Cabinet of Ministers Regulations No. 875 Riga 2008 October 21 (pr. No 75 40. §) rules on "operational programme infrastructure and services" in addition to the activity 3.1.1.2. "vocational education infrastructure development and modernisation of equipment training prisons" issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' addition ' Infrastructure priorities 3.1 human capital contributes to the strengthening of the "UR3.1.1.pas" infrastructure "of vocational training activity 3.1.1.2." vocational education infrastructure development and modernisation of equipment training prisons "(hereinafter referred to as the activity);
1.2. the requirements of the European regional development fund project application (hereinafter referred to as the project application) applicant;
1.3. project submission evaluation criteria;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination. 2. The purpose of the activity is professional mining opportunities in convicted. 3. activities at the prisons, inmates of prisons and prisons serving educators. 4. in implementing the objectives of the activity, make the rules referred to in point 16 activities to achieve the outcome of monitoring indicators – 31 December 2013 in eight prisons to modernise vocational subjects and Cabinet workshops. 5. Activity implemented limited project application selection (limited selection). Limited selection organized by the responsible authority in one round. 6. Activities financed from the European regional development fund and the State budget. Total restricted selection within the funding available is 2 315 330 pounds, including the European Regional Development Fund funding and the State budget LVL 1 968 030 co-funding 347 300 lats. 7. activities within the responsible authority provides the Ministry of education and Science (hereinafter referred to as the responsible authority). Collaborative institutions des functions ensure national educational development agency (hereinafter referred to as cooperation body). 8. the responsible authority: ensures application 8.1. project selection and evaluation;
8.1.1. establish and approve the project submission form for the evaluation of project applications of valuation and project submission form of evaluation methodologies;
8.1.2. create a limited selection of the assessment Commission (hereinafter referred to as the Evaluation Commission), develop and approve Evaluation Commission rules;
8.1.3. sends the call for project submissions;
8.1.4. valued project submissions and decides on the approval of the project application, approval or rejection of the condition, as well as assess the decision on approval of the application, the project provided the conditions are met;
8.2. the accumulated data on project submissions under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
8.3. following amendments to the draft according to this provision, paragraph 59;
8.4. the planning and implementation of information activities for the implementation of the activity;
8.5. ensure not to exceed this provision specified in point 6 available for the implementation of the activity the European regional development fund, as well as monitor and control available in the European regional development fund, including a learning Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 93. Article 1 and 2 of the principle referred to in the performance of the activity level;
8.6. on its website the European regional development fund project evaluation of the application form and submission of the project selection and evaluation procedures. 9. cooperation authority: 9.1. within 10 working days of the entry into force of these regulations establish and submit to the authority responsible for the coordination of the project standartvienošan for the implementation of a project;
9.2. the switch with the beneficiary of the financing agreement for the implementation of the project and determine the terms of implementation of the project beneficiaries in accordance with these rules and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation;
9.3. provides project monitoring and control, including checks in the project locations, and monitor the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999, article 93 1 and 2 of the principle referred to in the implementation of the project;
9.4. consider and submit to the procurement monitoring Bureau funding recipient's procurement plan;
9.5. prepare and submit to the authority responsible for the implementation of the project and the available funding;
9.6. prepare and submit a payment institution, the managing authority and the responsible authority payments forecast;
9.7. prepare and submit to the leading authority and the responsible authority funds the European Union demand forecasts for the current and the coming year;
9.8. checks and confirms the beneficiary's payment request and prepare the Declaration of expenditure;
9.9. the beneficiary to provide information about the fulfilment of the conditions of implementation of the project in accordance with the concluded agreement;
9.10. accumulates data about the implementation of projects under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
9.11. plans and implements public awareness measures on activities within the agreement concluded with the beneficiary;
