Cabinet of Ministers Regulations No. 633 Riga 2014 14 October (pr. No 55 38) of road and street issued in accordance with the provisions of the construction Act, article 5, paragraph 2, first subparagraph and the second subparagraph of paragraph 2, the General questions 1. determines: 1.1. National Road (national road), County Road, street, House road (hereinafter referred to as the roads and streets) and merchant road construction process procedures involved in building institutions and responsible būvspeciālist; 1.2. the construction process the necessary documents and their contents; 1.3. building permits, certification card and include in the explanatory memorandum; 1.4. derogations harmonisation; 1.5. construction expertise; 1.6. the control of the construction process and the rule of law, accountable institutions; 1.7. building preservation order; 1.8. location of the uzmērījum building procedure and a procedure acceptable to the permanent building commissioning; 1.9. guarantee terms of the works by making permanent structures. 2. Subject to the provisions of the new public road, road and street merchants road construction, as well as to the existing public road, road and street merchants road reconstruction, rebuilding and demolition. 3. the term "road", "the road" and "Street" in these terms are used according to the law "on the road" and the Highway Traffic Act definition laid down. 4. these rules in a particular State road construction process control and the rule of law is responsible for the State joint stock company "Latvian state roads" (hereinafter referred to as the company), but the construction law 6.1 of the first paragraph of article 1, point "b" in the case referred to in point on the control of construction works and justice is responsible for the construction of national control Office (hereinafter the Office). 5. these rules in a particular road and street merchants, as well as road construction process control and the rule of law in the administrative territory of the būvvald, but responsible construction law 6.1 of the first paragraph of article 1, point "b" and "c" in the cases referred to the work control and justice is responsible for the Office. 6. National Road, road and street as well as merchant traffic during road construction works shall be used according to the traffic organization scheme, which the legislation in accordance with the procedure laid down in the joint stock company, but road and street construction in accordance with the relevant applicable also in the road Manager. 7. A Person is entitled in certain documents in these provisions for limited company, būvvald or Office electronic document, if the document has been prepared according to the law on electronic document design. 2. the provisions of the public road 2.1. national road construction process necessary documents and their contents 8. take engineering research to develop a construction plan for the minimum (sketch design) or construction, guiding and monitoring the works, as well as expertise in the framework of these rules is entitled būvspeciālist with independent practice rights in the sphere of action. 9. the new national road construction, existing national road restoration, conversion or demolition must receive building permits (annex 1). Building permits shall be issued by the company. 10. to decide on the new national road or stage construction and its best position, before receiving the construction permit is designed research projects whose content is determined by the customer in the design task based on Latvian standards LV 190-1:2000 "road design rules – part 1: travel route". Research projects shall include technical and economic assessment of the environmental impact assessment report, if required by law. 11. If a solution for the preparation of the project (development) necessary to make topographical uzmērījum, engineering research and constructive round of bearing capacity calculation, the Subscriber shall take a decision on the construction plan. 12. in order to get a building permit, the proposing construction of the limited liability company shall submit construction plans. The application shall state: 12.1. buildings; 12.2. types of construction; 12.3. national road route/index. 12.4. the national road, the location of the national road network (km); 12.5. General requirements for construction; 12.6. the planned construction schedule plan; 12.7. the planned key types (izbūvējam or pārbūvējam in a constructive, planned traffic organization technical resources); 12.8. the planned lifetime of capital investment. 13. Shares of the company on the construction plans adopted within one month of receipt of the application for the construction plans. Notification of the decision taken by the construction plans, the application shall be published on the company's website on the internet. 14. A permit shall include the following: 14.1 conditions design including: 14.1.1. type of construction (building project or a simplified renewal projects); 14.1.2. for the reconciliation of receipts from an adjacent real estate property owners; 14.1.3. the special rules for technical or from State and municipal institutions; 14.1.4. technical regulations received from the owners of the inženiertīkl; 14.1.5. environmental accessibility, if it should ensure appropriate laws and regulations; 14.1.6. for other permissions from authorities in the receiving institutions; 14.1.7. construction parts and other requirements of a construction detail, according to the local government building regulations; 14.1.8. the inspection of the construction plan (if necessary); 14.1.9. evaluation of the acceptability of the use of the construction works or after completion of the works before construction commissioning terms of use; 14.2. the conditions for the opening of the works, including requirements for: 14.2.1 deliverable documents on responsible for the works and the būvspeciālist liability insurance; 14.2.2. the documentation to be submitted to the responsible būvspeciālist (related articles, autoruzraudzīb); 14.2.3. the documentation to be submitted for registration process for fixation of the works (public works magazine, autoruzraudzīb magazine, building plan); 14.2.4. national cultural monuments protection inspection permit, if the work provided for in the national protected cultural monument protection zone or, if provided for by law; 14.2.5. the provision of information on the work of the works and whom defensive coordinator; 14.2.6. other documents if required by laws and regulations; 14.3. time limits the construction permit conditions. 15. Construction permit is issued to the time that the national road the construction of the proponent has planned for construction under certain conditions the design deadline, the commencement of the construction works of the period and the conditions for the duration of the works. 16. national road construction and design requirements determined by the Subscriber in the design task based on Latvian standard LVS 190-6:2009 "road design rules" part 6 "road and bridge construction and design". 17. the national reconstruction of road and bridge construction projects in a simplified design. The content of the simplified construction and design requirements determined by the Subscriber, the design and consists of: 17.1 defect; 17.2. work quantity list; 17.3. an explanatory description. 18. The Subscriber before the construction plans to the application may decide on the necessity of construction of road or bridge. This information indicates the construction intentions in the application. 19. before the decision on the construction of development engineering studies the composition and abundance of the adopted national road owner, detailed description of the design tasks in a minimum amount of current construction engineering studies, as well as the most important technical specifications, regulations and standards to be followed when designing projects. 20. If you plan to retrofit public road or constructing a new State Highway, State Road constructing elements outside the road land partition borders or bar the red line boundaries, being developed for the minimum construction (design project), which shall be submitted together with the application for a building permit. Construction of minimal composition includes: 20.1. emerging or pārbūvējam country road or bridge main technical parameters-project, šķērsprofil; 20.2. the construction or conversion of the necessary land and land acquisition solutions; 20.3. the documentation necessary for the construction plans public consultation (if needed). 21. A construction developer building the design conditions for the duration of the evaluation of the projects submitted to the Corporation. 22. If the company finds that not all design conditions or have not received all the required consent from third parties, it instructs the developer projects to address deficiencies. 23. the Construction of the developer is obliged to address deficiencies and submit projects for consideration again in the company building the design in terms of execution time. 24. Design conditions evidenced by the marks of having building permits on the basis of harmonised construction plan of the Subscriber. After the building of the mark on the design conditions the client is entitled to initiate the commencement of the construction works conditions. 25. the construction of coherent or simplified construction period of validity is two years. If, within that period, the works have not been started, you must renew a construction-need new reconciliation, to assess changes in nature, as well as, if it allows the construction of the planned implementation deadline, construction must be updated according to the current standard and specification requirements. 26. the commencement of the construction works, the conditions must be met within four years from the date of the building permits checked in for design conditions. Commencement of the construction works due to conditions shall not be included in the time when the construction conception for marketing funding was not available. 27. the projects to be implemented in the derogation only with the consent of the Subscriber, and may suggest the following participants of the construction process: 27.1. customer; 27.2. building project developer; 27.3. būvekspert; 27.4. public works Director; 27.5. civil engineer; 17.1. būvuzraug. 28. The client is obliged to request a derogation from the coordinated projects with a construction developer. If a construction developer indents do not match, the final decision on the implementation of the derogations adopted a Subscriber, based on the opinion of another building project developer, who is responsible for the conformity of the construction of the derogations granted, et seq of the law, as well as the designer and the principal civil procedure requirements contracts. 29. The Subscriber has the right to order the design projects for other derogations, the developer who takes responsibility for the possible consequences of deviations. 2.2. Construction expertise 30. If a construction expertise is not mandatory, the decision on the construction expertise to adopt and fixing the amount of the principal expertise. 31. If the General provisions provide for mandatory inspection of projects, within the būvekspert: 31.1. determine the conformity of a construction design task, regulations, technical rules and standards; 31.2. check the load-bearing structure bearing capacity calculations – a combination of the choice assignments, cover design, bridge supports and span structure bearing capacity and dimensions. 31.3. the checks provided for in the constructive solution to construction and material selection construction compliance functionality and longevity; 19.5. verify work quantity calculation for accuracy and compliance with construction drawings and specifications. 2.3. Works 32. Commencement of the construction works on the fulfilment of the conditions of having planning permission tags after construction contractor has submitted all documents specified in the building permit. 33. national road construction may begin after planning permission is done in markup design conditions and the commencement of the construction works and the building conditions become undisputed. 34. in the General būvnoteikumo of the principal cases of construction quality control of the būvuzraug call. Building out your hired būvuzraug. The order of the building and the building is fixed in the contract, subject to the General būvnoteikumo. 35. in the General būvnoteikumo of the principal cases call for a construction autoruzraudzīb of developers. Autoruzraudzīb optional national road. 36. prior to the commencement of the construction works shall provide to the owner of the public road and public works contractor takes the place of the construction (construction-renewable part). 37. the construction site of the transfer Act (annex 2) determines the operator's responsibility for the works traffic, as well as for the maintenance of the place of the construction works to the extent provided for in the Treaty. 38. the construction site is located in the following documents: 38.1. construction plan; 38.2. the work journal; 23.8. Special construction journals, as specified by the client; 23.9. autoruzraudzīb log (if autoruzraudzīb); 38.5. cover the works, if they are not aligned with the approval of the works; building materials and construction products 24.0. compliance with supporting documents; 24.0. volume uzmērījum. 39. participants in the works executed for fixation of the work and to control the works fill out public works magazine. 40. all structures during construction works, which are settled with other constructive step, cover the work to be drawn up of the adoption Act (annex 3). Cover of the work in making the customer or its representative, the reviewer, būvuzraug works by performing the Superintendence, and autoruzraug, if you autoruzraudzīb. 41. the quality of the works is responsible for the works. The quality of the works may not be lower than būvnormatīvo of Latvia, relevant standards, building regulations and other laws or works contracts laid down in the quality of the works. 42. After completion of the works be prepared on completion of the works Act (annex 4). The operator shall provide to the works and the client accepts the updated construction sites (construction). With the completion of the works on signature ends the operator responsibility for the works construction site maintenance and traffic organisations. 2.4. National Road preservation procedures 43. Decision on national road preservation is accepted by the Subscriber. 44. National Road preservation work is developed in the project. The project includes: 44.1. the necessary transactions to list; 44.2. construction solutions building loss of stability and structure of the elements of the subsequent deterioration; 44.3. the preservation activities calendar plan. 2.5. Construction of uzmērījum location, the order and the order in which the construction adopted By the permanent operation in 45. completion of construction work carried out works and izpildmērījum uzmērījum that procedure and amount required under laws determined by the Subscriber. 46. the analyst prepares the works accomplished the construction documents and uzmērījum not later than one month after the completion of the works to the customer, if the works contract provides otherwise. 47. The principal uzmērījum of the works in the event of renewal of documents stored in not less than 10 years after the completion of the works, but new construction, conversion or demolition event – not less than 25 years after completion of the works. 48. Construction Plan of izpildmērījum develop legislation in accordance with the procedure laid down, in addition to including information about national road area (area, including roadway, sidewalks and well-marked border area, but not including the busy area of vegetation) according to the national road pavement materials, road width and length of the roadway along the national road axis line. 49. a decision on the operation of national road construction during and after the completion of the works until the adoption of permanent structures in operation accepts a Subscriber, based on the evaluation of the building project on the acceptability of the use of the construction works and the conditions of use. For operation before construction making permanent operation inform the municipal administrative territory of which are located in this building. 50. the standing into the newly constructed or rebuilt shall adopt national road. 51. Newly built or rebuilt a State Road 60 working days after completion of the construction works in permanent service or adopted shall take a decision on the deficiencies identified and their prevention. 52. The authorities who have issued the technical or specific provisions, within 14 days after the receipt of the application to the client according to the competency test and give an opinion on the shipbuilding operations, readiness, its compliance with technical or special provisions and regulatory requirements. 53. The construction law 6.1 of the first paragraph of article 1, point "b" in the case referred to in subparagraph, suggesting newly built or rebuilt the national road into adoption, customers of the Office shall submit the following documents (originals): 53.1. opinions issued by the following institutions involved in construction and būvspeciālist: 53.1.1. construction performer; 53.1.2. civil engineer; 53.1.3. autoruzraug if the autoruzraudzīb has been performed; 53.1.4. municipality, which is located in the administrative territory of the building; 53.1.5. the institution which has issued the binding technical or specific provisions; 53.2. completion of the works; 53.3. construction and izpildshēm; 53.4. izpildmērījum construction plan; 13. the opinions of the Organization, which brought construction; 53.6. results of laboratory tests; 53.7. measurement protocols; 53.8. construction documents. 54. The newly constructed or rebuilt the national road is taken into service with the adoption of the legislation on building permanent operation (annex 5), on the basis of this provision, paragraph 53. Construction law 6.1 of the first paragraph of article 1, point "b" in the case referred to in subparagraph, the Office shall issue a statement concerning the acceptance of permanent construction into two copies. One copy shall be issued by the client, the other is kept in the archives of the Office. 55. Joint stock company or Office is not entitled to adopt a construction to permanent service where: 55.1. significant deviations from the established harmonised construction or substantial defects of the works, which will affect building maintenance and road safety; 55.2. found in the Latvian et seq, building regulations or other violations of law. 56. Newly built or rebuilt the State Highway into this provision adopted in paragraph 51 that decision specified deficiencies. 57. The construction of the institutions involved in the process are entitled to a copy or extract of the Act for the construction of a permanent adoption. 58. before the construction of the information system owner or, failing that, under the legal possessor of real estate cadastre of the State law after the adoption of the permanent structures in service shall submit to the State land service data for registration or updating of national real estate cadastre information system construction for making permanent and izpildmērījum plan. 2.6. the expiry date of the guarantee of the works by making permanent structures in service 59. Construction warranty period of not less than two years after the adoption of the renewal work or the adoption of permanent construction. Works contracts may specify a longer guarantee terms, taking into account the solutions provided for in the project lifetime. 60. During the period between the work the signing of the Act of adoption and permanent structures into the signing of the Act of acceptance is counted in warranty period. 3. provisions for road and street 61. the requirements laid down in this chapter shall apply to new municipal road, street, and House to road construction, as well as to the existing local road, street and House restoration, rebuilding roads and demolition. 62. The construction conception for the planned construction of the documentation submitted to the būvvald, which is responsible for the administrative area. If the planned construction of several local administrative areas, construction intentions: 62.1. all submitted documentation būvvald the administrative territory of the planned construction and the construction process from conception to adoption into each individual takes place; 62.2. būvvald, in which the authorities delegated to the individual tasks of the construction process. 63. Depending on the planned construction of the intentions laid down in the General būvnoteikumo of the building and construction group has the following construction types: application conception 39.2. explanatory note (annex 6), which fills this 71 rules. in the cases referred to in paragraph 1; 39.3. the construction of the application (annex 7), which populates the rule 73. in the cases referred to in point; 63.3. acknowledgement card (annex 8), which fills this rule 74. in the cases referred to in paragraph 1. 64. The construction plans are not required document: 64.1. first group House road; 64.2. when an accident prevention or relief work for the object that has the specified operation or security cordon. 65. the Person suggesting any kind of construction, construction intentions submission adds: 65.1. property, tenure or use rights supporting documents; 65.2. the term of Office of the construction agent, if the application is submitted by an authorised person; 65.3. the reconciliation with third parties and other permissions for these rules and other regulations in the cases. 66. the reconciliation presented to furnish a general plan of the territory with the road or street fundraising parcel (hereinafter construction master plan), to the receipt of the plan, the location of the card to the explanatory memorandum of the housing plan or as an individual arrangement so that it comes from the unequivocal consent to the construction plans. 3.1. The construction conception development 67. Construction document prosecutors agreed with the developer in accordance with civil design projects on the construction concerned the intention of the documentation required for development. According to the planned construction of the conception and the intended type of construction completed in one of the construction idea submissions. 68. The construction conception for the development of appropriate documentation of the construction of laws and regulations governing the municipal development planning of the territory, in accordance with the construction of statutory construction principles. 