The Provisions On "operational Programme Infrastructure And Services" Apakšaktivitāt "appendix 3.4.2.1.1. National Monuments Conservation, Urban Renewal And Infrastructure Adaptation To The Development Of Tourism Products"

Original Language Title: Noteikumi par darbības programmas "Infrastruktūra un pakalpojumi" papildinājuma 3.4.2.1.1.apakšaktivitāti "Valsts nozīmes pilsētbūvniecības pieminekļu saglabāšana, atjaunošana un infrastruktūras pielāgošana tūrisma produktu attīstībai"

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Clarifies 12.06.2008. Latvian journal, no. 91 (3875) Cabinet of Ministers Regulations No. 187 in Riga, March 17, 2008 (pr. 9. § 17) the rules on the "operational programme infrastructure and services" apakšaktivitāt "Appendix 3.4.2.1.1. National Monuments conservation, urban renewal and infrastructure adaptation to the development of tourism products" Issued under the European Union's structural and cohesion funds act 18 paragraph 10 of article i. General questions 1. determines: 1.1. procedures for implementing the action programme ' infrastructure and services ' Appendix 3.4. Qualitative environmental priorities "life and economic activity" UR3.4.2.pas "tourism" contributes 3.4.2.1. Oh tivitāt's "national interest" of the tourism product development activity "bottom 3.4.2.1.1. National Urban monument conservation, restoration and adaptation of the infrastructure for the development of tourism product "(hereinafter referred to as the activity);
1.2 project submission evaluation criteria;
1.3. the requirements of the project applicant;
1.4. the responsible institution and liaison body, as well as the distribution of competences between these institutions and cooperation arrangements;
1.5. the functional departments of the responsible authority form.
2. National Urban monument status is defined in the law on cultural monuments, protection, use and restoration.
3. The purpose of the activity is to promote the importance of national cultural tourism product development by providing internationally recognised the value of the Latvian cultural heritage tourism infrastructure improvements.
4. activities to target the Latvian residents and foreign travellers.
5. the meaning of these rules the following terms are used: 5.1 tourist product – a product or service that is or will be in demand on the market and which is created or adapted to the interests or needs of tourists;
5.2. extended tourist product – investing in investment in national monuments in the urban part, technically improved existing tourism products, without creating additional new product or service to the interests or needs of tourists;
5.3. a new tourist product – through the European Regional Development Fund (hereinafter the project) to the national significance of the urban monument base created a tourism product, which has not yet been placed on the market.
6. the implementation of the activity is detected in the project application selection.
7. the implementation of the activity provided by the responsible authority and the liaison body. Functions carried out by the responsible authority of the Ministry of Economic Affairs (hereinafter referred to as the responsible authority). The cooperation of the public authority for investment and development agency of Latvia (hereinafter referred to as cooperation body). The cooperation body is the functional authority.
8. Responsible authorities and cooperation authority: responsible authority: 8.1 8.1.1. ensure the activity implementation, monitoring and control;
8.1.2. the n + 2 and n + 3 principle of activity level, the implementation of the Council of 11 July 2006, Regulation (EC) No 1083/2006 laying down general provisions on the European regional development fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No 1260/1999 (hereinafter referred to as the Council Regulation No 1083/2006), 1 and article 93, paragraph 2 (published in the official journal of the European Union on July 31, 2006, the OJ L 210, 25-78);
8.1.3. inform the public and provide publicity on matters related to the implementation of the activity;
8.2. cooperation authority: 8.2.1. cooperation bodies placed on the internet (www.liaa.gov.lv) home page of the national significance of the long list of monuments, which are included in the national list of protected cultural monuments until 1 January 2007;
8.2.2. creates a project application to the Evaluation Commission and its composition in coordination with the responsible authority and develop evaluation Commission;
8.2.3. before the adoption of the project submission developed, approved and published in the internet home page of the liaison bodies of the project application selection and evaluation procedures, project submission form, the evaluation, the evaluation methodology, the European regional development fund project submission form (hereinafter referred to as the project submission form) the fill method, the agreement for the implementation of a project, including intermediate and final expenditure report forms and a list of supporting documents;
8.2.4. the assessment method of coordination with the responsible authority selects project applications and ensure evaluation;
8.2.5. Decides on the approval of the project application, approval or rejection of the condition and inform the European regional development fund, the project applicant (hereinafter referred to as project applicant);
8.2.6. the closing agreement with the beneficiary of the financing for the implementation of a project;
8.2.7. support activities within the approved project monitoring and control;
8.2.8. and n + 2 n + 3 principle on the project level, realizing the Council Regulation No 1083/2006 and article 93, paragraph 2;
8.2.9. analyse problems related to activity and project implementation and provide the responsible authority proposals for activities and improvement of the implementation of the project;
8.2.10. examine and approve the funding requested payment request and prepare the Declaration of expenditure;
8.2.11. inform the public and provide publicity matters relating to activities within the submitted project applications;
8.2.12. ensure data retention in the European Union fund management information system for project submissions and projects;
8.2.13. informed about the application of project preparation, project implementation and the fulfilment of the conditions of the arrangement.
