Advanced Search

Reclamation Cadastre Rules

Original Language Title: Meliorācijas kadastra noteikumi

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 623 Riga 2010 (13 July. 17. § 36) reclamation cadastre rules Issued in accordance with the Reclamation Act, the third subparagraph of article 14 and the third subparagraph of article 16 of the i. General questions 1. determines: 1.1. reclamation cadastre content and creation, maintenance and exchange of information;
1.2. reclamation cadastre data reporting and escalation procedures;
1.3. the drainage system and the contents of the inventory order.
2. Drainage operation of cadastre establishes and maintains reclamation cadastre information system. Reclamation cadastre information system is a national information system, and its curator is a public company with limited liability "the Ministry of agriculture in real estate" (hereinafter – the company).
II. content of cadastral, land drainage and maintenance 3. Reclamation cadastre contains: 3.1 text data, which includes information on the drainage system of the quantitative and qualitative condition of status and melioratīv of the hidrometrij, as well as the land owner or legal possessor;
3.2. spatial data, which includes the reclamation of cadastral plans and maps of the analog and digital form, which depicts a water drainage system, ūdensnotek, and ūdensnotek catchment area of drained land boundaries, drainage systems and devices and hidrometrij items with their reclamation cadastre, as well as ground unit boundaries and cadastral designation.
4. Drainage system characterized by quantitative condition of these rules referred to in annex 1 drainage system key indicators.
5. Reclamation cadastre plan use designations according to annex 2 of these rules.
6. Reclamation cadastre creation and maintenance company used such data and information: 6.1 the State land service of the real property cadastre of State information systems and spatial data of text;
6.2. the National Agency for Latvian geospatial information agency "the simplified digital topographic maps and digital ortofotokarta with the certainty of the scale 1:10 000;
6.3. the local authorities concerned in force planning (detailed) vector spatial data format.
7. Drainage company maintains such a cadastre information and data: 7.1 melioratīv technical documents: 7.1.1. drainage system technical project documentation;
7.1.2. izpilddokumentācij;
7.2. the drainage system inventory documentation;
7.3. reclamation cadastre data escalation documentation;
7.4. the land property reclamation Passport;
7.5. the documentation of technical regulations;
7.6. the hidrometrij data melioratīv.
8. This provision in paragraph 6 and 7 the information and data referred to the three public rounds level reclamation cadastre cases: 8.1 region reclamation cadastre in case: 8.1.1. reclamation cadastre in spatial data with the level of certainty in rural areas – 1:10 000, and city land-1:2000;
8.1.2. the region's administrative area drainage system main indicators;
8.1.3. melioratīv-hidrometrij;
8.2. administrative area reclamation cadastre in case: 8.2.1. drainage system technical projects and izpilddokumentācij;
8.2.2. the drainage system for the conversion of the technical regulation;
8.2.3. drainage system inventory documentation;
8.2.4. reclamation of cadastral spatial data with the scale 1:5000 and the certainty of 1:2000;
8.2.5. the administrative territory of the drainage system, a summary of the main aggregates;
8.3. land reclamation cadastre of property case: 8.3.1. land property reclamation Passport;
8.3.2. drainage system data and inventory documentation;
8.3.3. drainage system technical design documentation and izpilddokumentācij.
9. the drainage system that is national, municipal, and other natural and legal persons or the legal possession of the property, regardless of its property and status registers the reclamation cadastre information system, giving it a reclamation cadastre number.
10. Reclamation cadastre number consists of three levels of designation: 10.1 the first level – the name of the parish or seven decimal sign, which stands for the administrative area of the territory, in accordance with the administrative and territorial units;
10.2. second level-three decimal characters that represents the object number of the reclamation in accordance with the assigned number of reclamation cadastre;
10.3. third level-three decimal characters representing the reclamation system number under drainage system nospraudum plan.
