Advanced Search

Amendments To The Cabinet Of Ministers Of 13 November 2012 Rules No. 769 "rules On Stationary Technological Equipment For Membership Of The European Union's Emissions Trading System"

Original Language Title: Grozījumi Ministru kabineta 2012.gada 13.novembra noteikumos Nr.769 "Noteikumi par stacionāro tehnoloģisko iekārtu dalību Eiropas Savienības emisijas kvotu tirdzniecības sistēmā"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 368 Riga 2014 (1 July. No 36 20) amendments to the Cabinet of Ministers of 13 November 2012 rules no 769 "rules on stationary technological equipment for membership of the European Union's emissions trading system" Issued in accordance with the law "on pollution" in the third paragraph of article 24 and paragraph 1 of the seventh part of the first paragraph of article 30 and article 45 of the first and the seventh part and the law "on conformity assessment" 7. the first part of the article do cabinet 13 November 2012 rules no. 769 "rules on stationary technological equipment for membership of the European Union's emissions trading system" ( Latvian journal, 2012, nr. 190.) the following amendments: 1. To supplement, on the basis of the provisions of the law issued in seventh paragraph after the words "with the words" and the number "and the law" on conformity assessment "7. the first part of the article". 2. Replace the text, the words "emissions register" (fold) with the words "emissions register" (fold). 3. Make a point 15 as follows: "15. Authority within 10 working days of the receipt of the application for authorisation in writing or electronic document in the form of laws and regulations on electronic document design inform operator about the additional information required if permission is not specified in the application to all environmental laws regulating certain information or additional documents, if the application does not have permissions to add all the descriptions or attachments or information have been added supporting documents." 4. Make the following paragraph 21: ' 21. Administration within two working days after receipt of the authorization to place the national environmental service website, giving the date, which shall not be less than 15 working days, by which the public can submit proposals. The Administration said the application electronically: 21.1. its Government or City Hall, where the operator is located in steady technological equipment; 21.2. The protection of the environment and regional development Ministry; 21.3. the State limited liability company "Latvian environment, geology and Meteorology Centre" (hereinafter referred to as the Latvian environment, geology and Meteorology Centre). " 5. the introductory part of paragraph 31, the express and 31.1. subparagraph by the following: "31. The Operator shall make any amendments installation monitoring conditions and submit the application for permit amendments required, drawn up in accordance with the provisions of annex 1, in the following cases: 31.1. If the operator plans to change, its action or operational level of the equipment due to power cuts or equipment expansion, including getting your property all other operator-owned fixed technological equipment or hiring any other operator-owned fixed equipment;". 6. Express 32, 33 and 34 of this.: "32. This rule 31.2. and 19.5. in the case referred to in subparagraph operator application for authorisation shall submit the necessary amendments the Administration at least 45 days before the change of law implementation in annex 2 in the operation or in the conditions of the monitoring plan. 33. This rule 31.1. and 31.3. in the case referred to in subparagraph operator application for authorisation shall submit the necessary amendments the Administration at least 15 working days before the change of law implementation in annex 2 in the operation or in the conditions of the monitoring plan. 34. The Board examined 15 working days 32. these rules and application referred to in paragraph 33 and, if necessary, request additional information about the operator's planned changes, as well as, if necessary, extend the period within which the decision on the amendments to the permit. The operator shall submit the requested information within 15 working days after receipt of the request of the Government. " 7. Supplement with 36.3. subparagraph by the following: "operator does not submit the 36.3. additional information required under paragraph 34 of these rules." 8. Express 45. paragraph by the following: "45. within 10 working days of the Board evaluated this provision in paragraph 44 of the applications and shall decide on the revocation of the authorization granted. With the exception of the law "on pollution" referred to in part 3.1 of article 24.1 of the cases, the permit is cancelled by the Board's decision on the date of entry into force in respect of the operators, which are not law "on pollution" 24.1 referred to in the third subparagraph of article operators. " 9. Express 46.1.46.2. in this section and: "46.1. it finds that the machine has finished its operation, including your facility if the operator is not used in the production or use thereof is not possible, the operator all your owned stationary technological equipment has been sold or rented, the dismantling of the (operation of transferred to another operator, so the machine will no longer carry law leaseholders in the activities referred to in annex 2, which in turn take the renter of equipment); 46.2. except in law "on pollution" referred to in part 3.1 of article 24.1 of the cases, it is concluded that the equipment, which has made the law referred to in annex 2 of the action, no longer carry any of the laws referred to in annex 2 of the action or that the equipment no longer complies with the rules referred to in annex 2 of the operating conditions (also if the operator operates the only law "on pollution" in article 24.1 of part 2.1 1 and 2 such equipment); ". 