DECREE


Dated 28 February 2013

Amending Decree no. 499/2006 Coll., On construction documentation

Ministry for Regional Development, pursuant to § 193 of the Act no. 183/2006
Coll., On Territorial Planning and Building Code (Building Act), as amended
Act no. 227/2009 Coll. and Act no. 350/2012 Coll .:

Art. I

Decree no. 499/2006 Coll., On construction documentation, as follows:

First § 1 reads:

"§ 1

(1) This regulation establishes the scope and content

) Documentation for issuing a decision on the location of buildings or equipment

B) Documentation for the issue of change of land use,

C) documentation to issue a decision on changing the use of buildings influence on
territory

D) joint documentation for the issuance of a joint zoning and building permit
,

E) project documentation for the construction notification referred to in § 104.
1 point. a) to e) of the Building Act or the project documentation for the issuance of a building permit
,

F) documentation for construction and implementation

G) documentation of actual construction.

(2) This Decree also establishes requirements documentation demolition work,
content requirements of building log, single record of building and
way of their leadership.

(3) This Decree does not apply to the project documentation for the construction
aviation, railway construction and track equipment, including the runway, construction
highways, local roads and public purpose roads under §
194 point. c) Building Act. ".

Second Under § 1, the following new § 1a to 1d, which, including the title added:

"§ 1a

Documentation for issuing a decision on the location of the building or facility

(K § 86 par. 7 of the Building Act)

The scope and content of the documentation for issuing a decision on the location of buildings or
device is specified in Annex no. 1 hereto.

§ 1b

Documentation for issuing a decision on change of land use

(K § 86 par. 7 of the Building Act)

The scope and content of the documentation for issuing a decision on change of land use
is set out in Annex no. 2 hereto.

§ 1c

Documentation for the issuance of the decision to change the use of the impact of construction on the territory

(K § 86 par. 7 of the Building Act)

Scope and content of the documentation for the issuance of the decision to change the effect of the use
construction in the territory is stipulated in Annex no. 3 hereto.

§ 1d

Common documentation for the issuance of a joint zoning and building permit


(K § 94a paragraph. 7 of the Building Act)

Scope and content of a joint document for the issuance of common
zoning and building permits is set out in Annex.
4 to this decree. ".

Third § 2, including the heading reads:

"§ 2
Project documentation


(K § 105 para. 8 and § 110 paragraph. 5 of the Building Act)

Scope and content of the project documentation for the construction notification referred to in §
104 paragraph. 1 point. a) to e) of the Building Act or the issuance of building permits
is stipulated in Annex no. 5 to this decree. ".

Fourth In § 3, the number "2" is replaced by "6".

Fifth In § 4 para. 1 the words "acquired pursuant to § 125 paragraph. 1 and 3
Building Act is set out in Annex no. 3" is replaced by "
is set out in Annex no. 7".

6th In the heading of § 5 the number "7" is replaced by "8".

7th In § 5, the words "to be attached to a declaration of intent to remove the building by
§ 128 paragraph. 1 of the Building Act specified in Annex no. 4" is replaced
"laid down in Annex no. 8".

8th In § 6, the number "5" is replaced by "9".

9th Annex no. 1-4, including footnotes Nos. 1-7 added:

"Annex no. 1 to Decree no. 499/2006 Coll.

The scope and content of the documentation for issuing a decision on the location of buildings or equipment


The documentation contains parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D drawing documentation

E invoices part

Documentation must always contain sections A to E, with the scope and content
individual parts will be adapted to the nature and scope of works or
device (hereinafter referred to as "building") and conditions in the area.

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
)


C) The subject documentation.

A.1.2 Details of the applicant

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on the processor documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) the name and surname of the chief designer including a number under which it
registered in the register of authorized persons kept by the Czech Chamber of Architects
or the Czech Chamber of Chartered Engineers and Technicians in construction
, with marked field or specializing in the authorization,

C) full names of the designers of the individual parts of the documentation including
number under which they are entered in the register of authorized persons held
Czech Chamber of Architects and Czech Chamber of Chartered Engineers and Technicians in
construction, with highlighted field or
specializing their authorization.

A.2 List of input documents

A.3 Information on the territory

A) the extent of the area; built / unbuilt territory

B) the use and zastavanosť territory

C) information on the protection of the territory under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

D) data on runoff,

E) data on compliance with the territorial planning documents, the objectives and tasks
spatial planning

F) data on compliance with the general land use requirements,

G) data on compliance with the requirements of the authorities concerned

H) a list of exemptions and concessional solutions

I) a list of related and conditional investment

J) a list of land and buildings affected by the placement of buildings (according to the cadastre
property).

A.4 Data on construction

A) new construction or change the completed building,

B) the purpose of use of the building,

C) the permanent or temporary structure,

D) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

E) information regarding compliance with the technical requirements for the construction and general
technical requirements for barrier-free use of buildings,

F) data on compliance with the requirements of the authorities concerned and
requirements arising from other legislation ^ 2)

G) a list of exemptions and concessional solutions

H) the proposed capacity building (built-up area, enclosed space,
floor area, number of functional units and their size, number
users / workers, etc.)

I) the basic balance of the building (needs and consumption of media and materials,
rainwater management, total produced quantities and types of waste and emissions
etc.)

J) the basic assumptions of construction (time data on the implementation of construction
breakdown on stage)

K) indicative construction costs.

A.5 breakdown structures for buildings and technical and technological equipment

B Summary technical report

B.1 Description of territory construction

A) the characteristics of building land,

B) listing and conclusions of completed surveys and analyzes (mineral exploration
hydrogeological survey, construction and historical research, etc.)

C) the existing protective and safety zones,

D) position relative to záplavovému territory, territory etc. poddolovanému.,

E) the impact of construction on surrounding buildings and land, protecting the environment, construction
effect on runoff in the area,

F) requirements for decontamination, demolition, tree felling,

G) requirements for maximum occupation of agricultural land fund or
land intended to fulfill forest functions (temporary / permanent)

H) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure)

I) accruals construction bonds, conditional induced related
investment.

B.2 The description of the building

B.2.1 Intended use of the construction, the basic functional units capacity

B.2.2 Overall urban and architectural design

A) urban - territorial control, spatial composition solution

B) architectural design - shape solution composition, material and color
solutions.

B.2.3 layout and operational solutions, technology


B.2.4 Disabled use of the building

B.2.5 Safety in use of construction

B.2.6 Basic technical description of buildings

B.2.7 Technical and technological equipment

Principles for equipment, supplies and consumption of critical media.

B.2.8 Fire safety solutions

Assessment of technical conditions of fire protection:

A) calculating and assessing odstupových distances and definition of the fire
hazardous areas,

B) provide the required fire water or other extinguishing agents,

C) the projected construction equipment
dedicated fire safety equipment, including setting requirements for building construction,

D) assessment of access roads and assembly areas for fire
technology including the possibility of conducting the intervention of fire brigade units.

B.2.9 Principles of energy management

Criteria heat technical evaluation.

B.2.10 Hygiene requirements for the construction, requirements for working and communal environment


Principles for construction parameters (heating, ventilating, lighting,
water supply, sewage, etc.) As well as the principle solution
impact of construction on the environment (noise, vibration, dust, etc.).

B.2.11 Privacy buildings from the adverse environmental effects

Penetration of radon from the subsoil, stray currents, seismicity, noise, flood control etc.
.

B.3 Connection to technical infrastructure

A) connecting points of the technical infrastructure, relocation,

B) mounting dimensions, power capacity and length.

B.4 Traffic Solutions

A) a description of the transport solutions

B) connecting the territory to the existing transport infrastructure

C) the right to rest.

B.5 Solutions vegetation and associated landscaping

B.6 Description of the effects of construction on the environment and its protection

A) the impact on the environment - air, noise, water, waste and soil

B) the impact on nature and landscape (protection of trees, protection of protected trees,
protection of flora and fauna, etc.), Maintaining the ecological functions and
relationships in the landscape,

C) the impact on the system of protected areas Natura 2000

D) a proposal for consideration of the terms of the conclusions of the inquiry proceedings or opinions
EIA

E) the proposed protective and safety zones, range limitations and conditions
protection under other laws.


B.7 Protection of Population
Compliance with the basic requirements of the tasks of protection
population.

B.8 principles of organization of the construction

A) the connection of the site to the existing transport and technical infrastructure
,

B) protection around the site and requirements related to sanitation,
demolition, tree felling,

C) the maximum occupation of the site (temporary / permanent)

D) the balance of earthworks, the requirements for supply or depositions earth.

C
drawings Situation
C.1 Situational drawing wider relations

A) the scale of 1: 1000 to 1: 50,000,

B) connecting the building to the transport and technical infrastructure,

C) existing and proposed protective and safety zones,

D) indicate the borders of the territory.

C.2 overall situational drawing

A) the scale of 1: 200 to 1: 1000, with large buildings 1: 2000 or 1:
5000,

B) existing buildings, transport and technical infrastructure,

C) boundaries,

D) the boundaries of the area,

E) the base elevation and topography,

F) the proposed construction

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) communications and paved areas,

I) surface vegetation.

C.3 Coordination situational drawing

A) scale of 1: 200 to 1: 1000, with extensive buildings 1: 2000 or 1:
5000, with changes to the building, which is a cultural monument in a building in the historic
reservation or conservation area in scale 1: 200

B) existing buildings, transport and technical infrastructure,

C) boundaries, parcel numbers,

D) the boundaries of the area,

E) the current elevation and topography,

F) any individual proposed and disposed
buildings and technical infrastructure

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) the proposed roads and paved areas, access to transport
infrastructure

I) addressing vegetation


J) dimensioned spacing structures

K) plotting new technical infrastructure, connecting the building to the technical
infrastructure

L) current and proposed safety and protection zones, conservation
reserve, conservation zones, etc.,

M) maximum occupation (temporary / permanent)

N) geodetic data, determine the coordinates of control networks,

O) distances including the definition of the fire danger zone,
access road and entrance areas for fire equipment and fire water source
.

C.4 Cadastral situational drawing

A) scale used by cadastral maps

B) plot of building land, the desired location of the building,

C) an indication of linkages and impacts on the environment.

Special Situation C.5 drawing

Situation drawings made as needed in appropriate scale
showing special requirements of buildings, technological equipment, technical
network infrastructure and related engineering
measures.

