Cabinet of Ministers Regulations No. 996 in 2011 (December 27. No 76 14. §) rules on "operational programme human resources and employment ' 1.3.1.5. activities Appendix" local employment promotion measures support the introduction of a "second round of issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures implemented by the operational programme" human resources and employment ' priorities 1.3 of Appendix "employment promotion and health work" based on "employment" UR1.3.1.pas 1.3.1.5. activities for the promotion of local employment action plan in support of the implementation of the "second round (hereinafter activity);
1.2. the project of the European Social Fund (hereinafter the project) of the application evaluation criteria;
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, the distribution of competence between these institutions and cooperation arrangements, as well as the responsible authorities and cooperation agencies functional form of subordination.
2. The purpose of the activity is to support employment and unemployment reduction measures in municipalities.
3. activities to target the unemployed who do not receive unemployment benefits and unemployment status have been registered for at least six months.
4. the purpose of the activity reaches the implementation of this rule 5 eligible referred to actions and running the following monitoring indicator – a result of temporary public works involved 29 700 unemployed.
5. The project supported the following: 5.1 salaried temporary public work;
5.2. project administration;
5.3. information and publicity measures for the implementation of a project.
6. implement a limited activity in the project application selection.
7. This provision 5.1. eligible activities referred to in the implementation of the European Social Fund, the beneficiary shall apply the regulations concerning the employment of preventive measures and the reduction of unemployment measures, organisation and financing arrangements and measures implementing these check the principles, in so far as the rules do not stipulate otherwise.
8. Activity total eligible funding available is 14 091 760 dollars, including the European Social Fund is LVL 14 091 760. In addition to the activity is not attributable to funding available up to 219 480 lats this provision cost referred to in paragraph 45.
II. Responsible authorities and cooperation bodies and the Division of competences within the activity 9 authority functions provides the Ministry of welfare (hereinafter referred to as the responsible authority). Responsible authority: 9.1 limited project creates the application selection project submission Evaluation Commission (hereinafter the Commission);
9.2. forward to the limited range of the project call for project submissions;
9.3. provides project information on the project to the applicant's application and development in preparation of the exhibit project submission form to be filled out;
9.4. ensure the evaluation of the application of projects and adopt the Administration's decision on the application of the project approval, approval with conditions or disapproval, if not complied with the requirements of these regulations;
9.5. accumulate data on project submissions under the laws and regulations of the European Union's structural funds and the cohesion fund management information system design and use;
9.6. participating in the agreement on the implementation of the project (hereinafter referred to as the agreement) project;
9.7. in those provisions referred to in paragraph 56 of the draft amendments and, if there are objections, the authority shall supply the cooperation opinion on deficiencies identified;
9.8. plan and implement information measures on the implementation of the activity, including information on the activities are published within the projects approved;
9.9. ensure that these rules are not exceeded, paragraph 8 of the activities available for the implementation of eligible funding, and monitor the available European Social Fund funding, including the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006) 93. Article 1 and 2 of the principle laid down in the execution of the activity level.
10. activities of cooperation within the authority of the country of employment agency (hereinafter referred to as cooperation body). The liaison body: 10.1 develop a draft agreement;
10.2. the switch arrangement with beneficiaries;
10.3. the development of methodological support materials for the beneficiaries, who buys for the project in accordance with the public procurement law and is a Subscriber that the meaning of the Act;
10.4. the project appropriate pre-verification of procurement legislation on the European Union's structural and cohesion funds in institutions involved in planning documents for the preparation and implementation of these funds;
10.5. provide information to the Department of Public Welfare in the budget request, subject to the laws and regulations that govern the public financial management and planning of national budgetary resources for the European Union agenda, the Fund co-financed projects and making payments;
10.6. ensure project implementation monitoring and control, including checks in the project locations and manages the Council Regulation No 1083/2006 Article 93 1 and 2 of the principle laid down in the execution of the project;
10.7. providing information on the beneficiaries of the arrangement;
10.8. check payment submitted by the beneficiaries of funding requests, approve the amount of the eligible expenditure and prepare payment orders, as well as the declarations of expenditure shall be prepared and sent to the certification authority for examination or, if the declarations of expenditure shall prepare a certification authority, the certification authority shall submit the completed Declaration of expenditure declarations for approval according to laws and regulations on the procedures foreseen in the State budget for the European Union structural funds and the Cohesion Fund co-financed project implementation, as well as payment and arrangements for the preparation of declarations of expenditure;
10.9. the draft amendments, subject to this provision and paragraph 57 55. conditions referred to, but that rule 56 in the cases referred to in the amendments approved if they matched with the authority under this rule 9.7.;

10.10. the responsible authority shall provide information on the activities available for the implementation of the European Social Fund funding;
10.11. the accumulated data on projects consistent with the laws of the European Union's structural funds and the cohesion fund management information system design and use;
10.12. plans and implements public awareness measures for the implementation of projects;
10.13. the review and approval of funding European Social Fund projects submitted by receiving progress reports.
