Cabinet of Ministers Regulations No. 858 in Riga in 2008 (October 21. No 75 42. §) rules on "operational programme infrastructure and services" 3.1.4.1.2. apakšaktivitāt "Appendix of this infrastructure of professional rehabilitation services" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' addition ' Infrastructure priorities 3.1 human capital contributes to the strengthening of the "UR3.1.4.pas" in the employment and social services infrastructure "3.1.4.1. activity" capacity assessment and the implementation of social service institutions for the development of infrastructure "3.1.4.1.2." infrastructure development activity below the professional rehabilitation services the provision "(hereinafter referred to as the activity);
1.2. the European Regional Development Fund (hereinafter the project) submission evaluation criteria;
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination.
2. The purpose of the activity is to create an infrastructure for the vocational services rehabil tation! opportunities to persons with disabilities and the predictable disabilities working age.
3. the purpose of the activity reaches the implementation of this provision in paragraph 5 that the eligible operations and execution of the following indicators: monitoring outcome indicators 3.1 – Riga planning region supported the institution of the three departments, which provide vocational rehabilitation services;
3.2. result indicators – about two percent increase in the number of persons who made use of the supported social services institutions.
4. activities to target persons with disabilities and persons with predictable disabilities. The predictable disabilities have personal illness or injury induced effects of the functional limitations that can lead to disability, unless you provide the necessary treatment and rehabilitation services.
5. The project to be supported are the following: 5.1 learning environment adaptation: 5.1.1 classroom renovation and adaptation to the environment;
5.1.2. the computerization of the classroom;
5.2. the refurbishment and equipping of premises for professional rehabilitation to enable beneficiaries to restore integrity, combining individual social rehabilitation with medical rehabilitation elements according to the customer's functional impairments, abilities and level of development: 5.2.1. space refurbishment and adaptation of the environment;
5.2.2. fitting of space, including the gym and therapeutic medical equipment;
5.3. the refurbishment and equipping of premises to provide customized live target group, professional and social rehabilitation services;
5.4. information and publicity measures for the implementation of a project.
6. implement a limited activity in the project application selection.
7. Activity total eligible funding available is 2 540 299 lats, including the European regional development fund-2 159 254 dollars, and State budget funds-381 045 lats.
8. activities within the responsible authority provides the Ministry of welfare. Responsible authority: 8.1 establish restricted the application of the selection of projects project application Evaluation Commission (hereinafter the Commission);
8.2. send the limited range of the project call for project submissions;
8.3. provide information about the project applicant project application preparation and elaborate exhibit project submission form to be filled out;
8.4. assess the project submissions and decides on the approval of the project application, approval or rejection of the condition;
8.5. to accumulate data on project submissions in accordance with the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
8.6. participating in the agreement on the implementation of the project (hereinafter referred to as the agreement) project;
8.7. provide methodological tools development funding recipients who are purchasing the project in accordance with the public procurement law and who are the principals of that law;
8.8. in those provisions set out in paragraph 67 of the draft amendments and, if there is objection, advising on the deficiencies identified;
8.9. the plan and implementation of information activities for the implementation of the activity, including information on the activities are published within the projects approved;
8.10. ensure that these rules are not exceeded, paragraph 7, of the activities available for the implementation of funds and monitors the available European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006) 93. Article 1 and 2 of the principle referred to in the performance of the activity level.
9. cooperation authority provides the Central Finance and contracts. The liaison body: 9.1. draft agreement in the development;
9.2. the closing agreement with the European regional development fund, the beneficiary (hereinafter referred to as the beneficiary);
9.3. requested funding procurement plan and submit it to the procurement monitoring Bureau;
9.4. provide information to the national budget request prepared away, subject to laws and regulations that govern the public financial management and planning of national budgetary resources for the European Union agenda, the Fund co-financed projects and making payments;
9.5. the review and approval of the reports submitted by the beneficiaries of the project progress reports;
9.6. provide project monitoring and control, including inspections of the project site and managed by the Council Regulation No 1083/2006 and article 93, paragraph 2, of the enforcement principle project level;
9.7. provide information about the recipient of the funding arrangement;

9.8. checks the recipient's funding requests for payment submitted by the eligible expenditure approved amount and prepare payment orders, as well as the declarations of expenditure shall be prepared and sent to the managing authority for the examination;
9.9. approve the draft amendments under this rule 66 and 68, as well as 67, if the responsible authority has agreed amendments to the draft;
9.10. the responsible authority shall provide information on the activities available for the implementation of the European regional development fund financing;
9.11. accumulates data about the projects in accordance with the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
9.12. plans and implements public awareness measures for the implementation of projects.