11. Reclamation cadastre of drainage system established the public set one of the following statuses: drainage system 11.1. national drainage system;
11.2. the national drainage system. Status States: 11.2.1. ūdensnotek whose catchment area is at least 10 kvadrātkilometruv for at least five kilometers long (also trans-national ūdensnotek);
11.2.2. the waterworks structures and devices in the event of an accident or flood risk of the pal at least 100 hectares large area or locality;
11.3. the municipal drainage system. The status determines the drainage system in accordance with the information submitted by the municipality;
11.4. sharing drainage system. Status: 11.4.1. ūdensnotek fixed, large diameter collector, which provides two or more estates or legal possession of the existing ground-water regime regulation, except the delimiting and regulatory network construction;
11.4.2. the waterworks structures and devices that no other natural or legal persons in possession, but is on a shared ūdensnotek;
11.5. the property drainage system. Status States: 11.5.1. ūdensnotek that is on one property or legal possession of the existing land border;
11.5.2. defining the regulatory and network structures (drain systems, drainage ditches and kontūrgrāvj), which is located in one of the property or the legal possession of the land regardless of how much the legal possession of the property or land in water regime regulation affects;
11.5.3. waterworks structures and devices that no other natural or legal persons owned or possession, but located on one property ūdensnotek.
12. the company shall grant the system ūdensnotek of the drainage catchment areas of water in the economic circuit code according to the classification of economic water circuit water economic circuit code that contains the ūdensnotek.
13. Reclamation cadastre information system changes to the responsible person is certified by the signature of the document in question or the electronic information system, noting on the record date.
14. Documents and data on the basis of which creates and maintains cadastral drainage, stored permanently on paper or in electronic form (if technically possible).
III. Reclamation cadastre information exchange 15. State land service law in the order issued by the public (reclamation cadastre creation and maintenance) data from the following real estate national cadastre information system information block: 15.1. cadastral object identification information unit;
15.2. the composition of real estate information block;
15.3. real estate base data information unit;
15.4. property rights and rental rights information unit;
15.5. the land units of the base data information block;
15.6. land units and land units part of the real estate of the purpose of the information block;
15.7. cadastral spatial data on the land unit and the construction of the information block.
16. the company electronically, upon request, the State land service (so the function) drained wetlands area boundaries (digital form) with scale 1:10 000 of certainty from the November 1.
17. the national agency "Latvian geospatial information agency" public (reclamation cadastre upkeep) online data transmission mode in electronic form, issued or transmitted in the digital topographic maps with scale 1:10 000 and the certainty of the digital ortofotokarta with the certainty of the scale 1:10 000.18. local analogue or digital provides public information about municipal drainage systems in their administrative territory, as well as in force issued by the municipal planning (detailed) vector spatial data format.
19. public joint stock company "Latvian State forests" provide the public (reclamation cadastre updating and maintenance of the data) in digital form information on drainage systems and owned the possession of land.
20. The company shall provide the national agencies ' geospatial information agency of Latvia "with reclamation cadastre in spatial data in digital form, the statutory master data preparation.
IV. Reclamation cadastre data submission and updating of information on 21 drainage system reclamation cadastre information system provides: 21.1. land owner or legal possessor: 21.1.1. drainage system in a first inventory or drainage structures inventory information;
21.1.2. the application of technical rules for receiving the information (article 4 of the law on Drainage in the first part of the cases) and Meliorācijaslikum the information specified in article 18;