11. The Liaison Office has functional authority.
III. Project applicants and project cost a total of 12 Projects, the applicant is an institution (institution of the labour market), in accordance with the law on the support of the unemployed and jobs seekers to implement the national policy for the reduction of unemployment and the support of the unemployed and jobs seekers.
13. If the application is approved, the project, the applicant is the sole beneficiary, which agreed with the liaison body for the implementation of a project.
14. the maximum eligible European Social Fund funding is 100 percent of the overall activity of the related funding.
15. the minimum Project total eligible costs is not limited to, the maximum eligible cost total is 14 091 760 dollars. The maximum eligible cost total amount may increase if additional this provision in paragraph 8 of the finance for the implementation of the activity is assigned to the additional funding from other sources of finance. In addition to the project plan can not apply the State budget funding pursuant to this provision, paragraph 46.
IV. Project application selection 16. the responsible authority shall send to the applicant of the project call for project applications (hereinafter referred to as the notice).
17. The invitation shall: 17.1. project to the application, if submitted in person, by post or by electronic means;
17.2. the project submission deadline (that period not less than 10 working days from the date of dispatch of the invitation);
17.3. the Web site containing the application, to be used for the preparation of the project documents (these provisions and consumables to the project submission form to fill out);
17.4. the Web site on which you placed in the draft agreement.
18. the applicant shall submit Project application, subject to the following conditions: the applicant shall provide the project 18.1. one project submission;
18.2. the project application consists of the completed project submission form (annex 1) and the following documents: 18.2.1. If the project is planned for the implementation of logistical support,-accompanied by documents certifying the project budgeted funds and logistic equipment rental and leasing, as well as space for rent and lease costs (applicable if the project is planned for the implementation of logistical support);
18.2.2. the costs of the planned outsourcing of projects, which the applicant purchased the equivalent of the cost of the service, or the results of the survey of the market, which contains three different suppliers price (applicable if the project is planned within the framework of outsourcing;)
18.3. the project submission form section, subsection and the names project, the applicant does not change and do not delete;
18.4. the project shall ensure the conformity of the application of the draft provisions referred to in annex 2 of the administrative, compliance and quality criteria;
18.5. completing the project submission form section, the project shall ensure compliance with the information, that is, describe the project up-to-date by identifying the problem and its solution, linking it with the project objectives, the results to be achieved, the selected target group, planned activities, time and the design of the eligible costs, as well as the rules for the implementation of the project;
18.6. the project the applicant required project cost plan according to these rules, in 23.7 39, 40, 41, 42, 43, 44, 45, 46 and 47. costs referred to in paragraph 1, and about restrictions, giving the project the expected costs and ensuring compliance with project objectives, planned activities, achieved results and time schedule. The European Social Fund project in the application intends to apply to the costs of the project, the State budget funding – not to cover the eligible costs;
11.6. project applicant project application to the responsible body can submit one of the following forms: 18.7.1. paper form in triplicate (original and two copies to the relevant "original" or "copy"). Project submissions prepared according the laws drafting and presentation of documents;
18.7.2. electronic document (with signature of the project application to the secure electronic signature pursuant to the electronic movement of regulatory laws and requirements);
12.8. the project application submitted that rule 17.2. within the time limit referred to in person, by mail or electronically.
19. the competent authority shall register the project application submitted to it on the date of receipt, as well as the identification number. Proof of receipt of the application, the project authority in charge of the project to the applicant personally immediately or within two working days of receipt sent by mail or electronically (signed with a secure electronic signature).
20. the responsible authority shall have the right to organize a more limited application of additional selection if: 20.1. this rule 17.2. within the time limit referred to in the application is filed for the project;
20.2. the project application is rejected;
20.3. the project application is approved for an amount that is less than that of the provisions referred to in paragraph 8 to the activity common to apply available funding.
