Training framework for vocational training as a scaffold builder |
Lfd. No. |
Part of the training profession |
Skills and knowledge to be conveyed through the involvement of self-employed planning, implementation and control |
Timeframe values in weeks in the training year |
1 |
2 |
3 |
1 |
2 |
3 |
4 |
1 |
Vocational training, labour and collective bargaining (§ 4 no. 1) |
-
a)
-
The importance of the training contract, in particular completion, duration and termination
-
b)
-
Mutual rights and obligations arising from the training contract
-
c)
-
The possibilities of continuing vocational training
-
d)
-
call essential parts of the employment contract
-
e)
-
the main provisions of the collective agreements applicable to the establishment of the establishment
|
throughout the training |
2 |
Establishment and organisation of training (§ 4 n. 2) |
-
a)
-
Explaining the structure and tasks of the training company
-
b)
-
Explaining the basic functions of the training company such as offer, procurement, manufacturing and administration
-
c)
-
The relationship between the training company and its employees on economic organisations, professional representatives and trade unions
-
d)
-
Describe the basics, tasks and working methods of the executive bodies of the training company or personnel representation of the company
|
3 |
Safety and health at work (§ 4 no. 3) |
-
a)
-
Identify risks to safety and health at work and take action to avoid them
-
b)
-
apply occupational health and safety and accident prevention regulations
-
c)
-
Describe behaviour in the event of accidents and initiate initial measures
-
d)
-
Apply preventive fire safety rules; describe behaviour in fires and take measures to combat fires
|
4 |
Environmental protection (§ 4 n. 4) |
Contribute to the prevention of operational environmental pressures in the occupational field of action, in particular:
-
a)
-
explain possible environmental pressures through the training establishment and its contribution to environmental protection
-
b)
-
apply environmental protection rules applicable to the training establishment
-
c)
-
Use the possibilities of economical and environmentally friendly use of energy and materials
-
d)
-
Avoid waste; supply substances and materials to environmentally friendly disposal
|
5 |
Planning and preparation of work processes, obtaining and evaluating information, working in a team (§ 4 no. 5) |
-
a)
-
Collect work order and review it with respect to the preferences
-
b)
-
Procure information, in particular use instructions, catalogues, trade journals and textbooks
-
c)
-
Controlling work results
-
d)
-
Reading architectural timetables and determining changes
|
2 *) |
|
|
|
-
e)
-
Define work steps, taking into account constructive, manufacturing and economic aspects
-
f)
-
Determining the need for work materials, assembling work materials
-
g)
-
Plan and prepare work sequences for the up, down, and dismantling as well as for the maintenance and storage of scaffold, taking into account ergonomic aspects
-
h)
-
Applying information and communication technologies
-
i)
-
Plan and apply the use of work equipment in compliance with the regulations
-
k)
-
Estimate time and personnel support, document time
-
l)
-
Planning and implementing tasks in a team, evaluating results and evaluating results
|
|
2 *) |
|
|
-
m)
-
Detect and evaluate technical changes in scaffold construction
-
n)
-
Holding discussions in a situation-appropriate way, presenting facts
-
o)
-
Applying the possibilities of conflict control in the team
-
p)
-
with the votes involved in the construction of the building
|
|
|
|
2 *) |
6 |
Manufacture and use of technical documentation (§ 4 no. 6) |
-
a)
-
Make sketches, read and apply drawings and plans
-
b)
-
Read and apply standards, safety rules, leaflets, approval notices and work instructions
-
c)
-
Creating material and parts lists
|
2 |
|
|
|
-
d)
-
Read and apply construction drawings and performance directories
-
e)
-
read and use technical documentation, in particular parts lists, tables, diagrams, operating instructions, manuals, and instructions for installation and use
|
|
2 |
|
|
-
f)
-
Implement technical specifications in the light of the building situation
-
g)
-
Creating anchor plans
|
|
|
2 |
|
7 |
Setting up, securing and spaces of construction sites (§ 4 no. 7) |
-
a)
-