21.2. municipal būvvald-drainage system and the construction of the waterworks structures, regulations governing the prescribed amount;
21.3. the local authority-information on municipal drainage system;
21.4. the public drainage region chapter-information for first-time state of the drainage system and the national drainage system inventory.
22. to register the drainage system, updated data reclamation cadastre information system, or remove the data from the land owner or legal possessor shall provide public drainage region chapter submission (annex 3) in paper form or electronic form and shall be accompanied by the following documents: 22.1. reclamation facilities inventory file, if this rule proposes 23.2. referred to reclamation facilities registration.
22.2. the drainage system of the technical opinion of the survey, if the proposed drainage system removing data;
22.3. the drainage system nospraudum (project) a copy of the plan or the revised plan to mark the boundary of the area of the drainage system or structure, which suggests the data removed from the reclamation cadastre information system;
22.4. the nature protection management opinion, if the proposed drainage system data removal, which is specially protected natural territory.
22.5. the drainage system of the first inventory file;
22.6. the power of the copy, if the application is submitted by an authorised person (the presentation of the original).
23. the drainage system registers the cadastral information system of drainage if: 23.1. received documents referred to in the legislation of drainage system and the construction of the waterworks structures;
23.2. the proposed the existing drainage structures registration, in accordance with the laws of the land drainage reclamation system and match under these rules shall be recorded in the register of the drainage.
24. the drainage system to remove the data from the reclamation cadastre information system, assess and take into account: 24.1. drainage system impacts on other land ownership or legal possession of the ground water treatment;
24.2. the drainage system.
25. the drainage system data removed from the reclamation cadastre information system: the system is 25.1. drainage and ground water regime affects one land ownership or legal possession;
25.2. it does not impair other land ownership or legal possession of the ground water treatment.
26. Reclamation cadastre data updated, on the basis of the documents on the drainage system construction, removal of data, inventory and real estate the State cadastre information system data as well as using the latest ortofotokarta.
27. the drainage system for registration, data updating, or removing data submissions must comply with the following terms: 27.1. The real property cadastre information system state data;
27.2. the existing municipal planning (detailed) planned (allowed) the use of the territory;
27.3. the nature protection management opinion (if such is required).
28. This rule 22.2. technical survey referred to the opinion of the land owner or legal possessor fails if the drainage system is interrupted to ensure special protection, special protection of species or habitats of priority European Union habitats favourable conservation status of specially protected natural territories.
29. the Public drainage Department within 30 days after this provision 22, paragraph document evaluating the compliance of the receipt of the requirements of this regulation and shall take a decision on reclamation system logging or for drainage system reclamation of data updating cadastral information system or removal from it.
30. If the public drainage region chapter accepts the decision on refusal to register the drainage system, or to update or remove the data within 30 days after receipt shall notify the land owner or legal possessor of the refusal, stating its reasons. The decision on the refusal to adopt if: 30.1. the documents submitted do not contain the information necessary for the Betterment of the system of registering or updating data or removal;
30.2. the land owner or legal possessor of information provided in documents do not meet the requirements of this regulation. 
31. This provision 30. in the cases referred to in point land owner or legal possessor has the right to submit documents again, if the reasons for the refusal.
32. The public drainage system by State and national drainage system reclamation cadastre data escalation information system prepares a summary of data about the public drainage systems and national reclamation systems and to the November 1, submit it for approval to the Minister of agriculture.
33. the documents for the Betterment of the system of registration, data updating cadastral information system of drainage, or removal of the data added to the relevant reclamation cadastre case.
V. Reclamation systems make the counting and 34. Reclamation system of laws and regulations on the Phys. Invt būvpraks and architect practice certificates, registration, and cancellation in the order certified by the person granted the certificate of būvpraks drainage system, River waterworks structures or drainage system design of river waterworks structures, construction management and building supervision (hereinafter referred to as the inventory reviewer).
35. the drainage system in the counting procedure applies to rural areas: agricultural and forest lands (except for joint stock company "Latvian State forests", and owned the land), and urban drainage systems installed.
36. the drainage system of the inventory shall be carried out during the period from 1 April (after pal or flood peak end) to 1 November (summer season period).
37. The agricultural land that drained to drainage, the base unit is the smallest inventoriable drain system drained the area regardless of the ground units.
38. Drain system drained the area of external borders provides: 38.1. ūdensnotek, novadgrāvj, kontūrgrāvj, or travel to the edge of the ditch;
38.2. the inner slope at aizsargdambj;
23.8. along the midline between the adjacent drain system side drains;
23.9. along the lines drawn parallel to the drain side to drain the system for half the distance between susinātājdren;
38.5. along the lines drawn along the drain system drain ends, a quarter of the distance between the susinātājdren.
39. The land owner or legal possessor shall inform the public of the drainage section on drainage system of the first counting or reclamation cadastre information system construction of reclamation not registered the counting started.
40. the Public drainage Department issued the following counting reviewer drainage system inventory data necessary for: the drainage system inventoriable 24.9. drainage of the cadastral map output – counting plan (in duplicate) to the scale of 1:5000 with certainty the real estate (land units) kadastrālaj borders, simplified topographic maps or ortofotokarta prints with the attraction of geodetic coordinate system of Latvia for LK-92 (hereinafter referred to as the LK-92 coordinate system);
40.2. the land drainage system drainage farmhouse plan or nospraudum copies of the material (one copy);
40.3. the text data in 3-d and included information on specific land ownership or legal possession of the land of pierobežniek drainage systems, if they affect the functioning of the system of drainage inventoriable.
41. The land owner or legal possessor deliver the inventory reviewer land reclamation of passport data.
42. The inventory of the existing investigator drainage construction inventory, for which there is no betterment of the cadastral information, do the following: 42.1. down the line and point to the construction of surface drainage part raksturojošo characteristics (length, width, diameter);
26.2. the drainage structure placement counted land unit and the technical assessment represents the graphical reference material LK-92 coordinate system with scale 1:10 000 or certainty of higher certainty level in accordance with the provisions of annex 2 and 4 above the legend;
26.3. According to those rules, assess the technical condition of drainage structures, land hidromelioratīv and drainage system compliance and draw up an opinion on the drained land by filling out this rule 6, 7, 9, 10 and 11 in annex table.
43. Pārmitr-drained areas and provincial areas that clearly no longer is used in agriculture (for example weedy, built on afforested, or flooded), based on the common elements of the situation and the graphical reference material or making instrumental trying, marks the inventory plan according to the rules referred to in annex 4 of the legend.

