262/2007 Sb.



REGULATION OF THE GOVERNMENT



of 3 July 2003. October 2007



the binding part of the plan of main river basins of the Czech Republic



Government orders under section 24, paragraph. 4 of Act No. 254/2001 Coll. on waters and the

amendments to certain acts (the Water Act), as amended by Act No. 20/2004 Coll.:



§ 1



The mandatory part of the plan of main river basins of the Czech Republic is given in annex

to this regulation.



§ 2



This Regulation shall enter into force on the date of its publication.



The President of the Government:



Ing. Topolanek in r.



Minister of agriculture:



Mgr. Gandalovič in r.



Annex



THE PLAN OF MAIN RIVER BASINS OF THE CZECH REPUBLIC



The mandatory part of the



The general objective of national policy in the area of water is to create the conditions for the

sustainable management of limited water wealth of the Czech Republic,

that allows to align the requirements for all forms of use of water resources with

the requirements of the protection of waters and aquatic ecosystems, taking into account the

measures to reduce the harmful effects of water.



The main principles of State policy in the field of water based on the renewed

the European Union strategy for sustainable development:



RETENTION OF WATER IN THE TERRITORY AND WATER PROTECTION



To support the reduction of the adverse impact of urbanization, agricultural territory

and forest landscape management on water supplies, to support the recovery of the

the ecological stability of the landscape, and an integrated approach to water protection and

water management.



THE INTEGRATION POLICIES OF THE ECONOMIC SECTORS AND GOVERNMENT



To engage other sectors of the economy, including the municipalities and public administration on

the level of the regions, in order to ensure an integrated approach to the solution of prospective

needs and requirements on water, in particular for the long view when the

assumes that there will be significant consequences of the anticipated

climate change.



PRELIMINARY CAUTION



In the case of scientific uncertainty use evaluation procedures and appropriate

preventive measures in order to prevent damage to human health or the

of the environment.



THE INVOLVEMENT OF THE PUBLIC



To strengthen the participation of citizens in decision-making. To ensure that the

the public about the intentions and possible development scenarios and variants of the solution

prepare an appropriate communication strategy.



ECONOMIC AND SOCIAL IMPACTS



Continue to apply the principle of "the polluter pays and the user pays", and in the selection of

the measures take into account the scenarios in addition to the environmental impact of the economic

and social impacts.



1. the objectives and measures in the protection of water as a component of the environment



The specific objectives is to protect surface and ground water, allow

sustainable and equitable use of water resources, reduce transport

pollution of the water flows across the boundary of the State, create conditions for

the protection and improvement of the status of surface water and groundwater, and the water

ecosystems and aquatic species and individual organisms contribute to the protection of

on terrestrial ecosystems which depend directly or individual

terrestrial species of organisms. The fulfilment of these objectives will contribute also to the

creating ecologically stable landscape, resistant to external negative

effects and contribute to the reduction of pollution of the seas.



1.1. The framework objectives in water protection as a component of the environment



1.1.1. In the protection of surface waters



and prevent the deterioration of the status of all) bodies of surface water,



(b)) ensure the protection, improvement and restoration of the status of all bodies of water

(with the exception of artificial and strongly affected water bodies) and the achievement of

their good condition



(c) ensure the protection and improvement of the) status of all artificial and heavily affected by the

water bodies and achieve their good ecological potential, and

good chemical status,



(d) targeted pollution reduction) hazardous substances, nutrients and

organic substances, i.e.,. stop, or the gradual elimination of emissions

These substances and prevent their vnosu from non-point sources.



1.1.2. In the protection of groundwater



and) prevent or limit the input of pollutants into groundwater

and prevent the deterioration of the status of all water bodies of the water,



(b)) ensure the protection, improvement and restoration of the status of all bodies of groundwater

waters and ensure a balanced state between groundwater and its subscriptions

replenishment and to achieve good status of these waters,



(c)), averting any significant and persistent upward trend

the concentration of dangerous, particularly dangerous substances and other harmful

substances as a result of the impact of human activities, in order to reduce

pollution of groundwater,



(d)) and monitor the State of the stocks of groundwater and the possibility of their

the use of.



1.1.3. In the protection of water in protected areas



and standards and other) the achievement of the requirements laid down for the surface and

underground water in protected areas,



(b)) the protection of habitats and species that are bound to the water and create the conditions for the

increasing biodiversity.



1.1.4. In the use of water resources for drinking water supply



Achieve the requirements on the quality of water samples from water sources for the purposes of

modifications to the drinking water.



1.1.5. In supporting the life of fish and other aquatic animals



and the required quality assurance limited) designate salmonid and cyprinid

waters,



(b) the clearing of transverse migration barriers) on waterways and renewal

úkrytových and reproductive habitats.



1.1.6. the protection of water



and ensure protection of water) in the countryside and improving retention

the ability of the landscape,



(b)) ensure the protection of natural watercourses watercourses morphology and

protection of all types of wetlands under the Ramsar Convention,



(c) the improvement of the status of water and) on water ecosystems, bound



(d) maintaining and enhancing systematic) biological diversity, indigenous

species,



(e) ensure the application of standards) farming related

the protection of the environment.



1.1.7. The monitoring of the status of surface water and groundwater



Ensure monitoring programmes to the extent necessary for the purposes of:



and processing of the river basin district plans),



(b)) the monitoring and control of the fulfilment of the objectives of the protection of water as a folder

of the environment,



(c) the implementation of international commitments and) the obligations arising under the laws of the

EC/EU.



1.2. the measures in the protection of water as a component of the environment



1.2.1.

Since 2007 to launch the operation of the system of monitoring and detection of water status,

that have been affected by all the major anthropogenic influences both from the perspective of

the chemical and ecological status of waters, including the monitoring of

the hydromorphological conditions, ensuring the necessary documents for

evaluation of the status of water bodies, and for the river basin district plans and proposals to

by providing the data to evaluate the effectiveness of the implementation of the programmes

the measures.