10. the cooperation body is the functional supervision of the responsible authority.
II. Requirements for the project applicant Project applicant has 11 professional rehabilitation services provider institution for which the responsibility for the provision of the services of its governing legislation (public administration, which provides vocational rehabilitation services to the disabled).
12. If the application is approved, the project, the applicant is the sole beneficiary, which agreed with the liaison body for the implementation of a project. Project applicant project does not constitute a partnership.
13. European regional development fund to invest in the public domain.
14. the maximum eligible European regional development fund shall be 85 percent of the project's total eligible cost.
15. the minimum Project total eligible costs is not limited to, the maximum eligible cost total is $2 540 299.
III. Project application selection 16. the responsible authority shall send the invitation to submit a project application to the project the applicant (hereinafter referred to as the notice) in accordance with the requirements of these regulations set out in paragraph 11 of the draft.
17. The invitation shall: 17.1. project application procedures for submitting it in person, by mail or electronic transmission;
17.2. the project submission deadline, which is not less than 30 days from the date of dispatch of the invitation;
17.3. homepage on the internet containing the application to be used for the preparation of the project documents (these provisions and consumables to the project submission form to fill out);
17.4. the home page on the internet where you inserted the draft agreement.
18. the applicant shall submit Project application, subject to the following requirements: the applicant shall provide the project 18.1. one project submission;
18.2. the project application consists of the completed project submission form (annex a) and the following documents: 18.2.1. the project applicant questionnaire-application of value added tax, provided for in the laws and procedures and checks the information provided on the application of value added tax to the European Union's structural funds in the framework of projects funded and shall take a decision on the inclusion of value added tax to the project-related costs;
18.2.2. the project budget materials, technical and equipment acquisition cost calculations, supporting documents (relating to fuel, if the project is planned for the implementation of tangible technical support);
18.2.3. documents certifying that the property on which the project is intended to invest the European regional development fund, is State-owned;
18.3. the project submission form section, subsection and the names project, the applicant does not change and do not delete;
18.4. the presentation of the project application, the project shall ensure compliance with the rules referred to in paragraph 25.1. administrative criteria. Preparing the project application, the project shall ensure that its contents match this rule 25.2. referred to the eligibility criteria and 25.3. referred to quality criteria;
18.5. the submission form by filling in the project title, project applicants will provide the information to be provided for cross-compliance, it is a description of the current project, identifying the problem and its solution, linking it with the project objectives, the results to be achieved, the selected target group, planned activities, time and the design of the eligible costs, as well as the conditions required for the implementation of the project;
18.6. the application by filling in the project, the project applicant required project cost plan according to this provision, 50, 51, 52, 53, 54, 55, 56 and 57. those costs and limits, giving the project the expected costs, and ensure their compliance with the objective of the project, the results to be achieved, planned activities and the time schedule. The European regional development fund project in the application intends only to cover the eligible costs of the project;
11.6. in assessing the investment alternatives, the project, the applicant argues that the chosen alternative provides a cost effective solution implementation;
12.8. the project applicant project application to the responsible body can submit one of the following forms: 18.8.1. the paper form in triplicate (original and two copies to the relevant "original" or "copy"). Project submissions are presented according to the laws that govern the development and presentation of documents;
18.8.2. electronically (the project application must be signed with a secure electronic signature pursuant to the electronic movement of regulatory laws and requirements);
11.7. the project application submitted that rule 17.2. referred to in subparagraph within the time specified in the invitation in person, by mail or electronically.
