23/2007 Sb.
The DECREE
of 31 March 2004. January 2007
about the details of the definition of the water works registered in the cadastre of real estate
Of the Czech Republic
The Ministry of agriculture in the agreement with the Czech Office of land survey and
the land lays down, pursuant to section 20 (2). 1 of Act No. 254/2001 Coll., on the
waters and on amendments to certain acts (the Water Act), as amended by Act No.
20/2004 Coll.:
§ 1
The subject of the edit
This Decree lays down a more detailed definition of the water works associated with the
countries fixed Foundation, registered in the cadastre of real estates of the Czech
Republic, dams, dikes, dams, buildings to nautical
the purposes established in the open water or on the banks of the streams, the construction of the
the use of hydroelectric power and the construction of tailings dams.
The details of the definition of the water works for the purposes of registration in the land registry
real estate in the Czech Republic
§ 2
In the cadastre of real estates of the Czech Republic is registered
and as the construction of the přehrazující Dam) water flow or the Valley, formed by the
Dam, including functional devices that can be used to permanently
impoundment and the accumulation of surface water in the water tank in order to control
runoff of surface waters,
(b) the construction of the dam as,) including functional device, which
1. the water flow or spans the Valley and which is used for permanent or
occasional impoundment or the accumulation of surface water,
2. serve on flood protection, where appropriate, to increase the capacity of the
the trough of the water flow, or
3. to damming the water reservoirs,
(c)) as building přehrazující eat water flow, or the Valley, including the
functional device, which is used primarily to the impoundment of surface water
in the zdrži,
(d) construction of the nautical purposes) to set up in the bed of the watercourse or on its
sides of the building, which is connected with the ^ 1), including functional
device, such as a lock, boat hoist, energy saving,
Canal Bridge, Canal Tunnel, ferry pass, closing the object on the
navigational channels, Canal, including Tara Reid or the water part
ports including a swimming pool, Waterside of the walls and the control room for the management
the operation,
(e)) to the construction of the hydropower as the construction of the flow, accumulation or
pumped storage Hydro plant, including functional facilities and
of related objects as object, the gate feeder, waste
channel, and buffer Chamber, in the case of pumped storage hydro power plant
In addition, including dam reservoirs and artificial reservoirs,
(f) the construction of the tailings impoundment construction) mainly hrázového system, including
Basic, zvyšovací and dividing the perineum and including functional device,
the area of the tailings impoundment and the sampling or launching devices, which
allows a permanent or temporary storage of zvodnělého material.
§ 3
(1) the circuit works corresponds to the intersection of the outer perimeter of the water works with
the terrain or the vertical projection of the outer perimeter of the water works on the terrain,
If the vertical projection of the intersection of the outer perimeter of the area exceeds water
works with the terrain.
(2) If a portion of the perimeter of the water works to establish due to flooding
surrounding water, or due to permanent water spillover, the
geometric and positional determination of this part of the circuit works by taking the
from the documentation of the actual construction ^ 2).
(3) If, in the cases referred to in paragraph 2 of the documentation of the actual
the implementation of building available is used to determine the portion of the perimeter of the water
the work, which cannot be determined due to the flooding of surrounding water, or
due to the permanent water spillover, simplified documentation (passport
construction) ^ 3), in particular its GEODESIC part.
§ 4
Mark the perimeter of the water works in the field
If part of the perimeter of the water works in the field of reason
and the inability to identify the part of the circuit) works with the intersection of the outer
the circuit works with the terrain without the use of special technical
the device, in particular because of the terrain, inaccessibility
(b) the penetration of the water works) nezřetelnosti with the terrain, especially if the water
the work does not constitute a sharp break off or passes imperceptibly to the shore or
through it runs the infrastructure, or
(c)), the granularity of penetration of water works with the terrain, which exceeds the
the criterion for the resolution of the detailed shapes of objects that are displayed in the
cadastral maps positioning according to the law issued by the
the implementation of the land law,
the designation shall apply to this part of the circuit works in the field by analogy
the provisions concerning the permanent marking of the boundaries of land law issued by the
for the implementation of the land law.
§ 5
The effectiveness of the
This Decree shall take effect on 1 January 2005. in March 2007.
Minister:
Mgr. Gandalovič in r.
1) § 1 of law No. 114/1995 Coll. on inland navigation.
§ 125, paragraph 2). 1 of law no 183/2006 Coll. on territorial planning and the
building code (the building Act).
§ 125, paragraph 3). 3 of Act No. 183/2006 Sb.