55/1996 Coll.



The DECREE



The Czech Mining Authority



of 7 June. February 1996



about the requirements to ensure the safety and protection of health at work and the

safety when activities carried out using mining techniques in the underground



Change: 238/1998 Coll.



Change: 144/2004 Sb.



Change: 298/2005 Sb.



Change: 265/2012 Sb.



The Czech mining Office lays down pursuant to section 5 (3). 3 and § 6 (1). 6 (a). and (b)))

and (d)), the Czech National Council Act No. 61/1988 Coll. on mining activities,

explosives and the State Mining Administration, as amended by the Act of the Czech national

Council No. 542/1991 Coll.:



PART THE FIRST



GENERAL PROVISIONS



HEAD FIRST



INTRODUCTORY PROVISIONS



§ 1



The range of validity of the



(1) this Ordinance shall in accordance with the law of the European

^ 1a) Community requirements to ensure the safety and health at

work and safety (hereinafter referred to as "safety and service") in the

activities carried out by using ^ 1).



(2) this Ordinance shall not apply to mining of deposits of non-reserved

minerals underground. ^ 2)



§ 2



Interpretation of the terms



(1) For the purposes of this Ordinance shall be deemed to



and work in the underground pit) vertical or horizontal plane with bowed from the larger

than 45 degrees, whose length exceeds 50 m; shorter than the specified length,

at least 3 m if the cross section greater than 3.75 m2,



(b)) the chimney, embossed work underground, whose length is greater than the

the diameter or longer side of the layout and size of bows from the horizontal

the plane is greater than 45 degrees,



(c) the prohibition, a warning label), or information expressed in sound,

light, mark, inscription or návěštním character in his position,

movement or colors,



d) touch předvěští the warning element, for example. hanging rods or strips,

that touch notes in advance of the approaching traffic participant

an obstacle on the way of transport,



(e) the protective device) devices to prevent accidents, traffic accidents

or disorders of the technical installations,



(f)), the distance between the protective distance protective device and source

endanger the life or health of natural persons (hereinafter referred to as "the parties"),



g) deliberate controlled burning open fire; for open fire

considers that the development of heat or sparks, which is

the result of deliberately induced by physical or chemical processes or

processes and could cause a fire or explosion,



(h)), the workflow type of operational documentation indicating the sequence of

each work operations and related security measures,



I) workplace space specified by the employees for the performance of his work

activity; in terms of ventilation and walk in the workplace considered it

place in the underground, where the blazes, ensures a strain on or disposed of underground

the work,



j) establishment built up or otherwise enclosed space in which the

built-in mechanical or electrical device or that is designed to

decommissioning of mobile machinery,



the lower limit of explosiveness to) the lowest concentration of flammable substances or their

mixtures in the air, in which there is a risk of explosion,



l) construction shaft pit, whose depth does not exceed 20 m,



m) vertical work well in the underground (hole, pit) deeper than 3 m intended

for water management purposes,



n) the outer work underground vertical or with bowed from the horizontal

more than 45 degrees, whose cross section not exceeding 3.75 m2 and the depth is

greater than 3 m, but not more than 50 m,



o) maintenance of equipment working towards maintaining the equipment in a safe and

working order. Maintenance of the equipment are prescribed examinations,

test, inspection, revision and repair of the equipment, as well as Assembly and disassembly

parts to the extent necessary to perform inspections, tests, inspections,

revisions or corrections facilities



p) management of underground works in the process of creation or liquidation of the works in the underground.

Includes stamping, stiffening, maintenance, reconstruction, establishment,

the provision and disposal works in the underground,



q) reinforcement (lining), building elements used to ensure works

in the underground against the release of rock deformation of the mountain pressures and the like,



r) equipment all equipment works in the underground needed for its construction and

the operation,



with the burden of excessive weight of the subject), whose mass is greater than 3000

kg,



t) the burden of excessive dimensions of course, which transportation or

handling spaces cannot be honored on the route set out in this

by Decree.



(2) for the purposes of this Ordinance be deemed to



and the underground work space) underground created by embossing or digging in the

activities carried out by using ^ 1), old or permanently abandoned

the work of mining or accessible part of the cave ^ 3). Is it velkoprůměrový

VRT or cats, if they can keep people. For the underground

the work is considered to be the construction of a shallow underground and stored underground line

the building, in particular the mined sewerage and collector,



(b) stored underground work) shallow underground work with overburden of less than

the width of its excavation,



(c) the Gallery underground work) horizontal or úklonné until the bow from 458

a horizontal plane with the gross cross-section of less than 16 m2,



(d) the underground work of the horizontal tunnel) or úklonné until the bow from 458

a horizontal plane with the gross cross-section 16 m2 and more



(e)) protlakem a summary of stamping operations required to disconnection and removal

the rock for the purpose of jacking pipes with a diameter of at least 0.8 m,



(f) an observational method of tunnelling method), which allows you to

flexibly change the way to ensure the stability of the excavation on the basis of the actual

the geological conditions encountered and inženýrskogeologických,



g) Provisional reinforcement file support elements used to ensure

the stability of the excavation carried out in underground work only on necessary

period of time,



h) temporary reinforcement file support elements used to ensure

stability of underground works in the meantime to ensure stability of the underground works

continuous reinforcement,



I) permanent reinforcement of the technological elements of the file used to ensure

the stability of the underground works throughout his life, laid down



j) technological class of the excavation and construction measures file

the processes leading to the achievement of the required stability

excavation and affected objects in specific geological and

inženýrskogeologických conditions



to ensure the stability of the excavation) schema document, which specifies the before

making the shot way to ensure the stability of the excavation on the basis of the forecast

the behaviour of the rock mass,



l) warning the status of the project defined the value of the deformation of the rock

solid wood, or other measurable quantity dependent on expression of the excavation on the

the rock massif, which is necessary to evaluate the resulting

the situation and, where appropriate, establish measures to ensure the stability of the

the excavation, the objects in the overburden and work safety,



m) the starting sheet document that records the scope of ensuring the stability of

carried out the excavation,



permanent supervision n) continuous monitoring of the work activities of employees and

the State Department, in which an employee designated by the Organization for the performance of

permanent surveillance and not detract from the employees they did not employ anything other

than it supervision,



about) ^ 22) Geotechnics professionally capable natural person authorized to

rock mass classification in a technology class,



p) means that geomonitoring follow-up and measurement of the mechanical properties

rocks and their effects on the mined and cut work.