D drawing documentation

D.1 Typical plans

D.2 Characteristics cuts

(Including section documenting the continuity of the existing buildings
particularly with regard to the depth of the foundation of the proposed buildings and existing buildings)

D.3 The views

(Including postcards documenting the integration of the building into the existing buildings or landscapes
)

E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons and documents prepared by other persons authorized
legislation.

E.1 binding opinion, opinions, decisions, statements of the affected organs


E.2. The opinions of owners of public transport and technical infrastructure

E.2.1 Opinions owners of public transport and technical infrastructure
to the possibility of a connection method, wherein for example, situational drawing

E.2.2 Opinion owner or operator of the conditions of establishment
structures, works and activities in the trade and
security zones under other laws

E.3 Proof by special legislation 3) demonstrating compliance
characteristics of the product which fulfills the function of the building, with construction requirements
under § 156 of the Construction Act or technical specifications of the manufacturer or importer
, or another document from which it is possible to verify compliance with the requirements for construction


E.4 Geodetic basis for project processing activities under other legislation
^ 4)

E.5 Other comments, statements, reports and the results of negotiations conducted
during processing documentation

Annex no. 2 to Decree no. 499/2006 Coll.

The scope and content of the documentation for issuing a decision on change of land use

The documentation contains parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D drawing documentation

E invoices part

Documentation must always contain sections A to E, with the scope and content
individual parts will be adapted to conditions in the area and the nature
proposed changes.

A
accompanying report
A.1 Identification data

A.1.1 Data on the territory

A) the proposed change of land use,

B) place (cadastral, land plot numbers)

C) The subject documentation.

A.1.2 Details of the applicant

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on the processor documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) the name and surname of the chief designer including a number under which it
registered in the register of authorized persons kept by the Czech Chamber of Architects
or the Czech Chamber of Chartered Engineers and Technicians in construction
, with marked field or specializing in the authorization,

C) full names of the designers of the individual parts of the documentation including
number under which they are entered in the register of authorized persons held

Czech Chamber of Architects and Czech Chamber of Chartered Engineers and Technicians
under construction, with a marked field or specialization
their authorization.

A.2 List of input documents

A.3 Information on the territory

A) the extent of the area; built / unbuilt,

B) the use and zastavanosť territory

C) the characteristics of the territory, the land and buildings on them,

D) data protection area under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

E) data on runoff,

F) data on compliance with the territorial planning documents, the objectives and tasks
spatial planning

G) data on compliance with the general land use requirements,

H) data on compliance with the requirements of the authorities concerned

I) a list of exemptions and concessional solutions

J) a list of related and conditional investment

A) a list of land and buildings affected by the change of land use (according
cadastre).

A.4 Data on the change of land use

A) the total area of ​​land affected by the change,

B) data on runoff,

C) requirements for the capacity and technical infrastructure

D) estimated period of implementation of land use change.

B Summary technical report

B.1 Description and assessment of the territory

A) the characteristics of the territory

B) listing and conclusions of completed surveys and analyzes

C) the existing protective and safety zones,

D) position relative to záplavovému territory, territory etc. poddolovanému.,

E) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure)

F) accruals bonds, conditional induced related investment.

B.2 Description of the proposed land use changes

A) the basic characteristics of land use change,

B) the rationale for the changes due to the current method of use of the
territory

C) the principle of ensuring the technical conditions for fire protection in the affected area
terms of projected land use

D) the principle of protection of the territory from the negative effects of the external environment
(floods, erosion and landslides, undermining,
seismicity, radon, noise, emissions, waste, etc.).

B.3 Connection to technical infrastructure

B.4 Traffic Solutions

B.5 Solutions vegetation

B.6 Description of the impact of a proposed land use on the environment and its protection


A) the impact on the environment - air, noise, water, waste and soil

B) the impact on nature and landscape (protection of trees, protection of protected trees,
protection of flora and fauna, etc.), Maintaining the ecological functions and
relationships in the landscape,

C) the impact on the system of protected areas Natura 2000

D) a proposal for consideration of the terms of the conclusions of the inquiry proceedings or opinions
EIA

E) the proposed protective and safety zones, range limitations and conditions
protection under other laws.

C
drawings Situation
C.1 Situational drawing wider relations

E) the scale of 1: 1000 to 1: 50,000,

F) an indication of the relationship of the territory to the territory and urban structure
location in the seat.

C.2 overall situational drawing area affected by the change

A) scale of 1: 500 or 1: 1000, with extensive plans 1: 2000 or 1
: 5000,

B) existing buildings and technical infrastructure,

C) boundaries, parcel numbers,

D) the boundaries of the area,

E) existing and proposed elevation and topography,

F) an indication of links to the transport and technical infrastructure

G) current and proposed safety and protection zones, conservation
reserve, conservation zones, etc.

C.3 Cadastral situational drawing

A) scale used by cadastral maps

B) marking the boundaries with new uses,

C) an indication of linkages and impacts on the environment.

D drawing documentation

Drawings showing the change of land use (drawings arranged in a sufficiently
scale documenting the overall urban planning and architectural design
changes proposed land use basic
vertical cuts, documenting designed landscaping, the level of current and
grade level showing the groundwater level; plotting solutions
land drainage in the event of changes in runoff, etc.).


E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons and documents prepared by other persons authorized
legislation.

E.1 binding opinion, opinions, decisions, statements of the affected organs


E.2 opinions of the owners of public transport and technical infrastructure to
conditions of the trade and safety zones, wherein
example situational drawing

E.3 Geodetic basis for project processing activities under other legislation
^ 4)

E.4 Other comments, statements, reports and the results of negotiations conducted
during processing documentation

Annex no. 3 to Decree no. 499/2006 Coll.

Scope and content of the documentation for the issuance of the decision to change the effect of the use
buildings on the territory

The documentation contains parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D drawing documentation

E invoices part

Documentation must always contain sections A to E, with the scope and content
individual parts will be adapted to conditions in the area and the nature
proposed changes influence the use of buildings on the territory.

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
)

C) The subject documentation.

A.1.2 Details of the applicant

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on the processor documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) the name and surname of the chief designer including a number under which it
registered in the register of authorized persons kept by the Czech Chamber of Architects
or the Czech Chamber of Chartered Engineers and Technicians in construction
, with marked field or specializing in the authorization,

C) full names of the designers of the individual parts of the documentation including
number under which they are entered in the register of authorized persons held
Czech Chamber of Architects and Czech Chamber of Chartered Engineers and Technicians in
construction, with highlighted field or
specializing their authorization.

A.2 List of input documents

A.3 Data for territory and influence change in use of buildings on the territory

A) the extent of the area; built / unbuilt,

B) the use and zastavanosť territory

C) information on the protection of the territory under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

D) data on runoff,

E) data on compliance with the territorial planning documents, the objectives and tasks
spatial planning

F) data on compliance with the general land use requirements,

G) data on compliance with the requirements of the authorities concerned

H) a list of exemptions and concessional solutions

I) a list of related and conditional investment requirements for the issue
other decisions or actions

J) a list of land and buildings affected by the change of building use to influence
territory (according to the cadastre).

A.4 Data on the structure and change of use of the building

A) the purpose of use of the building (existing and proposed)

B) a permanent or temporary structure,

C) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

D) information regarding compliance with the technical requirements for the construction and general
technical requirements for barrier-free use of buildings,

E) data on compliance with the requirements of the authorities concerned and
requirements arising from other legislation ^ 2)

F) the list of exemptions and concessional solutions

G) the proposed change in capacity building (floor area, number of functional
units and their size, number of users / workers, etc.)

H) the basic balance of the building (needs and consumption of media and materials, general

Produced quantities and types of waste and emissions
class energy performance of buildings, etc.)

I) basic assumptions of implementation.

A.5 Justification for changes influence the use of buildings in the

B Summary technical report

B.1 Description of territory

A) the characteristics of the territory

B) listing and conclusions of completed surveys and analyzes

C) the existing protective and safety zones,

D) position relative to záplavovému territory, territory etc. poddolovanému.,

E) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure)

F) accruals bonds, conditional induced related investment.

B.2 Description of proposed changes influence the use of buildings in the

A) existing and proposed end use of the building,

B) the principle of protection of the area against the adverse effects resulting change of control
use of the building,

C) an assessment of technical conditions of fire protection in the affected area of ​​
terms of the change in use of the building.

B.3 New demands on the technical infrastructure

A) connecting points of the technical infrastructure, relocation,

B) mounting dimensions, power capacity and length.

B.4 new demands on transportation infrastructure

A) a description of the transport solutions

B) connecting the territory to the existing transport infrastructure

C) the right to rest.

B.5 Editing terrain and vegetation solutions in the context of a change of control
use buildings on the territory

The data on induced noise measures - ramparts, noise barriers, etc.
.

Description B.6 changes influence the use of construction on the environment and its protection


A) the impact on the environment - air, noise, water, waste and soil

B) the impact on nature and landscape (protection of trees, protection of protected trees,
protection of flora and fauna, etc.), Maintaining the ecological functions and
relationships in the landscape,

C) the impact on the system of protected areas Natura 2000

D) a proposal for consideration of the terms of the conclusions of the inquiry proceedings or opinions
EIA

E) the proposed protective and safety zones, range limitations and conditions
protection under other laws.

Description B.7 changes influence the use of the building for barrier-free building use

C
drawings Situation
C.1 Situational drawing wider relations

A) the scale of 1: 1000 to 1: 50,000,

B) an indication of the connection to the building of transport and technical infrastructure

C) existing and proposed protective and safety zones,

D) indicate the borders of the territory.

C.2 overall situational drawing area affected by the change

A) scale of 1: 500 or 1: 1000, with extensive buildings 1: 2000 or 1
: 5000,

B) the boundaries of the area,

C) boundaries, parcel numbers,

D) an indication of the connection to the building of transport and technical infrastructure

E) current and proposed safety and protection zones, conservation
reserve, conservation zones, etc.

C.3 Cadastral situational drawing

A) scale used by cadastral maps

B) an indication of the new buildings for uses

C) an indication of linkages and impacts on the environment.

D drawing documentation

Drawings showing the change in use of the building (plans showing
current and proposed method of use of individual rooms and spaces
, sections, elevations).

E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons.

E.1 binding opinion, opinions, decisions, statements of the affected organs


E.2 opinions of the owners of public transport and technical infrastructure to
conditions of the trade and safety zones, wherein
example situational drawing

E.3 Other comments, statements, reports and the results of negotiations conducted
during processing documentation

Annex no. 4 to Decree no. 499/2006 Coll.