69. developing construction plans, if the documentation for the construction in accordance with the relevant regulations, it is necessary for technical or special provisions, construction of the planned construction of the agent's conception can request and receive the necessary technical or specific provisions of State and local institutions, as well as the owners of inženiertīkl. 70. the conception of construction documentation (except for construction application) development in three original copies, but the law on construction of the first paragraph of article 6.1 of the cases referred to in paragraph 1, the four original copies. One copy is stored in būvvald, one copy – in the Office, one copy of the initiating projects in construction and developer. The prescribed number of copies of documents is not required if the document is prepared and filed electronically. 3.1.1. House road construction intentions documents 71. proposes a new home the first group of road construction, as well as the conversion of an existing House road or demolition, construction of the proponent submit: 71.1. the būvvald fill the explanatory memorandum part I; 71.2. explanatory description, which contains information about the planned construction, including the works of techniques and technologies, applied materials and road safety measures, if necessary; 71.3. graphic: 71.3.1. House of travel on a valid Visual solutions for topographic plans (M 1:500) cities, towns and villages, except when the House is torn down the road; 71.3.2. new construction or alterations, in the case of housing plans in appropriate scale (M 1:500), which contains the path of the proposed House position and plot it on the topographic plan valid cities and villages, but outside the cities and the villages to the instrumental in the uzmērīt plot of land boundary plan. 71.3.3. in the case of the demolition plan of the situation in accordance with clearly visible (M 1:250, M 1:500 or 1:1000 M) on the land plan, which contains the home path nojaucam; 71.4. reconciliations with: 71.4.1. the owner of the parcel, if construction is not the agent of the owner of the parcel; 71.4.2. third parties whose property or usage rights are affected; 71.5. technical or special rules, as determined by the legislation; 71.6. legislation in the cases specified in other documents or other authorization or consent. 72. If home path planned to add to the existing public road or House road that connected to the national road, the planned retrofit or construction of the planned number of pieces of land, which is the other owner, būvvald receives the application and construction of construction minimum composition in accordance with the provisions of paragraph 73. This House and the acceptance of road construction into operation carried out road and street construction. 3.1.2. The road and street construction intentions in proposing new 73. document road and street construction or existing road and street būvvald the modification, submit an application for the construction and construction of minimal composition consisting of: 73.1. interpretative description that contains information about the place of the construction conception for the construction, the works to be provided and the method of carrying out; construction plan of the master plan of 73.2. appropriate scale topographic plan valid scale M 1:500; 73.3. the characteristic cuts with height marks, except where the road and the street is torn down; 45.6. graphical documents with road and street Visual solutions and the height of the marks, except where the road and the street is torn down; 73.5. home improvement plan if solution is designed for facilities; 73.6. transport and pedestrian movements in the description of the organisation; 45.8. institution technical or special terms; 73.8. If road and street commissioning is designed by shipbuilding, – specific breakdown, showing the road and street stage boundaries and sequence; 73.9. other documents according the local government planning, lokālplānojum or detailed (if one has been developed). 74. the Proposed road and street restoration or demolition, the būvvald submitted by: 74.1. fill the receipt card, part I; 74.2. plot a topographical plan, if the path is restored and the street plot, located in the town or village of administrative territory; 46.2. the plot situation plans, if the path is restored and the street plot outside the town or village of administrative territory; 74.4. technical institution or special rules; 46.3. documents in accordance with the technical regulations; 74.6. explanatory description, which contains information about the planned construction, including the works of techniques and technologies, the materials used, if necessary, also adds calculations; reconciliations to 74.7 at. the property owner, if construction is not proposing a real estate owner and third parties; 46.5. the legislation in the cases specified in other documents or other authorization or consent. 3.2. Building plans review procedure 75. when construction plans and the application of these provisions in certain documents, būvvald of construction law article 12 the time limits laid down in the fourth paragraph-looking construction plans compliance with laws and regulations and shall take a decision pursuant to article 14 of the law on construction of the third part. 76. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third part (1) of the issued building permits (annex 1). 77. Būvvald for taking a decision on the acceptance of the construction plans in accordance with article 14 of the law on construction of the third subparagraph of paragraph 2 and 3, it shall mark the explanatory memorandum or a receipt card. 78. After būvvald marks made in the explanatory memorandum of the construction agent provides information about construction workers. Information on the work of the analyst can provide at the same time with the construction plans of the būvvald submission for decision. The construction conception for marketing shall be two years, counted from the date of the decision on acceptance of the construction plans. 79. After būvvald marks the acknowledgement card submitted būvvald on agent construction works start up the necessary documents. If designed for road and street restoration, seed sales period is two years counted from the date of the decision on acceptance of the construction plans. 3.3. Building permits, proof of the map and explanatory note to be included in the conditions of a permit shall include the following: 80.1 80. Design conditions, including: 80.1.1. requirements for construction parts and construction detail according to local building regulations; 80.1.2. requirements for technical or special terms from State and municipal institutions; 80.1.3. the requirements for the receipt of technical regulations for inženiertīkl connections (atslēgum) and the crossings; 80.1.4. requirements for receivable reconciliation from a property owner or legal possessor and third parties; 80.1.5. environmental accessibility requirements when the construction to ensure access, consistent with the laws; 80.1.6. legislation in the cases specified in other documents, permission or consent; 80.2. the conditions for the commencement of the construction works, including the requirements of: 80.2.1. the documentation to be submitted to the responsible būvspeciālist (related articles, autoruzraudzīb); 80.2.2. registration documents to be submitted to the procedure for fixation of the works (public works magazine, autoruzraudzīb magazine, building plan); 80.2.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 80.2.4. other deliverable documents legal cases; 49.9. deadlines for the construction permit conditions. 81. the memorandum include the commencement of the construction works the conditions requiring the provision of information on the work of the analyst. 82. in the receipt card include the commencement of the construction works, including conditions requirements: 82.1. the documentation to be submitted to the responsible būvspeciālist (related articles); 82.2. the documentation to be submitted for registration process for fixation of the works (public works magazine, building plan); 82.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 82.4. other documents if required by law. 83. the conditions in the Building works started to take four years of building permits in the markup for design conditions. 3.4. Designing Construction of 3.4.1 and 84 receiving planning permission for development., the Subscriber provides building design conditions. The necessary technical or specific provisions require the relevant authorities if they are not received, the drafting of minimum building project. 85. A construction has the following components: 85.1. General: 85.1.1. initiation of the necessary civil design documents and materials; 85.1.2. land engineering studies materials in the General būvnoteikumo of the cases; 85.1.3. Description of the interpretative, which contains general information on road and street technical indicators, including General information about accessibility; 85.1.4. permission and consent; 85.2. the parts of the architecture section of the territory: 85.2.1. the General index page; 85.2.2. Drawing of the master plan of the construction site to the appropriate scale topographical plan. 85.2.3. the projected plan of inženiertīkl aligned according to the scale on the topographic plan. 85.2.4. the vertical design of the territory; 85.2.5. facilities and greenery plan; 85.2.6. graphic document with road and street the height of Visual solutions and marks; 85.2.7. specific sections with height marks; 85.2.8. building materials of construction and specifications; 85.3. transport and pedestrian movement organization chart; 85.4. inženierrisinājum: 85.4.1. constructions; 85.4.2. road and street inženiertīkl are required (for example, gravity's drain, electricity, electrical communication systems); 85.4.3. technical diagrams and calculations; 85.4.4. building materials of construction and specifications; 85.4.5. installation and fixing of construction drawings and descriptions; 85.4.6. other inženierrisinājum; 85.4.7. environmental protection measures; the work of organizing the project 85.5.; assessment on the construction of 85.6. admissibility of the works use during or after completion of the works before construction commissioning, conditions of use, the assignment of inspection arrangements bridges; 53.3. detail of the part corresponding to local building regulations; 85.8. construction expertise (third group structures). 86. The objects financed from public law legal persons, policy instruments of the European Union or other foreign financial assistance, in addition to economic construction plan include: 53.5. equipment, design and construction; 86.2. works; 86.3. cost calculation (estimate). 87. the development of the Latvian language in the construction plan. Foreign language text of the construction plan of the Latvian language to be translated. 88. A construction developer develops projects to the extent set out in these regulations and the necessary construction plans for disposal, as well as specified in the building permit. 89. the work of the Organization in all public works projects (projects) in the volume, and it has the following components: 89.1. Works Calendar (if requested by the customer); 89.2. master plan works; 89.3. job protection plan (it can also develop as a standalone document); 89.4. explanatory description. 90. the master plan of the works developed in the individual stages of construction. Master plan in the works, existing and newly built in nojaucam construction, temporary structures, permanent and temporary roads, būvmašīn, also the location of the Assembly buildings and paths of movement, rapper and attract sharp fixing point, inženiertīkl (electricity, water, heat and other resource inženiertīkl), indicating the standing and temporary connection to the site, as well as the construction and design of the stowage area. 91. If the structural manufacturing process also provided outside the construction site, it is recommended that you create a situation plan, which contains all of the facilities and palīgražošan facilities. 92. the interpretative description describes the General and special conditions of construction, possible difficulties and peculiarities, justify the total duration of the works, as well as the most important environmental protection measures and suggestions for the quality control and assurance for organizing the construction site. 93. developing projects in operation of road and street conversion to be carried out without interrupting the execution of basic work in addition to the organisation of the project specify: 93.1. what works and in what order, to be without losing the road and the street, and some basic works, in what order, and which time limits – the planned execution of basic breaks; 93.2. identified the works – the path and use the street or their stage, also inženiertīkl, which at the time of the conversion function is not interrupted as well as road and street or their stage and inženiertīkl, the function is interrupted temporarily or completely; 93.3. interpretative description-cooperation between the participants and the works pārbūvējam or renewable road and the street, as well as measures to ensure the smooth road and street and basic conversion work; 93.4. material of construction and dismantling of temporary stowage location. 3.4.2. Construction Plan retreats from the harmonisation of the technical requirements of the 94. If the connection or inženiertīkl crossing the technical requirements or technical or specific rule requirements cannot be met, a construction of technical solutions that harmonisation of the bodies established by the relevant claim. Inženiertīkl to derogation from or crossing the technical requirements or technical or specific provisions of the proposed building design conditions. The mark made on the construction plan for the reconciliation of the master plan or change the technical solutions. On the inženiertīkl of the connection or the crossing of technical requirements for harmonization of the relevant derogations may charge a fee according to the price list approved by the institution. 95. If the law governing the construction of technical requirements cannot be met, article 9 of the law on construction of part three of the cases allowed them to coordinate with the relevant national and local authorities. Harmonisation of building permits to the design conditions. A check mark in the reconciliation is made to construction master plan. 3.4.3. Construction expertise 96. If General provisions provide for mandatory inspection of construction, it will be carried out in order to assess the projected road and street compliance with mechanical strength and stability, fire protection, security, and accessibility requirements: 96.1. part of inženierrisinājum; 96.2. the economic part-construction, design and implementation is financed from public law legal persons, policy instruments of the European Union or other foreign financial assistance,-by assessing the economic justification of the choice of materials in accordance with the design of the task, as well as the cost of the workstations. 97. the expert opinion of a construction contractor adds a construction documentation. 3.4.4. Building Design conditions of projects developed under 98. the Subscriber and other persons according to the building design. A construction developer with a signature certifying the conformity of a construction solution to the Latvian et seq, and other laws, as well as the provision of technical or special requirements. 99. in the original construction plan drawn up in triplicate (with the Manager and the principal original signatures, reconciliation and seal the prints to the site master plan), but the construction law 6.1 of the first paragraph of article 1, point "b" and "c" in the cases referred to in point-four copies and, where necessary, the construction expertise in building permits submitted to the opinion of the būvvald design conditions during the period. The prescribed number of copies of documents is not required if the document is prepared and filed electronically. 100. Būvvald assesses building projects developed under the design conditions and the necessary technical the solution, as well as make sure the statutory requirements. 101. If all the conditions of the būvvald design of construction of article 12 of the law in the fifth subparagraph shall be made within the time limit set in the building of the design mark of the conditions. After committing one check mark copies stored in būvvald construction. 102. third parties can challenge the building permit within one month from the date of the building permits checked in for design conditions. 103. If the Office finds that the būvvald do not fulfil all the conditions of the design or not received all necessary consent from third parties, it instructs the customer to recycle construction plan or get missing reconciliations. Examine the construction of one copy is stored in būvvald. 104. The client is obliged to address the gaps and submit projects for evaluation in būvvald again permits the design laid down in condition during the period of performance. 105. on the design conditions covered by building permits for execution of the works submitted to the principal būvvald to initiate the necessary documents. 3.5.106. Execution of building works in the commencement of the construction works and the subscriber conditions by submitting the following documents būvvald, būvvald of construction law article 12 fifth part: the time limit set in the building, the 106.1. mark on the commencement of the construction works of the conditions; 106.2. construction permit shall specify the works requested by the Subscriber, corresponding to the works for insurance against civil liability in respect of the time limit; 106.3 in the maximum building. the works duration according to the stipulated in the General būvnoteikumo, to which a permit may be extended (the works) and to which Street should be put into service; building permit annex added to 106.4. (annex 9), the investigator and the works of būvspeciālist are invited. 107. If during the works it is necessary to provide for different solutions than those projects, their implementation allowed after a construction change, if they relate to article 17 of the law on construction of the cases referred to in part 2.1 or General būvnoteikumo down. Article 17 of the law on construction of the cases referred to in part 2.1 of the changed parts of the construction plan and the documents justifying the need to submit changes for reconciliation būvvald. 108. The construction contractor and guest būvspeciālist for works may change over time. In this case, about the changes, inform būvvald and submit new works for compulsory insurance against civil liability in respect of a copy of the insurance policy or the new būvspeciālist related articles and new būvspeciālist a professional indemnity insurance policy. The new operator of the works or new guest būvspeciālist are eligible to begin duties on the construction site of a new building permit annex (annex 9) issue of the moment. 109. the receipt card works included the launch conditions, the Subscriber shall be submitted in the specified būvvald. Būvvald of construction law article 12, fifth subparagraph shall mark the period of commencement of the construction works conditions. 3.5.1. preparation of the Construction Works of the preparation initiated 110. only after you received the construction permit has become the undisputed and fulfilled the conditions contained in the permit. 111. the preparation of the construction works and the construction works are performed. 112. The Subscriber and the operator works the mutual commitments set according to these rules, and the Latvian et seq of the law on the execution of the contract, which also covers the preparation of the construction works. 113. The Subscriber receives with the execution of the associated permissions and before the commencement of the construction works: 113.1. works shall be issued a building permit to the operator for works for the opening tag stated conditions (copy) and construction; 113.2. According to legislation in the field of labour protection shall designate one or more of the labour protection coordinators, where the works are performed in more than one works. 114. The construction contractor employing one or more health professionals or to the competent specialists or attracting institutions according to the laws and regulations in the field of labour protection. 115. If a contractor works concluded a contract with the works of individual works, he takes the construction permit shall be issued for each individual copy of the works of the reviewer. 116. The work carried out in the preparation of the necessary organizational measures, as well as works on the construction site and outside it, to ensure the smooth operation of the works and all works membership in coordinated action. 117. The works receive a construction contractor, make sure that the additional detailed blueprints. If the operator is not the works requested more detailed drawings or even is not developed by them, the works contractor is responsible for the possible consequences. Detailed drawings can develop also during the works, and they agreed with the developer and construction contractor. 118. as the main objective, but būvas works not yet started, the main operator of the works takes all the construction conception site protection works against adverse natural and geological phenomena (such as flooding, noslīdeņ), for this provision in paragraph 121 works project. 119. before the commencement of the construction works, the existing building conditions, the main operator of the construction marks and delimit danger zones, set the existing underground structures of inženiertīkl and other axes or marks it borders, as well as provide traffic and pedestrian movement and safe access to the existing buildings and infrastructure. These measures work carried out in line with the draft inženiertīkl and affected building owners. 3.5.2. The works documentation 120. organizes and carries out the works under construction and its work in organizing the project, as well as the work of the project. 121. the work of the project, based on the development of the construction plan, the main operator of the works, but a separate and dedicated work, the operator of certain works. Work out the components of the project determined in accordance with the legislative work of the project, project the level of detail is determined by its developer, depending on the nature and extent of the work. 122. Depending on the volume of work and the duration of the planned construction work out of project development for the entire road and the street as a whole, individual portion (phase) or works cycle (for example, the underground, the surface for the cycle cycle cycle of preparation works). 