1.2.2.

On the basis of the evaluation of the results of monitoring, assessing the State of water

services, the expert assessment of the options for improving the status of water bodies and

water supply and sewerage development plans for the territory of the regions identified in

plans for the river basin district projects and evaluate the effect of:



and the lack of urban sewage) water and sanitation systems

in agglomerations above 2000 population equivalent,



(b) the renewal or intensification of city) wastewater treatment plants to

improvement of the technology of wastewater treatment in agglomerations above 2000

population equivalent,



(c)) the missing adequate sewage treatment in municipalities about the size

the 2000 population equivalent, where there are zkolaudovaná and functional

the sewer system for public use,



d) missing adequate sewage treatment in municipalities about the size

the 2000 population equivalent, where the influence of municipal pollution

an important factor in the condition of the water body.



For each of the projects in the agglomerations above 2000 population equivalent

referred to in the current list of projednaném Government in the framework of the Update

the strategy of financing implementation of Council Directive 91/271/EEC on cleaning

of urban waste water and for relevant projects

agglomerations in 2000 population equivalent process plans

River basin district schedules of implementation in 2008, buildings

including the method of financing. Enjoy financial support resources

national programmes and funds of the European Union, in particular the operating funds

the programme environment and monitor compliance with the deadline, 31. December

2010, which will be a requirement of the European Union on the urban

waste water treatment in accordance with the access agreement of the Czech Republic with

The European Community.



1.2.3.

In the river basin district plans to identify priority projects of recovery

faulty and outdated sewage networks to reduce the risks

uncontrolled pollution of groundwater due to leak

of the waste water. After the agreement with the purchasers of the river basin district plans

the owners of the infrastructure to handle the training schedules and the gradual

implementation of the relevant projects. Enjoy financial support

the resources of the national programmes and the funds of the European Union, in particular the resources

Operational programme environment. In the selection of projects based on

in particular, the analysis of the efficiency and effects in favour of the protection of water and also

of the approved plans for the development of water supply and drainage for the territory of the region.



1.2.4.

Update plans for the development of water supply and drainage for the territory of the regions where

evaluation of the water monitoring or other data indicate that the objectives of protection
the waters of the realization of the programme of measures for the water Department

likely to be achieved.



1.2.5.

In the river basin district plans to identify projects:



and) to improve the ecological status of the hydromorphological parameters and

waterways, including riparian structures,



(b)) to improve the clearness of the water flows for fish and other aquatic

animals and further support the development of the natural fish populations.



In the selection of priority projects based on the results of the monitoring of the waters,

assessment of the effectiveness of the proposed measures and on the action plan of the building

fish transitions. While used primarily financial support resources

national programmes and funds of the European Union, in particular the operating funds

the program environment.



1.2.6.

The programmes of measures in the framework of the plan of river basin areas suggest on the basis of

evaluation of the monitoring of water and soil analysis of the threats to the system erozního

measures in favour of the protection of water and water ecosystems, bound

concerning the management of agricultural and forest soil (derived from the

compliance with the principles of "good agricultural and environmental condition" and

standards) and further measures in the area of improving the quality of life in

rural areas. While used primarily for financial support

resources included in the rural development programme of the Czech Republic for the period

2007 to 2013, and also in the environment operational programme for the period

2007 to 2013. In particular, apply the measures derived from the implementation of the

land consolidation, sustainable use of agricultural and forest land

(mainly grass growing along watercourses, reforestation, reduction of

the negative consequences of water erosion, etc.), measures to ensure the requirements of the

on the management in vulnerable areas, environmental management practices

to the environment and the measures derived from the realization of small

water-management structures in municipalities in the 2000 population equivalent

(sewerage and wastewater treatment).



1.2.7.

On the basis of the monitoring and evaluation of the water analysis to assess the State of water

services identified in the river basin district plans equipment intended for cleaning

or disposal of waste water and sewage systems of industrial

sources of pollution that pose risks in terms of ensuring

the requirements of national legislation, and for selected industries

and the requirements of Council Directive 91/271/EEC on urban waste water treatment.



1.2.8.

To 24. March 2008 to transpose the new directive 2006/7/EC on the control of

bathing water quality and repealing Directive 76/160/EEC.



1.2.9.

In the river basin district plans take account of measures of the programme for the reduction of

pollution of surface waters and on its basis to propose specific changes

the existing definition of the surface waters suitable for life and reproduction

native species of fish and other aquatic animals, in order to update

and edit the definition of these waters.



1.2.10.

To strive for the completion of the setting buffer zones to protect the richness,

quality and health certificate used by major water sources.



2. The objectives and measures in the protection against floods and other adverse effects

waters



The specific objective is retention of water in the landscape by optimizing its

the structure and its use, and the application of efficient nature nearby

and technical preventive measures.



2.1. Framework objectives in flood protection



Reduce the threat of floods and the dangerous effects of a population limit risks

property, the cultural and historical values in the priority application

the principle of prevention.



2.1.1. In time of flood management



and improvement of the measurement and prediction) services, also in relation to the

neighbouring States,



(b) increase the value and utility) reliability of flood forecasting,



(c) raising awareness of the danger) of flooding for the affected population,

improving practical knowledge in managing flood hazard and

the improvement of their cooperation with authorities and povodňovými folders

the integrated rescue system,



(d) improvement of cooperation of participants) flood protection, including the provision of

timely, high quality and up-to-date information and improving communication

systems,



(e) increase the ability of workers) water management dispatching centres of administrators

the water catchment areas, flood authorities, the integrated rescue system and

the emergency system of the economy to address exceptional flood situation



(f)) improving the provision of up-to-date information to the population

through the flood of bodies,



(g)) improving the availability of information to the public about all kinds of

flood hazard, including specific local risk special

the floods.