9. the activities implemented in the framework of projects co-financed by the European regional development fund. The overall activity within the available public funds have 12,402,423.65 lats. It consists of the European regional development fund of 10 542 060 lats, the State budget and local budget funds not less than 1,860,363.65 lats.
II. Project requirements the applicant 10. activities within the project application can be submitted to the municipality (hereinafter referred to as project applicant) whose property (recorded in the land or in municipal accounting balance sheet) is a national monument of urban part that until 1 January 2007 will include a national list of protected cultural monuments.

11. activities within the funding not eligible, if the project applicant: 11.1. has not fulfilled obligations relating to the payment of taxes arising from the legislation of the Republic of Latvia;
11.2. tried to get confidential information in your possession or control of a project submission Evaluation Commission or the authority, or the authority of this cooperation project submission or other European Union fund co-financed project submission evaluation.
III. eligible and ineligible activities Funding is allocated 12 national monument or part of urban renewal, conservation and adaptation of the infrastructure for the development of the tourism product, if object tiskum the Authentica.
13. funding is not granted: 13.1. actions which are initiated by the applicant of the project before the agreement with the liaison body for the implementation of the project, excluding this provision 14.1 above the bottom;
13.2. the Museum of art and history for the purchase and restoration of the exposure;
13.3. the new building planning and construction, with the exception of this rule 14.6. referred cases.
IV. Eligible and ineligible costs 14. activities within the eligible costs are as follows: 14.1. construction preparation and infrastructure required for engineering studies, costs incurred no earlier, as laid down in the regulations on the procedures for European Union structural and cohesion funds in the participating institutions provide the planning document preparation and implementation, and these funds shall not exceed 7% of the project's eligible direct costs. Direct eligible costs of the project are in this subparagraph and that rule 14.3., 14.4, 14.5, 14.6.., 14.7 and 14.8 in determining costs, as well as the cost of building and autoruzraudzīb;
14.2. the project administration and monitoring costs (the consideration for the particular task or achievement of results – project management, accounting, building, autoruzraudzīb) not exceeding 3% of the project's eligible direct costs. Activities referred to in this paragraph for the performance artist can only be associated to a company or service contract, remuneration including the national employers ' compulsory social insurance contributions, as determined by the laws and regulations in the field of taxation;
14.3. the dismantling of buildings and premises, renovation, restoration and reconstruction costs. Dismantling of buildings and premises costs must not exceed 10% of the project construction estimates of eligible costs;
14.4. the infrastructure (Street, park, playground, channel, moat, mound, bridge, dam, road, mountain, cemetery, prospect, the beach, trail, redoubt, signs and tourist information booth) construction, restoration, rekonstruk tion, renovation and reinforcement costs;
14.5. track, trails, an artificial body of water, the monuments and sculpture, environmental art object, a fountain, a fence, lapeņ, Pergola, plant containers, the walls, benches, waste receptacles installation, construction, restoration, reconstruction, renovation and reinforcement costs;
14.6. the construction cost of public lavatories;
14.7. area home improvement and landscaping costs, lighting equipment, acquisition and reconstruction of the installation costs;
14.8. urban monuments of national importance for the promotion of the marketing activity costs, does not exceed 3% of the project's eligible direct costs. Aided only those marketing efforts, which is a direct reference to the national significance of the urban monument or part thereof: 14.8.1. information editing and translation costs, photos and material purchase, typographic material (brochure, poster, booklet, or postcard) preparation costs (design, layout, printing and reproduction);
14.8.2. information editing and translation costs, the acquisition cost of the photograph audiovisual material, video filming and Assembly costs and royalties costs (if you purchased music, photos, video);
14.8.3. information editing and translation costs, purchasing costs for the preparation of electronic material on the internet (website, banners, articles), website development costs;
14.8.4. participation in specialized tourism fairs, exhibitions (the membership fee; the bench area for rent; the rent on the exposure area, the rent for the stand construction, stand structures manufacturing costs; rental charge for the stand equipment (for example, electricity, carpet) information into the catalog of the exhibition or fair; a media publication, exhibition or publication trade show organizer's homepage on the internet; product demonstration costs, rentals of presentation and Conference room, permit and license cost; cost of translation services exhibition and trade fair venue; employee travel (travel) costs in accordance with the law norms (daily allowance, expenses for hotel (accommodation), including breakfast in hotel expenses); travel (transport); luggage, including Billboard and the transport costs of exposure to exhibitions, trade fair venue and back up to the permanent jobs, as well as the fee for the transfer, if the project planned for several exhibitions, fairs; economy class public transport costs to the exhibitions, trade fair venue and back up to the permanent jobs, as well as the fee for the transfer, if the project planned for several exhibitions, fairs; local transport costs to get to the exhibition or trade fair venue (public transport, taxi, rental vehicle); fuel costs, if you are using the service road or vehicle being hired; travel insurance; the issue of visas);
9.3. the costs relating to information and publicity measures for the implementation of a project under the European Union funds the implementation of the laws regulating, not exceeding 1% of the project subject to the direct cost of the building;
14.10. the value added tax, directly linked to the project, co-financed the project applicant cannot recover fully or partially according to the laws of the Republic of Latvia.
