Advanced Search

The Procedures For Granting State Aid In The European Union And Open The Project In The Form Of Tender Application For The Measure "promotion Of Tourism Activity"

Original Language Title: Kārtība, kādā piešķir valsts un Eiropas Savienības atbalstu atklāta projektu iesniegumu konkursa veidā pasākumam "Tūrisma aktivitāšu veicināšana"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No 773 Riga 2012 13 November (pr. No 64 38) procedures for granting state aid in the European Union and open the project in the form of tender application for the measure "promotion of tourism activities" Issued under the agricultural and rural development Act article 5, fourth paragraph i. General questions 1. determines the order in which the State and the support of the European Union (hereinafter referred to as aid) to open the project in the form of tender application for the measure "promotion of tourism activities" (hereinafter measure), implemented under Council of 20 September 2005 Regulation (EC) No 1698/2005 on support for rural development by the European agricultural fund for rural development ( The EAFRD) (hereinafter Regulation No 1698/2005), the Commission of 15 December 2006, Regulation (EC) No 1974/2006 laying down detailed rules for the application of Council Regulation (EC) No 1698/2005 on support for rural development by the European agricultural fund for rural development (EAFRD) (hereinafter Regulation No 1974/2006), and of the Commission of 15 December 2006, Regulation (EC) No 1998/2006 on 87 and 88 of the Treaty. application of article de minimis aid (hereinafter referred to as Commission Regulation No 1998/2006). 2. objective of the measure is: 2.1. promote non-agricultural activities in rural areas, developing and improving the rural tourism and tourism-related services and infrastructure; 2.2. with a marketing campaign to help promote rural development, agricultural and rural tourism industry cooperation in the development and promotion of rural tourism in the rural environment. 3. Measures to support the following activities: 3.1 existing tourist accommodation (not more than 20 beds throughout the complex as a whole) the reconstruction or reconstruction and equipping of simplified; 3.2. existing tourist accommodation catering to block construction or reconstruction, or renovation and equipping of the simplified; 3.3. the existing camping and youth tourism accommodation sharing kitchenettes, dining room, toilet and shower room construction, reconstruction, rehabilitation and equipping of the simplified (not including bath or sauna construction, reconstruction or simplified reconstruction); 3.4. the diversification of tourism services; 3.5. the investment in environmental protection and energy efficiency of the tourist accommodation shall, if the project is not intended for other construction or reconstruction work in the headquarters of tourism; 3.6. the rural tourism-related marketing activities of tourism services. 4. project application (1 or 2) announcing the adoption, project submissions valued and select, adopt and communicate, as well as support for the request in accordance with the laws of the State of the European Union and the granting of aid for rural and fishery development. 5. the following Activities are not eligible: 5.1 interest payments, money transfers, Currency Exchange Commission payments and currency fluctuation losses; 5.2. fines, penalties and costs; 5.3. subcontracting, if they do not ensure the achievement of the objectives of the project; 5.4. costs associated with the supply of any services or work for which there is no appropriate procurement procedure organised pursuant to the laws and regulations on the application of the procurement procedure; 5.5. the existing maintenance costs, maintenance, spare parts and operating costs; 5.6. the remuneration of personnel; 5.7. fees for equipment with internal combustion engines; 5.8. the costs in excess of the market price, and the unfinished work; 5.9. tack the equipment (as defined in the company's accounting in accordance with accounting standards); 5.10. other costs that are not eligible under Regulation No 1698/2005 and article 71 of the Regulation No 1974/2006 Article 55 (1) of the regulation. 6. before the grant of the aid field support service checks whether the aid granted pursuant to these provisions, the Commission Regulation No 1998/2006 2 the requirements set out in the article. The beneficiary of the aid in accordance with these provisions, the total de minimis aid granted shall, together with the fiscal year concerned and the two previous fiscal years assigned other de minimis aid does not exceed the Commission Regulation No 1998/2006, article 2 (2) the maximum amount of de minimis aid. 7. The recipient of the aid cannot have difficulty operating. Difficulty operating the operator complies with the following characteristics: 7.1 with the judgment of the Court of Justice has declared insolvency proceedings or the judgment of the Court is the legal protection process, or by a decision of the Court of Justice is an out-of-court redress process, the previous bankruptcy, reorganisation or appropriate composition, or the economic activity it has ended; 7.2. the loss more than half of the share capital and the last 12 months more than a quarter of the capital loss (this provision does not apply and section 10.1 10.2 and 15 persons referred to in paragraph); 7.3. in accordance with the last two financial