44. Drainage facilities technical condition according to the rules referred to in annex 5, drainage structure evaluation criteria specifies this provision in annex 6 and 7. Drainage structures cipher consists of these rules referred to in annex 8 drainage construction sign and decimal counting agent assigned marks.
45. Finding reclamation cadastre plan does not specify the reclamation construction or specified drainage structures, it marks the inventory plan. Where necessary, the construction of the drainage not specified location clarified and down instrumental.
46. the Drained farmland assessment of the situation in the hidromelioratīv, drainage system, conformity assessment and on the ground indicate that drained rules 9, 10 and 11 in the table in annex.
47. After counting the reviewer drainage system of the completion of the inventory prepared and transferred the land owner or legal possessor in the counting. Inventory file includes: 29.3. explanatory memorandum, which include a review of the drainage system, run the inventory and the inventory results;
47.2. this rule 6, 7, 9, 10 and 11 annex the assessments and opinion in paper and electronic form;
47.3. the inventory plan, which in accordance with the provisions of annex 2 and 4 display: 47.3.1. Update land border; drained
47.3.2. border with the outline number drained land where the hidromelioratīv condition is not provided and the drainage system is inadequate;
47.3.3. the agricultural use of drained (such as wooded, overgrown, built-up, flooded) land boundary;
47.3.4. drained areas of the land pārmitr border;
47.3.5. the drainage line counted and point structures.
48. the inventory file and content compliance with those regulations ensure the physical inventory.
49. land owner or legal possessor before the reclamation Act, article 4 provided for in the first subparagraph apply technical regulations shall take the first one property drainage system and drainage system of sharing inventory and inventory information submitted to the public.
50. First State drainage system and national reclamation system inventory: 50.1. the present inventory plan in accordance with the provisions referred to in annex 4 of the legend;
50.2. data on public drainage systems and national reclamation technical state of maintenance of the system that rules 6 and 7 in the table referred to in the annex.
Vi. Closing questions 51. Society this provision in paragraph 16 and 20 this data for administrative areas, of which reclamation cadastre information system in electronic form is not created, provides the analog form.
52. paragraph 49 of these rules shall enter into force three months after the date of entry into force of the provisions.
53. a first inventory of the drainage system is necessary drainage system or this rule 23.2. the referred to reclamation for the construction for which the inventory was made or registered to reclamation cadastre in the period from 25 December 2003 until the date of entry into force of the provisions.
Prime Minister v. dombrovsky Minister of Agriculture j. Dūklav of annex 1 of the Cabinet of Ministers of 13 July 2010 regulations no 623 drainage systems key indicators no PO box
Indicators measure of total quantity according to the status of State and national authorities share one property 1 2 3 4 5 6 7 8 1.
Ūdensnotek km 2.
Novadgrāvj km 3.
Large diameter collectors (Ø ≥ 30 cm) km 4.
Kontūrgrāvj km 5.
Susinātājgrāvj km 6.
Drain system (drainage) ha 7.
Dams, aizsargdambj km 8.
Culverts * PCs.





