About Permissible Measuring Documentation When Mining Activity

Original Language Title: o důlně měřické dokumentaci při hornické činnosti

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
435/1992 Sb.



Decree



The Czech Mining Authority



of 13 October. May 1992



about permissible measuring documentation when mining activity and some

activities carried out using mining techniques



Change: 158/1997.



Change: 298/2005 Sb.



Change: 382/2009 Sb.



The Czech mining Office pursuant to § 39 para. 3 of Act No. 44/1988 Coll., on the protection and

the use of mineral wealth (the top Act), as amended by the law of the Czech

the National Council No 549/1991 Coll. and section 20 (2). 2, § 38 paragraph 1(a). 5 (a)) and §

paragraph 41. 1 (b). h) of the Act of the Czech National Council No. 61/1988 Coll., on

mining activities, explosives and the State Mining Administration, as amended by

the Czech National Council Act No. 542/1991 Coll., provides:



Part the first



General provisions



§ 1



The scope of the



(1) this Ordinance governs the management, retention and completion (hereinafter referred to as

"leadership") permissible measuring documentation ("documentation") for the

legal and natural persons (hereinafter referred to as "the Organization") when mining activity

and activities carried out using mining techniques within the meaning of the law of the Czech national

Council Regulation No 61/1988 Coll. on mining activities, explosives and the State mining

the Administration, as amended by Act of the Czech National Council No. 542/1991 Coll., and for

the Organization, which for this purpose shall carry out the project, výstavbové or

other work.



(2) this Ordinance shall not apply to



and editing and refining of minerals) to be carried out in the context of their

exploitation,



(b) the extraction of sand and gravel sand) in open water courses floating machine

including the adaptation and refinement of these raw materials carried out in the context of the

with their extraction,



c) construction and reconstruction of utility lines in depths to 10 m, where the

the depth of the entry to the underground shall not exceed 50 m and life time (from the time of the initiation of the

by the end of the building) of the individual sections, one year



d) stamping engineering network connections,



(e) the stamping of subways under communications),



f) stamping of pickles, regardless of their length and diameter,



g) digging wells,



h) quarrying bearing non-reserved mineral, where each of the

mining the walls is less than 20 m per year, and the annual extraction does not exceed 50 000

M3.

Documentation in these cases governed by specific

legislation. ^ 1)



§ 2



Responsibility for the management of documentation



(1) the organization when mining activity or activities carried out by mining

(hereinafter referred to as "action under § 1") is required to ensure the completeness of the

documentation and technical performance of permissible measuring work under this Ordinance.



(2) For the proper performance of permissible measuring activities under this order corresponds to the

the Executive Organization (racing or racing pit quarry). ^ 2)



(3) for the correctness and completeness of the documentation produced and its expert guidance

corresponds to the worker (hereinafter referred to as "the main mining meter"), which confirms its

signature.



(4) the accuracy and completeness of each measurement and the parts of the documentation

corresponds to the worker who performed the work or driving (hereinafter referred to as

"mining the meter"), which shall acknowledge his signature.



(5) under the leadership of a special-purpose content of mine maps to the permissible

měřickém substrate corresponds to the specialist responsible for the organisation, which

confirm your signature.



(6) the main mining meter decides on the acceptance of the dossier drawn up by the

other service organizations or other organizations to file documentation.



§ 3



The main mining meter



Requirements for professional qualifications and competence to carry

the main function of the mining Decree lays down the meters requirements

professional qualifications and competence when mining activity or

activities carried out using ^ 3).



§ 4



Mine meter



Requirements for professional qualifications and competence to carry

features of the mining Decree lays down the meters requirements on professional

qualifications and competence when mining activity or activities

by using ^ 3).



§ 5



Withdrawal of the certificate of professional competence



After finding deficiencies in fulfilling the obligations imposed by this Decree,

that could result in danger to life, health workers or

the immediate threat to the operation of the Organization, the authority of the State Mining Administration

shall be withdrawn by the holder of the certificate of professional competence, where appropriate, suspend the

its validity until the examination of the representative that the shortcomings of the

caused, first after three months from the date of the withdrawal of the certificate.



Part two



Mining point field



§ 6



Mining location point field



(1) a mining location point field contains the



and mining location point) of the underlying field in the underground and on the surface,



(b)) for detailed location point field in mine underground and on the surface.