years signed financial statements are ailing economic analyst signs-damage increase, the reduction in turnover, declining cash flow, debt growth, rising interest rates, stock inventories, low liquidity, falling asset values or null; 7.4. no option to cover the losses from its own resources or with the funds it is able to obtain from its owner or vendor, and stop losses without external intervention by public authorities in the short or medium term will almost certainly result in the company being unable to continue. II. conditions for receiving the aid of these provisions 3.1., 3.2., 3.3., 3.4 and 3.5. activities referred to in point 8 of the implementation of the action site is the territory of Latvia, except: 8.1. of the city; 8.2. the County territorial units-cities that have more than 5000 inhabitants. Population is determined, taking into account the Central Administration of statistics data for the population of Latvia's administrative territories in accordance with the latest State statistical observations; 8.3. the counties bordering the territory of the city of Riga. 9. This provision 3.4. activities referred to in the implementation is supported in the following: 9.1 fitting bathing; 9.2. active recreation trail and bridge or improvement; 9.3. the natural recreational parks or landscapes; 9.4. the playground, attractions, horse izjāž area (excluding construction), the creation or improvement of the bicycle; 9.5. ūdenstūrism the campsites (camping, campfire sites, toilet) or utilities; 9.6. the infrastructure adaptation for persons with functional disabilities; 9.7. acquisition of tourist services and creative workshop; 9.8. sports and sports and recreational facilities construction in the existing or planned tourist services; 9.9. the provision of tourism services in tourism need to be used in equipment storage sheds or locked room or expansion, as well as improvement of the territory, subject to the maximum eligible costs in the calculation of the aid the main types of structures (structure type maximum eligible costs) (annex 3). 10. supports the applicant is: 10.1 farm; 10.2. a natural person pursuing an economic activity; 10.3. the merchant. 11. the applicant shall satisfy the following conditions: support the project, 11.1 reaches a particular event target; 11.2. it is at least one year before the submission of the draft as a tourism service provider includes a tourist brochure or Web site created by the tourism promotion of the associated institution; 11.3. it develops and expands business operations, using, at least one of the following conditions: 11.3.1. creating new jobs; 11.3.2. existing jobs; 11.4. this project demonstrates economic viability in the application according to the rules in paragraph 20 and 21 above; 11.5. it is the owner or lessee (at least for a period of seven years from the date of submission of application) for real estate, which planned activities, which represents a record in the land. 12. paragraph 9 of these regulations the implementation of activities referred to in support of the applicant starting no later than three months after the entry into force of the rural support service of the decision on the approval of the project application. If within this period the implementation of activities was not started, as well as failure to comply with the provisions of paragraph 19 of such requirements, then the decision on approval of the project application shall lapse. III. conditions for receiving the aid of the rules referred to in paragraph 3.6. activity

13. the implementation of the measure space is the territory of Latvia. 14. This rule 3.6. activities referred to in the implementation is supported in the following: 14.1. the tourism product direction and development of the market related to regional and local food, culture and rural crafts (participation in foreign trade fairs, exhibitions, conferences and seminars is supported, if it is intended as one element of the overall marketing campaigns, ensure the tourism product presentation and organisation of the bench); 14.2. ' field ' ' ' benefit of the farm product creation and marketing; 14.3. the national Latvian rural kitchen create a quotation and marketing; 14.4. rural tourism marketing campaign to promote the field of the environment; 14.5. reach new markets. 15. the applicant is a society whose members the project at the date of application, at least 50 percent are farmers and sole proprietors. 16. the applicant shall satisfy the following conditions: support the project, 16.1 reaches a particular event target; 16.2. it has at least five years of experience in the field of tourism marketing; 16.3. it has at least five years of experience in the fields of tourism, agriculture and other fields of economic cooperation; 16.4. it has at least one international organization of rural tourism; 16.5. the society has a Web site of tourist services; 16.6. This works across the territory of Latvia in the field of tourism and rural development. 17. This provision, paragraph 14, to the implementation of the activities supporting the applicant begin no later than three months after the entry into force of the rural support service of the decision on the approval of the project application. If within this period the implementation of activities was not started, then the decision on approval of the project application shall lapse. IV. Application procedures and the documents to be submitted that rule 3.1, 3.2, 3.3, 3.4 and 3.5. activities referred to in point

