Advanced Search

Local Regulations No. 2 2015

Original Language Title: Peraturan Daerah Nomor 2 Tahun 2015

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
p>

24. A feasibility study is a study that assesates the feasibility of

investment of a project.

25. Detailed work image (Detail Engineering Design) is planning

details of a project consisting of detailed image

building/bestek images, Cost Budget Plan (RAB) as well as

Work Plan and Terms (RKS).

26. The popularity is everything that concerns

the provision and utilization of electrical power as well as the support effort

electric power.

27. Electric power is a form of secondary energy that

is resurrected, transmitted, and distributed for any

type of purpose, but does not include the electricity used for

communication, electronics and cues.

28. An effort to supply electricity is the provision of electricity

includes the generation, transmission, distribution, and provision

electric power to the consumer.

29. Electric power generation is a power-producing event

electric.

30. Electric power transmission is the conduction of electrical power from the

generation to the distribution system or to the consumer, or

intersystem electric power supply.

31. Electric power distribution is the conduction of electrical power from the

transmission system or from the generation to the consumer.

32. The power generation effort is procuring to

producing electric power.

33. An electric power transmission effort is the procurement of transmission

electrical power from generation to the distribution system, or to the

consumer, or to the intersystem of electrical power between the systems.

34. An electric power distribution effort is the procurement of transmission

electric power from the transmission system or from generation to

consumers.

5

35.Effort of electric power sales is a provision business activity

electric power to the consumer.

36. The permit for the provision of the provision of electric power is the permit to perform

the provision of electric power for the general interest.

37. Electric Power Services Venture permit is a permit to

conduct an electric power support service.

38. The operating permit is a permit to conduct electricity provision for

its own interests.

39. An area of business is the territory designated by the Government or

The Regional Government as a place for distribution and/or

sales of electric power to provide electricity.

40.Each person is a person Individual or corporate, whether or not a legal entity or a legal entity.

41. An enterprise is the provider and/or the distribution and/or

user of the legal entity and running the type

a fixed, continuous and established effort and established pursuant to

with the laws of the law. Apply and work

and in the Republic of the Republic territory

Indonesia.

BAB II

ASAS AND PURPOSE

Section 2

Management of energy and composure based on asas:

a. benefits;

b. The efficiency of justice;

c. continuous;

d. optimizing the economy in the utilization of energy resources;

e. rely on its own capabilities;

f. A healthy effort;

g. security and safety;

h. Sustainability of environment functions; and

i. region autonomy.

Article 3

(1) The purpose of energy management in the area is:

a. Energy management independence for the region;

b. The availability of the area's energy availability, both sourced from

local potential management and outsourced

area;

c. The energy management is optimal, integrated, and

sustained;

d. The balance of energy balanced in 2025

is by maximizing the role of new energy sources and

renewable to the provision of electricity, as well as pressing

the use of oil fuels as primary energy;

e. Energtically efficient;

6

f. Access to poor people's access to energy for

improving the welfare of life;

g. the creation of a field of work; and

h.

(2) The goal of the development of the composure in the area is:

a. the balance of the balance between provision with

the needs of the electric power; and

b. the availability of the capable electrical power infrastructure

maximizing public access to the power needs

electricity.

BAB III

PLANNING

Article 4

(1) The Local Government is compiling energy bauran planning

for each energy type and energy type target type

for power generation.

(2) The planning of the energy bauran target as referred to in

paragraph (1) is used as a guideline in determining the direction

energy infrastructure development policy and composure

in the area.

BAB IV

POLICY REGIONAL ENERGY AND IMPLEMENTATION STRATEGIES

Article 5

The Regional Energy Policy includes:

a. the policy of the provision and utilization of primary and energy energy

secondary by optimizing the utilization of energy potential

local;

b. investment policy, by providing the ease of process

the practices in order to attract investor interest in

energy infrastructure development;

c. incentive policy in terms of energy conservation implementation;

d. the policy of improving human resources that supports

energy development;

e. Standardization policy and certification, by reference to

national standardization;

f. research policies and development of new energy fields

renewable;

g. energy management institutional policy; and

h. policy that supports the preservation of the environment.