(2) the basic mining location spot underground field consists of points of the basic

indicative of straight lines, intended when the connection and measuring usměrňovacím and

points of orientation of lines that are part of a very precise

polygonal shows. The guide line is placed so that the length of the

These programmes between them were not polygonal greater than 1000 m (annex

# 1) ^ 4)



(3) detailed mining location spot in underground form the field points

the location was determined by the mining polygonovým or other measurement that is based on

out the basic position of mining point field in the underground.



(4) each of the guide line must be secured by at least three points.



(5) the basic mining location point field on the surface consists of points derived

from the basic position of the point on the surface of fields specified by the very

accurate měřickými methods (Appendix 2). ^ 4)



(6) detailed mining location point field on the surface consists of points, which

the position of měřickými was determined by deriving from the base of the mining methods

point field position on the surface. Used for tracking positioning

all the objects of measurement needed for the management of the documentation.



(7) the dossier shall be drawn up in a single coordinate system

trigonometric network land registry (S-JTSK).



§ 7



Mining height point field



(1) Mining height point field contains the



and mining height point) of the underlying field in the underground and on the surface,



(b)) for detailed mining height point field in the underground and on the surface.



(2) the basic mining height point in the underground field form



and Trinity points in náražích) jam individual horizons (underground workings),

whose height are determined by the precise height measurement,



(b)) the individual points in a stabilized main mine (underground)

parts, separated by a 300 m, most of which were determined by height

precise height measurement.



(3) detailed mining height point in the underground field consists of points, which

height height measurements were determined by the technical.



(4) Mining height point on the surface of fields



and mining height point) of the underlying field, derived from the Czechoslovak

levelling networks i. to III. the order,



(b)) for detailed mining height point field, derived from the Czechoslovak

levelling network IV. order or from the basic mining height point

the fields on the surface,



c) points of the mining position point field on a surface whose height has been

the technical measurement of elevation, the intended.



(5) in altitude in the level of the Baltic after

settlement (Bpv).



§ 8



Stabilisation and acceptance points of mine point fields



(1) Sections of the mine fields shall be conditioned to the point locations of safe

against their damage or destruction.



(2) the organization is required to protect and maintain all stabilized

points that set up or taken over.



(3) when taking the survey points and prior to their inclusion on a list

coordinates and heights points validates the integrity of their measurement position.



Part three



Measuring methods



§ 9



Option of marking methods



(1) each time the measurement be taken into account as well as to the purpose and meaning of the

zaměřovaných facts and the future use of the results

measurement.



(2) for the measurement methods and procedures will be used to ensure sufficient

internal control or at least two different, independent ways

measurement, or independently twice repeated the same method of measurement.



(3) the choice of survey methods and accuracy of each location and

height measurement in the activities under section 1 (1). 1 is listed in the

the annexes to this Decree, and that:



and) for underground mining referred to in § 2 (b). a), b), c) and (g))

and activities carried out by using mining techniques in the underground as referred to in paragraph 3 (b).

(d)), e), (f)) and i) of the Act in annex No. 1



(b)) for mining on the surface referred to in paragraph 2 (a). a), b), c),

(e)), and (f)) and the activities carried out by using mining techniques on surface referred to in

§ 3 (b). a), b), (g)), and h) of the Act in annex No. 2.



Part four



Documentation



§ 10



The contents of the documentation



Documentation includes:



(1) basic documentation File, which consists of data on



and protected the territory). protected territories



b) mining area, including cadastral territory (with an indication of their

proportional representation), on which it is established, the mining area



(c) the protection of the surface)



d) protection against plynonosným and vodonosným horizons and their manifestations,



e) protect jam (protective pillar, the directness of the pit, etc..) and other

main mine (underground) works,



f) connection and measurement, usměrňovacím



(g)) the main position and height measurement;




the next part of this documentation are



h) technical report (undertaken by the documentation, final report of the bearing

and the leaves of main mine workings),



I) registration book documentation.



(2) the numeric part, which contains the



and) notebooks,



(b)) calculation (calculations of polygonal and shows),



(c) a list of the coordinates of points) the basic mining point fields



(d)) odbírkovou documentation,



e) register and the movement of inventory.



(3) the graphics section, which contains



a) sketches,



(b)) the basic mining map,



(c)), profiles and sections,



(d)), the surface map



(e) Special mining maps).



(4) in the case of individual measurement shall be indicated



and instead of and the subject of measurement),



(b)) date of measurement and evaluation,



(c) the coordinates of the points of the basic mining) limit point field and points

the basic mining height point field,



d) permissible masonry sketch



e) references to the notebooks, or other documentation.



