Amendments To The Cabinet Of Ministers On October 28 2008. Regulations No. 899 On "rules" Of The Operational Programme Infrastructure And Services "appendix 3.4.1.5.1. Apakšaktivitāt" Meadow And Jēkabpils City Flood Threat Reduction ""

Original Language Title: Grozījumi Ministru kabineta 2008.gada 28.oktobra noteikumos Nr.899 "Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.4.1.5.1.apakšaktivitāti "Pļaviņu un Jēkabpils pilsētu plūdu draudu samazināšana""

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 52 in 2011 (January 18. Nr. 5 11. §) amendments to the Cabinet of Ministers on October 28 2008. Regulations No. 899 on "rules" of the operational programme infrastructure and services "Appendix 3.4.1.5.1. apakšaktivitāt" Meadow and Jēkabpils city flood threat reduction "issued under the European Union's structural funds and the cohesion fund management law, article 18, paragraph 10 do Cabinet of 28 October 2008 rules No 899" rules for the operational programme ' infrastructure and services ' 3.4.1.5.1. apakšaktivitāt ' Appendix Meadow and Jēkabpils city flood threat reduction "(Latvian journal 2008, 186. no; 2009, no. 94, 155; 2010, 126 No.) the following amendments: 1. Replace the words "in the text of the provisions of the Ministry of the environment" (fold) with the words "the protection of the environment and regional development Ministry" (fold).
2. the title of chapter II be expressed by the following: "(II). the project activities and assisted eligible costs".
3. Delete paragraph 8.5.
4. Express 8.6. subparagraph by the following: "8.6. publicity expenses, if the relevant publicity services shall not exceed the minimum requirements set by the laws and regulations of the European Union fund co-financed project publicity and visual identity requirements;".
5. Delete paragraph 8.1 "8.5".
6. The deletion of paragraph 12, the word and the number "and 8.5".
7. Express 21 as follows: "21. the applicant shall prepare a project the project submission (annex 2) according to the rules referred to in annex 3 of the draft application evaluation criteria."
8. Delete paragraph 32.
9. Expression 33 as follows: "33. evaluation the Commission shall assess the project submissions in the following order: 33.1. scored the first application project compliance with this provision 3.25, 26, 27, 28 and 29 administrative criteria listed in. If the assessment is in one of the following criteria is "no", the project application and assessment of the head of the responsible authority shall take a decision on the rejection of the application of the project;
33.2. If application of the project in all these rules 33.1. in the criteria referred to in point evaluates to "Yes", the application is assessed according to annex 3 of these rules 7, 8, 9, 12, 14, 15, 16, 17, 21, 22, 24, 30, 33, 34, 35 and 36. criteria referred to in paragraph 1. If the assessment is in one of the following criteria is "no", the project application and assessment of the head of the responsible authority shall take a decision on the rejection of the application of the project;
33.3. If application of the project in all these rules 33.2. in the criteria referred to in (a) evaluates to "Yes", the application is assessed according to annex 3 of these regulations 10, 11, 13, 18, 19, 20, 23, 31, 32 and 37 of the criteria referred to in paragraph and quality criteria in accordance with the provisions of subparagraph. 30.2.1. If the application does not meet the quality assessment criteria (this provision 30.2.1.), project evaluation, the application will not continue and the head of the responsible authority shall take a decision on the rejection of the application of the project;
33.4. If the application meets the quality criteria in accordance with the provisions of section, project 30.2.1. submissions under this provision is valued 3. in paragraph 38 of the annex this criterion. "
10. Replace the paragraph number and 35.2. the word "39." with a number and the word "38".
11. Put 36 as follows: "36. Decision on the application of the project approval may include conditions that the project applicant must meet the deadline set in the decision, so that it could conclude an agreement on the implementation of the project (hereinafter referred to as agreement): 36.1. specify information about the project the applicant (contact information and properties) (annex 2);
36.2. to clarify the documents presented under this provision paragraph 37 of annex 3 of this criterion;
22.6. to clarify the documents presented under this provision of the annex 31 and 32 of this criterion;
22.6. to clarify changes in the total amount of eligible costs and eligible costs according to the provisions of paragraph 8 and 12;
22.7. to clarify the changes in total amount of eligible costs and not eligible under this provision, paragraph 57;
22.7. to clarify the project time schedule according to the planned project activities (3.13;)
22.8. to clarify the cash flow forecast (3.18;)
22.9. to clarify the implementation of the planned projects and planned human resources funding requested feature (3.19;)
22.9. to clarify the planned publicity and information dissemination actions (3.20;)
36.10. ensure tax payment under this provision of the annex 3 paragraph 23 of this criterion. "
12. Deleting the introductory part of paragraph 57, the words and figures "for which an agreement has been concluded by 2010 April 30".
