571/2006 Sb.
DECREE
of 14 July 1999. in December 2006,
amending Decree No 415/2003 Coll., laying down the conditions for the
ensure the safety and health at work and the safety of operations
When the vertical transport and walking
The Czech mining Office lays down pursuant to § 5 para. 3, § 6 (1). 6 (a). and) and § 8
paragraph. 4 of Act No. 61/1988 Coll. on mining activities, explosives and
the State Mining Administration, as amended by Act No. 542/1991 Coll. and Act No.
124/2000 Coll.:
Article. (I)
Decree No 415/2003 Coll., which sets conditions to ensure
safety and health at work and the safety of operations at the vertical
transport and walking, is amended as follows:
1. In paragraph 1, at the end of paragraph 1, the following sentence "this Decree was
notified in accordance with European Parliament and Council Directive 98/34/EC of
on 22 November. June 1998 on the procedure for the provision of information in the field of standards
and technical regulations and of rules on information society services, in
the texts of Directive 98/48/EC ".
2. In paragraph 2 (a). with) the words "and intentionally made the change in the security
the circuit "is replaced by" replacing the original braking device
brake device of a different type, or a change in the safety circuit that
has the effect of increasing current or voltage on contacts
security features ".
3. in article 2, the following new paragraph 2a, including title and notes
line 6a is inserted:
"§ 2a
Selected mining equipment
Winding gear is selected mining device ^ 6a).
§ 8 paragraph 6a). 4 of Act No. 61/1988 Coll. ".
4. in article 4, paragraph 2, including the footnote No. 9 and 9a is added:
"(2) Extracting equipment and pit before placing them in the test and
the Commission shall examine the experts, the permanent operation in which are represented by the
profession mining, mechanical engineering and electrical engineering. The Commission shall determine on the bottom of the race
the mine, in other cases, the head of the Organisation (hereinafter referred to as "racing
mine "). If it is part of the hoist device concrete headframe shall be determined by
racing down a member of the Commission is also an expert ^ 8) in the field of construction. Work
the Commission also will participate in the employees referred to in section 6 (1). 2 to 5,
the employees, determining the race down. For the purposes of this
the Ordinance for the profession of mining expert, mechanical or electrical engineering
just a graduate study program in the appropriate
the industry, which has been around for at least 5 years in charge of supervision under section 6 (1).
3, 4 or 5 and passed the examination of professional competence before State
Mining Authority under special legislation ^ 9). For an expert
the profession of mining, mechanical engineering or electrical engineering in the field of the
also considered to be an expert connoisseur ^ 9a).
9) § 5 and 8 of Decree No. 301/2005 Coll. on technical requirements
qualifications and competence when mining activity or activities
by using mining techniques and on amendments to certain laws, as
amended by Decree No. 240/2006 Sb.
9A) § 2 (2). 1 (b). j) Decree No. 301/2005 Coll. ".
5. In section 4, paragraph 4 reads:
"(4) after the introduction of the pit or the relevant part of the hoist and the device to the
continuous operation can enable a proper ride racing down at
device. ".
6. in paragraph 4 of the paragraph 6 is added:
"(6) the adjustment of the winding devices not having the character of substantial changes may be
carried out with the consent of the technique with supervision (article 6, paragraph 3, 4 and
5).".
7. in paragraph 4, the following new paragraph 4a, including title and notes
line no. 10a is inserted:
"§ 4a
Continuous operation of the hoist device
(1) the introduction of a new type device or hoist the hoist device on which
substantial change has been made to use, that is, into permanent operation,
enables ^ 10a) the Czech mining Office. Making substantive changes at
the device is the original type of the hoist device changes to the new type.
(2) before issuing a permit of permanent operation of the hoist device shall be assessed
information about loaded carriages back device pursuant to § 4 paragraph 2. 7, evaluation of the test
operation of the hoist device and testimonials of professional experts.
§ 8 paragraph 10A). 3 of Act No. 61/1988 Coll. as amended by Act No. 204/2002
Coll. ".
8. in paragraph 6 of the text at the end of paragraph 2, the words ", including at least
one year in Office in accordance with paragraph 3, 4 or 5 ".
9. in section 6 (1). 6 ' 2 to 5 ' shall be replaced by "3-5" and the words
"before the Commission the district mining Office." shall be replaced by the words "professional
eligibility before the authorities of the State Mining Administration under a special legal
prescription ^ 9). ".
10. In section 6 (1). 7, the words "2-5" shall be replaced by "3-5" and the words
"before the Commission the district mining Office." shall be replaced by the words "professional
eligibility before the authorities of the State Mining Administration under a special legal
prescription ^ 9). ".