Scope and content of a joint document for the issuance of common
zoning and building permits

Shared documentation includes parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D objects and documentation of technical and technological equipment

E invoices part

Shared documentation must always contain sections A to E, with the range

Contents and individual parts will be adapted to the nature and significance of construction
conditions in the area, construction and technical design, purpose of use,
impact on the environment and the duration of construction.

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
)

C) The subject documentation.

A.1.2 Details of the applicant / builder

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on processors joint dossier

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) the name and surname of the chief designer including a number under which it
registered in the register of authorized persons kept by the Czech Chamber of Architects
or the Czech Chamber of Chartered Engineers and Technicians in construction
, with marked field or specializing in the authorization,

C) full names of the designers of the individual parts of the joint dossier
including the number under which they are entered in the register of authorized persons
led by the Czech Chamber of Architects and Czech Chamber of Authorised
engineers and technicians active in construction, with marked field or specialization
their authorization.

A.2 List of input documents

A.3 Information on the territory

A) the extent of the area; built / unbuilt territory

B) the use and zastavanosť territory

C) information on the protection of the territory under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

D) data on runoff,

E) data on compliance with the territorial planning documents, the objectives and tasks
spatial planning

F) data on compliance with the general land use requirements,

G) data on compliance with the requirements of the authorities concerned

H) a list of exemptions and concessional solutions

I) a list of related and conditional investment

J) list of affected land and buildings and placing of construction
(according to the cadastre).

A.4 Data on construction

A) new construction or change the completed building,

B) the purpose of use of the building,

C) the permanent or temporary structure,

D) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

E) information regarding compliance with the technical requirements for the construction and general
technical requirements for barrier-free use of buildings,

F) data on compliance with the requirements of the authorities concerned and
requirements arising from other legislation ^ 2)

G) a list of exemptions and concessional solutions

H) the proposed capacity building (built-up area, enclosed space,
floor area, number of functional units and their size, number
users / workers, etc.)

I) the basic balance of the building (needs and consumption of media and materials,
rainwater management, total produced quantities and types of waste and emissions
class energy performance of buildings, etc.)

J) the basic assumptions of construction (time data on the implementation of construction
breakdown on stage)

K) indicative construction costs.

A.5 breakdown structures for buildings and technical and technological equipment

B Summary technical report

B.1 Description of territory construction

A) the characteristics of building land,

B) listing and conclusions of completed surveys and analyzes (mineral exploration
hydrogeological survey, construction and historical research, etc.)

C) the existing protective and safety zones,

D) position relative to záplavovému territory, territory etc. poddolovanému.,

E) the impact of construction on surrounding buildings and land, protecting the environment, construction
effect on runoff in the area,

F) requirements for decontamination, demolition, tree felling,

G) requirements for maximum occupation of agricultural land fund or
land intended to fulfill forest functions (temporary / permanent)

H) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure)


I) accruals construction bonds, conditional induced related
investment.

B.2 The description of the building

B.2.1 Intended use of the construction, the basic functional units capacity

B.2.2 Overall urban and architectural design

A) urban - territorial control, spatial composition solution

B) architectural design - shape solution composition, material and color
solutions.

B.2.3 Total operating solutions, technology

B.2.4 Disabled use of the building

B.2.5 Safety in use of construction

B.2.6 The basic characteristics of objects

A) construction solutions

B) structural and material solutions

C) mechanical resistance and stability.

B.2.7 Basic characteristics of technical and technological equipment

A) technical solutions

B) a list of technical and technological equipment.

B.2.8 Fire safety solutions

A) distribution structures and buildings in fire zones,

B) calculation of fire risk and determining the degree of fire safety

C) evaluating the design of building structures and building products
including requirements to increase the fire resistance of structures,

D) an evaluation of evacuation, including the evaluation of escape routes,

E) evaluation odstupových distances and defining the fire dangerous
space

F) ensuring the necessary amount of fire water or other extinguishing agents, including deployment
internal and external supply points,

G) evaluate the possibility of execution fire intervention (
access roads, access routes)

H) evaluate the technical and technological equipment construction (
distribution piping, HVAC equipment)

I) assessment of the security requirements of construction fire safety
devices

J) the extent and manner of placement of warning and safety signs and
tables.

B.2.9 Principles of energy management

A) criteria for heat technical evaluation

B) assessment of the use of alternative energy sources.

B.2.10 Hygiene requirements for the construction, requirements for working and communal environment


Principles for construction parameters (heating, ventilating, lighting,
water supply, sewage, etc.) As well as the principle solution
impact of construction on the environment (noise, vibration, dust, etc.).

B.2.11 protection of buildings against negative environmental effects

A) protection against penetrating radon from the subsoil,

B) protection against stray currents

C) protection by technical seismicity,

D) protection against noise,

E) anti-flood measures

F) other effects (effect of undermining, the occurrence of methane, etc.).

B.3 Connection to technical infrastructure

A) connecting points of the technical infrastructure,

B) mounting dimensions, power capacity and length.

B.4 Traffic Solutions

A) a description of the transport solutions

B) connecting the territory to the existing transport infrastructure

C) transportation calm

D) walking and biking trails.

B.5 Solutions vegetation and associated landscaping

A) landscaping

B) used vegetation elements

C) biotechnical measures.

B.6 Description of the effects of construction on the environment and its protection

A) the impact on the environment - air, noise, water, waste and soil

B) the impact on nature and landscape (protection of trees, protection of protected trees,
protection of flora and fauna, etc.), Maintaining the ecological functions and
relationships in the landscape,

C) the impact on the system of protected areas Natura 2000

D) a proposal for consideration of the terms of the conclusions of the inquiry proceedings or opinions
EIA

E) the proposed protective and safety zones, range limitations and conditions
protection under other laws.


B.7 Protection of Population
Compliance with the basic requirements of the tasks of protection
population.

B.8 principles of organization of the construction

A) necessary and critical consumption of media and materials, their collateral

B) drainage site,

C) the connection of the site to the existing transport and technical infrastructure
,

D) the impact of the implementation of the construction of the surrounding buildings and land,

E) protection around the site and requirements related to sanitation,
demolition, tree felling,

F) the maximum occupation of the site (temporary / permanent)


G) produced the maximum amount and types of waste and emissions during construction
their disposal,

H) balance earthworks requirements for supply or depositions earth

I) environmental protection during construction,

J) the principles of occupational safety and health in construction,
needs assessment coordinator occupational safety and health
under other laws ^ 5)

A) adjustments for wheelchair use construction affected buildings,

L) policies for traffic engineering measures

M) setting special conditions for the execution of the project (implementation
buildings in operation, measures against the effects of the external environment during construction
etc.)

N) construction progress, sub-critical deadlines.

C
drawings Situation
C.1 Situational drawing wider relations

A) the scale of 1: 1000 to 1: 50,000,

B) connecting the building to the transport and technical infrastructure,

C) existing and proposed protective and safety zones,

D) indicate the borders of the territory.

C.2 overall situational drawing

A) the scale of 1: 200 to 1: 1000, with large buildings 1: 2000 or 1:
5000,

B) existing buildings, transport and technical infrastructure,

C) boundaries,

D) the boundaries of the area,

E) the base elevation and topography,

F) the proposed construction

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) communications and paved areas,

I) surface vegetation.

C.3 Coordination situational drawing

A) scale of 1: 200 to 1: 1000, with extensive buildings 1: 2000 or 1:
5000, with changes to the building, which is a cultural monument in a building in the historic
reservation or conservation area in scale 1: 200

B) existing buildings, transport and technical infrastructure,

C) boundaries, parcel numbers,

D) the boundaries of the area,

E) the current elevation and topography,

F) any individual proposed and disposed
buildings and technical infrastructure

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) the proposed roads and paved areas, access to transport
infrastructure

I) addressing vegetation

J) dimensioned spacing structures

K) plotting new technical infrastructure, connecting the building to the technical
infrastructure

L) current and proposed safety and protection zones, conservation
reserve, conservation zones, etc.,

M) maximum occupation (temporary / permanent)

N) an indication of geotechnical probes

O) geodetic data, determine the coordinates of control networks,

P) distances including the definition of the fire danger zone,
access road and entrance areas for fire equipment and fire water source
.

C.4 Cadastral situational drawing

A) scale used by cadastral maps

B) plot of building land and the proposed buildings

C) an indication of linkages and impacts on the environment.

Special Situation C.5 drawing

Situation drawings made as needed in appropriate scale
showing special requirements of buildings, technological equipment, technical
network infrastructure and related engineering measures
:

A) the traffic situation including adaptations for people with limited mobility and orientation
,

B) situation vegetation.

D objects and documentation of technical and technological equipment

Documentation of buildings, engineering buildings, technical or technological equipment
was treated for objects and files
technical and technological equipment in the following breakdown in reasonable extent
:

D.1 Documentation building or engineering object

D.1.1 architectural and construction solutions

A) Technical Report (architectural, artistic, material, layout
and operational solutions, barrier-free building use;
constructional and technical design and technical characteristics of construction, building physics -
thermal technology, lighting, insolation, acoustics / noise, vibration - a description
solution listing standards used).

B) The drawings (drawings of the construction pit, foundations floor plans, floor plans
individual floors and roofs dimensional dimensions of the main partition

Structures, the openings and the overall dimensions of the mass
buildings; a description of the intended use of the rooms with acreage
including video resolution characteristic material solutions
basic structures; characterized by cuts to the basic design solution
including sections documenting the continuity of the existing buildings
particularly with regard to the depth of the establishment of the proposed construction and existing buildings, with
spot heights referenced to the existing terrain including graphic
resolution characteristic material solution
basic structures; views showing the basic elevator solutions
colors and materials characterization of surfaces;
views documenting the integration of the building into the existing buildings or landscapes).

D.1.2 Building and construction solutions

A) Technical report (description of the proposed construction of buildings
result of a survey of the current state of the bearing system of the building during the design
changes to that proposed materials and key components;
utility values, climatic and other loads considered
when designing the supporting structure, draft special, unusual structures or
technological procedures, ensure construction pit; technological progress
conditions that could affect the stability of their own
structure or neighboring structures; principles for implementation
podchycovacích and demolition works and reinforcing structures or penetrations; requirements
control conceals structures; a list of documents, norms
technical regulations, literature, computer programs, etc .;
specific requirements for the scope and content documentation for the implementation
buildings or documentation provided by the contractor).