18. To apply for support for this rule 3.1, 3.2, 3.3, 3.4 and 3.5. activities referred to in point, support the applicant Field support services in person or electronic form of the document in accordance with the laws and regulations on the development of electronic documents, presentation, storage and circulation by: 18.1. the project submission (annex 1); 18.2. the applicant's statement in accordance with the laws of the State of the European Union and the granting of aid for the development of the rural and fisheries; 18.3. the construction or improvement of regional environmental management assurances that the activities envisaged under the project are permitted and will not be harmed if this provision the environment 3.1., 3.2., 3.3., 3.4 and 3.5. activities referred to in the implementation of the activities of the European Union's Natura 2000 protected area; 18.4. a brochure or information on the Web site address under this rule 11.2. the conditions referred to in (a); 18.5. the purchase of building materials – construction of the technical design of the accepted stages or a copy of it (the presentation of the original); 18.6. the construction or reconstruction, if the date is a technical project: 18.6.1. accept the construction of the technical design stage, or a copy of it (the presentation of the original); 18.6.2. construction permit (copy, presenting the original) to be submitted not later than three months after the entry into force of the rural support service of the decision on the application for the approval of the project; 11.6. the construction or reconstruction, if the date is not in the project, the technical planning and architectural task (copy, the presentation of the original); 12.8. the simplified reconstruction: 18.8.1. the acknowledgement card and the intentions of the dossier, including construction work (on presentation of the original copy); 18.8.2. the purchase of building materials – drawn up by the applicant of the receipt of the aid card and them; 11.7. the procurement procedure of the supporting documents in accordance with the laws and regulations on the application of the procurement procedure. If you do not need to apply laws on procurement procedures – description of free-form, showing how the price was determined, and information about the entrepreneurs surveyed. Description adds advertising booklets and other information indicating that the prices of impartiality; 18.10. form of de minimis aid received in accordance with the laws and regulations on de minimis aid and the procedure of accounting and accounting forms; 18.11. the reconstruction or renovation of technical-simplified inventory file (a copy of the presentation of the original); 18.12. proof of project available financial resources (hereinafter referred to as the Declaration) – where the total eligible cost over the entire programming period to support the applicant's one related group of people exceeding 70 280 lats. Evidence submitted with the project application or within three months after the entry into force of the rural support service of the decision on the approval of the project application. If the project supports the tenderer intends to invest private or any other money funds, it shall submit the documents that prove the availability of funds. 19. when Claiming for financing new construction or reconstruction, construction and purchase documents for the construction, reconstruction, simplified reconstruction and general costs, relating to the construction, submitted with the project application or within three months after the entry into force of the rural support service of the decision on the approval of the project application. To qualify for funding for the purchase of building materials, construction and purchase documents submitted with the application for the project. 20. the applicant in the application of the project (annex 1), where the total amount of eligible costs not exceeding 70 280 lats, fill in the E. E. 1, 2. and (E). 5. section that: 20.1. include information about services, rates for the last year concluded, the subsequent years up to the end of the project, and a year after the implementation of the project, as well as the cash flow statement per month project in the year of application, the subsequent years up to the end of the project, and a year after the implementation of the project; 20.2. the tenderer showing support to economic viability. Economic viability is positive cash flow of the project in the year of application, all project implementation years and years after the implementation of the project. The cash balance at the end of each month must be positive. Support the applicant in the year after the implementation of the project in comparison with the last year signed by at least three percent increase in revenue from operating activities or at least a three percent decrease in expenses. The project attached to the application of the cash flow statement to the application of the draft year, in all the years of implementation and a year after the implementation of the project reflects the ability of the project to implement and achieve the goal. 21. the applicant in the application of the project (annex 1), where the total eligible cost amount exceeds LVL 70 280, fill in the E. E. 1, 2, 3 the E. E., 4., 5., E. and (E). 