Advanced Search

Amendments To The Cabinet Of Ministers On 1 April 1997 Of Regulation No 112 "general Provisions"

Original Language Title: Grozījumi Ministru kabineta 1997.gada 1.aprīļa noteikumos Nr.112 "Vispārīgie būvnoteikumi"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 313 in Riga on 11 June 2013 (pr. No 34 24) amendments to the Cabinet of Ministers on 1 April 1997 of Regulation No 112 "General provisions" Issued in accordance with article 2 of the law on construction of the fourth subparagraph and article 13, paragraph 2, of the sixth part 1. make Cabinet 1 April 1997 Regulations No. 112 "General provisions" (Latvian journal, 1997, no. 88;/163.nr.; 2001, 161.2000, no. 182; 2003, 53, no. 137; 2004, nr. 68; 2005 92., nr. 145; 2007, 103 no; 2009, 56 no; 2010, no. 8; 2011, 82, 122 no). 1.1. the following amendments: deletion of 35.2 points; 1.2. to supplement the rules by 35.3 35.4 points and the following wording: "If a 21.9 in accordance with the laws of the territory in the area of development planning in the development of a detailed sketch of the project at the project planning, design and architectural task conditions include the development of a detailed statement of work. 35.4 Where building sites in accordance with the laws of the territory in the area of development planning is a drafted a detailed plan and on its implementation of the agreement has been concluded between the municipality and a detailed plan for the implementation of development, planning and architectural task shall not be issued and projects drawn up in accordance with those laid down in a detailed land-use and building conditions, except where the proposed action in accordance with the laws and regulations on environmental protection is required in the national environmental service regional environmental management technical rules. "; 1.3. to replace the words "paragraph 37.2 (except facade finishing the renovation and replacement of window without changing their distribution, facade and roof insulation, roof replacement iesegum)" with the words "(except for the renovation of the façade finishing and window replacement, without changing their distribution, facade and roof insulation, roof replacement, the Loggia iesegum aizstiklošan)"; 1.4. to complement the 37.2 point after the words "roof replacement of" iesegum "of aizstiklošan, if Loggia does not change its position"; 1.5. to supplement the rules with 37.5 points in the following: "this rule 37.2 37.5 points in the building in front of the renovation of the simplified card is not necessary when the high-rise apartment houses, except the national protected cultural monuments, planned the loggias, the aizstikl of all other facade works, and būvvald the apartment property in accordance with the procedure laid down in the law, a decision is taken and submitted to the visual appearance of the building and the facades of the Loggia aizstiklojum sketch, with explanatory memorandum signed by the architect, which is an independent practice rights. Before the start of work aizstiklošan the client shall inform būvvald. "; 1.6. to replace the words "paragraph 25.4 Designer" with the words "the relevant field of certified person or persons registered in the register of būvkomersant"; 1.7. Express 25.5. subparagraph by the following: "25.5. land plan and situation plan;" 1.8. to complement the 46.11 points with the third and fourth sentence as follows: "If we accept the the extended sketch project made significant changes affecting the conditions of technical regulations or external appearance of the building or structure is changed, the function changes the accordance with the binding provisions of technical publishers. In that case, būvvald has the right to ask to submit new shipbuilding and construction application of meta-tab card. "; 1.9. subparagraph expressing 62.5. as follows: "62.5. separate facilities, smaller elements (lighting fixtures, fences, barriers, benches, garbage bins, children's play equipment, bike racks and similar small architectural form walkways), billboards and object reference column in the demolition, if these activities are coordinated by the būvvald;" 1.10. to supplement the provisions under section 39.1. the following wording: "39.1. advertising billboards and objects without elektropieslēgum, which shall not exceed 2.5 meters in height, and tourist attractions and street indications posts without elektropieslēgum, with a height of not more than 4 metres, if their position in the plot and Visual solutions matching būvvald."; 1.11. delete paragraph 110, the second and third sentence; 1.12. the express section 116.1. by the following: "the request for building permits 116.1. (4.1)"; 1.13. deleting subparagraph 116.3.1; 1.14.118 points to express the following: 118. Building permits issued for "the customer's requested time, which may not be less than one year. Total building permit, the period of validity shall not exceed this provision 120.1 referred the maximum duration of the works. Būvvald, extending building permits for a total building permits within the validity period, you do not need to evaluate the factual and legal circumstances on the basis of which it was issued building permits. " 1.15. supplement with 119.1 points as follows: "If 119.1 in accordance with the laws of the territory in the area of development planning for construction not provided a detailed plan was developed simultaneously with the design or Construction of the project in accordance with article 12 of the law was not