123. the drafting work of the project to existing structures, follow their rules and the situation of the owners site. 124. If the works projects of the works of the individual investigator, this project is consistent with the main participants in the works. On the basis of the mandate of the head of the company, the work of the project approved by the individual responsible for the works būvspeciālist. Rebuilding works also with a construction project in the developer and the client. 125. the work of the project before construction work provided shall be transmitted to the responsible manager of the works. 126. the work of the project is available at the construction site workers būvspeciālist and control institutions. 127. The construction log does not fill in the first group home in the way of new construction, conversion or demolition. 128. Public Works Director every working day of the works carried out in the journal entries, and must describe the actual situation on the construction site. If būvuzraug and autoruzraug have any objection or instructions, it works in the journal entry. Objections or instructions shall be considered as fulfilled if the būvuzraug or autoruzraug carried the tag works in the journal. Entries in the journal also performs the works of the individual by whom the works construction managers perform their jobs. 3.5.3. The works and quality control 129. On the protection of health in matters within their competence, the construction site is responsible for the main construction works Manager responsible, but on the individual job types – individual contributor of the works construction managers responsible. Responsible public works Director followed the defensive coordinator job. 130. Road and self-propelled mechanism motion construction site organized in accordance with the work project, et seq, and the rules of the road. 131. On the quality of the works is responsible for the works. The quality of the works may not be lower than būvnormatīvo of Latvia and in the relevant standards, building regulations and other laws or works contracts laid down in the quality of the works. 132. The construction of quality control system of each company develops according to your profile, the type of work performed and amount. Quality control of the works include: 132.1. documentation of the works of construction and design of the delivered equipment, machinery, and equipment similar to the original; 132.2. individual operations or technological processes control; 132.3. completed (a candidate) the type of work or construction cycle (design element) closing control. 133. the work of the inspection after full completion of construction is not possible, acceptable performance, immediately after creating your cover work. 134. Completed major structural elements and work into segto adopted for drawing up the adoption Act (annex 3). 135. the continuation of the works is not allowed if the customer or būvuzraug (if construction is performed in the building) and representatives of the performers of the works is not compiled, and work site signed by previous cover work receipts. If būvuzraug or autoruzraug finds the work carried out by the non-compliance with construction or construction technology requirements, further work should be stopped, a record of the work or the autoruzraudzīb journal and specifying a due date. Work continues only after all the work of the respective cover signed the Act. 136. If in the course of construction formed a break during which the Act adopted may cover work injuries, before resuming again made the previous cover verification of the quality of the work and shall draw up a report. 137. the construction contractor quality control general būvnoteikumo of the būvuzraug in the cases specified in the call. 138. The client autoruzraudzīb General būvnoteikumo for the cases brought by the construction of developers. 3.5.4. Environmental conditions 139. organizes and carries out the works so that environmental damage would be minimal. Environment and natural resources protection, sanitary and security established in the works are organized and conducted in compliance with the law, within the limits and requirements. The consumption of natural resources must be economically and socially sound. 140. the road and street restoration, reconstruction of such works or demolition, if possible, take the construction waste recycling and recovery. All construction waste materials, which are to be classified as hazardous waste, managed according to the regulations on the management of hazardous waste. 141. before the ground work, as well as through gliding jobs construction site, soil is removed and stored for future use. 142. Drilling work process, reaching the water, sējhorizont, take measures not appropriate for ground water discharge and water sējhorizont pollution prevention. 143. the soil, prevents ground water and open water pollution. The necessary measures should be provided for work carried out in the project. 144. The construction process can change the natural terrain and hidroģeoloģisko conditions (for example, fill up the ravine and career, be fitted with drainage), if those measures are intended for construction or determined by the Geotechnical Control Office (Geotechnical work as a whole, performed in the course of construction, to establish the conformity of the construction plan of the actual geotechnical data and, if necessary, adjust it). 3.5.5. the preservation of works in the event of termination or suspension 145. Road and street works to be carried out, where preservation of termination or suspension may occur because of the danger to the environment or to human life or health or dangerous defects may occur in structures. 146. the decision on the suspension of the works may accept contractor by giving būvvald. 145. These provisions in the case referred to in paragraph 1 before the termination of the works submitted to the coordination of the būvvald the principal road and street works of preservation project. 147. The road and street preservation project in the works: 147.1. the necessary transactions to list; 147.2. solutions to road and street strength and stability, safety in use and further deterioration; 147.3. solutions to prevent hazards to human life and health or the environment; 147.4. road and street preservation activities calendar plan. 148. If the authority which is not būvvald, within the limits of its competence has stopped the works, it shall forthwith notify the būvvald. 149. Būvvald 14 days After 146. these provisions and referred to in paragraph 148 of the receipt of the information on the cessation or suspension of the works carried out on-the-spot, except when the works stopped Office, and shall decide on the permission to stop the works, street preservation activities the project or, if necessary, shall take a decision on the road and street preservation. 150. If, after a survey found the object's path and the need for preservation of the street and the client has not submitted the būvvald road and street works for the preservation project, the decision on būvvald road and street preservation: 150.1. the road and street conservation reasons; 150.2. road and street preservation conditions (measures to be taken to ensure road and street construction security, stability and integrity, as well as road and street works of preservation project scope, if necessary); time travel and 150.3. Street preservation activities the project submission. 151. Būvvald 14 days of road and street works preservation project, the assessment of its conformity with the law requirements, or adopt a decision specifying the identified deficiencies and failures. 152. following the provisions referred to in paragraph 151 of the decision implementing the client repeatedly go to būvvald. 153. On the road and street works for the preservation of the works of the relevant requirements, including the requirement for public works for liability insurance. Works for civil liability to be insured at all times of the implementation of the work of preservation. 154. Works shall end with the moment when the būvvald has taken a decision on the authorisation to suspend the works or the customer has finished the road and street conservation work according to the agreed būvvald road and street works of preservation project. 155. If the client fails to fulfil the requirements of this regulation, a notice to local client is entitled to carry out road and street preservation work. All with road and street preservation-related costs shall be borne by the Subscriber. 156. If after the termination of works būvvald later period of time find that path and can cause hazard Street to the environment or to human life or health or dangerous to damaged structures, shall decide on būvvald road and street preservation in accordance with the procedure laid down in this chapter. 157. where, after the suspension of the works of būvvald finds that necessary road and street būvvald preservation, shall decide on the road and street preservation in accordance with the procedure laid down in this chapter. 3.6. the Adoption and acceptance of individual jobs 3.6.1. accepting the Road Home into the acceptance of work and demolition works completed 158. Subscriber shall submit būvvald: 158.1. fill in part II of the explanatory memorandum; 158.2. izpildmērījum plan (with the House with accommodation, constructed the road/demolished external inženiertīkl and the other at the same time built/demolished structures), but rebuilding in the event changed the situation in the region. 159. The explanatory memorandum refers to the Subscriber a harmonised time limit within which a Subscriber may request that the contractor works on its own means, eliminate the construction defects discovered after the House the way the transfer. The minimum guarantee period of construction work after būvvald marks made in the explanatory memorandum shall be two years. 160. Būvvald is five working days after the receipt of all documents, as set out on-the-spot. At the time of the survey of the būvvald make sure that the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, or organized territory, and made the tag in the explanatory memorandum. If the House is torn down, the path būvvald is issued the certificate of absence of construction (annex 10) three originals and sign it. Two copies shall be given to the customer, one copy is stored in the archives of būvvald. The prescribed number of copies of documents is not required if the statement is prepared electronically. 161. The newly constructed or rebuilt House travel shall be deemed to have been accepted into service with the būvvald marks made in the explanatory memorandum. 162. If būvvald detects that the construction works does not conform to the accepted conception or construction of regulatory legislation, the decision shall specify the Subscriber identified deviations from the accepted conception or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 163. by this provision in paragraph 162 of the decision implementing the client repeatedly go to būvvald. If the customer has prevented a decision, specified in būvvald of the mark in the explanatory memorandum and in the event that a path is torn down, the House shall issue a certificate on the premises not being. 3.6.2. the adoption of road and street Service After completion of the works 164. progress of the works carried out uzmērījum and izpildmērījum. The order in which you perform these measurements and the required amount is determined by the Subscriber, subject to the regulatory requirements. 165. The road and street izpildmērījum plan develop legislation in accordance with the procedure laid down, in addition to including information on road and street area (area, including roadway, sidewalks and well-marked border area, but not including the busy area of vegetation) on the road and pavement materials, roadway width and the length of the carriageway by road and street axis line. 166. New, pārbūvējam or renewable road and street can be used before the adoption of the construction into the projects submitted in būvvald was included in the assessment of the admissibility of the use of the construction works and the use conditions. 167. at the written request of the principal bodies that have issued technical or special terms, verifying and 14 days after receipt of the corresponding application competency provides opinion on road and street life, its readiness for compliance with technical or special provisions and regulatory requirements. 168. The road and street into proposes adoption of the Subscriber. Before proposing a building or part of the service, making the building or part thereof shall be made by izpildmērījum. 169. the Proposed road and street acceptance of all or part of the service, the Subscriber būvvald or construction law 6.1 of the first paragraph of article 1, point "b" or "c" in the cases referred to in point – the Office shall submit the following documents (originals): 169.1. proof of construction readiness for operation (annex 11); construction of 169.2. change parts, which levels during the works will be carried out in accordance with the General būvnoteikumo; 169.3. construction sites or part of izpildmērījum plan; 169.4. technical regulations for issuing opinions on the readiness of operation inženiertīkl; 169.5.167. these provisions referred to in paragraph 1, the opinion of the institution; 169.6. Journal of the works and significant design and cover the work of adoption legislation; 169.7. technological equipment provided for construction, special systems and equipment inspection records and receipts, as well as compliance with the supporting documentation, should they need determined by law on equipment safety; 169.8. built-in compliance of products supporting documentation; 169.9. autoruzraudzīb journal, if the work is carried out in the laws of the autoruzraudzīb in the order; 169.10. construction Developer's opinion on the building or parts thereof compliance with construction, if not autoruzraudzīb; 169.11. būvuzraug report on the implementation of the plan of the building, where the works are carried out of the building regulations. 170. This provision, 169.2 169.1..,.,., 169.7 169.3 169.4. and 169.10. referred subscriber copies of documents shall be deposited in the archives of the Office or of the būvvald. 171. Road and street or part thereof shall be taken into būvvald or Office. The Office of recruitment of officers of the būvvald call, if būvvald has expressed its desire to participate in it. External būvvald official signature on acceptance of all or part of the building. 172. Būvvald or Office after receipt of all documents specified in agreement with the customer, down the road and the street or portion of a time limit for the receipt of not more than 14 days from the date of submission of the documents in the būvvald or in the Office. 173. The principal road and street or part thereof presented in the būvvald, or the Office. The principal investigator of the works consulted or its authorised representative who has carried out the works concerned. 174. Būvvald and the Office's task is to assess the road and street or part of readiness for operation, on the basis of the būvvald, or the Office this provision in paragraph 169 above documents, as well as compliance with laws and regulations in the field of construction and construction. 175. If the driveway and the street or part of a building, construction conducted recruitment participates in būvuzraug. Būvvald or the Office may call upon hiring a construction Developer (autoruzraug), if he is not made a autoruzraudzīb and given an opinion. Būvuzraug and the construction of the outside developer signs the legislation on building acceptance of all or part of the service. 176. Būvvald or draw up a law Office on the premises or the part of the adoption service (hereinafter referred to as the Act) (annex 12) or three-construction law 6.1 of the first paragraph of article 1, point "b" or "c" in the cases referred to in point-four originals and sign it. Two copies shall be given to the customer, one copy of the būvvald and the archives of the Office. The prescribed number of copies of documents is not necessary if the Act is prepared electronically. 177. The Act specifies the Subscriber and the operator of a harmonised construction period, a Subscriber may request that the contractor works on its own means, eliminate the construction defects discovered by road and street acceptance of all or part of the service. The minimum guarantee period of construction work after the signing of the Act are: 177.1. three years for the construction of the second group; 177.2. five years for the construction of the third group. 178. Būvvald and the Office is not entitled to adopt the road and the street, or part of the service if any of the bodies delivered a negative opinion for commissioning. 179. where the road and the street or part thereof is not accepted into service, būvvald, or the Office shall issue to the customer a reasonable decision. The decision shall indicate the deviations from established projects or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 180.179. These provisions in the decision referred to in paragraph specified deficiencies the customer repeatedly invited būvvald or Office and presented a road and a street or part of it. 181. the path and the street or part thereof is deemed to have been accepted into service with the signing of the Act of the day. 182. the provisions recorded in the būvvald or in the Office. The number of the Act contains the following characters: 182.1.14 of the first two characters – the year the last two digits; 182.2. next five marks – the registration number of the Act, which is up to five characters with zeros from the left; 182.3. last seven signs-construction of the territorial code under the administrative and territorial units. 183. the construction sequence can be taken into operation, if the works are completely finished, and all the relevant structures for fire safety, turn work and environmental protection measures, as well as the entire construction made in order to ensure the availability of the environment. 184. where road and street or part thereof shall be taken into the winter, utilities jobs (for example, landscaping of the territory, the planting of trees, bushes) can perform the works mentioned in the season, but they must be completed by June 1 of a given year. 185. Trees and shrubs planted near a suitable time. 186. In accordance with the provisions of paragraph 184 and 185. certain deferred works and their terms of entry. The Act that delayed the completion of the works within the scope of control and the building. 187. the deferred works made in the Analyst works within the time limits and, if the customer has agreed on other arrangements. 188. until the construction of the information system owner or, failing that, under the legal possessor of real estate cadastre of the State legal service, upon the adoption of construction presented the State land service data for registration or updating of national real estate cadastre information system construction of the adoption Act and the izpildmērījum plan. 3.6.3. Road and street reconstruction and demolition work completion After 189. road and street reconstruction or demolition works completed Subscriber shall inform the būvvald on completion of the works by submitting a completed acknowledgement card (II) and izpildmērījum plan, if the path and street is demolished. 190. If simultaneously with road and street restoration or demolition of the inženiertīkl was carried out restoration, installation, alteration or demolition, būvvald in addition to also submit their opinions on the institutions inženiertīkl readiness the operation, which is issued by the technical regulations. This opinion by the institution shall be issued within 14 days of the receipt of the customer application. 191. in the receipt card indicates to the customer the agreed period of time in which the client may require the contractor works on its own means, eliminate the construction defects discovered by road and street reconstruction or demolition of public works construction. The minimum guarantee period of construction work after completing the būvvald marks the acknowledgement card is two years. 192. Būvvald is five working days after the receipt of the documents specified in the site survey and make sure that the works are conducted in accordance with the accepted construction plans and the construction of the regulatory laws, and made the tag for the acknowledgement card. If the path and the road is demolished, the būvvald shall issue a certificate of absence of construction (annex 10) three originals and sign it. Two copies shall be given to the customer, one copy kept in the archives of būvvald. The prescribed number of copies of documents is not required if the statement is prepared electronically. 193. If the works carried out do not meet the accepted conception of construction or the construction of laws framework, būvvald shall decide on derogations identified that indicates deviations from the accepted identified construction plans or construction of regulatory laws and deadlines for the correction of these derogations. 194.193. These provisions in the decision referred to in paragraph indents in the prevention client repeatedly go to būvvald. If the customer has prevented a decision, specified in būvvald of the mark acknowledgement card or, if the path and the road is demolished, shall issue a certificate on the premises not being. 195. Road and street demolition case until the construction of the information system owner or, failing that, under the legal possessor of real estate cadastre of the State specified in the law shall provide the State land service data to update the national real estate cadastre information system construction for the absence and the izpildmērījum plan. 4. The merchant path … of 4.1 merchant road construction process necessary documents and their contents 196. Merchant road construction, if it's a new path, or conversion of an existing road to receive building permits (annex 1). 197. The merchant or the decommissioning of the renewal party, submit the receipt card (annex 8). 198. The construction conception for the planned construction of the documentation submitted to the būvvald, which is responsible for the administrative area. If the planned construction of several local administrative areas, construction intentions: 198.1. all submitted documentation būvvald the administrative territory of the planned construction and the construction process from conception to adoption into each individual takes place; būvvald in the municipality of 198.2. to which it has delegated certain tasks during the construction process. 199. the documentation for the construction of the road operators, if it's a new path, or the conversion of existing road construction plan drawn up by the developer. The renewal of the economic operator's conception or demolition of the necessary documentation may develop at the construction agent employed būvspeciālist in the appropriate field. 200. the drafting of construction plans, if the documentation for the construction in accordance with the relevant regulations, it is necessary for technical or special provisions, construction of the planned construction of the agent's conception can request and receive the necessary technical or specific provisions of State and local institutions, as well as the owners of inženiertīkl. 