensations | 6,154 |
Operator | 0.316 |
Diversification and security of supply costs: |
|
Moratorium | 0.422 |
2. part of the nuclear fuel cycle | 0.001 |
Recorder to recover revenue shortfall in the settlement of regulated activities generated between 1 January 2005 and December 31, 2005 | 2,521 |
2. The percentages to be used for costs with specific destinations as set out in the previous paragraphs may be updated during 2011 at the time the access tolls are reviewed.
3. Without prejudice to the provisions of the preceding paragraph, the remuneration of the System Operator for the year 2011 shall be EUR 39,032 thousand. The National Energy Commission shall include in settlement 14 of 2010 the positive or negative differences between the amounts received by the System Operator for the application of the quotas set out in paragraph 1 and the quantities quoted.
4. The island and extra-island compensation for 2011 amounts to 1,552,355 thousand euros. 51% of this amount, EUR 791,701 thousand, will be financed from the General Budget of the State and the remaining 49%, EUR 760,654 thousand, from the access charges through the corresponding percentage referred to in paragraph 1.
The National Energy Commission will include in liquidation 14 of 2011 the difference, positive or negative, between the amounts received for the application of the quota set out in paragraph 1 and the amount of the island and extra-island compensation provided under the access charges for 2011. In any event, the deviations from the island and extra-island compensation that occur between the total amount provided for in the previous paragraph and the final amount that is approved in accordance with the provisions of Article 18 of Royal Decree 1747/2003, of 19 December 2003, which regulate the island and extra-island electrical systems, will be included in charge of the access fees and will have the consideration of permanent costs of the system, according to the Royal Decree-Law 6/2009 of April 30.
Article 6. Review of the remuneration of the operator of the Iberian Energy Market, Polo Español for 2011.
1. In accordance with Article 16.9 of the Law of the Electrical Sector, and in the additional provision fourth to Royal Decree 485/2009 of 3 April 2009, the overall amount established for the remuneration of the Operator of the Iberian Energy Market, Polo Español, S.A. and, at the time, for the OMI-Polo Español, S.A.U. once the activity of the Market Operator is segregated to this society, in compliance with Article 4. º of the International Convention, signed in Santiago de Compostela on October 1, 2004, published in the "Official Gazette of the State" of 22 May 2006 concerning the the creation of an Iberian Electricity Market between the Kingdom of Spain and the Portuguese Republic, in the wording made in Braga on 18 January 2008, published in the "Official Gazette of the State" on 11 December 2009, corresponding to the year 2011 will be of 13,625 thousand euros and will be financed from the prices charged to the market generators, both the ordinary regime and the special regime, that act in the area of the Iberian Electricity Market.
The difference, positive or negative, that occurs between the amount resulting from the collection of the generating subjects and the one set out in the previous paragraph will have the consideration of income or liquidable cost, and will be included in the process of liquidations of the National Energy Commission, in the liquidation that takes place in the month of March 2011.
2. The market-generating subjects of both the ordinary and special arrangements operating in the area of the Iberian Electricity Market shall pay the Market Operator for each of the net power plants or installed in the case of the special scheme exceeding 1MW a fixed monthly amount of EUR 16,21/MW of available power. Payments shall be made on a monthly basis from 1 January 2011. This amount may be revised during 2011 at the time when the access tolls are reviewed in accordance with the remuneration set out in paragraph 1.
For the calculation of the power available in 2011, the value of the availability coefficient applicable to the applicable regime and technology shall be applied to the net power or installed in the case of the special scheme for each installation, in accordance with the following table:
Percentage availability | ||
---|---|---|
regime installations |
| |
| 87 | |
+ anthracite | 90 | |
|
| |
| ||
| 75 | 75 |
75 | ||
93 |
| Pumping | 73 |
Hydraulics | 59 | |
| ||
Hydraulic | 29 | |
Biomass |
| |
22 | ||
R.S. Industrialists | 52 | |
R.S. Urban | 48 | |
Solar | 11 | |
29 | 29 | |
| 90 | |
Fuel-diesel | 26 | |
Gas Refinery | 22 | |
Gas | 39 |
3. For subjects selling and buying energy on the market, the market operator may, in whole or in part, make up for the monthly payment of the month to be paid by such persons or their representatives with the charges from the market not before the first day of charges after the third working day of the month n + 1. To this end, the subjects or their representatives must send to the Market Operator the data necessary for the billing, relating to the facilities of which they hold the ownership or to the ones they represent.
4. The market operator and the subjects referred to in paragraph 1, by mutual agreement, may establish a billing period other than the monthly one.
Article 7. Review of regulated tariffs and prices.
1. As of 1 January 2011, the prices of tolls for access to the transport and distribution networks defined in Royal Decree 1164/2001 of 26 October 2001, establishing rates of access to electricity transmission and distribution networks, and in Article 20 of Order ITC/1659/2009 of 22 June, establishing the mechanism for the transfer of customers from the market to the supply of electricity and the procedure for the calculation and structure of the tariffs for the last resort of electric power, in the values set out in the Order, are maintained. ITC/3519/2009, of 28 December, for which access tolls are revised from 1 January 2010 and the fees and premiums of the special scheme and in Order ITC/1732/2010 of 28 June 2010, for which access tolls are revised from 1 July 2010 and the fees and premiums for certain installations of the special scheme, respectively.
2. In accordance with the provisions of Article 44.1 and the second transitional provision of Royal Decree 661/2007 of 25 May 2007 regulating the production of electrical energy by special scheme, the quarterly updates for the fourth quarter of 2010 and the first quarter of 2011, of the tariffs and premiums, of the facilities of the sub-groups a.1.1 and a.1.2 of the group c.2 and of the installations covered by the second transitional provision are applicable. In Annex II to this order, the tariffs and premiums laid down for the said installations for the two quarters mentioned above are set out.
3. In accordance with Article 44.1 and the transitional provision of Royal Decree 661/2007 of 25 May 2007, which regulates the activity of the production of electrical energy by special scheme, the annual update of the tariffs, premiums and, where applicable, upper and lower limits, for their implementation from 1 January 2011, of the facilities of the sub-groups a.1.3 and a.1.4 of the group a.2, of the facilities of category (b), of the facilities of the transitional arrangement tenth and of the installations of the groups c.1, c.3 and c.4, is to be applied. Paragraphs 1 to 4 of Annex III to this order include the tariffs, premiums and, where applicable, upper and lower limits, which are fixed for the said installations.
4. In accordance with the provisions of paragraph 2 of the additional provision sixth to Royal Decree 661/2007 of 25 May 2007, the annual update of the premium for installed power plants of greater than 50 MW and not more than 100 MW covered by paragraph 2 of that additional provision is made, taking as a reference the increase in the CPI, which is fixed at EUR 2,5776 c€/kWh, for its implementation as from 1 January 2011.
Likewise, in accordance with the provisions of paragraph 3 of the sixth provision of the aforementioned royal decree, the annual update of the premium of installed power plants of greater than 50 MW and not more than 100 MW under paragraph 3 of that additional provision is carried out, with the same increase as those applicable to installations of category a.1.1, with a fixed amount of EUR 2,8808 c€/kWh, for its implementation as from 1 January 2011.
5. The value of the complement for reactive energy is revised, being set at 8,4681 c€/kWh, for its application as from 1 January 2011, in the terms set out in Article 29.1 of Royal Decree 661/2007 of 25 May 2007.
Also, according to the provisions of the additional seventh provision of the aforementioned royal decree, the value of the complement for continuity of supply in front of voltage gaps is revised, being fixed at 0.4104 c€/kWh, for its application from 1 January 2011.
6. In accordance with Article 12 of Royal Decree 1578/2008 of 26 September 2008, the annual rate update for photovoltaic installations entered in the Register of Preallocation of Pay in the calls for the year 2009 is carried out, in the same way as the facilities of the sub-group b.1.1, which were received by Royal Decree 661/2007 of 25 May 2007. In paragraph 5 of Annex III to this order, the rates set for the said installations are set out for their implementation from 1 January 2011.
7. The coefficients for the calculation of the transport and distribution losses, homogeneous for each supply and/or access tariff, to transfer the energy supplied to the consumers at the rate of last resort and to the consumers on the market in their counters to energy supplied in bars of central, to the effects of the liquidations provided for in the Royal Decree 2017/1997, of December 26 and in the Royal Decree 2019/1997, of December 26, for 2010 are those contained in Annex IV of this order.