(3) for the work on upkeep of the caves in a safe state is considered

ensuring accessible part of the cave against falling rocks, maintenance

feasibility of pathways and lighting, ventilation and control this condition.



§ 2a



(1) the obligation to employees at each of the stages of the management for the compliance with the

This order provides for the Organization in the internal regulation.



(2) When reporting on activities carried out in the manner of mining district

Mining Authority announces the Organization of the person Racing ^ 4) and its

identification data. Racing is in the performance of its activities, it considers

the head of the employee.



THE HEAD OF THE SECOND



THE OBJECTS OF THE WORKPLACE AND OF THE EQUIPMENT



§ 3



Access to the objects and to the workplace



(1) a racing ^ 4) determines how the object security of workplaces and equipment

the surface against the entry of unauthorized persons and determine the limits of their checks. For

Security is not a mere indication of the tables.



(2) the security of the mouth of the underground works on the surface against the entry

unauthorised persons must not prevent the departure of people from the underground in danger.



(3) Holes, depressions, hollows and other places, where there is a risk

the fall of persons, shall not be left without the cover, enclosures, or filling.



(4) the ban on the entry of unauthorized persons to the places referred to in paragraph 1 shall

on the security tables for all entrances, approaches and paths to the

them.



(5) into the underground works marked by prohibiting entry, security

table laťovým Cross and the like, or znepřístupněného may be

enter only a written statement in which the race will determine the measures to

ensure the safety of incoming persons.



(6) into the underground, may enter and stay in it without the

protective helmets, and if the workplace is not illuminated by natural light, without

personal lights. On the surface, may not enter without protective helmets to

places with a risk of falling objects.
(7) all persons entering the underground are maintained. If it is in the underground

at the same time, more than ten people, leads the dual independent.

If someone is missing, it immediately starts the search.



§ 4



Protective devices



(1) where one can assume the presence of air rescue,

enter into the underground without sebezáchranného apparatus.



(2) Sebezáchranný the device is allowed to allocate only one who was

familiar and procvičen with its use. Practice is repeated once per

two years ago.



§ 5



Objects and equipment



(1) when the activities covered by this Decree is permitted to operate and

use only the workplaces, machinery, equipment, apparatus, tools, objects

and materials which, by their design, implementation and technical status

correspond to the legislation to ensure the protection of the health and safety at work

operation. To use may be given only such products which your

construction, design and technical status, meet the requirements of the

safe product. ^ 4a)



(2) the use of machinery, equipment, apparatus, tools and materials

permitted only in compliance with the manufacturer's instructions or technical conditions,

instructions and conditions laid down in their approval or authorization.



(3) the device may only be put into operation or used for staff

their manual. The device is allowed to use to operations for which they are

intended; to other acts only under the conditions specified racing.



Section 5a



Requirements on objects



(1) the floor should not have dangerous obstacles, holes or slope and must be

fixed, stable and not slippery.



(2) the Floor area (base), the height and volume of the work space must

be designed and constructed so that workers can carry out their

work, without affecting their safety, health or good

working. ^ 17)



(3) the space that an employee has available at the workplace, must be

so big, that the employee had sufficient freedom in their activities

movement and could safely carry out their tasks. ^ 17)



(4) Windows, skylights and ventilation devices which can be opened,

closed, converted and provided, it is necessary to design and construct

so, in order to ensure safe handling. In an open State

must not constitute a danger to the employee. Must be able to

safe cleaning of Windows and skylights.



(5) the transparent or translucent walls, partitions, in rooms or in the

close to transport routes, doors and gates must be clearly in the eye

indicated and made of safety material or reliably

protected in the event that they are breaking up, it was prevented from

injury to employees.



(6) it is prohibited to access the roof of materials which do not have satisfactory

resistance to the load when the device is not available, the

You can perform the activity safely.



(7) the location, number and dimensions of doors and gates, and the materials for their

construction must be chosen according to the characteristics and way of use of premises

and workplaces.



(8) the doors and gates shall comply with the following requirements:



a) pendulum swing doors and gates must be transparent; If you are not

transparent, must have a transparent window,



b) sliding doors must be secured against falling out, and eject



(c)) doors and gates opening upwards must be

supplied against the unexpected fall back,



(d)) the door to rescue the road shall open outwards, must be

marked, their design must be able at any time to open from the inside

without the use of assistive devices, and must not be locked,



e) door on the go with a transportation, if they pass for pedestrians is not

the safe must be equipped with other well visible and still

accessible doors for passage,



(f)) doors and gates controlled by the mechanical force of not its movement

endanger workers, must be equipped with a clear, well

easily identifiable and accessible emergency shut-down devices and with

except in the case when the power failure automatically opens,

must allow also the manual opening,



(g)) if access to some chains instead of preventing or similar

the device must be these chains or similar devices clearly

visible and marked with the corresponding signs prohibitions or warnings.