9.12. the draft amendments to the regulations under this paragraph 58 and 59. 10. the cooperation body is the functional supervision of the responsible authority. II. European regional development fund allocation 11. Limited selection in the project application submitted to the authority in the exercise of State policy in the prison as the execution of the criminal sanctions field. 12. Limited selection within the project application, the applicant may submit one project submission. 13. the application shall be accompanied, for the whole of the project activity funding available. 14. the maximum permitted by the European Regional Development Fund funding is 85 percent of the total eligible costs of the project amount. 15. The beneficiary in implementing the project, ensure the co-financing of at least 15 percent of the total eligible cost of the project. 16. activities supported are the following: 16.1. the implementation of vocational training programmes and the acquisition of professional qualifications required training equipment (equipment, technology, including information technology) and learning the necessary furniture purchase, delivery and installation of prisons;
16.2. instruction and electronic training material and software;
16.3. the training room and utility room, or create a marshalling construction (renovation or reconstruction);
16.4. the training room and utility room, to ensure labour protection requirements. III. Project application selection 17. the responsible authority shall within 60 working days following the entry into force of these regulations shall send the institutions that implement State policy in the prison as the execution of the criminal sanctions field, call for project submissions. 18. The invitation shall: 18.1. the project submission deadline – it may not be less than 40 working days from the date of dispatch of the invitation;
18.2. the project location, the application procedure for sending it by mail, in person or submit an electronic document;
18.3. the Web site containing the application, to be used in the preparation of project documents. 19. the project the applicant shall prepare a project submission according to the project application form (annex 1). The project applicant, prepare a project application and fill out a project application form, comply with the following conditions: 19.1. the project submission form section, subsection and the names project, the applicant does not change and do not delete;
19.2. If the project application submitted personally or sent by post, the original and the copies of the application, placed in a package (envelope) and sealed. 20. the application of the project the following annexes are added: 20.1. Ministry of Justice proof of project co-financing required for implementation;
20.2. the project applicant questionnaire-application of value added tax, according to the regulations on the procedures for issuing and verifying the information on the application of value added tax to fund the European Union funded projects and adopt a decision on the inclusion of value added tax to the project-related costs;

20.3. financing plan the State budget authorities in accordance with the classification of expenditure of the budget, according to economic categories (annex 2);
20.4. other documents that justify the submission of the project's compliance with these rules in the project application evaluation criteria. 21. the project application to the project the applicant can submit one of the following forms: 21.1. paper, adding identical electronic version of its electronic media;
21.2. the electronic document-signed with a secure electronic signature and confirm with the time stamp under the electronic Act. 22. paragraph 18 of these rules in the invitation referred to in the said project to the application date is the last day when the project applicant project application submitted personally, electronically or by post. 23. the competent authority shall register the project submission it received on the date of receipt. The responsible authority for the project the applicant a receipt of the project application or within 10 working days after the application deadline date for submission of proof of the receipt of the project sent by post or electronically signed with a secure electronic signature pursuant to the electronic Act. IV. evaluation of the application of project activity within 24 of the projects submitted to the evaluation of applications of valuation the Commission supports. Scoring panelists included representatives from the Ministry of Justice and the Ministry of education and science. 25. Evaluation Commission meetings as observers may participate in the cooperation between the managing authority and authorities, as well as the Evaluation Commission may invite one or more experts without voting rights. 26. the Commission determines the Statute approved by the responsible authority. 27. prior to the submission of a project evaluation, the members of the Commission and experts sign a declaration that there are no circumstances in which they might violate the European Union's structural and cohesion funds, the law limits the European Union fund management person involved and in which it could be argued that they are interested in a specific project in the project submitted by the applicant in the application. 28. The assessment shall be carried out pursuant to these provisions, the responsible authorities develop and approve project submissions and evaluation of laws and regulations that govern the European Union's structural and cohesion funds, implementation, and monitoring of implementation, as well as through the application of the project assessment and project appraisal form the gum cold filling methodology. 29. the project submissions valued under that rule 30, 31, 32 and 33 of the project referred to in paragraph submission evaluation criteria. 30. Administrative criteria: 30.1. the applicant is hereby invited the project to submit a project application to the limited application of the selection of projects;
30.2. the project application is filed within the time limit laid down;