B) The drawings (drawings fundamentals when these structures are not
shown in the construction drawings foundations;
shape monolithic concrete constructions, assembly drawings of prefabricated concrete panels
design, assembly drawings metal and wooden structures, etc. ).

C) Static assessment (validation of basic conceptual solution
supporting structure; assessing the stability of the structure; determining dimensions
main elements of the support structure, including its foundation; dynamic calculation, if
for construction work dynamic stress).

D) Control Plan reliability of structures (setting controls
reliability of the construction of the building for their future use).

D.1.3 Fire safety solutions

A) Technical Report (listing of used materials, description and location of buildings and their
objects, distribution structures and buildings in fire zones,
assessment of the size of the fire zones, the calculation of fire risks
determine the degree of fire safety , evaluating the design of building structures
terms of fire protection, including requirements to increase
their fire resistance, evaluation of building products in terms
reaction to fire class, dripping in terms of fire propagation speed
flame, evaluation of evacuation and determining the type and number
escape routes, capacity, design and equipment, determination
odstupových distance or clearance and their
appreciation in relation to the surrounding buildings, the definition of fire dangerous area and
An evaluation in relation to the surrounding buildings and adjacent land
, evaluating the performance of fire intervention, including the definition
emergency routes appreciation access roads, assembly areas
fire technique, method of construction of fire water and other extinguishing
means, including the deployment of external and internal supply
sites, determining the number, type and method of deployment of fire extinguishers
or other means of fire protection or fire
techniques, evaluation of technical or technological equipment
construction assessment security requirements
construction fire safety devices, including the conditions and manner of their draft
location, their installation in the building and setting requirements for
building construction, scope and method of placement of warning and safety signs and
tables).

B) The drawings (situational drawing fire protection on a scale of 1: 500 or 1
: 1000, floor plans each with the name and description
fire zones, in accordance with the requirements of other legislation that

Regulates technical conditions for fire protection).

D.1.4 Environmental Engineering buildings

Documentation of individual professions determined devices and systems in technical details
evidencing compliance with fire regulations and laws
regulations. Define the basic material, technical and technological,
layout and operating characteristics of equipment and systems. Give
basic quality and safety requirements for equipment and systems.

Documentation is processed separately for each part (profession)
by concrete buildings and divided eg .:

- Sanitary equipment installation,

- Air conditioning and heating, cooling,

- Measurement and regulation

- Power engineering,

- Electronic communications, and more.

Content and scope of documentation is processed according to common principles.
Will be tailored to the nature and technical complexity of the structures and equipment.
Organizational structure of the documentation of individual parts (professions)
expedient to arrange the procedure of construction.

Documentation particular:

A) technical report (statement of the standards - standard values ​​and
regulations; default documents and construction program, the requirements for the job -
assignment, the climatic conditions of the site - calculation parameters
outside air - winter / summer; required climatic conditions -
winter / summer, minimum health benefits of fresh air, share
air circulation; data on pollutants with the determination of emissions and their
concentration, operating conditions - persons, heat dissipation, thermal | || load etc., operation mode - constant, intermittent, continuous;
description of the proposed solution and sizing, job description and an arrangement of installation and
system; the balance of power, media and materials needed;
principle of protection of health, safety in the operation of facilities; environmental protection
environment, protection against noise and vibration, fire protection measures;
requirements for process implementation work conditions and designer for the realization of works
its commissioning and operation over the lifetime of a building) .

B) drawing part (location and arrangement of critical equipment
machinery, basic mechanical components, power supplies, etc .;
basic definition of space at their location in the building;
basic schematic diagrams and wiring devices
basic technological diagrams, floorplans basic routed systems in
jednočárovém view, any cuts coordinating nodes;
placement of fixtures and fittings, site preparation and solutions
special areas of environmental engineering structures).

C) List of machinery and technical specifications (
list of critical machinery and equipment, basic mechanical components
energy sources, etc .; description of the essential technical and performance parameters
and related requirements).

D.2 Documentation of technical and technological equipment

Building is to be, by nature, be divided into operational units, which are further divided into
operational files and sub-files or operational function files.
Technological devices are productive and non-productive.

Nonproduction technological equipment eg .:

- Supply management and distribution of all technical
infrastructure (energy, electronic communications, gas, heat supply
, distribution media, etc.), including related equipment,

- Realignment technical infrastructure

- Equipment vertical and horizontal transport of persons and goods
equipment for the transport of persons with reduced mobility, evacuation or fire
device

- Dedicated technical equipment,

- Dedicated fire safety equipment and more.

Documentation is processed in individual operational or functional
files and devices.

Following content and extent of documentation is given as a maximum and the
particular case will be adapted to the nature and technical complexity of the construction
. Consists of:

A) technical report (description of the production program; in non-production buildings
description of the purpose, a list of documents, a description of the technological process
production, the need for raw materials and quantity of products, basic composition
technological equipment - Purpose description and basic parameters description
warehouse management and material handling in production, transportation requirements
interior and exterior, the impact of technological equipment for construction

Solution needs for energy, fuel, water and other media, including
requirements and their connections).

B) drawing part (contains only the location and arrangement of decisive
equipment, machinery, basic mechanical components, power supplies, etc .;
basic definition of space at their location in the building,
basic schematic diagrams and wiring equipment, basic plans
routed systems in jednočárovém view, any cuts
coordinating nodes, site preparation and customized solutions
areas of technology, whose layout is
usually included drawings of construction parts;
basic technological schemes documenting the purpose and the level of the proposed manufacturing process
disposition and location of the main machinery and equipment and the method of installation
- plans, sections, usually at a scale of 1: 100).

C) List of machinery and technical specifications (
list of critical machinery and equipment, basic mechanical components
energy sources, etc .; description of the essential technical and performance parameters
and related requirements).

E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons and documents prepared by other persons authorized
legislation.

E.1 binding opinion, opinions, decisions, statements of the affected organs


E.2 opinions of the owners of public transport and technical infrastructure

E.2.1 Opinions owners of public transport and technical infrastructure
to the possibility of a connection method, wherein for example, situational drawing

E.2.2 Opinion owner or operator of the conditions of establishment
structures, works and activities in the trade and
security zones under other laws

E.3 Geodetic basis for project processing activities under other legislation
^ 4)

E.4 treatment projects Mining designer ^ 6)

E.5 building energy certificates under the Act on energy management
^ 7)

E.6 Other comments, statements, reports and the results of negotiations conducted
during processing documentation

1) Eg. Law no. 20/1987 Coll., on state monument care, as amended
.

2) Eg. Law no. 18/1997 Coll., on peaceful use of nuclear energy and
ionizing radiation (Atomic Act) and amending and supplementing certain
Acts, as amended.

3) Act no. 22/1997 Coll., On technical requirements for products and amending
and supplementing certain acts, as amended.

4) Decree no. 430/2006 Coll., On the
geodetic reference systems and state map series obligatory for the country and
principles of their use, as amended Government Regulation no. 81/2011 Coll.

§ 12 and 13 of the Act no. 200/1994 Coll., On Surveying and Amendments
some acts related to its introduction, as amended
regulations.

§ 13 of Decree no. 31/1995 Coll., Which implements Act no. 200/1994 Coll., On Surveying
amending and supplementing certain acts related to
its introduction, as amended.

5) Act no. 309/2006 Coll., Stipulating further requirements
occupational safety and health in labor relations and
ensure the safety and health activities or providing service outside labor
relations (Act on securing other conditions
occupational safety and health), as amended.

6) Act no. 61/1988 Coll., On mining activities, explosives and state
Mining Administration, as amended.

Decree no. 298/2005 Coll., On requirements for professional qualifications and
professional competence at mining operations or operations
mining methods and amending certain laws, as amended
.

7) Act no. 406/2000 Coll., On energy management, as amended
regulations. ".

10th after Annex no. 4 the following new Annex. 5-8 that
including footnote no. 8 added:

"Annex no. 5 to Decree no. 499/2006 Coll.

scope and content of the project documentation for the construction notification referred to in §

104 paragraph. 1 point. a) to e) of the Building Act or the issuance of a building permit


Project documentation includes parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D objects and documentation of technical and technological equipment

E invoices part

Project documentation must always contain parts A through E that
scope and content of the individual parts will be adapted to the nature and scope
construction, its location, construction and technical design, purpose of use, environmental impact
environment and duration of construction.

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
)

C) the subject of project documentation.

A.1.2 Data on the builder

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on processor design documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) the name and surname of the chief designer including a number under which it
registered in the register of authorized persons kept by the Czech Chamber of Architects
or the Czech Chamber of Chartered Engineers and Technicians in construction
, with marked field or specializing in the authorization,

C) full names of the designers of the individual parts of the project
documentation including the number under which they are entered in the register of authorized persons
led by the Czech Chamber of Architects or
Czech Chamber of Certified Engineers and Technicians active in construction, with | || highlighted field or specialization of their authorization.

A.2 List of input documents

A.3 Information on the territory

A) the extent of the area,

B) information on the protection of the territory under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

C) data on runoff,

D) data on compliance with the planning documentation, the absence of a
zoning or planning measures, or the absence of a territorial
consent

E) data on compliance with zoning decisions or public contract
replacing zoning or land use consent, or with
regulatory plan to the extent that replaces the zoning, and in the case
construction works conditional change the use of the building
information on its compliance with the zoning documentation,

F) data on compliance with the general land use requirements,

G) data on compliance with the requirements of the authorities concerned

H) a list of exemptions and concessional solutions

I) a list of related and conditional investment

J) list of affected land and buildings of construction (according to the cadastre
property).

A.4 Data on construction

A) new construction or change the completed building,

B) the purpose of use of the building,

C) the permanent or temporary structure,

D) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

E) information regarding compliance with the technical requirements for the construction and general
technical requirements for barrier-free use of buildings,

F) data on compliance with the requirements of the authorities concerned and
requirements arising from other legislation ^ 2)

G) a list of exemptions and concessional solutions

H) the proposed capacity building (built-up area, enclosed space,
floor area, number of functional units and their size, number
users / workers, etc.)

I) the basic balance of the building (needs and consumption of media and materials,
rainwater management, total produced quantities and types of waste and emissions
class energy performance of buildings, etc.)

J) the basic assumptions of construction (time data on the implementation of construction
breakdown on stage)

K) indicative construction costs.