2.1.2. In the time after the flood



and improvement of the rules and conditions) providing assistance from sources

the public budget for the repair, reconstruction, or replacement of assets

demonstrably affected by floods in the interest of the rapid recovery of basic

functions in the territory,



(b)) for a single form of policy processing documentation evaluation

floods.



2.1.3. Flood Prevention



and to improve the legislative and economic) instruments related to

preventive security measures,



(b) improve the operational and informational) part of the flood of plans,



(c) ensure the training of flood situations) with the participation of affected

bodies,



(d) support the insurance against risks) flood damage, as the basic

tool protection of property values,



(e) improve documentation of the extent of) flooding the affected territory, including

related infrastructure, on the characteristics of the course of the flood,

povodňovém risk and its management,



(f) limit activities in flood) territories and the deteriorating flow conditions

increasing flood risks,



(g) ensuring efficient preventive suggestions) flood control measures

on the basis of the quality of materials and optimisation of the variant solution concepts

flood protection with application of a risk analysis, analysis of the costs and

benefits,



(h)) in the design of preventive flood search suitable

a combination of measures in the landscape, increasing the natural accumulation and retardation

the water in the territory and technical measures affecting flow rates and volumes

the flood wave,



I) use such methods on the management of agricultural and forest land, to

avoid the deterioration of the retention capacity of the soil and the negative

influence of the water regime in the landscape; to prepare and implement

the appropriate economic instruments,



j) use available financial support from the relevant national

programmes and financial resources of the European Union to improve the prevention of

floods in the affected areas,



to improve technical condition of water) works and their operation with regard to the

flood protection,



l) improve and expand communications with the public on all aspects of

flood prevention,



m) promote the involvement of the specialized institutions of the relevant disciplines to

international cooperation with the aim to improve flood protection as

in the framework of European cooperation, as well as to the effective transfer of know-how,



n) to coordinate plans for flood protection within international river basins.



2.2 the framework objectives in water protection against other harmful effects of water

(the problems of drought and water erosion)



Gradually to prepare and adapt to anticipated climate change

appropriate adaptačními measures and limit the negative consequences of excessive

water erosion from surface runoff water.



and implement adaptation measures) specified in the national programme for

mitigate the impacts of climate change in the Czech Republic,



(b) to involve other sectors of the economy) and the region in the long-term forecasts

rights to water in the adaptation to climate change,



(c) prepare a draft legislative measures) to achieve consistency

the processing of the river basin district plans with the solution of complex land

editing,



(d)) apply in generelech drainage of urban territory concept

the management of rain water, allowing their seizure, and infiltration

direct use of,



(e)) to apply the requirements for "good agricultural and environmental condition" and

the requirements of the standards of agricultural management, relating to the protection

of the environment with regard to the increasing infiltration of water,



(f)) to create the appropriate programmes of research and development,



(g) to ensure the recovery of the functions of the existing) water tanks by removing the

the sediments,



h) ensure the protection of sites suitable for the artificial accumulation of surface

water for the purposes of compensation, the impact of climate change.



2.3. the measures in the protection against floods and other adverse effects of water



2.3.1.

Proposals for effective preventive anti-flood measures search

an appropriate mix of measures in the landscape, which will increase the natural retardation

the water in the territory and technical measures affecting the flood flows.

In the design of flood control measures based on the hydromorfologického

mapping of the river network, from conceptual studies to runoff conditions and studies

comprehensive flood control measures in river basins, involving analysis of

factors affecting erosion and runoff ratios with vytipováním surfaces and

the land, which are the source of erosion and surface runoff and analysis

possible variants of solution of flood protection concepts, including analysis of the

the cost and benefit analysis and risk analysis.



2.3.2.
In 2007, in the scope of the Ministry of the environment gradually

to handle the concept of nature close to the flood control measures in

the selected priority areas:



and in the main basin of the Elbe)



-the catchment area of Eva,



-the catchment area of the village,



-the catchment area of the Ploučnice.



(b)) in the main basin of the oder



-the catchment area of Opava.



(c)) in the main basin of Morava



-the catchment area of the Bečva,



-the catchment area of the river Thaya,



-the catchment area of the Svratka River.



2.3.3.

By the end of 2007, in the scope of the Ministry of agriculture and the Ministry of

the environment, defined on the basis of conceptual design studies

specific measures in each of the priority areas of:



and in the main basin of the Elbe)



-Complex flood control measures on the Lužnice River and Nežárce



-Complex of flood control measures in the basin of the Vltava River in the section

Štěchovice-Melnik



-Complex of flood control measures in the territory of the Middle Elbe River in the section

Cologne-Melnik



-Flood protection measures in the Valley of the water Village



-Complex of flood control measures in the territory of the lower River in the section Štětí

-Křešice-Hřensko



-Protection of Česká Lípa and the municipalities in the water meadows of the territory, including the Ploučnice River

flood control measures in the catchment area of the Svitávky



-Complex of flood control measures and the protection of communities in the territory of the confluence of the Ohře River

and the river Elbe.



(b)) in the main basin of the oder



-Flood protection measures to protect the villages in the upper Opava



-Flood protection measures in the Liberec-Jablonec conurbation.



(c)) in the main basin of Morava



-Flood protection measures in the territory of the Olomouc



-Flood protection measures in the territory of the Litovel



-Flood protection measures in the territory of Uherské Hradiště and the old town



-Complex flood control measures on the lower Bečvě and the confluence with the Moravia



-Reconstruction of the dry tanks (polders) and managed by the inundací under the

the work of New Mills



-Increase retention at the confluence of the Morava and Dyje



-Controlled inundace in territory of Kroměříž



-Controlled inundace in the territory of the Mohelnické.



These measures focus substantively consistent with the objectives of the operational programme

The environment for the period 2007-2013 rural development programme on

period 2007 to 2013 and Flood Prevention Programme II. stage on the

the period 2007 to 2012. After a positive assessment is reflected in plans

River basin districts, reflected in the urban plans and launch their

the investment preparation.