10. Express 48, second sentence as follows: "the emission report prepared using a single European Commission developed the emissions report form and in the light of Regulation No 601/2012 in annex X annual report the minimum content." 11. the express section 75.2. the following wording: "75.2. the operator's reorganization, including the operator, and in accordance with the laws and regulations on pollution, the new operator, the Board has not submitted a written declaration that will prepare and submit a report on the emissions of the entire calendar year, which occurred in the operator;". 12. Delete 75.4. section. 13. Express 78. the introductory paragraph as follows: "78.  within 15 working days after the rules referred to in paragraph 75 of the report of receipt or issue of each year to 31 March to this rule referred to in paragraph 74 of the report, the issue of governance: ". 14. Make the following paragraph in 82.1: "82.1. operator does not submit the rule referred to in paragraph 74 of the information or it is submitted after 30 April of the year." 15. Express 84. paragraph by the following: "84. National environmental service in accordance with the provisions of paragraph 82 of the calculated or defined operator uses emissions: 84.1. operator natural resources tax calculation in accordance with the laws and regulations on natural resources tax, if the operator has not submitted information in accordance with this provision, paragraph 74 and have not made the transfer of emission allowances in accordance with the laws and regulations on the operations of the emission register; 52.3. operator the amount of the administrative penalty for evaluation in accordance with the code of administrative offences, art. 84. " 16. the express section 85.1. the following wording: "85.1. Administration on April 1, or the next working day after 1 April of the operators concerned shall inform the Latvian environment, geology and Meteorology Centre". 17. Supplement with 87.1 points by the following: "national environmental service 87.1 within five working days after the decision, sent to the Latvian environment, geology and Meteorology Centre 45. these rules and decisions referred to in paragraph 46 of the licence." 18. in paragraph 89 of the following expressions: "89. National Environment services on its Web site: inserts 89.1. Regulation No 600/601 Regulation No 2012/2012 under detailed guidance documents, support documents and tools; 89.2. the sample submission form for authorisation (annex 1) and the monitoring plan form – proposals for the operation of the equipment monitoring the operator conditions; 89.3. This provision of annex 2, paragraph 28 a list of laboratories which are accredited in accordance with standards LVS EN ISO/IEC 17025:2005, but that analysis is to be recognized in annex 2 of the law on these activities for the monitoring and reporting the required data; 89.4. the sample form (annex 3); 89.5. all operators of the authorization granted, as well as in the monitoring plan and monitoring conditions; 55.7. managerial decisions on the amendment of the authorisation for the refusal to issue a permit and licence; 55.7. This provision 48. emissions report referred to in paragraph form; 89.8. the operator submitted the annual emissions report verifiers, and regulatory decisions on the approval of the report or refusal to approve it; 55.9. administrative decisions taken in respect of operators on these rules and Regulation No 601/2012 specified defaults. " 19. To supplement the provisions of this paragraph 94: "94. amendments concerning the second sentence of paragraph 48 editorial change and deletion of annex 4 apply to emissions reports on action taken on 1 January 2014." 20. Make annex 1 as follows: "annex 1: Cabinet of Ministers of 13 November 2012 rules no 769 Applications for greenhouse gas emissions permit _____ _____ _____ _____ _____ _____ _____ _____ (specify periodu1) national environment service regional environmental pārvaldei2
 

The operator's name or the first name, last name, contact info: address phone and fax number, e-mail address, registration number of the register of enterprises, the operator's unified registration number or social security number, date of registration with the register of enterprises of the commercial register or companies register, ruling the company name, if the operator is dependent on the society the Group Operator authorized contact name contact details: address, phone and fax numbers e-mail address the name of the machine the location address (including postal code and country) code of the territory's geographical location koordinātas3 ° ° ʹ ʹ ʺ   ʺ (n) (e) other equipment issued to environmental legislation in specific authorisation number (specify the nature of the permit) 4 equipment owner's name or the name of the owner contact details: address, phone and fax numbers e-mail address registration with the register of enterprises, the operator's unified registration number or social security number, date of registration with the register of enterprises of the commercial register or companies register, A section of the law "on pollution" 2. polluting activities referred to in the annex of emissions monitoring plāns5 (operator only fills in sections points that corresponds to a given transaction) 1. Monitoring plan form sections that relate to a specific operator's equipment, which made the law "on pollution" in annex 2 to these polluting activities applied in the monitoring conditions. 2. the monitoring plan annexed to form the name of the Excel file. (B) section summary information about equipment darbību6 3. Technological equipment and operation (including the technology used), including: 3.1. best available techniques; 3.2. the introduced and planned cleaner production measures. 