Set up, secure, entertain and vacate the workplace, consider ergonomic aspects
-
b)
-
Adopting security measures in the handling of electricity
-
c)
-
Hazards arising from overhead lines and operating machinery
-
d)
-
Detect supply and disposal lines and protect them from damage
-
e)
-
In the event of accidents at work, take first aid measures to supply injured persons, secure the accident site
-
f)
-
Protect devices and machines on site from weather and damage, as well as secure against theft
-
g)
-
Collect construction site waste separately, take measures for the removal of goods
|
2 |
|
|
|
-
h)
-
Building site equipment and securing with those involved in the construction
-
i)
-
Provision of supply and disposal facilities as well as accommodation and sanitary facilities
-
k)
-
Take measures to protect people from construction sites
-
l)
-
Assess transport and transport routes to their suitability, arrange for measures to be used
|
|
2 |
|
|
-
m)
-
Take measures to protect adjacent land and structures and technical facilities
-
n)
-
Detecting hazardous substances and taking protective measures, ensuring the storage of hazardous substances
-
o)
-
Preparing devices and machines for transport
-
p)
-
Establish and maintain traffic control systems according to the given traffic signs plan
|
|
|
|
2 |
8 |
Editing materials (§ 4 no. 8) |
-
a)
-
Materials according to species and intended use, in particular artificial stones, concretes, construction timber, steel and aluminium
-
b)
-
Producing components made of artificial stone and concrete
-
c)
-
Working with wood and making wood joints
-
d)
-
Machining and joining plastics, using prefabricated plastic parts
-
e)
-
Process metals and connect them, in particular by cutting, drilling, grinding and screwing
|
7 |
|
|
|
-
f)
-
Profile steel flame cutting and heavy welding
|
|
|
|
2 |
9 |
Handling and maintenance of tools, equipment, machinery and technical equipment (§ 4 no. 9) |
-
a)
-
Select tools, devices, machines, and technical equipment and arrange for deployment
-
b)
-
Handling tools
|
2 |
|
|
|
-
c)
-
Checking devices and machines for tightness, avoiding contamination of soils and water
-
d)
-
Use equipment, machinery and technical equipment using the protective equipment
-
e)
-
Maintain tools, devices and machines
|
|
5 |
|
|
-
f)
-
Detect faults in equipment, machines and technical equipment, cause disturbance elimination
|
|
|
|
2 |
10 |
Perform survey work (§ 4 no. 10) |
-
a)
-
Perform length, height and angle measurements, curse straight lines
|
2 |
|
|
|
-
b)
-
Measuring components and scaffolds
-
c)
-
Measuring anchor points
|
|
2 |
|
|
-
d)
-
Check and store measuring devices for function
-
e)
-
Select measurement methods, adjust and use optical and electronic measuring instruments
|
|
|
|
2 |
11 |
Waiting, storage and transport of scaffold components (§ 4 No. 11) |
-
a)
-
Apply bearings for scaffold components
-
b)
-
Test scaffold components for usability, but not usable parts.
-
c)
-
Loading and securing scaffold components for transport in public road transport and in the construction site area
-
d)
-
Reloading, distributing and storing scaffold components
|
6 |
|
|
|
-
e)
-
Select corrosion protection and wood protection measures in accordance with the hazardous substances and carry out scaffold components
-
f)
-
instandsit and maintain scaffold components
|
|
3 |
|
|
-
g)
-
Select and use load-bearing and stop means
|
|
|
2 |
|
-
h)
-
Test and use means of transport and support for operational safety, in particular forklift trucks, lifting trucks and lifting equipment
|
|
|
|
3 |
12 |
Assessment of load-bearing capacity and the production of load-bearing capacity (§ 4 n. 12) |
-
a)
-
Distinguish soil types and soil classes and assess the sustainability of soils
|
2 |
|
|
|
-
b)
-
Assessing the load capacity of the vehicle by inspection of the eye
-
c)
-
Making substructures
|
|
|
3 |
|
-
d)
-
Detect and document defects in support grounds
-
e)
-
Making the load-bearing capacity
|
|
|
|
2 |
13 |
Anchorage of scaffold (§ 4 n. 13) |
-
a)
-
Check the anchorage options, detect defects on the ground, and select anchoring means
-
b)
-
Install, verify and remove anchorages, in particular dowels and brackets
|
6 |
|
|
|
-
c)
-
Make tensions according to preferences
|
|
|
|
2 |
14 |
Construction of length-and surface-oriented working and protective scaffold (§ 4 no. 14) |
-
a)
-