(9) the Auxiliary operating objects, for example, workshop, Office, warehouse or

rest room, must be placed in the space without danger of explosion.



(10) if they are installed in the operational object measuring and control

the device, which is fed into the gas, it must be odfukové

pipe led out from the object so that the gas could not return, and even

diluted.



(11) operating objects must be labelled with the name of the object.



§ 6



Tours



(1) a workplace is populated only if it was before starting the work, including

access roads examined the technical supervision of the ^ 13) or leader

trained and designated in writing for the exercise of supervision. Before the cast

the workplace removes the identified deficiencies. If the defect cannot be

immediately threatening the safety and operation of the delete, not

the workplace can be cast.



(2) the excavation, galleries, chimneys and concentrates and excavation

Jam and at the workplace, where it is used in the minting of blasting, and

in the workplace, where it cannot be excluded the presence of flammable gases, vapours and

money (hereinafter referred to as "flammable gases"), danger or inrush fo water or

zvodněných materials, ensure their technical racing tour

supervision at least once in the inning, in which the work is performed. Racing

performs inspection of such workplace at least twice a week.



(3) the technical supervision of compliance with the inspection checks of workplaces

the relevant operating documentation, the status of the workplace and of access roads,

the status of safety and technological equipment and machines. If you cannot

delete the detected deficiencies and the staff are obviously and immediately

at risk, technical supervision of stops in the workplace work and arrange for the departure of the

employees in a safe place. On this measure, immediately inform the

the racing. The results of the survey and the specified measures shall be recorded in the day

checks in the appropriate book.



(4) in order to ensure work safety and the operation of the race's adjacent

the underground works, without delay, be communicated to all the knowledge that is associated with the

safe and professional management of these works.



(5) the safe state of the accessible caves Tour performs a day before

the start of operation in her authorized employee and once every 6 months

Racing. On the content and the outcome of the inspections shall immediately carry out viewing

record.



(6) the Inspections referred to in paragraph 5 shall be checked at least



and State of the rock mass) made available part of the cave and its collateral

against the fall of rocks,



(b) the feasibility and throughput) and lighting,



(c) ventilation and air composition),



(d)) the water regime of the cave and



(e)) the functionality of the security alarm equipment.



(7) the Organization at least once a year, tours of the steel and

wooden structures and buildings, if they are exposed to moisture

or aggressive substances. About performs inspection and its contents

the person performing the inspection record.



THE HEAD OF THE THIRD



The STAFF of the



section 7 of the



On-the-job training



(1) an outline of the training, the amount of time that an employee must work under the

the supervision of a designated qualified employees, and how the tests shall determine the

racing by type of work, if these requirements are not established

provisions to ensure the safety and the operation of, or specific

provisions.



(2) on-the-job training may waive the graduates of secondary vocational and

universities and their employees, who are taught in the scope in which the

they have to work.



§ 8



Classification of employees



(1) an employee may be responsible for the performance of the work and the workplace,

If the disabled eligible, and only if,



and if an internship), if he has not been pardoned according to § 7 (2). 2,



(b)) was a familiar with the principles of safe conduct in the workplace and with

and the source of possible threat and



(c)) if he was familiar with the operating documentation to the extent necessary for the performance of

his work. ^ 5)



(2) a Work in which there is an increased risk of accident (hereinafter referred to as "work

associated with increased danger ") may perform only authorized

employee. Such work must be carried out without the operational documentation and

without continuous monitoring work activities and the State of the workplace

a designated employee (hereinafter referred to as "constant surveillance").



(3) Permanent surveillance may only be exercised by the employee, who was with his

rights and obligations of the familiar. When the performance of the employee specified by the

as a permanent supervision must not move away from the place of performance and shall not employ

anything other than supervision.



(4) the Organization shall determine the work associated with increased danger of accidents and for the

These works designate the permanent supervision.



§ 9



Cast institutes



Fill in the underground of one employee is allowed when the

If the intended and secured way and time of appellate review or reporting or shorter

period inspections of the workplace by the supervisory authorities.



§ 9a



The staff of the



(1) employees shall verify the safe condition of the workplace before starting work

during it. When the threat to life, health and safety of persons and property

work stops, it shall notify this threat to the foreman and act under section 9b. In
It is possible to continue work, as soon as the threat passed.



(2) except in the cases referred to in § 8 paragraph. 2 enter into

endangered places in them and delete their potential

the designation.



(3) the employees are allocated to personal protective

resources at work follow the operational documentation and legislation to

to ensure work safety and traffic and elect such workflows,

which are in accordance with the rules of safe work. Without the parent command

does not change anything on the operational, safety, fire, health and

other devices. Use and operate can only the machinery, equipment,

tools and utilities that were designed for their work.



(4) employees nevzdalují from his workplace without the consent of the leader

or technical supervision except for imperative reasons, in particular the imminent

the danger of nausea, sudden illness or injury. Departure from

urgent reasons promptly reports the leader and technical supervision.



(5) employees shall respect the guidelines resulting from the security designation,

warning signals and warnings. They are also required to obey instructions

patrols belonging to the safety circuit, in particular during blasting

the works.



(6) in places with an increased fire danger must not be used

open fire or smoke. In exceptional cases, may be used

open fire only on the written order of the organization.



§ 9b



Danger



Anyone who notices the danger which might endanger the health or

the lives of people or cause traffic accident (a crash) or disorder

technical equipment or signs of such danger, if

cannot delete this risk himself, it shall notify immediately to technical supervision

or inspection service and notifies all physical persons,

that could be at risk from this hazard.



§ 10



Foreman, foreman for the stamping ground of the works and the foreman for excavating

the underground works



(1) a group of two or more of the employees governed by the foreman. The performance of the activities of the

the foreman entrusts the technical supervision of the staff.