13. Replace the annex 2 table 7.2) (words and "including the financial reserve of the project's eligible costs up to 5% with the words" and the number "including a financial reserve of the project's eligible costs of the works up to 5%".
14. Express 2.7.3.1. subparagraph by the following: ' 7.3.1. Cost Assessment index of return (infrastructure planned lifetime (years) relative to the initial project, the total cost ($)): infrastructure planned lifetime (years) the original total cost ($) project cost estimate of return indicator "15. Replace annex 2, section 8, the words" provide funding from its own resources "with the words" and the number will ensure financing from its own resources (this condition does not apply to the project application selection round 2) ".
16. Annex 3 to express the following: "3. the Cabinet of Ministers on October 28 2008. Regulations No 899 Project submission evaluation form no PO box
Assessment criteria 1. Quality criteria for rating points 1.
The project planned for the launch of preparedness activities: must obtain at least 1 point 1.1.
the project is ready to start (a list of the works to be carried out is not prepared or not prepared qualitatively) 0 1.2.
the project is ready for the launch of the Earth (is prepared and based on the list of the works to be carried out, the purchase documentation not prepared) 1 1.3.
the project is ready for the launch of the medium (is ready and reasonable list of works to prepare the purchase documentation projects development) 1.4 2.
the project has a high readiness to start (the accepted technical projects in the works, prepared for the technical specifications of the procurement) 3 2.
The planned duration of the project: to obtain at least 1 paragraph 2.1.
is greater than 4 years 0 2.2.
is 3 to 4 years 1 2.3.
It is from 2 to 3 years (not including) 1.5 2.
is less than 2 years 3 3.
The risk assessment of the implementation of the project, including the estimated potential cost increase: at least 1 must be obtained in point 3.1.
the project submission does not assess potential risks 0 3.2.
project risk assessment in the application are incomplete, the action plan identified risks are not developed or not developed completely 1 3.3.
project risk assessment in the application of qualitative, action plan identified for the elimination or reduction of risk developed in incomplete 2 3.4.
project risk assessment in the application of high quality, developed reasonable action plan identified for the elimination or reduction of risk 3 4.
Project submission is analyzed for possible alternatives (financial, technical solution): obtain at least 1 paragraph 4.1.
alternative analysis has not been carried out 0 4.2.
analysis of alternatives performed only one parameter 1 4.3.
an alternative analysis is carried out based on numeric calculations and justify the proposed alternatives 2 4.4.
an alternative analysis is carried out based on numeric calculations and justify the proposed alternatives, the selected alternative is for lowest cost 3 5.
The cost of return indicators (infrastructure planned lifetime (years) relative to the initial project, the total cost ($)): note. The average project application selection round of cost indicators of return calculates the project submissions that meet the administrative and eligibility criteria – cost of return indicators in relation to the amount of selection round of project submissions, the number of criteria gives extra points 5.1.
project cost estimate of return is less than the project application selection round of cost indicators of return, and the difference is more than 10 percent 1 5.2.
project cost estimate of return is equal to the average of the project application selection round of cost indicators of return, is about 10 percent less than or about 10 percent of their more than 2 5.3.
project cost estimate of return is greater than the average project application selection round of cost indicators of return, and the difference is more than 10 percent of the 3 criteria 1.1 priorities horizontal rating points 6.
The project will reduce the threat of flooding in flood-threatened areas (sustainable development): obtain at least 1 paragraph 6.1.
the expected impact of project activities on flood endangered areas not rated 0

6.2. the implementation of the project will be achieved that the flood threatened area flooded once in 20 years 1 3.9.
implementation of the project will be achieved that the flood threatened area flooded more frequently than once every 50 years 2 6.4.
implementation of the project will be achieved that the flood threatened area flooded more frequently than once every 100 years, 3 2. eligibility criteria 2.1. project eligibility criteria Yes/No/NA 7.
The project is intended to prevent the flood risk caused by difficult ice melt and unpredictable phenomenon N 8.
The project submission complies with the purpose of the activity N 9.
Application of the project included in the eligible operations correspond to activities eligible activities N 10.
The project's eligible costs included in the submissions comply with the eligible costs of the activity P 11.
Application of the project not included in the eligible costs correspond to activities not eligible costs P (NA) 12.
Project project description in the application provides the information you need about action to be taken: N 12.1.
given the technical characteristics of the activities to 12.2.
planned monitoring indicators are clearly defined and measurable, they meet the purpose of the activity 12.3.
indicates the position of the action to be taken in the territory of the project 13.