9. Dam on PCs.





10. Lock the pieces.





11. The bridge to pieces.





12. Drain wells PCs.





13. Surface water receivers PCs.





14. Pump Station PCs.





15. Straujtek for PCs.





16. Kritņ for PCs.





17. Meniķ for PCs.





18. Zemtek-PCs.





19. Gauge devices PCs.





20. Culverts-regulators * PCs.





21. Other buildings note. Keep, if the premises are registered or they must be recorded in the cadastre of land drainage.
Minister of agriculture j. Dūklav in annex 2 of the Cabinet of Ministers of 13 July 2010 regulations no reclamation cadastre plan 623-use signs of Agriculture Minister j. Dūklav in annex 3 of the Cabinet of Ministers of 13 July 2010 regulations no 623 reclamation cadastre data escalation submission form sample agricultural Minister j. Dūklav in annex 4 of the Cabinet of Ministers of 13 July 2010 regulations no 623 inventory plan edible drained land and drainage structures the Minister of Agriculture the legend J. Dūklav in annex 5 of the Cabinet of Ministers of 13 July 2010 regulations no 623 drainage structure evaluation criteria no PO box
Name and designation of the shipbuilding the shipbuilding technical assessment of bad technical condition (a criterion no.)
an unacceptable condition (criteria no.)
1 2 3 4 1 Ūdensnotek, novadgrāvj. and construction 1.1. Ūdensnotek (FROM) (1) bottom heavily overgrown with Woody or herbaceous, with a Haggard pielūžņot trees or municipal waste.
(2) the seabed scour and piesērējum, many frequent šķērsprofil deformation, many landslides and hillsides, rinse rolled bearing connection site or collapsed bottom concept.
(3) the often congested Beaver.
(4) unauthorized installed seabed obstruction.
(5) the Beaver or congested to penetrate the bed of arbitrary barrier to change the normal water flow mode ūdensnotek, disturbing the seabed stability and creates new deformation.
(6) Ūdensnotek or novadgrāvj a bad condition due to: (a) the localities frequent) flooding Palos or flood, (b)) unsecured drained land hidromelioratīv.
1.2. the regulated Ūdensnotek (NOR) Novadgrāv (N) 1.3 1.4. Dam (A) (1) expressed in dam deformation of hillsides, waves or currents scour or washings, landslides.
(2) a significant body of a cofferdam or ground settling.
(3) cracks the dam body.
(4) the animal in the cave of the dam body.
(5) Observed the filtering (or feet) through the dam body or base (outside the dam drains).
(6) Through cracks in the dam body or connection with the novadbūv.
(7) the observed water filtration (or feet) with sufozij (soil particle leaching) through the dam body or base.
(8) the dam is causing unauthorized water level uzstādinājum of ūdensnotek.
(9) the dam bad technical condition can happen its rupture and rapid uzstādināt water leaking down the ūdensnotek.
1.5. Zemtek (Zt) (1) or of significant scour paskalojum, priekšjosl, pēcjosl, or ūdensnotek on the seabed.
(2) the construction of Some part of the uneven settling or offset.
(3) Through cracks in the atbalstsien, balsto, starpbalsto or other construction elements.
(4) latch: a) the metal corrosion, b) support element damage, c) caulking around damage.
(5) the latch-lift system damage.
(6) the main buildings have lost their bearings or is in a stage of decay.
(7) construction in poor technical situation can happen in uzstādināt water leaking down the rapid ūdensnotek.
(8) the building causing unauthorized water level uzstādinājum of ūdensnotek.
Straujtek (St) 1.6 1.7 1.8 Kritn (Kr) Novadbūv (pārgāzn, output, gateways) (NB) 1.9. Governor (R) 1.10.-regulators Culverts (CR) for 1.11. Reservoir (WW) (1) bottom piesērējus and heavily overgrown with more than 50 percent of the aquatic plants in the area of the surface area.
(2) many peat uzpeldeņ reservoir.
(3) reservoir created without a statutory basis (not operational (management)).
1.12. Aizsargdamb (D) (1) expressed in the hillsides and landslides deformations, waves or currents scour or washings.
(2) a significant body of aizsargdambj or ground settling.
(3) crack aizsargdambj body.
(4) the animal cave aizsargdambj body.
(5) the observed water filtration (or feet) through aizsargdambj body or base.
(6) Through cracks in the aizsargdambj body.
(7) the observed filtering (or feet) with sufozij (soil particle leaching) through aizsargdambj body or base.
(8) Aizsargdambj poor technical situation can happen its rupture and water inlet protected area.
2. Drainage and bilateral activities drainage system construction 2.1. Kontūrgrāv (K) (1) bottom heavily overgrown with plants.
(2) bed scour, piesērējum or hillsides and noslīdeņ provoked a rolled bottom depth by more than one-third of the original depth.
-Susinātājgrāv (S) 2.2 2.3. Large diameter collector (SN) (1) bottom track iesēdum, invasion, hopper.
(2) the Kontrolak pipeline piesērējum to more than one third of the average of the pipeline.
(3) water leak long spout.
-2.4. Drain collector (DK) (1) bottom track iesēdum, invasion, hopper.
(2) water leaking past the source.
(3) summer mazūden in period sources located beneath the surface of the novadgrāv.
(4) novadgrāvj of aizbrukus with the spout seabed scour the slopes, rolled or noslīdeņ (not found).
-2.5. Drainage channels (DR)