7. section that: 21.1. include information about services, rates, fixed assets, accounts payable, profit and loss statement, the balance sheet for the last year concluded, the subsequent years up to the end of the project, and a year after the project implementation (except production and cost), as well as the cash flow statement per month project in the year of application, the subsequent years up to the end of the project, and a year after the implementation of the project. The cash balance at the end of each month must be positive; 21.2. Reaffirms economic viability of applicants last year, concluded before the application of the project. Support the applicant meets at least two of the following indicators: 21.2.1. equity to total assets is, or more than 0.20; 21.2.2. working capital ratio of short-term vendor is 1.00 or more about it (from short-term creditors less short-term deferred income included in the composition of the State and the financial support of the European Union); 21.2.3. net profit and depreciation, multiplied by 50 percent, the amount is zero or greater; 21.3. prove the economic viability of the company a year after the implementation of the project according to the rules referred to in paragraph 21.2.2. indicator and at least one of these rules or 21.2.1.21.2.3. the indicators referred to in point. 22. The aid recipient along with the final payment request Field Support Services report on the implementation of the project results to the European agricultural fund for rural development (EAFRD) under "tourism promotion activities" (code 313) (annex 4) and an overview of the economic activity of the beneficiaries of the European agricultural fund for rural development (EAFRD) under "tourism promotion activities" (code 313) (annex 5). 23. Starting with the next year after the implementation of the project, the beneficiary each year up to June 1, a five-year period, the rural support service shall submit an overview of the economic activity of the beneficiary of the European agricultural fund for rural development (EAFRD) under "tourism promotion activities" (code 313) (annex 5), for the previous calendar year. V. application procedures and the documents to be submitted that rule 3.6. activity referred to in subparagraph 24. To apply for support for this rule 3.6. activity, referred to in support of field support the applicant in person or electronic form of the document in accordance with the laws and regulations on the development of electronic documents, presentation, storage and circulation shall submit the following documents: 24.1 application project (annex 2); 24.2. a brochure or information on the Web site address under this rule 16.5. conditions referred to; 24.3. form of de minimis aid received in accordance with the laws and regulations on de minimis aid tracking and award procedure and form. 25. supports the applicant two months before the implementation of the activities supported under the project time schedule provided for in the submitted Field support procurement documents in accordance with the laws and regulations on the application of the procurement procedure. If you do not need to apply laws on procurement procedures – description of free-form, showing how the price was determined, and information about the entrepreneurs surveyed. Description adds advertising booklets and other information proving the impartiality in determining the price. 26. supports the applicant project application (annex 2), which is the total amount of eligible costs not exceeding 140 560 million lats (EUR 200 000 equivalent in local currency), add: 26.1. society's annual report on the conclusion of the previous financial year; 26.2. supported activity table with timetable for implementation; 26.3. the date of submission of the project to update the list of members of the society. 27. The aid recipient along with the final payment request Field Support Services report on the implementation of the project results (annex 6).

28. Starting with the next year after the implementation of the project, the beneficiary each year up to June 1, a five-year period, the rural support service report on the supported and implemented activities (annex 7). Vi. the nature of the aid, the amount and eligible costs this rule 3.1, 3.2, 3.3, 3.4 and 3.5. the activities mentioned in points 29. During the period 2007-2013 (hereinafter referred to as the planning period) per beneficiary the maximum eligible cost of EUR 375 000 equivalent in local currency. 30. Aid shall be granted to the economic sectors and activities, referred to in Commission Regulation No 1998/2006 article 1, paragraph 1. 31. the aid intensity is: 31.1.40 percent of the total eligible cost total-this rule 3.1, 3.2 and 3.3. the activities mentioned in points; 31.2. the 50 per cent of the total eligible cost total-3.4. these provisions and referred to in point 3.5. 32. The beneficiary of that programming period has changed the legal status, of the natural person becoming the reorganization of legal persons or company owns or farms (the beneficiary owns any number of shares in the new company): 32.1. aid can apply that rule 18 in that order and that rule 3.1, 3.2, 3.3, 3.4 and 3.5. activities referred to in the remainder of the amount of the eligible cost; 32.2. unable to log in to support this provision, paragraph 18, in the order and these terms 3.1., 3.2., 3.3., 3.4 and 3.5. activities referred to in (a), if the programming period has received the maximum amount of the eligible costs. 