Advanced Search

Amendments To The Cabinet Of Ministers Of 28 December 2010 Regulations No. 1210 "provisions On The System Of The European Railway Interoperability '

Original Language Title: Grozījumi Ministru kabineta 2010. gada 28. decembra noteikumos Nr. 1210 "Noteikumi par Eiropas dzelzceļa sistēmu savstarpēju izmantojamību"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 8 in Riga 2016 January 5th (Mon. No 1 13) amendments to the Cabinet of Ministers of 28 December 2010 regulations No. 1210 "provisions on the system of the European railway interoperability ' Issued in accordance with the law" on conformity assessment "article 7 of the law and article 43 of the third to make the Cabinet on 28 December 2010 the arrangements no 1210" provisions on the system of the European railway interoperability "(Latvian journal 2011, 2., no. 168; 214. nr. 2013, 2014; 256., no.) the following amendments: 1. Express 2.1. subparagraph by the following: "2.1. verification of the subsystem-procedure performed to prove that the subsystem concerned is fulfilled the requirements of these rules and may be put into service in the European rail system. This procedure does not remove the verification that the conformity assessment body shall be carried out in accordance with the subsystem the laws applied to the rail system in areas not directly applied. The subsystem verification checks and attests that a subsystem: 2.1.1. these rules and the technical specifications of interoperability requirements (hereinafter referred to as the requirements of the European Union); 2.1.2. these rules and this provision applicable in Latvia 29. referred to in legislation, standards and regulations to the requirements of technical documentation (hereinafter referred to as the national requirements). " 2. Supplement with 2.12. subparagraph by the following: "2.12. verification Declaration-declaration certifying that the subsystem concerned is suitable for the relevant procedures and verification of the subsystem meets the requirements of these regulations. Declaration of verification of compliance with the identified in the European Union and the national requirements. " 3. Add to paragraph 33 in the second sentence by the following: "where an interoperability technical specifications are set by open access or if the technical specifications for interoperability in part apply upgrades or renovations, the technical specification of interoperability in the transitional period for the application of this provision or paragraph 27 for the special case of an interoperability constituent meets the essential requirements if it complies with the applicable technical specifications for interoperability in national requirements and requirements derogations applicable to the case. " 4. Supplement with 33.1 point as follows: "33.1 regardless of whether the technical specifications for interoperability are defined or not for certain derogations or transitional periods for certain parameters are subject to conformity assessment for all interoperability technical specifications the following interoperability constituents." 5. Make the following paragraph 34: "34. Interoperability technical specifications of interoperability constituents specified in the conformity assessment shall be carried out by the notified body and the manufacturer or his authorized representative on the conformity assessment of the time, place and agenda." 6. in paragraph 54 of the following expression: ' 54. structural subsystems authorised to be put into service in the European rail system if they are designed, constructed, or produced and installed in accordance with this provision, the essential requirements referred to in the annex and the technical specification for interoperability relating to the subsystem as well as is verified and is drawn up by the relevant declaration of verification. " 7. Supplement with 54.1 points as follows: "54.1 to prove that the subsystem meets European Union and national requirements, the verification shall be carried out and it is responsible for a trader or a public institution that contracts and orders the railway system, subsystem or part of the design, construction, manufacture, modernization or reconstruction (hereinafter referred to as the client), or the manufacturer as well as the customer or the manufacturer's authorized representative. The Subscriber can also be of the rail infrastructure, carrier, holder or user of the subsystems, as well as the concession holder, which is responsible for the commissioning of the project. " 8. Add to paragraph 59 of the third and fourth sentence as follows: "manufacturer, contractor or their authorized representative may request an assessment of any of the individual parts, which he wants to split the subsystems. Each part of the examination of each subsystem in this provision, paragraph 58. " 9. Express 59.1 and 59.2 points as follows: "this rule 59.1 59. in the case referred to in paragraph notified body assessment and issue the manufacturer or his authorized customer representative intermediate statements of verification for the design, construction, or production of certain parts of the subsystem or compliance with the requirements of this regulation. 59.2 intermediate statements of verification points used in the verification of the technical specifications for interoperability and compliance with laws and regulations, the notified body which checked the intermediate verification process, including the technical specifications for interoperability in specific use derogations in cases where laws and regulations are used. Interim Declaration presented in the same way as that rule 69, paragraph Declaration of verification. " 10. Express 64.1 points as follows: "If there are 64.1 intermediate statements of verification issued by the notified body, which shall carry out the verification of the whole entire subsystem shall take account of relevant intermediate statements of verification and verification before the certificate is issued for the entire subsystem in General: 1. verify, or 64.1 intermediate statements of verification shall cover all the technical specifications for interoperability and the legislation requirements; 2. check all 64.1 requirements do not cover intermediate statements of verification; 64.1 3. final inspection of all subsystems prior to commissioning. " 11. Replace paragraph 65.1, the words "European Community" with the words "European Union". 12. Supplement with 65.3 points as follows: "If the conversion subsystem 65.3, which already has a certificate of verification issued by the notified body carries out only the changes needed for the verification tests, assessing only those parts of the subsystem is modified, and their interface with subsystem without significantly altering the parts." 13. Express in paragraph 68 of the first sentence as follows: "each of the subsystems involved in verification of the notified body shall draw up the rules referred to in point 3 72.1 technical documentation showing the extent of the action taken." 14. Replace paragraph 69, the words "European Community" with the words "European Union". 