Cabinet of Ministers Regulations No. 897 2013 in Riga on September 17 (pr. No 49 101), amendments to the Cabinet of Ministers of 15 December 2009 regulations "regulations on 1487 operational programme ' infrastructure and services ' 3.5.1.2.3. Appendix apakšaktivitāt" shared the waste management system development "issued under the European Union's structural funds and the cohesion fund management law, article 18, paragraph 10 do cabinet 15 December 2009 regulations" regulations on 1487 operational programme ' infrastructure and services ' 3.5.1.2.3. Appendix apakšaktivitāt "shared the waste management system development" (Latvian journal 2009, no. 203; 2010, no. 174; 2012, 3. No.) the following amendments: 1. provisions be supplemented by the following paragraph 6.5: "6.5. treatment of sewage sludge." 2. Express 7.3, 7.4, 7.5 and 7.6. subparagraph by the following: "7.3. acquisition of containers (except fixed set containers) municipal waste selective collection points; 7.4. waste collection vehicles and other vehicles of acquisition (except for the operation of specialised technical and limited area for lifting and moving motor vehicles); 7.5. equipment and tools for production of biogas; 7.6. the acquisition of fixed assets which do not provide for regulations on waste collection and sorting, sewage sludge and compost use, monitoring and control, as well as for waste treatment facilities. " 3. Make paragraph 10 by the following: "the project applicant has 10 Corporation that: 10.1 has an agreement with the municipal waste management services in the administrative territory; 10.2. contracted with waste operator, has entered into an agreement with the local legislation on waste management in the order; 10.3. concluded the contract with the consignee for the disposal of hazardous waste; 10.4. is water a public service or a medical establishment that received permission to (A) or (B) the category of polluting activities, which include waste management. " 4. Make 16.2. subparagraph by the following: "investment in fixed assets – 16.2 hazardous waste collection and treatment facilities and equipment veterinary care practice sites, including hazardous waste pre-treatment plants (disinfection, crushing);".
5. Supplement with 16.3 and 16.4. subparagraph by the following: "investment in fixed assets-16.3. sewage sludge processing infrastructure and equipping in accordance with laws and regulations for sewage sludge and compost use, monitoring and control; 16.4. the investment in fixed assets, specialized technical and operation limited area for lifting and handling the purchase of motor vehicles, not exceeding 10% of the total eligible costs. " 6. To supplement the provisions of this subparagraph with 18.6.: "18.6. operation of specialised implements and limited area for lifting and handling motor vehicle acquisition costs, which exceed 10% of the total eligible costs." 7. Make the following point 21.1:21.1. the project "the applicant meet the ailing merchant status and have found that: 21.1.1. it is declared by a Court of insolvency proceedings or the judgment of the Court is the legal protection process, or by a decision of the Court of Justice is an out-of-court redress process, the previous bankruptcy, reorganisation or appropriate composition, or the economic activity it has ended; 21.1.2. design submission date of loss more than half of the share capital and the last 12 months – a quarter of the capital, and found 21.1.4. these regulations referred to; 21.1.3. the project at the date of the application in accordance with the last two years, the financial statements and the latest available financial statements of operational project at the time of submission of the application is experiencing difficulty in operating the operator signs – damage increase, the reduction in turnover, declining cash flow, debt, interest payments rise, stock inventories, low liquidity, falling or zero value of assets – and found 21.1.4. these regulations referred to; 21.1.4. it is not possible to cover the losses from its own resources or with the funds it is able to obtain from its members, shareholders, members or creditors, and it could not stop losses, without which national authorities external intervention in the short or medium term will result in the company being unable to continue as a going concern. " 8.21.7. subparagraph be expressed as follows: "the project applicant other 21.7. the Cohesion Fund or the structural funds of the European Union during the implementation of projects is deliberately misled the liaison body or authority, giving false information in connection with that project implementation;". 9. Replace paragraph 23 in the introductory paragraph, the word "six" with the word "seven". 10. To supplement the provisions of this subparagraph with 14.8.: "the seventh draft submission 14.8. selection round redirects the application to the sixth round of the draft framework does not attract the Cohesion Fund co-financing 17 000 000 lats." 11. Supplement with 24.7. subparagraph by the following: "the seventh draft submission 24.7. selection round – up to 1 October 2013." 12. Replace the words in paragraph 25.1. "the newspaper" by the words "Official Gazette". 13. Replace the introductory part of paragraph 26, the words "three months" with the word "month". 14. Replace, in paragraph 27, the words "and the numbers 49, 50, 51 and 52, 54, 55 or 53., 56, 57" with numbers and words "50, 51, 53, 54 and 52.. or 55, 56, 57. 