Article 8. Plans to perform the cleaning of the vegetation of the margins where distribution power lines run.
According to Article 48.2 of Law 54/1997, of 27 November, of the Electrical Sector, and its development regulations, it is included in this order, within the recognized costs for the remuneration of the distribution, a specific item that will not be able to exceed the 10,000 thousand euros in order to carry out plans of cleaning of the vegetation of the margins where electric lines of distribution are running.
This amount will be distributed among the companies distributed by the Ministry of Energy State Secretariat of the Ministry of Industry, Tourism and Trade with objective character and will be liquidated after verification of the realization of the plans of each company.
The National Energy Commission will open a deposit account for these purposes and will communicate it with a circular published in the "Official State Gazette", where the party that corresponds to this purpose will be entered in each settlement. This account will be paid to the distribution companies after authorization from the General Directorate of Energy Policy and Mines after the plans have been made.
Additional disposition first. Closure of surplus balances of certain accounts opened by the National Energy Commission on deposits.
The balances of the deposit account opened by the National Energy Commission for the implementation of quality improvement plans for service with charge of the 2006 tariff, corresponding to the pending settlements of works included in Plans approved that at 31 March 2010 have not presented to the Directorate General of Energy Policy and Mines the certification of the performance of the work and its corresponding start-up act, will be incorporated as revenue of regulated activities corresponding to the year 2011.
Additional provision second. Application of the Interruptibility Demand Management service.
For the purpose of verifying the effective functioning of the service of management of the demand for interruptibility regulated in Order ITC/2370/2007 of 26 July 2007, for which this service is regulated for consumers who acquire their energy in the production market, the System Operator will randomly apply that service in 1% of the hours of the year in which it provides for the greatest demand of the system. In such cases the chosen sample of service providers shall represent at least a percentage reduction of the active power demanded of 5 percent over the reduction set of the active power contracted for the service provider set.
The compliance requirements and the impact of the service providers ' failure to comply with these power reduction orders will be those set out in Articles 7 and 8 of ITC/2370/2007 of 26 July 2007, which regulates the service of demand management of interruptibility for consumers who acquire their energy in the production market.
Additional provision third. Remuneration reviews for the years 2009 and 2010 of several electricity distribution companies of less than 100,000 customers.
1. According to the report "Proposal for the revision of the 2009 and 2010 remuneration, inspections of distributors with less than 100,000 customers" of the National Energy Commission, as a result of the inspection carried out by the Commission to the electricity distribution companies of less than 100,000 customers Central Eléctrica Sestelo and Cia., S.A., Union of Distributors of Electricity, S.A. (Udesa) and Eléctrica del Pozo, S. Coop. Madrid, the definitive accredited cost of the remuneration for the distribution and commercial management activity in compliance with the provisions of Article 8 (1) of Royal Decree 222/2008 of 15 February 2009 shall be for the year 2009 of EUR 9,355,063 and for the year 2010 of EUR 9,462,452 according to the breakdown in the table below:
| Distributor Company | Retribution 2009 | Pay 2010 |
---|---|---|---|
R1-022 | CENTRAL ELECTRIC SESTELO AND CIA, S.A. | 5.184.216 | 5.306.828 |
R1-042 | UNION OF ELECTRICITY DISTRIBUTORS, S.A. (UDESA) | 3.760.286 | 3.746,952 |
R1-203 | WELL ELECTRIC, S. COOP. MADRID | 410.561 | 408,672 |
Total | 9.355.063 | 9.462.452 |
2. According to the National Energy Commission in the " Report on the Application for Popular Power, S. Coop. Mad., in order to review its remuneration for the years 2009 and 2010 ", the definitive accredited cost of the remuneration of the distribution and commercial management activity in compliance with the provisions of Article 8 (1) of Royal Decree 222/2008, of 15 February, shall be for the years 2009 and 2010, as follows:
| Distributor Company | Retribution 2009 | Pay 2010 |
---|---|---|---|
R1-317 | POPULAR ELECTRIC, S. COOP. MAD | 322,635 | 321.247 |
3. According to the National Energy Commission in the "Report on the request of Vargas and Company Electroharinera San Ramón, S.A. to review its remuneration for the year 2010", the definitive accredited cost of the remuneration of the activity of distribution and commercial management in compliance with the provisions of Article 8 (1) of the Royal Decree 222/2008, of February 15, will be for the year 2010 of:
| Distributor Company | Retribution 2010 |
---|---|---|
R1-203 | VARGAS AND COMPANY ELECTROHARINERA SAN RAMON, S.A. | 444.490 |
4. As a result of the integration in Hidroflamicell, S.L. of the company Distribuidora Eléctrica Vila i Vall de Castelbo, S.L., and once the report has been seen with regard to the National Energy Commission, the remuneration of the company Distribuidora Eléctrica Vila i Vall de Castelbo, S.L., corresponding to the year 2010, amounting to 321,303 euros, is added to the remuneration corresponding to Hidroflamicell, S.L., for that year 2010, which will become:
| Distributor Company | Retribution 2010 |
---|---|---|
R1-304 | HYDROFLAMYL, S.L. | 740,078 |
Additional provision fourth. Unit price for the financing of payments for capacity.
Unit prices for the financing of the capacity payments regulated in Annex III of Order ITC/2794/2007 of 27 September 2007, for which electricity charges are revised from 1 October 2007, applicable for energy acquired by customers, depending on the differentiation of tariff periods for access tolls, on 1 January 2011 take the following values expressed in euro/kWh:
Peages | Unit Price for Financing of Payments by Capacity | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
P1 | P2 | P3 | P4 | P5 | P6 | |||||
voltage: |
|
|
|
|
|
| ||||
0.009812 |
|
|
|
|
| |||||
| 2.0 DHA (Pc ≤ 10 kWh) |
0.001706 |
|
|
|
| ||||
| 2.1 A (10 < Pc ≤ 15 kWh) | 0.009812 |
|
|
|
|
|
|
| |
0.010110 | 0.001706 |
|
|
|
| |||||
A (Pc > 15 kWh) |
0.009122 | 0.000122 |
|
|
| |||||
High voltage: |
|
|
|
|
|
|
|
| ||
0.013630 |
0.000000 |
|
|
| ||||||
6.1 (1 kV to 36 kV) | 0.013630 | 0.006291 | 0.004193 | 0.003145 | 0.003145 | 0.000000 | ||||
6.2 (36 kV to 72.5 kV) | 0.013630 | 0.006291 | 0.004193 |
0.003145 | 0.000000 | |||||
0.013630 | 0.006291 | 0.004193 | 0.003145 | 0.003145 | 0.000000 | |||||
6.4 (Greater than or equal to 145 kV) | 0.013630 | 0.006291 | 0.004193 | 0.003145 | 0.003145 | 0.000000 |
Additional provision fifth. Communication of membership of a special regime facility pool.
1. For the purposes of the fourth subparagraph of Article 18 (d) of Royal Decree 661/2007, of 25 May 2007, production facilities forming part of a grouping to which the requirement for the control of generation or transmission of telematic equipment to the operator of the system is applicable shall be informed of such an obligation, by notification, by the distribution or transport undertaking holding the line or the common processor to which they are connected.
Such notification shall be made within a maximum period of two months from the date of subscription of the technical contract with the distribution or transport undertaking, as appropriate.
2. For installations which, at the date of entry into force of this order, are already under contract, the notification referred to in the preceding paragraph shall be made before 1 April 2011.
Additional provision sixth. Zonal loss coefficients for the calculation of the incentive or penalty for the reduction of losses of the distribution companies.
According to Article 5 of the Order ITC/2524/2009 of 8 September, which regulates the method of calculating the incentive or penalty for the reduction of losses to be applied to the remuneration of the distribution for each of the electricity distribution companies and once the proposal made by the National Energy Commission in its report called "Proposal of values for the coefficients of zonal losses to be used in the calculation of the incentive of loss reduction of the distribution companies", the coefficients of Zonal losses for peak periods and valley will be those collected in the following table:
Company/Zone | Coefficient | Coefficient |
---|---|---|
endesa electrical distribution, S.L. | 0.99622557 | 0.99590615 |
E.ON DISTRIBUTION, S.L. | 1.00512669 | 1.00639551 |
UNION FENOSA DISTRIBUTION, S.A. | 1,00139350 | 1,00103264 |
HYDROTALABRIC ELECTRICAL DISTRIBUTION, S.A. | 1,00830326 | 1,00807960 |
IBERDROLA ELECTRICAL DISTRIBUTION, S.A.U. | 1.00212089 | 1.00236759 |
Additional provision seventh. Settlement of the review of the distribution costs for 2009 and 2010.