A.5 breakdown structures for buildings and technical and technological equipment

B Summary technical report

B.1 Description of territory construction


A) the characteristics of building land,

B) listing and conclusions of completed surveys and analyzes (mineral exploration
hydrogeological survey, construction and historical research, etc.)

C) the existing protective and safety zones,

D) position relative to záplavovému territory, territory etc. poddolovanému.,

E) the impact of construction on surrounding buildings and land, protecting the environment, construction
effect on runoff in the area,

F) requirements for decontamination, demolition, tree felling,

G) requirements for maximum occupation of agricultural land fund or
land intended to fulfill forest functions (temporary / permanent)

H) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure)

I) accruals construction bonds, conditional induced related
investment.

B.2 The description of the building

B.2.1 Intended use of the construction, the basic functional units capacity

B.2.2 Overall urban and architectural design

A) urban - territorial control, spatial composition solution

B) architectural design - shape solution composition, material and color
solutions.

B.2.3 Total operating solutions, technology

B.2.4 Disabled use of the building

B.2.5 Safety in use of construction

B.2.6 The basic characteristics of objects

A) construction solutions

B) structural and material solutions

C) mechanical resistance and stability.

B.2.7 Basic characteristics of technical and technological equipment

A) technical solutions

B) a list of technical and technological equipment.

B.2.8 Fire safety solutions

A) distribution structures and buildings in fire zones,

B) calculation of fire risk and determining the degree of fire safety

C) evaluating the design of building structures and building products
including requirements to increase the fire resistance of structures,

D) an evaluation of evacuation, including the evaluation of escape routes,

E) evaluation odstupových distances and defining the fire dangerous
space

F) ensuring the necessary amount of fire water or other extinguishing agents, including deployment
internal and external supply points,

G) evaluate the possibility of execution fire intervention (
access roads, access routes)

H) evaluate the technical and technological equipment construction (
distribution piping, HVAC equipment)

I) assessment of the security requirements of construction fire safety
devices

J) the extent and manner of placement of warning and safety signs and
tables.

B.2.9 Principles of energy management

A) criteria for heat technical evaluation

B) the energy performance of buildings,

C) assessment of the use of alternative energy sources.

B.2.10 Hygiene requirements for the construction, requirements for working and communal environment


Principles for construction parameters (heating, ventilating, lighting,
water supply, sewage, etc.) As well as the principle solution
impact of construction on the environment (noise, vibration, dust, etc.).

B.2.11 protection of buildings against negative environmental effects

A) protection against penetrating radon from the subsoil,

B) protection against stray currents

C) protection by technical seismicity,

D) protection against noise,

E) flood prevention measures.

B.3 Connection to technical infrastructure

A) connecting points of the technical infrastructure,

B) mounting dimensions, power capacity and length.

B.4 Traffic Solutions

A) a description of the transport solutions

B) connecting the territory to the existing transport infrastructure

C) transportation calm

D) walking and biking trails.

B.5 Solutions vegetation and associated landscaping

A) landscaping

B) used vegetation elements

C) biotechnical measures.

B.6 Description of the effects of construction on the environment and its protection

A) the impact of construction on the environment - air, noise, water, waste and
land

B) the impact of construction on nature and landscape (protection of trees, protection
memorial trees to protect plants and animals, etc.)
Maintaining the ecological functions and relationships in the landscape,

C) the impact of buildings on the system of protected areas Natura 2000

D) a proposal for consideration of the terms of the conclusions of the inquiry proceedings or opinions
EIA


E) the proposed protective and safety zones, range limitations and conditions
protection under other laws.


B.7 Protection of Population
Compliance with the basic requirements of the tasks of protection
population.

B.8 principles of organization of the construction

A) necessary and critical consumption of media and materials, their collateral

B) drainage site,

C) the connection of the site to the existing transport and technical infrastructure
,

D) the impact of the implementation of the construction of the surrounding buildings and land,

E) protection around the site and requirements related to sanitation,
demolition, tree felling,

F) the maximum occupation of the site (temporary / permanent)

G) produced the maximum amount and types of waste and emissions during construction
their disposal,

H) balance earthworks requirements for supply or depositions earth

I) environmental protection during construction,

J) the principles of occupational safety and health in construction,
needs assessment coordinator occupational safety and health
under other laws ^ 5)

A) adjustments for wheelchair use construction affected buildings,

L) policies for traffic engineering measures

M) setting special conditions for the execution of the project (implementation
buildings in operation, measures against the effects of the external environment during construction
etc.)

N) construction progress, sub-critical deadlines.

C
drawings Situation
C.1 Situational drawing wider relations

A) the scale of 1: 1000 to 1: 50,000,

B) connecting the building to the transport and technical infrastructure,

C) existing and proposed protective and safety zones,

D) indicate the borders of the territory.

C.2 overall situational drawing buildings

A) the scale of 1: 200 to 1: 1000, with large buildings 1: 2000 or 1:
5000,

B) existing buildings, transport and technical infrastructure,

C) boundaries,

D) the boundaries of the area,

E) the base elevation and topography,

F) the proposed construction

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) communications and paved areas,

I) surface vegetation.

C.3 Coordination situation

A) scale of 1: 200 or 1: 1000, with extensive buildings 1: 2000 or 1
: 5000, with changes to the building, which is a cultural monument in the works
conservation or conservation area in scale 1: 200

B) existing buildings, transport and technical infrastructure,

C) boundaries, parcel numbers,

D) the boundaries of the area,

E) the current elevation and topography,

F) any individual proposed and disposed
buildings and technical infrastructure

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) the proposed roads and paved areas, access to transport
infrastructure

I) addressing vegetation

J) dimensioned spacing structures

K) plotting new technical infrastructure, connecting the building to the technical
infrastructure

L) current and proposed safety and protection zones, conservation
reserve, conservation zones, etc.,

M) maximum occupation (temporary occupation / permanent)

N) an indication of geotechnical probes

O) geodetic data, determine the coordinates of control networks,

P) distances including the definition of the fire danger zone,
access road and entrance areas for fire equipment and fire water source
.

C.4 Cadastral situational drawing

A) scale used by cadastral maps

B) drawing of the proposed construction,

C) an indication of linkages and impacts on the environment.

Special Situation C.5 drawings

Situation drawings made as needed in appropriate scale
showing special requirements of buildings, technological equipment, technical
network infrastructure and related engineering measures
:

A) the traffic situation including adaptations for people with limited mobility and orientation
,

B) situation vegetation.

D objects and documentation of technical and technological equipment

Documentation of buildings, engineering buildings, technical or technological equipment
was treated for objects and files

Technical and technological equipment in the following breakdown in reasonable extent
:

D.1 Documentation building or engineering object

D.1.1 architectural and construction solutions

A) Technical Report (architectural, artistic, material, layout
and operational solutions, barrier-free building use;
constructional and technical design and technical characteristics of construction, building physics -
thermal technology, lighting, insolation, acoustics / noise, vibration - a description
solution listing standards used).

B) The drawings (drawings, construction pit, foundations floor plans, floor plans
individual floors and roofs dimensional dimensions
main dividing structures, the openings and the overall dimensions of the mass
buildings, with a description of the intended use rooms with acreage
including video resolution characteristic material solutions
basic structures, characterized by cuts to the basic design solution
including sections documenting the continuity of the existing buildings
particularly with regard to the depth of the establishment of the proposed construction and existing buildings,
with spot heights referenced to the existing terrain including graphic
resolution addressing the basic characteristic of the material
structures; views showing the basic elevator solutions
colors and materials characterization of surfaces, looks documenting
integration into existing structures buildings or landscapes).

D.1.2 Building and construction solutions

A) Technical report (description of the proposed construction of buildings
result of a survey of the current state of the bearing system of the building during the design
changes to that proposed materials and key components;
utility values, climatic and other loads considered
when designing the supporting structure, draft special, unusual structures or
technological procedures, ensure construction pit; technological progress
conditions that could affect the stability of their own
structure or neighboring structures; principles for implementation
podchycovacích and demolition works and reinforcing structures or penetrations; requirements
control conceals structures; a list of documents, norms
technical regulations, literature, computer programs, etc .;
specific requirements for the scope and content documentation for the implementation
buildings or documentation provided by the contractor).

B) The drawings (drawings fundamentals when these structures are not
shown in the construction drawings foundations;
shape monolithic concrete constructions, assembly drawings of prefabricated concrete panels
design, assembly drawings metal and wooden structures, etc. ).

C) Static assessment (validation of basic conceptual solution
supporting structure; assessing the stability of the structure; determining dimensions
main elements of the support structure, including its foundation; dynamic calculation, if
for construction work dynamic stress).

D) Control Plan reliability of structures (setting controls
reliability of the construction of the building for their future use).

D.1.3 Fire safety solutions

A) Technical Report (listing of used materials, description and location of buildings and their
objects, distribution structures and buildings in fire zones,
assessment of the size of the fire zones, the calculation of fire risks
determine the degree of fire safety , evaluating the design of building structures
terms of fire protection, including requirements to increase
their fire resistance, evaluation of building products in terms
reaction to fire class, dripping in terms of fire propagation speed
flame, evaluation of evacuation and determining the type and number
escape routes, capacity, design and equipment, determination
odstupových distances, respectively. safety distances and their
appreciation in relation to the surrounding buildings, the definition of fire dangerous area
and its appreciation in relation to the surrounding buildings and adjacent land
, evaluating the performance of fire intervention, including the definition
emergency routes appreciation access roads, assembly areas
fire technique, method of construction of fire water and other
extinguishing agents, including the deployment of external and internal supply
sites, determining the number, type and method of deployment of fire extinguishers,

Or other means of fire protection or fire
techniques, evaluation of technical or technological equipment
construction, the assessment of the security requirements at construction
fire safety devices, including the conditions and manner of their draft
location, their installation in the building and setting requirements for
building construction, scope and method of placement of warning and safety signs and
tables).

B) The drawings (situational drawing fire protection on a scale of 1: 500 or 1
: 1000, floor plans each with the name and description
fire zones, in accordance with the requirements of other legislation that || | regulates technical conditions for fire protection).

D.1.4 Environmental Engineering buildings

Documentation of individual professions determined devices and systems in technical details
evidencing compliance with fire regulations and laws
regulations. Define the basic material, technical and technological,
layout and operating characteristics of equipment and systems. Give
basic quality and safety requirements for equipment and systems.

Documentation is processed separately for each part (profession)
by concrete buildings and divided eg .:

- Sanitary equipment installation,

- Air conditioning and heating, cooling,

- Measurement and regulation

- Power engineering,

- Electronic communications, and more.