15. Make the following paragraph 33:33. submission of the project "compliance with the quality criteria assessed by giving a certain number of points: 33.1. If application of the project planned for the separate waste collection project infrastructure components, application for compliance with the provisions of this annex 1., 2., 3., 4., 5., 6., in paragraph 8.1 or 8.2, 8.3, 8.4, or under and 12 or. criteria referred to in paragraph must receive at least one point (on each criterion); 33.2. If application of the project planned for the management of hazardous waste treatment infrastructure, the application of the project's compliance with this provision of the annex 3 1., 2., 3., 4., 5., 6, 9.1, 9.2 and 9.3. criteria referred to in subparagraph must receive at least one point (on each criterion); 33.3. If application of the project planned for the separate waste collection project infrastructure components, application for compliance with the provisions of annex 7, paragraph 3, and paragraph 8.2.6.8.3.6., 11, 13, 14, 15 and 16 of the draft criteria referred to in the application may receive additional points; 33.4. If application of the project planned for the management of hazardous waste treatment infrastructure, the application of the project's compliance with the provisions of annex 3, paragraph 7, 9.4., 11, 13, 14, 15 and 16 of the draft criteria referred to in the application may receive additional points; 33.5. If a project planned in the application of sewage sludge processing infrastructure, the application of the project's compliance with this provision of the annex 1., 2., 3., 4., 5., 6, and 10. criteria referred to in paragraph 1 must be received at least one point (on each criterion); 20.9. If application of the project planned for sewage sludge processing infrastructure, the application of the project's compliance with this provision 3.7, 11, 13, 14, 15 and 16 of the draft criteria referred to in the application may receive additional points. " 16. Replace paragraph 34 in numbers and the word "47, 49 and 50." with numbers and the word "48, 50 and 51. 17. Make 35 as follows: ' 35. evaluation the Commission shall assess the project submissions in the following order: 21.8. by this provision in paragraph 34 above, the criteria of the evaluation assesses the project's compliance with other application these rules referred to in annex 3 administrative criteria, project application and project eligibility criteria eligibility criteria for the applicant. If the assessment is in one of the following criteria is "no", the application is rejected and the project evaluation do not continue. If the application of these criteria the project evaluates to "Yes", the application of the project evaluated compliance with quality criteria; 35.2. If the application complies with the project: these provisions 3.35.2.1.1., 2., 3., 4., 5., 6., in paragraph 8.1 or 8.2, 8.3, 8.4, or in or and 12. criteria referred to in paragraph 1 and if the project planned for the separate waste collection project infrastructure components, application 1., 2., 3., 4., 5., 7., 8., 12., the overall quality rating is at least eight points. If the application does not meet these criteria, the application is rejected and the project evaluation do not continue; 35.2.2. This provision of the annex 1., 2., 3., 4., 5., 6, and 9. criteria referred to in paragraph 1 and if the project planned for the management of hazardous waste treatment infrastructure, the project application 1., 2., 3., 4., 5., 6, and 9. quality the overall rating is at least nine points. If the application does not meet these criteria, the application is rejected and the project evaluation do not continue; 35.2.3. This provision of the annex 1., 2., 3., 4., 5., 6, and 10 of the criteria referred to in paragraph and if project planned for sewage sludge processing infrastructure, the project application 1., 2., 3., 4., 5., 6, and 10. quality criteria the overall rating is at least seven points. If the application does not meet these criteria, the application is rejected and the project evaluation do not continue. " 18. Replace the in number and 36.4 word "in paragraph 11" with a number and the word "the" in paragraph 12. 19. Replace the paragraph number and 22.7. the word "13." with a number and the word "14.". 20. Delete 37.2. section. 21. Make 24.0 24.0, 24.1, 24.2 and the following of the paragraph: "24.0 refine. cash flow forecast (annex 3 of the criteria specified in paragraph 32); to specify the project's application 36.6. the planned implementation of the project and projected human resource security (annex 3, paragraph 33 of the specified criteria); 24.1. specify information about publicity measures (annex 3, paragraph 34 of the specified criteria); 24.2. to ensure tax payment under this provision of the annex referred to in paragraph 36 of the criterion. " 22. Add to 43 in the third sentence by the following: "the application of the seventh round of the project activities implemented by the beneficiary until 1 June 2015." 23. the supplement to chapter VI 30.0 points as follows: "If the activity within a 30.0 project has been discrepancy or is terminated the contract in civil law for the implementation of a project, the funding does not match any of the expenses or the amount for liability in the event of breach of contract, may not be directed to implement new projects and additional financing activities in the project to be implemented." 