The cost allocations to the review of the distribution costs for 2009 and 2010 as set out in Article 2.1 and 2. of this Order, shall be settled in the settlements of the regulated activities of the year 2010.
The cost allocations to the review of the distribution costs for 2009 and 2010 as set out in Article 2.1 and 2 of this Order shall be settled in the settlement of the regulated activities of the year 2010.
First transient disposition. Use of consumer profiles.
Those supplies that since the entry into force of Royal Decree 1110/2007, of August 24, by which the unified regulation of points of measurement of the electrical system is approved, have changed their classification of type of measurement point from being points of measure type 4 to being of points of measure type 3, and that they do not have record of consumption time, they will be able to use profiles of consumption for the liquidation of the energy until the moment in which they replace the equipment of measure in order to adapt it to the Royal Decree 1110/2007, of August 24.
Second transient disposition. Consumers who, without having the right to avail themselves of the last resort fee, are temporarily lacking a supply contract in force with a marketer and continue to consume electricity.
1. Consumers connected in high voltage as at 31 December 2010 are being supplied by a marketer of last resort and on 1 January 2011 lack of a supply contract on the free market, provided that they are not included in the derogation provided for in Article 3.3 of Royal Decree 485/2009 of 3 April 2009, may continue to be provided by that marketer of last resort until 31 December 2011.
The price to be paid by these customers for the electricity consumed to the marketer of last resort during this period will be the one corresponding to the application of the billing of the rate of last resort, TUR without application of the modality of the time discrimination, increased its terms by 20 percent.
2. Consumers connected in low tension without the right to a last resort tariff which at 30 September 2011 are being supplied by a trader of last resort and on 1 October 2011 lack of a supply contract on the free market, provided that they are not included in the derogation provided for in Article 3.3 of Royal Decree 485/2009 of 3 April 2009, may continue to be supplied by that marketer of last resort until 31 December 2011.
The price to be paid by these customers for the electricity consumed to the marketer of last resort during this period will be the one corresponding to the application of the billing of the rate of last resort, TUR without application of the modality of the time discrimination, increased its terms by 20 percent.
3. If, on 1 January 2012, the consumers referred to in the preceding paragraphs have failed to contract their supply on the free market, the contract between the consumer and the marketer of last resort shall be deemed to have been terminated for the purposes laid down in Article 86.2 of Royal Decree 1955/2000 of 1 December 2000 governing the transport, distribution, marketing, supply and authorisation procedures of electrical energy installations.
The provisions of Article 21.3 of Order ITC/1659/2009 of 22 June establishing the mechanism for the transfer of customers from the market to the supply of the last electricity resource and the procedure for the calculation and structure of the tariffs for the last resort of electricity are also applicable.
Single repeal provision. Regulatory repeal.
How many provisions of equal or lower rank are repealed with the provisions of this order.
Single end disposition. Entry into force.
This order shall enter into force on 1 January 2011.
Madrid, December 28, 2010. -Minister of Industry, Tourism and Trade, Miguel Sebastian Gascón.
ANNEX I
Remuneration for the year 2011 of distribution companies with less than 100,000 customers
| Distributor Company | Retribution |
---|---|---|
R1-014 | AGRI-ELECTRICAL ENERGY, SA. | 7.256.666 |
R1-015 | BASSOLS ENERGY, S.A. | 12.405.818 |
R1-016 | CALDENSE, S.A. | 4.779.365 |
R1-017 | ELECTRICAL FROM MAESTRAZGO, S.A. | 5.559,749 |
R1-018 | ANELL AND PAHISA ENERGY, S.A. | 20.095,639 |
R1-019 | EBRO ELECTRIC, S.A. | 3.820.732 |
R1-020 | ELECTRICAL PRODUCER URGELENSE, S.A. (PEUSA). | 4.255.924 |
R1-021 | ELECTRICITY SUPPLY FROM CADIZ, S.A. | 22.285.465 |
R1-022 | CENTRAL ELECTRIC SELELO AND CIA, S.A. | 5.326.994 |
R1-023 | HYDROELECTRIC DEL GUADIELA I, S.A. | 4.129.239 |
R1-024 | ALBALENSE ELECTRIC COOPERATIVE, S.A. | 131,946 |
R1-025 | LIVESTOCK INDUSTRIES OF THE PEDROCHES, S.A. | 5.844.215 |
R1-026 | ENERGIES OF ARAGON I, S. L. UNSTAFF. | 4.319.109 |
R1-027 | GAS AND ELECTRICITY COMPANY, S.A. | 9.764.999 |
R1-028 | MEDINA GARVEY ELECTRICITY, S.L.U. | 7.576,926 |
R1-029 | ELECTRIC DISTRIBUTOR OF THE SIL, S.L. | 2.833.114 |
R1-030 | ELECTRIC LIGHTING COMPANY OF CEUTA DISTRIBUTION, S.A.U. | 9.948.893 |
R1-031 | ENREIQUE GARCÍA SERRANO READ ENERGY DISTRIBUTION. S. L. | 256.346 |
R1-032 | REPSOL ELECTRIC DE DIDTRIBUCIÓN, S.L. | 3.090.440 |
R1-033 | S. C. V. LTDA. B. OF CONS. OF ELECT. "SAN FRANCISCO DE ASIS" BY CREVELLENTE. | 4.759.433 |
R1-034 | ELECTRICITY FROM PUERTO REAL, S.A. (EPRESA). | 3.470,000 |
R1-035 | SLU DISTRIBUTION WEST ELECTRICAL. | 8.719,675 |
R1-036 | ELECTRICAL DISTRIBUTOR, S.A. | 4.368.925 |
R1-037 |
. | 2.689.748 |
R1-038 | ELECTRIC SEROSENSE DISTRIBUTOR, S.L. | 3,421,505 |