30.3. the project is drawn up into the application;
18.9. the project proposal is prepared for the Latvian language;
5. the project proposal is prepared for the indicated project submission form, and all form sections are completed;
19.0 submission project is submitted in paper form with the required number of copies of the application for the project, the original and copies of the application are cauršūt (caurauklot) or the application is filed in electronic form of a document according to the law of electronic documents;
19.1. the project application is signed by the project head of the institution to the applicant or his authorised person;
19.1. the project application has been added to that rule 20.2 and 20.3 20.1., below the annex referred to in paragraph 1;
19.2. the period of project implementation and cost allocation over the years correspond to the provisions referred to in paragraph 66 of the project implementation period;
30.10. the project required in the application of the European regional development fund co-financing and the total eligible costs indicated in lats;
30.11. project requested by the European regional development fund co-financing does not exceed 14. these provisions referred to in paragraph 1, the European regional development fund co-financing;
30.12. application of the project eligible costs required in total not exceeding the provision referred to in paragraph 6-2 315 330 pounds of funding;
30.13. eligible costs over the years project contains the full application in the arithmetic right and meet the project budget totals listed in the summary;
30.14. project submissions given in eligible positions match this rule 45, 47, 49 and 51 points in eligible costs;
project submission planned 30.15. costs not exceeding that rule 52, 53 and 54. costs referred to in paragraph 1. 31. the eligibility criteria (projects and projects of the application the applicant eligibility criteria): 19.3. the aim of the project complies with this provision in paragraph 2 of this activity objective;
31.2. the project for the implementation of this Regulation referred to in paragraph 16 of the eligible actions;
31.3. the project application is defined in the problem addressed and justified the chosen target group needs;
19.5. the project will address the prisoners ' educational policy guidelines 2006-2010 (approved by Cabinet of Ministers of 15 June 2006 order No. 443) that the provision of vocational training to the problem of prisons;
31.5. project submissions and planned activities provide the problem and define target groups needs are met;
19.6. the project activities are clearly defined, proportionate with the planned time schedule for implementation and ensure the planned results;
19.7. the application of the project results and the planned figures are accurately defined and measurable (reachable results are specified in units with specific values);
19.8. the expected results for the project and their indicators contribute to the achievement of the outcome indicators, at least eight prisons, which modernized the professional subject study and workshops;
19.8. the project application describes the project management, implementation and monitoring system and the required resources (in the number of staff involved, qualifications and responsibilities, the facilities available), and they meet the needs of the project;
31.10. the project application is justified, as it will ensure the sustainability of the results achieved by project implementation and maintenance of at least five years;
31.11. project costs indicated in the application corresponds to the period of project implementation, are necessary and reasonable to achieve the objectives of the project and the implementation of the planned activities;
31.12. project planned in the publicity and information dissemination activities comply with the European Union funds projects in publicity;
31.13. project applicant is an institution in the exercise of State policy in the prison as the execution of criminal penalties;
31.14. infrastructure, designed to make the European regional development fund, the investment is in the possession of the applicant or of the project applications. 32. Quality criteria: 32.1. to start a project: preparedness 32.1.1. project is not ready to start – provides a list of equipment and a list of the works to be carried out is not prepared or have been prepared in low quality (zero point);
32.1.2. project readiness is low to start – is prepared and based on the purchased equipment and the list of the works to be carried out, the purchase documentation is made (one point);
32.1.3. the project is ready for the launch of the medium – is prepared and based on the purchased equipment and the list of works to prepare the purchase documentation projects for the development or prepared the technical documentation for the purchase of equipment (two points);
32.1.4. project readiness for the launch of the high-technical projects of the works developed and prepared the technical documentation for the purchase of equipment (three points);
32.2. infrastructure and equipment for training intended to improve support for priority giving them prison: 32.2.1. which are being implemented, accredited professional education program (one point);
32.2.2. which are being implemented, accredited professional education programs, and for which the contract has been concluded with a vocational educational institution or institutions (two points);
32.2.3. which are being implemented, accredited professional education programs, for which the contract has been concluded with the vocational training authority or authorities, and have built up cooperation with economic operators about the employment of prisoners (three points);