11. in section 7 (2). 3 (b). (b)) after the word "scope", the words "machinery
or the electronic ".
12. In paragraph 7 (2). 3 letter d) including footnote No. 14a is inserted:
"d) validation of competence before the authorities of the State Mining Authority in accordance with
special legal regulation ^ 14a).
14A) section 5 of Decree No. 301/2005 Coll., as amended by Decree No. 240/2006 Sb. ".
13. in section 7 (2). 5, in the first sentence the words "the competence of the
The Machinist again validates "is replaced by" expert knowledge engineer
validates the "and other words in the sentence" the verification of professional competence must "
shall be replaced by "verification expertise must".
14. in section 7 (2). 5 (d)):
"(d)) within 3 years from the last examination".
15. In § 8 para. 3 (b). and the word "scope)" shall be replaced by the words "mining
transport ".
16. in paragraph 10 to the beginning of paragraph 1 the following sentence "the organization maintains
winding gear and a pit in a sound and safe condition and perform such other
adjustments in order to achieve the most effective and the most advanced degree
the safety of operations. ".
17. in section 10, paragraph 1. 10, the second sentence is replaced by the phrase "at the same time ensures
handling the space between the stop and the pit was empty. ".
18. in paragraph 22 of the following shall be added at the end of paragraph 6, the phrase "the most adverse
the position is determined by the project. If the project is not established, it shall determine the
professional expert ^ 9a). ".
19. in section 22 paragraph 7 is added:
"(7) driving and parking brake drum of the hoist in its full
impressing when driving under load corresponding to the load at the proper riding
must cause the average delay was identified in the period of time from the beginning
speed reduction in stopping at least 1.8 m. s-2, and in the time
the section from 1.0 s after the start of braking to the time when speed
drops to the level of the level crossing rate, not the greatest value
the delay should not exceed 5 m. s-2 ".
20. in article 23 paragraph 1. 2 (a). n), the words ", where appropriate, on the initiative of the device
oily slide the rope for the hoist with the friction wheel "are deleted.
21. in section 29, the following paragraph 10 is added:
"(10) if the hoist device operated in automatic mode
to slip the rope must not be to the time of removal of the cause of the slip started
the new ride in the automatic mode. ".
22. in § 33 para. 2 (c)):
"(c)) the documentation referred to in § 5 para. 2 (a). k),".
23. in § 58 paragraph 6 is added:
"(6) a Corrosive loss of thickness of metal elements of the rigging of the pit is
checks the pits in the dry or dry areas, jam once every four
years, in other cases, once every two years. Corrosive loss is
on the measurement of the characteristic elements of the checks, for example on the
průvodnici, rozponě, rung, ladder, shoring, grate and the console. At the same time
checks the status of each element and gripping the handles.
Controlled metal element, replace it, if its thickness is less,
set out in the strength calculation referred to in the project or in the expert
opinion. ".
24. In § 63 para. 1 (b). and) the words "brake delay characteristics when
impressing brake "are replaced by the words" of the brakes, even
While impressing brake, "and the sentence with a semicolon, the word
"delay" is deleted.
25. In paragraph 63, the following paragraph 5 is added:
"(5) where it is technically demonstrated that verification of the correct operation of the hoist
the device or its parts, or verify the results of the tests
results from the implementation of other tests on the same device can be loaded carriages back from
appropriate test. ".
26. in § 64 paragraph 7 is added:
"(7) non-destructive control of the lan and its evaluation will be carried out according to the
technical standards DIN EN 473, ČSN EN ISO 17 025 and EN 12927-8. ".
27. in section 70 para. 4, the words "section 66 paragraph 1. 1 (b). (e)) "shall be replaced by ' paragraph
66 para. 4. "
28. in paragraph 70, at the end of paragraph 5, the following sentence "the conclusions of the review report
the hoist device for an older 30 years must be certified professional
experts from the ^ 9a) mechanical and electrical engineering profession. ".
29. in annex 5, part A, point ad 6), the words "so that their top
edge was approximately 20 cm below the lower edge of the transport container ' shall be deleted.
30. in annex 5, part A, point ad 7), the words "so that their top
edge was approximately 20 cm below the lower edge of the transport container ' shall be deleted.
31. in annex 5, part C, section ad 2) brand in the formula "log"
replaces the "ln".
Article II
This Decree shall enter into force on 1 January 2000. January 1, 2007.
President:
Prof. JUDr. Ing. Makarius, CSc. v. r.