2.3.4.

In the river basin district plans reflect the priority measures of flood

prevention with the demonstrable effect of reducing the risk of flooding, which will be

provided in the scope of investment managers, administrators, water basin

flows, regions and municipalities. In particular, it will be:



and the measures in the landscape of the nature) of the middle way (natural rozlivy,

polders, editing the troughs in the built-up areas of municipalities),



(b) measures to optimise the water), landscape mode, increase its

retention ability and to protect against water erosion (in particular the revitalisation of

inappropriately modified water flow, inadequate drainage and other interventions

negatively affecting the water regime in the landscape, the reduction of

the negative effects of water erosion, reducing the negative consequences of

surface runoff of water-zasakovací belts and průlehy, the rehabilitation of the retention

space),



(c)) technical measures specified in the sub-programmes of the Ministry of

Agriculture (support for flood control measures, retention Aid

flood control measures along the waterways, support the raising of the

the safety of water works),



(d) the coverage of the streams in the Woods) (section 35 of Act No. 289/1995 Coll., on forests and on the

amendment and supplement to some acts (forest law), as amended

regulations.



2.3.5.

By the end of 2008 to complete the delineation of floodplains along the major

water flows on the territory zastavitelných built-up areas by spatial

planning documentation, or in other areas as needed for

to determine the range of potentially affected territory and subsequently

reflected in the river basin district plans.



2.3.6.

In the river basin district plans will be established in cooperation with the regions of the territory,

which require protection against floods in terms of significance, including the

standards of protection and of the territory, to be used to mitigate the

the floods.



2.3.7.

In the years 2008 and 2009 to establish a long-term program of research of the extreme

hydrological phenomena and coordinated procedure from the level of the Ministry of

the environment, in agreement with the Ministry of agriculture and

The Ministry for local development, in cooperation with universities and

other professional institutions.



2.3.8.

30. June 2009 update on the precautionary principle

the existing system of territorial protection of sites of hydrologically and morphologically

suitable for accumulation of surface water in the long run, as

one of the adaptation measures to climate change expected in the next

50 to 100 years, which may be the increased occurrence of extremitou

droughts and flood situations. For this purpose, amend

Institute of water law (a protected area of natural accumulation of water)

the addition of the area suitable for the artificial accumulation of surface water is

by determining the regulativů of territorial protection and mandate to the publication of these

Government Regulation effective sites no later than the time of the approval of plans

River basin district. In the preparation of the list of sites suitable for accumulation

surface water, taking into account the socio-economic consequences of land-use

advocacy and consultation with the relevant region and the municipalities.



2.3.9.

Further develop, improve and modernize equipment information

prediction and measurement systems flood services at national, regional and

the local level. To take advantage of financial aid from the operational programme

The environment.



3. The objectives and measures in the water management services



For water service shall be, in accordance with article. 2 paragraph 38

Directive 2000/60/EC, all activities that provide for the household,

public institutions or any economic activity:



and subscription) impoundment, accumulation, collection, treatment and distribution of surface water

or groundwater,



(b)) collection and treatment of waste water with subsequent discharge to

surface water.



The specific objective is to ensure the smooth supply of the population and

other purchasers of non-toxic and water-quality and water-efficient

waste-water disposal, without negative impacts on the environment,

socially acceptable prices.



3.1. Framework objectives in water management services



3.1.1. In circuit development and restoration of the water management infrastructure



and increase the number of inhabitants connected) on the water supply for public use

in accordance with the objectives of the Protocol on water and health and to ensure access to drinking

water for all, in particular support to the water supply for the public

the need to be able to connect even residents in outlying towns and villages and places

the inhabitants of small villages,



(b) support to ensure high-quality sources) of drinking water for the individual

household supply, for which, for technical or economic reasons

It is not possible to connect to the water supply for public use



c) accelerate the recovery and outdated water network failure and the

How to reduce the losses of drinking water in water supply networks under level 5 000

l/km/day, then in the long term on the level of the most advanced States of the European Union,

and to reduce the numbers of accidents and related negative consequences, in particular on the

the infrastructure of the cities,



(d) increase the number of inhabitants connected) on sanitation for public

the need for.



3.1.2. In the ambit of improvement of the quality and safety of water management

services



and) create conditions for permitted waste waters to allow

the reliable provision of water services to the water

for the adjustment of the drinking water comply with the requirements on the quality in accordance

with Decree No 428/2001 Coll., implementing Act No. 274/2001 Coll., on the

water supplies and sewerage Act for public use and change some

laws, as amended.



(b) to ensure a high degree of reliability) the operation of the water works for

the provision of water services, including ensuring their

safety; in particular, the weirs, dams and other water works, which

are in continuous operation of 30 to 100 or more years old and will be in the medium and

long term require major reconstruction (to these

restore access sparingly with regard to the protection of nature and the

the landscape),



(c) linking to support water) water systems

capacity and high-quality water resources,



(d)) to restrict the cases non-compliance with the limit values for drinking water quality

(expressed as a% of the non-compliance with the limit values): water over 5000

population (in 0.1% for indicators with the lowest emission limit value (NMH) and 1.0

% for indicators with the limit value (MH), for water supply to population (up to 5000

1.0% of the indicators with the NMH to 3.0% for indicators with MH)



(e) to improve the security systems) water services for the

emergency and crisis situations,



(f)) to create effective regulatory tools of the public administration, with the intention of

to achieve the correct relationship between the provider and the customer

water services.



3.1.3. In application of the principle of recovery of the costs of the circuit

water services



and in the process of planning)-economic analysis to assess the current

the application of the principle of "the polluter pays and the user pays", and propose

appropriate adjustments,
(b)) to strive for sustainable water management functional status

contingent upon the provision of water services infrastructure.