32.3. the implementation of the project: 32.3.1. in the implementation of vocational training programmes for quality professional education programs closer to that being implemented outside prisons (one point);
32.3.2. in the implementation of vocational training programmes for quality professional education program zoomed, taken outside the prison and secured the offer of vocational training according to the prisoners ' educational needs (two points);

32.3.3. in the implementation of vocational training programmes for quality professional education program zoomed, taken outside the prison and secured the offer of vocational training according to the prisoners ' educational needs and demand of the labour market (three points);
32.4. following the implementation of the project: 32.4.1. will not change in this profession (zero point);
32.4.2. will be increased in this profession (two points);
32.4.3. will be increased in this profession and different levels of professional qualification acquisition (three points);
32.5. the result of the implementation of the project shall ensure that: 32.5.1. at least 50 percent of the project involved in the educational process the prisoners will be able to obtain professional qualifications or to improve professional skills (one point);
32.5.2. from 51 to 70 percent of the project involved in the educational process the prisoners will be able to obtain professional qualifications or to improve professional skills (two points);
32.5.3. more than 70 percent of the project involved in the educational process the prisoners will be able to obtain professional qualifications or to improve professional skills (three points);
32.6. the project planned by the European regional development fund investment alternatives and assessment of the effectiveness of the project submission 32.6.1.: not the investment alternative assessment (zero point);
32.6.2. submission of project investments is provided in two alternative assessment and offered the most cost effective solution in the vis (two points);
32.6.3. submission of project investments is provided in three or more of the alternative assessment and offered the most cost effective solution (three points);
32.7. the project implementation risks (prisons reorganisation, construction and supply procurement and sales risks, potential cost, incidence of insufficient teacher support and other risks) evaluation: the project submission does not contain 32.7.1. assess potential risks or potential risks in the application considered incomplete action plan identified risks are not developed or are not completely developed (zero point);
32.7.2. application of the project risks are assessed in qualitative, action plan identified for the elimination or reduction of risks not fully developed (one point);
32.7.3. application of the project risks are assessed in qualitative, including the estimated potential cost incidence, develop a reasoned plan of measures identified for the elimination or reduction of risk (two points);
20.4. the impact of the project on the balanced development of the territory the horizontal priority: project planned 32.8.1. improve vocational learning programs required infrastructure in less than four planning regions (zero point);
32.8.2. project planned to improve vocational learning programs required infrastructure in four planning regions (one point);
32.8.3. project planned to improve vocational learning programs required infrastructure in all five programming areas (two points);
32.9. project-specific activities, the principle of equal opportunities for: project does not foresee 32.9.1. specific activities the principle of equal opportunities (zero point);
32.9.2. project for one or two specific activities the principle of equal opportunities (one point);
32.9.3. project for three and more specific activities the principle of equal opportunities (two points);
32.10. the impact of the project on the information society: the horizontal priority of the project is for 32.10.1. information and communications technology equipment, acquisition of information and communication technologies to improve the skills of use (one point);
32.10.2. the project is intended for the information and communications technology equipment, acquisition of information and communication technologies skills improvement and modernisation of vocational training programmes (two points). 33. the criterion for the award of funding: 33.1 an application complies with the project this rule 30.1, 30.2, 30.3.., 18.9., 5.,.,., 19.5 19.3, 19.4 19.8., 31.13. and 31.14. referred to evaluation criteria, as well as 32.1.,.,., and 32.7 32.8 32.5. in the assessment of the criteria referred to in each has received at least one point, 32.6. evaluation criteria referred to in subparagraph for at least two points, and these rules referred to in paragraph 32 of the leaderboard in the quality criteria are received at least nine points. V. decision and notification of the approval of the project application, approval with conditions or disapproval 34. the responsible authority shall take a decision on the application of the project approval if compliance with that rule 30, 31 and 33 projects listed in the submission evaluation criteria have been assessed with "Yes". 35. the responsible authority shall take a decision to reject the application of the project and not be judged according to the rules of the other 30, 31 and 33. criteria referred to in point, where the application does not meet any of these rules 30.1:21.8., 30.2, 30.3, 30.4..., or 30.5. referred to administrative criteria;
35.2. this rule 31.1, 31.2, 19.5.,.,., or 31.14 31.13 19.8. referred to the eligibility criteria;