(5) the input data and results, for the management of the graphic documentation

or as the default for all other computations, data is written to a permanent way.

In the input data, States a link to their source (e.g. number and page

the appropriate notebook).



section 10a



Management of digital documentation



(1) all work associated with the formation of the digital documentation must be

operated using the software, the use of which is governed by specific

legislation. ^ 12)



(2) notebooks, calculations and lists the basic coordinates of mine

point fields are part of the database of digital documentation.



§ 11



Note Books



(1) the measured data, entries and sketches are performed in a scrapbook when measuring

legibly and neatly. After the evaluation of the resulting data, necessary for the

another calculation, write the Permanent way.



(2) each sheet of notebook in advance and shall be numbered at the beginning of the notebook is

the number of sheets.



(3) on each side of the notebook, in addition to measurement data shall be



and instead of and the subject of measurement),



(b)) date of measurement,



(c) the name and signature of mine) of the meter,



(d)) and numbers of types of marking equipment,



e) permissible masonry sketch, or a reference to a sketch, drawn up separately



f) check data.



§ 12



Calculations



(1) the calculations are handled transparently. The input and output

data is written to a permanent way.



(2) each time the calculation shall be specified



and a reference to supporting documents) from which to draw the default data measured and

calculated,



(b)) a comparison of the achieved deviations with tolerances,



(c) the name of the person who) calculation, or processed to calculate the input on the

computer, or by whom it is checked and their signatures.



section 13 of the



Lists of coordinates of points of basic mining point fields



(1) the lists of coordinates contain the coordinates of permanently stabilized points

the basic point of the mine fields.



(2) for each point of the basic mining point field the following particulars

identifying information:



and) issues and coordinates of a point (indicating the different height of the system),



(b)) the way of stabilization,



(c) the regional point)



(d)) means of identification in the field,



e) date.



§ 14



The basic mining map



(1) the basic mining map is the technical and legal document of the Organization,

held for activities under section 1. Be made to the Permanent way

the original on the basis of data obtained its own measurement or taken

information according to § 2 (2). 6.



(2) as the original digital basic mining maps are also considered

the digital model of the basic mining map on the storage media; graphic

print output then it is the image of the basic mining maps.



(3) the basic mining map in mining activities and the activities carried out by

using mining techniques in the underground and on the surface means in particular



Basic reconnaissance map) in the implementation of geological exploration

deposits of minerals on the surface and in the engineering-geological and

hydrogeologickém survey



(b)) the basic mining map of underground mining of minerals,



c) base map of the quarry during the surface mining of minerals,



d) base map in the extraction of oil and gas probes,



e) base map in the extraction of liming probes,



f) base map of work performed on the surface during activities

carried out using mining techniques under section 3 (b). g) and (h)) of the United

the National Council No. 61/1988 Coll. as amended by Act of the Czech National Council.

542/1991 Coll.,



g) base map specific intervention in the Earth's crust.



(4) the basic mining map contains drawings of all basic mining,

geological and technical data as well as administrative objects and data

are required for the conduct of the work. For the use of marks of mining maps pay part of

the fifth of this order and annex No. 3. ^ 4)



(5) the original basic mining maps shall be made out on the basis of which the

clotting in any direction shall not exceed the value of one part in a thousand, at a scale of 1

: 500, 1:1000 or 1:2000, uniformly for the territory of the whole of the

space or workplace. On the choice of the scale base mining maps shall be decided by

the main mining meter.



(6) the Example leaves the basic mining map builds on the Division of registration

Unit (triangulation) in the coordinate system of the single

trigonometric networks.



(7) failure to comply with a scale of basic mining map sheets is permissible if

can the entire mining area, or the entire show to a single bearing

map sheet. Side frame map it is possible to move in the direction of os

coordinate system. In the direction of the X axis you can move about 100 m and their

increments, in the direction of the Y axis about 25 m and their whole multiples. The displacement of the

map sheet shall be marked on it.



(8) two adjacent map sheets of the same columns, it is possible to combine in one

double sheet format.



(9) the basic mining map in the activities referred to in paragraph 1 shall be made out in the underground

for horizons (patra), seams or seams of the powerful, for the Causeway a vein or

-core nodes.



(10) for his more than 45 degrees as part of the

the basic mining maps be drawn up projection of the bearing in the vertical plane, or to

the plane, which monitors the general direction of the bearing. Track of the plane, and more

data on the position of the plane in the area shall be indicated in the relevant basic mining

the map.