33. project submissions are ranked according to the criteria for the selection of projects (annex 8). If the number of points be equal, priority is supported by the applicant, which operates in the territory of the municipalities with less development index. 34. The event has the following eligible costs: 34.1. the construction, reconstruction or simplified reconstruction costs, on the basis of contracts with third parties, responsible for carrying out the work, but not exceeding the maximum structure types of eligible costs (annex 3); 21.3. the acquisition cost of the building materials based on the construction plan of the technical design of the accepted stages or to support the preparation of the estimate, but not exceeding the maximum structure types of eligible costs (annex 3); 21.3. the acquisition cost of fixed assets, in order to ensure the implementation of the relevant activities; 21.4. General costs (including architects ', engineers ' and consultants ' fees, legal fees, feasibility study, obtaining of patents and licences), directly related to the project preparation or implementation. If the application contains only this rule 21.3. the costs referred to in general costs shall not exceed two percent of the 21.3 these rules in those costs. In other cases, the General costs shall not exceed eight percent of these rules, and 21.3 21.3 21.2. in the above eligible costs. 35. in the structure type to apply the maximum costs include all of the object's construction-related costs, including external and internal plumbing, internal and external sewerage, internal and external power supply, ventilation and heating systems, as well as the rules referred to in paragraph 36. 36. eligible costs are directly related to tourism services costs if their amount does not exceed 30 percent of the total eligible cost of construction: 36.1. the new administrative space construction, reconstruction of the existing space or a simplified reconstruction; 36.2. guarding and passes construction of premises; 36.3. burglar alarm (including CCTV systems); 36.4. the staff construction of premises; 22.7. building balcony and patio construction; 22.7. road construction. 37. If the project construction or reconstruction costs for the respective type of construction exceeds the maximum eligible costs, the cost difference shall be borne by the beneficiary. 38. Apply construction estimates are solely those positions that directly linked to the achievement of the objective of the project. 39. The aid shall be paid only for goods purchased, which is the property of the beneficiary. 40. aid for goods bought on installments, paid only if they have become the property of the beneficiary. VII. Form of aid, the amount and eligible costs this rule 3.6. activity referred to in point 41. throughout the programming period to one beneficiary the maximum eligible cost of EUR 200 000 equivalent in local currency. 42. Aid shall be granted to the economic sectors and activities referred to in Commission Regulation No 1998/2006 article 1, paragraph 1. 43. the aid intensity is 90 percent of the total eligible cost total. 44. the following Measures with the marketing of tourism services relating to eligible costs: 44.1. acquisition cost of fixed assets, in order to ensure the implementation of the relevant activities; 44.2. outsourcing costs based on contracts with third persons responsible for carrying out the works; 44.3. the travel and accommodation expenses according to laws and regulations about the order in which the recoverable costs associated with business travel. VIII. Closing issues 45. lost in the void of the Cabinet of Ministers on 16 November 2010, Regulation No 1036 "procedures for granting state aid in the European Union and open project submissions in the form of a competition event" promotion "of tourism activity" (Latvian journal 2010, 188. nr.). 46. the project submissions, approved under the Cabinet of Ministers on 15 September 2008, the Regulation No 754 "procedures for granting state aid in the European Union and open project submissions in the form of a competition event" promotion "of tourism activity" and the Cabinet of Ministers on 16 November 2010, regulations no 1057 "procedures for granting state aid in the European Union and open project submissions in the form of a competition event" promotion "of tourism activity", implemented and monitored in accordance with the agreement on aid. Prime Minister, the Defense Minister a. Minister Pabriks farming L. the Ministry of Agriculture presented the speed version of annex 1 of the Cabinet of Ministers of 13 November 2012 regulations No 773 agricultural Minister l. Rapidity in the Ministry of Agriculture presented in annex 2 versions of the Cabinet of Ministers of 13 November 2012 regulations No 773 agricultural Minister l. Rapidity of annex 3 of the Cabinet of Ministers of 13 November 2012 regulations No 773 maximum eligible costs in the calculation of the aid the main structure types, No. PO box The structure type unit of measure for the total new shipbuilding area (excluding VAT) of the total reconstruction of the area compensated (without VAT) for simplified reconstruction of the total area of compensated (no SALES TAX) 1. Tourism headquarters to 20 Ls/m2 500 500 350 2 beds. The catering unit Ls/m2 500 500 350 3. Sharing a kitchen, toilet, shower, etc. Ls/m2 350 350 200 4. Palīgbūv or inadequacy of Ls/m2 100 80 70 5. Ls/m2 in area 15 12 12 6. Roof replacement Ls/m2 – 20 15 Rate of Agriculture Minister l. Annex 4 of