Content and scope of documentation is processed according to common principles.
Will be tailored to the nature and technical complexity of the structures and equipment.
Organizational structure of the documentation of individual parts (professions)
expedient to arrange the procedure of construction.

Documentation particular:

A) technical report (statement of the standards - standard values ​​and
regulations; default documents and construction program, the requirements for the job -
assignment, the climatic conditions of the site - calculation parameters
outside air - winter / summer; required climatic conditions -
winter / summer, minimum health benefits of fresh air, share
air circulation; data on pollutants with the determination of emissions and their
concentration, operating conditions - persons, heat dissipation, thermal | || load etc., operation mode - constant, intermittent, continuous;
description of the proposed solution and sizing, job description and an arrangement of installation and
system; the balance of power, media and materials needed;
principle of protection of health, safety in the operation of facilities; environmental protection
environment, protection against noise and vibration, fire protection measures;
requirements for process implementation work conditions and designer for the realization of works
its commissioning and operation over the lifetime of a building) .

B) drawing part (location and arrangement of critical equipment
machinery, basic mechanical components, power supplies, etc .;
basic definition of space at their location in the building;
basic schematic diagrams and wiring devices
basic technological diagrams, floorplans basic pipe and cable networks in
jednočárovém view, any cuts coordinating nodes;
placement of fixtures and fittings, site preparation and solutions
special areas of environmental engineering structures).

C) List of machinery and technical specifications

(List of critical machinery and equipment, basic mechanical
components, power supplies, etc .; description of the essential technical and performance parameters
and related requirements).

D.2 Documentation of technical and technological equipment

Building is to be, by nature, be divided into operational units, which are further divided into
operational files and sub-files or operational function files.
Technological devices are productive and non-productive.

Nonproduction technological equipment eg .:

- Supply management and distribution of all technical
infrastructure (energy, electronic communications, gas, heat supply
, distribution media, etc.), including related equipment,

- Realignment technical infrastructure

- Equipment vertical and horizontal transport of persons and goods
equipment for the transport of persons with reduced mobility, evacuation or fire
device

- Dedicated technical equipment,

- Dedicated fire safety equipment and more.


Documentation is processed in individual operational or functional
files and devices.

Following content and extent of documentation is given as a maximum and the
particular case will be adapted to the nature and technical complexity of the construction
. Consists of:

A) technical report (description of the production program; in non-production buildings
description of the purpose, a list of documents, a description of the technological process
production, the need for raw materials and quantity of products, basic composition
technological equipment - Purpose description and basic parameters description
warehouse management and material handling in production, transportation requirements
interior and exterior, the impact of technological equipment for construction
solution needs for energy, fuel, water and other media including
requirements and their connections).

B) drawing part (location and arrangement of critical equipment
machinery, basic mechanical components, power supplies, etc .;
basic definition of space at their location in the building, basic
schematic diagrams and wiring devices
basic layouts of pipe and cable networks in jednočárovém view, any cuts
coordinating nodes, site preparation and customized solutions
areas of technology, whose layout is
usually part of the construction drawings; basic technology
diagrams documenting the purpose and the level of the proposed manufacturing process
disposition and location of the main machinery and equipment and the method of installation
- plans, sections, usually at a scale of 1: 100).

C) List of machinery and technical specifications (
list of critical machinery and equipment, basic mechanical components
energy sources, etc .; description of the essential technical and performance parameters
and related requirements).

E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons and documents prepared by other persons authorized
legislation.

E.1 binding opinion, opinions, decisions, statements of the affected organs


E.2 opinions of the owners of public transport and technical infrastructure

E.2.1 Opinions owners of public transport and technical infrastructure
to the possibility of a connection method, wherein for example, situational drawing

E. 2.2 Opinion of the owner or operator of the conditions of establishment
structures, works and activities in the trade and
security zones under other laws

E.3 Geodetic basis for project processing activities under other legislation
^ 4)

E.4 treatment projects Mining designer ^ 6)

E.5 building energy certificates under the Act on energy management
^ 7)

E.6 Other comments, statements, reports and the results of negotiations conducted
during processing documentation

Annex no. 6 to Decree no. 499/2006 Coll.

Scope and content of the documentation for the execution of the project

Project documentation includes parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D objects and documentation of technical and technological equipment

E invoices part

Project documentation must always contain parts A through E that
scope and content of the individual parts will be adapted to the nature and scope
construction, its location, construction and technical design, purpose of use, environmental impact
environment and duration of construction.

Common principles:

Project documentation for the construction
processed separately for each building and civil engineering objects and technological
devices.

Starting from the approved design documentation for the building notification or
for issuing a building permit for construction of technical infrastructure
requiring a building permit or notification is based on the documentation
for a zoning decision or planning approval.

Project documentation is processed in details to enable
establish an inventory of the works, supplies and services with a statement of measurements.

Project documentation also contains technical characteristics, descriptions and
conditions of works.

Drawings of detail (detail) show binding for the Supplier, or

Complex-shaped structures (elements), which puts the designer
special requirements which must be respected during the execution stage.

Part of project documentation for construction is not
documentation for odd jobs and construction, manufacturing and technical documentation, documentation
products supplied to the construction, prefabrication and assembly drawings
documentation. If it is necessary to handle any of these documents,
it is always a component supplier documentation.

Development Plan occupational safety and health on the construction site
regulated by other legislation ^ 5) (plan on safety and health at
work at the site is not part of this Annex).

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
).

A.1.2 Data on the builder

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on processor design documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name or name
(legal entity), identification number, if assigned, address headquarters,

B) the name and surname of the chief designer including a number under which it
registered in the register of authorized persons kept by the Czech Chamber of Architects
or the Czech Chamber of Chartered Engineers and Technicians in construction
, with marked field or specializing in the authorization,

C) full names of the designers of the individual parts of the project
documentation including the number under which they are entered in the register of authorized persons
led by the Czech Chamber of Architects or
Czech Chamber of Certified Engineers and Technicians active in construction, with | || highlighted field or specialization of their authorization.

A.2 List of input documents

A) basic information on decisions or measures on the basis
building was allowed (designation construction office / authorized inspector
name, date of issuance and number of the decision or measure
)

B) basic information on the documents or project documents on the basis of which
project documentation for the implementation
buildings

C) other documents.

A.3 Information on the territory

A) the extent of the area,

B) information on the protection of the territory under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

C) data on runoff,

D) data on compliance with the planning documentation, the absence of a
zoning or planning measures, or the absence of a territorial
consent

E) data on compliance with zoning decisions or public contract
replacing zoning or land use consent, or with
regulatory plan to the extent that replaces the zoning, with
building permit and in the case of construction edit conditional
change in building use information about its compliance with the zoning documentation,

F) data on compliance with the general land use requirements,

G) data on compliance with the requirements of the authorities concerned

H) a list of exemptions and concessional solutions

I) a list of related and conditional investment

J) list of affected land and buildings of construction (according to the cadastre
property).

A.4 Data on construction

A) new construction or change the completed building,

B) the purpose of use of the building,

C) the permanent or temporary structure,

D) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

E) information regarding compliance with the technical requirements for the construction and general
technical requirements for barrier-free use of buildings,

F) data on compliance with the requirements of the authorities concerned and
requirements arising from other legislation ^ 2)

G) a list of exemptions and concessional solutions

H) the proposed capacity building (built-up area, enclosed space,
floor area, number of functional units and their size, number
users / workers, etc.)


I) the basic balance of the building (needs and consumption of media and materials,
rainwater management, total produced quantities and types of waste and emissions
class energy performance of buildings, etc.)

J) the basic assumptions of construction (time data on the implementation of construction
breakdown on stage)

K) indicative construction costs.

A.5 breakdown structures for buildings and technical and technological equipment

B Summary technical report

The items will be taken from the project documentation for the construction
notification or for issuance of a building permit for construction of technical infrastructure
requiring a building permit or notification
will be taken from the documentation for the issuance of zoning or land use
consent to the execution of any revisions and additions so of them resulted
:

A) requirements for documents processing buildings

B) requirements for the development of the plan occupational safety and health
on site

C) the implementation conditions of work, if carried out in a protective or safety zones
other structures

D) the specific conditions and requirements for the organization and implementation of site
work on it, resulting mainly from the type of works, properties or requirements
site builder on the implementation of structures, etc..,

E) environmental protection during construction.

C
drawings Situation
C.1 Situational drawing wider relations

A) the scale of 1: 1000 to 1: 50,000,

B) connecting the building to the transport and technical infrastructure,

C) existing and proposed protective and safety zones,

D) indicate the borders of the territory.

C.2 overall situational drawing

A) the scale of 1: 200 to 1: 1000, with large buildings 1: 2000 or 1:
5000,

B) existing buildings, transport and technical infrastructure,

C) boundaries,

D) the boundaries of the area,

E) the base elevation and topography,

F) the proposed construction

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) communications and paved areas,

I) surface vegetation.

C.3 Coordination situational drawing

A) scale of 1: 200 to 1: 1000, with extensive buildings 1: 2000 or 1:
5000, with changes to the building, which is a cultural monument in a building in the historic
reservation or conservation area in scale 1: 200

B) existing buildings, transport and technical infrastructure,

C) boundaries, parcel numbers,

D) the boundaries of the area,

E) the current elevation and topography,

F) any individual proposed and disposed
buildings and technical infrastructure

G) determining the altitude at the first storey buildings (+ - 0, 00) and the height
grade level; the maximum height of buildings,

H) the proposed roads and paved areas, access to transport
infrastructure

I) addressing vegetation

J) dimensioned spacing structures

K) plotting new technical infrastructure, connecting the building to the technical
infrastructure

L) current and proposed safety and protection zones, conservation
reserve, conservation zones, etc.,

M) maximum occupation (temporary / permanent)

N) an indication of geotechnical probes

O) geodetic data, determine the coordinates of control networks,

P) distances including the definition of the fire danger zone,
access road and entrance areas for fire equipment and fire water source
.