3.1.4. In planning in the area of the water circuit and the concept of the development of water supply and

sewerage systems



By the end of 2007 to handle the development plan of water supply and sewerage systems of the Czech

the Republic as a base for the river basin district plans.



3.2. the measures in the water management services



3.2.1.

In the river basin district plans to identify priority projects to improve

the quality of the drinking water supplied and the security of supply of the population

drinking water and so that these projects correspond to the objectives of the grant

titles and defined financial resources in the operational programme The

environment, rural development programme for the period 2007 to 2013 and the programme

The Ministry of agriculture, the construction and rehabilitation of water supply and infrastructure

sewerage systems.



3.2.2.

In the programmes of measures for the river basin district plans to apply the site

using water resources with the unsatisfactory quality of surface water for

a subscription to the potable water treatment measures defined in the plans for improvement

the quality of the raw water.



3.2.3.

In update plans for the development of water supply and drainage for the territory of the regions take

in the account of the relevant measures contained in the approved plans of the areas

the catchment area concerning the requirements on water services and water protection.

When handling the water supply and sewerage development plans to further Orient

to ensure, in particular, the following objectives:



and quality improvement) the achievement of the drinking water supplied,



(b) increase the safety of water resources) and the supply of drinking water, especially

for exceptional weather situation,



(c) restoration of failure and outdated) of water systems in order to reduce the

the negative consequences of accidents and loss of water.



3.2.4.

With the intention to increase the degree of safety provided by the water

services, to provide in the river basin district plans, in particular on the basis of outputs

technickobezpečnostního supervision, the priorities of the gradual recovery of the water works

on the waterways associated with the provision of water management

services, assess the degree of their sustainable use, where appropriate,

the necessary degree of financial aid from the national resources in the meaning of § 102

the water law.



3.2.5.

On the basis of the economic analysis in the river basin district plans to assess

social, environmental and economic consequences of the reimbursement of all costs on

water services from revenue from users.



4. A summary of the measures to implement the strategy, including their financing



Breakdown of the definition of the framework of the measures and their financing options from the

public support resources, which will be applied at the time of validity of the

The plan of main river basins of the Czech Republic is this:

The financing of measures supporting framework of financial resources

---------------------------------------------------------------------------------- ----------------------------

The name of a number of measures (area support) sources of financial aid

---------------------------------------------------------------------------------- ----------------------------

A. measures to protect water as a component of the environment

---------------------------------------------------------------------------------- ----------------------------

A. 1 construction and reconstruction of WASTEWATER TREATMENT PLANTS and sewerage systems of the OPE-area support 1.1

in agglomerations above 2000 population equivalent Reduction of water pollution

Construction and renovation program

water supply and infrastructure

sewerage systems (subprogramme 229

313)



And 2 of the construction and reconstruction of WASTEWATER TREATMENT PLANTS and sewerage systems of the OPE-area support 1.1

in the conurbations in the 2000 population equivalent Reduction of water pollution

in areas requiring special protection



And 3 the construction and reconstruction of WASTEWATER TREATMENT PLANTS and sewerage systems in municipalities in 2000 the equivalent RDP-measures III. 2.1.1.

the population of renovation and development of villages

Construction and renovation program

water supply and infrastructure

sewerage systems (subprogramme 229

313)



4. Technical measures for industrial polluters (removal of particularly the OPE-area support 1.1

dangerous substances), the reduction of water pollution



And 5 the Revitalization of small waterways and areas in the municipalities of PRV-measures III. 2.1.1.

Renovation and development of villages of PRV

-measures 1.1.4.

Landscaping



And 6 old ecological burden the OPE-area support 4.2

Deleting old

environmental burdens



And 7 the revitalization of watercourses and the unsuitable drainage, improving the throughput performance of the OPE-area support 6.4

water flows water

landscape mode PRŘS-1.1.

Natural revitalization

features

watercourses, the subroutine

215 112 PRŘS-1.3.

The removal of the transverse

obstacles to the

watercourses, the subroutine

215 114



And 8 implementation of measures for land consolidation and land adjustment (reduction of the OPE-priority axis 6,

erosion, increase the ecological stability of the landscape) area support 6.3.

Restoration of landscape

structures of the PRV-

Action 1.1.4.

Landscaping



And 9 the creation and restoration of riparian stands of the OPE-priority axis

6, area support 6.3.

Restoration of landscape

structures



10. Conversion of arable land, especially along waterways PRV-measure II. 1.3.3.

Submeasure landscape care



And 11 species Improvement and spatial composition of forests in specially protected territories of the OPE-area support 6.3

Restoration of landscape

structures



And 12 afforestation of agricultural land-RDP measures II. 2.1

Afforestation of agricultural

the soil



13. Improvement of the species composition of forest stands of the PRV-measures II. 2.3.

Forest-environment

payments



14. Technical and biological measures to reduce eutrophication of surface waters, the OPE-area support 1.1

Reduction of water pollution



And 15 Treatment of grassland PRV-measures II. 1.3.

Agri-environment

measures



And 16 comprehensive tracking, detection and evaluation of the quality and quantity of the waters of the OPE-area support 1.1

(a comprehensive monitoring of the waters) Reduction of water pollution



17. Environmental education programs of the OPE-support area a 7.1

and provide environmental advice to the development of infrastructure for

the realization of the

environmental

training programs,

the provision of advice and

showcasing



18. Improving the human potential in the field of agriculture (maintenance of the landscape and PRV-measure 1.3.1.

environment, soil erosion, water pollution, increasing biodiversity, etc.) Vocational education and

information activities,

RDP measures-measures

1.3.4. The use of the

consulting

services



And 19 to reduce pollution of surface water and groundwater from agricultural resources PRV-measures II. 1 3.1.