Section 6

To implement the area energy policy as intended

in Section 5 is implemented through implementation strategy as

following:

7

a. encourage the development of primary and energy infrastructure of primary and energy infrastructure

secondary in the area;

b. conducting cooperation in terms of primary energy supply and

infrastructure development with other areas for security

primary energy supply and secondary energy;

c. prioritizing the use of renewable energy

available in the area;

d. Renewable energy utilization is done efficiently

by applying energy-saving principles in

energy management;

e. implement clean energy technology;

f. enhance the role of the parties in the primary energy utilization

and secondary energy;

g. enhance cooperation at nati either

directly or indirectly, from an energy source.

19. Energy management is the host of provisioning activities,

the enterprise, and the utilization of energy and the provision of reserves

strategic and conservation of energy resources.

20. Energy conservation is a systematic, planned, and integrated effort

to preserve the internal energy resources as well as

increase the efficiency of its efficiency.

21. A living environment is a unit of space with all things,

power, circumstances and living things, including humans and

its behavior, which affects the survival of and

human well-being as well as other living things.

22. Strategic reserves are the energy reserves for the future.

23. A preliminary survey is the activity of collecting data and

information related to the development plan of a

project.

referred to the paragraph (1) is required to be included in the business program

the provision and utilization of primary and secondary energy.

11

BAB VIII

THE POPULARITY AND PERSEVERANCE EFFORTS

The Kesatu

General

Section 16

The popularity effort is made up:

a. the effort of providing electricity; and

b. Electric power support.

Second Quarter

Electric Power Supply Effort

Article 17

An electrical power supply effort referred to in Article

The 16 letter a consists of:

a. the effort of providing electric power for the common interest; and

b. the effort of providing electric power for its own benefit.

Article 18

(1) The electrical power provision for the general interest

as referred to in Article 17 of the letter a includes the type

venture:

a. electric power generation;

b. electric power transmission;

c. electric power distribution; and/or

d. electric power sales.

(2) The business of providing electric power for the common interest

as referred to in paragraph (1) can be done

integrated.

(3) Electric power supply efforts for general interest

integrated as referred to in paragraph (2) include

business type:

a. Electric power generation, electric power transmission, distribution

electrical power and electrical power sales carried out

in a single entity;

b. electric power generation, electric power transmission, and

electrical power sales carried out in one unit

effort; and

c. The generation of electric power, electric power distribution and

electric power sales which is done in one entity

effort.

(4) The business of providing electric power for the general interest

as referred to in paragraph (2) is performed by 1 (one)

enterprise entity in 1 (one) business region.

12

(5) The region of the venture as referred to in paragraph (4) is set

by the Governor.

(6) The business of the provision of electricity for the common interest can

be exercised by:

a. The business entity belongs to the region;

b. cooperative;

c. private venture entity; and

d. swadaya society.

Article 19

(1) The business of providing electric power for the public interest

is implemented in accordance with the General Plan of Fame

Area (RUKD) and the Electric Power Supply Plan

(RUPTL).

(2) Any attempted perpetrator undertaking a power supply effort

electricity with a new source of new and renewable energy

or the entire facility is financed from the Revenue Budget and

Regional Shopping (APBD), in The management is required to cooperate

with the Regional Governing Body (BUMD).

(3) The perpetrator of the provision of electrical power using the source

new and renewable energy as referred to in paragraph (2)

may be provided with ease of obtaining the recommendation

and licensing by the Government The area corresponds to

its authority under the laws of which

applies.

(4) The order of the giving ease as referred to in paragraph

(3) is set in the Governor's Ordinance.

Section 20

(1) The electrical power provision for its own sake

as referred to in Article 17 B font consists of type

venture:

a. electric power generation;

b. electric power generation and electric power distribution; or

c. generation of electrical power, electrical power transmission, and

electrical power distribution.

(2) The supply of electrical power for self-interest can

is implemented by:

a. government agencies;

b. local government;

c. state-owned enterprise;

d. The business entity belongs to the area;

e. private business entity;

f. Cooperatives;

g. individual; and

h. The other business.

13

(3) The business of providing electric power for its own sake

as referred to in paragraph (2) has an installation facility

in 1 (one) province area.

Article 21

(1) Power support electric as intended in

Article 16 letter b includes:

a. Consultancy in the field of installation of the provision of electrical power;

b. development and installation of power supply installations

electricity;

c. inspection and testing of electrical power installations;

d. operation of electrical power installations;

e. electric power installation maintenance;

f. research and development;

g. education and training;

h. Equipment testing laboratory and power harvesting

electricity;

i. Electrical equipment certification and power monitoring;

j. Certification of the competencies of the workforce of the workforce; and

k. certification of the electric power support services agency.