R1-039 | HYDROELECTRIC DE LARACHA, S.L. | 2.301.123 |
R1-040 | ELECTRICAL SOCIETY OF TUY, S.A. | 2.969.361 |
R1-041 | ENBY ALTO MINO, S.A. | 2.794,710 |
R1-042 | UNION OF ELECTRICITY DISTRIBUTORS, S.A. (UDESA). | 3.952.948 |
R1-043 | ANSELMO LEON DISTRIBUTION, S.L. | 4.766.024 |
R1-044 | COUNTY ELECTRICITY COMPANY, S.A. | 4.100.029 |
R1-045 | AUTOL, S.A. | 1.413,876 |
R1-046 | TENTUDIA ELECTRICAL DISTRIBUTOR. S.L.U. | 2.015.845 |
R1-047 | FELIX GONZALEZ, S.A. | 3.769.556 |
R1-048 | THE ELECTRICAL DISTRIBUTION, S.L. | 1.328.439 |
R1-049 | ELECTRIC PITARCH DISTRIBUTION SLU. | 7.936,495 |
R1-050 | CHILDREN OF JACINTO GUILLEN DISTRIBUIDORA ELECTRICA, S.L.U. | 2.912.138 |
R1-051 | JUAN DE FRUITS GARCIA, S.L. | 1.310.705 |
R1-052 | LERSA ELECTRICITAT, S.L. | 1.679.317 |
R1-053 | DIELESUR, S.L. | 2.696.180 |
R1-054 | ENERGY DE MIAJADAS, S.A. | 2.550.328 |
R1-055 | BARBASTRO ELECTRICITY, S.A. | 2.229.374 |
R1-056 | VALL DE SOLLER ENERGY S.L. U (EL GAS, S.A.). | 3.020.336 |
R1-057 | ROMERO CANDAU, S.L. | 1,988,215 |
R1-058 | HYDROELECTRIC DE SILLEDA, S.L. | 2.153.563 |
R1-059 | RURAL ELECTRIFICATION GROUP S. COOP R. L. | 2.458.876 |
R1-060 | SPECIAL SUPPLIES ALGINETENSES, S. COOP. V. | 2.185.215 |
R1-061 | ONARGI, S.L. | 1.295.358 |
R1-062 | SUPPLY OF LIGHT AND FORCE, S.L. | 3.400.781 |
R1-063 | CATRALENSE CHARITY ELECTRIC COOPERATIVE, COOP. V. | 903,711 |
R1-064 | CARBAYIN, S.A. | 1.112.381 |
R1-065 | GUIXES, S.L. | 622.284 |
R1-066 | ELECTRIC COWBOY. | 840,732 |
R1-067 | KNIGHT REBOLLO BROTHERS, S.L. | 166.315 |
R1-068 | ELECTRIFICATION COMPANY, S.L. | 681.221 |
R1-069 | MELON ELECTRICAL DISTRIBUTOR, S.L. | 310.984 |
R1-070 | CABALAR, S.L. | 376,985 |
R1-071 | GAYOSO, S.L. | 568.767 |
R1-072 | FROM NARAHIO, S.A. | 1.177.266 |
R1-073 | BARCIADEMERA, S.L. | 46,633 |
R1-074 | CABAÑAS ELECTRICA, S.L. | 241.522 |
R1-075 | GRES ELECTRICA, S.L. | 183.780 |
R1-076 | ELECTRICAL AGENT, S.L. | 1.699.829 |
R1-077 | ELECTRIC CORvera, S.L. | 1,065,741 |
R1-078 | ELECTRIC FUCINOS RIVAS, S.L. | 848,792 |
R1-079 | ELECTRIC MILLS, S.L. | 1.401.522 |
R1-080 | HYDROELECTRIC DEL ARNEGO, S.L. | 385,556 |
R1-081 | SAN MIGUEL 2000 DISTRIBUTION, S.L.S.U. | 608,941 |
R1-082 | SUCCESSORS OF MANUEL LEIRA, S.L. | 374.386 |
R1-083 | BERRUZA, S.A. | 1.083.359 |
R1-084 | BLÁZQUEZ, S.L. | 515.357 |
R1-085 | CENTRAL ICA MITJANS, S.L. | 185.957 |
R1-086 | CENTRAL ICA SAN FRANCISCO, S.L. | 671,608 |
R1-087 | ELECTRICAL DISTRIBUTION LAS MERCEDES, S.L. | 726.398 |
R1-088 | ELECTRIC DE CANILES, S.L. | 418.466 |
R1-089 | ELECTRICAL DISTRIBUTOR OF RELEU S.L. | 496.246 |
R1-090 | ADURIZ SA. | 3.378.272 |
R1-091 | AVELLANA, S.L. | 862.387 |
R1-092 | CASTILEJENSE, S.A. | 595.134 |
R1-093 | ELECTRICITY DISTRIBUTOR LARRANAGA, S.L. | 35,092 |
R1-094 | SAN CRISTOBAL, S.L. | 473,948 |
R1-095 | ELECTRICAL BELABANA, S.A. | 497.443 |
R1-096 | ELECTRICAL THE VICTORY OF FUENHOT, S.A. | 269,719 |
R1-097 | ELECTRIC PELAYOS, S.A. | 534.414 |
R1-098 | ICA NTRA. SRA. DE LOS REMEDIA, S.L. | 1.209.261 |
R1-099 | ELECTRICITAT LA AURORA, S.L. | 580.502 |
R1-100 | ALMODOVAR DISTRIBUTION, S.A. | 1.046.808 |
R1-101 | IBM OR MOLINERA DE VALMADRIGAL, S.L. | 1.543,995 |
R1-102 | ELECTRICITY COMPANY SAN JOSE, S.A. | 520.713 |
R1-103 | SAN CIPRIANO DE RUEDA HYDROELECTRIC, S.L. | 367.413 |
R1-104 | CHILLA VIRGIN HYDROELECTRIC, S.L. | 1.335.067 |
R1-105 | THE ERNESTINA, S.A. | 756,747 |
R1-106 | DIELENOR, S.L. | 1.460.840 |
R1-107 | BAGES ELECTRIC ENERGY DISTRIBUTOR. | 1.468.711 |
R1-108 | ALCOMER ENERGY, S.L.U. | 928,630 |
R1-109 | INCATTLE VILLARALTO, S.L. | 211.864 |
R1-110 | GRACE UNZUETA HIDALGO E CHILDREN, S.L. | 229.666 |
R1-111 | AURORA GINER REIG, S.L. | 79.511 |
R1-112 | ARDALES ELECTRICAL DISTRIBUTOR, S.L. | 443.243 |
R1-113 | SIERRA magina, S.L. | 457.237 |
R1-114 | ELECTRIC BROTHERS CASTRO RODRIGUEZ, S.L. | 353.009 |
R1-115 | HYDROELECTRIC VEGA, S.A. | 1.772.990 |
R1-116 | CHILD OF JORGE MARTIN, S.A. | 255.157 |
R1-117 | JOSÉ RIPOLL ALBELL, S.L. | 302.325 |
R1-118 | JOSEFA GIL COSTA, S.L. | 33,947 |
R1-119 | LEANDRO PEREZ ALFONSO, S.L. | 678.322 |
R1-120 | ELECTRIC DISTRIBUTION COMPANY OF ELORRIO, S.A. | 222.905 |
R1-121 | NTRA ELECTRIC COMPANY. SRA. DE LOS DESTITUTE, S. L. | 1,088,833 |
R1-122 | GAUCIN ELECTRICAL DISTRIBUTOR, S.L. | 603,968 |
R1-123 | ALVARO BENITO, S.L. | 146.974 |
R1-124 | ICA CAMPOSUR, S.L. | 233,673 |
R1-125 | ELECTRIC FROM ERISE, S.L. | 113.132 |
R1-126 | ELECTRICITY HIJATE, S.L. | 209.473 |
R1-127 | JUAN N. DÍAZ GALVEZ Y BROTHERS, S.L. | 888.409 |
R1-128 | CHERA, S.C.V. | 116.249 |
R1-129 | HYDROELECTRIC GOMEZ, S.L.U. | 198.173 |
R1-130 | HYDROELECTRIC DE ALARAZ, S.L. | 159.076 |
R1-131 | ISMAEL BIOSCA, S.L. | 701.573 |
R1-132 | ICA SAN SERVAN, S.L. | 492,515 |
R1-133 | HYDROELECTRIC EL CARMEN, S.L. | 2.129.320 |
R1-134 |
| 567.370 |
R1-135 |
| 178,948 |
R1-136 | ELECTRIC SAN GREGORIO, S.L. | 106,898 |
R1-137 | HEIRS TO GARCIA BAZ, S.L. | 116.908 |
R1-138 | ELECTRICITY SIERRO, S.L. | 56.009 |
R1-139 | ELECTRICITY DISTRIBUTOR MARTOS MARIN, S.L. | 250.132 |
R1-140 | ELECTRIC DISTRIBUTOR CARRION, S.L. | 448.440 |
R1-141 | HELIODORA GOMEZ, S.A. | 219.670 |
R1-142 | LUIS RANGEL Y HNOS, S.A. | 688,259 |
R1-143 | SERVICIANO GARCIA, S.A. | 1.380.435 |
R1-144 | HYDROELECTRIC OUR LADY OF THE SOLITUDE OF TENDILLA AND LUPIANA, S.L. | 146.087 |
R1-145 | SECURE CALLOSE ELECTRICAL, S.V. L. | 1.656.692 |
R1-146 | JOSE FERRE SECURE AND CHILDREN, S.R.L. | 1.384,400 |
R1-147 | JOSE ANTONIO MARTINEZ, S.L. | 124.313 |