(1) bottom track iesēdum, invasion, hopper.
2.6. Kontrolak (the) (1) does not cover.
(2) the mutually bore damaged or misaligned.
(3) in the above iztekoš Piesērējum aka the collector tray.
-Uztvērējak (UA) 2.7 (1) do not cover.
(2) the mutually bore damaged or misaligned.
(3) in the above iztekoš Piesērējum aka the collector tray.
(4) water service in the lower line of the bore is higher in the surrounding land or about 0.5 m above the level of the ditch enclosures.
(5) the water holes in the capture has not settled with the filter bore material apbērum.
3. The Polder structures 3.1 Apvadkanāl (OH) (1) bottom heavily overgrown with Woody or herbaceous, with a Haggard pielūžņot trees or municipal waste.
(2) the seabed scour and piesērējum, many frequent šķērsprofil deformation, many hillsides landslides or rolled over, rinse the bearing places or collapsed bottom braces.
(3) the often congested Beaver.
(4) in the bottom barrier installed in Arbitrary.
(5) the Beaver or congested to penetrate the bed of arbitrary barrier to change the normal water flow mode apvadkanāl, disturbing the seabed stability and creates new deformation.
(6) Apvadkanāl the bad technical condition it could not be discharged to the drainage and insulate the polder area of uzplūstoš waters, and pose a threat to water entering the polder area.
3.2. Krājbasein-main channel (KM) (1) bottom heavily overgrown with Woody or herbaceous, with a Haggard pielūžņot trees or municipal waste.
(2) the seabed scour and piesērējum, many frequent šķērsprofil deformation, many hillsides landslides or rolled over, rinse the bearing places or collapsed bottom braces.
(3) the often congested Beaver.
(4) in the bottom barrier installed in Arbitrary.
(5) bed piesērējum level higher than the lowest operation water level in the krājbasein polder.
(6) the bottom in poor technical conditions krājbasein-line channel is unable to ensure the drainage of polders reception, adjustment and injection pump station and pose a threat to the polder area flooding.
3.3. Pumping Station (SS) (1) Silt detention grilles or bars corroded badly damaged.
(2) the pumps and the technological equipment is worn out.
(3) above the bottom of the iesēdum spiedvad, invasion or funnel.
(4) Significant cracks in the atbalstsien, balsto, starpbalsto and other construction elements.
(5) significant elements of the building (Foundation, walls, floors, roof).
(6) the pump station or building major constructions of the persistence or collapse is lost.
(7) the pump station in bad technical condition makes it impossible to 15 runoff, polders and it creates a polder area flooding hazards.
3.4. the Polder aizsargdamb (PD) (1) expressed in the hillsides and landslides deformations, waves or currents scour and washings.
(2) a significant body of aizsargdambj or ground settling.
(3) crack aizsargdambj body.
(4) the animal cave aizsargdambj body.
(5) the observed water filtration (or feet) through aizsargdambj body or base.
(6) Through cracks in the polder of the aizsargdambj body.
(7) the observed filtering (or feet) with sufozij (soil particle leaching) through the polder aizsargdambj body or base.
(8) the aizsargdambj Polder poor technical situation can happen its rupture and water inlet polder area.
3.5. Water inputs-outputs (I – I) (1) expressed in the aizsargdambj polder body or hillsides deformation, scour, washings or landslides into the output location.
(2) a significant body of aizsargdambj or the polder ground compaction and led to the release of the pārgāzn height.
(3) the aizsargdambj polder gap body, let the output stage or their butt.
(4) Through cracks in the body of the aizsargdambj polder, inputs, the output stage or their butt.
(5) Observed the filtering (or feet) with sufozij (soil particle leaching) through aizsargdambj body or base into the output stage.
(6) Into the output in poor technical situation can happen unplanned water inlet area, polder polder aizsargdambj of rupture and polder area flooding.
4. Transport structures 4.1. Bridge (T) (1) Zemtilt the drainage or shore collapsed.