V. Project submission evaluation activities within the 21 projects submitted to the evaluation of the application, provided by the Commission. The Commission establishes the following order: 21.1. the President of the Commission, the voting members of the Commission and their alternates are from the Ministry of welfare, the members of the Commission as an observer without voting rights – from managing authorities and cooperation agencies. The personnel of the Commission approved by the responsible authorities;
21.2. the members of the Commission or its substitute in their absence, replaced by another authorized representative. Such authorisation shall be made in writing to the Commission in accordance with the procedure laid down in the Statute.
22. The Commission shall determine the responsible authorities developed and approved regulations.

23. the project submission compliance is assessed on the basis of this provision listed in annex 2 of the draft application evaluation criteria and using the procedures developed by the responsible authority of the project application selection and evaluation, as well as the project application form of evaluation, developed in accordance with the laws and regulations that determine the European Union's structural and cohesion funds in institutions involved in planning documents for the preparation and implementation of these funds and the funds of the European Union management and control system. The documents referred to in this paragraph, the competent authority shall publish the website (URwww.lm.gov.lv/sf).
24. submission of project compliance with Annex 2 of these rules 1 and 2 of the project referred to in the submission evaluation criteria assessed with "Yes" () and "no" (no matches). The project's compliance with this provision the application to annex 2, paragraph 3 of the criteria assessed by giving a certain number of points.
Vi. adoption of the decision on the application of the project approval, the approval or rejection of a conditional and its notification to the responsible authority of 25 project application is approved if: 25.1. the project submission complies with all the rules referred to in annex 2 of the administrative criteria and eligibility criteria;
25.2. the application of this provision of the project 2. quality criteria referred to in the annex of assessment received at least the minimum number of points.
26. the project's responsible authority approves the application, if the application does not need to specify the corresponding to any of the provisions of annex 2 1 and 2 of the project referred to in the application of the evaluation criteria, which permit the application of the project approval with conditions.
27. paragraph 26 of these rules in these conditions may include: 27.1. additional explanation to the submission of the information contained in the application for the project;
27.2. project implementation time or cost planning clarification by years;
27.3. the cost adjustment (reduction or exclusion), in so far as it does not affect this rule 38.2.24.3 and 24.4.,., paragraph 40, and 41.3 in 41.2, 43, and 46 in 27.6. the costs referred to in paragraph 1;
27.4. other legally reasonable action to ensure compliance with the application of the draft rules annex 2 1 and 2 of the project referred to in the application of the evaluation criteria, which permit the application of the project approval with conditions.
28. the responsible authority continues the project evaluation and their application is rejected, if there was at least one of the following circumstances: 28.1. the project submission does not meet any of these provisions, annex 1 and 2 referred to in paragraph 2 of the draft criteria for the evaluation of the application for which the failure to execute the project application is rejected;
28.2. the project evaluation of the application of any of the provisions of annex 2, paragraph 3 of the draft application evaluation criteria received a lower rating than the minimum number of points.
29. the Board's decision on the application of the project approval, approval or rejection provided the determining authority within five working days after the adoption of the Board's decision must be forwarded to the applicant.
30. the Board's decision on the application of the project approval, the responsible authority shall include information on the conclusion of the agreement.
31. the responsible authority shall within five working days after the Board's decision on the approval of a project application shall inform the liaison body and send it a regulatory decision on approval of the project application and two copies of the project approved. The responsible authority approved projects can send an electronic document, if it is filed under 18.7.2. these provisions. The liaison body switch arrangement within five working days after the document referred to in this paragraph.
32. the Board's decision on the application for the approval of the project to the responsible authority of the conditions specified in the application for the project details in accordance with the provisions of paragraphs 26 and 27.
33. the Board's decision on the application for the approval of the project provided the conditions contained in the project, the applicant provides the information contained in the decision and the conditions provided by the responsible authority of the prescribed period, which shall not be longer than 30 days from the date of entry into force of the decision. The information that applicants may submit a project in one of the following ways: 33.1. paper form in triplicate (original and two copies to the relevant "original" or "copy"). Details of the decision contained in the conditions dealt with in accordance with the laws drafting and presentation of documents;
33.2. the electronic form of a document (for information on the conditions in the decision to sign with secure electronic signature pursuant to the electronic movement of regulatory laws and requirements).