R1-148 | ELECTRICITY PASTOR, S.L. | 645.272 |
R1-149 | CHILDREN OF FELIPE GARCÍA ALVAREZ, S.L. | 117.594 |
R1-150 | CASTELLAR ELECTRICAL COOPERATIVE, S.C.V. | 606,935 |
R1-151 | ALBATERENSE ELECTRIC COOPERATIVE, COOP.V. | 1.159.182 |
R1-152 | MELIANA ELECTRIC, VALENCIAN COOPERATIVE SOCIETY. | 426.552 |
R1-153 | CAMPRODON S.C.C.L. POPULAR ELECTRIC FLUID COOPERATIVE. | 325.996 |
R1-154 | ALGIMIA ELECTRIC FROM ALBARA, S.C.V. | 139,070 |
R1-155 | VINALESA, S.C.V. | 351,998 |
R1-156 | DURRO SLU. | 56,579 |
R1-157 | GUADALASAR ELECTRICAL, SDAD. COOP. V. | 1.090.142 |
R1-158 | COOP. CHERA SOT. | 128.593 |
R1-159 | ICA NTRA. SRA. FROM GRACE, SDAD. COOP VALENCIANA. | 1.276.862 |
R1-160 | FORCE AND ALUB ELECTRODISTRIBUTOR. CASABLANCA S.C.V. | 186.196 |
R1-161 | ELECTRICAL POWER OF MUSEROS, S. C. VALENCIANA. | 291,462 |
R1-162 | DELGICHI, S.L. | 45.459 |
R1-163 | DIELEC GUERRERO LORENTE, S.L. | 87,186 |
R1-164 | SANTA ANA SL VALLEY ELECTRICAL DISTRIBUTION. | 116.361 |
R1-165 | TORREHERTO ELECTRIC FARM, S.L. | 378.590 |
R1-166 | ELECTRIC SANTA CLARA, S.L. | 395,641 |
R1-167 | MARTÍN SILVA POZO, S.L. | 534,455 |
R1-168 | HYDROELECTRIC SAN BUENAVENTURA, S.L. | 274.254 |
R1-169 | HYDROELECTRIC SANTA TERESA, S.L. | 66,557 |
R1-170 | CHILDREN OF CASIANO SÁNCHEZ, S.L. | 61,630 |
R1-171 | ELECTRICAL SOCIETY JEREZ DEL MARQUESADO S.A. | 176.625 |
R1-172 | ELECTRICAL SUPPLIES FROM AMIEVA, S.L. | 112.799 |
R1-173 | HYDROELECTRIC DOMÍNGUEZ, S.L. | 64.003 |
R1-174 | CONSOLE, S.L.U. | 3.041,990 |
R1-175 | ELECTRICAL DISTRIBUTIONS PORTILLO, S.L. | 1.259.756 |
R1-176 | ELECTRICAL DE JAFRE, S.A. | 747,721 |
R1-177 | ELECTRICA LOS LAURELES, S.L. | 319.202 |
R1-178 | ELECTRIC SAN JOSE LABORER, S.L. | 176.137 |
R1-179 | ENERGY ACTIVITIES ESA, S.A. | 546.209 |
R1-180 | C. MARCIAL CHACON E SONS, S.L. | 1.465.501 |
R1-181 | ELECTRIC MORO BENITO, S.L. | 127.194 |
R1-182 | SOURCES AND COMPANY, S.L. | 997.432 |
R1-183 | EBO ' S VALL ELECTRIC, S.L. | 53,466 |
R1-184 | ANTOLINA RUIZ RUIZ, S.L.U. | 32,983 |
R1-185 | NORTHWEST ELECTRICAL ENERGY DISTRIBUTIONS, S.L. | 46,930 |
R1-186 | ZAS, S.L. | 263,704 |
R1-187 | CABRERA HYDROELECTRIC, SL. | 269,945 |
R1-188 | ELECTRICITY LA ASUNCIÓN, S.L. | 69,013 |
R1-190 | RIVERSIDE ELECTRICAL SOCIETY OF FRESNO, S.A. | 392.811 |
R1-191 | ALSET ICA, S.L. | 997.312 |
R1-192 | EITHER OR DISTRIBUIDORA CASTELLANO LEONESA, S.A. | 206.235 |
R1-193 | VALDIVIELSO, S.A. | 71,388 |
R1-194 | SAN PEDRO ELECTRICAL COMPANY, S.L. | 725.053 |
R1-195 | ELECTRIC ABENGIBRENSE DISTRIBUTION, S.L. | 182.726 |
R1-196 | ELECTRIC OF THE ROUND S SERRANIA L. | 1.214.990 |
R1-197 | EBROANAS, S.L. | 161.271 |
R1-198 | SACRED HEART OF JESUS, S.L. | 201.045 |
R1-199 | ELECTRICAL DISTRIBUTOR MONESTERIO, S.L.U. | 1.895.831 |
R1-200 | ELECTRIC DISTRIBUTOR BRAVO SAEZ, S.L. | 269.650 |
R1-201 | ELECTRIC OUR LADY DE LOS SANTOS, S.L. | 696.128 |
R1-202 | VILALLER OLD MILL, S.A. | 116.131 |
R1-203 | VARGAS AND COMPANY ELECTRO HARINERA SAN RAMON, S.A. | 497.595 |
R1-204 | NODE COMBA, S.L. | 1.675,000 |
R1-205 | ICASA DISTRIBUTION ENERGY, S.L. | 38,684 |
R1-206 | ELECTRICAL DISTRIBUTIONS FROM THE ERIA, S.L. | 82,615 |
R1-207 | ISABA ELECTRICAL DISTRIBUTOR, S.L.U. | 100.048 |
R1-208 | ENERFRIAS SL. | 146.077 |
R1-210 | CENTRAL ELECTRIC SAN ANTONIO, S.L. | 702.271 |
R1-211 | CUNPRESSE, S.L. | 566,000 |
R1-213 | ELECTRICITY FROM BENUZA, S.L. | 226.629 |
R1-214 | RODALEC, S.L. | 144,797 |
R1-215 | ELECTRIC DEL HUEBRA, S.L. | 95,943 |
R1-216 | NAVASFRIAS S.L. ELECTRIC DISTRIBUTOR | 155,328 |
R1-217 | ELECTRICAL MESTANZA R.V., S.L. | 92.231 |
R1-218 | HYDROELECTRIC DE CATALUNYA, S.L. | 1.275.482 |
R1-219 | ABUSEJO, S.L. | 1.209.501 |
R1-220 | CANTONA S.L. | 94.055 |
R1-221 | ELECTRICA GILENA, S.L.U. | 397.105 |
R1-222 | ENERGIES OF PANTICOSA S.L. | 332,512 |
R1-223 | HEIRS OF EMILIO GAMERO, S.L. | 834.391 |
R1-224 | MONTOLIU ELECTRICAL DISTRIBUTOR, S.L. U. | 55,616 |
R1-225 | ICA BANESA, S.L. | 81.086 |
R1-226 | GLORIA MARISCAL, S.L. | 123.032 |
R1-227 | RUIZ DE LA TORRE, S.L. | 1.111.268 |
R1-228 | CELA LIGHT, S.L. | 137.468 |
R1-229 | ELECTRIC SAN MARCOS, S.L. | 51,628 |
R1-231 | ICA CUROS, S.L. | 618.349 |
R1-232 | VALDIZARBE, S.A. | 1.276.430 |
R1-233 | ELECTRICAL LATORRE, S.L. | 545.225 |
R1-234 | ELECTRICAL DE CASTRO CALDELAS S.L. | 218.275 |
R1-236 | THE PROGRESS OF THE PYRENEES-HEIRS OF FRANCISCO BOLLO QUELLA, S.L. | 500.737 |
R1-237 | MONTESLIGHT ELECTRICAL DISTRIBUTION, S.L. | 391,881 |
R1-238 | EMILIO PADILLA E CHILDREN, S.L. | 134,445 |
R1-239 | CABRERA JUMPS, SL. | 297.760 |
R1-240 | ELECTRICAL ENERGY DISTRIBUTION OF PARCENT, S.L. | 183,916 |
R1-241 | ELECTRICAL ENERGY DISTRIBUTOR TORRECILLAS VIDAL, S.L. | 165.913 |
R1-242 | INDUSTRIAL ELECTRICAL, S.L.U. | 199.530 |
R1-243 | HYDROELECTRIC EL CERJON, S.L. | 120.553 |
R1-244 | HYDROELECTRIC JOSÉ SLAUGHTER GARCÍA, S.L. | 234.469 |
R1-245 | DISTRIBUTION AND ELECTRICAL CHARITY E ILDEFONSO, S.L. | 138,692 |
R1-246 | FELIPE BLÁZQUEZ, S.L. | 207,400 |
R1-247 | INPECUARIAS TORRECAMPO, S.L. | 170.741 |
R1-248 | E. SAAVEDRA, S.A. | 390.299 |
R1-249 | JUAN AND FRANCISCO ESTEVE MAS S.L. | 72,639 |
R1-250 | ELECTRICAL LIGHT MOLARS S.L. | 364.513 |
R1-251 | URBAN SERVICES OF CERLER, S.A. (SUCSA). | 359.048 |
R1-252 | HEIRS TO CARLOS OLTRA, S.L. | 47.270 |
R1-253 | FEREZ ELECTRIC COMPANY, S.L. | 389.782 |
R1-254 | OUTPUT SALTEA, S.L. | 137,028 |
R1-255 | ELECTRIC SANTA LEONOR S.L. | 131.017 |
R1-256 | EMDECORIA, S.L. | 1.377,743 |