201. The construction conception documentation (except for construction application) development in three original copies. One copy is stored in the būvvald and one copy kept in the building and construction developer agents. The prescribed number of copies of documents is not required if the document is prepared and filed electronically. 202. To get planning permission, construction or its authorized agent shall be submitted by the person in būvvald: 202.1. construction application (annex 7); construction of 202.2. minināl composition comprising: 202.2.1. topographic plot plan that highlighted the road route, if merchants path is a city or village administrative territory; 202.2.2. a plot situation plans that marked the road route, if the merchant path outside city or village administrative territory; 202.2.3. the owner of the parcel, if reconciliation in accordance with the legislation applicable; 202.2.4. the institution of a technical or specific provisions, if necessary; 202.2.5. an explanatory description, which contains information about the planned construction, including the works of techniques and technologies and applied materials; 202.3. property, tenure or use rights supporting documents; If the path of the planned 202.4. to operate during construction and prior to commissioning, the assessment of the admissibility of the use of the construction works or after completion of the works before construction commissioning and use conditions of the road. 203. In proposing the renewal of economic operators or demolition, the būvvald submitted by: 203.1. fill the receipt card, part I; 203.2. plot valid topographical plan that highlighted renewable way, if the renewal is piece of land located in the town or village of administrative territory; 203.3. plot situation plans that marked the path to restore, if the renewal is piece of land outside the town or village of administrative territory; 203.4. technical institution or special rules; 203.5. documents in accordance with the technical regulations; 203.6. explanatory description, which contains information about the planned construction, including the works of techniques and technologies, the materials used, if necessary, also adds calculations; 203.7. defect; work quantity list 203.8.; 203.9. reconciliations with the property owner, if construction is not the agent of the owner of the immovable property, and to third parties, if necessary. 204. Būvvald after the construction plans review decision within the time limit laid down in the law on construction. 205. A building permit is issued to the time that the proponent has planned the construction of construction, subject to certain conditions the design deadline, the commencement of the construction works and the construction conditions task duration. 206. A permit shall include the following: 206.1. conditions design including: construction; 206.1.1. 206.1.2. for the reconciliation of receipts from the adjacent property owners or the owner of the parcel, if the reconciliation is necessary, but is not received before the construction plans to the application; 206.1.3. about technical or special terms from State and municipal institutions; 206.1.4. receipt of the technical regulations of the inženiertīkl owners; 206.1.5. environmental accessibility, if appropriate legislation is a must; 206.2. conditions for the opening of the works, including requirements for: 206.2.1. deliverable documents on responsible for the works and the būvspeciālist liability insurance; 206.2.2. the documentation to be submitted to the responsible būvspeciālist (article autoruzraudzīb of the Treaty, in the case of autoruzraudzīb); 206.2.3. registration documents to be submitted to a process for fixing public works (public works magazine, autoruzraudzīb magazine, when autoruzraudzīb, the building plan); 206.2.4. provision of information about the work of the works and whom defensive coordinator; 206.2.5. other documents if required by laws and regulations; terms conditions of the building permit 206.3.. 207. in the receipt card include the commencement of the construction works, including conditions requirements: 207.1. the documentation to be submitted to the responsible būvspeciālist (related articles); 207.2. registration documents to be submitted to the procedure for fixation of the works (public works magazine, building plan); 207.3. deliverable documents on civil liability insurance (responsible for the works and būvspeciālist insurance policies); 207.4. other documents if required by law. 208. After būvvald marks the acknowledgement card submitted būvvald on agent construction works start up the necessary documents. If the merchant or the decommissioning of the renewal, the conception of marketing term is two years counted from the date of the decision on acceptance of the construction plans. If, within that period, the works have not been started, the acknowledgement card must receive. 4.2. Building Design condition execution After receipt of building 209. Subscriber ensure building design conditions. The necessary technical or special rules for a construction contractor or developer, if provided for in the agreement between the parties, request the relevant institutions, if they have not received previously. 210. The merchant road construction detailed content and design requirements determined by the merchant road owner design task based on Latvian standard LVS 190-6:2009 "road design rules" part 6 "road and bridge construction and design" or merchants in the travel requirements of the owner, if they are justified by the law or the requirements of the standards. 211. before the decision on the construction of development engineering studies the composition and abundance of the adopted path of economic operators, the owner of the design in detail describing the minimum amount for the construction engineering studies, as well as the most important technical specifications, regulations and standards to be followed when designing projects. 212. The construction of the client and other persons according to the building design. A construction developer with a signature certifying the conformity of a construction solution to the Latvian et seq, and other laws, as well as the provision of technical or special requirements. 213. in the original construction plan drawn up in triplicate in the construction agent (the client) or a construction developer, when provided for in the agreement between the parties, shall submit the building design būvvald conditions during the period. 214. If all the conditions of the būvvald design of construction law article 12, fifth paragraph, the construction permit shall be made within the time limit set in the tag for design conditions. After committing one check mark copies stored in būvvald construction. 215. the building of a third party can challenge a month from the day when the building permits checked in on the design conditions, if the land owner's consent was required and was received at the time of construction of the development. 216. If būvvald reveals that not all design conditions or have not received all the required consent from third parties, it instructs the customer to recycle construction plan or get missing reconciliations. 217. the deficiencies found by the Subscriber or a construction developer, if provided for in the agreement between the parties, shall be submitted for assessment of construction again būvvald in building design conditions during the period. 218. on the design conditions covered by building permits the execution of the client or his authorized person submitted the started works to būvvald the necessary documents. 219. the commencement of the construction works, the conditions must be met within four years from the date of the check mark on the design conditions. 220. the period of validity of the agreed projects is two years. If, within that period, the works have not been started, you must renew a construction-need new reconciliation, to assess changes in nature, as well as, if it allows the construction of the planned implementation deadline, construction must be updated according to the current standard and specification requirements. 221. the projects to be implemented in the derogation pursuant to statutory construction and only with the consent of the Subscriber, and may suggest the following participants of the construction process: 221.1. Subscriber; 221.2. a construction developer; 221.3. būvekspert; 221.4. public works Director; 221.5. civil engineer; 221.6. būvuzraug. 222. The client is obliged to request a derogation from the coordinated projects with a construction developer. If a construction developer indents do not match, the final decision on the implementation of the derogations adopted road owner operators, based on the opinion of another building project developer, who is responsible for the conformity of the construction of the derogations granted, et seq of the law, as well as the developer and the principal construction civil procedure requirements of the contracts. 223. The Subscriber has the right to order the design projects for other derogations, the developer who takes responsibility for the possible consequences of deviations. 4.3. Construction work 224. If the building works started in the conditions and the contractor or his authorized person submitted the necessary documents in the būvvald, the būvvald of construction law article 12 fifth part: the time limit set in the building, the check mark 224.1. about condition of the commencement of the construction works; 224.2. building permits shall specify a Subscriber requested duration of the works; building permits indicate maximum 224.3. the duration of the works according to the stipulated in the General būvnoteikumo, to which a permit may be extended (the works) and to which the merchant path put into service; building permit annex added 224.4. (annex 9), the investigator and the works of būvspeciālist are invited. 225. If during the works it is necessary to provide for different solutions than those projects, their implementation allowed after a construction change, if they relate to article 17 of the law on construction of the cases referred to in part 2.1 or General būvnoteikumo down. Article 17 of the law on construction of the cases referred to in part 2.1 of the changed parts of the construction plan and the documents justifying the need to submit changes for reconciliation būvvald. 226. The work to all the participants at the time of the works must have a valid insurance policy. 227. The construction contractor and guest būvspeciālist for works may change over time. In this case, the principal investigator of the works or, when provided for in the agreement between the parties, about the changes, inform būvvald and submit new works for compulsory insurance against civil liability in respect of a copy of the insurance policy or the new būvspeciālist related articles and new būvspeciālist a professional indemnity insurance policy. The new operator of the works or new guest būvspeciālist are eligible to begin duties on the construction site of a new building permit annex (annex 9) issue of the moment. 228. the preparation of the start of the works only after you received the construction permit has become the undisputed and fulfilled the conditions contained in the permit. 229. the preparation of the construction works and the construction works are performed. 230. The customer and works for mutual commitments determined in accordance with these rules, and the Latvian et seq of the law on the execution of the contract, which also covers the preparation of the construction works. 231. The Subscriber for the quality control of the works you can call būvuzraug. Building can be performed at a Subscriber employed būvspeciālist, based on the employer's orders, or other būvspeciālist, or būvkomersant, which employs the būvspeciālist. 232. The Subscriber can hire for autoruzraudzīb autoruzraug. 233. prior to the commencement of the construction works shall provide to the Subscriber and the operator accepts the works construction site. The date indicates the construction site and the acceptance of the transfer instrument (annex 2), which shall be prepared by the construction contractor. From the date of signature of this Act until the date when the construction adopted in service or acceptance of recovery or demolition jobs, construction contractor is responsible for a construction site maintenance. 234. the construction site is located in the following documents: 234.1. construction plan; 234.2. works journal; 234.3. autoruzraudzīb log (if autoruzraudzīb); 234.4. cover of the works; building materials and construction products of 234.5. compliance with the supporting documents. 235. in the case of renewal or demolition construction site is located in the following documents: 235.1. documentation was added to the card; 235.2. the work journal; 235.3. cover of the works; 235.4. building materials and construction products conformity with the supporting documents. 236. The construction contractor for fixation of the work performed and the control of construction works fill out during construction journal. 237. all structures during construction works, which are settled with other constructive step, cover the work to be drawn up of the adoption Act (annex 3). Cover of the work in making the customer or its representative, the reviewer, būvuzraug works by performing the Superintendence, and autoruzraug, if you autoruzraudzīb. 238. On the quality of the works is responsible for the works. The quality of the works may not be lower than būvnormatīvo of Latvia and in the relevant standards, building regulations and other laws or works contracts laid down in the quality of the works. 4.4. Merchant road preservation procedures. the decision on the construction of 239 interruption may accept contractor by giving būvvald. 240. If the merchant road works are interrupted and it is not technological or seasonal break, the operator shall carry out construction works to the conservation measures and with the construction of the transfer and acceptance report shall be referred to the building principal. 241. If the merchant road works are interrupted and this is technological or seasonal break, the participants in the construction works and the acceptance of the transfer Act. The Act specifies the luck and the deferred works and their deadlines. 242. If the merchant road works disruption or suspension may occur because of the danger to the environment or to human life or health, merchant road preservation made this provision in section 3.5.5. 4.5. the position of the uzmērījum building, the order and the order in which the construction adopted into service After the completion of the works 243. follow-up of the works carried out and izpildmērījum uzmērījum, the procedure and the required amount is determined by the Subscriber, subject to the statutory. 244. the analyst prepares the works accomplished works uzmērījum documents and izpildshēm (shipbuilding location plan in one of the following scale-M 1:1 000, M 1:2000 or 1:5000 M) and passes them to the client in the month following the completion of the work, if the work contract provides otherwise. 245. The principal uzmērījum of the works documents stored not less than 25 years after completion of the works. 246. izpildmērījum structures reflect the topographic information on merchants road, which occurred during the construction process, in addition to giving merchants Road area (area, including roadway, sidewalks and well-marked border area, if any, but not including the amount of vegetation areas) according to operator pavement materials, road width and length of the carriageway over the merchant road axis line. 247. the decision on merchant road construction operations during and after the completion of the construction of the works to the acceptance into service accepts the client, on the basis of the submitted projects būvvald, which includes the assessment of construction use the construction of the time limit and conditions of use. 248. The client or his authorized person upon renewal or completion of the works submitted to the demolition of the būvvald fill the receipt card, part II. If merchants path is torn down, the būvvald shall issue a certificate on the premises not being (annex 10) two original copies and sign it. One copy shall be issued by the customer, a second kept in the archives of būvvald. The prescribed number of copies of documents is not required if the statement is prepared electronically. 249. by way of economic operators to the completion of the works or works of the principal investigator, if provided for in the agreement between the parties, in writing, request the authorities who have issued the technical or special rules, to give an opinion on the conformity of the construction technical or special terms. Institutions within 14 days after receipt of the corresponding application competency gives its opinion. 250. In proposing the adoption of a road construction company in service (if that is the new route) or making the road of conversion into the client or contractor, if it works for the contract between the parties, the būvvald submit the following documents (originals): 250.1. proof of construction readiness for operation (annex 11); 250.2. the institution of the opinions issued by technical or specific provisions; 250.3. izpildshēm, which prepared the performer of the works; 250.4. izpildmērījum construction plan; 250.5. built-in compliance of products supporting documentation; 250.6. public works journal and cover the work of making laws, if they are not aligned with the approval of the works; 250.7. būvuzraug report on the implementation of the plan of the building, where the works are carried out of the building regulations. 251. The newly constructed or rebuilt merchant path takes into būvvald. 252. Būvvald after receipt of all documents specified in agreement with the client determines the time limit for the receipt of travel operators for longer than 14 days from the date of submission of the document būvvald. 253. The principal merchants road show būvvald. The principal investigator of the works consulted or its authorised representative who has carried out the works concerned. 254. Būvvald-is to assess the readiness of the service road of economic operators on the basis of these provisions of the būvvald the 250 documents referred to, as well as compliance with laws and regulations in the field of construction and construction. 255. If the merchant road works carried out building, construction recruitment participates in būvuzraug. Būvvald can call upon hiring a construction developer, if he is not made a autoruzraudzīb and given an opinion. Būvuzraug and the construction of the outside developer signs the adoption of the legislation on permanent housing. 256. the Būvvald shall be drawn up for the construction of the adoption service (hereinafter referred to as the Act) (annex 12) in two original copies and sign it. One copy shall be issued by the customer, a second kept in the archives of būvvald. The prescribed number of copies of documents is not necessary if the Act is prepared electronically. 257. Būvvald is not entitled to adopt a construction to permanent service where: 257.1. significant deviations from the established harmonised construction or substantial defects of the works, which will affect building maintenance and road safety; 257.2. Latvian et seq, building regulations or other violations of law. 258. If the merchant path is taken into service, the būvvald served the client informed decision. The decision shall indicate the deviations from established projects or construction of regulatory laws, deadlines, as well as other conditions of the deficiencies found. 259. After this provision in the decision referred to in paragraph 258 of the specified deficiencies the customer repeatedly invited būvvald and presented to the shipbuilding sector. 260. The merchant road can accept service with deferred jobs, which indicates the Act on adoption in the shipbuilding operation. Construction contractor performs work in the deferred time limit specified. The Act that delayed the completion of the works within the scope of control and the building. 261. The construction of the institutions involved in the process are entitled to a copy or extract of the Act for the construction of a permanent adoption. 262. The construction period of guarantee shall not be less than two years after rebuilding or demolition work, year of construction or completion of the refit. The beginning of construction of the warranty period is determined by the date when the renewal is approved or demolition work, new construction or conversion of the completion of the Act. 263. The construction of the information system owner or, failing that, under the legal possessor of real estate cadastre of the State legal service, upon the adoption of construction presented the State land service data for registration or updating of national real estate cadastre information system construction of the adoption Act and the izpildmērījum plan. 5. cooperation 264. Joint stock company General provisions of deadline and inform the relevant building permits issued in būvvald. 265. Būvvald 10 days to inform the public of the marks of shares in building permits for road and street merchants, as well as the commencement of the construction works of road conditions. 6. concluding issues of 266 1 July 2015 in the construction law 6.1 of the first paragraph of article 1, point "b" and "c" in the cases referred to in (a) national road, local road and street acceptance of these rules and section 3.6.2 2.5 established and works shall be carried out by the Office, but by 2015. June 30, within the limits of its competence to carry out joint stock company or būvvald. 267. the national motorway construction, which launched to this provision to the date of entry into force of transactions are legitimate and in the operation of this provision 2.5. in accordance with the procedures specified in that subsection if the owner of the national road with the construction of the works contracts in enforcers has agreed on other arrangements. 268. local road and street works, which brought up to this date of entry into force of the rules, the transactions are legitimate and in the operation of this provision section 3.6.2. 269. The merchant road construction, which launched to this provision to the date of entry into force of transactions are legitimate and in the operation of these regulations 4.5. in accordance with the procedures specified in that subsection if the owner of the travel company with works of works contracts in enforcers has agreed on other arrangements. The Prime Minister is the Rapidity of the Newsletters instead of Minister of Economics, Minister of Interior Richard Kozlovsk a annex 1 Cabinet 2014 October rules 14 no 633 (national joint stock company "Latvian state roads"/būvvald) construction permit no.       (date)      