19. the competent authority shall register the project submission it received, as well as the identification number. Proof of receipt of the application, the project authority in charge of the project to the applicant personally, on the same day or within two working days, shall be sent by mail or electronically (signed with a secure electronic signature).
20. the responsible authority shall have the right to organize additional limited application, if: 20.1. this rule 17.2. within the time limit referred to in the head of the project had not submitted a project submission;
20.2. the project application is rejected;
20.3. the project application is approved for an amount that is less than the rules specified in section 7 activity the total eligible funding available.
IV. evaluation of the project application

21. activities within the project application submitted to the evaluation provided by the Commission. The Commission establishes the following order: 21.1 the personnel of the Commission (the President of the Commission, members of the Commission balsstiesīgo and their replacements) consists of representatives of the Ministry of Welfare, and confirmed by the responsible authorities;
21.2. the managing authority and the representatives of the liaison bodies entitled to participate in meetings of the Commission as an observer;
21.3. the members of the Commission or its substitute in their absence, replaced by another authorized representative. Such authorisation shall be made in writing to the Commission in accordance with the procedure laid down in the Statute.
22. The Commission shall determine the responsible authorities developed and approved regulations.
23. the project submission compliance is assessed on the basis of the provisions referred to in paragraph 25 of the draft application evaluation criteria and with the responsible authorities the project application selection and evaluation procedures, as well as the application form for the evaluation of the projects mentioned in the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds and the European Union fund management and control system. The documents referred to in this paragraph, the competent authority shall publish the homepage on the internet (URwww.lm.gov.lv/sf).
24. submission of project compliance with this provision, and 25.4 25.2 25.1. projects referred to in the application of the evaluation criteria evaluated with "Yes" () and "no" (no matches). The project's compliance with this provision application 25.3. criteria referred to in point scored, giving a certain number of points.
25. the project submission is judged by the following project submission evaluation criteria: 25.1. administrative criteria (design and submit eligibility criteria): 25.1.1. or the applicant is invited to submit a project application to the limited application of the selection of projects;
25.1.2. or the application is submitted to the responsible authorities within the time limit laid down;
25.1.3. or the application is signed by the authorised person of the applicant in the project (Officer);
25.1.4. or the application is designed according to the circulation of electronic documents regulating legislative requirements (applicable if the project application submitted electronically);
25.1.5. or the application is made in the text;
25.1.6. or project submission is prepared in the national language;
25.1.7. This provision is made or 18.8.1. the project referred to in the copy of the application (original and copy) and they have been certified (applicable if the project application submitted in paper form);
25.1.8. or project submission, the original and the copies are cauršūt (caurauklot) (true if project application submitted in paper form);
25.1.9. or the application is fully completed and drawn up according to the project submission form and are attached to this provision, and 18.2.3 18.2.1.18.2.2. the documents prescribed in paragraph;
25.1.10. copies of the submission or the project comply with the project's original application (applicable if the project application submitted in paper form);
25.1.11. or all copies of the application project (original and copy) pages are numbered (true if project application submitted in paper form);
25.1.12. or project submission, financial calculation is made in local currency;
25.1.13. or project submission, financial calculation is designed to accurately and appropriately mean project application form;
25.1.14. or project submission under the European Regional Development Fund funding will not exceed that laid down in point 14 of the rules of the funding;
25.1.15. or project submission eligible cost specified in total not exceeding the provision referred to in paragraph 15 of the maximum project funding;
25.1.16. included in the application or project costs complies with these regulations 50, 51, 52, 53, 55 and 56 points in those costs;
25.1.17. or project submission, the planned costs do not exceed 54. these provisions and costs referred to in paragraph 57 of the position and 56.1.5. these provisions referred to in claims costs;
25.1.18. or the period of project implementation and cost allocation over the years correspond to the provisions referred to in paragraph 61 of the project implementation period;
25.2. eligibility criteria (substantive, financial and eligibility criteria in the implementation): 25.2.1. or the applicant complies with the provisions referred to in paragraph 11 of the draft requirements to the applicant;
25.2.2. or the aim of the project contributes to this provision referred to in paragraph 2, the objective of the activity;
25.2.3. or infrastructure in which to invest the European regional development fund, is State-owned;