24. Make 2 point 2.1 of the annex by the following: "2.1. Summary of the European Union (hereinafter EU) Fund project activities to be carried out (this information according to the principle of freedom of information in the order and the amount will be available after the entry into force of the decision on the application of EU funds for the project): provide a description of the project, indicating the project activities to be carried out according to the eligible activities: 1. the project apraksts2. The results of the project in progress with waste reduction "25. Express 2. section 8 of the annex by the following:" section 8-proof project applicant project I, the applicant, the name of the officer, first name, last name, job title, to certify that the application of the project while dd/mm/yyyy-the project applicant has the appropriate legal status; -the project the applicant does not have tax debt to the application for the first working day of the month, as well as the full amount is paid, taxes and other State or local minimum payments laid down in laws and regulations in the field of taxation and fee within the time limits; -the project the applicant does not meet the ailing merchant status (it is not a judgement delivered in insolvency proceedings is implemented or not, the legal protection process, with the decision of the Court are not implemented in an out-of-court redress process, not a previous bankruptcy, the project applicant is not in the recovery process, it is not suitable for settlement, it is not terminated, economic or loss does not exceed half of the share capital and the last 12 months of the loss does not exceed a quarter of the share capital as well as under the last two financial years, entered into the financial statements is not observable by the troubled operator of the economic activities and have the opportunity of signs of cover or stop losses); -the applicant is appropriate for the project activity; -the project applicant has sufficient and stable financial resources; -the project applicant is committed to providing financing from its own resources, if the increase in the cost of the project; as a result of the implementation of the project-related infrastructure (equipment, construction) will be the property of the applicant of the project after the implementation of the project and in accordance with the conditions of the activity will be in the region in which the planned activities for aid; -property (land, building), which will be carried, stored or will be in the initial investment of the project is the property of the applicant (registered in the land registry of ownership) or the applicant has long-term lease rights (at least five years after the implementation of the project), attaching to the land; -the project applicant has the right to carry out the works concerned, which works under the project; -the project and its papilddokumento application information true and requested for the implementation of the project of European Union co-financing by the Fund will be used in accordance with the submission of the project description; -the project the applicant did not commit criminal offences that hit the Republic of Latvia or the European Union's financial interests and in accordance with the criminal law is not applied to the forced influence; -the project is not and has not been financed or co-financed from other Union financial sources as well as State and local budgets, and the project planned activities do not overlap with the activities financed by other activities in European Union funds and other financial instruments; -If the project will be approved, this project application will not be submitted for co-financing funding or from other sources of Finance of the European Union, as well as State and local budget resources; -the project is not known to the applicant of the reasons why the project could not be implemented or could be delayed its implementation, and project obligations may make regulations for the implementation of the activity within the time limits; -the project applicant is noticed in the laws on commercial support requirements; -during project implementation will be provided according to the requirements of the laws and the administrative, technical, project and financial management;
-in the course of the project implementation will not be tolerated discrimination based on gender, race, ethnic origin, religion or belief, disability, sexual orientation or age, and will be provided equal opportunities for different groups in society; -project implementation will be provided at the time of the legislative requirements under the publicity; -is a separate economic activities related to waste management, from activities that are related to the public service; -the project the applicant has deliberately misled the liaison body or other authority or the Cohesion Fund co-financed by the structural funds of the European Union during the implementation of the projects, giving false information in connection with such projects. Aware that the project may not approve for co-financing from the Cohesion Fund of the European Union, if the application of the project, including this section, is not fully completed, and of high quality as well as on legislation implementing the planned activities of the European Union cohesion fund financing (for the current year or planning period) at the time of approval of the project has been used up. Aware that the false information given on the proof of due to the above legal persons – project – applicants may be administrative and financial penalties. I certify that the attached copy of the application the project comply with the existing document in my possession of the original and copies of the application, the project and the electronic version of the project submission complies with the original.