(2) The electric power support services business as referred to in paragraph

(1) is performed by:

a. The business entity belongs to the region;

b. A private enterprise whose majority is owned by

domestic investors;

c. Cooperative.

Third Section

The purified

Section 22

Any energy and energy management efforts are mandatory

meets safety provisions in accordance with regulatory provisions

laws Applicable and operated by the power

techniques that meet the competency standards.

Paragraph 1

The Safety of Fame

Article 23

(1) the operating electric power installer is required to have a Certificate

Operations (SLO).

(2) Licensee's licensed use of an electric power offering is prohibited from selling

to the consumer whose installation does not have

SLO.

(3) To acquire SLO as referred to in paragraph (1),

conducted checks and testing by the inspection institute

an accredited technique.

14

(4) The Accreditation as referred to in paragraph (3) is provided by

Minister.

(5) If in an area there is no inspection institution

accrued engineering, Head of SKPD on behalf of the Governor can

appoint an engineering inspection institute.

(6) If in an area there is no institution inspections

the techniques designated by the SKPD Chief on behalf of the Governor

as referred to in paragraph (5), Head of SKPD on behalf

The governor may appoint a responsible official

regarding the supervision of the perseverance.

Paragraph 2

Power Engineering

Article 24

(1) The engineering in the effort the provision of electrical power as

referred to in Section 22 is required to meet the competency standards

as evidenced by the competency certificate.

(2) The certificate of competence>e. conduct the technical guidance of energy conservation to

employers, energy source users and energy users;

f. carrying out energy conservation programs and activities; and

g. performing coaching and oversight of implementation

energy conservation programs.

Article 15

(1) Any person or entity that provides and

leverage primary energy and secondary energy is mandatory

pay attention to ecological balance and protection

environment.

(2) In an effort to maintain an ecological balance as referred to in paragraph (1)

provided by (3) Accreditation as referred to in paragraph (2) is provided by

Minister.

(4) If in an area there is no certification institution

accredited competence, the SKPD Chief on behalf of the Governor

may appoint a competency certification institution.

(5) If in an area yet There is a certification institution

A competency appointed Chief of SKPD on behalf of the Governor

as referred to in paragraph (4) Chief SKPD on behalf

The governor may appoint responsible officials

regarding the certification Competency.

BAB IX

SALE PRICE, NETWORK RENT AND ELECTRIC POWER TARIFFS

Part Kesatu

Jual Price Electric Power and Network Rent

Article 25

(1) The sale price of electricity and electric power grid lease

is set based on the principle of a healthy effort.

(2) The governor gives approval of the electric power sale price

and electric power grid lease.

(3) licensees of the supply of electricity supply are prohibited

apply the sale price of electricity and rent of the power grid

electricity without Governor's approval.

15

Second Part

Electric Power Tarif

Article 26

(1) The governor set the power tariff for consumers.

(2) The electrical power tarif for the/p>

In question with "asas of the sustainability of the environment function"

is that energy management and The composure should

guarantee the quality of the better environment function.

The letter i

referred to "area autonomy principle" is that

energy development and the composure are done with

based on the principles of regional autonomy.

Article 3

Quite clearly.

Section 4

Verse (1)

The target of the bauran is planned in the term

a certain time

Verse (2) < energy and composure;

i. calling people to be heard of his attachment and checked

as a suspect or a witness;

19

j. stopped the investigation; and/or

k. perform other actions that need to agility

the investigation of felon in accordance with regulatory provisions

laws.

(4) Investigators as referred to in paragraph (1) notify

the start of the investigation and deliver the results of its inquiry

to the Public Prosecutor through Investigations of State Police officials

The Republic of Indonesia, in accordance with the The provisions set in

The Criminal Event Law Act.

BAB XIV

CRIMINAL provisions

Section 34

(1) Any person or body that violates the provisions as

is referred to in Article 27 of the paragraph (3), Section 28 and Article 29 verse (2)

verses (3) and verse (4) are threatened with the longest confinement criminal

6 (six) months or criminal fines of the most Rp50,000,000,-

(fifty million rupiah).

(2) The criminal as referred to in paragraph (1) is a violation.