15. activities are not eligible the following costs:

15.1. interest payments on money transfers, commissions, losses on currency exchange and other direct financial expenditure;
9.4. customs duties and levies, value added tax, except that rule 14.10. cases referred to;
15.3. fines, penalties, interest on arrears, fines and legal expenses;
15.4. the staff paid bonuses or gifts;
15.5. real estate purchase or rental costs;
15.6. the costs relating to leasing and rental transactions;
15.7. simplified simplified renovation and reconstruction costs;
15.8. costs incurred before an agreement on the implementation of the project, except that rule 14.1. case referred.
16. in the framework of the activity supports only the eligible costs directly related to the project activities are proportionate and reasonable.
17. Purchase required for project implementation, project carried out by the applicant in accordance with the laws and regulations governing procurement procedures.
18. activities under the projects, not combined with other funding programmes or individual funding projects support the same eligible costs, with the exception of State budget allocations according to the municipal territory development index in accordance with the laws and regulations governing the national budgetary procedure for grants to municipalities to fund the European Union for the implementation of projects co-financed.
19. The European regional development fund does not provide the intensity 85% of the total over the eligible costs.
20. activities within the project, the applicant may receive funding for a maximum of one project submission. The maximum of the European Regional Development Fund funding one project submission application submission in the first round of projects is 700 000 LVL, the second project application deadlines — 400 000 lats. The minimum value for the European Regional Development Fund funding one project submission in both project application submission rounds is 70 000 lats.
21. the project activities referred to in the application must be implemented within three years after the institution of cooperation agreement for the implementation of a project.
V. Project application and selection of project proposals submissions submissions submissions submitted 22 Projects in two rounds. The first round is organised by the European regional development fund of 5 600 000 lats, the second round is organised for the remainder of the funding.
23. the notice of project application submission and submission to authority, the suspension of a cooperation agreement with the responsible authority, issued: 23.1. newspaper "Gazette";
23.2. the liaison bodies homepage on the internet (URwww.liaa.gov.lv).
24. Notice of project application acceptance issued at least a month before the start of the project, indicating the acceptance of the application, the project application selection round within the funding available, start and end dates, and the address for the submission of project cooperation bodies in electronic mail address. The statement said information is binding on the applicant, the cooperation of the project authority, the responsible authority and the managing authority.
25. To apply for funding of the project, the applicant shall submit to the institution the bass collabo project submission. Application of the project consists of: 25.1. completed project submission form (annex 1);
25.2. in addition to the documents to be submitted: 25.2.1. State revenue service certificate, which certifies that the applicant does not have tax arrears (statement of the project at the date of the application shall not be earlier than 30 calendar days), the consent of the applicant or the letter (the original of the letter is submitted separately, not attached to the application in the project), in which the project applicant authorizes the liaison authority of the State revenue service to request a certificate (annex 2) that the municipality does not have a tax debt (tax arrears);
25.2.2. Project Charter, a copy of the applicant;
25.2.3. value added tax, a copy of the registration certificate, if the applicant is a project of value added tax-taxable person;
25.2.4. būvvald issued by planning and architectural task copy if būvvald are not accepted and will not be filed for a construction project or design technical design stage;
25.2.5. būvvald planning and architecture issued on behalf of the owner of the specified or all utilities managers issued a copy of the technical regulations (including national cultural monuments protection inspection a copy of the technical regulations) if būvvald is not accepted and is presented in a construction project or design technical design stage;
25.2.6. construction plan approved by the būvvald (sketch draft) copy when the construction of the technical design stage is not accepted in būvvald before the application of the project and if it is developed in accordance with the laws and regulations (if applicable);
25.2.7. būvvald's accept projects (technical design stage) If a construction technical stage of the project has been accepted prior to the application of the project (if applicable);
25.2.8. pursuant to Cabinet of Ministers on 19 December 2006, the provisions of no. 1014 "rules for the Latvian et seq of the LBN 501-06" Būvizmaks procedure "to develop the construction cost estimates, indicating a copy and separating all labour and materials cost positions that are included in the project and eligible non-eligible costs, if the construction plan has been prepared and accepted by the būvvald before the application of the project;
25.2.9. a copy of the certificate of the civil engineers who developed them, if the construction project is drawn up and accepted the submission of the project before būvvald for trouble;
25.2.10. local Government Council (Council) decision about participating in the project and all project-related implementation of legal commitments, indicating the total cost of the project application and source of pre-financing;
25.2.11. Finance Ministry letter of consent for the purposes of the project, if the municipality is in the process of financial stabilisation;
25.2.12. cooperation protocols with the copy of the contract or of the travel agency, or package tour operator service provider registered in the tourism development of national tourism service provider database, created as part of the project or object into the well-appointed tourist route after project implementation (if available);

25.2.13. first draft submission deadlines, print or copy from the Latvian and/or foreign merchant tourism directory or guide (2005, 2006 and 2007 editions), which provides information about tourism offer at least the Latvian level. Print or copy should contain a title, Publisher, year and description (if available);
25.2.14. ownership of registered in the land registry a copy of the document certifying the property of the municipality in which you invest in the funds. If the property is not registered in the land registry, the State land service of the original certificate of property belonging to the municipality and composition, as well as asset tracking copy of a card on the property, which invests funds;
25.2.15. project applicant questionnaire-application of value added tax to the project, if a project's eligible costs is included in the value added tax. The questionnaire prepared in accordance with the laws and regulations that determine the order in which you provide and verify the application of value added tax to the European Union within the framework of the projects co-financed by the structural funds;
25.2.16. environmental monitoring national Office a copy of the opinion on the environmental impact assessment final report or a copy of the decision on the environmental impact assessment procedure.