34. the Commission examined this provision the information referred to in paragraph 33, and the responsible authority shall draw up an opinion on the Board's decision the conditions contained in the 10 working days prescribed by the responsible authority of the submission deadline.
35. Where the applicant has complied with the Board's decision on the application for the approval of the project provided the conditions laid down by the responsible authority within two working days, following this rule 34. the expiry of the period referred to in paragraph 1, the applicant shall send the draft opinion on the Board's decision contained in the conditions, but the cooperation body of four working days, the Board's decision on the application for the approval of the project provided the opinion on the Board's decision contains the conditions and two copies of the approved project as well as two projects submitted by the applicant with a copy of the document for information on the conditions contained in the decision. The responsible authority approved projects can be sent to the liaison body of the electronic form of a document, if it is filed under 18.7.2. these provisions in that order. The liaison body switch arrangement within five working days after the document referred to in this paragraph.
36. If the applicant has not fulfilled the regulatory decision on approval of the application, the project provided the conditions laid down or has not fulfilled the prescribed period, the application is deemed to have been rejected. The opinion that the decision contained in the conditions are not met, the responsible authority shall send the draft to the applicant within two working days, following these rules referred to in paragraph 34.

37. If the Government adopted a decision on the rejection of the application or project to the project the applicant has complied with the Board's decision on the application for the approval of the project provided the conditions laid down by the responsible authority in addition to the provisions referred to in paragraph 29, the condition that the applicant be returned to the project, or sent by mail two copies of the application for the project. The responsible authority for the project the applicant project application can be sent electronically if it is filed under 18.7.2. these provisions in that order.
VII. Eligible and ineligible costs 38. Project plans to the following costs: 38.1. eligible direct costs, or the cost of project implementation the following subheadings: costs 38.1.1. target groups of security costs;
38.1.2. logistical and equipment costs;
38.1.3. other project costs;
38.1.4. project information and publicity costs according to the regulations on the procedures for ensuring the European Union's structural and cohesion funds publicity and visual identity requirements, as well as public information on this Fund projects;
38.1.5. unforeseen costs;
38.2. the company's costs and its application of the project supporting the preparation of the documentation for the eligible costs of the project. If the operator is registered with the State revenue service as beneficiary, eligible employees of the employer are also state social security payment costs. This cost does not exceed 0.1% of the total eligible direct project costs, but not more than 2 000 lats;
23.8. eligible indirect costs;
23.9. the eligible indirect costs.
39. This provision 38.1.1. cost referred to in subheading includes the following costs: 24.3. temporary public jobs as a result of participating in the monthly unemployment compensation of 100 lats (net cost) in the amount paid in proportion to the result of temporary public works worked days and time (no more than two days per month) in the individual job search plan events and working in consultation with the condition that the unemployed are advance agreed with the supervisor and informed the work of the coordinating authorities;
24.4. the State social insurance contributions for pension insurance in accordance with the laws and regulations on State social security payments from the State budget and State social insurance special budget;
39.3. expenditure on the health checks as a result of temporary public works involved the unemployed provided for legislation on minimum health inspections, but no more than 20 dollars per one unemployed person;
24.5. accident insurance costs that rule 5.1. eligible activities referred to in the implementation.
40. This provision 38.1.2. cost referred to in subheading includes funding recipient project personnel needs space rental and lease costs, equipment, inventory, hardware repair and maintenance costs. These costs may not exceed one percent of the total eligible direct project costs.
41. This provision 38.1.3. referred to in subheading includes the following costs: costs of 25.5. procurement procedures implementation costs (fees and the company's costs of the procurement procedure for the preparation of the documentation, publication costs);
41.2. the remuneration costs (excluding allowances and compensation which does not calculate State income tax and compulsory social insurance contributions, bonuses, stimulus materials and cash prizes) and Enterprise contract costs, domestic travel and business travel costs (daily allowance, accommodation and transport costs), Office supplies and equipment, as well as other goods and materials cost of service (Office supply and inventory items (value up to 150 Lats per unit) If the lifetime is less than a year) and the electronic communications service costs the beneficiaries of project implementation staff. If the operator is registered with the State revenue service as the European Social Fund, the beneficiary of the worker, the employer also has to apply to the State social security payment;
41.3. remuneration costs (excluding allowances and compensation which does not calculate State income tax and compulsory social insurance contributions, bonuses, stimulus materials and cash prizes) one local paid temporary community work coordinating a monthly grant of 90 lats proportion worked in working days.