(3) Any person or entity that violates the provisions as

is referred to in Article 15, Section 22, Section 23 of the paragraph (1) and paragraph (2),

Article 24 of the paragraph (1) and Article 25 paragraph (3) is threatened with criminal

as set in terms of the perinvite rule-

invitation in the field of energy and composure.

BAB XV

TRANSITIONAL provisions

Article 35

(1) All permissions in the field of energy and the existing acquialism

before the Regional Regulation is in effect. still remain in effect

until the end of the permit.

(2) The request of a new permit and/or extension of the permit in the field of energy

and its mandatory provisions refer to the terms

as set out in this Regional Regulation.

BAB XVI

provisions CLOSING

Article 36

The Regulation of Regulation of this Regional Regulation should be set

at least 6 (six) months counting since the Regulation of this Region

promulctable.

20

Article 37

The County Regulation is in effect on the date of the invitation.

For everyone to know it, ordered the invitation

Rule of the County with its placement in the Section Sheet

West Nusa Tenggara Province.

Set in Mataram

on April 6, 2015

GOVERNOR NUSA SOUTHEAST WEST,

ttd.

H. M. ZAINUL MAJDI

PROMULRED IN Mataram

on April 6, 2015

PROVINCIAL SECRETARY OF THE PROVINCE OF NTB,

ttd.

H. MUHAMMAD NUR

LEAF SECTION OF THE PROVINCE OF WEST NUSA TENGGARA IN 2015 NUMBER 2

NOREG REGULATION AREA OF WEST NUSA TENGGARA PROVINCE: (2/2015)

A copy according to the original

SECRETARY OF THE PROVINCE OF NTB

Law Bureau,

H. R U S M A N

NIP. 19620820 198503 1 010

21

EXPLANATION

UP

THE PROVINCES OF WEST NUSA TENGGARA PROVINCE

NUMBER 2 YEAR 2015

ABOUT

ENERGY MANAGEMENT AND NOTORIALITY

I. UMUM

Energy resources are a natural wealth of strategic value and

is essential for the improvement of economic activity, job opportunities and

national resilience. Given the strategic role of energy resources,

energy management covering the provision, utilization and

of its efforts must be done in fairness, sustainable,

rational and optimal to provide added value for

the welfare of the nation and the country of Indonesia For that to be required

the planning based on the term energy management policy

length.

On the other hand, the application of regional autonomy through the Act

Number 23 of 2014 on Local Government has

the logical consequences in which the area has the authority to set

and take care of the interests the local community according to the initiative and

its own aspiration, including the authority in the drafting of energy policy

area and energy planning of the area.

On the other hand, energy needs and electricity in Nusa

Province

West Southeast continues to increase in line with the growing industrial sector

and tourism . However, this is not offset by providing adequate energy

. Therefore, it needs to be formed by the Regional Rule about

Energy and Monetary Management as a legal basis and

guidelines in determining the direction of infrastructure development policy

energy and notoriety in West Nusa Tenggara province

based on sustainable development concepts and

environment insight to improve the welfare of the people.

II. ARTICLE BY SECTION

Article 1

Is quite clear.

Article 2

The letter a

referred to as "benefit asas" is that the results

energy development and the composure should be able

22

utilized as large as the welfare and

of the people's prosperity.

The letter b

referred to as "fairness efficiency asas" is

that energy development and fame should be able to

is executed at a minimum cost, but with

results that can be enjoyed evenly by the rest of the people.

The letter c

referred to as "continuous asas" is that

an effort of providing energy and the power power must be managed

well in order to keep going continuously.

The letter d

referred to as "internal economic optimization in

utilization of energy resources" is that the use

energy source for electric power generation must

be done with regard to the availability of energy sources.

The letter e

referred to as "asas relying on the ability

itself" is that energy development and

the composure is done by prioration

Interior capabilities.

Letter f

In question " asas rule of effort healthy "is

that the effort of providing energy and electrical power is exercised

by applying the principles of transparency, accountability,

accountability and the kefrying.

The g

referred to as" asas security and safety "

is that the effort of providing and utilization of both energy

and the electric power should pay attention to the preservation of the function

environment and environment.