Signature: date: dd/mm/yyyy Z.v.

Document properties in the "signature", "date" and "filling" if Z.v. electronic document is drawn up according to the law on electronic document design. " 26. Express 3. attachment the following: "3. the Cabinet of Ministers of 15 December 2009. Regulations No 1487 cohesion fund project application form for the evaluation of PO box Assessment criteria 1. Quality criteria for rating points 1. The degree of ripeness: the project must obtain at least 1 point 1.1. is not a technical specification prepared in the project planned the construction of the object of the purchase notification and regulations construction in accordance with the procedure laid down in the technical design of the project accepted in the planned procurement of construction works 0 1.2. prepare the technical specifications of the project planned the construction of the object of the purchase tender according to law on procurement requirements 1 1.3. developed and legislation in the field of construction in the order provided for accepted project planned in the technical design of object 2 1.4. the project planned the technical design of objects accepted in būvvald 3 2. The planned duration of the project: to obtain at least 1 paragraph 2.1. more than 3 years 0 2.2. It is from 2 to 3 years 1 2.3. is less than 2 years 2 3. The effectiveness of the implementation of the project in relation to the direct waste management infrastructure: the need to have at least 1 paragraph 3.1. autoruzraudzīb and Superintendence of the eligible cost amount is higher than 3.5 percent of project submission planned total eligible costs 0 3.2. autoruzraudzīb and Superintendence of the eligible cost amount is between 3 and 3.5 percent of project submission planned total eligible costs 1 3.3. autoruzraudzīb and Superintendence of the eligible cost amount is from 2.5 to 3 percent (not including) from the project submission planned total eligible costs 2 3.4. autoruzraudzīb and Superintendence of the eligible cost amount is less than 2.5 per cent of the project planned in the application the total eligible costs 3 4. The project risk assessment, including the potential increase in the cost of the project assessment: get the at least 1 paragraph 4.1. the project is not carried out in the application of risk assessment 0 4.2. project risk assessment in the application was made, the plan of measures to prevent the risk identified is not developed or not developed completely 1 4.3. the project is carried out in the application of risk assessment, the risk identified in the plan of measures for the elimination or reduction of incompletely developed 2 4.4. the project is carried out in the application of risk assessment designed substantiated the risk identified in the action plan for the elimination or reduction of 3 5. Project submission is analyzed the possible alternatives to the project (financial, technological, technical solution) and carried out an economic analysis of the project: to obtain at least 1 paragraph 5.1. alternative analysis has not been carried out and the project economic analysis 0 5.2. the analysis performed for only one of the parameters (only the analysis of alternatives or only economic analysis) 1 5.3. analysis of alternatives is conducted and the project economic analysis based on numerical calculations, and justify the proposed alternatives 2 5.4. analysis of alternatives is conducted and the project economic analysis based on numerical calculations, and justify the proposed alternatives, and selected the alternative with the lowest cost 3 6. Waste management to be the life of the infrastructure assessment: the need to have at least 1 paragraph 6.1. infrastructure usage time is less than 5 years 0 6.2. infrastructure usage time is from 5 to 10 years (not including) 1 6.3. infrastructure usage time is from 10 to 15 years 2 6.4. the infrastructure life cycle is longer than 15 3 7. The project cost estimate of the return pointer (separately collected waste (tonnes) relative to the initial project total costs): note. The average project application selection round of cost indicators of return calculates the project submissions that meet the administrative and eligibility criteria – cost of return indicators in relation to the amount of selection round of project submissions.   