Recovery area | Total allowed quantity in m3 | Annually permitted quantity in m3 | Other Terms |
---|
Number Number
| Name Name Name Name Name
| | | | 502-AA
| Hesbjerg Grund
| 38,000
| | | 502-CA
| Fløjstrup Skov
| 480,000
| 480,000
| | 502-JA
| Hesbjerg Grund South
| 6,000
| | In the area, there must not be recycled materials for use for fillings.
| 502-KA
| North of Wullfs Flak
| 2,000,000
| 500,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 502-KB
| Wullfs Flak
| 2.583,000
| 900,000
| 2 circle-shaped protection zones with a radius of 200 m around 2 wrecks specified at the following positions in WGS 84:
| | | | | | | | | | | Ø. Length Length | N. width width width | | | | | 10°22,92'
| 56°04,95'
| | | | | 10°22,97'
| 56°03,97'
| | | | | | | | | | There must not be raw materials in the cultural history area of interest defined by the following coordinates in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 10°22,14'
| 56°04,84'
| | | | | 10°22,48'
| 56°04,97'
| | | | | 10°22,77'
| 56°04,76'
| | | | | 10°22,44'
| 56°04,60'
| | | | | | | | | | | For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 504DA
| North of Funen's Head
| 200,000
| 50,000
| | 504-EA
| Bolsaks
| 47,000
| | In the area, there must not be recycled materials for use for fillings.
| 504GB
| North of Bolsaks
| 3.368,000
| 900,000
| | 506-DA
| Mediterranean
| 150,000 hotels ago
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 506-FA
| Nordby Bay
| 128,000
| 33,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 506-GA
| Klørgrund
| 68,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 506-HA
| Helmet Northwestern
| 500,000
| 100,000 100,000 100,000
| | 506-NA
| Moselgrund
| 170,000
| 155,000
| In the area, there must not be recycled materials for use for fillings.
| 506-PA
| Marthe Flak
| 2.450,000
| 1,000,000
| In the area, there must not be recycled materials for use for fillings.
After the acquisition of 1 million m3, a program for the description of the environmental effects and is prepared a status for the nature and environmental conditions in the recovery area and a zone of 500 m around. The programme must be approved by the Naturstyrelsen.
| 506-SA and 506-SB
| Moselgrund Nord and East
| 3.998,000
| 1,000,000
| A circle-shaped protection zone with a radius of 200 m around the following position in WGS 84 in the area 506-SA:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 10°50,53'
| 56°05,84'
| | | | | | | | | | For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 510-AA
| Hub
| 40,000
| | | 510-DA
| Five
| 40,000
| | | 510-EA
| Karrebæksminde
| 365,000
| 79,000
| | 512-BA
| Tranekær
| 125,000
| 50,000
| | 520-AA
| Fakse Bay North
| 1.700,000
| 1,000,000
| No materials for use to fill up the east of a line through the following points in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 12°20,13'
| 55°11,77'
| | | | | 12°21,60'
| 55°09,96'
| | | | | | 520-DA
| Nordmandshage
| 430,000
| 86,000
| In the area, there must not be recycled materials for use for fillings.
| 520-EA and 520-EB
| Gyldenløves Flak
| 940,000
| | In the areas, 40,000 m3 materials are available for filling.
| 520-EF and 520-EG
| Golden Bear Flak Vest
| 3.560,000
| 900,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 520-FA
| Gyldenløves Flak South
| 140,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 524-AA and 524-AB
| Cancer Nord
| 5,000,000
| 1,000,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 524-BA
| Cancer South
| 5,000,000
| 1,000,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 524-CA
| Vyl South
| 200,000
| 50,000
| | 524-DA
| Vyl Vest
| 200,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 524-EA
| Vyl West
| 50,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 526-CA
| Rønne Rønne Rønne
| 1,000,000
| 200,000
| In the area, there must not be recycled materials for use for fillings.
For applications for the expansion of the recovery amount, the requirements for the implementation of supplementary measurements and renewed biological screening, including the surrounding stone reef areas.
| 526-DA
| Klintegrund
| 2.490,000
| 1,000,000
| In the area, there must not be recycled materials for use for fillings.
| 526-EA
| Bakkegrund Nord
| 200,000
| 50,000
| No 50,000 m3 materials are required for filling.
| 526-HA
| Klintegrund Vest
| 200,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 526-IA
| Bakkegrund South
| 3.170,000
| 1,000,000
| In the area that doesn't include the lower area 1, in total, 170,000 m3.