(2) the Foreman for stamping or digging of underground works can only be

an employee with at least three years ' professional experience in minting or excavation

mining or underground workings and who passed an examination of professional knowledge

and of the relevant provisions in order to ensure work safety and operation.

The performance of the activity leader for stamping or excavation of underground works

instructs employees racing. The scope, method and time limits for the repetition of tests

Specifies the organization.



(3) the foreman shall ensure the safety of the group assigned to him and ensures safe

the State Department, compliance with operational documentation and execution of orders

superiors. There is a clear and immediate danger to employees and

If you cannot delete them, stop work and conferred on him the Group

a safe place.



(4) when the shift foreman warns the new leader on the important

fact or glitches in the workplace. If it is unable to do so, shall submit a

the report of the technical surveillance before the onset of rotation shifts.



THE HEAD OF THE FOURTH



SERIOUS ACCIDENTS AT WORK, MAJOR EVENTS, SIGNIFICANT OPERATIONAL ACCIDENTS AND

DANGEROUS CONDITIONS



§ 11



Reports of serious accidents at work, major events, serious

traffic accidents and hazardous conditions



(1) the Organization shall ensure the immediate reporting of serious accidents at work,

major events, serious traffic accidents and hazardous conditions

the relevant district mining authority.



(2) these Reports serious occupational accidents



athletically, and)



(b)) injury, which is a life-threatening accident with subsequent anatomical or

functional loss of authority, life-threatening damage to health, including

industrial poisoning and injury with a character of the accident happening that

It was as a result of violation of safety regulations and suggests

serious threat to the safety and health at work, or



(c)), when the bulk of the same accident accident storyline were injured at least 3

persons, of whom at least one has suffered mortal injury, or when the

injured more than 10 people.



(3) this is a serious event, significant operational accidents and dangerous

States, and it



and) ignition and explosions of flammable gases,



b) fires in underground and surface fires, which threaten the person in

the underground,



(c)) the presence of gas or polluting nedýchatelných over the permissible limit in the

the underground,



(d)) závaly the underground works, whose zmáhání is envisaged for a longer period

than 24 hours or whose effects are, on the surface,



e) průvaly water, and surface, and for materials to

the underground works



f) leakage and leakage of hazardous substances in underground works



(g)) loss or proven leak radioactive emitters, or other

dangerous conditions,



h) finding missing persons, or



I) death of a person in the underground.



(4) Furthermore, the reports of serious events, significant operational accidents and

dangerous situations, if they occur at



and handling of explosives), including injuries, přiotrávení fumes

emerging during the explosion, breaking into stores, theft or finding

explosives,



(b) the use of reserved technical equipment) including electric accidents

stream ^ 6), or



(c) the operation of hoisting equipment including the) injuries incurred in the operation of hoisting

device ^ 7).



section 11a



The conservation status of the place of serious work accidents, major events,

unsafe condition and serious traffic accident (accident)



(1) where there has been a serious accident or serious

the event, an unsafe condition or serious traffic accident (a crash)

You cannot change anything until the district mining Office has not made an inspection of the place of

or decided otherwise, except when it comes to the rescue of the health and life of

people and the necessary work to ensure the safety and security of assets

operation. Changes required from other serious reasons can be made

only with the consent of the district mining Office.



(2) a place of serious work accidents, serious, dangerous events

condition or serious operational mishap takes organization documentation,

in particular, the sketch, map, photos.



(3) the Organization shall keep documentation on the serious work injury, serious

the event, a dangerous condition or serious traffic accident 5 years ago.



§ 12



Plan to combat the serious operational mishap



(1) ensure that Racing in conjunction with the mine rescue service before

start of activities carried out in the manner of mining development plan

control of significant operational accident ^ 9) and its update, where is

to its processing.



(2) plan to combat the serious operational mishap is binding for all persons

visitors in the underground and the objects for which it is drawn up.



(3) where there is an obligation to handle the serious fighting plan

operational accidents, shall determine the method of disclosure and ensure the racing people

responsible for tasks in the liquidation of the accident and the list of authorities, organizations and

employers that it is necessary to inform about the crash.



section 13



The contents of the emergency plan



(1) emergency plan contains a portion of the contingency, the operational and mapping.



(2) the contingency part emergency plan contains



and the list of persons), employers, organisations and bodies, which must be

bring on the crash site; first it is necessary to summon the head of the

the liquidation of the accident,



(b)) the list of persons, organisations and bodies, which must be informed about the

the crash,



(c) the duties of the selected employees at) crash.



(3) the operational part of the emergency plan contains all solutions

predictable types of accident, the occurrence of which the underground construction or

underground work, it can be assumed, and the accident on the surface, that would

its implications began to threaten people in the underground, and specifies the



and fast and reliable) way to notice to persons at risk of accidents,



(b)) the way of the appeal and the rescue of persons, determine the survival trips, Chamber

shelters and the like,



(c)) the means for rapid and effective control of crash, fire-fighting resources

and the way the fire water supply, emergency warehouses and landfills,



(d)) need to changes in ventilation to ensure the safe passage of persons from the affected

part of the underground buildings or underground work.



(4) the operational part specifies the time after which, when

interruption of the ventilation of the appeal of a person from the underground.



(5) emergency and operative part contains any measures in relation

to the adjacent underground buildings and underground works, or to clear the mines and

surface objects.



(6) the Mapping part of the emergency plan form



a basic map of the race), ^ 11)



(b)) map control accidents ^ 12) designating the water resources of the applicable

to hasebním purposes of explosives warehouses, storerooms, flammable substances on

the surface of the water and the distribution of fire and fire hydrants, location of

resources for the rescue of persons, their treatment and transport.