R1-257 | CHILDREN OF FRANCISCO SCARCE S.L. | 1.303.273 |
R1-258 | MILLARENSE OF ELECTRICITY, S.A.U. | 133,996 |
R1-259 | MUNICIPAL ELECTRIC VILORIA, S.L. | 123.937 |
R1-260 |
| 206,920 |
R1-261 | SAN BARTOLOME, S.L. | 277,751 |
R1-262 | ELECTRIC OF THE GUADALFEO, S.L. | 479.143 |
R1-264 | ELECTRIC SANTA MARTA AND VILLALBA, S.L. | 1.194,422 |
R1-265 | MARIA ALONSO CARRIAGEWAY HEIRS. SALE OF BATHS S.L. | 90,668 |
R1-266 | CHILDREN OF MANUEL PERLES VICENS, S.L. | 101.905 |
R1-267 | ELECTRICAL DE VER, S.L. | 35,975 |
R1-268 | ADEMADEMOS cíccio CENELLES, S.L. | 1.597.326 |
R1-269 | MANUEL ROBRES CELADES, S.L.U. | 58,455 |
R1-270 |
. | 365.094 |
R1-271 | ALCOLECHA ELECTRICAL DISTRIBUTION, S.L. | 36.578 |
R1-272 | ALGAR ELECTRIC LIGHT, S.L.U. | 486.298 |
R1-273 | MUNICIPAL COMPANY D' ENERGY ELECTRIC TORRES DEL SEGRE, S.L. | 428.616 |
R1-274 | ELEC VALL DE BOI, S.L. | 82,397 |
R1-275 | ICA DE VALDRIZ, S.L. | 181.177 |
R1-276 | IGNALUZ JIMENEZ DE TORRES, S.L. | 58.641 |
R1-277 | ELECTRICAL DISTRIBUTOR FOG, S.L. | 552,557 |
R1-278 | TOLARGI, S.L. | 1.575.484 |
R1-279 | MONTSEC SL ELECTRIC. | 386.201 |
R1-280 | ITURENGO ELEKTRA, S.L. | 91.082 |
R1-281 | EITHER OR OUTPUT FROM GALLEGO, S.L. | 245.332 |
R1-282 | CATOIRA ELECTRIC DISTRIBUTOR, S.A. | 217.989 |
R1-283 | POWER OF THE WELL S. COOP.MADRILENA. | 415.869 |
R1-284 | APHRODISIO PASCUAL ALONSO, S.L. | 181.064 |
R1-285 | ENERGY FROM BENASQUE, S.L. | 821.678 |
R1-286 | ELECTRICAL DISTRIBUTIONS FROM POZUELO, S.A. | 101.163 |
R1-287 | LÁZARO ' S HOUSE ELECTRICAL DISTRIBUTOR, S.A. | 203.214 |
R1-288 | DISTRIBUTED ALNEGA, S.L. | 62.371 |
R1-289 | ESCARRILLA, S.L. | 72.301 |
R1-290 | ALBERGUERIA ELECTRICAL, S.A. | 401,390 |
R1-291 | JORQUERA ELECTRIC COMPANY, S.L. | 53,603 |
R1-292 |
| 207.372 |
R1-293 | HYDROELECTRIC COTO MINING DISTRIBUTION, S.L.U. | 221.397 |
R1-294 | ELECTRICAL DISTRIBUTOR OF THE PORT OF THE CROSS, S.A. | 7.344,772 |
R1-295 | INDUSTRIAL BARCALESA, S.L. | 362,684 |
R1-296 | ELECTRICAL DISTRIBUTOR D' ALBATARRAC, SL. | 226.085 |
R1-297 | ORBAECITA, S.L. | 40.446 |
R1-298 | ENERFIFTH SL ELECTRIC POWER DISTRIBUTOR. | 94,631 |
R1-300 | ELECTRIC FROM VILLAHERMOSA S.A. | 86.466 |
R1-301 | ALARCON NAVARRO ELECTRICAL COMPANY, S.L. | 332,885 |
R1-302 | ARAMAIOKO ARGINDAR BANATZAILEA, S.A. | 161.462 |
R1-304 | HYDROFLAMYL, S.L. | 742,890 |
R1-305 | SDAD. MUNICIPAL DE DISTRICT. ELECTRICA DE LLAVORSI S.L. | 124,910 |
R1-306 | HELIODORO CHAFER, S.L. | 363.022 |
R1-307 | LORENTE WELL POWER, S. L. | 104,801 |
R1-308 | ARAXES ARGI INDARRA, S.L. | 167.163 |
R1-309 | PEDRO SANCHEZ IBANEZ. | 290.229 |
R1-310 | DISTRIBUTOR POOL S.L. | 18.166 |
R1-312 | PLEASE THE VENDUL S.L. | 37,167 |
R1-313 | LEINTZARGI S.L. | 32.365 |
R1-314 | ELECTRICAL DISTRIBUTOR OF PONTS S.L. (D.E.P. S.L.). | 118.405 |
R1-317 | POPULAR ELECTRIC, S. COOP.MAD. | 341,092 |
R1-318 | ELECTRICITY MENDIVIL, S.L. | 31,768 |
R1-319 | THE SINARCHENSE S.L.U. | 198.733 |
R1-320 | ARAS MUNICIPAL SUPPLIES AND SUPPLIES, S.L.U. | 142.943 |
R1-323 | BOGARRA SA ELECTRICAL FORCES S.A. (FOBOSA). | 488.495 |
R1-325 | MUNICIPAL ENTERPRISE OF DISTRIBUCIO D' ENERGY ELECTRICA D' ALMENAR, SLU. | 706.492 |
R1-326 | TUDANCA, S.L. | 73.319 |
R1-327 | ANTONIO MADRID SL. | 240.801 |
R1-328 | RIVER ISABENA S.L. | 582.305 |
R1-329 | TALAYUELAS ELECTRICAL DISTRIBUTIONS, S.L. | 267.505 |
R1-330 | CABRIEL ELECTRIC COMPANY S.L. | 128,527 |
R1-331 | ANZURIETAS, S.L. | 19,919 |
R1-332 | BAKAIKUKO ARGIA, S.A. | 59.837 |
R1-333 | ARRUAZU, S.L. | 31,746 |
R1-334 | BARAIBAR, S.L. | 28.627 |
R1-335 | CHULILLA MUNICIPAL SUPPLIES AND SUPPLIES, S.L. | 152,812 |
R1-336 | CATENERIBAS S.L.U. | 42,412 |
R1-337 | ETAT MUNICIPAL DE DISTRIBUCIO ELECTRICA DE TIRVIA, S.L. | 31.040 |
R1-338 | ELECTRICAL SUPPLIES ISABENA, S.L. | 138.841 |
R1-339 | URDAZUBIS S.L. | 278.805 |
R1-340 | ELECTRIC COSTUR, SL. | 83.174 |
R1-341 | TALRNA MUNICIPAL ELECTRICAL SL. | 73,591 |
R1-342 | LIGAR, S.L. | 743.232 |
R1-343 | FIELD VILLA ENERGIES, S.L.U. | 125,800 |
R1-344 | MANAGING THE ELECTRICAL SERVICE DONE S.L. | 194.589 |
R1-345 | ELECTRICITY, S.L. | 120,020 |
R1-346 | TEUJAR S.L. | 266.137 |
R1-347 | ELECTRIC HALLS OF PALLARS, S.L. | 80,664 |
R1-348 | ELECTRO-HARINERA BELSETANA, S. COOP. | 26.986 |
R1-349 | LA CONSTANCIA-AREN, S.L. | 75,427 |
R1-350 | ANSO S.L. VALLEY ELECTRICAL DISTRIBUTOR | 98.720 |
R1-351 | ELECTRIC SUDANELL S.L. | 137.172 |
R1-352 | ELECTRICAL HYDROBESORA, SL. | 88,744 |
R1-353 | ELECTRIC COLLADO WHITE, S.L. | 178.296 |
R1-354 | LLUM D' AIN, S.L. | 48,590 |
R1-355 | ELECTRÍTICA LA ENGUERINA, S.L. | 251.213 |
R1-356 | COOP V.E.F.A. "SERRALLO." | 41.392 |
R1-357 | MALCOOKED S.L.U. ELECTRIC | 108.999 |
R1-358 | VALLANAC, S.L. | 55,364 |
R1-359 | ELECTRIC MANZANEDA, S.L. | 144.410 |
R1-360 | MUNICIPAL ELECTRIC SANTA COLOMA DE QUERALT S.L. | 446.002 |
R1-361 | ELECTRICAL DISTRIBUTIONS FROM GISTAIN, S.L. | 25.502 |
R1-362 | ENERGIES OF THE ZINQUETA, S.L. | 65,230 |
R1-363 | NAME OF THE LLOBREGAT ENERGY, S.L. | 175.470 |
R1-364 | SAMPOL ENERGY, S.L. | 48,720 |
| TOTAL. | 359.320.012 |
The distribution companies listed in this Annex in the event of a sufficiently justified circumstance may request a reasoned request from the Directorate-General for Energy Policy and Mines to review the remuneration referred to in this Annex. The General Directorate of Energy Policy and Mines will resolve the request, after the National Energy Commission has submitted a report.