Submeasure procedures

friendly to the environment

PRV-environment measures

II. 1.2.2. Framework

the directive for the

the water policy of the EC

2000/60/EC

---------------------------------------------------------------------------------- ----------------------------

(B) protection against floods and other adverse effects of water

---------------------------------------------------------------------------------- ----------------------------

(B) 1 of the measures to reduce the runoff of water from the catchment area of the OPE-support area

1.3 Reduction of risk

flood



(B). 2 the construction of dry tanks (polders) over 50 thousand. M3 the OPE-support area

1.3 Reduction of risk

flood



(B) 3 Adjust the troughs of water flows in built-up areas of the countryside close to the OPE-area support 1.3

manner limiting the risks

the flood PRŘS-1.1.

Natural revitalization

functions of water

flows, the subroutine 215 112 PRV

-measures III. 2.1.1.

Renovation and development of villages



(B) Increasing the retention capacity of 4 landscape and limiting the emergence of floods the OPE-nature area of support 6.4

the middle way of optimization of water

landscape mode PRŘS-1.1.

Natural revitalization

functions of water

flows (subroutine 215 112),

PRŘS-1.2. The creation and

the revitalization of the elements

ecological system

the stability of water-bound

mode (the subroutine 215 113),

PRŘS-1.4. The revitalization of the

retention capabilities

landscape (subroutine 215

115)



(B) 5 protection against erosion and reducing the negative consequences of surface water drains the OPE-area support 6.4

Optimization of water

landscape mode PPK-and.

Protection against erosion



(B) 6 flood protection measures with the retention Program to support prevention

before the flood II

subroutine PRŘS-129 122

1.1. The revitalization of the natural

functions of water

flows (subroutine 215 112),

PRŘS-1.2. The creation and

the revitalization of the elements

ecological system

the stability of water-bound

mode (the subroutine 215 113),

PRŘS-1.4. The revitalization of the

retention capabilities

landscape (subroutine 215

115)



(B) 7 flood control along the waterways of the prevention Support Program

before the flood II

(129 123 subroutine)



(B) 8 increasing the safety of the water works Program to Support prevention

before the flood II

(129 123 subroutine)



(B) 9 the study of discharge conditions and defining flood prevention Support Program territory

before the flood II

(129 125 subroutine)



(B) 10 Restoration, reconstruction of the ponds and mud removal and construction of water tanks, recovery Support Program

mud removal

and the reconstruction of the ponds and

the construction of the water

tanks (129 130)

PRŘS-1.4. The revitalization of the

retention capabilities

landscape (subroutine 215

115) OPR-measure 1.1.

Investments in production

aquaculture
(B) 11 flood protection measures implemented within the framework of reparcelling PRV-measures 1.4.

Landscaping



(B) 12 implementing preventive anti-flood measures on small watercourses-RDP measures II. 2.4.1.

and in their catchment areas and erosion control measures on forest soils, restoration, restoration of forest nátrží

erosion grooves and cover, stabilize the ravine on land intended for the fulfilment of the potential of the after kalamitách

forest functions. and introducing prevention

measures

Measures resulting from § 35

forest law



(B) 13 building and modernization of the information systems of forecasting service and the OPE-support area

Reducing the risk of measurement services 1.3

flood



(B) 14 support for processing maps the OPE-support area

about the povodňovém of danger and Risk Reduction risk povodňovém 1.3

flood

---------------------------------------------------------------------------------- ----------------------------

C. measures in the field of water management services

---------------------------------------------------------------------------------- ----------------------------

(C) 1 of the construction and reconstruction of water treatment plants and sources of drinking water in the villages over 2000 OPE-support area 1.2.

improve the quality of the drinking population

Water Program construction and

restoration of infrastructure

water supply and sewerage systems

(229 312 subroutine)



(C) 2 of the construction and reconstruction of water supply pipelines and distribution networks in agglomerations OPE-support area 1.2.

over 2000 inhabitants of the improvement of the quality of drinking

water



(C) 3 of the construction and reconstruction of water treatment plants, drinking water and construction and OPZP-support area 1.2.

reconstruction of the pipelines and distribution networks in agglomerations in 2000 obyvatelv the improvement of the quality of drinking

areas requiring special protection of water



(C) 4 of the construction and reconstruction of water supply in villages in the 2000 population of the PRV-measures III. 2.1.1.

Renovation and development of villages

Construction and renovation program

water supply and infrastructure

sewerage systems (subprogramme 229

312)



(C) 5 the search and implementation of new sources for groundwater supply of the OPE-support area

the population 4.1 Evaluation resources

groundwater



(C) 6 the implementation of geological and hydrogeological work for the purpose of reassessment of stocks of the OPE-support area

groundwater to supply the population with drinking water 4.1 Evaluation resources

groundwater



(C) 7 search, survey and assessment of the options grants driven groundwater OPE-support area

surface water (infiltration) from watercourses or tanks 4.1 Evaluation resources

groundwater

---------------------------------------------------------------------------------- ----------------------------



Explanation of abbreviations:



The OPE-operational programme environment



RDP-rural development programme



OPR-operational Fisheries programme



PRŘS-rivers systems revitalisation Programme (from 2008 program Support

the recovery of the natural features of the landscape)



PPK-landscape care Program



Financing strategy of priority measures framework assumes that the

ensuring the continuous pumping of the anticipated volume of financial

aid from the Cohesion Fund of the EC for the commitment of the Czech Republic in

the transitional period up to 2010 for the construction and reconstruction of sewerage systems and

wastewater treatment plants required by Directive EC urban

waste water treatment plants. The uncertainty arises because of the reservations of the European Commission to

contracts for the provision of service of water supply, sewerage systems and wastewater treatment plants

waste water treatment plants.



In the case of operational programme environment will be measures

kofinancována also from the State budget (chapter of the Ministry of

environment) and the State Environmental Fund, or counties. For

co-financing from the party of regions is necessary to the appropriate revenue

counties. The requirements on the financial participation of the own resources of the investors and the

the conditions for co-financing of public resources will be established in the

of the relevant departmental guidelines.