Up to 3 million m3 within part range 1, which is bound by right lines between the following coordinates in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 14°49,25'
| 54°57,24'
| | | | | 14°50,66'
| 54°57,24'
| | | | | 14°50,66'
| 54°56,73'
| | | | | 14°49,25'
| 54°56,73'
| | | | | | | | | | No materials are required for filling.
| 526-JA
| Rønne Banke East
| 50,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 530-BA
| Light plot South
| 420,000
| 84,000
| | 530-DA
| Light plot South East
| 600,000
| 120,000
| In the area, there must not be recycled materials for use for fillings.
| 532-AA
| Lappegrund
| 330,000
| 66,000
| | 536-AA
| Green reefs
| 810,000
| | Maximum 200,000 m3 materials are required for filling.
| 536-BA
| Green Red West
| 2,000,000
| 500,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 538-AA
| Grønsund
| 460,000
| | Maximum 200,000 m3 materials are required for filling.
| 538-GA
| Bjelkes Flak
| 210,000
| 136,000
| In the area, there must not be recycled materials for use for fillings.
The acquisition must be carried out so that the Danish Environmental Protection Agency’s indicative limit values for companies regarding noise in residential areas for open and low residential buildings are complied with in accordance with guidance no. 5/1984 ‘External noise from companies’. The limit values are the following:
| | | | | | | | | | | Monday Friday
at 08-18,
Saturday at 07-14
| Monday - Friday
at 18-22,
Saturday at 14-22,
Son and Sacred Day
at 08-22:
| All days
at 22-07:
| | | | | | | 45 dB
| 40 dB
| 35 dB
| | | | | | | | | | | The limits – apart from noise tips – are indicated as the equivalent, corrected noise level and apply to the nearby housing and other noise-sensitive buildings.
The noise limits apply to each company’s total noise contribution.
All recovery crafts to work in the area must have been carried out in advance a noise measurement as documents that the conditions of the authorisation can be observed.
| 542-BA
| Halk Head
| 189,000
| 105,000
| When 80,000 m3 has been entered, a coastal study documenting that the advance can continue without the influence of the coast.
The acquisition must be carried out so that the Danish Environmental Protection Agency’s indicative limit values for companies in residential areas and publicly available recreational areas are complied with in accordance with guidance no 5/1984 ‘External noise from companies’. The limit values are the following:
| | | | | | | | | | | Monday Friday
at 08-18,
Saturday at 07-14
| Monday - Friday
at 18-22,
Saturday at 14-22,
Son and Sacred Day
at 08 22:
| All days
at 22-07:
| | | | | | | 40 dB
| 35 dB
| 35 dB
| | | | | | | | | | | The limits – apart from noise tips – are indicated as the equivalent, corrected noise level and apply to the nearby housing and other noise-sensitive buildings.
The noise limits apply to each company’s total noise contribution.
All recovery crafts to work in the area must have been carried out in advance a noise measurement as documents that the conditions of the authorisation can be observed.
| 542-EA
| Tranesand
| 100,000 100,000 100,000
| 50,000
| 20,000 m3 materials are required for filling.
| 542-FA
| Stokkebæk Flak
| 75,000
| 50,000
| 20,000 m3 materials are required for filling.
| 542-OA
| Trelde Næs
| 165,000
| 50,000
| In the area, there must not be recycled materials for use for fillings.
| 542-PA
| Tragten
| 360,000
| | The amount may only be in part range 1, which is bound by the right lines between the following coordinates in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 09°47,50'
| 55°34,08'
| | | | | 09°48,44'
| 55°34,59'
| | | | | 09°48,92'
| 55°34,30'
| | | | | 09°47,95'
| 55°33,76'
| | | | | | | | | | For applications for extensions of the recovery amount, the requirements for the implementation of supplementary measurement and biological screening of the low-watered areas will be laid north of the authorisation area.
| 542-QA
| Lyø Sand
| 20,000
| | 10,000 m3 materials are required for filling.
| 542-VA
| The Little Belt
| 1.998,000
| 500,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 544-EA
| Agersø Flak
| 965,000
| | maximum of 350,000 m3 materials are required for filling.