4. Fuel, raw materials and auxiliary materials, the use of which causes CO2 emissions and production, for which the data are used to calculate the CO2 emissions from the production processes. 5. installations for the source of CO2 emissions and CO2 emissions (estimated CO2 emissions in accordance with the monitoring plan). 6. Determine annual CO2 emissions apjoms7. 7. monitoring and reporting of planned measures. (C) section Pielikumi8 8. Optional attachments include: 8.1. monitoring plan form: 8.1.1. the section relating to the specific operator plants made in the law "on pollution" in annex 2 to these polluting activities applied in the monitoring conditions (operator only fills in sections points corresponding to the activity in question); 8.1.2. the monitoring plan annexed to form the name of the Excel file that was created so as to include the operator (the company's) and the machine name; 8.2. diagram that represents the source of emission sources, feeds, sampling and measurement devices; 8.3. all relevant emissions list of common activities, as well as the restrictions and transitional stages (including emergency periods or when running the machine into service) and in the process, you add to the list schema, if the operator is to be used for the determination of emissions measurement-based methodology. (D) section in the Operator's certification I certify that the information provided in the application is true and accurate.
The operator or the operator's authorized person name signature date phone number z. v.  
  National environmental services _____ _____ _____ _____ regional environmental administration marks the date of receipt of the application, ____ ____ ____ ___ national environment service regional environmental management officer: name signature date Z. v.  
  The notes. 1. According to the law "on pollution" fifth of article 24.1. 2. Specify a specific national environment service regional environmental administration, which submitted the application. 3. The location on a map, the location of buildings and facilities in the territory, which indicates the equipment appropriate for the map scale 1:25000, 1:10000, 1:5000 or 1:500 (attach). 4. the category A or category B for the activity of a pollutant or pollutant activities in category C certificate number, date of issue and issuing. 5. the Operator shall develop proposals for monitoring the conditions of the monitoring plan, using a single European Commission developed the form and monitoring plan in accordance with the Monitoring and reporting set out in annex I of the regulation, the monitoring condition minimum content. 6. This section includes a summary of the information that does not have specific technical descriptions, and terms to make it easy to understand. 7. The average verified emissions of the year based on the previous marketing period, or, if such data are not available or usable, objectively determined annual average emissions, including CO2 moved, but not including CO2 from biomass. 8. This section includes a list of all the documents attached to the application, stating their name and the file name, and format. " 21. To complement the chapter IV of annex 2 with 17.1 points as follows: "17.1 if the operator used in Regulation No 601/2012 article 31 paragraph 1 referred to" b "emission factors used in the greenhouse gas emissions inventory preparation of units in accordance with the laws and regulations on greenhouse gas emissions inventory national system of units and which are available to the public limited liability company" Latvian environment, geology and Meteorology Centre "website then the operator must use this emission factor, which refers to the year in question in the fuel used physico-chemical indicators. " 22. Annex 3 to express the following: "3. the Cabinet of Ministers of 13 November 2012 rules no 769 greenhouse gas emissions permit no. ____ ____ ____ ____ ____ ____ ____ ____ ____ __ (point periodu1) national environmental services _____ _____ _____ _____ _____ regional environmental pārvalde2 Operator's name or the first name, last name, contact info: address phone and fax number, e-mail address, registration number of the register of enterprises, the operator's unified registration number or social security number, date of registration with the register of enterprises of the commercial register or companies register, ruling the company name If the operator is dependent on the society the Group Operator authorized contact name contact details: address, phone and fax numbers e-mail address the name of the machine the location address (including postal code and country) code of the territory's geographical location koordinātas3 ° ° ʺ ʹ ʺ ʹ (n) (e) the equipment owner's name or the name of the owner contact details: address, phone and fax numbers e-mail address registration with the register of enterprises , a merchant in the unified registration number or social security number, date of registration in the register of companies or company in the commercial register of the date of the application for authorization of the law "on pollution" referred to in annex 2 of the polluting activity (in accordance with the monitoring plan c. section 5 c): 1 2 3))))        
Equipment operator shall submit an application for authorization, in accordance with the law "on pollution" in the third paragraph of article 24.1 (mark with X) permission is issued (mark with X): new equipment to an existing facility permit is amended (mark with X) gives you the right to Permit (operator's name) in the light of the conditions referred to in the authorization to issue the following greenhouse gas (mark with X): N2O CO2 PFCS national environment service Regional Director of environmental management date (the word name, signature) v Z.  