26. the project application can be submitted in paper form or electronic form of a document. Project submissions in paper form can be submitted to the Liaison Office or sent by registered mail. Project application that is designed to be an electronic document, may submit to the institution of cooperation, be sent by registered mail or send to the liaison body of the electronic mail address provided in the notice of project application acceptance: 26.1. If the application is sent by mail, on the date of filing is deemed the postmarked date of dispatch;
26.2. If the application is submitted electronically, at the time it is seen as the time when it is sent by electronic mail. In the event of a dispute, the applicant must demonstrate that the project is sent to the application before the closing date of the project;
16.3. If the project application submitted personally, on the date of submission of the project considers the cooperation office stamp shows the receipt date.
27. Documents to be submitted shall meet the following requirements: 27.1. the project application is fully completed and drawn up into the Latvian language;
16.9. If additional documents to be submitted are not Latvian language, accompanied by a certified translation into Latvian language in the document in accordance with the laws and regulations on the procedures for translation of documents in which the national language;
27.3. the original of the application project is completed according to the law on the development and design of a document these requirements.
27.4. the project submission form 6.1, 6.2., 7.2., 7.3 and 7.4. supplementary section shall be submitted electronically in one instance (information submitted to the xls format, recorded sound data not rewritable CD).
28. If the project application and additional supporting documents shall be submitted in paper form, comply with the following requirements (project applicant letter of consent submitted separately, not in the application of the draft caurauklot): 28.1. they shall be submitted in two copies (original and copy). On the first page of the original references the "original", to copy the first page is a "copy";
28.2. each project application submitted hardback copies, numbered caurauklot, with table of contents, at the back of the last page of the thread ends are glued, stamped with the seal of the municipality and to the label provides information about the document, and the page number the number of caurauklot, is proof of the correctness of the copy of the document, the document author's name, date, place and preparation of the document the document author's signature.
29. the application shall be accompanied, where the electronic document by sending to the liaison bodies designated electronic mail, the following requirements shall be met: 29.1. develop and project submissions are presented according to the circulation of electronic documents regulating the regulatory enactments;
29.2. the project submission developed in DOC, xls, PDF, or JPG file format;
29.3. the application of the project-project submission form and additional documents to be submitted together – is signed with an electronic signature by the applicant of the project and add the time stamp;
29.4. the project submission form and additionally deliverable document original is signed individually by the author of the safe digital signature and confirm with the time stamp of the selection before the project submission deadline. If additional documents are copies of documents, they are certified in each individual to the project the applicant secure electronic signature and a time stamp prior to the application deadline for the selection of projects;
29.5. the project submission form 6.1, 6.2., 7.2., 7.3 and 7.4. Xls files submitted to the section format.
30. cooperation authority within 15 working days after submission of the draft selection round end shall be notified in writing of the project applicant project application registration number.
Vi. Project application evaluation and decision-making activities within 31 to submit the evaluation of project applications provide cooperation authorities created the project submission Evaluation Commission (hereinafter the Commission). The Commission establishes the following order: 31.1. the Commission comprises representatives of the liaison bodies, responsible authorities and the country's tourism policy the implementing bodies;
31.2. the Evaluation Commission of the competent authority;
31. the President of the Commission and members of the Commission the voice eligible approved cooperation bodies;
19.5. the meetings of the Commission as observers may participate in the managing authority and the responsible authority.