Time schedule of the project comply with the planned project activities P 14.
The information provided in the application, stating that the project applicant will provide sustainability of the project results to the infrastructure depreciation period, but not less than five years after the implementation of the project: N 14.1.
are appropriate to the planned project would result in the cost of maintaining the value of 14.2.
is or will be available for staff to ensure the implementation of the project results in the maintenance of the value of 15.
The project specified in the project application to the actual figures (for example, aizsargdambj, pārgāzn reconstructed) meet the project schedule N 16.
Requested by the European regional development fund co-financing aid intensity laid down in accordance with the Cabinet of Ministers of 28 October 2008 the Regulation No. 899 on "rules" of the operational programme infrastructure and services "Appendix 3.4.1.5.1. apakšaktivitāt" Meadow and Jēkabpils city flood threat reduction "" N 17.
The project budget includes cost: N 17.1.
include all project costs required for the positions of 17.2.
is under construction for 17.3.
meet the projected average market prices during the half-year before the draft submission notification of selection round 18.
Project cash flow forecast: P 18.1.
displays both the demand and the cost of funding forecast 18.2.
meet the planned time schedule 18.3.
comply with the financial plan of the project 19.
The project planned in the application project implementation and human resources ensure planned legislation in certain functions of the beneficiaries: 19.1 P.
the administrative management of the project (including procurement, contract administration, record keeping) 19.2.
financial management (including accounting, verification and payment, financial planning) 19.3.
technical management (including the reconciliation of design and construction, work progress reports, and report preparation) 20.
The project planned publicity and visual identity measures comply with the laws and regulations of the European Union fund publicity and visual identity assurance requirements the project applicant 2.2 P eligibility criteria Yes/No 21.
The project applicant is municipality or public authority who, on the basis of the Republic of Latvia regulatory enactments, provides flood measures N 22.
Project applicant has stated that compensated infrastructure is owned by the applicant for the project N 23.
The project applicant is not tax debt on the application of the first working day of the month, P 24.
Project applicant has stated that it has the right to carry out the works concerned, which project they are for N 3. Administrative criteria yes/no/NA 25.
The project proposal is submitted to the responsible authorities within the specified N 26.
The project applicant is invited to submit a project application N 27.
Project submission has been prepared according to the activity the project submission form for N 28.
Project submission prepared for the Latvian language N 29.
Project submission prepared into N 30.
Project submission signed by the project responsible person of the applicant or the authorized person N 31.
Filed one project application, original and two copies without attachments (if the application is submitted in the form of a paper document) P (NA) 32.
Both the project the original and the copy of the application submitted to the caurauklot, of the attached document pages numbered (if the application is submitted in the form of a paper document) P (NA) 33.
The project application and attachments are presented according to the electronic movement of documents regulatory requirements in laws (where the application is filed in electronic form of a document) N (NA) 34.
Project application signed with a secure electronic signature (if the application is filed in electronic form of a document) N (NA) 35.
The project application and attachments are designed in DOC, xls, PDF or JPG file format (if the application is filed in electronic form of a document) N (NA) 36.
Project application form filled in all sections, 37 N.
The project attached to the application for all specified attachments: P (NA) 37.1.
the project's cartographic material is appropriate, which provide information about the location of project activities in the project area and their impact on the natural attractions in the surrounding area 37.2.
expertise on the technical condition of the building and compliance with legislative requirements, 37.3.
construction estimate 37.4.
local government decision on the provision of co-financing of the project (NA) 37.5.
local government (in which make the works) a statement that the project complies with the applicable municipal planning or detailed to 23.4.
Environmental monitoring national Office opinion on the environmental impact assessment of the final report or the decision on the environmental impact assessment procedure, the non-application of 37.7.
project cash flow forecast 4. Funding criteria Yes/No 38.
The project planned in the application of the European regional development fund co-financing shall not exceed the Cabinet of Ministers of 28 October 2008 No. 899 rules '' rules on "operational programme infrastructure and services" Appendix 3.4.1.5.1. apakšaktivitāt "Meadow and Jēkabpils city flood threat reduction" "1. maximum laid down in the annex of the European regional development fund co-financing for the project N legend.
N – If a negative rating, the application is rejected.
P – a decision on project approval with conditions (project applicant must ensure compliance with the criteria, specifying the project submission within the time limit laid down in that decision).
NA (not applicable) – criteria is not applicable to a specific project, applicant's project is not assessed on this criterion. "
Prime Minister v. dombrovsky environmental protection and regional development Minister r. vējonis