§ 14



Control the crash



(1) work on the rescue and combat the accident liquidation managers

the crash, which is racing.



(2) the racing may appoint another representative of the head of the liquidation of the accident

the employee; This, however, must meet the competence of ^ 13)

the racing. Deputy Head of the liquidation of the accident satisfies the obligations

the head of the liquidation of the accident for the duration of his absence.
(3) at the time of the accident may not be fighting head of the liquidation of the accident

pověřován other tasks, which would have prevented him to carry out the tasks of the head of

the liquidation of the accident.



(4) the head of the liquidation of the accident after receiving news about the crash

immediately takes control of the control. After the analysis of the situation to assess

possibly modifies the operational part of the emergency plan, determine the method

and, where appropriate, checks issued commands to the



and the rescue of persons, in particular), their appeal, the retirement or the outlet of the

the affected area,



(b) registration of persons), which are underground, and in particular in the

the affected area,



(c) the implementation of other measures) in the operative part of the emergency plan,

intended for the resulting from the crash,



(d)), or occupation of persons, authorities, employers ' and

organizations listed in the emergency section of the emergency plan according to the type

crash,



(e) the prohibition on entry into the underground), with the exception of mine rescuers and people,

that enter into the underground on his written order,



f) informing the other legal entities and persons that could crash

compromise,



g) supply material and equipment needed to combat the disaster.



§ 15



Familiarizing with the accident plan



(1) the Introduction of the employee with the accident plan is a condition of its

inclusion in the workplace under section 8.



(2) the employees referred to in paragraph 1 shall be repeated with every change

emergency plan, which concerns them, but at least once a year.



THE HEAD OF THE FIFTH



DOCUMENTATION



section 16 of the



Operational documentation



(1) before the commencement of the works or activities for which it is so this

the Decree provided for, shall be drawn up appropriate operational

documentation, in particular, the technological process, workflow, traffic

regulations, rules or instructions for operation and maintenance. Operating

documentation approved racing.



(2) the operational documentation must specify the relationship, or concurrency

operations, the conditions for the safe performance of work, the endangered places and

the method of their identification, the means and technology to ensure

work safety and traffic and measures to ensure that the workplace after a period,

After that it does not work.



(3) the operational documentation shall be in accordance with the design documentation,

the requirements of the legislation in order to ensure work safety and operation,

decisions on the authorization or approval of the activity, or

device ^ 23), technical conditions of the manufacturer or supplier of the equipment

or construction and the manufacturer's instructions for operation and maintenance of equipment.



(4) For similar activities may use a type of operational documentation

adapted to the local conditions.



(5) the operating documentation must be in changing conditions without delay

modified.



(6) the staff must be familiar with before starting the work of the operational

the documentation to the extent that concerns them.



(7) the operational documentation shall be stored at the specified location accessible

for employees who are required to comply with it.



(8) operational documentation must be kept for at least one year from the end of

the work. If you work an injury fatal, life

dangerous or strategies, operational documentation must be retained

at least 5 years from the accident.



section 16a



Management works in the underground and the requirements of the design documentation



(1) Management of underground works is permitted only according to the project, which

compiled by mining engineer ^ 24), whose expertise has been validated by the

According to the special regulations of the ^ 13).



(2) the basis for the processing of the project is geological and

inženýrskogeologický survey, which must be processed and evaluated

According to the special regulations ^ 25) before starting work on the project.

The results of geological and inženýrskogeologického of the survey must provide

enough information for the processing of project documentation.



(3) the project must be a risk analysis of the factors affecting the

the safety of the implementation of the work and of the objects in the range of possible influence on

the basis of the overall assessment of the results of geological and

inženýrskogeologického survey. Project splits the rock massif in the

kvazihomogenních units and for each of the units will determine the way of ensuring the

the stability of the excavation, and technological progress.



(4) project documentation also sets out the requirements for the content and scope of the

the geomonitoring, establishes a zone of influence with respect to the induced deformation

the overburden, seismic effects and effect on the groundwater regime.



(5) part of the project documentation is the calculation that models the behavior of the

during the excavation of the rock mass in the kvazihomogenním of the whole with the proposed

way to ensure the stability of the excavation.



(6) the organisation shall ensure regular evaluation of the Geotechnical monitoring with

regard to the eventual achievement of the warning status and early use

set out measures to secure implementation.



§ 17



Inženýrskogeologická documentation



(1) Management of underground works is allowed, if it is processed and supplemented

geological and inženýrskogeologická, which provides the necessary documentation

information about the circumstances in which the work is to be safely conducted. In the case of

prediction of the occurrence of underground caverns, mining and underground works and

other anomalies, which may have an influence on the security in the conduct of

the underground works, it is necessary to their authentication.



(2) Inženýrskogeologická documentation contains in particular information on



and the distribution of the rock mass on) kvazihomogenní units of similar

the properties of the inženýrskogeologických properties of the rock mass, and

Save the rocks due to the face and the face of the excavation, and especially from the

excavation will start at the point of view of deformation behaviour and strength properties, rock,

the quality and the cross-section, the quality of fill cavities and caverns,

cohesion, the danger of the weak and zavalování, throughput,

vrtatelnosti and suitability for anchoring,



(b)) during geological faults, the implied locations with elevated

pressures over the rocks, pokryvných, depth of weathering and surface

underground water, the height of the total and the rock, in the cases

the underground works stored beneath the surface of the shallow data localization

weakened zones in the rock massif with significantly lower structural strength,

about places and leaking effluent water



(c) the recommended parameters of individual kvazihomogenních) units

the rock mass for the calculation of the rock pressure dimensioning reinforcement and

determination method of disintegration and



d) hydro-geological and gas conditions to the extent necessary for the

establishing safety measures.