the Cabinet of Ministers of 13 November 2012 regulations No 773 report on the results of the implementation of the project the European agricultural fund for rural development (EAFRD) under "tourism promotion activities" (code 313) project no ____ ___ (s) Achieved objective (s), introducing the draft (mark with x): Promote an agricultural business in rural areas Developed and expanded the economic activity of the company created new jobs saved existing jobs project investment promoting tourism service availability and adaptation to the natural environment recreation for families with children other (specify) project created (mark with x): small scale infrastructure, recreational infrastructure for rural tourism development project was implemented in the less favoured region territory yes no project space areas development index project was implemented the following activities:

Existing tourist accommodation (up to 20 beds) the reconstruction or renovation of reconstruction, a simplified m2 simplified reconstruction of existing tourist accommodation m2 dining block construction or reconstruction, or a simplified reconstruction, acquisition of necessary equipment construction, reconstruction, a simplified m2 m2, m2 equipment, reconstruction of the (decrypted by positions) Camping and youth tourism accommodation sharing a kitchen, dining room, toilets and showers, construction or reconstruction, not including sauna and sauna construction or reconstruction of the building , m2, m2 Simplified reconstruction reconstruction, tourism service m2 diversification Bathing, recreational trail m2 or m2 or km development (specify appropriate units of measure) natural recreation park development, or m2 or km (specify appropriate units of measure) attraction, horse izjāž area, cross-country ski runs in the creation or development of the m2 or km (specify appropriate units of measure) of water tourism niche creation or improvement, m2 or km (specify appropriate units of measure) infrastructure adaptation for persons with functional disabilities , m2 or km (specify appropriate units of measure) equipment for the provision of tourism services (number) sports and sports and recreational structures construction within the existing or planned tourist services, a shelter or a locked room m2 or expansion for storage of equipment necessary for the provision of tourism services, environmental investment m2 rural tourist accommodation – sewage treatment system and nosēdak construction or reconstruction, the asbestos roofing material replacement for eco-friendly material coverage of the sewage treatment system and the construction of nosēdak , m2 sewage treatment system and nosēdak reconstruction, roofing replacement m2, m2, in accordance with the abovementioned aid measures investment made: a new production of fixed assets in acquisition (number) new construction, reconstruction, renovation of the building in a simplified acquisition m2 construction, reconstruction took place: the economic participation of the construction with the number of jobs saved, through the project (number of) made-for-television, the number of jobs, the project (number) declare that the information provided is true.
Report submitted to the _____ of ___. ___ ___ ___ ___ ___ ___ (name) (signature) Note. The document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Agricultural Minister l. Rapidity of annex 5 of the Cabinet of Ministers of 13 November 2012 regulations No 773 report on the beneficiary of economic indicators by the European agricultural fund for rural development (EAFRD) under "diversification of the tourism activity" (code 313) project 1 project 2 project 3 project number project due date, recipient name, surname/name (firm) recipient's registration number/ID number of the legal beneficiaries address/home address declared by the beneficiary (mark with X If it is 413) a woman younger than 25 years old male under 25 years old LADA customer number beneficiary's principal activities are the agriculture Yes No beneficiary of the aid in the reference period received support for other activities of the European Union Yes No number of projects supported supported projects is repaid ____ ____ ____ of ____ ____ ____ ____ ___ ____ ____ of ____ ____ ____ ____ ____ ___ ____ ____ of ____ ____ ____ ____ ____ ___ beneficiaries last year concluded the review scores for ____ ___ Financial indicators of t.sk. from an agricultural activity on the holding's net turnover Ls Ls Ls farm costs profit/loss after tax payment $ Ls General indicators – indicators, the number of jobs in the reporting period (including the newly created) (number) made-for-television, the number of jobs in the reporting period (number) made-for-television work during the reporting period, the number of farms (number of) men (number) men (number) t.sk. age of 25 (number) t.sk. age of 25 women (number) (number) (number) t.sk women. the age of 25 years (number) t.sk. the age of 25 years (number) made-for-television, the number of jobs in the period outside the farm (number) men (number) t.sk. age of 25 women (number) (number) t.sk. the age of 25 years (number) tourism offices tourist number served (number) t.sk. tourists who used accommodations (number) t.sk. day visitors (number of) accommodation capacity in the reference year (number) tourist accommodation activities number of days in the year (number) total agricultural land area (ha) I certify that the information provided is true.