D objects and documentation of technical and technological equipment

Documentation of buildings, engineering buildings, technical or technological equipment
treated for objects and files
technical and technological equipment in the following breakdown in reasonable extent
:

D.1 Documentation building or engineering object

D.1.1 architectural and construction solutions

A) technical report (purpose, functional content, capacity data;
architecture, art, materials and layout,
barrier-free use of the building, total operating solutions, technology
manufacturing, design and engineering solutions and technical characteristics
construction; safety in use of the building, health and the working environment
; building physics - thermal technology, lighting, solar,
acoustics / noise, vibration - description of the design, principles of energy management,

Protecting buildings from the adverse environmental effects;
requirements for fire protection structures; data concerning the quality required of proposed
materials and workmanship required;
description unconventional technological processes and specific requirements for implementation and quality
designed structures; requirements for the preparation of documentation provided by the contractor
- the content and scope of manufacturing and shop floor documentation
contractor; determination of required inspections and design conceals
any control measurements and tests if requested over
beyond mandatory - provided the relevant technological regulations and standards
; listing standards used).

B) The drawings (drawings foundation pit excavation plans and foundations -
are not covered under Part D.1.2, layouts of each floor with
dimensional structures of all dimensions, openings in structures with a description || | purpose utilization of rooms with acreage including video resolution
characteristic material design solutions, with a description or name
products and links to details; characteristics
cuts with a fundamental structural solution, with spot heights referenced to existing
terrain including video resolution characteristic
material design of structures, partial cuts in the necessary scope and scale
; drawings of roof truss possibly, looks at all areas
facades with spot heights basic elevator solutions
referenced to existing terrain, showing the color and characteristics of the materials
surfaces).

C) Documents detail (song structures, lists of parts, products and
work, crucial details of structures and atypical products).

D.1.2 Building and construction solutions

A) Technical Report (a detailed description of the proposed support system structures with individual structures
resolution by type, technology and
proposed materials, the final cross-sectional dimensions of the individual
structural elements or reference to the drawings, data | || contemplated loads in static calculation - stable, usable,
climate, the antennae, extraordinary, etc .; data required
quality materials proposed; description of the innovative technology
procedures and specific requirements for implementation and quality
designed structures; securing the building pit; determination of required inspections
conceals any control structures and measurements and tests, if required
beyond the mandatory - set
relevant technological regulations and standards; in the case of changes in the existing structure -
description of the structure of the current state of the technological process with
warning measures necessary to preserve the stability and strength of their own
structure or immediately adjacent buildings;
requirements for preparation of the documentation provided by the contractor -
contents and scope, notice to the minimum load, which must meet
structure; requirements for fire protection structures;
list of used materials - regulations, standards, literature, computer programs, etc .;
safety requirements for the implementation of structural design -
reference to the relevant regulations and standards).

B) A detailed structural analysis

Static calculation must be controllable, therefore, must be clear that
be able to monitor the progress of the calculation, design loads, considered
static diagram of a computational model.

Static design documentation for building construction based on
static calculations prepared in the preceding stage of the project
documentation. It is a complete basis for drawing up technical specifications
components and drawings for building construction.
Contains dimensioning of all structures that are part
documentation provided by the contractor (drawings
monolithic concrete and prefabricated structures, supply documentation
metal and wooden structures). Detailed structural analysis contains
especially accompanying report to the static (dynamic) calculation
briefly summarizing the basic concept of design solutions and differences
preliminary calculation, which was developed under the previous stage
project documentation; Used materials - standards, regulations, literature
computer programs, etc .; static scheme design; data

Materials and technologies; recap load, load
including load factors and combinations of factors; computational models
computing schemes; design and assessment of all supporting elements;
calculate the effects on the basics, design of foundation structures;
design and assessment of all details, assembly relations, etc., which
decisively influence the safety of the structure; production process - casting,
striking, installation, stressing, filling completed construction
like.

C) The drawings (drawings of floor plans bearing structures at a scale of 1:
50, rarely 1: 100, including the folded sections and corresponding cuts
views and details with the necessary precision display, the drawings must
be clearly identifiable shape design, all structural elements
and detail; monolithic drawings, respectively.
circuit prefabricated foundations, pile foundations and the underlying grid, if these structures are not sufficiently
concise manner shown in the construction drawings
foundations; details of joints, anchors etc. in scale 1: 20 or 1: 10 or
1: 5, assembly drawings, detail and anchoring
prefabricated building elements, parts of metal, composite or wooden structures
; drawings location of structures containing floor plans and modular
network, sections and elevations clearly defining bearing structures marked
sections of structural elements and details of the structure and its
anchoring; Dimension / contour drawing prefabricated building elements;
Layout drawing of monolithic reinforced concrete structures containing
views and ample cross sections
unequivocally determine the quality of concrete and steel, the position and the cross-sectional area, or the number of bars
appropriate profile; layout drawing of reinforcement used to
a detailed static calculation basis for the preparation of detailed drawings of reinforcement
-
documentation provided by the contractor building).

D.1.3 Fire safety solutions

Revisions and additions to the documentation for the building notification or for issuance
building permit for construction of technical infrastructure
requiring a building permit or notification revisions and additions to the documentation for the issuance
zoning or planning approval, including the designation changes
fire safety processing solutions in the documentation for reporting
works or for a building permit for construction of technical infrastructure
requiring a building permit or notification in
documentation for issuance of zoning or planning approval.

D.1.4 Environmental Engineering buildings

Documentation of individual professions determined devices and systems in technical details
evidencing compliance with fire regulations and laws
regulations. Define the basic material, technical and technological,
layout and operating characteristics of equipment and systems. Give
basic quality and safety requirements for equipment and systems.

Documentation is processed separately for each device and divided eg .:


- Sanitary equipment installation,

- Gas sampling equipment

- Air,

- Heating

- Cooling

- Measurement and regulation

- Power engineering, including lightning protection

- Electronic communications, and more.

Individual parts are processed according to common principles.
Contents and scope of documentation is provided as general and in the specific case
will be adapted to the nature and technical complexity of the structures and facilities and
relation to the aforementioned professions. If any portion of the building
occur, it will not be included in the documentation. Organizational structure
documentation profession is expedient to arrange the procedure
construction works and supply security. It is therefore possible to merge into one professions
portion.

General (in relation to the professions) documentation includes:

A) technical report (technical data containing basic parameters
the normative requirements for various professions - balance the needs
media resp. Energy, pressure ratios, types of connections and networks
types of services provided, the amount of waste
generated traffic, including sewage, etc .; description of the technical solutions and functions of an arrangement
installation and system; a description of the end elements and devices and systems,

Fixtures; a description of the conditions for connection to the public or local
technical infrastructure; principles of safe operation, including the protection
people, animals and property from injury or from damage; Fire
measures, protection against noise and vibration, noise parameters
indoor and outdoor environments; environmental policy;
technical calculations demonstrating the safety of the design, if such a calculation is required;
List of required documents necessary for putting the building into use;
Listing standards used, including the date of issue).

B) drawing part (the situation with connections and other necessities
profession, developed cuts and longitudinal sections, including the necessary connections
details; location of machines and equipment; drawings of floor plans
pipe or even cable routes in the individual floors;
needed an exploded perspective view, vertical or developed cuts if
not enough to mark out the floor plan, installation drawings and diagrams, drawings
pipeline and cable routes, including connecting terminal
equipment and instrumentation for the measurement circuitry and controlling or managing
system; surveillance power scheme grounding scheme and receiving
system and others; layout, links and communications systems;
related details if necessary).

C) List of machinery and technical specifications (
list of machinery and equipment, mechanical components, power supplies, etc .;
description of the technical and performance parameters and related requirements;
lists of materials for the construction, distribution , pipes, coatings, insulation).

D.2 Documentation of technical and technological equipment

Building is to be, by nature, be divided into operational units, which are further divided into
operational files and sub-files or operational function files.
Technological devices are productive and non-productive.

Technological equipment of buildings and public technical infrastructure:

- Overground and underground communication lines of electronic communications
, their antennas and masts, including overhead support points, or stake out points
underground communications lines, phone booths and trailers
communications lines and electronic communications networks | || related communications equipment including electrical connections,

- Underground and overhead line transmission or distribution system
electricity, including systems supporting points and metering, protection, control,
security, information and telecommunication technology,

- Keeping the transmission or distribution system gas (or flammable liquids
) and related technological objects, including control systems,
security, information and telecommunication technology,

- Distribution of thermal energy and technology related subjects including
control systems, security, information and telecommunication technology,

- Maintaining public lighting networks, including masts and control systems,
security, information and telecommunication technology,

- Structures for production and transformation of energy with the exception of the construction of the water
works

- Water, sewer and energy connections, including connections
construction and supply equipment

- Tanks for liquefied petroleum gas or flammable liquids,

- Water tanks or other flammable liquids

- Tanks for storage of agricultural products, animal feed and fertilizers,

- Water tanks, unless the water works

- Water networks, pumping stations, sewer and sewer networks, sewage
wastewater, including control systems, security, information and telecommunications technology
.

Non-industrial technological equipment as:

- Equipment vertical and horizontal transport of persons and goods
equipment for the transport of persons with reduced mobility, evacuation or fire
device

- Dedicated technical equipment,

- Dedicated fire safety equipment and more.

Documentation is processed in individual operational or functional
files and devices.

Following content and extent of documentation is given as a maximum and the
particular case will be adapted to the nature and technical complexity of the construction
. Consists of:

A) technical report (description of the production program; in non-production buildings
description of the purpose, a list of documents, a description of the technological process

Production, the need for raw materials and quantity of products, basic composition
technological equipment - purpose, description and basic parameters description
warehouse management and material handling in production, transportation requirements
internal and external , the impact of technological equipment for construction
solution needs for energy, fuel, water and other media, including
requirements and their connections; list of required documents needed for construction
putting into use; listing standards used, including the date of issue).

B) drawing part (for the location and layout, machinery, and
mechanical components, power supplies, etc .; defining space
their location in the building, schematic diagrams and wiring equipment, piping and plans
cable networks and their possible cuts
placement apparatus, appliances and fixtures;
requirements for construction work and solving specific areas of technology,
whose layout is usually a part of the construction drawings;
technological schemes documenting the purpose and the level of the proposed manufacturing process
, layout and location of machinery and equipment and the method of installation
- plans and sections at an appropriate scale).

C) List of machinery and technical specifications (
list of machinery and equipment, mechanical components, power supplies, etc .;
description of the technical and performance parameters and related requirements;
lists of materials for the construction, distribution , pipes, coatings, insulation).

E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons and documents prepared by other persons authorized
legislation.

E.1 Setting out drawings of each object processed by other legislation
^ 4)

E.2 treatment projects Mining designer ^ 6)

Annex no. 7 to Decree no. 499/2006 Coll.