The acquisition of more than 500,000 m3 of the authorisation quantity must first be initiated when a new environmental examination documenting that the previous recovery has not had significant negative environmental effects on flora and fauna in the areas of the Northwestern and Southwestern part of the safety area. The documentation must be approved by the Naturstyrelsen before the work can be initiated.
| 544-JA
| Musholm South
| 100,000 100,000 100,000
| 50,000
| 20,000 m3 materials are required for filling.
| 544-QA
| Light ground
| 420,000
| 84,000
| Maximum 40,000 m3 materials are required for filling.
| 544-QB
| Light plots
| 3.138,000
| 800,000
| A circle-shaped protection zone with a radius of 200 m around the following position in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 10°56,98'
| 55°36,46'
| | | | | | | | | | There must not be deployed in an area of the right lines between the following coordinates in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 10°54,38'
| 55°36,68'
| | | | | 10°55,42'
| 55°36,68'
| | | | | 10°55,39'
| 55°36,02'
| | | | | 10°54,63'
| 55°36,04'
| | | | | | | | | | For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 544-TA
| Musholm Sydvest
| 195.000
| 50,000
| Maximum 80,000 m3 materials are required for filling.
| 548-AA
| Køge Køge Køge Køge Køge Køge Køge Køge
| 790,000
| 158,000
| In the area, there must not be recycled materials for use for fillings.
| 548-BA
| Juelsgrund
| 640,000
| 128,000
| In the area, there must not be recycled materials for use for fillings.
| 548-EA
| Moses
| 635,000
| | | 548-FA
| Køge Bay East
| 550,000
| | | 548-HA
| Juelsgrund East
| 70,000
| 70,000
| | 550-BA
| Dryer
| 850,000
| | No filler must be deployed south of a line between the following coordinates in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 10°25,44'
| 55°36,85'
| | | | | 10°27,24'
| 55°36,33'
| | | | | | | | | | In the area south of the above line, up to 500,000 m3 quality materials, the raw material types 1, 2 and 3. In the area north of the above line, up to 350,000 m3 materials.
The acquisition must be carried out so the Danish Environmental Protection Agency’s indicative limit values for noise from companies are complied with the area type of cottage areas and publicly available recreation areas, in accordance with guidance no. 5/1984 ‘External noise from companies’. To ensure that the total noise contribution of the companies does not exceed the limit values, the following noise limits apply:
| | | | | | | | | | | | | | | Monday Friday
at 08-18,
Saturday at 07-14
| Monday - Friday
at 18-22,
Saturday at 14-22,
Son and Sacred Day
at 08-22:
| All days
at 22-07:
| | | | | | | 40 dB
| 30 dB
| 30 dB
| | | | | | | | | | | | | | | | | | | | The limits – apart from noise tips – are indicated as the equivalent, corrected noise level and apply to the nearby housing and other noise-sensitive buildings.
The noise limits apply to each company’s total noise contribution.
All recovery crafts to work in the area must have been carried out in advance a noise measurement as documents that the conditions of the authorisation can be observed.
| 550-CA
| Hasmark
| 1,000,000
| 200,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 550-EA
| East of Tørresø
| 2.752,000
| 750,000
| The acquisition must be carried out so that the Danish Environmental Protection Agency’s guidance limit values for noise from companies are observed for the area type of holiday areas and publicly available recreation areas. To ensure that the total noise contribution of the companies does not exceed the limit values, the following noise limits apply:
| | | | | | | | | | | | | | | Monday Friday
at 08-18,
Saturday at 07-14
| Monday - Friday
at 18-22,
Saturday at 14-22,
Son and Sacred Day
at 08-22:
| All days
at 22-07:
| | | | | | | 40 dB
| 30 dB
| 30 dB
| | | | | | | | | | | | | | | The limits – apart from noise tips – are indicated as the equivalent, corrected noise level and apply to the nearby housing and other noise-sensitive buildings. The noise limits apply to each company’s total noise contribution.
All recovery crafts to work in the area must have been carried out in advance a noise measurement as documents that the conditions of the authorisation can be observed.
For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 550-EB
| Vest for Tørresø
| 4,000,000
| 1,000,000
| The acquisition must be carried out so that the Danish Environmental Protection Agency’s guidance limit values for noise from companies are observed for the area type of holiday areas and publicly available recreation areas. To ensure that the total noise contribution of the companies does not exceed the limit values, the following noise limits apply:
| | | | | | | | | | | | | | | Monday Friday
at 08-18,
Saturday at 07-14
| Monday - Friday
at 18-22,
Saturday at 14-22,
Son and Sacred Day
at 08-22:
| All days
at 22-07:
| | | | | | | 40 dB
| 30 dB
| 30 dB
| | | | | | | | | | | | | | | The limits – apart from noise tips – are indicated as the equivalent, corrected noise level and apply to the nearby housing and other noise-sensitive buildings. The noise limits apply to each company’s total noise contribution.