32. The Commission establishes the cooperation agenda approved.
33. project submissions valued at the following evaluation criteria (annex 3): 33.1. quality criteria in the first round of project submissions, (specifically the introduction of eligibility criteria): the readiness project 33.1.1 filing date;
33.1.2. added to the cooperation protocol or the number of contracts with travel agencies, or package tour operator service provider registered in the tourism development of national tourism service provider database, created as part of the project or object into the well-appointed tourist route after project implementation;
33.1.3. administrative territory of tourist accommodation in nakšņojoš (after the Central Statistical Bureau's 2006 data);

33.1.4. the proposed national monument of urban marketing efforts in local and international markets;
33.1.5. and/or foreign merchant 2005, 2006 and 2007 editions of the guide of the tourism and the number of prints or copies, which provides information about the urban monument or part of it;
33.1.6. how the project contributes to the tourism product offer expands;
33.1.7. the volume of investments to the planned number of tourists in the year following the implementation of the project;
33.1.8. application of and compliance with the project horizontal priority "macro-economic stability", requested by the European Regional Development Fund funding intensity;
33.1.9. application of and compliance with the project horizontal priority "for the balanced development of the territory" – the project space areas (local) development index project application deadlines a day of conclusion;
33.1.10. application of and compliance with the project horizontal priority "equal opportunities"-project specific activities under the equal treatment provision, particularly by improving accessibility for people with functional disabilities;
33.2. the quality criteria in the second project application deadlines (the specific eligibility criteria of implementation): the readiness project 33.2.1 filing date;
33.2.2. added to the cooperation protocol or the number of contracts with travel agencies, or package tour operator service provider registered in the tourism development of national tourism service provider database, created as part of the project or object into the well-appointed tourist route after project implementation;
33.2.3. the proposed national monument mārketin ga occurring events in local and international markets;
33.2.4. how the project contributes to the tourism product offer expands;
33.2.5. investment in relation to the expected number of tourists in the year following the implementation of the project;
33.2.6. application of and compliance with the project horizontal priority "macro-economic stability", requested by the European Regional Development Fund funding intensity;
33.2.7. application of and compliance with the project horizontal priority "for the balanced development of the territory" – project site (local) territorial development index project application deadlines a day of conclusion;
33.2.8. application of and compliance with the project horizontal priority "Equally in the gas option"-project specific activities provided for equal treatment, especially by improving the accessibility for persons with disabilities the professional function;
33.3. eligibility criteria (substantive, financial and eligibility criteria in the implementation): 33.3.1. project eligibility criteria: 33.3.1.1. project costs and financing source allocation calculation is correct arithmetic;
33.3.1.2. costs correspond to these rules 13, 14, 15 and 16 Thai determine requirements;
33.3.1.3. the requested funding is calculated correctly and not over this provision gives the 19 and 20 shows;
33.3.1.4. planned spending is economically justified, necessary for the implementation of the project and provides measurable results physically;
project applicant 33.3.1.5. investing funds in the municipal-owned urban monuments of national importance pursuant to this part of the rule in paragraph 10;
implementation of the project in 33.3.1.6. planned activities, beneficiaries shall ensure the preservation of the authenticity of an object under the laws of the Republic of Latvia;
33.3.1.7. application of the project planned activities and results to be achieved are clearly defined, reasonable, measurable, according to project implementation time schedule and focus on the achievement of the project objectives;
33.3.2. project eligibility criteria of the applicant: 33.3.2.1. project eligibility of the applicant's paragraph 10 of these regulations;
33.3.2.2. project met this rule 11.1;
20.8. administrative criteria (design and submit eligibility criteria): application of the project financial 33.4.1. the calculation is carried out in dollars;
33.4.2. the project submission complies with these provisions the original 27.3. the requirements set out in paragraph below, and it is the document legal force;
33.4.3. project application has been drawn up according to the provisions laid down in 25 knot kt project submission form and is accompanied by all the documents to be submitted in addition to the documents referred to in the list, and it is according to the laws of the Republic of Latvia;
33.4.4. project application form is fully completed and complies with the provisions of section 27.1. these requirements;
33.4.5. the project is not specified in the application for revision-deletion, aizkr, deletion or vote in addition – and this meets this provision 16.3. the requirements laid down in paragraph 1 below;
33.4.6. the implementation of the project shall not exceed this provision defined in point 21;
33.4.7. project applicant one project application under the selection round has not submitted more than one application and the project has received funding for an earlier project application selection round these activities;
33.4.8. a project proposal is prepared and submitted to the Latvian language;
33.4.9. the project is drawn up into the application;
33.4.10. project application is filed within the time limit laid down;
33.4.11. a project proposal is submitted in two copies-the original and the copy (if filed on paper).
34. the project submission's compliance with the administrative and eligibility criteria is assessed by "Yes" or "no" ("Yes", "no" – meets does not meet). Application of project compliance with quality criteria assessed by giving a certain number of points. Project submission compliance is assessed on the basis of these provisions referred to in paragraph 33 the assessment criteria and with the project application selection and evaluation procedures, as well as application forms, assessment provided in the laws of the order in which the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds and the European Union fund management and control system.
35. the criteria of evaluation order: 21.8. If the project submission does not comply with this provision. 33.4.10 criterion, referred the application of the evaluation of the project did not continue;

35.2. If the application complies with this provision 33.4.10 in this criterion, valued project submission compliance of these rules, 33.3.2.1, 33.3.1.5 33.3.1.6 33.4.2. and 33.4.7., the criteria referred to in point. If the application does not meet any of these rules, 33.3.2.1, 33.3.1.6 33.3.1.5.., or 33.4.7. in subparagraph 33.4.2. these criteria, evaluation of the application of the project could not continue;
35.3. If the application complies with all the rules, 33.3.2.1, 33.3.1.6 33.3.1.5..,., 33.4.7. and 33.4.10 33.4.2. the criteria referred to in the submission of the project evaluation continues after the rest of this rule 33.1. and 33.2. criteria referred to in (a);
35.4. all tenders submitted applications, which have been measured at 33.1 and 33.2. these provisions. the criteria referred to in the project application in the framework of the round ranked in descending order of the number of points earned. After the rest of this provision 33. criteria referred to in paragraph 1 continue to rate only the project submissions that meet these rules 37.2 and 37.3. bottom point. those requirements.
36. If there is no information in the project application in order to assess compliance of the application for the project to one or more of the evaluation criteria, as well as if this information is not legible or not submitted to the Latvian language, believes that the project submission does not meet the criterion or criteria is assigned the lowest rating.