Issued (construction agent (client) – natural persons name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) for the design and construction works (object name) public road, municipal road, street or road network operators (not applicable).

The real property cadastre number address, if any,-the location of the road construction route/index, the location of the construction of national road network (km) land cadastral designation of the unit construction type 1 (required mark): updated the work to new construction demolition construction group 2 (General provisions) 3. Shipbuilding (existing), the intended use (according to the classification of structures) 4. A construction Developer (physical person's name, surname, personal code, no certificate or the name of the legal person būvkomersant, registration No., registration certificate No.)
5. Conditions of design conditions (required mark): 1) reconciliation with adjacent property owners, co-owners: (real estate office, an individual's first name, last name or legal name) (address of real property, an individual's first name, last name or legal name) (address of real property, an individual's first name, last name or legal name) 2) technical or special provisions and their Publisher: reconciliation with the national authorities: (name , address, contact info) (name, address, contact info) (name, address, contact information) with municipal institutions: (name, address, contact info) (name, address, contact info) (name, address, contact information) by the holders of the inženiertīkl: (name, address, contact info) (name, address, contact info) (name, address, contact info) (name, address, contact info) (name, address, contact info) 3) technical or special provisions, if it is not necessary to the Publisher Agreement: (name, address, contact info) (name, address, contact info) (name, address, contact information) 4) other institutions consent or permission : (name, address, contact info) (name, address, contact info) (name, address, contact info) 5) accessibility requirements when building it to be according to the laws of the territory to access facilities: roads Street sidewalks and walkways pedestrian crossing for the chance to move from one level to another height level, especially for persons with functional disabilities handicapped parking, the number of not less than ____ ____ ____ 6) national road, a road construction plan in the composition of economic operators: General technical-economic part of the road (the road) the route and road grade with land (road) construction of artificial cover exit , intersection, connection and crossings on the road (the road) equipment for building materials production site and characteristics of inženiertīkl rebuilding work environmental protection measures work and cost assessment of the admissibility of the use of the construction works or after completion of the works before construction commissioning terms of use, additional requirements for the construction of the detail, according to the local government building regulations ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ construction expertise 7) public road construction plan of the composition: simplified fault Act work quantity list explanatory description of municipal road 8) , street, House consist of road construction: general architecture part of the territory of the section transport and pedestrian movement org chart inženierrisinājum: building the necessary inženiertīkl: (water supply and sewerage, heating, ventilation and air conditioning, electricity, heating, gas supply, electronic communication networks, security systems) the technical diagrams and calculations of construction installation and reinforcement drawings and descriptions by other inženierrisinājum in environmental protection measures of construction and building materials specifications work for organizing the project economic assessment on the part of the admissibility of the use of the construction works during or after completion of the works before construction commissioning , terms of use, the assignment of the inspection arrangements for additional requirements for a construction bridge in detail, according to the local government building regulations ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ construction expertise 9) requirements in construction waste management 10) other requirements for the planning, lokālplānojum or detailed (if there is) 11) būvspeciālist of professional liability insurance for construction projects of the developer: the driver of a construction expert 6. Design conditions (date) 7. conditions for the commencement of the construction works 1) documents to be submitted (the required mark) : for construction civil liability compulsory insurance certificate and a copy of the responsible būvspeciālist of professional civil liability compulsory insurance policy copy coherent construction of public works Director in charge related article būvuzraug responsible commitment article traffic organization scheme building plan public works magazine autoruzraudzīb magazine autoruzraudzīb information on works contract workers (legal name, registration No., registration būvkomersant ID no) information about defensive coordinator (first name, last name, ID number, phone number, where the works are performed by more than one reviewer of the works) a national cultural monument protection Inspectorate's permission if the construction works for the national protected cultural monument protection zone or other documents if required by regulations 2) before the commencement of the construction works necessary to receive additional permissions: 3) the execution of particular provisions of: Executive (position, name, surname , the signature of the official veterinarian) SJSC Latvian state roads "or the būvvald marks and decision 8. Mark for design conditions (date) By Mark made on the design conditions for the commencement of the construction works, the conditions must be met in four years.
Officer (position, name, surname and signature of the official veterinarian) (date) 9 mark on the commencement of the construction works conditions (date) Officer (position, name, surname and signature of the official veterinarian) (date) 10. by mark the commencement of the construction works for the conditions the maximum duration of the works is ___ ____ ____ ____ ____ ____ ____ year 1) works to be taken up (date) 2) works for civil liability compulsory insurance policy the insurance period specified in 3 construction put into service) until (date) Officer (job title , name, surname and signature of the official veterinarian) (date) 11. Permit extended until (date) Officer (position, name, surname and signature of the official veterinarian) (date) This town planning (administrative) within a month of its entry into force may be challenged in the administrative procedure law. (name, address)  
The notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the "land cadastral designation of the unit" expandable if necessary to reflect the information in more than one land unit. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 2 of the Cabinet of Ministers of 14 March 2014 October rules no 633 construction site of the transfer Act of restoration/conversion/new construction _____ ____ ____ ____ ____ ____ 20. the year ____. _____ ____ ____ ____ ____ location of motorway Construction/merchant road km site designation of the building cadastre owner (name, position, name, surname), and public works contractor, (name, position, name, surname), amounted to this Act that the owner of the construction works shall pass, but the performer assumes the construction site to perform restore/conversion/new construction (necessary to underline) (a short list of the main foreseeable work) according to ________. the year ____. _ _____ _____ _____ _____ of contracts concluded no ____ between works by whom ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ and road/merchant road owner ____ ____ ____ ____ ____ ____ ____ ___ _____ ___.