All recovery crafts to work in the area must have been carried out in advance a noise measurement as documents that the conditions of the authorisation can be observed.
For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 550-FB
| Hasmark South
| 2.691.000
| 750,000
| The acquisition must be carried out so that the Danish Environmental Protection Agency’s guidance limit values for noise from companies are observed for the area type of holiday areas and publicly available recreation areas. To ensure that the total noise contribution of the companies does not exceed the limit values, the following noise limits apply:
| | | | | | | | | | | Monday Friday
at 08-18,
Saturday at 07-14
| Monday - Friday
at 18-22,
Saturday at 14-22,
Son and Sacred Day
at 08-22:
| All days
at 22-07:
| | | | | | | 40 dB
| 30 dB
| 30 dB
| | | | | | | | | | | The limits – apart from noise tips – are indicated as the equivalent, corrected noise level and apply to the nearby housing and other noise-sensitive buildings. The noise limits apply to each company’s total noise contribution.
All recovery crafts to work in the area must have been carried out in advance a noise measurement as documents that the conditions of the authorisation can be observed.
For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 550-GA
| Nord for Hasmark
| 1,000,000
| 250,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 554-AA
| Skovshoved
| 95,000
| 50,000
| | 554-CA
| Disk
| 0
| | | 554-DA
| Vedbæk
| 0
| | | 558-CB
| Skagens Rev
| 2,000,000
| 250,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurement and geomorphological impact assessment, as well as renewed biological screening.
| 560-BA
| Gedser Rev
| 200,000
| 51.000
| Maximum 35,000 m3 materials are required for filling.
| 562-HA
| Jyske Rev
| 2.770,000
| 1,000,000
| No more than 150,000 m3 materials are required for filling.
| 562-KD
| Jyske Rev E
| 3.190,000
| 800,000
| 2 circle-shaped protection zones with a radius of 200 m around 2 wrecks specified at the following positions in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 7°48,99'
| 56°35,37'
| | | | | 7°55,79'
| 56°36,06'
| | | | | | | | | | For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 562-LC
| Jyske Rev A
| 1.835,000
| 1,000,000
| There must not be deployed in a circular protection zone with a radius of 1000 m around the stone reef location in the southern corner with the centre of the W 84GS:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 07°22,86'
| 56°42,76'
| | | | | | | | | | For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 562-MB
| Jyske Rev D
| 3.200,000
| 800,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 562-NA
| Jyske Rev C
| 4,000,000
| 1,000,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| 564-AA
| Adler Grund East
| 490,000
| 98,000
| In the area, there must not be recycled materials for use for fillings.
| 564-BA
| Rønne Banke South
| 1,000,000
| 467,000
| | 566-AA
| Keldsnor
| 0
| | | 566-BA
| Roadsnæs Flak
| 5,000,000
| 1,000,000
| For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening, including the surrounding stone reef areas.
| 568-AA
| Rødbyhavn
| 200,000
| 98,000
| The area is closed if the recovery in the area constitutes a safety risk in connection with facilities and operation of the fixed connection to the Fehmarnbelt.
| 568-CA
| Gedser
| 200,000
| 50,000
| | 570-BA
| Small Light
| 970,000
| | The amount may only be in part range 1, which is bound by the right lines between the following points in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 11°29,19'
| 56°18,32'
| | | | | 11°29,56'
| 56°18,32'
| | | | | 11°29,80'
| 56°18,26'
| | | | | 11°30,47'
| 56°17,81'
| | | | | 11°30,54'
| 56°17,65'
| | | | | 11°29,19'
| 56°17,65'
| | | | | | | | | | The acquisition of more than 250,000 m3 must first be initiated when an environmental investigation was carried out, which documents that the previous recovery has not had significant negative environmental effects on flora and fauna outside the part area. The documentation must be approved by the Naturstyrelsen before the work can be initiated.
In the area, there must not be recycled materials for use for fillings.
| 580-AA
| Jammerbugt
| 3.520,000
| 900,000
| No 3 circle-shaped protection zones with a radius of 500 m around 3 wreck listed at the following positions in WGS 84:
| | | | | | | | | | Ø. Length Length | N. width width width | | | | | 9°07,07'
| 57°24,47'
| | | | | 9°07,96'
| 57°24,06'
| | | | | 9°17,00'
| 57°24,07'
| | | | | | | | | | For applications for extensions of the recovery amount, requirements for the implementation of supplementary measurements and renewed biological screening.
| «
| |