37. the decision on the approval of the project application is accepted if the following conditions are met: 37.1. the project submission complies with all the eligibility criteria and all administrative criteria;
37.2. the application of the project according to the project application to the quality of criteria evaluated won at least 60 points;
37.3. submission of project pronounced the project application selection round has received the highest rating for compliance with quality criteria, compared to other project submissions. If multiple project submissions receive the same number of points, the first application round project in the priority given to project applications with a higher administrative territory of nakšņojoš tourist arrivals, while the second project application selection round – with a lower index of the development of the territory.
38. the decision on rejection of the application of the project accepted if: 38.1. the project submission does not meet one or more of these rules, 33.3.2.1, 33.3.1.6 33.3.1.5..,., 33.4.7. or 33.4.10 33.4.2. the priority criteria referred to in (a);
38.2. the list of project submissions under the resulting points in accordance with the quality criteria, the application calls the project application selection round is not received within a sufficient number of points and not enough funding;
38.3. the project application to the quality evaluation criteria in the project application selection round have not won at least 60 points.
39. The decision on the application of the project approval may include conditions which must be fulfilled in order to project the applicant would conclude the agreement on the implementation of the project: 24.3. to clarify the application of the project's financial plan and cost estimate, in the case of the arithmetic calculation errors. Specifying the project application, the total amount of eligible costs, funding and effort should not be increased;
24.4. additional information should be provided, if the application does not contain complete information or the information is unclear;
39.3. the eligible costs of the project to be the cost of this provision in paragraph 13 and 15 identified as ineligible;
24.5. the project should be clarified;
24.5. to clarify the funding under these rules 19 and 20;
24.6. to certify the tax and other State or local Government set the minimum payment of the full amount and within the time limits laws;
24.7. to clarify the application of the project according to this provision, 33.3.1.2., 33.3.1.1., 33.3.1.3., 33.3.1.7., 33.3.2.2 33.3.1.4..,.,., 33.4.4 33.4.3 33.4.1., 33.4.5., 33.4.6., 33.4.8., 33.4.9. and 33.4.11.;
24.7. the project application must be designed according to these rules 27, 28 and 29.
40. the information referred to in paragraph 39 of these rules, is required after project evaluation. After the submission of the information quality criteria of assessment is not changed.
41. the cooperation of the authorities of the conditions contained in a decision due may not be longer than three calendar months from the date of dispatch of the decision. Information about the decision the conditions contained in the project the applicant shall submit to the liaison body for assessment. The liaison body shall assess the information provided by the applicant of the project and prepares opinion on its compliance with the conditions laid down in the decision. If the applicant does not provide the draft decision contained in the conditions or the conditions are not met the deadline set in the decision, the application shall be deemed to have been rejected. The opinion that the decision contained in the conditions are not met, the liaison body within two working days from the date of signature of the applicant must be forwarded.
42. This provision, the time limits referred to in paragraph 41 shall not be extended.
43. the arrangements for the project, the applicant is entitled to challenge or appeal against decisions taken by the European Union structural funds and the cohesion fund management law. The rules referred to in paragraph 41 of the opinion, Justice shall be carried out as in the decision on the condition of the rule of law.
VII. Project implementation and financing conditions 44. in accordance with the statutory procedures, the European Union's structural and cohesion funds in the participating institutions provide the planning document preparation and implementation of these funds in the five working days following the agreement on the conclusion of the project beneficiaries shall submit to the authority of the procurement plan of cooperation.
45. The funding recipient, the available payment types: 45.1. the advance payment is not more than 20% of the drop in the European Region Development Fund funding;
45.2. interim payments granted on the basis of the eligible expenditure, and that may require no more than once every six months;
45.3. final payment is granted after the implementation of the project, based on the highest eligible expenditure.
46. The advance payment and the total amount of interim payments shall not provide 90% of all the European Regional Development Fund funding.
47. The beneficiary requires advance payment if the following conditions are met:

29.3. the beneficiary with the authority has entered into a cooperation agreement for the implementation of the project;
47.2. the beneficiary submits a collaborative institution purchase plan;
47.3. the initiation of implementation of the project is opened in a separate account in the State coffers, which are made and received all the payments related to the implementation of the project.
48. The beneficiaries of cooperation bodies for the specified account to repay the amount, if the advance payment exceeds the approved funding, calculated in proportion to the intensity of funding in relation to the project activities eligible costs.
49. the funding recipient may receive interim or final payment if the following conditions are met: 49.1. the beneficiary with the authority has entered into a cooperation agreement for the implementation of the project;
30.6. the beneficiary of the project is the opening of a separate account opened by the Treasury, which is being carried out and to all the project-related payments;
30.6. investments, except that rule 14.2., 14.8, 14.9 and 14.10.. the costs referred to in (a), included in the assets of the beneficiaries as a long-term investment and the depreciating of at least five years after the implementation of the project will remain the property of the beneficiary;
49. the investment is actually made and listed in the beneficiary's book-keeping, cost is identifiable, separate from the rest of the cost, and verifiable, and they acknowledge the original source document concerned;
30.8. investments are necessary for the implementation of the project, is designed for in the approved project application and is performed under appropriate financial management, that is, the subject of the economy, productivity and the effect of dynamic principles;
30.8. the costs were incurred during the period set out in the agreement for the implementation of the project (that is, the duration of this agreement, unless the eligible costs that may be carried out before the conclusion of the agreement in accordance with this rule 14.1. (a)), and is based on paid invoices or other relevant source documents;
49.7. beneficiary has prepared and stuffed by the time limit laid down by the institution nor cooperation interim and final reports;
49.8. submitted interim and final reports for cooperation institutions des inspections supervision is confirmed.