25.2.4. or project submission is based on the projected expenditure need šamīb;
25.2.5. or project environmental impact assessment;
25.2.6. or project submission, justify the need for the implementation of the project and identifies the challenges (including target groups);
25.2.7. or project submission, the planned project activities as defined in project problem solving;
25.2.8. or in the application of the project results and planned results indicators contribute to the rule laid down in paragraph 3 of the monitoring indicators;
25.2.9. or project submission seeks to ensure the maintenance of the results achieved by the implementation of the project (at least five years after the final payment to the beneficiary);
25.2.10. or the application are defined in the project administration personnel job responsibilities and qualifications requirements;
25.2.11. or project submission reflect existing and planned logistic support (applicable if the project is planned for the implementation of tangible technical support);
25.2.12. or project submission reflect project management, monitoring and quality assurance system;
25.2.13. or project planned in the application of publicity and information dissemination activities comply with these regulations, paragraph 63 and 64;
25.3. quality criteria (specific to the policy implementing the eligibility criteria): 25.3.1. institutions provided for in the project infrastructure development promotes professional and social rehabilitation services for the target group;
25.3.2. the project application include project implementation readiness assessment;
25.3.3. investment projects based on the use of the applicant's development strategy;

25.3.4. the project provides continuity of the investment made in the past;
25.3.5. the project focuses on the development of the infrastructure of vocational rehabilitation services to persons with disabilities in working age, to promote the rights of persons with functional disabilities integration into the labour market;
25.3.6. duration of the project;
25.3.7. project submissions are assessed in the investment alternatives, and offer the most cost effective solution;
25.3.8. submission of the project includes the implementation of the project risk analysis;
25.3.9. project-specific activities, the principle of equal opportunities, particularly in improving accessibility for people with functional disabilities;
25.3.10. project intended to implement activities for the development of the information society;
25.4. the criterion for the award of funding – or project submission complies with these rules, 25.1.3 25.1.1 25.1.2.,.,.,., and 25.1.6 25.1.4 25.1.5. referred to administrative criteria, this provision, 25.2.2 and 25.2.3 25.2.1... the eligibility criteria referred to in this provision, 25.3.1. quality criteria referred to in point of assessment has received at least three points, 25.3.2. these provisions, and 25.3.10 25.3.8. quality criteria referred to in each of the ratings has received at least four points 25.3.3. these rules and 25.3.7. quality criteria referred to in each of the ratings has received at least five points, this provision, 25.3.5 25.3.4. and 25.3.9. referred to quality criteria of assessment are received in each of at least two points and has received at least 31 points, judging by this rule 25.3. referred to quality criteria.
26. about this rule referred to 25.3.1. quality criteria at aware can get a maximum of 10 points, and its relevance to the determination of the apakškritērij and the following number of points: 26.1. project submissions that, in developing the infrastructure of the institution, professional and social rehabilitation services are available for persons with disabilities – four points;
26.2. the project in the application provided that the development of the infrastructure of the institution, professional and social rehabilitation services will be available to individuals with visual impairments – three points;
26.3. the project in the application provided that the development of the infrastructure of the institution, professional and social rehabilitation services will be available to individuals with hearing impairments – three points;
26.4. the project in the application that, by developing institutions infra structure, professional and social rehabilitation services will be available to the target group-the zero point.
27.25.3.2. These rules the quality criteria referred to in point at aware can get a maximum of seven points, and the determination of its conformity with the applicable one of the following apakškritērij and scoring: 27.1. to project the day of the application has been designed for the construction (including sketch project and technical project), if the project requires development projects – seven points;
27.2. the project submission contains the object of each investment readiness assessment to launch the works (including strukcij and renovation rekon), including required documentation have been identified and action sequences, four points;
27.3. the project submission does not contain the project readiness assessment – the zero point.
28. about this rule referred 25.3.3. quality criteria at aware can get a maximum of five points, and the determination of its conformity with the applicable one of the following apakškritērij and scoring: 28.1. project submissions included investment in the use of the conformity assessment activities of the applicant in the project development strategy – five points;
28.2. the project submission does not include the use of conformity assessment of the investment project of the applicant's development strategy or investment included in the project application usage does not meet or part of the applicant of the project development strategy – the zero point.