Also in the case of financial aid from the rural development programme and programmes

financed from the State budget foresees the participation of own

investor resources, under the conditions and in the amount according to the relevant rules,

Alternatively, the outputs of the financial and economic analysis.



The measures referred to in the table do not include, in particular, the necessary measures covered from

own resources and associated with the duties of administrators of the waterways

When caring for a trough of water flows and water works, nor the related measures

in the field of securing water services and owners

the operators of water mains and sewerages. Also

do not include the relevant measures of entrepreneurs in industry, agriculture and

forestry, to be paid by their own resources.



5. Requirements for the processing of plans for the river basin district



During the processing of the river basin district plans are based on the binding of

The plan of main river basins of the Czech Republic and the following requirements

broken down in annex No. 2 to the Decree No 142/2005 Coll., on planning

water area:



5.1. In the ambit of the protection of water as a component of the environment



and the processing of plans) within the river basin district to take account of measures of the programme

to reduce the pollution of surface waters and on the basis of design

specific changes to the existing demarcation of surface waters suitable for life

and reproduction of native species of fish and other aquatic animals, in order to

updating and editing the definition of these waters.



(b)) based on the evaluation of the results of monitoring, assessing the State of water

services, the expert assessment of the options for improving the status of water bodies and

water supply and sewerage development plans for the territory of the regions identified in

plans for the river basin district below the projects and evaluate the effect of:

the missing of the urban waste water treatment plants and sewerage systems in the

agglomerations above 2000 population equivalent, renewal or

the intensification of the urban waste water treatment plants to improve the technology

treatment of waste water in agglomerations above 2000 population equivalent,

the lack of an adequate sewage treatment in municipalities about the size of the

2000 population equivalent, where there are zkolaudovaná and functional

the sewer system for public use, the lack of an adequate cleaning

waste water treatment plants in the municipalities of size up to 2000 population equivalent, where

is the effect of municipal pollution status of water is an important factor in the

unit. For each of the projects in the areas above 2000 equivalent

the population listed in the current list of projednaném Government in the framework of the

"The strategy of financing implementation of Council Directive 91/271/EC

on urban wastewater treatment "for the relevant specific projects

in the conurbations in the 2000 population equivalent process plans

River basin district schedules of implementation in 2008, buildings

including the method of financing. While watching a deadline of 31.

December 2010, which will be a requirement of the European Union on the cleaning

of urban waste water in accordance with the access agreement of the Czech Republic

with the European Community.



(c)) in the river basin district plans to identify priority projects of recovery

faulty and outdated sewage networks to reduce the risks

uncontrolled pollution of groundwater due to leak

of the waste water. After the agreement with the purchasers of the river basin district plans

the owners of the infrastructure to handle the training schedules and the gradual

implementation of the relevant projects. In doing so, assume the framework financial

support resources from tables 4.1. and 4.2., in particular funds

Operational programme environment. In the selection of projects based on

in particular, the analysis of the efficiency and effects in favour of the protection of water and also

of the approved plans for the development of water supply and drainage for the territory of the region.



(d)) in the river basin district plans to identify projects:



-to improve the morphological and ecological state of watercourses, including the

shore structures,



-to improve the clearness of the water flows of migration for fish and other aquatic

animals and further support the development of the natural fish populations.



In the selection of priority projects based on the results of the monitoring of the waters,

assessment of the effectiveness of the proposed measures and on the action plan of the building

fish transitions. In doing so, assume the financial framework support resources

as described in Chapter 4, in particular, the funds of the operational programme The

environment.



(e)) To the programmes of measures in the framework of the plan of river basin areas suggest the

the basis of the evaluation of the monitoring of water and soil analysis of the erozního threat

the system measures in favour of the protection of water and water bound

ecosystems, concerning the management of agricultural and forest land

(derived from the principles of "good agricultural and

environmental status "and standards) and further measures in the field of

improving the quality of life in rural areas. In doing so, use

financial support resources that are included in the rural development programme

The Czech Republic for the period 2007 to 2013, and also in the operational programme

The environment for the period 2007 to 2013. In particular, apply the measures

derived from the implementation of, sustainable use of land

agricultural and forestry land (mainly grass growing along watercourses,

reforestation, reduction of the negative effects of water erosion, etc.),
measures to ensure that the requirements of the forest management in vulnerable

areas of practice management, environmentally friendly and

the measures derived from the implementation of small water structures in

municipalities in the 2000 population equivalent (the sewer system and treatment plant

waters).



(f)) on the basis of analysis of monitoring and evaluation of water status assessment

water bodies identified in the river basin district plans equipment intended to

cleaning and disposal of waste water and sewage systems of the

industrial sources of pollution that pose risks to the

meet the requirements of the national legislation, and for selected

industry and the requirements of Council Directive 91/271/EEC on cleaning

of urban waste water.



5.2. In the heading of flood protection and other harmful effects of water



and in the river basin district plans) include an appropriate mix of measures in

increasing the natural landscape and the accumulation of water in the territory of the retardation and

technical measures affecting the flood flows in each

the priority areas set out in paragraph 2.3.3. stating assumptions

a time schedule for their preparation and implementation. This measure objectively focus

in accordance with the objectives of the operational programme environment 2007

up to 2013, the rural development programme for the period 2007 to 2013 and the programme

Flood prevention II. the stage for the period 2007 to 2012.



