Cabinet of Ministers Regulations No. 662 in Riga on august 3, 2004 (Mon. No 46 82) shared drainage system construction, operation and maintenance costs, distribution and billing order Issued in accordance with article 26 of the law on Drainage in the second part of rule 1 determine the drainage system of sharing (hereinafter the system) the construction, operation and maintenance activities (hereinafter measure) the cost calculation, the distribution and billing arrangements. 2. to measure the amount of costs to be apportioned as appropriate between the land owners or legal possessor of land owners, the legal possessor or their authorized person submitted relevant Fields support regional agricultural administration (Administration) joint submission of the cost distribution. 3. Administration costs of the measure of the amount allocated in proportion to the respective system of land ownership or possession of the legal benefit of the obtainable water discharge capabilities regardless of this option. 4. To distribute the event costs about between the land owners or legal possessor, governance: 4.1 system overview plan (M 1:10 000): 4.1.1. measure the affected drainage system within the catchment area;
4.1.2. the measure affected land or legal possession;
4.1.3. measure the affected land or legal possession;
4.1.4. the measure affected land ownership or legal possession of land cadastral value;
4.1.5. the different shapes of the land nogabal;
4.2. split each land owner or legal possessor of land affected by the implementation of different measures, ground nogabalo, depending on terrain and other indicators that characterize the efficiency of the measure. 5. the cost of the amount of pointer for each land Ltd. the owner or legal possessor (S1; S2; S3 ... SN) is calculated using the following formula: F (1, 2, 3 ... n), each in a different land area (ha) nogabal; V (1, 2, 3 ... n), each land ownership or legal possession of land in average hectares cadastral value; k – drainage impact factor for each different land nogabal; k = 1.0, if reclamation impact high, where the area's low, flat terrain and it is restored a measure of drainage system for smooth operation; k = 0.5, if the impact of the land reclamation, the area concerned is located in the rugged terrain of the high, and the smooth functioning of the drainage systems was assured well before the implementation of the measure.
6. If the measures implemented in road, rail, land partition the building territory or at road, railway, building area: 6.1. calculate their land ownership or legal possession of the average Earth hectare cadastral value, which is in the system, using the following formula: 6.2 adequate factor: 6.2.1. k1 = 2.0 – measures the impact of the implementation of road land partition bar; 6.2.2. k2 = 1.5 – measures the impact of the implementation of the railway land partition bar; 6.2.3. k3 = 1.2 – measures the impact of the implementation of the building site.
7. each land owner or legal possessor measures cost percentage (M1; M2; M3 ... MN) is calculated using the following formula:-all the land owner or legal possessor costs about a score for each land owner or legal possessor costs about indicators.
8. the administration of the administrative procedure law shall inform the applicant in writing of the performed calculations and add billing information to them. 9. Settlement of accounts with the construction, maintenance and operation of service providers maintain landowner or legal possessor, which is located within the system, or the land owner or legal possessor authorised person. Prime Minister i. Emsis Minister of Agriculture m. rose