29.25.3.4. These rules the quality criteria referred to in point at aware can get a maximum of two points, and the determination of its conformity with the applicable one of the following apakškritērij and scoring: 29.1. project submissions in the past made contributions to the analysis and evaluation of continuity — two points;
29.2. the project is excluded from the application of the investment made to date in the analysis and assessment of succession-zero point.
30. about this rule referred 25.3.5. quality criteria at aware can get a maximum of five points, and the determination of compliance with the following criteria and the bottom score: 30.1. optimizing the infrastructure project of professional rehabilitation, persons with functional disabilities of working age will have the opportunity to develop professional skills – two points;
30.2. improving the infrastructure project of professional rehabilitation, persons with functional disabilities of working age will have the opportunity to obtain professional qualifications – three points;
30.3. the project is aimed at improving the infrastructure of vocational rehabilitation services to persons with disabilities in working age, to promote the rights of persons with functional disabilities integration into the labour market – the zero point.
31.25.3.6. These rules the quality criteria referred to in the periods concerned can be obtained at the maximum five points, and the determination of its conformity with the applicable one of the following apakškritērij and score: 19.3. the planned duration of the project is up to 24 months – five points;
31.2. the planned project duration is from 24 to 30 months – four points;
31.3. the planned duration of the project are more than 30 months-zero point.
32.25.3.7. These rules the quality criteria referred to in the periods concerned can be obtained at the maximum five points, and the determination of its conformity with the applicable one of the following apakškritērij and scoring: 32.1. the project is assessed in the application of investment alternatives and offer the most cost effective solution – five points;
32.2. the project submission does not assess the investment alternatives and not offer the most cost effective solution – the zero point.

33.25.3.8. These rules the quality criteria referred to in the periods concerned can be obtained at the maximum four points, and the determination of its conformity with the applicable one of the following apakškritērij and scoring: 33.1. application of the project are identified and reflected in the project implementation risks, assess their impact and the probability of occurrence, as well as certain risks mitigation measures – four points;
33.2. the project submission does not contain the project risk analysis – the zero point.
34.25.3.9. These rules the quality criteria referred to in the periods concerned can be obtained at the maximum five points, and the determination of its conformity with the applicable one of the following apakškritērij and scoring: 34.1. the project for three and more specific activities ensuring the principle of equal opportunities, five points;
21.3. the project has two specific activities ensuring the principle of equal opportunities – three points;
21.3. the project is one specific activity equal opportunities – for two points;
21.4. the project does not provide for specific activities of the equal opportunities provision – zero point.
35. As this provision referred 25.3.10. quality criteria at aware can get a maximum of four points, and the determination of its conformity with the applicable one of the following apakškritērij and score: 21.8. project application provides that investments in information technology will improve the quality of service provision, four points;
35.2. the project application for investment in information technology will improve the quality of service provision – the zero point.
V. decision on approval of the project application, approval or rejection of a conditional acceptance and notification of the responsible authority 36. project application is approved if it meets the following conditions: 36.1. its compliance with this provision and 25.2 25.1. eligible referred to the administrative and eligibility criteria is evaluated with "Yes";
36.2. This provision it, 25.3.2.25.3.3 25.3.1.,.,., 25.3.5 25.3.7 25.3.4.,.,.,., and 25.3.10 25.3.9 25.3.8. quality criteria referred to in point of assessment received a number of points equal to that rule 25.1, 25.2, 25.2..,.,., 40.7 25.4 25.4., 40.10 and 40.11, 34.64. above. the quality criteria defined for the minimum number of points that must be obtained or greater;
36.3. the compliance with this provision. above bottom 25.4 funding criteria have been assessed with "Yes".