35.3. This provision in paragraph 33 above funding criteria. 36. the responsible authority shall take a decision to reject the application of the project and not be judged according to the rules referred to in paragraph 32 of the quality criteria, if the application is received at least one point this rule 32.1.,.,., or 32.7 32.8 32.5. criteria referred to in subparagraph or at least two points at the bottom of this rule 20.3. criteria referred to in paragraph. 37. the decision on the application of the project approval may include conditions which must be fulfilled in order to project the applicant would conclude the agreement on the implementation of the project: 37.1 develop project. in accordance with the following criteria: 37.1.1. this rule 19.1 19.1 19.0.,.,.,.,., 30.10 30.11 19.2., 30.12.,.,., or 30.13 30.15 30.14 in certain administrative criteria;
37.1.2. this rule 31.3 31.5 31.6,.,.,.,., 19.7 19.8 31.10., 31.12. in paragraph 31.11. or certain eligibility criteria;
37.2. in the light of the European Union's structural funds and the cohesion fund management law, perform the following actions: If the project submission 37.2.1. information is unclear or inaccurate, to submit additional information or a document (specified or requested additional clarifying information);
37.2.2. to clarify the project's eligible costs, up to a maximum of that rule 52, 53 and 54. cost limit laid down in paragraph;
37.2.3. to carry out other responsible authorities specific to the project could be implemented. 38. the responsible authority shall within five working days after the decision sent to the applicant of the project: 38.1.-the decision on the application of the project or the project of authorisations requested transmit application rejection, or project approval submissions;

38.2. the cooperation of the authority-the decision on the application of the project of authorisations requested transmit and two certified copies of the approved project or project submission in electronic form of a document, prepared in accordance with the law of electronic documents. 39. the decision on the application for the approval of the project by the deadline laid down the conditions for the fulfilment of conditions is not longer than 20 working days from the date of dispatch of the decision. 40. the decision on the application for the approval of the project provided the conditions contained in the project, the applicant provides a decision within the time limit. Information about the conditions in the decision included a project applicant submits the body responsible for evaluation in no more than two times. 41. the responsible authority shall be 20 working days after this provision 39. the period referred to in paragraph 1 shall examine the information submitted and, if the decision of the conditions are met, drawing up an opinion on the fact that the applicant has met the draft decision on the application for the approval of the project provided the conditions laid down. Opinion assessed simultaneously with the decision taken by the evaluation of the rule of law. 42. the responsible authority shall within five working days after the rules referred to in paragraph 41 of the findings inform in writing the applicant and the project authority. While this provision paragraph 41 of that opinion of the responsible authority shall send to the liaison body of the two certified copies of the project or a project in the form of electronic document, prepared in accordance with the law of electronic documents. 43. If the applicant does not provide the conditions contained in the decision or execution under this rule laid down in paragraph 39, the project submission deadline will be considered rejected. Opinion on the conditions contained in the decision of the determining authority within five working days after the preparation of an opinion sent to the project applicant. 44. the project applicant 20 working days of receipt of the decision on rejection of the application or project that rule 43. in the case referred to in paragraph shall have the right to request the competent authority to issue the project applicant project application of two copies according to the laws and regulations governing the circulation of information. Vi. implementation of the project. Eligible and ineligible costs 45. Pursuant to Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 of the European Parliament and of the Council of 5 July 2006, Regulation (EC) No 1080/2006 on the European regional development fund and repealing Regulation (EC) No 1783/1999 conditions , the project has the following applicable items: 45.1. a project for the preparation of the documentation supporting the application costs, if they are related to the provisions referred to in paragraph 32.1. below requirements (procurement and technical project development costs);
45.2. the implementation of vocational training programmes and the acquisition of professional qualifications required training facilities (training and electronic training material, software, equipment, technology, including information and communication technology) and the purchase of furniture, delivery and installation of the prison costs;
45.3. the buildings, structures, facilities and infrastructure renovation and reconstruction costs, as well as the site's redevelopment costs;
28.2. the labour protection requirements, the cost of providing training facilities and utility room;
28.3. the project information and publicity costs that comply with the regulations on the European Regional Development Fund funded project publicity and information measures;
45.6. Services and other costs that are reasonable and related to the implementation of activities;