The letter h

a person or body about the truth of the deed

performed in connection with the criminal activity in the field of energy

and the popularity;

c. requesting the caption and evidence material from a private person or

Body in connection with a criminal offence in the field of energy and

its composure;

d. examine books, records, and other documents with respect to

criminal acts in the field of energy and the notoriality;

e. performing a search to obtain evidence /p>

Enough clear.

Article 5

23

Quite clearly.

Section 6

Quite clearly.

Article 7

Quite clearly.

Article 8

Quite clearly.

Article 9

Verse (1)

The letter a

Is quite clear.

The letter b

The recommendation is a letter of recommendation published by

related agencies based on data and technical studies as

the consideration of a permit.

Verse (2)

It is fairly clear.

Article 10

Verse (1)

Clearly enough.

Verse (2)

The letter a

Biofuel is bioethanol and biodiesel and other fuels

resulting from biomass primarily used for

transport, industry, household and power generation

with quality standards and specifications according to regulations

The laws.

Nabati Fuel is biofuel which is powered as

another fuel.

The letter b

Is pretty clear.

The c

is quite clear.

Article 11

Quite clear.

Article 12

Verse (1)

Pretty clear.

Verse (2)

The letter a

The minimum competency is the work capability that includes

aspects of education, knowledge, skills and/or

expertise as well as relevant work attitudes to the execution of

the duties and terms of the office are specified in accordance with

the rules of the rules It's

The letter b

Is pretty clear.

24

The letter c

Quite clearly.

The d

is quite clear.

Article 13

Quite clearly.

Article 14

Quite clearly.

Article 15

Verse (1)

The ecological balance is a conditions where the interaction between

components in it takes place harmoniously and

balance.

Verse (2)

Pretty clear.

Article 16

Pretty clear.

Article 17

Quite clear.

Article 18

Quite clear.

Article 19

Quite clear.

Article 20

Quite clear.

Article 21

Clear enough.

Article 22

Quite clear.

Article 23

Quite clear.

Article 24

Quite clear.

Article 25

Quite clear.

Article 26

Quite clear.

Article 27

Clear enough.

Article 28

Quite clear.

Article 29

Quite clear.

Article 30

25

Quite clearly.

Section 31

Verse (1)

It is pretty clear.

Verse (2)

The letter

Is quite clear.

The letter b

Is quite clear.

The letter c

Is quite clear.

The d letter

Clearly.

The letter e

Is pretty clear.

The letter f

Is pretty clear.

The g

The power funneled to consumers should

meet the quality quality of the service that contains the indicator

as following:

1. High voltage at the usage point specified in

kV;

2. Medium voltage at the point of use specified

in kV;

3. Low voltage at the point of use expressed in

volt;

4. The frequency at point of use is expressed in cps;

5. Long annoyation per customer specified in

jam/monthly;

6. The number of distractions per customer is specified in

you/monthly;

7. The speed of the new TM connection service is specified

within the working day;

8. The speed of the new TR connection service is stated

in the working day;

9. TM power change service speed stated

within the working day;

10. The service speed of the TR power change is stated

within the working day;

11. The speed responding to the tampering complaint was stated

in the hours;

12. The kWh meter reading error was specified in

you/year/customer;

13. Account error correction time specified in

workday.

The letter h

Is quite clear.

Letter i

26

Quite clear.

The letter j

Mutu services provided by the power support attempt

electricity must meet the requirements as follows:

1. Has an Effort Certificate in accordance with

its classification and qualifications, except for services efforts

checks and tests in the field of Installation

Low voltage power heating;

2. It has a certified engineering power;

3. It has an engineering performance;

4. Satisfy the quality management system.

Verse (3)

Clearly enough.

Verse (4)

Clearly.

Verse (5)

Clearly.

Verse (6)

The Organizational Inspector is a given civil servant

task, responsibility, authority and the right to perform

execution of the composure inspection.

Investigations civil servants of the next civil servant

abbreviated as PPNS the Fame of Fame is the Official Official Officer of the State

Certain civilians based on the laws

designated As the Investigator is referred to in the Invite-

invite the Criminal Event Law to conduct a program of inquiry

criminal in the field of notoriality.

Verse (7)

Quite clear.

Article 32

Quite clear.

Article 33

Pretty clear.

Article 34

Quite clear.

Article 35

Quite clear.

Article 36

Quite clear.

Article 37

Quite clear.

ADDITIONAL LEAF AREA OF THE NUSA TENGGARA PROVINCE WEST NUMBER

113