37. the responsible authority shall approve the application, the project on condition that the applicant projects that rule 45 time limit referred to in paragraph shortcomings noted, if there was at least one of the following circumstances: 37.1. a project application to specify the appropriate one of these rules, 25.1.9 25.1.7 25.1.8.,.,.,., 25.1.10 25.1.11 25.1.12.,.,., 25.1.15 25.1.13 25.1.14.,.,., and 25.1.18 25.1.16 25.1.17. referred to administrative criteria, except in the case where the application is not added to this provision and the bottom paragraph 18.2.2.18.2.3. certain documents;
37.2. the project application to the need to clarify the appropriate one of these rules, 25.2.4, 25.2.5.25.2.6.,.,., 25.2.9 25.2.7 25.2.8.,.,., 25.2.12 25.2.11 25.2.10. and 25.2.13. referred to the eligibility criteria.
38. This provision, paragraph 37 of the condition can include: 38.1. additional explanation of the submission;
38.2. the project implementation time or cost design clarification by years;
23.8. This provision 18.2.1. adding the document referred to in point a;
23.9. the cost adjustment (reduction or exclusion), in so far as it does not affect this provision. 54 and 57 the costs referred to in that provision and paragraph 56.1.5. below cost in the amount of limitation;
38.5. other steps to ensure the conformity of the project application, this provision, 25.1.8 25.1.7.,.,., 25.1.9 25.1.10 25.1.11.,.,., 25.1.14 25.1.13 25.1.12.,.,., 25.1.15 25.1.16 25.1.17. and 25.1.18. referred to administrative criteria.
39. If this rule 37 and 38. compliance with the conditions referred to in paragraph 1 affect any other provisions of this paragraph 25 evaluation criteria mentioned in the conformity assessment, the responsible authority decision on the approval of the application, the project on condition accompanied by appropriate instructions. Conditions do not affect the quality criteria for the evaluation of the results.
40. the responsible body stops and does not continue the project evaluation, and their application is rejected, if there was at least one of the following circumstances: 24.9. the project submission does not comply with any of these terms, 25.1.3 25.1.1 25.1.2.,.,.,., and 25.1.6 25.1.4 25.1.5. independent of the administered referred to in criteria;
40.2. the project submission does not have added this provision to the bottom paragraph 18.2.2 and 18.2.3.. in those documents;
40.3. the project submission does not comply with any of these terms and 25.2.3 25.2.1 25.2.2.., referred to the eligibility criteria;
25.1. the project application, rated according to this provision the 25.3.1. referred to quality criteria of less than three points;
25.2. the project application, rated according to this provision the 25.3.2. referred to quality criteria is below four points;
40.6. application assessment project under this provision in the abovementioned 25.3.3 quality criteria is below five points;
40.7. application assessment projects according to this provision in the abovementioned 25.3.4 quality criterion is lower than two points;
25.4. the project application, rated according to this provision the 25.3.5. referred to the criterion of quality is lower than two points;
25.4. the project application, rated according to this provision the 25.3.7. referred to quality criteria of less than five points;
40.10. application assessment project under this provision in the said 25.3.8 quality criteria is below four points;
40.11. assessment of the application of the project according to the rules referred to in paragraph 25.3.9 quality criterion is lower than two points;
project application rated 34.64. pursuant to this provision in the abovementioned 25.3.10 quality criteria is below four points;
40.13. the project submission does not comply with the provisions referred to in paragraph 15.8 funding allocation criteria.

41. the decision on the approval of the project application, approval or rejection provided the determining authority along with supporting documents (extract from the minutes of the Commission by Commission decision) within five working days from the date of adoption of the decision must be forwarded to the applicant.
42. the decision on the application of the project approval, the responsible authority shall include information on the conclusion of the agreement.
43. the responsible authority shall within five working days after the decision on the approval of a project application shall inform the liaison body. The liaison body switch arrangement in accordance with the law establishing procedures for the structural funds and the European Union cohesion fund management in the participating institutions provide the planning document preparation and implementation of these funds. The responsible authority shall send to the liaison body of the decision on the application for the approval of the project, and two copies of the project approved. The responsible authority cooperation authority approved projects can be sent electronically if it is filed under these provisions. 18.8.2 in that order.
44. the decision on the application for the approval of the project, provided the determining authority specifies in the application of the project details in accordance with the provisions of paragraph 37 and 38.