ANNEX II
Quarterly updates of special regime fees and premiums
1. As of 1 October 2010
1. Fees and premiums for the facilities of the sub-groups a.1.1 and a.1.2 and of the group c.2 of Article 2 of Royal Decree 661/2007 of 25 May 2007.
subgroup | Fuel | Power | Regulated Rate | | |
---|---|---|---|---|---|
a.1 | a.1.1 | P≤0.5 MW | 14,3949 | - | |
| 11,8123 | - | |||
|
9.3820 | 3,9284 | |||
| 8,9076 | 3,2418 | |||
25
| 8,4658 | 2,8911 | |||
a.1.2 |
|
- | |||
14,2958 | - | ||||
1
| 12,2380 | 6.5079 | |||
6.5079 |
10
| 11,9069 | 5.9500 | ||
25
| 11,4968 | 5,4464 | |||
Fuel | 0.5
| 13,1016 | - | ||
1
| 11,1575 | 5,4382 | |||
| 10,8166 | 4,8693 | |||
25
| 10,4147 | 4,3819 | |||
c.2 |
|
|
| 6.8369 | 3,4883 |
2. Rates for the facilities under the second transitional provision of Royal Decree 661/2007 of 25 May 2007.
Power | Set rate by installation type | |||||
---|---|---|---|---|---|---|
Treatment and reduction of pig holdings | Treatment and reduction of sludge derived from the | Treatment | Treatment | |||
Natural Gas | P≤0.5 MW | 12,5416 | 11,1788 | 6,4082 | 5,4997 | |
0.5
| 12,5416 | 11,1786 | 6,4083 | 5,4997 | ||
| 12,7483 | 11.3630 | 6,5139 | 5,5903 | ||
| 12,7826 |
6.5314 |
5.6053 | 5.6053 | ||
|
| 12.8333 | 11.4385 | 6.5574 | 5.6276 | |
Gasole/LPG |
13.2594 | 11.8183 | 5.8142 | 5.8142 | ||
13.2594 | 11.8184 | 6.7752 | 5.8143 | 5.8143 | ||
1
| 13,3864 | 11.9317 | 6,8398 | 5,8703 | ||
| 13,4016 | 11.9454 | 6.8478 | 5,8768 |
||
25
| 13,4150 | 11.9572 | 6,8548 | 5,8827 | ||
Fuel | P≤0.5 MW | 13,2594 | 11,8183 |
5.8142 | ||
13,2021 | 11,7674 | 5,7893 | 5,7893 | |||
1
| 13,3612 | 11.9091 |
6,8269 | 5,8589 | ||
| 13,3805 | 11,9264 | 6.8369 | 5,8674 | ||
25
| 13,4049 | 11.982 | 6.8495 | 5,8781 |
2. As of 1 January 2011
1. Fees and premiums for the facilities of the sub-groups a.1.1 and a.1.2 and of the group c.2 of Article 2 of Royal Decree 661/2007 of 25 May 2007.
subgroup | Fuel | Power | Regulated Rate | | |
---|---|---|---|---|---|
a.1 | a.1.1 | P≤0.5 MW | 14,3548 | - | |
| 11,7794 | - | |||
| 9,3510 | 3,9154 | |||
| 8,8772 | 3,2307 | |||
| 8,4358 | 2,8808 | |||
a.1.2 |
| P≤0.5 MW | 16,5821 | - | |
|
14,1116 | - | |||
| 12,0543 |
6,4102 | |||
| 11.7236 | 5,8584 | |||
25
| 11,3148 | 5,3602 | |||
Fuel | 0.5
|
- | |||
10,9960 | 5,3595 | ||||
| 10,6555 | 4,7968 | |||
| 10.2533 | 4,3140 | |||
c.2 |
|
|
| 6.7351 | 3.4364 |
2. Rates for the facilities under the second transitional provision of Royal Decree 661/2007 of 25 May 2007.
Power | Regulated Rate by Installation Type | |||||
---|---|---|---|---|---|---|
Treatment and reduction of pig holdings | Treatment and reduction of sludge derived from olive oil production | Treatment and reduction of other sludge | Treatment | |||
Natural Gas | P≤0.5 MW | 12,5067 | 11,1476 | 6,3904 | 5,4844 | |
| 12,5066 | 11,1475 | 6,3905 | 5,4844 | ||
| 12,7062 | 11.3255 | 6,4924 | 5,5718 | ||
| 12,7389 |
6.5091 | 6.5091 | 5.5862 | ||
12,7878 | 11,3979 | 6.5342 | 5,6077 | |||
Gasole/LPG |
13,0885 | 11,6661 | 5.7393 | |||
0.5
| 13.0885 | 11.6662 | 6.6879 | 5.7394 | 5.7394 | |
1
| 13,1855 | 11,7526 | 6,7372 | 5,7822 | ||
| 13.1953 | 11,7615 | 6.7424 | 5,7863 |
||
25
| 13,2026 | 11,7679 | 6,7462 | 5,7896 | ||
Fuel | P≤0.5 MW | 13,0885 | 11.6661 |
5.7393 | ||
130411 | 6.6635 | 5.7187 | 5.7187 | |||
| 13,1678 | 11.7367 | 11.7367 |
6.7281 | 5,7741 | |
| 13,1812 | 11.7488 | 6,7351 | 5,7800 | ||
25
| 13.1972 | 11.7630 | 6.7433 | 5,7870 |
ANNEX III
Annual updates of the special regime's rates, premiums, and upper and lower limits
1. Rates for the facilities of the subgroup a.1.4 and group a.2 of Article 2 of Royal Decree 661/2007, of 25 May.
subgroup | Fuel | Power | Regulated Rate c€/kWh | Reference Prima c€/kWh | |
---|---|---|---|---|---|
a.1 | a.1.4 | Carbon | P≤10 MW | 11.1839 | 7.8430 |
| 7.6889 | 3.6321 | |||
25
| 6.9900 | 2,6266 | |||
Other | P≤10 MW | 5,0116 | 2,5979 | ||
| 4,5939 | 1,7524 | |||
25
| 4,1764 | 1,1515 |
|||
a.2 | P≤10 MW | 5,0168 | 2,5991 | ||
| 4,5914 | 1,7570 | |||
25
| 4,1770 |
1,1594 |
2. Tariffs for the facilities of sub-group a.1.3 of Article 2 and of the transitional provision 10th of Royal Decree 661/2007 of 25 May 2007.