42. This provision 38.1.4. referred to in subheading costs include the cost of providing the information plate for indoor as well as for the provision of information to the media.
43. This provision 38.1.5. referred to cost within no more than five percent of the total direct eligible costs of the project. The project cost plan as one expense items, and they are used for the previously unscheduled expenses direct eligible costs of the project.
44. This rule 38.3. referred to in subheading includes costs, such costs, used this provision as referred to in point 5.2 eligible activities: 44.1. transport costs (fuel, vehicle hire, purchase of transport services, the use of public transport);
44.2. space rental cost;
44.3. the space management costs (heating, electricity, management services, water supply);
27.6. the Office and the Office supply costs (including non-essential items of equipment costs up to 150 lats value per unit, if the lifetime is less than a year);
27.7. the internet, postal and telecommunications costs;
27.7. travel or travel costs.
45. This rule 38.4. referred to in subheading includes consideration of costs costs (excluding allowances and compensation which does not calculate State income tax and compulsory social insurance contributions, bonuses, stimulus materials and cash prizes) project management personnel on the basis of the employment contract that during project implementation is carried out only with the administration of the project-related duties.

46. This provision and 23.9 23.8. the costs referred to in total not exceeding five percent of the project's eligible direct costs, but these rules referred to in paragraph 45 eligible costs requested from 74. Annual departments ' national budget execution process transferable funds "program 80.00.00" unallocated funding instrument of the policy of the European Union and other foreign financial assistance co-financed projects and the implementation of measures ", up 219 480 dollars.
47. the eligible costs recoverable value added tax payments are eligible.
48. Financing from the European Social Fund, referred to in point 8 of these regulations, does not apply a cost: 29.9. not specified in these rules and in 38.1.5 38.2, 39, 40, 41, 42, 44 and 47 points and or does not comply with this rule 38.2., 24.3. in paragraph 40, and 39.3. in paragraph 41.2 and 41.3 in., 43, and 46 in 27.6. above the limit on the amount of the eligible cost;
48.2. for which the beneficiary has undertaken and payments made before January 1, 2012;
48.3. the provisions referred to in paragraph 45.
VIII. conditions for implementation 49. Project implementation plan in accordance with the agreement, but no more than 31 December 2013.
50. The project site is the territory of the Republic of Latvia. Project international cooperation does not apply.
51. in implementing the project, the beneficiary shall ensure information and publicity measures, laid down in the Commission of 8 December 2006, Regulation (EC) no 1828/2006 laying down provisions for the implementation of Council Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund, and the European Parliament and Council Regulation (EC) No 1080/2006 on the European regional development fund as well as regulations on procedures to ensure the European Union's structural and cohesion funds publicity and visual identity requirements, as well as public information on this Fund projects.
52. The beneficiary on your website, if any, not less frequently than once every three months puts up-to-date information on the implementation of the project.
53. the structural funds of the European Union for the implementation of the project the necessary financial resources for the implementation of the plan, a project funded by the national budget and payments made to the authority in accordance with the laws and regulations governing the Fund's European Union funding conditions.
54. before the implementation of the project required access to finance project costs incurred can be considered eligible if they comply with these rules, the following cost items, and they are incurred no earlier than January 1, 2012.
55. the draft amendments be made according to the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds, in so far as these rules otherwise.
56. the cooperation of harmonisation in the responsible authority shall submit the draft amendments to the institution, if the changes are related to: 56.1. project objectives;
56.2. European Social Fund financing requested;
56.3. period of implementation of the project, subject to this provision, paragraph 49;
56.4. project results to be achieved;
56.5. project total eligible cost, or the amount of programming over the years.
57. Not exceeding that rule 38.2., 24.3. in paragraph 40, and 39.3. in paragraph 41.2 and 41.3 in., 43, and 46 in 27.6. the costs referred to in paragraph about limits and prior coordination with the liaison body, the funding recipient project can take: 57.1. the reallocation of costs between 38.1.1. these provisions, 38.1.2.38.1.3 and 38.1.4.,., 23.8. cost referred to in subparagraph headings, not exceeding five percent of the cost of a transferable within the total amount of the eligible cost;
57.2. reallocation of costs between these rules 39, 40, 41, 42 and 44. costs referred to in paragraph 1. This reallocation of costs to this provision, 38.1.2 38.1.1.38.1.3 and 38.1.4.,., 23.8. cost referred to under subheading does not exceed 10 percent of the cost of the total reallocated the eligible cost;
57.3. this rule 43, paragraph reallocation of costs.