15. in paragraph 71 of the following expression: ' 71. Declaration of verification shall include at least the following information: 71.1. reference to these rules and of the relevant European Union directive as well as a reference to the interoperability specifications and applicable national requirements; 71.2. the manufacturer, or the Subscriber, as well as their authorized representative (if any) name or business name and full address; 71.3. brief description of the subsystem; 71.4. notified body name, address and registration number: 71.4.1. verified conformity of the subsystem with the requirements of the European Union; 71.4.2. verified the conformity of the subsystem with the requirements of the national; 71.4.3. compliance assessment subsystem appropriate regulations on railway system directly applied areas; 71.5. the technical documentation shall include a list of the documents; 71.6. all the relevant provisional or definitive conditions which must be met by the subsystem, as well as, where appropriate, any operating restrictions or conditions; in the event of a derogation, 71.7. or, if the technical specifications for interoperability in part apply upgrades or renovations, the technical specification of interoperability or the transitional period provided for in paragraph 27 of the provisions in the specific case – a reference to the interoperability technical specifications or parts thereof compliance with which the verification procedure has not been verified, and a reference to national requirements which apply in the case of derogations; 44.6. evaluation name and address of the institution that prepared a report on common security risk assessment methods in line with the Commission 30 April 2013 implementing Regulation (EU) no 402/2013 for a common security method for the detection and assessment of risks and of Regulation (EC) no 352/2009; News of the Declaration of 71.9. signer. " 16. paragraph 72 be deleted. 17. Supplement with 72.1 72.2 72.3 72.4 points, and such as: 72.1 manufacturer, contractor or their authorized representative collects and Declaration of verification accompanied by the technical documentation of the following: 1.72.1 project related technical characteristics which are sufficiently detailed to document compliance with the verification carried out, including the General drawings and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams of the control , description of data-processing and automatic systems, operating and servicing, as well as other documentation subsystem targeted information; 2. the subsystem 72.1 interoperability constituents of the enum; 3. these provisions 72.1 paragraph 68 specified in the technical documentation. This documentation shall include: 3.1 the 72.1 subsystem interoperability constituents of the copies of the Declaration of conformity and, if necessary, the corresponding calculation notes and a copy of the Protocol for the trials and tests carried out by the notified bodies on the basis of the common technical specifications; 3.2. the verification certificate 72.1 attached intermediate statements of verification (if any), as well as data on notified bodies the results of the verifications with respect to intermediate statements of verification of conformity; 72.1 3.3. verification issued by the notified body certificate (together with the corresponding calculation notes), approved by signature and which States that the subsystems meet the requirements of these rules (mentioning any reservations arising from work at the time and still not withdrawn). Visits are attached to the certificate of inspection and monitoring (audit) reports drawn up by the notified body in accordance with the provisions of paragraph 63 and 64; 3.4. verification certificate 72.1 added a technical dossier containing the information needed to assess the conformity of the subsystem with the requirements of the national; 72.1 4. conformity assessment certificates issued in accordance with the subsystem the laws applied to the rail system is not directly applied areas; 5. the evaluator's report 72.1 for common security risk assessment methods, where, according to the Commission 30 April 2013 implementing Regulation (EU) no 402/2013 for a common security method for the detection and assessment of risks and of Regulation (EC) no 352/2010 cancellation requires the inclusion of a secure subsystem user's security management system. 72.2 If subsystem, which is prepared Declaration of verification, modifications are made that are not related to the maintenance, replacement, and the manufacturer or the customer that implements this modifications, show that the modification will not affect the construction of the subsystem the main characteristics that are essential to ensure compliance with the basic parameters of the subsystem, the manufacturer or the Subscriber restores references to the documents contained in the Declaration of verification in the attached technical documentation. A new declaration of verification does not prepare. 72.3 If the subsystem is up Declaration of verification, modifications are made that are not related to the maintenance, replacement, and the manufacturer or the customer who implement modifications, indicate that the modification will affect the main constructive characteristics of the subsystem, which is essential to ensure compliance with the basic parameters of the subsystem: 72.3 1. manufacturer, contractor or his authorised representative shall draw up an additional declaration of verification by reference to certain basic parameters; 72.3 2. additional declaration of verification accompanied by the original declaration of verification accompanied by the technical file an initial list of documents that are no longer in force; 72.3 3. the attached technical documentation shall include a statement that the moves will affect only the relevant basic parameters; 4. this rule 72.3 Chapter VIII requirements for verification of the subsystems, apply additional declaration of verification of subsystems; 5. with regard to the basic 72.3 that this modification will not affect remain valid in the original declaration of verification. 72.4 If commissioning requires additional verification parameters, and additional verification of Declaration of verification of subsystems can be supplemented to cover only the additional scope of verification. " 18. Add to paragraph 74 of the second sentence as follows: "If the issue of a certificate of verification of certain parts of the subsystem, the provisions of this chapter, as they are applicable to the verification of the subsystems, also apply to part of the subsystem verification." 19. Add to the informative reference to European Union directives, with paragraph 5 by the following: "5) Commission 2014 5 December 2014/106/EU directive amending annexes V and VI for a European Parliament and Council Directive 2008/57/EC on the interoperability of the rail system within the community." The Prime Minister is the Minister of traffic Speed Newsletters ad interim, Interior Minister Richard Kozlovsk a