criterion gives extra points to 7.1. project cost estimate of return is less than the project application selection round of cost indicators of return, and the difference is more than 10 percent 1 7.2. project cost estimate of return is equal to or greater than 10 percent, or 10 percent less than the average of the project application selection round costs ROI Assessment index 2 7.3. project cost estimate of return is greater than the average project application selection round of cost indicators of return, and the difference is more than 10 percent in 3 8. The distributed garbage collection of infrastructure components (project submission is evaluated, if the corresponding component is planned): 8.1. the distributed garbage collection points (DAS) in accordance with the laws and regulations on waste management procedures of the Cabinet of Ministers approved the regional waste management plans – 1 point to 400 residents DAS: must obtain at least 1 paragraph 8.1.1. the project application is specified, the percentage of the population of the municipal waste management region will ensure waste collection 0 shared 8.1.2. DAS planned points will be available for less than 20 percent of the population of municipal waste management region 1 8.1.3. DAS planned points will be available from 20 to 40 percent of the population (not including) municipal waste management region 2 8.1.4. DAS planned points will be available from 40 to 60 percent of the population (not including) municipal waste management region 4 8.1.5. DAS planned points will be available from 60 to 80 percent of the population (not including) municipal waste management region 6 8.1.6. DAS planned points will be available from 80 to 100 percent of the population of municipal waste management region 8 8.2. the composting area planned recycled biodegradable municipal waste: to obtain at least 1 paragraph 8.2.1. the project application is specified, any quantity of municipal waste management in the region during the year, the amount of biodegradable waste is planned to process the composting area 0 8.2.2. the composting area planned to recycle bio-degradable municipal waste is less than 25 percent of the amount of municipal waste management in the region during the year, the amount of biodegradable waste 1 8.2.3. the composting area planned to recycle bio-degradable municipal waste by 25 to 50 percent (not including) of the amount of municipal waste management in the region during the year, the amount of biodegradable waste 2 8.2.4. the composting area planned to recycle bio-degradable municipal waste by 50 to 75 percent (not including) of the amount of municipal waste management in the region during the year, the amount of biodegradable waste 4 8.2.5. the composting area planned to recycle bio-degradable municipal waste by 75 to 100 percent of the amount of municipal waste management in the region during the year, the amount of biodegradable waste 6 8.2.6. a signed contract or agreement or letter of intent with local governments or enterprises for waste acceptance criteria of the composting square 2 gives extra points to 8.3. sorting and handling Centre (including bulky waste) the planned amount of waste treated: must obtain at least 1 paragraph 8.3.1. the project application is specified, any quantity of municipal waste management in the region during the year generated recyclable waste planned to handle the sorting and handling centre 0 8.3.2. sorting and handling Center planned to work with less than 25 percent of domestic waste management in the region during the year generated recyclable waste 1 8.3.3. sorting and handling Center planned to handle 25 to 50 percent (not including) of municipal waste management in the region during the year, the recyclable waste 2 generated 8.3.4. sorting and handling Center planned to handle 50 to 75 percent (not including) of municipal waste management in the region during the year generated recyclable waste 4 8.3.5. sorting and handling Center planned to handle 75 to 100 percent of municipal waste management in the region during the year generated recyclable waste 6 8.3.6. a signed contract or agreement or letter of intent with local governments or enterprises for waste sorting and handling the adoption Center 2 criteria gives extra points to 8.4. in accordance with the regulations on the classification and characteristics of the waste, which makes the waste hazardous, determine the classification of the hazardous waste hazardous household waste collection points, collection of waste planned (names): 8.4.1. the project is not specified in the application, any hazardous household waste will be collected in the collection points must be at least 0 1 paragraph 8.4.2. planned to collect 1 to 5 types (name), hazardous municipal waste 1 8.4.3. planned to collect 6 to 10 type (name), hazardous municipal waste 2 8.4.4. planned to collect 11 to 14 (name), hazardous municipal waste 3 8.4.5. planned to collect more than 14 type (name), hazardous municipal waste 4 9. Management of hazardous waste treatment infrastructure (project submission is evaluated, if the corresponding component is planned): 9.1. hazardous waste treatment point creation: the need to have at least 1 paragraph 9.1.1. the project submission does not specify the type of hazardous waste management 0 9.1.2. hazardous waste 1 9.1.3. hazardous waste storage, the corresponding isolated and temperature 2 9.1.4. hazardous waste storage, the corresponding isolated and temperature conditions, the pre-treatment (disinfection, crushing) 9.2 4. as a result of the implementation of the project intended to provide medical institutions generated hazardous waste management: 9.2.1. as a result of the implementation of the project to ensure the management of hazardous waste treatment facilities, which serve the total number of the population is less than 20 000 inhabitants 0 to obtain at least 1 paragraph 9.2.2. as a result of the implementation of the project to ensure the management of hazardous waste treatment facilities, which serve the total number of the population is between 20 000 and 50 000 of the population (not including) 1 9.2.3. as a result of the implementation