Advanced Search

Riga South Bridge Construction Planning Permission Issue

Original Language Title: Rīgas Dienvidu tilta būvniecības būvatļauju izsniegšanas noteikumi

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Cabinet of Ministers Regulations No. 797 in Riga 2004 21 September (pr. No 54 4) Riga South Bridge construction building permits issued rules Issued in accordance with article 6 of the law on construction of the first part of paragraph 3 of rule 1 defines the issue of building permits, building and autoruzraudzīb construction of contracts and conditions of service of the journal Riga South Bridge first round of construction. 2. būvvald of Riga (hereinafter būvvald) at the Riga South Bridge area a detailed approval issued construction permit that provision referred to in paragraph 3 the Riga South Bridge the first round during the construction phase, if they have developed the technical design (technical project conducted a construction expertise and received a positive opinion, technical expertise in the project has been approved by the Cabinet of Ministers on 1 April 1997 of Regulation No 112 "General provisions" in the order) and the whole construction is generally developed and coherent sketch project. 3. Building permits can be obtained for such South Bridge pre-proposal stages of construction: 3.1 the stakes and piles of reasoning;
3.2. the bridge spans works;
3.3. connecting the complex works;
3.4. construction of estakād across the coast road and the Moscow Street. 4. To get planning permission for a separate South Bridge the first round during the construction phase, the client shall submit: būvvald 4.1. construction permit;
4.2. the consistent design project;
4.3. in the approved construction phase the technical project (technical project requires a positive construction expertise);
4.4. the works construction phase project. 5. Riga South Bridge pre-proposal subscriber switch: 5.1. one (common) Riga South Bridge pre-proposal complex building construction contract;
5.2. the one (common) Riga South Bridge pre-proposal construction complex autoruzraudzīb. 6. Būvvald, simultaneously with the building of the stakes and the justification for the construction of a single issue of the journal Riga South Bridge pre-proposal construction complex. Prime Minister i. Emsis economic Minister j. lujans