45. the decision on the application for the approval of the project provided the conditions contained in the project, the applicant provides the information contained in the decision and the conditions provided by the responsible authority of the prescribed period, not longer than 60 days from the date of entry into force of the decision. The information that applicants may submit a project in one of the following ways: 45.1. in paper form in triplicate (original and two copies to the relevant "original" or "copy"). Details of the decision contained in the conditions presented in consistent with the laws that govern the development and presentation of documents;
45.2. electronically (for information on the conditions in the decision must be signed with a secure electronic signature pursuant to the electronic movement of regulatory laws and requirements).
46. the Commission examined this provision in paragraph 45 and the responsible authority shall draw up an opinion on the decision the conditions contained within 10 working days after this rule laid down in paragraph 45. In the opinion of Justice control is done just like the decision, which contains the conditions to control this opinion is drawn up.
47. Where the applicant has complied with the decision on the application for the approval of the project provided the conditions laid down by the responsible authority within two working days, following this rule 46. the expiry of the period referred to in paragraph 1, the applicant shall send the draft opinion on the conditions contained in the decision, but the cooperation body-decision on approval of the application, the project provided an opinion on the conditions contained in the decision and two copies of the approved project, as well as two copies of the document , which contains information on the fulfilment of the conditions contained in the decision. The liaison body switch arrangement in accordance with the law establishing procedures for the structural funds and the European Union cohesion fund management in the participating institutions provide the planning document preparation and implementation of these funds. The responsible authority cooperation authority approved projects can be sent electronically if it is filed under these provisions. 18.8.2.
48. If the applicant has not provided a decision on the application for the approval of the project, provided the conditions are met, the application shall be deemed to have been rejected. The opinion that the decision contained in the conditions are not met, the responsible authority shall send the draft to the applicant within two working days, following this rule 46. the expiry of the period referred to in paragraph 1.
49. If a decision to reject the application of the project or the project, the applicant has not fulfilled the decision on approval of the application, the project provided the conditions laid down by the responsible authority in addition to the provisions laid down in point 41 of the project applicant be returned or sent by mail two copies of the application for the project. The responsible authority for the project the applicant project application can be sent electronically if it is filed under these provisions. 18.8.2.
Vi. Project implementation conditions 50. Project plans to the following eligible costs: 50.1. direct cost cost following positions: 50.1.1. costs related to the preparation for the implementation of the project;
50.1.2. construction, logistical means and equipment costs;
50.1.3. other project costs;
50.2. indirect costs the following cost headings: 50.2.1. information and publicity measures;
50.2.2. project implementation would cause the value of the materials cost of insurance (apply during project implementation);
50.3. unforeseen costs.
51. This provision 50.1.1. cost referred to in the heading of the company include the costs of supporting the implementation of the project for the preparation of the dossier (including costs associated with the procurement and technical implementation of the projects). If the operator is registered with the State revenue service as beneficiary, eligible employees of the employer are also state social security payment costs.
52. This provision, in particular cost 50.1.2. position includes the following subdivisions: 52.1 cost of renovation and room environmental accessibility costs these regulations 5.1, 5.2 and 5.3 eligible activities referred to in (a);
52.2. the equipment, hardware and software acquisition cost of these regulations 5.1, 5.2 and 5.3 eligible activities referred to in point.
50.1.3.53. This provision States the cost line includes the following subdivisions: 53.1 the costs. the company's costs of construction supervision;
53.2. procurement procedure implementation costs.
54. This rule 50.3. referred to the cost of the position shall not exceed five percent of the total eligible direct project costs. The project cost plan as one expense items, and its previously unplanned spending to cover the costs of the project's eligible direct costs.

55. The value added tax payments are eligible costs depending on whether the project will purchase goods and services received are for taxable or non-taxable transaction or transactions to provide assurance not provided for in the law "on value added tax".