of the project to ensure the management of hazardous waste treatment facilities, which serve the total number of the population is from 50 000 to 150 000 inhabitants 2 9.2.4. as a result of the implementation of the project to ensure the management of hazardous waste treatment facilities, which serve the total number of the population is greater than 150 000 inhabitants 3 9.3. as a result of the implementation of the project for the establishment of a hazardous waste collection points and equip them: 9.3.1. as a result of the implementation of the project is not intended to create a hazardous waste collection points and equipping them to be at least 0 1 paragraph 9.3.2. as a result of the implementation of the project is intended to be fitted to the created hazardous waste collection points 1 9.3.3. as a result of the implementation of the project for the establishment of a hazardous waste collection points and equipping them 2 9.4. the operator of hazardous waste hazardous waste management provides outpatient medical authorities to: 9.4.1. hazardous waste operator does not provide outpatient management of hazardous waste in medical institutions 0 criterion gives additional points 9.4.2. the operator of hazardous waste hazardous waste management provides outpatient treatment for authorities 3 10. Sewage sludge processing infrastructure (project submission is evaluated, if the corresponding component is planned): obtain at least 1 paragraph 10.1. handling unknown 0 10.2. storage, also in liquid form (cold fermentation) 1 10.3. in anaerobic decomposition of 2 mezofil 10.4. in anaerobic decomposition of 3 termofil 10.5. termofil aerobic stabilization in 4 .6a. composting 5 10.7. treatment with lime 6 10.8. pasteurization 7 10.9. drying 8 1.1. criteria on horizontal priorities Assessment points 11. The project intended to raise awareness of waste sorting needs: the criterion gives extra points to 11.1. information not intended for 0 11.2. for awareness of waste sorting needs in relation to infrastructure 5 12. Sorted waste, including biodegradable waste, disposal or processing support (sustainable development): obtain at least 1 paragraph 12.1. the reviewer of marketing or processing is unknown or the project is not intended to create a sorting line 0 12.2. signed letter of intent with the potential purchasers of marketing or processing 1 12.3. for marketing or processing contracts concluded, marketing or processing operator is known for marketing or processing is carried out outside national territory 2 12.4. for marketing or processing contracts concluded, marketing or processing operator is known for marketing or processing is carried out in the territory of the country 3 13. Ensure recyclable waste not going into a landfill site for disposal (sustainable development): the criterion gives extra points to 13.1. the conclusion of agreements with the operator of the landfill of non-recyclable waste disposal landfill in adoption 0 13.2. concluded agreements with the operator of the landfill of non-recyclable waste disposal landfill acceptance 3 14. Project applicant's additional financial contribution to the implementation of the project (macroeconomic stability): the criterion gives extra points to 14.1. less than 5 percent of the project's eligible costs 1 14.2. from 5 to 10 percent of the eligible costs of the project 2 14.3. more than 10 percent of the eligible costs of the project 3 15. The project area development index project at the date of the application (of the balanced development of the territory): the criterion gives additional points 15.1. the average territory development index greater than + 1.6 1 15.2. the average index for the development of the territory of 0.57 + 1.6-2 15.3. the average index for the development of the territory less than – 0.57 3 16. After the project implementation in the region created more jobs (of the balanced development of the territory): the criterion gives additional points 16.1. additional jobs are generated in 0 16.2. additional jobs created Riga planning region 1 16.3. additional jobs created in other regions, with the exception of planning in the planning of Riga region 2 2. Eligibility 2.1. submission of project eligibility criteria Yes/No/NA 17. Activities under the project to conform to the approved regional waste management plan N (NA) 18. Project activities described in the application meets the legislation on waste collection and sorting, sewage sludge and compost use, monitoring and control, as well as medical institutions, waste management requirements N 19. Project activities described in the application meets the regulations for the implementation of the activity specified in the activity purpose N 20. Project activities described in the application meets the regulations for the implementation of the activity of the eligible actions provided for N 21. The project's eligible costs included in the submissions comply with the laws and regulations on the implementation of the activity of the eligible costs laid down 22 P. Application of the project not included in the eligible costs comply with the laws and regulations on the implementation of the activity not specified eligible costs P 23. Project project description in the application provides the information you need about action to be taken: N 23.1. given the technical characteristics of the activities to 23.2. planned monitoring indicators are clearly defined and measurable, and they