The public works Director in charge (name, surname, address, certificate No., phone number) Būvuzraug (name, surname, address, certificate No., phone number) Autoruzraug (name, surname, address, certificate Nr. and telephone number) With the signing of this legislation, public works contractor takes over the construction sites referred to in his possession and to assume responsibility for the completion of the signing of the Act.

Before work need to get additional permission: notes.      
The Act is drawn up in duplicate, one copy for the store owner, the other the construction of public works.
Building owner's representative (signature of the official veterinarian) (name) Works for a representative (signature of the official veterinarian) (name) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 3 of the Cabinet of Ministers of 14 March 2014 October rules no 633 Cover work acceptance Act No. ____ _____ ____ 20. the year ____. _____ ____ ____ ____ ____ Site name and location of the Construction agent (the client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address, and phone number) the reviewer Commission works: the works of representative shipbuilding analyst owner's representative of a construction developer būvuzraug/(autoruzraug), the Commission found: 1. For adoption indicated: (a brief cover of the work description) 2. work performed in accordance with the construction plan of the developer: (first name and last name or the name of the legal person the name of the construction drawings, no date), the 3. During use, the following materials, structures and products (materials, design, product name, indicating the certificates or other documents certifying quality) 4. Jobs are run, not/(delete as appropriate) of derogation from construction. The deviations permitted are consistent with: (if there are deviations, specify to which they are aligned, drawing no and reconciliation date) the Commission decision to Cover the work is undertaken in accordance with the construction plan, regulations and standards, and they are adopted. On that basis, authorized to perform the following work: (work and design the name of the operator of representative Works) (signature of the official veterinarian) representative of the proprietor of the Building/būvuzraug (signature of the official veterinarian) a construction Developer (autoruzraug) (signature of the official veterinarian) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 4 of the Cabinet of Ministers of 14 March 2014 October rules no 633 works completion Act of _____ ____ ____ ____ ____ ____ 20. the year ____. ____ ____ ____ ____ _____ construction site (motorway, km) cadastral designation I, works a caller (organization name) representative, (position, name, surname) announced and to certify that all 20 ____. the year ____. ____ ____ ____ ____ _____ contract construction jobs are completed instead of the full 20 ____. the year ____. _____________________ un ar 20____. the year ____. ____ ____ ____ ____ _____ shipbuilding site referrals and acceptance Act of stricken shipbuilding site passes and completed jobs, the State joint stock company "Latvian state roads" ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ section (signature of the official veterinarian) certify that the performer of the works has finished the construction of the site all jobs.
Būvuzraug (name, surname, signature of the official veterinarian) With the signing of this legislation the State joint stock company "Latvian state roads" ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ section takes the place of the construction mentioned in his possession. Until the completion of any inspection works reviewer Yes/No (delete as appropriate) you need to install traffic restrictive road signs: State joint stock company "Latvian state roads" of the regions head of unit (first name, last name, signature of the official veterinarian) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 5 cabinet 2014 October rules 14 no 633 the adoption of the Act on the construction and long-term operation ____ ____ ____ ____ ____ ____ 20. the year ____. ____ ____ ____ ____ _____ no ____ ____ ____ Building Construction (subscriber) agent legal address permit no. ____ ____ ____ ____ ____ 20 issued. the year ____. _____________________, kas 20____. the year ____. _____ ____ ____ ____ ____ registered a construction developer address reg. Nr. __________________ reģ. datums ____.____.____________.