§ 15



Location and accuracy of the map sheet and frame grid



(1) the frame of the map sheet is placed so that its distance from the North,

the southern and Western edges of the sheet was the same.



(2) map sheet Frame is displayed with an accuracy of +-0, 2.1 on the to-3 m

side a +-0, 3.10, on-3 m in a rhombus with diagonals.



(3) in the adjacent grid points shall not exceed a distance difference

value +-0, 4.10, on-3 m.



section 16 of the



The accuracy of the display and artwork



(1) Sections of the mine location point fields are displayed with an accuracy of +-

0, 3.10-3 m.



(2) the difference between the distance of points plotted from point and actually

the measured distance must not exceed the value +-0, 4.10-3 m.



(3) the accuracy of the detailed points (e.g. corners of buildings, landmarks, and

below.) orthogonal or polar method-focused, or other

method of equal or greater accuracy, checks the oměrnými rates and

other control lengths, measured in the field. The difference between the directly

the measured lengths and lengths of odměřenými from the map must not exceed a value of +

-0-3 m, 5.10. This value is exceeded, it is necessary to determine the problem and

clear the error.



(4) drawing on the adjacent map sheets with contact compares the current

set intersection of the artwork with a frame, or other suitable means.

The detected defects are removed.



§ 17



The contents of the basic mining maps



(1) in the basic mining map shall contain the following information: mimorámové



the worksheet)



(b) coordinate and elevation systems); When using other than the prescribed

the height of the system should be noted the difference in altitude,



(c)) example sheets showing their corners, border area,

vyšrafováním of sheet and map marking, referred to in

scale sheets



(d)),



e) establishing the basic mining maps,



(f) the basic completion of mining) on the map



g) on restoring the basic mining maps,



h) mining of mineral,



I) mining method, the technology used,



j) name of the Organization



bearings, name)



l) the name of the area,



m) base name mining maps,



n scale basic mining maps),



about) the serial number of the sheet (according to custom scale sheets),



p) the registration number of the basic mining maps,



r) coordinates of the grid on the southern and eastern edges of the frame of the sheet,



with the basic components of the indivisible) mining maps (onion skinning, etc.).



(2) in the basic mining map is drawn marks as part of the fifth and

Annex No. 3.



and the square network/) 100 mm x 100 mm, where relevant, other

multi-resolution grid,



(b)) the State border and the border areas,



(c) the protected boundary bearing territory), protected areas and protection

zones in accordance with special regulations, ^ 5) mining areas, trade

pillars, indicative of the security celíků, trade celíků,

protection wells, or other restrictions on activities referred to in paragraph 1, including the

putting the numbers was a decision by which the boundaries fixed,



(d)) the basic and detailed mining spot fields



e) exploration drilling, adits and shafts,




f) basic data, desktop inventory depreciation of the bearing,



g) mining and underground work, related to the activities referred to in paragraph 1 with the

technological data



h) devices and objects used for safety and health at work

and safety, fire protection and ventilation,



I) details of an earlier mining activities, and other activities in the underground,



j) data about objects and places of particular importance,



to) full mining situation in the zone of at least 100 m beyond the total

space,



l) line profiles and cross-sections,



m) wells and probes,



n) administrative, social, and technological objects and devices,



about Karst and other cavities) natural character,



p) tailings impoundments, waste, stockpiles, landfills, waste storage and reconditioned

desktop and other important issues arising from the activities of the

According to § 1.



(3) If a Mining Organization conquers in foreign mining area

the organization also runs the Organization basic mining maps space

that might cause interference to their mining activities.



(4) if the representation of the data referred to in paragraph 2, more difficult

readability and clarity the basic mining maps, these data shall be on

a separate průsvitce with coagulation problems referred to in § 14 para. 5 in the scale

the basic mining maps. Keeping separate onion skins to the underlying mining

a map of the main mining is decided by the meter.



(5) technological objects and devices into the basic mining maps

regions, if they remain in place for at least three years. About their plotting

Chief mining meter.



(6) breakdown of data from a comprehensive database for digital basic mining maps

in individual layers of the graphic system corresponds to the main mining meter;

the contents of the layers shall be entered in the list of layers and their contents, which will be

continuously replenished.



(7) in the event of changes and fixes in the digital base map of the main mine mining

the meter shall ensure that its original status and provides the

the method of proof.



section 18



Profiles, sections and their contents



(1) profiles and sections is the product of measured data or from the data

referred to in the basic mining map in the same scale lengths.



(2) If profiles and sections kept digital form, is a graphic print

output the image profiles and sections.