meet the purpose of the activity 23.3. provides a location for operations within the territory of 23.4 implementation. given what economic benefits 23.5. actions to provide qualitative and quantitative environmental benefits 23.6. actions to provide qualitative and quantitative contribution to the European Union and the Republic of Latvia on the implementation of the requirements of environmental protection and waste management in the area of 23.7. describe the principle of the "polluter pays", the project 24. Time schedule of the project comply with the planned project activities P 25. Project information provided in the application certifies that the applicant will ensure the implementation of the project on the sustainability of the project results: N 25.1. administrative capacity corresponds to the planned activities of the project, 25.2. are appropriate to the planned project results in operating the infrastructure built and maintenance cost of 25.3. It is planned according to the tariff of the service, which will provide the necessary project fixed assets resulting from the operational and development costs (in the case of a loan-repayment of the loan also) 25.4. is or will be available to staff as a result of the implementation of the project generated asset operation 26. The project specified in the execution of the application (for example, composting area, separate waste collection points) Indicators correspond to the description of the project and includes key works that describe the project objectives N 27. Project cost-benefit analysis carried out by applying: N 27.1. the real social discount rate or the appropriate nominal discount rate of 27.2. the real financial discount rate or the appropriate nominal discount rate of 27.3. the appropriate conversion factor scores 27.4. According to the medium-term and long-term forecasts 28. Project financial analysis confirms the financial stability of the project N 29. The requested funding from the Cohesion Fund aid intensity justified by cost-benefit analysis N 30. Project total cost does not exceed the activity project application selection within the Cohesion Fund co-financing available N 31. The project budget includes cost: N 19.3. include all project costs required for the positions of 31.2. is under construction for the 31.3. are reasonable and justified, as are laid down for the implementation of project activities required costs (cost calculation assumptions) 19.5. It is directly necessary for the implementation of the project of 31.5. meet the projected market price 32. Project cash flow forecast: P 32.1. displays both the demand and the cost of funding forecast 32.2. meet the planned time schedule for carrying out the project of 32.3. comply with the financial plan of the project 33. The project planned in the application project implementation and human resources ensure planned legislation for the management of European Union funds and the introduction of certain functions of the beneficiaries: P 33.1. Project administrative (e.g., procurement, contract administration, record keeping) control, 33.2. project finance (for example, accounting and payments, financial planning) management 33.3. the technical project (such as the reconciliation of design and construction, work progress reports, and report preparation) management 34. The project planned publicity and visual identity measures comply with the laws and regulations of the European Union's structural and cohesion funds publicity and visual identity assurance requirements the project applicant 2.2 P eligibility criteria yes/no/NA 35. The project, the applicant is a corporation, which has a contract with the municipal waste management services in the administrative territory or contracted with waste managers, who has entered into a contract with the local legislation on waste management in the order, or contract with the consignee for the disposal of hazardous waste, or the project, the applicant is a corporation – water management in the public service or the medical establishment, which authorised A or B category contaminating activities that includes waste management N 36. The project applicant is not tax debt to the application for the first working day of the month (the project has stated that the applicant has paid the taxes and other State and local government at minimum payments in full and laws in the area of taxation and fee limits set) P 37. The project, the applicant stated that it is not a judgement delivered in insolvency proceedings or is not implemented in the legal protection process, or by a court decision is not implemented in the out-of-court redress process, the project applicant is not in the recovery process, the economic activity is not terminated, the loss does not exceed half of the share capital and the last 12 months of the loss does not exceed a quarter of the share capital, as well as under the last two financial years, entered into the financial statements is not observable by the troubled operator of the economic activities and have the opportunity of signs of cover and stop losses   N 38. The Corporation that made the project application under the regulations, arrangements for issuing and withdrawing authorisations for waste management of the required permits have been issued to the nature and extent of the waste management N (NA) 39. Project assessment of the financial situation of the applicant certifies the Corporation's financial stability