The main performer of the works registered office reg. Nr. __________________ reģ. datums ____.____.____________.

Būvuzraug registered office is exempt. Nr. __________________ reģ. datums ____.____.____________.
Būvspeciālist responsible: public works Director (name, certificate No.)

Civil engineer/managers (first name, last name, certificate No.)

Autoruzraug (if you have autoruzraudzīb) (first name, last name, certificate No.)
The performance of the work under the contract, the actual start of the end of the construction the main technical indicators: 1. Road and street works: the length of the period, 1.1 km ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 1.2 built cover, m2 ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 1.3. land of width, m grade ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 1.4 m width, roadway ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 1.5. built in road pavement design _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2. Bridge work: 2.1 bridge (culverts) length of __ _____ _____ _____ _____ _____ __________________________________________________________________________ 2.2. gabarīti _________________________________________________________________________________________________________________ 2.3. aprēķina slodze ___________________________________________________________________________________________________________ 2.4. laidumu materiāls un konstrukcija _____________________________________________________________________________________________ 2.5. laidumu skaits un garums ____________________________________________________________________________________________________ 2.6. brauktuves seguma materiāls _________________________________________________________________________________________________ 2.7. pieeju garumi __________________________________________________________________________________ _____ _____ _____ _____ _____ __ 2.8. access to land width of grade _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 2.9 approach paving width ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 3. other works of the construction works cost (euro) (construction costs, the price undercutting) the warranty period of the works is ___ _____ _____ years from the completion of the works the Act of signing date. Evaluating the performance of construction work, as well as construction and public works execution documentation, found that: 1) work completed under 20 ____. the year ____. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ the agreement no _____ _____ 2) are conducted in accordance with the work (building project developer), which coordinated the projects developed, (which match, date) and construction changes according to the change: notes.      
(According to the situation): 1. Opinions issued by the following institutions involved in construction and public works būvspeciālist: 1.1. operator; 1.2. civil engineer, būvuzraug; 1.3. autoruzraug if the autoruzraudzīb has been performed; 1.4. the municipality, where the building is located; 1.5. the bodies that issued binding technical or special terms. 2. the completion of the works. 3. Construction plan. 4. the owner of the izpilddokumentācij Road. 5. transfer of the place of the construction Act. 6. Inspection reports: 1) 2) 3) to Annex ____ _____ pages have this permanent construction commissioning is an integral part of the Act. SJSC Latvian state roads "/construction State control Office (not applicable) recognise as valid the construction operation. SJSC Latvian state roads "/construction State control Office (not applicable) responsible officer (job title, first name, last name) (signature of the official veterinarian) Note. 1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 6 of the Cabinet of Ministers of 14 October 2014 regulations no 633 ____ ___ ____ ____ ____ ____ ____ ____ ____ ____ būvvald explanatory note for the construction of the initiator (client) (persons name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) please consider submission (object (the road home) name).
I. conception documentation 1. Construction type (required mark): new construction alteration demolition 2. details of the object/existing House way: 1) shipbuilding Group (General provisions) 2) shipbuilding (existing), the intended use (according to the classification of structures) 3) object/home path length ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 4) object/House track width ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 5) object/home path connection ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6) in construction materials and construction products planned ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ___ 7) into an existing House road owner or, failing that, the legal possessor and/or user ____ ___ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person, registration No.) 8) construction waste management ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 9) construction waste volume ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 10) construction waste processing or disposal site ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3. details of the plot: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) ground the unit owner or, failing that, the legal possessor and/or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ (persons name, surname, personal code, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ legal name, registration No.) 4) where construction for the forest: a forest block) number ____ ____ ____ b) forest and nogabal number _ _ _ _ _ _ _ _ _ _ _ c) atmežojam area by the forest of nogabal ____ _____ _____ 4. Authorised person _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ legal name, registration No., address, telephone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 5. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., registration certificate No. būvkomersant. legal address, phone number) 6. proof: a construction developer solutions comply with the construction of the laws governing local authorities and binding rules.
A construction Developer (signature of the official veterinarian) (date) 7. Construction agent (subscriber) certificate: certify that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement House road new construction, conversion or demolition (not applicable) according to the plans drawn up documentation and construction waste delivered to them in the correct place.
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) in annex 8, the documents produced (according to the situation, the required mark): property, possession or usage rights supporting documents to the _____ ____ lp. the construction of the power of attorney to the agent ____ _____ lp. interpretive description on ___ ___ ___ lp. graphic documents on the ___ ___ ___ lp. If the construction for forest-land boundary plan with a marked atmežojam for construction in forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ___ ___ ___ lp. reconciliation with the people at _____ ____ lp. reconciliation with the institutions on the ___ ___ ___ lp. permission to the _____ ____ lp. ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ technical or special provisions on ___ ___ ___ lp. other documents on the ___ ___ ___ lp.
__ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ Fills the būvvald planning in 9. (lokālplānojum, detailed) main (papildizmantošan) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ____ 10. Marks for construction intentions acceptance officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) 11. Seed sales deadline (date) 12. Decision on the refusal to accept the intention of decision number date of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) 13. Mark the commencement of the construction works conditions (date) the participants in the works (legal person name, registration No. būvkomersant, licence, registration No., address , telephone number) of the responsible officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) (II) the completion of the works. 14. information on the completion of the works, certify that the works are complete and made in accordance with the documentation for the seed, accepted and submitted a izpildmērījum plan (in the case of new construction or alterations, in case the situation changed area).
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) 15. expiry date of the guarantee of the works after the adoption of the road into ____ _____ years atklājušo defects of construction works contractor will remove at their own expense. 16. check the object Works surveyed and found that works (date) in made/not made (necessary to underline) according to the plans drawn up documentation.
17. the decision on the known deviations from the accepted conception or construction of the laws governing the decision number date of the period for implementing the decision of the designated officer Būvvald (position, name, surname and signature of the official veterinarian) (date) 18. Marks for completion of works/home travel advice issued by the demolition of buildings, the number date of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Each part of the explanatory memorandum completed separately, developing seed documentation and complete the works. 3. the explanatory memorandum the relative box will expand, if necessary to reflect the information in more than one construction agent or the owner of the land on Earth. 4. House road rebuilding case, the explanatory memorandum shall be completed to the extent that characterized the House road changes. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 7 Cabinet 2014 October rules 14 no 633 ____ ___ ____ ____ ____ ____ ____ ____ ____ ____ būvvald construction for construction application agents (natural persons first name, last name or legal name of the person) (natural person or legal person code registration number) (residence or registered office, telephone number) (electronic mail address) please consider submission (object (municipal road, street, merchants road, road House) name).
The real property cadastre number _____ _____ _____ _____ _____ _____ _____ 1. Construction type (required mark): new construction work to 2. News about the object: 1) shipbuilding Group (General provisions) 2) structures the intended use (according to the classification of structures) the planned length 3) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ the planned width 4) _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 5) planned connection (atslēgum), crossings ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6) in construction materials and planned būvizstrādājumi _____________________________________________________________________________________
_______________________________________________________________________________________________________________________________ 7) nepieciešamo inženiertīklu ierīkošana (nojaukšana) ___________________________________________________________________________________
_______________________________________________________________________________________________________________________________ 8) būvniecībā radīto atkritumu apsaimniekošana ________________________________________________________________________________________ 9) būvniecībā radīto atkritumu pārstrādes vai apglabāšanas vieta
_______________________________________________________________________________________________________________________________ 3. details of the plot: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 3) ground the unit owner or, failing that, the legal possessor and/or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ (persons name, surname, personal code, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ legal name, registration No.) 4) where construction for the forest: a forest block) number ____ ____ ____ b) forest nogabal number ____ ____ ____ (c)) in atmežojam area by the forest of nogabal ____ ____ ____ 4. details of existing Municipal Road, street, merchants road, road House: 1) shipbuilding Group (General provisions) 2) shipbuilding existing use (according to the classification of structures) 3) Municipal Road, street, merchants road, House the path location ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 4) existing Municipal Road, street, merchants road, home of the road owner or, failing that, the legal possessor and/or user ____ ___ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person, registration No.) 5) in construction materials and construction products planned ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 6) construction waste management ____ ____ ____ ____ ____ ____ ____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 7) construction waste processing or disposal site ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 5. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features 6. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, telephone number) of the person specified in (name of contact person first name, last name, ID number, phone number, e-mail address) 7. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, telephone number) 8. Construction Developer (contractor) provided information on the composition of a planned construction project, it required, the development section ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 9. A construction Developer's assurance solution corresponds to the construction of laws and regulations governing local government binding rules.
A construction Developer (signature of the official veterinarian) (date) 10. Answer to the application and I would like to receive planning permission (specify one of the ways): by mail to the address indicated in the application electronically to the electronic mail address (in accordance with article 9 of the law on Notification, second paragraph) ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ personally the 11 būvvald. Request for additional information (documents) and/or a decision on extension to the response to send electronically to the e-mail address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 12. proposing the construction of receipts : Declare that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement the municipal road, street, merchants road, House of travel new construction or alterations (not applicable) the appropriate documentation for the seed developed.
The construction of the proponent (name, surname, signature of the official veterinarian) (date) 13. – the documents submitted in the annex (according to the situation, the required mark): property, possession or usage rights supporting documents to the _____ ____ lp. the construction of the power of attorney to the agent ____ _____ lp. construction the minimum composition to ____ _____ lp. If the construction for forest-land boundary plan with a marked atmežojam for construction in forest land and forest land atmežojam sketch, prepared according to the laws and regulations on tree felling of the forest in the ___ ___ ___ lp. reconciliation with the people at _____ ____ lp. reconciliation with the institutions on the ___ ___ ___ lp. ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ technical or special provisions on ___ ___ ___ lp. other documents on the ___ ___ ___ lp. Fill out būvvald 14. Marks for construction intentions of building permit number of the accepted date of Būvvald (position, name, surname and signature of the official veterinarian) (date) 15. the decision to issue the construction permit waiver decision number date of Būvvald (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the application for the Construction of the box extend, if necessary to reflect the information in more than one construction, local travel agents, street, merchants road, House or land owners, land units. 3. the municipal road, street, merchants road, the road home rebuilding case application of construction completed to the extent that describes the changes. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of Annex 8 Cabinet 2014 October rules 14 no 633 _____ _____ _____ _____ _____ _____ _____ _____ būvvald card proof Construction for the agent (the client) (persons name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration number, registered office, telephone number, e-mail address) please consider the application for renewal or demolition. (municipal road, street or road name of traders)  
The real property cadastre number _____ _____ _____ _____ _____ _____ _____ i. seed documentation 1. Construction type (required mark): updated the demolition 2. News on the local road, street, merchants road, road House: 1) shipbuilding Group (General provisions) 2) shipbuilding (existing), the intended use (according to the classification of structures) 3) Municipal Road, street, merchants road, houses the path length _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4) Municipal Road, street, merchants road, home of the road width ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 5) Municipal Road, street, travel, home business travel location ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 6) in construction materials and construction products planned _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 7) existing Municipal Road, street, merchants road, home of the road owner or, failing that, the legal possessor and/or user ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person, registration No.) 8) construction waste management ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 9) in construction the volume of waste generated by the _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 10) construction waste processing or disposal site ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 3. details of construction funding sources: private means public law legal persons means European Union policy instrument features other foreign financial help features
4. Authorised person (an individual's name, surname, personal code, place of residence, telephone number, electronic mail address or legal name, registration No., address, and phone number) of the person specified contact person (first name, last name, ID number, phone number, e-mail address) 5. A construction Developer (physical person's name, certificate number or the name of the legal person, registration No., būvkomersant registration certificate No., address, and phone number) 6. proof of a construction developer solutions comply with the construction of the laws governing local authorities and binding rules.
A construction Developer (signature of the official veterinarian) (date) 7. Construction agent (client) certificate Certifying that the property attached supporting documents (copies) are authentic, truly and completely, for the object is not a burden, prohibition or dispute. Undertake to implement the reconstruction or demolition (not applicable) designed to work according to the documentation for the seed.
The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) in annex 8, the documents produced (according to the situation, the required mark): property, possession or usage rights supporting documents to the _____ ____ lp. the construction of the power of attorney to the agent ____ _____ lp. interpretive description on ___ ___ ___ lp. graphic documents on the ___ ___ ___ lp. reconciliation with the people at _____ ____ lp. reconciliation with the institutions on the ___ ___ ___ lp. permission to the _____ ____ lp. ___ ____ ____ ____ ____ ____ ____ ____ ____ ____ technical or special provisions on ___ ___ ___ lp. other documents on the ___ ___ ___ lp.
_____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ ____ ____ ____ Completed 9. Mark būvvald for the construction of the acceptance of the idea of a responsible officer of the Būvvald (position, name, surname and signature of the official veterinarian) (date) 10. Seed sales deadline (date) 11. Decision on the refusal to accept the intention of decision number date of Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) 12. Commencement of the construction works, the conditions in Būvvald documents (required mark): participants in the construction/Builder civil liability compulsory insurance certificate and a copy of the responsible būvspeciālist of professional civil liability compulsory insurance policy public works Director in charge of the copy of the article būvuzraug of the commitment the responsible commitment of article building plan for public works žur professional information for the participants of the construction works or of other documents, the Builder if the regulations so provide _____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ 13. Mark the commencement of the construction works conditions (date) Construction Contractor/Builder (an individual's name, surname, personal code, place of residence, phone number, or the name of the legal person, registration No. būvkomersant, licence, registration No., address, telephone number) of the responsible officer of Būvvald (position, name, surname and signature of the official veterinarian) (date) (II) the completion of the works. 14. information on the completion of the works, certify that the works are complete and made in accordance with the documentation for the seed accepted. Submitted to: Journal of the works, important design and cover the work of making acts of construction built in assurance of compliance with the Act, copies of the Construction agent (the client) (first name, last name, signature of the official veterinarian) (date) 15. expiry date of the guarantee of the works at the municipal road, the street making service ___ ___ ___ years atklājušo defects of construction works contractor will remove at their own expense. 16. check the object object surveyed (date) and found that the works are made/not made (necessary to underline) according to the plans drawn up documentation. 17. the decision about found deviations from the accepted conception or construction of the laws governing the decision number date of the period for implementing the decision of the designated officer Būvvald (position,       name, surname and signature of the official veterinarian) (date) 18. Marks for the completion of the works of the Būvvald Officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Each receipt card fill out separate parts – designing conception documentation and complete works. 3. in the receipt card aisle of the relevant Extensible if necessary to reflect the information in more than one construction, local travel agents, street, merchant road. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of Annex 9. Cabinet of Ministers of 14 March 2014 October rules no 633 ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ building permits of No būvvald.   Annex No.       (date)          

1. the participants in the works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 2. Guest būvspeciālist: 1) responsible works Manager (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.)