(2) Balsto or span significant through cracks, no deviation from the vertical plane or horizontal line curvature.
(3) the bridge roadway in deep holes that reveal the span of the surface.
(4) Metal parts are corroded.
(5) the elements of the tree much gap, atšķēlum, bruising or damage of the troupe.
(6) in the Bottom of the bridge column piesērējus and produce additional hydraulic resistance, causing the water level uzstādinājum water.
(7) the bridge of the main constructions persistence or collapse is lost.
4.2. Culverts (C) (1) of more than about Culverts piesērējus one-third of the tube diameter.
(2) the mound above the pipe bottom invasion, scour.
(3) the pipes, concrete cross nobīdījuš izdrupum.
(4) the final wall become detached from the pipes.
(5) the main building culverts (pipes, end wall) have lost their bearings or is collapsing.
4.3. the small footbridge (CP) (1) the elements of the tree much gap, atšķēlum, bruising or damage of the troupe.
(2) the plant is designed to dock cables wear, corrosion or some stranded wire rupture.
(3) a support or span wooden elements decayed or broken.
(4) equipment: (a) dock construction rope diameter) decreased by more than 40 percent of the original volume or ropes, wind gap b) ropes considerably exceeds the current catenary design hangs.
Minister of agriculture j. Dūklav in annex 6 of the Cabinet of Ministers of 13 July 2010 regulations no 623 (administrative area) (property name, or property address object) drainage structures technical assessment of (I). Ūdensnotek, drainage system and the structure of the ditch a technical assessment of the situation of the Ūdensnotek/ditch construction code building technical assessment of the status of water in the economic circuit code ** piquette bad technical condition (a criterion no.)
an unacceptable condition (criteria no.)
1 2 3 4 5 6 the national drainage system and a national system of municipal drainage reclamation system sharing drainage system one property reclamation system date *** the inventory shall be carried out (name and signature ***) (II). the Waterworks structures (such as polder) technical assessment of Waterworks construction control technical assessment of the situation of water in the economic circuit code name/code status length (m) bad technical condition (a criterion no.)
an unacceptable condition (criteria no.)
1 2 3 4 5 6 date *** the inventory shall be carried out (name and signature ***) notes.
1. Drainage facilities condition assessment as: 1.1., if a particular bad shipbuilding operation meets the objective, but the installation of the building and its elements are essential and the necessary renewal (renovation or reconstruction);
1.2. If the non-allowable construction activity does not meet the goal of building installation, interfere with drainage systems concerned or other drainage systems or the use of the territory intended purpose or structure and its main elements are collapsed or is in a State of decay and demolition (dismantled).
2. technical assessment of the structure (columns 5 and 6) determined in accordance with the Cabinet of Ministers of 13 July 2010 rule no. 623 "reclamation cadastre rules" referred to in annex 5, drainage structure evaluation criteria.
3. The term "trenches" refers to novadgrāvj (N), kontūrgrāvj (K) and susinātājgrāvj (S).
4. Water in the economic circuit code is assigned according to the laws of the economic circuit of water classification defined in the water circuit of the economic code, which contains the ūdensnotek.
5. Document Properties "date" and "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
Minister of agriculture j. Dūklav in annex 7 of the Cabinet of Ministers of 13 July 2010 regulations no 623 (administrative area) (property name, or property address object) Ūdensnotek and ditches in the technical assessment of the situation of the Ūdensnotek in bad technical condition technical condition unacceptable status in the economic circuit of the water code name/code length (m) of the pickets (from-to) length (m) No.
piquette (from-to) length (m) No.
1 2 3 4 5 6 7 8 9 10 national ūdensnotek municipal ūdensnotek and ūdensnotek, and sharing the ditch ditch