the construction of the public consultation, receiving a construction permit, the Subscriber: 1. send the 119.1 construction of article 13 of the law referred to in the sixth subparagraph persons written notice of: 119.1 1.1. reconstruction of buildings the city or village in the territory of the that results in a change in the building's function (use) or amount; 119.1 1.2. new building construction, except one or two dwelling houses, inadequacy, the fence, the site's facilities, construction or transport construction inženiertīkl construction, as well as the use of temporary structures and construction of mazēk; 2. deploy 119.1 parcel būvtāfel (not less than A1 format), informing about the reconstruction of the building of a town or village in the area, the result of which is a change in the building's function (use) or volume, and the construction of new buildings, except one or two dwelling house construction outside the town and village areas, inadequacy, fencing, building or transport construction inženiertīkl construction, as well as the use of temporary structures and mazēk construction. Būvtāfel is placed, oriented to public place and shall state the following particulars: 119.1 2.1. construction plan (construction type and address); 119.1 2.2. agents (natural persons first name, last name or legal name, address, registration number and phone number); 119.1 2.3. Designer (name, address, registration number and phone number); 119.1 2.4. construction plans or plan the Mets; 2.5. information on building permits 119.1 enters into force. " 1.16. Supplement 5.1. subheading with 120.1, 120.2, 120.3 and 120.4 to 120.6, 120.5 points as follows: "the maximum 120.1 duration of works to which the work or (if the construction put by for instance) put into service: 120.1 1. structures for which the public has expressed the views of the action for the environmental impact assessment and public consultation the proposed building, five years; 2. other 120.1 structures – eight years. 120.2 maximum duration of the works is determined from the date of issue of the permit, including the time when the works were interrupted. The maximum duration of the works is not counted in the time in which: 1. construction permit 120.2 is stopped, if the administrative procedure prescribed by law it is disputed or appealed against; 120.2 2. suspended or discontinued the work based on this rule 165, paragraph of the decision, except where the suspension or interruption of the works due to construction. 120.3 works, which are performed after this provision 120.1, of the period referred to in paragraph 1 is an arbitrary construction. Būvvald of planning permission may be extended by this provision or 120.6 referred to 120.5 conditions. If this provision 120.4 120.1 construction referred to in paragraph 1 is not put into operation before the time limit expires, the Subscriber to the law "on environmental impact assessment" in order to carry out initial environmental impact assessments or būvvald should take a decision on the construction for public consultation if the organisation has changed the factual and legal circumstances on the basis of which the construction was initiated. If you have changed the factual or legal circumstances, the municipality may adopt a decision on the construction of the consequences under this provision 171.1. 120.5 If under this provision is made to 120.4 points construction intentions evaluation, planning permission is extended to būvvald of the down time, but not more than one year, if the būvvald is shown in the current cadastral trying thing (inventory case) and the uzmērījum of the geodetic construction sites to check. If building within that time-limit is not put into operation, the authorities may take a decision on the construction of the consequences under this provision 171.1. If this provision 120.1 120.6 2. construction or referred to them (if the building is to be implemented by orders of magnitude) is placed into the deadline, construction permit shall be extended for the time requested by the customer, if the būvvald is presented to the relevant cadastral trying thing (counting thing) and the uzmērījum of the geodetic construction holding checked. "; 1.17. replace 161.2 in the word "public" with the word "public"; 1.18. delete paragraph 165, the words "and in accordance with the law on companies, institutions and organisations the suspension order ""; 1.19 replace paragraph 170, the words "building owner" with the words "building owner or legal possessor, if construction is not concerned by the owner"; 1.20. the transitional provisions be supplemented by the following paragraph 189: "189. Planning and architectural task and period of validity, if not initiated, the works accepted in advanced design project or accept technical project shall not extend the period of validity of the construction process, who proposed after July 1, 2013. Building permits issued before July 1, 2013, extended for a period not exceeding the provision referred to in paragraph 120.1. "; 1.21. Express annex 1 as follows: "annex 1 Cabinet 1 April 1997 Regulations No 112 City/District būvvald for construction/building demolition application – tab card the client (initiator of construction): (persons name, surname/name of the legal person (company)) (personal code/registration number) (place of residence/registered address) (telephone number) (electronic mail address), please consider the application object (the name of the free-form construction) construction/demolition.