(3) Inženýrskogeologická documentation contains information about the surrounding area

the underground works into the distance, its possible influence. Information about the area

the underground works must contain detailed information about the seismic and

inženýrskogeologických, about the nature of above-ground buildings,

the surface of the terrain and engineering networks in the range of possible influence

underground work, its status and resistance to manifestations of the excavation.



(4) in the inženýrskogeologické documentation shall contain the facts directly

authenticated, certified or indirectly implied.



(5) If, in the course of the excavation are encountered other inženýrskogeologické

ratios compared to the project, it is necessary to further evaluate these before excavation,

where applicable, make a change to the project or additional inženýrskogeologický

the survey. The scope and content of the additional exploration will determine the mining engineer,

the project elaborated.



(6) Inženýrskogeologická documentation, the continuous excavation

the underground works.



(7) Upon punching must be evaluated the development of deformations at a time by using the

the measurements provided for the project. When you deviate manifestations of the impact of

the excavation of the rock massif, underground work and of the objects in the overburden compared

the assumption listed in the project it is necessary to carry out a reassessment of

provided for measures to ensure the safety of traffic and the objects in the

the overburden. In case of necessity it is necessary to clarify the measures on

the new static calculation.



(8) part of the documentation is the exploration of underground disposal method

works and wells.



section 18



Documentation and records



(1) in addition to the documentation required by specific provisions to ensure

work safety and traffic organisations in activities carried out by

using underground



and the book report, směnového)



(b)) the book of orders and



(c)) the book of checks.



(2) the race to determine where and how they are to be stored and kept books

referred to in paragraph 1 (b). and (c))), and according to local conditions can also

to specify that these books will be merged. Racing may entrust another

employees activities referred to in the first sentence.



(3) the Books referred to in paragraph 1 (b). and (c))) are kept from the date of the initiation of the

work at the workplace, to the date of termination of the activities carried out by mining

in each of the calendar months in a year. The page must be

marked so that it is not possible to renumber or change their

the order. The book must be available at the place of the designated race.



(4) records of supervisory bodies, reporting of data sensors, sensors, and the similar

records for which the regulations to ensure the safety and operation of the

do not require form books, may be carried out in a manner that will allow the

retention and use of data for a specified period of time.



(5) the results of statutory inspections, inspections, measurements and analysis

record the employee who is made. Unless otherwise specified,

records are kept for at least one year.
(6) training, on-the-job training and tests according to the legislation in order to ensure

work safety and operation of the leading organization records.



§ 18a



The book of směnového report



The records in the book of směnového the reporting done by the racing authorized employee

in the appropriate shift; in particular, records of the particulars of the



and the workplace from the perspective of) State work safety and operation,



(b) the time course of activities) in the course of the shift-basic operations; about

Special activities will be conducted separately, records



(c) the reasons for and the time course of) the interrupt and restore the stamping or

for boring work,



(d)) of serious accidents at work, major traffic accidents and

hazardous conditions, if they are not kept separately,



(e)) start time of activity, the implementation of the work and their activities

subcontractors, if these data are not kept separately,



(f)) and the lessons of the staff changes in occupational safety and

safety, if these data are not kept separately,



(g)) and the training of the persons staying in the underground work, with the

conditions of work safety and the safety of operations, if the data

they are not kept separately, and



h) effects of nepředpokladatelných expressions as a result of the excavation, trenching or

carried out blasting works compared to the operational documentation.



section 18b



Book orders



The records in the book commands contain the information concerning the



and the race to remove statements) deficiencies and hazardous conditions,



(b) technical visits to commands) solutions to immediate removal

deficiencies and hazardous conditions,



(c) the race to implement commands) change of project documentation

the proposed responsible Mining Designer, who handled the project, and



(d)) the commands and instructions of a race setting corrective measures to

recorded the results of the Geotechnical measurement.



section 18 c



The book checks



In the book of records of the checks performed by the racing authorized employee. Insert

protocols, or entry of the record must be done in a day

checks. The book documents the checks, in particular data on the



and inspection reports and records), supervisory bodies and their conclusions,



(b)) recommended or recommended operational changes to derogations

project documentation signed Mining Designer, project

processed,



(c) the results of the control activities of the mining) of the designer, the project

processed and which is carried out at least once a week,



(d)) the implementation and the results of geotechnical measurements,



e) unforeseen effects on the surface as a result of the excavation, trenching or

blasting works and



(f) the results of controls carried out by other) technicians.



§ 19



Preservation of documentation



(1) the documentation and records referred to in section 16 and 18 the employer holds

at least one year from the completion of the work for which it is established. If, at the

the implementation of the work there has been a massive, dangerous to life or death

accidents, operational documentation for at least five years after the year in which the

the accident happened.



(2) the documentation referred to in section 17 shall be governed by the Special

14. ^ ^)



PART THE SECOND



MANAGEMENT WORKS IN THE UNDERGROUND AND GROUND REDEVELOPMENT WORK



HEAD FIRST



GENERAL PROVISIONS



section 20



cancelled



section 21



The mouth of the works in the underground and the exits of the workplaces



(1) the race will determine the way of ensuring the mouth works in the underground against the fall of persons,

rocks and objects.



(2) Articles and dredging the rock must not be stored in a manner that allows

fall into art in the underground or its breach of the excessive load.



(3) every workplace must be safely walkable and free exit.



section 22



Protection of underground works, engineering networks and other objects



(1) a project for the management of the underground works under a continuous built-up area shall be defined by

bandwidth expected downturns and indicate the values of permissible declines

building objects and engineering networks, depending on the

the technology and properties of the rock mass. The project also will determine how

and the frequency of measurement of convergence of the excavation at the time of the construction of the cheeks of the underground

the works and their permissible values, measuring the shifts of construction and other

objects; When you use the blasting and measurement of seismic load.