Distinguishing work and protective scaffolders according to their intended use
-
b)
-
Select scaffold components with regard to their requirements, in particular wood, steel and aluminium scaffolders
-
c)
-
Up-, to-, and dismantled pipe coupling scaffolds in control
-
d)
-
Up, down and down system scaffolds in rule execution
-
e)
-
Scaffolders
-
f)
-
Bridging
|
14 |
|
|
|
-
g)
-
Set up and down ladder scaffolders
-
h)
-
To-, to-and remove pipe coupling scaffolds outside of the control design
-
i)
-
To-, remove and remove system scaffolds outside the rule execution
-
k)
-
Creating protective walls
|
|
8 |
|
|
-
l)
-
Up-, to-, and dismantled boom scaffolders
|
|
|
2 |
|
-
m)
-
To-, to-and dismantled pipe coupling scaffolds according to static calculations, drawings and plans
-
n)
-
To-, and remove system scaffolds according to static calculations, drawings and plans
-
o)
-
Control released scaffolders for work safety and document results
|
|
|
|
8 |
15 |
Construction of load-bearing structures with substructure including basic formwork (§ 4 no. 15) |
-
a)
-
Distinguishing the load-bearing framework groups and systems and assigning them to the intended use
-
b)
-
Read and apply drawings with symbols for scaffold construction
-
c)
-
Supporting frames, for which no execution documents are required, to-, to-and dismantled
-
d)
-
Up-, down-and dismantled towers
-
e)
-
Install, align, and remove basic formwork
|
|
|
6 |
|
-
f)
-
Build up and down armor supports
-
g)
-
Upgrade and remove armor binders and girders
-
h)
-
horizontal and vertical stiffening associations in order to increase and expand
-
i)
-
To-, to-and dismantled load-bearing scaffolders according to static calculations, drawings and plans
-
k)
-
Lowering of load-bearing structures, in particular mechanical and hydraulic
-
l)
-
Moving and moving the load-bearing framework
|
|
|
|
10 |
16 |
Working platforms, working platforms and elevators (§ 4 n. 16) |
-
a)
-
Selecting work platforms by type and purpose
-
b)
-
To-, to-and dismantled running stands and mobile working platforms
|
2 |
|
|
|
-
c)
-
Set up and operate lifting work platforms
|
|
2 |
|
|
-
d)
-
Connecting points for vertically and horizontally movable working platforms and platforms in accordance with specifications and testing
|
|
|
2 |
|
-
e)
-
Vertically and horizontally movable working platforms and platforms to-, to-and dismantled and operate
-
f)
-
Build and dismantuse and use mastled climbing platforms
-
g)
-
Build and remove loads and passenger elevators as well as use them and assign users
|
|
|
|
5 |
17 |
Building of suspension frames (§ 4 n. 17) |
-
a)
-
Select the suspension scaffolders by type and purpose
-
b)
-
Suspension systems differ and assemble
-
c)
-
Up-, down-and-down suspended scaffolders in control
|
|
|
2 |
|
-
d)
-
To-, to-and dismantled suspended scaffolders according to static calculations, drawings and plans
|
|
|
|
5 |
18 |
Building of weather protection halls and inhouse (§ 4 n. 18) |
-
a)
-
Weather protection halls and concretions according to the type and purpose of use, in particular against weather conditions, immissions and damage
-
b)
-
Installation and removal of housing according to specifications, in particular in the case of environmentally harmful works
|
|
|
2 |
|
-
c)
-
To-, to-and dismantled weather protection halls according to static calculations, drawings and plans
|
|
|
|
5 |
19 |
Building scaffold for special requirements (§ 4 no. 19) |
-
a)
-
To-, to-and dismantled access and staircases
|
3 |
|
|
|
-
b)
-
Apply rules for the construction and operation of stages and grandstands
-
c)
-
Traffic scaffolding, traffic routes, stages and grandstands differ according to the type of construction and purpose of use
-
d)
-
Traffic scaffolding, traffic routes, stages and grandstands on-, to-and dismantled, to control road safety
|
|
|
3 |
|
20 |
quality assurance measures and reporting (§ 4 No. 20) |
-
a)
-
Creating daily reports
|
2 *) |
|
|
|
-
b)
-
Testing scaffolders and scaffold structures based on the work order on measure, form, function and safety
-
c)
-
Make thickness
|
|
|
2 *) |
|
-
d)
-
Determine deviations from target values during the execution of the work order and document control results
-
e)
-
Contribute to the continuous improvement of work processes in our own workspace
|
|
|
|
2 *) |
-
*)
-
To mediate in connection with other training contents.
|