Prime Minister v. dombrovsky Welfare Minister i. Viņķel of the Ministry of welfare submitted version of annex 1 of the Cabinet of Ministers of 27 December 2011 regulations No 996 Welfare Minister i. Viņķel annex 2 Cabinet 27 December 2011 regulations No 996 Project submission evaluation criteria 1. Administrative criteria evaluation system Criteria the impact on decision making (P, N) Yes/No 1.1. Project applicant is invited to submit a project application to the limited application of project selection X N 1.2 project submission is submitted to the responsible authorities within the specified X N 1.3.
The project application is signed by the authorised person of the applicant in the project (Officer) X N 1.4 project submission is prepared according to the circulation of electronic documents regulating legislative requirements (applicable if the project application submitted in the form of an electronic document) X h 1.5. Project application is drawn up into the project application to the 1.6 X N is drawn up in the language of the country X N 1.7. Project application has been added to the Cabinet on 27 December 2011 No. 996 of the provisions of the "rules for the operational programme" human resources and employment ' 1.3.1.5. activities Appendix "local employment promotion measures the introduction of the support for the "second round" (hereinafter referred to as the rules) the documents prescribed in paragraph 18.2 X p 1.8 is filed rule 11.6. project referred to a copy of the application (original and copy), and these are presented according to the laws drafting and presentation of documents (applies if the project application submitted in paper form) X P 1.9. Project application, the original and copies thereof is cauršūt (caurauklot) (true if project application submitted in paper form) X P 1.10. Project application is fully completed and drawn up according to the project application form X P
1.11. the project submission complies with a copy of the original application to the project (applies if the project application submitted in paper form) X P 1.12.

All project application copies (original and copy) pages are numbered (true if project application submitted in paper form) X 1.13. Project application, P financial calculation is performed in the X P 1.14. application of the project financial statement is designed to accurately and appropriately mean project application form requirements X P 1.15. Project application under the European Social Fund funding does not exceed the provisions mentioned in paragraph 14, the funding for the project application, P X 1.16. the eligible cost specified in total not exceeding the provisions referred to in point 15 of the maximum project funding for
X P 1.17. project costs included in the submissions comply with the rules in paragraph 39 38.2., 40, 41, 42, 43, 44, 45, 46 and 47.. costs referred to in paragraph 1.18. X h project application costs do not exceed the planned rule 38.2.24.3 and 24.4.,., paragraph 40, and 41.3 in 41.2, 43, and 46 in 27.6. costs referred to in paragraph limits X P 1.19. Project duration and cost allocation over the years corresponds to rule 49 of the project implementation period X P 2. eligibility criteria for evaluation the criteria for the system's impact on the decision of the (P, N) Yes/No 2.1. The aim of the project contributes to the provision referred to in paragraph 2, the objective of the activity X N 2.2. the project target group (s) comply with the provisions referred to in paragraph 3, target groups project 2.3 X N application to provide temporary paid public to organise the work site to create social benefits to society without intent to profit X N 2.4. submission of the project provide that paid temporary public works implementation is created from scratch or they at least four months before the target activity group memberships in paid temporary public works started has not been employed no other person, except if you are paid temporary public works site previously organized the event "work practice in municipalities, receiving a scholarship to the" within X N 2.5. application of the project projected expenditure need is justified P X 2.6. project application based on the chosen target group needs and identifies the challenges X P 2.7. project application planned project activities project of solving the problem defined in X P 2.8. project planned in the application outcome indicators facilitates the provision referred to in paragraph 4, the resulting pointer to the achievement of the project application, P X 2.9 defines the project personnel job responsibilities and qualifications requirements X P 2.10 application is defined in the project in the project administration personnel job responsibilities and qualifications requirements X P 2.11. Project application to reflect the existing and planned logistic support (apply If project implementation is planned logistical support) X P 2.12. project submissions reflects the project management, monitoring and quality assurance system X P 2.13. Project planned in the application of publicity and information dissemination activities conformed 51 and 52 to the requirements of P X 3. Criteria of quality evaluation system for the apakškritērij/point scale, the maximum number of points to be acquired and the procedure for awarding points the minimum number of points required 3.1 the applicant is informed of the project and identifies the municipalities that could be held in their administrative territory of the involvement of older unemployed people in temporary public works projects 3.1.1 the applicant informed the Latvian authorities for all the opportunity to organize in its administrative