(3) the direction and scale of the density profiles and sections is chosen so as to provide

the necessary information on the activities referred to in paragraph 1. On the choice of parameters of profiles and sections

Chief mining meter.



(4) the profiles and sections include scaling heights and lengths, and reasonably details

pursuant to section 17.



§ 19



Map of the surface of the



(1) map the surface, leads under the specific legislation on the substrate ^ 6)

land maps of land registration. If the numeric result

the land registry, land registration maps the coordinates of detailed points,

must be the coordinates of detailed points of land maps and districts maps

the surface of the identical.



(2) map the surface leads to a scale base mining maps.



(3) If no worsening of legibility and clarity, the map can be

the surface used as the underlying base map map made by

work in some of the activities carried out using mining techniques.



(4) if the map led digital form, can be used as

vector, bitmap display. Graphic print output is

the image of the surface of the map that is created by trapping layers graphic

the system on one worksheet.



section 20



The contents of the map of the surface



In the map the surface appear



a) data, referred to in § 17 paragraph 2. 1 (b). (f)), j), k), (l)), p) (a). 2

(a). b), c) and (g)) (of which only the upper edge of the first cut, skrývkového

the entrances to the caves and other underground spaces), section 17

paragraph. 2 (a). (j)) to (p)),



(b) the terrain contour interval) to be determined by the main mining meter.

The main mining meter decides, in which case the data will be in accordance with

letters and held on to průsvitce) the basic mining map.



section 21



Special mining maps



(1) The purpose of mining maps are maps, whose leadership is given by



and) specific provisions, ^ 7)



(b)) and decision according to the needs of the Organization of the main mining meters.



(2) mining maps are in particular Purpose



and operating mining map,)



(b)) map of ventilation,



(c) accidents, fighting) map



d) base map of the plant (the establishment).



(3) keeping the purpose of mine maps, drawn up pursuant to paragraph 1.

(b)), which are not subject to paragraph 2, shall be governed by the directive,

the meter's main mining and approved by a Senior Executive of the Organization

(racing, racing or racing down the quarry).



(4) Special mining maps-led digital form have their basis in the

Digital basic mining map and are made up of withdrawal, replenishment,

or by editing the layers of graphics system within the meaning of paragraphs 1 and 2.



(5) to trap its layer (depending on the nature of digital special

mining maps) with the ground digital basic mining maps-its graphic

output at scale and format-is the image of digital special

mining maps.



(6) in the case of the map image map image control and ventilation,

the following is the worker responsible for the organisation, according to § 2 (2). 5 and verifies the

the main mining meter.



section 22



Operating the map



(1) operating the map leads in the range operated by developing, training

and conquering the exclusive bearing.



(2) results are usually on a single sheet of any format; on the appropriate

Chief mining scale meter.



(3) the map orientation is governed by the shape of the plot section of the bearing (kry,

the quarry), the effectiveness and the needs of the organization. In operating the map

make a map of the base frames are the intersections of mining maps showing the

its scale leaves pursuant to § 14 para. 6, 7 and 8.



(4) the operating mining map contains reasonably data according to § 17 para. 1

(a). and), f), (j)), k), (l)), m), (p)) and pursuant to § 17 para. 2 (a). and)

(c)), even), and m), and other factors according to the purpose and needs of the organization.



Article 23 of the



Map of ventilation



(1) map of ventilation is the operating results of the map.



(2) ventilation always includes a Map



and) mining (underground) the works of its own and adjacent mines (underground space)

for distances up to 100 m from the common borders, ventilated průchodním

větrním shock, separately or by diffusion, as well as mining (underground) works

musty or closed,



(b) the designation of the direction of the vtažných), osvěžených, and required the winds, indicating the

their volumetric flow and speed,



(c)), used for the distribution and regulation of větrních currents and wind

objects (marked in accordance with the plan of control of accidents),



d) preventive device against explosions, fires and průvalům waters and gases



(e)) of the place of closed zápar and fires,



(f)) of strong leak of gases,



g) paddles closures.



section 24



Map of control accidents



(1) the Map control accident leads on the base of operating the mine maps.



(2) the Map control of accidents includes ventilation map data, supplemented by

For more information, set out in a special provision. ^ 8) this information may be

kept on display onion skinned frames.



(3) if the map control accidents, replaced by a new specimen, at least

a copy of the original maps shall be kept for at least one year.