1. type of Construction (required mark): new construction of existing building construction 2. details of the plot: cadastral designation 2.1 2.2. address of the parcel if the construction for forest: 1) forest block number _____ _____ _____ _____; forest nogabal number _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2) atmežojam area by the forest of nogabal ____ ____ ____ ____ ____ ____ _____ 2.3. owner or, failing that, the legal possessor (persons name, surname, personal code/name of the legal person (company), registration number) 2.4. land user (an individual's name, surname, personal code/name of the legal person (company), registration number) 3. details of the existing building/construction (completed for each building separately): 3.1 construction type (required mark) : reconstruction refurbishment restoration of 3.2 construction/demolition groups cadastral designation 3.3. building/address classroom Group 3.4. building/space group holder or, failing that, the legal possessor and/or user (an individual's name, surname, personal code/name of the legal person (company), registration number) 4. Authorised person (Project Manager) (persons name, surname, personal code, place of residence, telephone number, electronic mail address/name of the legal person (company) , registration number, registered office, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 5. Reply to the application would get (specify one of the ways): by mail to the address indicated in the application electronically to the electronic mail address (in accordance with article 9 of the law on Notification, second paragraph) ____ ____ ____ ____ ____ ____ ____ personally būvvald the 6. Request for additional information (documents) and/or a decision on extension to the response to send electronically to the electronic mail address ____ ____ ____ ____ ____ ____ ___ – documents submitted in annex (according to the situation) : 1) situation plan, specifying the new size of the premises and the number of parking spaces provided on a ___ ____ pages; If the construction for forest-land boundary plan with a marked atmežojam for construction in forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ____ ___ pages; 2) power of attorney client (if the application is submitted by an authorised person); 3) property, possession or usage rights supporting documents; 4) existing utilities Manager issued technical noteikumi1; 5) the preferred route izvietojums1; 6) topographical plan M 1:500 or 1:250 M (can be submitted to būvvald by the topographic plan development utilities to fine-tune placement according to the local government binding rules or other laws of the Republic of Latvia, in agreement with the participating third parties) 1.
The construction agent or authorized person (name, surname, 's signature2) (date2) fill the 1. būvvalde3 local government planning effective date 2. date of entry into force of the Lokālplānojum 3. date of entry into force of the Detailed 4. architectural planning and task/task of constructing the demolition, the number and date of issue 5. waiver issue planning and architectural task/construction demolition task number and release date of the city/district būvvald Officer (job title , first name, last name, 's signature2) (date2) notes. 1 provided for the construction of utilities. 2 document properties in the "signature" and "date" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 3 Būvvald may not fill the application part that contains information about the existing planning documents, as well as information on the planning and architectural task or issue a refusal if the following documents are attached to specific construction case. "; 1.22. Replace annex 1.11. Sub-paragraph 2, the words "(for example, make the Earth transformation to building land)" with the words "(for example, must be submitted to the national forest service, information about the atmežojam forest land in accordance with laws on deforestation detection, calculation of compensation and reimbursement procedure)"; 1.23. Replace annex 2, the words "this administrative act within one month of its entry into force may be referred to the administrative procedure prescribed by law" with the following content: "The task of planning and architecture in the month after its entry into force may be challenged in the administrative process law (name, address)";
1.24. Replace annex 2.1, the words "this administrative act within one month of its entry into force may be referred to the administrative procedure prescribed by law" with the following content: "This building demolition tasks month after its entry into force may be challenged in the administrative process law (name, address)";
Replace annex 2.2 1.25 point 6, the words "window" with the words "replacement window replacement/Loggia of aizstiklošan"; 1.26. supplement with 4.1 attachment the following: ' Annex 4.1 Cabinet 1 April 1997 Regulations No 112 City/County building permit request for 1 būvvald. Principal (initiator of construction): (an individual's name, surname, personal code, place of residence, phone number, e-mail address, or the name of a legal person (company), registration number, registered address, phone number) 2. Construction type (required mark): new construction reconstruction renovation Restoration Projects for the demolition of 3.   , (site name) by a subscriber of 20 ___ ____. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ and accepted by _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ būvvald 20 ___ of ___. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ the acceptance number for a construction Projects the total cost of the implementation of the liability insurance policy (number and expiration date) for completing the works 20 ___. year (month) 4. Site address or, if not, the location of land cadastral designation 6. Construction/cadastre signage classroom Group (complete reconstruction, renovation, restoration and decommissioning) 7. Parcel owner or If not, the legal possessor (an individual's name, social security number, or the name of a legal person (company), registration number) 8. Building/space group holder or, failing that, the legal possessor and/or user (reconstruction, renovation, restoration and demolition) (an individual's name, social security number, or the name of a legal person (company), registration number) 9. Construction of the author (an individual's first name, last name, ID number, certificate number or the name of a legal person (company) , registration number būvkomersant registration the number of the licence) involved in the construction of the 10 participants: 10.1 būvuzraug (an individual's first name, last name, ID number, certificate number or the name of a legal person (company), registration number, registration certificate number būvkomersant, registered office, telephone number) 10.2. autoruzraugs1 (an individual's first name, last name, ID number, certificate number or the name of a legal person (company), registration number, registration certificate number būvkomersant, registered office, telephone number) 10.3 būvuzņēmējs2 (physical person's name the name, identity number, certificate number or the name of a legal person (company), registration number, registration certificate number būvkomersant, registered office, telephone number) 10.4. responsible public works Director (an individual's first name, last name, ID number, certificate number, phone number) 10.5. labour protection Coordinator (an individual's first name, last name, ID number, phone number) 11. Planning permission I would like to receive (specify one of the ways): by mail to the address indicated in the request electronically to the electronic mail address (in accordance with article 9 of the law on Notification, second paragraph) ____ ____ ____ ____ ____ ____ _____ personally in 12 būvvald. information about the deforestation of pay (compensation If the construction is designed for forest land): 12.1 payment identification number ____ ____ ____ ____ ____ ____ ____ ____ _____ 12.2. payment amount ____ ____ ____ ____ ____ ____ ____ ____ _____ 12.3. date of payment _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ annex – documents submitted (as appropriate for the situation): 1) accepted a construction; 2) parcels of property, possession or usage rights and building rights supporting documents (if they were changed); 3) certified by a responsible public works Director and certified būvuzraug (if any turns) of the article; 4) a copy of the contract for the autoruzraudzīb and autoruzraudzīb log (if it works autoruzraudzīb); 5) public works journal; 6) the insurer issued the contractor or builder of the compulsory civil liability insurance policy.