 
 
 
 
 

 
 
 


 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
 
One property ūdensnotek and ditch date ** Counting was carried out (name and signature) Note.
1. The term "trenches" refers to novadgrāvj (N), kontūrgrāvj (K) and susinātājgrāvj (S).
2. Document Properties "date" and "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
Minister of agriculture j. Dūklav in annex 8 of the Cabinet of Ministers of 13 July 2010 regulations no 623 of drainage structures Inventoriable designation and their characteristics no PO box
Name designation Description 1. Ūdensnotek, novadgrāvj and Ūdensnotek from the shipbuilding 1.1. Unregulated River or stream, novadgrāv, remove the water from the drainage systems, a number of other areas, water bodies or watercourses regulated by ūdensnotek 1.2 NOR Regulated (cleaned, in-depth, extended or straightened) a river or Creek bed stage 1.3. Novadgrāv N Novadoš a network of drainage system construction of water run-off capture from one system regulating and defining network and discharges to the ūdensnotek , water or sea barrage 1.4 A waterworks construction water runoff detention and for regulating the water level upstream of the 1.5 Zemtek Zt waterworks construction – watercourse discharges to the pipeline, under the bed of the watercourse or other any other artificial or natural barriers of 1.6 St Straujtek waterworks construction water level of different heights to join ūdensnotek seabed bottom large inclination case Kritn by 1.7 Kr waterworks construction water level of different heights for short ūdensnotek seabed. Unlike the kritn straujtek flow of water at some stages will move away from its seabed 1.8. Novadbūv (pārgāzn, output, gateways) NB waterworks construction water runoff through the dam caurvadīšan 1.9. Regulator R waterworks construction water level for novadgrāvj susinātājgrāvj uzstādināšan or the bottom and to regulate runoff 1.10. WW water reservoir bottom and (or) flood plains with the dam uzstādināt waterbed 1.11. Aizsargdamb a D bottom waterworks construction site protection against flooding 2. Draining and bilateral activities to the construction of drainage systems 2.1. Kontūrgrāv K by Defining the network structure of the area delimitation of drained for "inrush" surface waters or groundwaters 2.2. Susinātājgrāv S regulatory network construction to lower the groundwater level in the soil and surface water discharges to the reception and the novadgrāv 2.3. Large diameter 300 mm and the manifold SN larger diameter drainage pipeline system drain system and surface water drainage discharges to water bodies of water or Drain collector DK 2.4 Drain pipeline susinātājdren from the soil or water collection and filtration discharge in open bottom Drain 2.5 Dr. underground drain pipeline groundwater capture and discharges to the drain collector 2.6. Kontrolak KA
Drain well with surface part of the banks get into drains for precipitation, the manifold, the manifold traces the direction of dramatic change and drain steps Visual control of UA Uztvērējak Drain 2.7 aka surface water run-off, susinātājgrāvj, kontūrgrāvj or pietec of the ditch of the road entering drains, as well as the drain operation Visual control of constructing Polders 3 3.1. Apvadkanāl aka line construction area delimitation of the polder uzplūstoš waters and with the polder pumping station pārsūknējam for reducing the quantity of water Krājbasein-line 3.2 channel KM line construction of polder drainage basin of reception accumulation and discharges to, pumping station and pump operating mode optimization for 3.3. Pumping Station is part of the hidromezgl Polder, SS, responsible for the basin water polder drainage of liquid ūdensnotek, body of water or the sea of the aizsargdamb Polder 3.4 PD bottom waterworks construction polder area for protection against flooding 3.5. Water-output I-let I waterworks construction pal waters entering the polder area in summer and output in the post-flood period ūdensnotek 4. Transport constructions (Phys. Invt shall only If the premises are registered or they must be recorded in the cadastre) 4.1 drainage bridge T transmission path for the structures over the bed of the watercourse 4.2 C Structures, Culverts, water pipelines flow for discharges to below the knee or exit 4.3 Culverts-Governor CR Structures – pipeline – water flow for discharges regulated under aizsargdambj, path or ramp 4.4. Small footbridges over simplified the structures of small arms traffic over ūdensnotek Seabed (usually wooden construction. If the span exceeds 12 metres-rope machine construction) Minister of Agriculture j. Dūklav in annex 9 of the Cabinet of Ministers of 13 July 2010 regulations no 623 (administrative area) (property name, or property address object) Drained land in the assessment of the situation of the hidromelioratīv drainage system (object)-drained land reclamation cadastre of the State of hidromelioratīv No.
name (object) the year of putting into operation area (ha) circuit No.
area (ha) features URNr.* 1 2 3 4 5 6 7 date ** Counting was carried out (name and signature) Note.
1. Record the drained land in hidromelioratīv assessment of the number of signs – (1) or (2) that: (1) when ground water regime regulated in accordance with the relevant land use agrotehniskaj;
(2) ensure that, if the ground water regime does not meet (is too wet) the land use requirements agrotehniskaj.
2. Document Properties "date" and "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
Minister of agriculture j. Dūklav in annex 10 of the Cabinet of Ministers of 13 July 2010 regulations no 623 drainage system drainage system of conformity assessment (object) in the absence of no.
Total area (ha) marine technical assessment of the situation (+/–) circuit No.
Drainage system compliance (ha) N K U R S SN DK DR that according to irrelevant date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 * the inventory shall be carried out (name and signature) Note.
1. Tables 3, 4, 5, 6, 7, 8, 9, 10 and 11 depending on the in box drainage system specific shipbuilding technical General evaluation (the Cabinet of Ministers on 13 July 2010, rule no. 623 "reclamation cadastre" annex 6 and 7) building good technical condition marked with "+", but the poor technical condition of the "_".
2. Drainage system of conformity assessment is appropriate if the drainage system is of delivers relevant ground of hidromelioratīv and water uzstādināšan construction could add to soil moisture supplies the plant vegetation period.
3. Drainage system of conformity assessment is irrelevant if the drainage system is disturbed or interrupted, does not provide the land use situation and hidromelioratīv with the water level control structure run is impossible to replenish soil moisture regime for plant vegetation period.
4. the document properties "date" and "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
Minister of agriculture j. Dūklav in annex 11. Cabinet of Ministers of 13 July 2010 regulations no 623 (administrative area) (property name, or property address object) the real property cadastre number opinion on drained land land cadastral designation of the Vienîbas reclamation cadastre system No.
After reclamation cadastre data after inventory assessment area (ha) drained from it (ha) area (ha) drained from it (ha) of forest land in the other LIZ land forest land overgrown LIZ built-up of afforested land of submerged pārmitr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 date the inventory shall be carried out (name and signature) Note. The document properties "date" and "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design.
Minister of agriculture j. Dūklav in