§ 25



A basic map of the race



A basic map of the plant is kept in scale of 1:500 or 1:1000 by

the specific legislation. ^ 9)



section 26



-Complete graphic documentation



(1) the basic mining map is added, and when the activity



and according to a special underground) prescription ^ 13) by 15. of the day

the following month, a pencil, and a permanent manner once per quarter,



(b)) on the surface according to a special regulation ^ 14) regularly once a year,



(c)) on the surface in otvírce, preparing and mining deposits,

If it is about conquering with mining blocks, regularly once every five years,



(d)) on the surface in otvírce, preparing and mining deposits,

If each procedure from mining the walls less than 20 m per year, or annual

extraction does not exceed 50 000 m3, regularly once every two years.



(2) the Map surface, the following at least once a year.



(3) operating mine map is added under paragraph 1.



(4) the map of ventilation and control of accidents, the following map data



and mine surveying at least) once a month, but the newly formed

link of mine (underground) works, the connection with the surface and underground changes

in the ventilation, which result in a change to větrních, the following

within 24 hours,



(b)) in the ventilation at the latest within three days, but the changes in ventilation that have

in a change of větrních currents are characterized by no later than within 24 hours,



(c) special provision) ^ 8) in the map control accidents by

24 hours.



(5) a basic map of the plant is added to every change, at least once

per year.



(6) the following profiles and sections according to the intervals laid down in paragraph

1.



(7) in the case that is a graphical documentation supplemented in accordance with paragraph 1

(a). (c)), and (d)) must be the situation on the site aimed at

regular annual intervals, and the detected status into the garbage and

map or on the onion skin, which are part of the core mining maps.



(8) every document must be provided with a registration number, the date of the last

complete and validated the main mining meter.




(9) for digital documentation validates the main mining graphic print meter

the output of the digital model.



section 27 of the



A copy of the basic mining maps



(1) the Organization shall be obliged to draw up and in at least two-year interval

complementary copy or take photo snapshots (photomicrographs)

the basic mining maps and store them separately, so that it cannot be

their destruction or deterioration at the same time as the originals.



(2) a copy of the Basic Function of mine maps may perform other map or

documentation, if it will be possible to draw up a replacement base

mining map.



section 28



Fixes in documentation



(1) Corrections to the documentation shall be made by crossing out the wrong record with

giving the correct information so that the original writing was readable.



(2) the repair of the documentation shall be carried out only with the consent of the main

the mining of the meter.



(3) when correcting the date, the name and signature of the person who repair

and verification of the main mining meter.



section 29



Marking the work



(1) for the marking work processes input in accordance with the project

mining (underground) works (buildings) or spending plan, the preparation and

conquering ^ 10) or a project of geological work. ^ 11)



(2) Entry contains the basic parameters for the conduct of mining (underground)

the works (the stopper section, the direction of the work, the inclination of the works, etc.).



(3) on his award, the establishment and implementation of a record shall be made in the relevant

the documentation.



Part five



Tag graphic documentation



section 30



Graphical representation of the facts in the dossier



To illustrate the facts arising in the activities under section 1,

used depending on the scale and type of graphic documentation map

a generalization of the



and) simplifying the shapes and contours of the pictured items



(b)) by displaying objects or phenomena symbolically, t. j. marker,



(c) a combination of the ways a)) and (b)).



section 31



The display of objects depending on their size



(1) the items whose image in a graphic scale 1:2000 documentation and

a greater excess of the limit dimensions of the artwork (paragraph 2), according to the

focused facts (with a possible simplification) to scale graphics

documentation, and any relevant tags to display plotting

object.



(2) the items whose image in a graphic scale documentation is less

than or equal to the limit dimensions of the artwork are fundamentally indicate brand. For the limit

the dimension of this Ordinance shall be deemed to



and) for mining (underground) works with a circular cross-section diameter 9 mm,



(b)) for mining (underground) makes another cross-section transverse size 6 mm,



(c)) for long mining (underground) line of the construction works and the dimension of width 2

mm,



(d)) for other objects, spaces, objects and devices with a simple

footprint of the shortest side of the drawings of 2 mm,



(e)) for details of 1 mm.



§ 32



Drawing and brand positioning



(1) the strength of the current lines is 0.18 mm.



(2) the derogation in dimension labels must not be greater than +-0.5 mm.



(3) if the point field points located on the premises, the brand

the point of showing an object, it must not be distorted location

the location of the tag.



§ 33



The orientation of the brands and their description



(1) marks showing the floor plan of the subject is always oriented by

the fact (for example, the mouth of the gallery).



(2) other brands and their description is oriented according to the frame of mine maps.