(b)) in the river basin district plans reflect other priority measures

flood prevention with the demonstrable effect of reducing the risk of floods,

that will be provided in the investment scope of the administrators of the catchment,

Administrators of the waterways, regions and municipalities. These measures focus on the substantive

accordance with the objectives of the operational programme environment 2007-

2013 rural development programme for the period 2007 to 2013 and the programme

Flood prevention II. the stage for the period 2007 to 2012. In particular, the

will be:



-measures in the countryside close to nature (natural rozlivy, dry

tanks, modifications of the troughs in the built-up areas of municipalities), measures to

the optimization of the water regime of the landscape, increasing its retention capabilities and

to protect against water erosion (in particular the revitalisation of inappropriately modified

waterways, drainage and other inappropriate interference negatively

affecting the water regime in the landscape, the reduction of the negative effects of

water erosion, reducing the negative consequences of surface runoff of water-

zasakovací belts and průlehy, the rehabilitation of the retention area)



-technical measures with the flood retention (establishing new

the retention of premises on watercourses, reconstruction and editing objects

reservoirs with retention effect to increase the level of protection of the territory,

construction and reconstruction of buildings in areas intended for

rozlivům flood)



-technical measures along the flood water flows (increase

the flow capacity of the waterways and surroundings//koryta in

residential areas of towns and cities and their stabilization, construction and reconstruction

dykes to protect the local territory, troughs and endurance of the galleries,

increase the flow capacity of the Weirs),



-increasing the safety of the water works (reconstruction of the weirs, reconstruction

effluents and safety equipment and increase their capacity),



-payment streams in forests (section 35 of the forest law). For these measures

flood prevention in the river basin district plans to prove whether or not the assumption

a time schedule for their preparation and implementation.



5.3. Within water services



and in the river basin district plans) to identify priority projects for

improve the quality of drinking water supplied and of security of supply

the population with drinking water, so that these projects correspond to the objectives of the

grants and financial resources set out in the operational programme

The environment, the rural development programme and the programme of construction and

rehabilitation of water supply and sewerage infrastructure (subroutine 229 312).



(b)) in the programmes of measures for the river basin district plans to apply the site

using water resources with the unsatisfactory quality of surface water for

a subscription to the drinking water measure, as defined in the plans for improvement

the quality of the raw water.



(c)) with the intention to increase the degree of safety provided by the

water services, to provide in the river basin district plans, in particular, on the

the basis of the outputs of the technickobezpečnostního supervision, progressive priorities

rehabilitation of water works on streams related to the provision of

water services, assess the degree of their sustainable

use, where appropriate, the necessary degree of financial aid from national resources

within the meaning of section 102 of the water law.



(d)) on the basis of economic analysis in the river basin district plans to assess

social, environmental and economic consequences of the reimbursement of all costs on

water services from revenue from users.



6. the requirements on the part of the International Assembly of the plans of the national areas

the catchment area of the river Elbe, oder and Danube



6.1. the contents of the plans of the national parts of the international river basin district,

The Oder and Danube



In the processing of plans of the national parts of the international river basin district,

based on the Plan of main river basins of the Czech Republic approved the outputs

the various stages of the processing of the river basin district plans, from monitoring programmes

and detection of water status and approved plans for the river basin district.



The plans of the national parts of the international river basin district of the Elbe, oder and Danube

the Ministry of the environment shall draw up, in cooperation with the

The Ministry of agriculture, the administrators of the catchment and regional authorities under the

the current requirements of the European Commission and the International Commission for the protection of

The Elbe, oder and Danube. On the basis of the evaluation of the effectiveness of coordination in the

the preparation of the plans of the national parts of the international river basin district design

any modification to the amendment to the water law in mid-2008, which

will take effect in 2009.



When drawing up the plans of the national parts of the international river basin district

The Elbe, oder and Danube of annex VII of Directive 2000/60/EC.

The basic chapters correspond to the breakdown of already processed messages to the European

the Commission, in particular, of the reports referred to in article. 5 and article. 8. Update

all the characteristics and processed information.



The plans of the national parts of the international river basin district of the Elbe, oder and Danube

will include:



and characteristics of the national part of the) international river basin district,



(b)) the significant pressures and impacts due to human activities,



(c)) the identification and mapping of protected areas (the registry of protected

areas),



(d)) and the results of the monitoring network monitoring,



(e)) goals, objectives and the exceptions in the area of environmental protection,



(f)) economic analysis of water use,



(g)) the programmes of measures,



h) register more detailed programmes and plans, in particular the plans of the areas

the river basin,



I) measures in the field of public information and consultation,



j) authorized authorities and international agreements in the field of coordination,



to contact points for the acquisition) of supporting documents.



6.2. structure of Assembly plans for sub-basins of the national parts

international river basin district of the Elbe, oder and Danube



6.2.1. The international area of the Elbe catchment area



States in the International area of the Elbe catchment area agreed on the definition and

the use of the coordination zones, which are for the national plan of

international river basin district defined and marked as:



5100 upper and Middle Elbe River



5210 Upper Vltava



5240 Berounka



5290 Lower Vltava



5300 Ohře and the lower Elbe



5400-Elbe-Mulde Schwarze Ester



5600 Saale



5800 Havel.



6.2.2. The international river basin district Odra



States in the International River basin district Odra agreed on the definition and

the use of the coordination zones, which are for the national plan of

international river basin district defined and marked as:



6200 Upper Odra



6300 Middle Odra



6400 Lusatian Neisse.



6.2.3. The international area of the Danube basin



States in the International area of the Danube basin agree on the definition of the

and the use of the intermediate units, which are for the national plan of

international river basin district defined and marked as:



Cz1-Czech part of the Sub-basin of the river Naab, a tributary of the Danube



Cz2-Czech part of the Sub-basin of the river Regen, a tributary of the Danube



Cz3-Czech part of the Sub-basin of the river Ilz, a tributary of the Danube



Cz4-Czech part of the Sub-basin of the River, a tributary of the Danube in the Grosse Mühl



The Czech part of the territory of CZ5 sub-basin Aist and Zwett rivers, tributaries of the Danube



CZ6-Czech part of the territory of the Dyje river sub-basin, a tributary of the Morava



The Czech part of the CZ7 sub-basin of Moravia



CZ8-Czech part of the sub-basins, a tributary of the Danube River, tributaries of the Weight.