Date of issue of the place of A general information section about permission

1. the regulations on the basis of which the authorization was issued and appropriate laws and regulations. 2. information on the authorisation for this operator category A or category B for the activity of a pollutant or pollutants in category C activities. 3. A copy of the permit. 4. The information to be classified as a restricted access information. (B) section Log activity and information given in the application for the permit assessment 5. Law "on pollution" referred to in annex 2 and their polluting emissions short description. 6. information about facilities that make the law "on pollution" 2. pollutants listed in the annex,-location and location. 7. the process of adoption of the decision: 7.1 the proposals submitted by national or local government bodies of the proposal; 7.2. the company's proposals. 8. Submission of information specified in the rating: 8.1. best available techniques; 8.2. the introduced and planned cleaner production activities; 8.3. use of resources (energy, fuel, raw materials and consumables); 5.2. information about environmental management and audit system registry. (C) the conditions of the authorization section 9. list of equipment covered by this permit. 10. the conditions for the operation of the equipment. 11. conditions for the use of plant resources-energy (heat and electricity), fuel, raw materials (including heat and electricity used as raw material for production) and consumables. 12. conditions in the facility emissions trading systems and the monitoring of emissions in accordance with the permissions attached in annex 1 of the monitoring plan: 12.1 operating data monitoring (in accordance with the monitoring plan); 12.2. the emission detection method and the parameters used in the establishment; 12.3. the monitoring and reporting used in data flow and control. 13. conditions for sampling, if the calculation factors are determined using analysis in accordance with the permissions set out in annex 2 of the sampling plan. 14. conditions for the State environment inspectorate regular checks. (D) section in the Operator's obligations in terms of the annual emission conditions 15. messages: 15.1 emissions reporting and verification; 15.2. the emission reporting procedures; 15.3. evaluation of the emission reports. 16. the conditions the operator's obligations in respect of emission data and the emission emission allowance transfer. 17. Information requirements regarding environmental protection institutions, if the conditions of the permit have been violated. 18. amendment of the authorisation conditions. In annex 19.  Annex 1 – installation of the law "on pollution" referred to in annex 2 and their polluting emissions monitoring conditions (in accordance with the operator's monitoring plan prepared form). 20. Appendix 2 – sampling plan (if applicable). 21. Annex 3-diagram: 21.1. diagram that represents the source of emission sources, feeds, sampling and measurement devices; 21.2. equipment process performed by the scheme, if the operator is to be used for the determination of emissions measurement-based methodology. 22. Annex 4 – public authorities, other bodies, on the date of authorisation and the conditions of the Protocol meeting with the operator and the authorities, opinion on the conformity of the equipment, the information provided in the application (if applicable). The notes. 1. According to the law "on pollution" fifth of article 24.1. 2. Specify a specific national environment service regional environmental governance, which filed the application. 3. The location on a map, the location of buildings and facilities in the territory, which indicates the equipment appropriate for the map scale 1:25000, 1:10000, 1:5000 or 1:500 (add). " 23. Deletion of annex 4. The Prime Minister is the Rapidity of the Newsletters of the protection of the environment and regional development Minister novel Naudiņš