56. in addition to the provisions referred to in paragraph 50 of the eligible cost of the plan, the following positions are not eligible costs: 56.1. project administration costs, including the cost of the following subheadings: 56.1.1. remuneration (excluding bonus and money award);
56.1.2. domestic travel and travel cost (daily allowance, accommodation and transportation expenses) for monitoring the implementation of the project;
56.1.3. postal and electronic communications services;
56.1.4. utility costs;
56.1.5. Office supplies and inventory costs (Office supplies and non-essential items in the inventory value of up to 150 Lats per unit, if the lifetime is less than a year);
56.2. the company's costs for the preparation of project applications. If the operator is registered with the State revenue service as the beneficiary of the worker, the employer also plans the State social insurance compulsory contribution costs.
57. in paragraph 56 of these rules, the costs are financed from the State budget, and the costs should not exceed five percent of the project's eligible direct costs.
58. Financing from the European regional development fund and the applicable state budget resources, referred to in section 7 of these regulations, does not apply a cost: 58.1. not specified in these regulations 50, 51, 52, 53 and 55 or does not comply with the provisions referred to in paragraph 54 of the eligible cost about limits;
58.2. for which the beneficiary has not undertaken the implementation of project activities (except this rule 51, paragraph costs) and for which payments are not made within the time limit set in the agreement;
58.3. This provision, paragraph 56.
59. during the implementation of the project in addition to the costs incurred (including project cost incidence costs) shall be borne by the beneficiaries of their own funds, if the beneficiary is not available in this rule 50.3. the costs referred to in paragraph 60 of the structural funds of the European Union for the implementation of the project the funds required for the planning, financing and execution of the State budget authority are carried out in accordance with the laws and regulations governing the Fund's European Union funding conditions.
61. The implementation of the project plan from the date of conclusion of the agreement until July 1, 2011.
62. The project site is the territory of the Republic of Latvia. Project international cooperation does not apply.
63. in implementing the project, the beneficiary shall ensure information and publicity measures, laid down in the Commission of 8 December 2006, Regulation (EC) no 1828/2006 laying down provisions for the implementation of Council Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund, and the European Parliament and Council Regulation (EC) No 1080/2006 on the European regional development fund and regulations of European Union funds publicity and visual identity requirements.
64. The beneficiary in its homepage on the internet at least once every three months puts up-to-date information on the implementation of the project.
65. The beneficiary of these regulations 5.1, 5.2 and 5.3 eligible activities referred to in the first purchase for the implementation of a call for competition is made no later than 90 days from the date of this provision in paragraph 36, the adoption of the decision or these rules in the opinion referred to in paragraph 47 of the date of its entry into force.
66. the draft amendments shall be consistent with the laws that determine the order in which the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise.
67. the cooperation of harmonisation in the responsible authority shall submit the draft amendments to the institution, if the changes are related to: 67.1. project objectives;
67.2. change of the beneficiary;
67.3. the term of the project;
41.9. project results to be achieved;
67.5. project total eligible costs amount or their Division schedule over the years.
68. within this rule 54. and 57 paragraph cost position and 56.1.5. these provisions referred to in point apakšpocīzij of the amount of the cost limits and previously announced a cooperation body, the funding recipient project can take: 68.1. the reallocation of costs between 50.1.1. these provisions, 50.1.2.,.,., and 50.2.2 50.1.3 50.2.1. costs mentioned in points positions, not exceeding five percent of the cost of common positions reallocated eligible costs;
68.2. the reallocation of costs between these rules 51, 52 and 53. costs referred to in paragraph subheadings. This reallocation of costs to this provision, 50.1.2 50.1.1. and 50.1.3. cost referred to under heading, up to 10 percent of the cost of a transferable within the total amount of the eligible cost;
68.3. cost reallocation 50.2.1. these provisions referred to under the heading of costs, not to exceed 10 percent of the cost of a transferable within the total amount of the eligible cost;
68.4. This provision defined in point 54b reallocation of costs;
68.5. cost reallocation between 56.1.1. these provisions, 56.1.2.,.,., and 56.1.5 56.1.3 56.1.4. the costs referred to in subparagraph bottom positions, up to 10 percent of the cost of a transferable within total cost amounts.
Prime Minister i. Godmanis Welfare Minister i. Muzzle is the Editorial Note: rules shall enter into force on 29 October 2008.
Annex PDF240kb Ministry of welfare submitted the attachment Cabinet October 21 2008. Regulations No 858 Welfare Minister of the nose.