28.4. unforeseen costs. 46. This rule 45.1 45.2 45.3.,.,., 28.2 and 28.3. in point costs are direct costs of the project. 47. This rule 45.2. in point costs can include: 29.3. Training Office training required for modernisation of equipment and technology acquisition costs;
47.2. the training and electronic training material and software acquisition costs;
47.3. the information and communications technology and software acquisition costs;
47.4. the learning process requires the acquisition cost of the furniture;
29.5. training equipment, equipment, furniture, and information and communication technology delivery, installation, repair, service, costs, training equipment, information technology equipment and use technical training costs. 48. This rule 45.2. in point costs shall constitute not less than 35 percent of the total eligible costs of the project. 49. That rule 45.3. in point costs can include: 30.5. classroom and utility room creation, adaptation or adjustment of construction (renovation or reconstruction);
30.6. the site improvement costs. 50. Where the application of this provision include 30.6. site referred to in the home improvement work, the applicant shall provide the project site of a home improvement job need a justification, as well as the exact home improvement job positions and their cost. 51. This rule 28.3. in point costs can include: 51.1. the provision of procurement costs;
51.2. technical project development costs;
51.3. the Superintendence and autoruzraudzīb costs. 52. This rule 28.3. in point costs do not exceed 10 percent from 45.1. these provisions, 45.2 45.3 45.4., and the bottom point down payment amounts. 53. This rule 28.3. in point costs do not exceed 0.2% of the direct costs of the project. 54. This rule 28.4. in point costs do not exceed five per cent of the direct costs of the project, and can be used directly attributable costs. 55. the non-recoverable value added tax payments are eligible. 56. Financing from the European regional development fund and the State budget resources do not apply and are not included in the application for the project shall be the following: 56.1. real estate (buildings and land) acquisition cost;
56.2. expenses which are not intended for immediate purchase of equipment;
56.3. payment for loan processing, presentation, and service, the reservation fee on financial transactions, interest on arrears, penalties and expenses of litigation;
56.4. costs not specified in that rule 45, 47, 49 and 51 or 52, the rule 53 and 54 in the fixed costs;
56.5. costs that are not related to the implementation of project activities and does not meet the reasonable financial management, in particular value for money and cost-effectiveness;
56.6. the costs incurred by the implementation of project activities, except during the project preparation of the documentation supporting the application costs, or costs of payments made later than the month following the expiry of the implementation of the project;
56.7. costs not justified by supporting documents or the costs incurred by the law of the non-compliance. 57. project administration costs are not eligible costs. Administration costs of the project the project application may not contain more than five percent of the project's eligible direct costs. 58. the project is carried out in accordance with the amendments to the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise. 59. The beneficiaries of cooperation before submission to the authority shall be submitted to the responsible body harmonization project amendments, if the changes are related to: 59.1. project objectives;
59.2. change of the beneficiary;

59.3. project sample outcome indicators. 60. in cases determined by the agreement on the implementation of the project, the liaison body after consulting the responsible authority may initiate a unilateral retreat from an agreement on the implementation of the project. 61. This provision up to 52, 53 and 54. eligible costs set out in paragraph 1, the beneficiary of the project, by the liaison body of the payment request to add an explanation of the following measures, you can make this rule 45.2. redistribution, 45.3 45.4 45.5.,., and 45.6. the cost in point position within or between them, not exceeding five percent of the cost of common positions reallocated eligible costs. The liaison body cost reallocation may be disregarded or considered not to have occurred if the beneficiary has not substantiated it. 62. The beneficiary within five working days after the agreement on the conclusion of the project procurement plan shall be submitted to the Liaison Office. 63. The beneficiary of these rules referred to in paragraph 16 of the implementation of the activities supported the first procurement tender issued within 90 days after the decision on project approval. 64. The beneficiary shall ensure the implementation of the project of placing the snapshot, the beneficiary authority Web site at least once every three months. 65. The beneficiaries of the activities provided for in the project implementation started only after the institution of cooperation agreement for the implementation of a project. 66. Project implementation duration does not exceed three years from the date of the agreement for the implementation of a project, but no more than 31 December 2013. Prime Minister i. Godmanis, Minister of education and science t. koķe Ministry education and science presented in annex 1 of the Cabinet of Ministers on October 21 2008. Regulations No 875 annex 1 PDF format, Minister of education and science t. koķe annex 2 Cabinet October 21 2008. Regulations No 875 annex 2 PDF format, Minister of education and science t. koķe