The client (initiator of construction) (name, paraksts3) (datums3) būvvald 1. Fills in the construction site provided for inspection (date) 2. Opinion on the test (number and date) 3. Construction permit (number and date of issue) the City/District Officer of būvvald (position, name, surname, paraksts3) (datums3) notes. 1 fill out, if contracted for in accordance with the provisions of the autoruzraudzīb on the autoruzraudzīb of the works. 2 do not fill out, if the Builder is built small structures, which do not exceed two storeys and a building area not greater than 400 m2 and būvapjom – about 2000 m3, and if the Builder is also responsible the public works Director. 3 the document properties in the "signature" and "date" does not fill in, if the electronic document has been prepared according to the law on electronic document design. " 1.27. the Express 5. attachment as follows: "annex 5 cabinet 1 April 1997 Regulations No 112 City/County building permits for no būvvald ___ ___ valid until 20 ____ of ____ __. _____ ____ ____ ____ _____ issued (a Subscriber (the construction agent) an individual's name, surname, personal code, place of residence, phone number, e-mail address, or the name of a legal person (company), registration number, registered address, phone number) for construction/demolition (site name) Site address or, if no such location – construction type (required mark): new construction renovation restoration reconstruction demolition plot cadastral designation of the building/space groups cadastral designation (completed reconstruction, renovation, restoration and decommissioning) a construction of the author (an individual's first name, last name, ID number, certificate number or the name of a legal person (company), registration number būvkomersant registration certificate number) Būvuzraug (an individual's first name, last name, ID number, certificate number or the name of a legal person (company) , registration number, registration certificate number būvkomersant, registered office, telephone number) Autoruzraugs1 (an individual's first name, last name, ID number, certificate number or the name of a legal person (company), registration number, registration certificate number būvkomersant, registered office, telephone number) Būvuzņēmējs2 (an individual's first name, last name, ID number, certificate number or the name of a legal person (company), registration number, registration certificate number būvkomersant, registered office, telephone number), the public works Director (responsible for the physical person's name the name, identity number, certificate number, phone number) job defensive coordinator (an individual's first name, last name, ID number, phone number), a permit issued on the basis of: 1. a plot of land ownership or use rights and building rights supporting documents 2. construction, (site name) by a subscriber of 20 ___ ____. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ and accepted by _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ būvvald 20 ___ of ___. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ the acceptance number for a construction Projects the total cost of the implementation of the maximum duration of the works-_____ _____ years (corresponding to the Cabinet on 1 April 1997 of Regulation No 112 of the "General provisions" _____ _____). Construction should begin operation up to 20 _____ of ___ ___. _ ___ ___ ___ ___ ___ ____ ______.
City/District Officer of būvvald (position, name, surname, paraksts3) 3 (datums3) This building Z.v. (administrative) within a month of its entry into force may be challenged in the administrative process law (name, address).
The notes. 1 fill out, if contracted for in accordance with the provisions of the autoruzraudzīb on the autoruzraudzīb of the works. 2 do not fill out, if the Builder is built small structures, which do not exceed two storeys and a building area not greater than 400 m2 and būvapjom – about 2000 m3, and if the Builder is also responsible the public works Director. 3 document properties "signature", "stamp" ("Z.v.") and "date" does not fill in, if the electronic document has been prepared according to the law on electronic document design. " 2. This rule 1.14, 1.16 and 1.27. subparagraph shall enter into force on July 1, 2013. Prime Minister Valdis Dombrovskis Economy Minister Daniel Pavļut in