territory the involvement of older unemployed people in temporary public works – 2 points 2 points 3.1.2.5S project applicant has validated all the municipalities that want and are ready to organize in its administrative territory the involvement of older unemployed people in temporary public works-3 point 3.1.3. project the applicant has informed the authorities and knew their willingness and readiness to organize in its administrative territory of the involvement of the unemployed as a result, temporary public works – 0 point 3.2 Project provides a mechanism for additional support persons engaging in temporary public jobs as a result, ensuring their needs and opportunities for suitable activities in long-term unemployment and return to activate the labour market 3.2.1. project provide a mechanism to support sustained unemployment further exposed persons activation, and return to the labour market by providing advice and information on finding jobs in the appropriate strategies and on paid temporary community work participants appropriate active employment services – 2 points 2 points 1.2 v 3.2.2. project does not provide a mechanism to support sustained further unemployment persons subject to activation, and return to the labour market – 0 point 3.3. submission of the project is reflected in the criteria and mechanisms for municipalities to create paid temporary public jobs planning 3.3.1. project criteria are reflected in the municipalities, the number of jobs to be created for planning – 2 points 4S 2 points 3.3.2. project is reflected in the municipalities of the proposed mechanism, the number of jobs for planning – 2 points 3.3.3. application of the project are not reflected in the criteria and mechanism for municipalities, the number of jobs to be created for planning – 0 point 3.4. project application readiness for the planned launching of activities that made the destination of the activity group membership as a result of temporary public works project application 3.4.1 demonstrates high readiness, providing activities for the target group member as a result of participation in the temporary public jobs no later than one month from the agreement on the conclusion of the project – 4 points 2 points 4V 3.4.2. design application demonstrates the high readiness, providing activities target group membership as a result of temporary public jobs in one to two months from the agreement on the conclusion of the project – 2 points 3.4.3. the application of the project shows a low readiness, providing activities target group membership as a result of temporary public works later than two months from the agreement on the conclusion of the project – 0 point 3.5 application of the project are identified and reflected in the project implementation risks, assess their impact and the probability of occurrence, as well as certain risk mitigation measures

3.5.1. the project content the project submission deadline risk analysis-2 points 6 S 4 points 3.5.2. project content the project application to the financial risk analysis – 2 points 3.5.3. content submission project activity results and indicators of monitoring risk analysis – 2 points in the application of the project not 3.5.4. identified and reflected in the project implementation risks, not rated their impact and likelihood of accession, as well as the absence of risk mitigation measures – 0 point 3.6 the project respects the principle of non-discrimination by providing activities that promote gender equality and active ageing, as well as persons with disabilities rights project applicant is 3.6.1. identifies the target groups of the project social portrait and needs, including a breakdown by gender, age and disability – 2 points 2 points 3.6.2 4S project designed for specific activities, which contribute to gender equality and active ageing, as well as the rights of persons with disabilities are respected – 2 points 3.6.3. the project applicant is not understood by the target group of the project, and where the social portrait , including a breakdown by gender, age and disability, and the project is not intended for activities that promote gender equality and active ageing, as well as the rights of persons with disabilities are respected – 0 point 3.7. strengthening the project application to the balanced development of territories, municipalities create paid temporary public jobs in pursuant to the planning area with high unemployment where the target group and number of participants in the area of the project submission 3.7.1 provide municipalities to create the number of jobs in the area of planning to follow with high unemployment where – 2 points
4S 2 points 3.7.2. submission of the draft provides for municipalities to create the number of jobs in planning activities to observe the target groups number of participants in the territory – 2 points the project submission 3.7.3. provides to promote balanced development of territories – municipalities, the number of jobs to be created in the planning of the territory are not satisfied with the high level of unemployment needs and activities target groups number of participants in the territory – 0 point notes.
1. where non-compliance with the criteria established, the responsible authority shall take a decision on the application for the approval of the project, subject to the conditions laid down in the rules.
2. If found non-compliance with the criteria, the responsible authority shall take a decision on the rejection of the application for the project.
3. Apply one V the corresponding criteria.
4. Apply all applicable criteria (the sum of the number of points applicable to them).
Welfare Minister Viņķel of I.