after the implementation of the project N 40. The project has shown that the applicant will provide funding from its own resources, if the increase in the cost of the project N 41. Project applicant has stated that the project would result in infrastructure (equipment, construction) will be the property of the applicant of the project after the implementation of the project and in accordance with the conditions of the activity will be in the region, which was planned activities support N 42. Property (land, building), which will be carried, stored or will be in the initial investment of the project is the property of the applicant (registered in the land registry of ownership) or the applicant has long-term lease rights (at least five years after the implementation of the project), attaching to the land registry N 43. Project applicant has stated that it has the right to carry out the works concerned, which within the framework of the project for the construction works N 44. The project has shown that the applicant has provided false information in relation to the European Union's structural and cohesion funds, the implementation of projects co-financed N 45. The project has shown that the applicant has not committed a crime that hit the Republic of Latvia or the European Union's financial interests, and the trader under criminal law is coercive influence N 46. The project has shown that the applicant has not received or intended to receive support for the same eligible costs of other activities in the framework of local, regional, national or European funds of the Union N 47. Project applicant has stated that it is noticed in the laws on commercial support for the requirements of the project, the applicant is not N 29.3 punished for the Latvian Code of administrative offences article 189.2 of the referred to in the third subparagraph or administrative offences it is not appropriate to the means of influence on the coercive criminal law article 280 referred to in the second paragraph of Commission of a criminal offence, the applicant of the project N 47.2 has stated that it will separate economic activities related to waste management from activity related to public service N (NA) 3. Administrative criteria yes/no/NA 48. The project proposal is submitted to the responsible authorities within the specified N 49. Project submission has been prepared according to the application form for the activity N 50. Project submission prepared for the Latvian language N 51. Project submission prepared into N 52. Project submission signed by the responsible person or authorised person's 53 N. The project application submitted to the original and two copies, as well as the electronic version of that annex contains only the cost benefit analysis (where the application is filed in paper form) P (NA) 54. Both the project the original and the copy of the application submitted to the caurauklot, of the attached document pages numbered (if the application is filed in paper form) P (NA) 55. The project application and attachments are presented according to the electronic movement of documents regulatory requirements in laws (where the application is filed in electronic form of a document) N (NA) 56. Project application signed with a secure electronic signature (if the application is filed in electronic form of a document) N (NA) 57. Project submission developed in DOC, xls, PDF or JPG file format (if the application is filed in electronic form of a document) N (NA) 58. Project application form filled out all sections 59 N. The project attached to the application for all specified attachments: P 59.1. prepare technical specifications for the procurement of the works tender in accordance with the laws and regulations on the procurement procedure (NA) 59.2. developed and legislation in the field of construction in accordance with the procedure laid down in harmonised technical project or the accepted technical project būvvald (NA) 59.3. construction (NA) 59.4. statement, with its municipal administrative territory of planned infrastructure that the project complies with municipal planning or detailed (NA) in 59.5. Environmental monitoring national Office opinion on the environmental impact assessment of the final report or the decision on the environmental impact assessment procedure, the non-application of 37.0. (copy) with the Corporation about the provision of waste management services in the administrative territory of the (copy) or a contract with waste managers, who has entered into a contract with the local legislation on waste management, or in accordance with the procedure laid down in the Treaty (copy) to the recipients of services for the management of hazardous waste (NA) 59.7. permit (copy) the nature and extent of the waste management of 59.8. credit agreement (copy) or a document issued by the lending institution (copy), certifying the granting (NA) 59.9. project cash flow forecast for the legend. N – If a negative rating, the application is rejected. P – a decision on project approval with conditions (project applicant must ensure compliance with the criteria, specifying the project submission within the time limit laid down in that decision). NA (not applicable)-if the specified criteria are not attributable to the applicant of the project, the project is assessed for this criterion. " Prime Minister Valdis Dombrovskis of environmental protection and regional development Minister Edmund Sprūdž in