(3) a description of the tag is usually stating the right of the tag. In the event that the

There was an overlap of the artwork, or to make it difficult for clarity and readability

graphical documentation, description at another suitable place, however, to

always expressed a clear link with the tag.



(4) the Description of long objects and linear structures is carried out in parallel with the

the larger dimension.



(5) is used to describe the standard font and abbreviations.



§ 34



The dimensions of the brands and their color designation



(1) the dimensions of the brands listed in annex No. 3 correspond to their use in

Basic and special purpose maps in scale 1:1000 and 1:2000. For

video documentation in the scale of 1:500, its dimensions are doubled.



(2) for the purpose of mine maps in the scale 1:5000 and less the

tags halve.



(3) the Marker is drawn in black. In the case of use of other colors

It's the stencil company Technicolor scale.



(4) details of the single drawing markup graphic documentation and

their color designation are listed in the explanatory notes in annex No.

3.



Part six



Registration and retention of documentation



§ 35



Registration documentation



(1) each permissible masonry document or their inextricably linked

file is marked registration number and registered.



(2) If this document is kept in digital form must indicate the place and

the method (for example, diskette, computer) to save it. Digital image

the document has the same registration number with registration number of his

the digital model.



section 36



Retention of documentation



(1) the documentation will be kept permanently in order to avoid damage,

destruction or theft. Numeric documentation referred to in § 10 (1). 2 (a).

and (d))) and shall be kept at least 10 years.



(2) documentation, led by digital in the form of the stores and secures the

media with magnetic record in two copies on two places

separate from the original location on the computer, in an area protected from

magnetic and chemical effects that could affect the carrier or data

stored on it. At the same time it must be ensured the regular recovery carriers with

saved data, at least in three-year intervals. To revive the carrier

registration must be made, the data of which validates the main mining meter. In

If any change occurs in the stored information, you must

the portion of the minutes on a medium that will be changed, print, and save to

It was obvious what changed from its original state.



(3) documentation, led by digital in the form of the stores and secures the

media with a laser record (CD ROM, etc.) in a single copy of a stored

separately from the original location on the computer, in an area protected from

physical and chemical damage. Any additional restocking

recorded on the CD ROM that was stored at the temporary media with

Magnetic record shall be retained and secure until new

a complete transcript of the CD ROM drive.



(4) in order to ensure clarity and flexibility to search documentation

a detailed list shall be drawn up stating the date, place and method of preservation

documentation.



§ 37



The managed documentation organization



After their activities pursuant to section 1 shall be destroyed with the documentation of the Organization

be treated under the specific legislation. ^ 15)



Part seven



Common, transitional and final provisions



§ 38



Common provisions



For documentation under this Ordinance shall be treated as project documentation

or part thereof, drawn up in accordance with special regulations, "^ 1") if

at the same time the formalities laid down by this Decree.



§ 39



Transitional provisions



(1) documentation, drawn up according to the rules applicable so far, the leading

According to the Decree of the effective date of its effectiveness.



(2) organisation, which has not yet had an obligation to keep a dossier, it shall ensure

processing and other guidance under this Ordinance within 12 months from the date of

its effectiveness.



(3) pending the processing of land registration maps a numeric method is

can be used to map the surface of a different scale than the one in which it is

drawn up the basic mining map.



(4) the certificate of professional competence the main mining and mining

the meters, which are issued before the entry into force of this order, the

the expiration on 31 December. December 1993.



section 40



Exceptions



(1) the exceptions to the provisions of § 6 (1). 7, § 7 (2). 5 allow in justified

cases, the Czech mining Office, reaches the goal, pursued by Decree

even another way, or by any other means.



(2) an application for authorization exceptions including the alternative measures

the Organization shall be presented according to the proposal, drawn up and authenticated principal

mine meter.



(3) the exceptions relating to the geodetic bases (§ 6 paragraph 7 and section 7 (1).

5), allowed after 1. July 1973 under the rules in force before the effective date

This order shall remain in force.



(4) exemptions from the education required for the performance of the functions of the main mining

the meter and the meter of the mining (section 3 and 4), authorized before the effective date of this

the Decree, shall expire on 31 December 2007. December 1996.