Subgroup | Fuel | Power | Deadline | Regulated Rate | Reference Prima |
---|---|---|---|---|---|
a.1.3 | b.6.1 | P≤ 2 MW | first 15 years | 17,2917 | 13.0780 |
from then | 12.8343 | 0.0000 | |||
2 MW < P | first 15 years | 15.8313 | 11,3885 | ||
| 13,3344 | 0.0000 | |||
b.6.2 | P≤ 2 MW | first 15 years | 13.8233 | 9.6258 | |
| 9,3195 | 0.0000 | |||
2 MW < P | first 15 years | 11,6140 | from then | ||
8.7110 | 0.0000 | ||||
b.6.3 | P≤ 2 MW | first 15 years | 138233 | 9.6258 | |
9.3195 | 0.0000 | ||||
first 15 years | 12,7754 | 8,3333 | |||
from then | 8.7110 |
b.7.1 | |||
8.8884 | 4,8897 | ||||
then | 7.2402 | 0.0000 | |||
b.7.2 | |||||
b.7.2 | |||||
b.7.2 | |||||
rowspan="2"> P≤500 kW | first 15 years | 14,4147 | 11,3753 | ||
| 7.1803 | 0.0000 | |||
500 kW < P | first 15 years |
7.0735 |
| ||
0.0000 | |||||
| b.7.3 | first 15 years | 5,7887 | 3.8158 | |
5.7887 | 0.0000 | ||||
P≤ 2 MW | first 15 years | 138233 | 9.6258 | ||
| from then | 9.3195 | 0.0000 | ||
first 15 years | 11.8253 | 7,3772 | |||
from then | 8.8695 | 0.0000 | |||
P≤ 2 MW |
first 15 years | 10.2385 | 6.0564 | ||
from then | 7.1824 | 0.0000 | |||
2 MW < P | 7.7053 | 3,7202 | |||
| from then | 7.7053 | 0.0000 | ||
b.8.3 | P≤ 2 MW | first 15 years |
6.3374 |
| |
7.1824 | 0.0000 | ||||
| 2 MW < P | first 15 years | 10,0437 | 5.8398 | |
then | 8.1705 | 0.0000 | |||
a.1.3 within the 10. ª. |
| 14,2825 | 9.8426 |
3. Fees, premiums and limits for the facilities of category (b) of Article 2 of Royal Decree 661/2007 of 25 May 2007.
Subgroup | Power | Deadline | Regulated Rate | Prima | Limit | Limit | ||
---|---|---|---|---|---|---|---|---|
b.1 | b.1.1 | P≤100 kW | first 28 years | 47.5597 | ||||
100 kW
| first 28 years | 45,0886 | ||||||
| 10
| first 28 years | 24,8138 | |||||
b.1.2 | first 25 years | 29,0916 | 27,4312 | 37,1483 | 27,4353 | |||
| from then | 23,2731 | 21.9449 | |||||
b.2 | b.2.1 | first 20 years | 7.9084 | 2,0142 |
9,1737 | 7.6975 | ||
from then | 6,6094 |
|
|
| ||||
b.2.2 * |
|
|
| 9.1041 | 17.7114 |
| ||
| b.3 | first 20 years | 7,4410 | 4,1519 | ||||
then | 7.0306 | 3,3047 | ||||||
b.4 | first 25 years | 8,4237 | 2,7047 | 9,2014 | 7.0414 | |||
7.5814 | 1,4519 | |||||||
| b.5 |
| first 25 years | ** | 2.2727 | 8.6397 | 6.6094 | 7.5814 | 6.6094 |
| from then | *** | 1,4519 | |||||
b.6 | b.6.1 | P≤ 2 MW | first 15 years | 17,1596 | 12.9361 |
166423 | ||
12,7362 |
|
|
| |||||
2 MW < P | first 15 years | 15.8313 | 11.3885 | 16,2967 | 15,4111 | |||
13,3344 |
|
|
| |||||
b.6.2 | P≤ 2 MW |
first 15 years | 13,5763 | 9,3528 | 14,3744 | 13,0568 | ||
| 9,1530 |
|
|
| ||||
first 15 years | 11.6140 | 7.1712 | 12,0849 | 11.2090 | ||||
from then | 8.7111 |
|
|
| ||||
b.6.3 | P≤ 2 MW | first 15 years | 13,5763 | 9,3528 |
13,0568 | |||
from then |
|
|
| |||||
first 15 years | 12,7754 | 8,3333 | 13,2404 | 12.3548 | ||||
8.7111 |
|
|
| |||||
b.7.1 | first 15 years | 8.6311 |
9.6766 | 8.0350 | ||||
7.0306 |
|
|
| |||||
b.7.2 | P≤500 kW |
| 14,1141 | 11.0355 | 16,5559 | 13,3376 | ||
from then | 7.0306 |
|
|
| ||||
500 kW < P | first 15 years | 10,4541 | 6,7241 | 11,9121 | 10,3137 | |||
from then | 7.0306 |
|
|
| ||||
| b.7.3 | 5,7887 |
3.8158 | 8,9961 | 5,5078 | |||
from then | 5,7887 |
|
|
| ||||
b.8.1 | b.8.1 | P≤ 2 MW | first 15 years | 13,5763 | 9,3528 | 14,3744 |
|
from then |
9.1530 |
|
|
| |||||
| 2 MW < P | first 15 years | 11,6140 | 7.1712 |
11.2090 | 11.2090 | ||
|
|
| b.8.2 | |||||
P≤ 2 MW | first 15 years | 10.0221 | 5,7997 | 10,8213 | 9,4929 | |||
| 7.0306 |
|
|
| ||||
2 MW < P | 7.0284 | 2,5856 | 7,4950 | 6,6094 | ||||
from then | 7.0284 |
|
|
| ||||
b.8.3 | P≤ 2 MW | first 15 years | 10.0221 | 6.0677 | 10,8213 | 9,4929 | ||
from then | 7.0306 |
|
|
| ||||
2 MW < P | first 15 years | 8.6397 | 3.9621 | 9.7197 | 8.0998 | |||
from then | 7.0284 |
|
|
|
* Maximum reference premium for the purposes of the concurrency procedure provided for in Royal Decree 1028/2007 of 20 July and the upper limit for offshore wind installations.
**. The amount of the regulated tariff for the facilities of the group b.5 for the first 25 years from the start up shall be: [6,60 + 1,20 x [(50-P)/40]] x 1.0826, with P being the power of the installation.
***. The amount of the regulated tariff for the premises of the group b.5 for the twenty-sixth and successive years from the start up will be: [5,94 + 1,080 x [(50-P)/40]] x 1.0826, with P being the power of the facility.
4. Fees and premiums for the installations of groups c.1, c.3 and c.4 of Article 2 of Royal Decree 661/2007, of 25 May.
| C€/kWh regulated rate | Prima |
---|---|---|
c.1 | 5,8026 | 2.9758 |
c.3 | 4,1463 | 2.9758 |
c.4 | 7.5669 | 3,1851 |
5. Fees for installations covered by Royal Decree 1578/2008 of 26 September, registered in the corresponding calls for the year 2009.
C€/kWh regulated | |||||
---|---|---|---|---|---|
Convocation | Convocation | Convocation | Convocation | ||
Type I. 1 | 34.7079 | 34.7079 | 34.7079 | 34.7079 | |
Type I. 2 | 32.6662 | 32.6662 | 32.6662 | 32,6662 | |
Type II | 32,6662 | 31,3585 | 30,5340 | 29,6912 |
ANNEX IV
Loss Ratios for transferring power supplied to consumers at the rate of last resort and at access rate on their counters to power supplied in central bars
Loss Ratios for Low-Voltage Access and Rate Contracts
Imputed energy losses (in% of energy consumed in each period) | |||
---|---|---|---|
Period 1 | Period 2 | Period 3 | |
and tolls without time discrimination | 14 |
|
|
and tolls with 2-period time discrimination | 14.8 | 14.6 |
|
-period time-discrimination rates and tolls | 15.3 | 14.6 | 10,7 |
Loss Ratios for high voltage access contracts with 3-period time discrimination (in% of the energy consumed in each period)
Imputed energy losses (in% of the energy consumed in each period) | |||
---|---|---|---|
Period 1 | Period 2 | Period 3 | |
3.1A. Greater than 1 kV and not greater than 36 kV | 6.6 | 6.4 | 4.8 |
Loss Ratios for high voltage general rate access contracts with 6-term time discrimination (in% of the energy consumed in each period)
Imputed energy losses | ||||||
---|---|---|---|---|---|---|
Period 1 | Period 2 | Period 3 | Period 4 | Period 5 | Period 6 | |
Greater than 1 kV and not greater than 36 kV | 6.8 | 6.6 | 6.5 | 6.3 | 6.3 | 5.4 |
Greater than 36 kV and not greater than 72.5 kV | 4.9 | 4.7 |
4.6 | 4.4 | 4.4 | 3.8 |
Greater than 72.5 kV and not greater than 145 kV | 3.4 | 3.3 | 3.2 | 3.1 | 3.1 | |
1.7 | 1.7 | 1.7 | 1.7 | 1.7 | 1.7 |
Loss coefficients for other supply or access contracts (in% of the energy consumed in each period)
% | |
---|---|
BT | 13.81 |
(1 > kV ≥ 36) | 6.00 |
(36 > kV ≥ 72, 5) | 4.00 |
(72.5 > kV ≥ 145) | 3.00 |
1.62 |