First The scope and content of documentation of actual construction

The documentation contains parts:

A
accompanying report
B Summary technical report

C
drawings Situation
D drawing documentation

E Geodetic part

Documentation must always contain sections A to E, with the scope and content
individual parts will be adapted to the nature and significance of the building, its
location, construction and technical design, purpose of use, the impact on the environment
and duration of the construction.

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
).

A.1.2 Information on the owner

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on the processor documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) name and surname (natural person).

A.2 List of input documents

A) basic information on all decisions or actions
associated with the building (construction office designation / name
authorized inspector, date of issue and number of the decision or measure
), where these documents are preserved, state
probable year of completion of construction,

B) basic information on the documentation, design documentation or other
technical documentation (identification, date of issue, identification information of the contractor
documentation) if it survives,

C) other documents.

A.3 Information on the territory

Data on the protection of areas under other laws ^ 1) (
monument reservation, monument zone, specially protected natural areas, flood areas, etc.
.).

A.4 Data on construction

A) the purpose of use of the building,

B) a permanent or temporary structure,

C) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

D) capacity building (built-up area, enclosed space, floor
area, the number of functional units and their size, number of users /

Workers, etc.)

E) the basic balance of construction (needs and consumption of media and materials,
rainwater management, total produced quantities and types of waste and emissions
etc.).

B Summary technical report

A) a general description of the building (technical description of the building and its technical equipment
)

B) an assessment of the existing structural and technical condition

C) access to transport and technical infrastructure

D) protective and safety zones,

E) the impact of construction on the environment and the protection of special interests.

C
drawings Situation
C.1 Coordination situational drawing

A) scale of 1: 200 to 1: 1000, with extensive buildings 1: 2000 or 1:
5000, with changes to the building, which is a cultural monument in a building in the historic
reservation or conservation area in scale 1: 200

B) boundaries, parcel numbers,

C) existing buildings and plotting surface features
technical infrastructure

D) the current elevation and topography,

E) determining the altitude; height of objects

F) dimensioned spacing structures

G) of existing roads and paved areas, access to transport
infrastructure

H) existing vegetation grown,

I) safety and protection zones, conservation areas, conservation zones
etc.,

J) distances including the definition of the fire danger zone,
access road and entrance areas for fire equipment and fire water source
.

C.2 Cadastral situational drawing

A) scale used by cadastral maps

B) the designation of the building,

C) an indication of linkages and impacts on the environment.

D drawing documentation

Construction drawings prepared by the actual construction of
characteristic sections and elevations, with a description of all spaces and rooms
according to the method of use as an indication of their size and
acreage.

E Geodetic part

Numerical and graphical representation of the results focus of buildings, topography with
výškopisnými data, surveying sketches of figures, a list
coordinates and altitudes, and a technical report by
another legal regulation 8).

Second Simplified documentation (passport construction)

Simplified documentation includes parts:

A
accompanying report
B Summary technical report

C Simplified situational sketch

D simplified drawings

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
).

A.1.2 Information on the owner

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on the processor documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) name and surname (natural person).

A.2 List of input documents

A) basic information on all decisions or actions
associated with the building (construction office designation / name
authorized inspector, date of issue and number of the decision or measure
), where these documents are preserved, state
probable year of completion of construction,

B) basic information on the documentation, design documentation or other
technical documentation (identification, date of issue, identification information of the contractor
documentation) if it survives,

C) other documents.

A.3 Information on the territory

Data on the protection of areas under other laws (
monument reservation, monument zone, specially protected areas, floodplains
etc.).

A.4 Data on construction

A) the purpose of use of the building,

B) a permanent or temporary structure,

C) information on the protection of buildings under other laws ^ 1) (
cultural monument, etc.)

D) capacity building (built-up area, enclosed space, floor
area, the number of functional units and their size, number of users /
workers, etc.)

E) the basic balance of construction (needs and consumption of media and materials,

Rainwater management, total produced quantities and types of waste and emissions
etc.).

B Summary technical report

A) a general description of the building (technical description of the building and its technical equipment
)

B) an assessment of the existing structural and technical condition

C) access to transport and technical infrastructure

D) protective and safety zones,

E) the impact of construction on the environment and the protection of special interests.

C
simplified sketch
Simplified situational sketch in the scale used by the cadastral maps showing
building.

D simplified drawings

Simplified drawings of actual construction in the scope and detail
corresponding to the type and purpose of the work describing how
use of all spaces and rooms.

Annex no. 8 of Decree no. 499/2006 Coll.

Essentials of documents the demolition

The documentation contains parts:

A
accompanying report
B Summary technical report

C
drawings Situation Documentation D


E invoices part

Documentation must always contain sections A to E, with the scope and content
individual parts will be adapted to the nature and significance of the building, its
location, size, materials used and construction and technical implementation.

A
accompanying report
A.1 Identification data

A.1.1 Data on construction

A) the name of the building,

B) construction site (address, house number, cadastral, land parcel numbers
).

A.1.2 Information on the owner

A) the name and place of residence (natural person) or

B) the name, business name, identification number, if assigned, instead
business (individual business) or

C) business name or name, identification number, if assigned, registered address
(legal entity).

A.1.3 Data on the processor documentation

A) the name, business name, identification number, if assigned, instead
business (individual business) or business name,
identification number, if assigned, address of registered office (legal entity )

B) name and surname (natural person).

A.2 List of input documents

A.3 Information on the territory

A) data about the area in which the building is being removed,

B) information on the protection of the territory under other laws ^ 1) (
monument reservation, monument zone, specially protected areas, floodplains
etc.)

C) data on compliance with the requirements of the authorities concerned

D) list of neighboring land necessary to carry out the demolition
(according to the cadastre).

A.4 Data on construction

A) the nature and purpose of use of the removed buildings

B) information on the protection of the removed buildings under other legal provisions
^ 1) (about canceling a thing as a cultural monument
etc.)

C) data on compliance with the requirements of the authorities concerned

D) removal capacity of existing buildings (built-up area, enclosed
space, the number of functional units, in buildings containing flats -
total floor area, number and size of disappearing flats, residential and commercial area of ​​the dissolving
bytes)

E) the basic assumptions for the removal of the building - time information on the progress
work, broken down into stages, approximate costs, anticipated method
removal of the building.

A.5 Breakdown Structures removed

B Summary technical report

B.1 Description of territory construction

A) the characteristics of the built building plot

B) the existing protective and safety zones,

C) position relative to záplavovému territory, territory etc. poddolovanému.,

D) the effect of removing the construction of the surrounding buildings and land, protecting the environment, building removal
impact on runoff,

E) evaluate the contamination area of ​​construction materials harmful to the environment
if it occurs,

F) requirements for tree felling,

G) material and temporal linkages; conditioning caused, related investment.

B.2 The description of the building

A) a brief description of the building or civil engineering objects and their
structures

B) a brief description of technical and technological equipment

C) the results of survey, the presence of asbestos in the building.

B.3 Connection to technical infrastructure

A) connecting points of the technical infrastructure,

B) mounting dimensions, power capacity and length

C) the method of disconnection.


B.4 Landscaping and solutions in vegetation after the removal of the building

A) landscaping after the removal of the building,

B) used vegetation elements, biotechnical measures.

B.5 Principles organizations demolition work

A) necessary and critical media consumption and ensure

B) drainage site,

C) the connection of the site to the existing transport and technical infrastructure
,

D) the effect of removing the construction of the surrounding buildings and land,

E) protection around the site,

F) the maximum occupation,

G) produced the maximum amount and types of waste and emissions at
removing construction waste management, especially hazardous waste,
method of transporting and storing or further use or disposal,

H) protection of the environment when removing structures

I) the principles of occupational safety and health in construction,
needs assessment coordinator occupational safety and health
under other laws ^ 6)

J) adjustments for barrier-free use of buildings by removing the affected buildings

K) principles for traffic engineering measures.

C
drawings Situation
C.1 Situational drawing wider relations

A) scale of 1: 500 to 1: 50,000, with the removal of the construction, the statement
cultural monument was canceled, and removal of buildings in the historic
reservation or in the conservation area in scale 1: 200 | ||
B) connecting the building to the transport and technical infrastructure,

C) protective and safety zones,

D) indicate the borders of the territory.

C.2 Cadastral situational drawing

A) scale used by cadastral maps

B) an indication of disposed construction and engineering buildings,

C) an indication of the effects of the demolition of the area.
Documentation D


Documentation disposed construction or civil engineering objects are processed after
objects are broken down to a reasonable extent.

A) Technical report (description of the technological process of demolition and removal
technical or technological equipment; alert
strange, unusual designs, construction details, technological processes, etc.
.)

B) The drawings (the present state documentation showing
links to neighboring buildings, schematic drawings of the process of demolition work, if
not sufficient information in the technical report)

C) The structural analysis (static, eventually. Dynamic analysis to assess the structural stability
in various stages of demolition work, possibly
for the design of temporary support structures).

E invoices part

Part of the documents contain evidence that the requirements under other legislation
issued by the competent administrative authorities or relevant
persons.

E.1 binding opinion, opinions, decisions, statements of the affected organs


E.2 opinions of the owners of public transport and technical infrastructure

E.2.1 Opinions owners of public transport and technical infrastructure
to the possibility and method of disconnecting

E.2.2 Opinion owner or operator of the conditions of implementation
work and activities in the trade and security zones by other legislation


E.3 Other comments, statements, reports and the results of negotiations conducted
during processing documentation

8) § 13 para. 5 point. a) Decree no. 31/1995 Coll., which implements
Act no. 200/1994 Coll., on Surveying and amending and supplementing some
acts related to its introduction, as amended. ". | ||
the Annex no. 5 becomes Annex no. 9.

11th in Annex no. 9 in part A. point.), the words "works in a shortened construction management
"replaced by" building plan with a certificate
authorized inspector. "

12th in Annex no. 9 in part B. point 2. f) the word" and "is deleted.
|| | Article. II Transitional provisions



first documentation and project documentation in accordance with § 1 to 5 of the Decree, which
been processed before the effective date of this decree and submitted to the building Authority
31 December 2014 will be assessed under the existing legislation
.

second project documentation in accordance with § 3 of the Decree may be processed by
Decree no. 499/2006 Coll., as amended on on the effective date of this decree
when construction will begin no later than 31 December 2014.

Art. III
Efficiency



This Decree shall take effect on the fifteenth day after its publication.
Minister
:

Ing. Jankovský vr