Report submitted to the _____ of ___. ___ ___ ___ ___ ___ ___ (name) (signature) Note. The document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Agricultural Minister l. Rapidity of annex 6 of the Cabinet of Ministers of 13 November 2012 regulations No 773 report on the results of the implementation of the project the European agricultural fund for rural development (EAFRD) under "tourism promotion activities" (code 313) project no ____ ___ (s) Achieved objective (s), introducing the draft (mark with x): Promote an agricultural business in rural areas local and external market promotion of tourism products and developing guidance related to regional and local food , culture and rural crafts created ' field ' ' ' benefit of the farm product and marketing created the national Latvian rural kitchen supply and marketing Organized marketing campaigns promoting rural tourism rural environment Promoting the interest of travellers using rural tourism services in Latvia, Promote cooperation between tourism, agriculture and craft enterprises project investment promoting tourism service availability and adaptation to the natural environment recreation for families with children Keep existing jobs in other (specify what tourism marketing activities) will be implemented following (give brief description): the progress of tourism products and the development of the local and external markets related to regional and local food, culture and rural crafts ' ' ' ' field advantage holding product and marketing national Latvian rural kitchen create a quotation and marketing marketing campaign, promoting rural tourism rural environment reach new markets more secure certify that the information provided is true.
Report submitted to the _____ of ___. ___ ___ ___ ___ ___ ___ (name) (signature) Note. The document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Agricultural Minister l. Rapidity of annex 7 of the Cabinet of Ministers of 13 November 2012 regulations No 773 report on the activities of the beneficiaries European agricultural fund for rural development (EAFRD) under "diversification of the tourism activity" (code 313) project number project due date, the name of the beneficiary (the firm) beneficiary of the registration number of the legal beneficiaries address LADA customer number is the core activity of the beneficiary rural tourism, marketing Yes No beneficiary of the aid in the reference period received support for other activities of the European Union Yes No Project implementation of ____ _____ ___. , kopējā projekta atmaksātā summa
________.gada _______________________ ________.gada _______________________ ________.gada _______________________ ________.gada _______________________

Beneficiary last year concluded the review scores for ___ ____ year general indicators indicator (specify): Promote an agricultural business in rural areas local and external market promotion of tourism products and developing guidance related to regional and local food, culture and rural crafts created ' field ' ' ' benefit of the farm product and marketing created the national Latvian rural kitchen supply and marketing Organized marketing campaigns promoting rural tourism rural environment Promoting the interest of travellers using rural tourism services in Latvia, Promote cooperation between tourism, agriculture and craft enterprises Promote tourism services and customize the natural environment recreation for families with children Keep existing jobs in other (specify): full annual report of the society. I certify that the information provided is true. Report submitted to the _____ of ___. ___ ___ ___ ___ ___ ___ (name) (signature) Note. The document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. Agricultural Minister l. Rapidity of Annex 8 of the Cabinet of Ministers of 13 November 2012 regulations No 773 project selection criteria No. PO box A group of criteria the maximum number of points in a group criterion criterion point number 1. Support previously received by the applicant in support of the apmērs1 30 0 30 $1-$ 25 000 $25 000 001-50 26 22 Ls 50 001 – 18 Ls 75 75 000 001-100 000-125 000 100 001 14 Ls 10 Ls-6 Ls 125 001 150 000 and over 150 001 0 2. Accepted 30 aid applied for būvprojekts2 accepted 30 confirmation card construction 15 0 3 other projects. The accommodation noslodze3 in the previous year in the summer season (01.05.-01.10.) more than 40% 15 15 0 0 all year up to 40% more than 20% 15 15 0 to 20 0 4. Support the activities of the applicant in 15 more 3 years 15 years less than 3 0 5. The difference between the maximum amount of aid and the aid requested for the project, for each full percentage point-1 notes.
1 support for the tourism industry of the special pre-accession programme for agriculture and rural development (SAPARD) single programming document.
2 in accordance with the regulations for construction.
3 the maximum number of points for the accommodation capacity of the previous year's 15 points. Agricultural Minister l. Rapidity of