50. The liaison body in proportion to the reduced funding in the following cases: 50.1. If the actual financial leverage is lower than that provided for in the project application;
50.2. If not implemented in any of the planned activities, but the aim of the project is reached;
50.3. where no opposition to the use of the funds supporting documents;
50.4. If the estimate project costs eligible costs specified in is not proportionate and economically justified;
50.5. If applicant projects during project implementation has misled the liaison body by providing false information.
51. cooperation authority have the right to review of interim and final evaluation, as well as by making a payment request from the applicant the additional information required.
52. the cooperation of the authority shall be entitled to interim and final evaluation report during the call upon experts to check whether the project cost estimates specified eligible costs are not unreasonably high.
53. cooperation authority payment by Cashless settlement via project Treasury open project applicant account indicated in the payment request.
54. cooperation authority applicant project funding to be paid shall be determined on the basis of the eligible costs of the project, procurement documentation and expenses submitted supporting documents prepared, subject to the payment and transaction documents in design and design requirements.
55. Breaking the agreement for the implementation of the project, the authority requires the cooperation of the beneficiary to repay the full amount of the funds paid.
56. The beneficiary provides a snapshot into the funding of the beneficiary's institution's homepage on the internet (if any) on the progress of the implementation of the project at least once every three months.
57. the project applicant stores your project submission or its derivatives with the original legal effect until the end of the project evaluation, but, if the project is approved, up to December 31, 2021.
Prime Minister Godmanis economic Minister i. k. Gerhard Editorial Note: the entry into force of the provisions with the April 5, 2008.
Attachments ZIP economic Ministry submitted version of annex 1 of the Cabinet of Ministers of 17 March 2008. Regulations No 187 Economy Minister k. Gerhard annex 2 of the Cabinet of Ministers of 17 March 2008. Regulations No 187 Economy Minister k. Gerhard annex 3 of the Cabinet of Ministers of 17 March 2008 the Regulation No 187 of the draft application evaluation criteria 1. Criteria of quality evaluation system of point scale I turn to the first project evaluation criteria submission in round 1.
The readiness of the project at the time of filing: 0-10 1.1.
the application is added to the project planning-architectural task 0 1.2.
the application is added to the project planning-architectural and technical regulations 3 1.3.
the project application has been added to the construction of the būvvald coherent sketch draft 6 1.4.
the project is attached to the būvvald application accepted construction of technical design stage 10 2.
Application of the draft Protocol and the cooperation contract with a travel agency, or package tour operator service provider registered in the tourism development of national tourism service provider database, created as part of the project or object into the well-appointed tourist route after the implementation of the project: 0-5 2.1.
the cooperation protocol or contract with a travel agency, or package tour operator service provider not connected 0 2.2.
the cooperation protocol or contract with one travel agency, operator or package tour provider 1 2.3.
the cooperation protocol or agreement with two travel agencies, package tour operators or service providers 3 2.4.
the cooperation protocol or agreement with three and more travel agencies, package tour operators or service providers, 5 3.

Administrative territory of tourist accommodation in nakšņojoš (after the Central Statistical Bureau's 2006 data) 0-30 3.1.
to 4999 0 3.2.
from 5000 to 9999 10 3.3.
from 10000 to 14999 20 3.4.
over 15000 30 4.
The project for urban monuments of national importance in the marketing efforts are local and the international market: 0-5 4.1.
marketing efforts are not designed or intended for only one marketing type of measure 0 4.2.
at least two marketing measures 1 4.3.
at least three types of marketing activities 3 4.4.
for four or more types of marketing measures 5 5.
Urban monument or part of it is included in the Latvian and/or foreign tour operators catalogues and guidebooks (2005, 2006 and 2007 editions), which provides information about tourism offer at least the Latvian national level: 0-10 5.1.
a copy of the description does not have 0 5.2.
Add at least one copy of the description 3 5.3.
added at least five copies of the description of 6 5.4.
Add at least 10 copies of the description 10 6.
The project contributes to the tourism product offering expansion: 0-10 6.1.
tourism product offerings remains current amount 0 6.2.
expand existing tourism products offer 5 6.3.
creates a new tourist product offer 10 7.
The project investment in relation to the expected number of tourists in the year following the implementation of the project: 0-5 7.1.
investment above 200 Lats per the associated tourist 0 7.2.
investment from 150 lats to 200 Lats per the associated tourist 1 7.3.
investment from 100 lats to 150 Lats per attract tourists 3 7.4.
investments under 100 lats for one tourist bound 5 1.1. Criteria on horizontal priorities of 8 point scale.
Requested by the European Regional Development Fund funding intensity: 0-20 8.1.
85% 0 8.2.
from 75.01% to 8.3% 6 84.99.
from 65.01% to 75% 13 8.4.
up to 65% 20 9.