(2) in the space of the underground works of the mined from the surface to the surface ústícího

or maintained by the shallow surface must be measured



and engineering networks and cable) leadership, ^ 15)



(b)), the underground spaces



c) leakage or outflow of harmful substances,



d) construction and other interested objects or archaeological monuments,



(e)) and the nature of the operation distance communications on them and punching may only be

initiated, if verified their status and made the necessary arrangements.

If this fact finds during stamping, necessary

measures or work stops.



THE HEAD OF THE SECOND



MANAGEMENT WORKS IN THE UNDERGROUND AND GROUND REDEVELOPMENT WORK



section 23



Technological process and operating procedures



(1) the underground work must only be conducted and remedial work carried out

According to the technological procedure ensuring safe work procedure.

Technological process must be in accordance with the project under section 16a.



(2) technological procedure shall determine



and the direction and bows) stamping or excavation cross-section of underground works, and



(b) the maximum permissible length of the shot), method and procedure of disintegration

rocks and broken down the face,



c) precautions when punching or excavation of underground work needed

for reasons of proximity to other underground spaces, engineering networks,

cable the management and safety of surface objects in the overburden, including

the design of preventive measures, the stability



d) projected inženýrskogeologické and hydrogeological conditions,



(e)) kind of way, and the period of building reinforcement, its distance and

no more than a holiday, the distance from the face the increasing strength

concrete way the creation and filling of vacant space for reinforcement, the kind of

Provisional reinforcement and provisional reinforcement, substitution rules for cutting

Provisional reinforcement, supply of materials for the reinforcement of, a time limit for the establishment of a permanent

reinforcement,



(f) the method of ventilation of the workplace),



(g) the method of disposal of the dust),



(h)) method of drainage,



I) special measures against inrush fo water or materials zvodněných, breach of

the stability of rock mass around the excavation, or other hazards,



j) mechanical and electrical equipment for stamping, ventilation, reinforcement and

transport,



to the scope and organization of transport) in the workplace,



l) procedure and the continuity of operations,



m) range of the workplace with the definition of responsibilities,



n) personal protective equipment,



about) other measures require the special conditions, particularly in the

expectations of increased deformation of the excavation, making nadvýrubů, opening

rocks from the face and the like,



p) means for safe exit from the pit or the pit and their

the location,



q) to achieve a warning and emergency conditions found within the

the Geotechnical monitoring and



r) distance of the rock, or subordinate headings parallel mined

the underground works.



(3) the annex forms the routing diagram of the cross, where appropriate,

longitudinal cross-section of underground works in designating the location of the equipment and

of transport equipment.



(4) the cave open to the public may only be operated in accordance with the

the operational procedure, which shall determine the conditions for the entry of persons into the cave.

Operating procedure also contains



and emergency) solution



(b)) the scope and content of inspections pursuant to section 6 (1). 5 and 6,



(c)) the measures to fulfil the requirements laid down in the authorisation for the operation,



(d) replacement of lighting sources),



e) equipment, personal lights



(f) ensure a friendly atmosphere) and even with regard to the impact of external

climatic conditions.



section 24



Reinforcement works in the underground



(1) Work in the underground must be vyztuženo so as to avoid falling

rocks. The reinforcement must also prevent the accidental release

the rock mass and its penetration into it, and thus the possible threat

surface objects.



(2) Work in the underground is allowed to mint and leave without reinforcement, if in

There is no danger of him falling rocks or if any deformation

do not endanger objects in the overburden.



§ 25



Stamping and tunelovacími major machine and shields



(1) the Tunnelling and tunnelling machine can be put into operation until after the departure of the

all persons from the reach of the rozpojovacího body of the machine. In the space before the

separating machine, outside the authority of the cases of replacement of cutting tools, maintenance

and in place of the disorders, no one to enter. Before the entry into

This space shall verify that there is no danger of falling rocks and whether it is

the machine is secured against entry into operation.



(2) move the tunnelling and tunnelling machine and the shield is permitted only

If no one is vulnerable to this shift.



(3) in the space where they are fitted with all the parts by ukladače,

the work, which must not be held with planting immediately.



(4) under the working platforms may only be a person, only if they are not there

at risk from falling rocks or subject.



section 26



Stamping extrusion



(1) when the hydraulic unit into operation near the

the hydraulic parts of the machine may keep just the one who controls the machine. When

the face may be offset by just the one who gives the label the lower manual

the device.



(2) in the extruded pipe and in the pit may be carried out when you shift
only by regulating the movement of the work associated with the pipe.



(3) manual grit rock on the face are allowed only in the tubes of diameter

at least 0.8 m. In diameter of less than 1 m is an employee at the face

chained to the precautionary and protected another employee from the place of

inter protlačovanou pipe.



section 27 of the



Tunnelling and large underground works



(1) until the establishment of the permanent reinforcement of the tunnel and "large-volume

the underground works must be allowed and any stability control

obtrhávání sides and ceiling.



(2) Stamping with overpriced adit is allowed only if the

excavation of předrážky used such technology, which would alter the conditions

the coining of the tunnel.