§ 41



Regulation (EEC)



Shall be deleted;



and mining-masonry Regulation) of the Central Mining Office of 7 November 2002. July

1967 no. 4700/1967-the list of tags of mine maps to agreed (reg.

the amount of the 34/1968 Coll.)



b) permissible masonry prescription the Czech Mining Authority of 31 July. January 1972

No. 700/1972 for surface mining of ores and nerud (reg. in the amount

26/1972 Sb.)



c) permissible masonry prescription the Czech Mining Authority from day 1. July 1974

No 3700/1974 for geological exploration and extraction of oil and gas

(in the amount of the 6/1976 Coll.),



(d)) the yield of the Czech Mining Authority of 6 December. November 1986 j.

4800/1986 on the permissible measuring documentation at deep mines (reg.

the amount of the 27/1986 Coll.)



e) yield of the Czech Mining Authority of 24 September. March 1987 No. 900/1987 on the

permissible measuring documentation during the surface mining of coal (reg. in the amount

11/1987 Coll.)




f) Decree of the Czech Mining Authority of 23 December 2003. February 1990 No 98/1990

Coll., on mining surveying documentation for certain activities carried out

using mining techniques.



§ 42



The effectiveness of the



This Decree shall take effect on the date of publication.



President:



Ing. Bartos in r.



Selected provisions of the novel



Article II of Decree No. 158/1997.



Transitional provision



(1) a certificate of professional competence, meter or main mining

mining the meters released Slovak mining authority, or obvodními

mining authorities of the Slovak Republic shall expire on 31 December 2007.

December 1997.



(2) the exceptions relating to the geodetic bases according to § 6 paragraph 1. 7 and section 7 of the

paragraph. 5 of Decree No. 435/1992 Coll., on mining surveying documentation

mining activities and certain activities carried out by mining

in a way, issued under this Ordinance and permitted under the former

regulations, shall expire on 31 December 2007. December 20, 1999.



1) Decree of the State Commission for scientific, technical and investment development no.

43/1990 Coll., on project preparation.



Decree of the Czech Mining Authority no. 175/1992 Coll., on conditions for the use of

bearing non-reserved minerals.



2) § 6 para. 1 of Act No. 61/1988 Coll. on mining activities,

explosives and the State Mining Administration, as amended by Act No. 542/1991

SB.



3) Decree No 298/2005 Coll., on professional qualifications and requirements

competence in mining activities, or activities carried out

using mining techniques and on amendments to certain laws, as amended by

Decree No. 240/2006 Coll. and Decree No. 378/2012 Sb.



4) Annexes 1, 2 and 3 shall be published as a separate annex of the laws

(will be released as a separate publication, and s. SEVT Prague).



5) Eg. Decree of the Czech Mining Authority no 78/1988 Coll., on protected

and bearing territories of mining leases, as amended by Decree of the Czech

Mining Authority no 172/1992 Sb.



6) § 4 of law No. 200/1994 Coll., on surveying and amending and supplementing

Some laws related to its introduction.



7) Eg. Decree of the Czech Mining Authority No 22/1989 Coll., on safety

and occupational health and safety in mining operations

and when the activities carried out in the manner of mining underground, and Decree

The Czech Mining Authority No 26/1989 Coll., on safety and health

at work and the safety of operations in mining activities and in the activities

by using mining techniques on the surface.



8) the yield of the Czech Mining Authority no. 8/1987 on the plans of fighting serious

traffic accidents in deep mines (in the amount of 4/1988 Coll.).



9) directive the Czech Office of geodetic and cartographic no 300/1984-21

a purpose built large scale maps (in the amount of 14/1984 Coll.).



10) Decree of the Czech Mining Authority no 104/1988 Coll., on a rational

the exploitation of the deposits, the authorisation and reporting of mining

activities and reporting activities carried out using mining techniques.



11) Decree of the Czech Geological Office No. 121/1989 Coll., on

designing, implementing, and evaluating geological work, on the award of

permits and professional competence to their performance.



12) Act No. 35/1965 Coll., on literary, scientific and artistic

(the Copyright Act), as amended by Act No. 86/1996 Coll.



13) § 2 (b). a), b), c), (e)), and (f)) and paragraph 3 (b). (d)), e), (f)) and i) of the Act

No. 61/1988 Coll. on mining activities, explosives and the State mining

the Administration, as amended by Act No. 542/1991.



14) § 2 (b). a), b), c), (e)), and (f)) and paragraph 3 (b). a), b), (g) and (h)) of the Act)

No. 61/1988 Coll.



15) Act No. 97/1974 Coll. on archives, as amended by Act No.

343/1992 Sb.



Decree of the Czech Mining Authority no 52/1997 Coll., laying down the

requirements to ensure the safety and health at work and the

safety when disposing of the main mine workings.