2) responsible būvuzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.)

3) autoruzraug (an individual's first name, last name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.)

4) defensive coordinator (an individual's first name, last name, ID number, phone number) Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the annex building boxes expandable if necessary to reflect more information. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk annex 10. Cabinet of Ministers of 14 March 2014 October rules no 633 statement of absence of structures with cadastral designation (building name) located, is demolished.   (location)  
The real property cadastre number ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _____ 1. News of the demolished structure: 1) the owner of the building or, failing that, the legal possessor and/or user ____ ___ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ (an individual's name, social security number, or the name of the legal person registration No.)
2) shipbuilding Group (General provisions) 3) construction usage (according to the structure of the classification) 2. News of the plot of land where the demolished structure: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) ground the unit owner or, failing that, the legal possessor and/or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ (persons name, surname, personal code, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ name of legal person Registration No.) 3. details of construction: 1) the construction of the initiator (client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address, and phone number) 2) construction works carried out on the basis of (the required mark): accepted the intention and explanatory memorandum (date) issued the construction permit no. ____ _____ (date) 3) object surveyed (date) statement drawn up 4 ____ ____ ____ copies. Izpilddokumentācij is passed to the store ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ _____ ___.
Būvvald the designated officer (position, name, surname and signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. Cognitive relative box extend, if necessary to reflect the information in more than one agent, construction construction or land owners, land units. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 11 cabinet 2014 October rules 14 no 633 proof of construction readiness of all or part of the operation of the Construction agent (the client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and telephone number) 1. Announces that (construction of all or part of the name), the works carried out on the basis of the planning permission no ____ ____ ____ ____ ____ _ issued, is completed. (date)   (būvvald name)  
2. News about the built object (s): 2.1 local roads, streets (road transport), merchant, House roads total length: 1) ____ ____ ____ m 2) total area, which performed works, ____ ____ ____ 3 m2) area roadway ____ ____ ____ m2, sidewalks area ____ ____ ____ 4 m2) of lawn area ____ ____ ____ m2, the outlying area ____ ____ ____ 5 m2) with the concept of medicinal product falls media ____ ____ ____ m2 6) Municipal Road, the street (road transport), merchants road, House of travel technical characteristics: No. PO box Civil engineering technical specifications (m) 1.     2.     3.    
2.2. external inženiertīkl: 1) inženiertīkl type (such as water, sewage, cable) _ _ _ _ _ _ _ _ _ _ _ _ 2) route length ___ ___ ___ ___ m 3) surface part ____ ____ ____ 4 m) underground part of ___ ___ ___ ___ m 5) inženiertīkl technical characteristics: No. PO box Inženiertīkl-type construction material cross section (mm) (m) 1.         2.         3.        
3. details of the plot in which the construction: 1) land cadastral designation of the Vienîbas _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 2) land units address _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ 3) ground the unit owner or, failing that, the legal possessor and/or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ (persons name, surname, personal code, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ legal name, registration No.) 4. details of the municipal road, street, merchants road, houses a path that made construction: 1) shipbuilding Group (General provisions) 2) shipbuilding cadastral designation ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ ___ 3) construction usage (according to the classification of structures) 4) shipbuilding location ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ 5) the owner of the building or, failing that, the legal possessor and/or user _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ __ (persons name, surname, personal code, or ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ the name of the legal person registration No.) 6) total length, which performed works, ____ ____ ____ m 7) total area, which performed works, ____ ____ ____ m2, including: area roadway ____ ____ ____ __ m2 area sidewalks _____ _____ m2 of lawn area ____ ____ ____ the outlying area m2 ____ ____ ____ m2 8) with medicinal concept falls media ____ ____ ____ m2 9) Municipal Road, the street (road transport), merchants road, houses the technical characteristics of the road: no PO box Civil engineering technical specifications (m) 1.     2.     3.    
5. details of construction: 5.1 construction started and completed on (date) to (date) 5.2. construction projects or part of the match, developed by ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ (the construction plan of the developer's name, certificate number or the name of the legal person, ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ registration No., būvkomersant registration certificate No., address, telephone number) 5.3 changes and deviations from the agreed construction is/is not (not applicable), its duly agreed and marked technical documentation in the implementation of the construction plan 5.4 participated in construction of the participants 5.4.1. the reviewer of the works: (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 5.4.2. responsible public works Director (an individual's first name, last name, certificate No.)

5.4.3. būvuzraug (an individual's first name, last name, certificate No.)

5.4.4. a construction Developer (autoruzraug) (an individual's first name, last name, certificate No.)

5.5. construction waste management take (waste authorities name) 6. Certify that: 6.1. structure, or a portion thereof is ready for adoption into service; 6.2. construction waste management is carried out in accordance with the laws and requirements of waste management, including construction waste classified as hazardous waste is managed in accordance with the laws and requirements of the management of hazardous waste; 6.3. after the adoption of the shipbuilding or part into _____ years works of atklājušo defects of the reviewer will prevent work at its own expense; 6.4. the total cost of construction is a ____ _____ euro, including public law legal persons, policy instruments of the European Union or other foreign financial help features-_____ ___ _ euro; 6.5. outstanding works (territory greening, a fragment of the facade decoration) will be completed in the following scope and limits: No. PO box The name of the job Completion date Unit quantity 1.         2.         3.        

The construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) the performer of the works (first name, last name, signature of the official veterinarian) (date), the public works Director in charge (name, surname, signature of the official veterinarian) (date) Būvuzraug (name, surname, signature of the official veterinarian) (date) a construction Developer (autoruzraug) (first name, last name, signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. the relative box Proof expandable if necessary to reflect the information in more than one agent, construction construction or land owners, land units. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk of annex 12 Cabinet 2014 14 October Regulations Act No 633 of the code (the building or part of a name, location, land units cadastral designation) adoption in service (the Act of dialing location) on (date) construction type (required mark): new construction work to the construction of the initiator (client) (persons name, surname, personal code, place of residence and telephone number or the name of the legal person, registration No., address and telephone number) 1. Making work out būvvald/construction of national control Office (delete where inapplicable): 1.1. building (first name, last name, construction control certificate No.) 1.2. the architect (name, title) 1.3. other official (name, title) 2. Hire guest: 2.1 būvuzraug (an individual's first name, last name, certificate No.)

2.2. a construction Developer (autoruzraug) (an individual's first name, last name, certificate No.)

2.3. the participants in the works (legal name, registration No. būvkomersant, licence, registration No., address, telephone number) 2.4.     (body/specialty, position, name, surname)
3. Būvvald/construction of national control Office (not applicable) met: 3.1.-the transfer of a construction ____ ____ ____ volumes 3.2. execution of works execution and documentation: 3.2.1. public works Journal No ___ ___ ___ ___ 3.2.2. autoruzraudzīb Journal No. _____ ____ ___ 3.2.3. important design and cover the work of making legislation on ____ _____ lp. ___ ___ ___ ___ volume (s) 3.2.4. būvuzraug report on the implementation of the plan of the building to the _____ ____ lp. 4. Būvvald/construction of national control Office (not applicable) assessment: 4.1 construction proposing construction of the proof of the maturity of all or part of the service; 4.2. the following State, municipal and other authorities opinions: 4.2.1.       no opinion ___ ___ on ___ ___ ___ lp.   (body)   (date) 4.2.2.       no opinion ___ ___ on ___ ___ ___ lp.   (body)   (date) 4.2.3.       no opinion ___ ___ on ___ ___ ___ lp.   (body)   (date) 4.2.4.       no opinion ___ ___ on ___ ___ ___ lp.   (body)   (date) 4.2.5.       no opinion ___ ___ on ___ ___ ___ lp.   (body)   (date) 4.3 construction Developer's opinion No ___ ___ on ___ ___ ___ lp.   (date)  
5. Būvvald/construction of national control Office (not applicable) heard the hiring Executive and outside specialists and found: 5.1 the construction works carried out on the basis of No construction permit.   issued by (date) to (name of būvvald) 5.2 construction started and completed on (date) to (date) 5.3. structure or part thereof complies with the construction plan, developed by (a construction Developer's name, certificate number or the name of the legal person, registration No., registration certificate No būvkomersant.)
5.4. changes and deviations from the agreed construction is/is not (not applicable), they established a coherent and indicated in the technical documentation. 6. The municipal road, the street (road transport), merchants road, home of the road technical economic indicators: total length 6.1 ___ ___ ___ ___ m 6.2. the total area of the works, ____ ____ ____ m2 6.3. suspended area ____ ____ ____ m2, sidewalks area ____ ____ ____ m2 of lawn area 6.4 ____ ____ ____ m2, the outlying area ____ ____ ____ m2 6.5.50 with medicinal hillsides media ____ ____ ____ m2 6.6 Municipal Road, the street (road transport), merchants road, houses the technical characteristics of the road: no PO box Civil engineering technical specifications (m) 1.     2.     3.    
4.2. functional description: No. PO box Civil engineering use (m2) 1.     2.     3.    
7. external inženiertīkl: 7.1. form of inženiertīkl (such as water, sewage, cable) ____ ___ _____ 7.2. route length ___ ___ ___ ___ m 7.3. surface part ____ ____ ____ m 7.4. underground part of ___ ___ ___ ___ m 7.5. inženiertīkl technical characteristics: No. PO box Inženiertīkl-type construction material cross section (mm) (m) 1.         2.         3.        
8. environmental accessibility solutions (if planning permission for certain accessibility requirements): to access the facilities area roads roads and streets, sidewalks and walkways pedestrian crossing for the chance to move from one level to another height level, especially for persons with functional disabilities handicapped parking number ____ ____ ____ ____ _____ 9. Construction total cost (after the construction of the proof of the agent) is ___ ___ ___ ___ euro, including public law legal persons, policy instruments of the European Union or other foreign financial help features-___ ___ ___ ___ euro.
10. The equipment inspected and deemed fit for service, which represents the opinion annexed to this Act. 11. Outstanding works (territory greening, tree and shrub planting) must be completed and the following time limits: No. PO box The name of the job Completion date Unit quantity 1.         2.         3.        
12. After the adoption of all or part of the building into operation ____ ____ ____ years atklājušo works the main operator of the construction defects will eliminate at their own expense.
13. Būvvald/construction of national control Office (not applicable) proposes to recognize as valid for operation. (building or part thereof) of the buildings and 14 parts are brought (contested building permits) ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ court case number ____ ________. 15. Acceptance report drawn up in ____ ____ ____ copies. Izpilddokumentācij is passed to the store ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ _____ ___.
Building     (first name, last name, signature of the official veterinarian) Architect (first name, last name, signature of the official veterinarian) Officer (first name, last name, signature of the official veterinarian) Guest: būvuzraug (name, surname, signature of the official veterinarian) a construction Developer (autoruzraug) (position, name, surname and signature of the official veterinarian) met with the Act: construction of the initiator (client) (first name, last name, signature of the official veterinarian) (date) the performer of the works (first name, last name, signature of the official veterinarian) (date) notes. 1.1 document property "signature" does not fill in, if an electronic document is drawn up according to the law on electronic document design. 2. If making the Office, paragraph 1, of the Act clarified according to the situation, indicating officials make the hire. 3. In the box extend, if necessary to reflect more information than one construction, construction of the agent or the owner of the land on Earth. 4. the premises or the part of the Act in the event of alterations (6) shall be completed to the extent that describes the changes. The Minister of economy, Minister of Home Affairs in place of Richard Kozlovsk a