The project site (local) territorial development index project application deadlines a day of conclusion is: 0-3 9.1.
greater than 0 0 9.2.
from 0 to-1 0.499 9.3.
from-to-0.500 0.899 2 9.4.
from: 0.900 and less 3 10.
The project of the specific activities provided for equal treatment, especially by improving accessibility for people with functional disabilities 0-2 10.1.
the project is not intended for specific activities for the provision of equal opportunities 0 10.2.
Project 1 – 3 specific activities for the provision of equal opportunities 1 10.3.
the project provides for 4 and more specific activities for the provision of equal opportunities II round 2 judging criteria the second project application selection round 11.
Project readiness date of submission: 10.0-11.1
the application is added to the project planning-architectural task 0 11.2.
the application is added to the project planning-architectural and technical regulations 11.3 3.
the project application has been added to the construction of the būvvald coherent sketch draft 6 11.4.
the project is attached to the būvvald application accepted construction of technical design stage 10 12.
Application of the draft Protocol and the cooperation contract with a travel agency, or package tour operator service provider registered in the tourism development of national tourism service provider database, created as part of the project or object into the well-appointed tourist route after the implementation of the project: 0 3 12.1.
the cooperation protocol or contract with the tourist agency operator or package tour service provider application is not added to the 0 12.2.
the cooperation protocol or contract with one travel agency, operator or package tour provider 1 12.3.
the cooperation protocol or agreement with two travel agencies, package tour operators or service providers 2 12.4.
the cooperation protocol or agreement with three and more travel agencies, package tour operators or service providers, 3 13.
The project for urban monuments of national importance in the marketing efforts are local and the international market: 0-10, 13.1.
marketing efforts are not designed or intended for only one marketing type of measure 0 13.2.
at least two marketing measures 3 13.3.
at least three types of marketing activities 6 13.4.
for four or more marketing activities in 10 14.
The project contributes to the tourism product offering expansion: 0-15 14.1.
tourism product offerings remains current amount 0 14.2.
expand existing tourism products offer 10 14.3.
creates a new tourist product offer 15 15.
The project investment in relation to the expected number of tourists in the year following the implementation of the project: 0-5 15.1.
investment above 200 Lats per the associated tourist 0 15.2.
investment from 150 lats to 200 Lats per the associated tourist 1 15.3.
investment from 100 lats to 150 Lats per the associated tourist 3 15.4.
investments under 100 lats for one tourist bound 5 1.1. Criteria on horizontal priorities point scale 16.
Requested by the European Regional Development Fund funding intensity: 0-20 in 16.1.
85% 0 16.2.
from 75.01% to 16.3% 6 84.99.
from 65.01% to 16.4% 13 75.
up to 65% 20 17.
The project site (local) territorial development index project application selection round of the day is: 0-35 17.1.
greater than 0 0 17.2.
from 0 to-10 0.499 17.3.
up to-20 from-0.500 0.899 17.4.
from: 0.900 and less 35 18.
The project of the specific activities provided for equal treatment, especially by improving accessibility for people with functional disabilities: 0-2 18.1.
the project is not intended for specific activities for the provision of equal opportunities 0 18.2.
Project 1 – 3 specific activities for the provision of equal opportunities 1 18.3.
the project provides for 4 and more specific activities for the provision of equal opportunities 2 2. eligibility criteria 2.1. project eligibility criteria ranking system Yes/No 19.
Project cost and financing source allocation calculation is done arithmetically correct 20.

The eligible cost of the project and the amount corresponds to the activity set 21.
The requested funding is calculated correctly and match the activity set about 22.
Spending is economically justified and necessary for the implementation of the project and provides measurable results for physical generation 23.
The beneficiary shall carry out investment in municipalities of the national monument of that occurring until 1 January 2007 to the national conservation included cultural monuments list, 24.
Implementation of the project, planned activities, beneficiaries shall ensure the preservation of the authenticity of an object under the laws of the Republic of Latvia 25.
Application of the project planned activities and results to be achieved are clearly defined, reasonable, measurable, according to project implementation time schedule and focus on the achievement of the project objectives 2.2 Project eligibility criteria applicant ranking system Yes/No 26.
The project applicant is municipality, and it meets the requirements 27.
Project applicant has paid taxes and other State and local government at minimum payments in full and legal time limits 3. Administrative criteria ranking system Yes/No 28.
Project application of the financial calculation carried out in 29.
Application of the original project is the document legal force 30.
The project application has been drawn up according to the project submission form and is accompanied by all the documents to be submitted in addition to the documents referred to in the list, they are formatted according to the laws of the Republic of Latvia requirements 31.
Project application form is completely filled out 32.
The project is not specified in the application for amendment, deletion, aizkrāsojum, deletion or addition of 33.
Project implementation duration does not exceed the period of time specified in activity 34.
One project applicant project application under the selection round has not submitted more than one application and the project has received funding for an earlier project submission round 35 within this activity.
The project proposal is prepared and submitted to the Latvian language, 36.
The project has been prepared for submission into 37.
The project application has been submitted within the prescribed period 38.
The project proposal is submitted in two copies-the original and the copy (if filed on paper) the Minister of Economic Affairs k. Gerhard