(3) Upon punching in the face may not be articulated improve production of muck from the

upper degrees, no one threatened to lower levels. The current cast

more degrees face is allowed only if it is kept safe

access to them and ensure the stability of the upper grades; the device and the person

must not be endangered by falling or sesutím.



section 28



The use of observational methods tunelovacích



(1) in addition to the requirements defined in section 16a of project documentation in the

the use of observational methods further down



and on the basis of the results of inženýrskogeologického), the survey forecast

the distribution of the rock mass in the route and around the work to kvazihomogenních

units with anticipated behaviour of the rock mass during excavation,



(b) the distribution of the mined section) works to the classes of the excavation under the

implied inženýrskogeologických conditions in the kvazihomogenním

a whole and



(c) the method of editing options), to ensure stability of the excavation in the

technological class of the excavation on the basis of the actual inženýrskogeologických

the conditions encountered during the excavation.



(2) before the commencement of the work shall be evaluated by the project documentation

Professional valuer ^ 26).



(3) Technological class of the excavation shall determine, in particular,



and the method of excavation sequence on) partial excavation,



(b)) maximum distance of each part and the requirements of the rock

on the possible closure of the profile component of the excavation or the whole work in

Depending on the distance from the face, or on time,



(c) maximum recommended length), and the shot of the excavation,



(d) how to ensure the stability of the excavation), including in relation to the time of the excavation face

implementation of excavation,



(e) the method of breaking rock mass),



f) speed of the excavation,



(g)) the maximum expected deformation of rock mass and its effect on the

System lining-rock,



h) warning conditions in terms of ensuring the stability of the excavation, the load-bearing capacity

System lining-rock, the permissible deformation of the excavation and to ensure

the stability of the objects in the overburden. The warning status may be in addition to the values specified

and the expected developments in the monitored variable in time and



and recommendations for the implementation of the accompanying) measures to achieve

the warning status.



(4) Technological class of the excavation must be in the project dokladovány

technical documentation in the transverse and longitudinal section. The anchorage system must

be provides on the developed coat lining.



(5) every shot, including partial excavation of the rock must be included in the

technological class of the excavation by encountered inženýrskogeologických

conditions and on the basis of the results of the measurements. Classification performs

geotechnik and approves the racing.



(6) the extent, type and number of elements of the temporary reinforcements for ensuring the stability of

excavation technology of the excavation in the individual classes must be in the course of the

the excavation of the updated in accordance with zastiženými and inženýrskogeologickými

hydrogeological conditions.



(7) For every shot must be the starting sheet. Racing

provides a way of keeping záběrových leaves, which must contain, in particular,



and the face, chainage)



(b) the time frame)



(c)) the length of the shot,



(d) the method of disintegration and)



(e) the minimum content of elements) to ensure the stability of the reinforcement, especially

Lattice frames, support networks, anchoring, the thickness and quality of concrete,

ensure the stability of the excavation face, overbreak and Grouting.



section 29



Stamping in the frames of the flat steel tunelovacích



(1) the distance of wooden thresholds, which puts the tunnelling, the frames

be not more than 1 m frames are rozepřeny to each other.



(2) the rail must be pulled continuously with the excavation, and it's all over

the circuit works, and presses to the obverse of the excavation, the a-line wedges.



section 30



Stamping of chimneys



(1) the chimney may not have a separate lezní the Department, if it is ensured

the possibility of understanding between staff at the base of the chimney and on the face of the chimney.

Entry into the chimney without prior understanding is disabled. For walk

or drive in the chimney is all the other work of the disabled.



(2) the current work at different levels of the chimney is allowed only if the

When employees are not at risk. Specific measures to

the protection of workers when these works will determine the technological procedure.



section 31



Stamping with driving rigs



(1) the technological procedure specifies time limits and how checks consistency of rocks

of the work and the status of the anchor track driving platform.



(2) the material delivered driving platform may not endanger the persons and

to inhibit the output on the working platform.



§ 32



Digging shafts and wells



(1) the Excavation pit and wells (hereinafter referred to as "the pit") is only allowed

then, if the following conditions are met:



and the mouth of the pit on an inclined) surface is provided so that the withholding

water nestékala into the pit and its surrounding area, nerozmáčela



(b)) in the outer deeper than 5 m is established at a height of 2 to 4 m above the date

protective waste chute. For representing the full landing lezního

the Department. For shafts with a cross-section of 2.5 m2 is possible instead of povalu to establish the full

ohražení ohlubně to the amount of 1.1 m,



c) pit to a depth of 15 m is equipped with at least a fixed ladder.

Pit deeper than 15 m is equipped with a separate Department with lezním

odpočívadly of vertical distance of not less than 5 m. Lezní Department can be

nahraženo vertical ladder with protective basket. In the outer, where you can

When you lean on the wall, climbing is possible from the protective baskets may be waived or

use our ladder. The extraction in the outer cross-section 2.5 m2

the ladder must not remain in the cross-section of the pit.



(2) if it is not lezní from the separation of the hoist area separated by a pažením, is

the current mining and walk people disabled.



(3) the entrance to the pit is disabled, or if the rope is not ready

ladder for safe output.



(4) work in the outer is permitted only if it is on the shaft Bank still

at least one staff member present.



(5) the Pit, which has lost its importance, and the underground work of the impacted her

must be disposed of immediately after the acquisition of documentation. Way

Specifies the disposal project.



section 33



Excavation construction of shafts



(1) a construction shaft deeper than 5 m is allowed on dredge and

to operate only if it is equipped with a separate lezním Department. Lezní

the Department must comply with the following construction requirements:



and) the vertical distance between odpočívadly can be no more than 5 m,



(b) the rail gap separating) lezní from the separation of the hoist area can be

not more than 0.1 m,



(c)) of the structure must provide in all directions with protection against falling into the

depth.



(2) Lezní the Department is allowed to replace the vertical ladder with protective

the basket, which is located at least 0.5 m from the reach of the extracting vessel.



(3) technological procedure will determine the method and means of escape from the

the construction of the shaft and place their storage or location.



§ 34



Excavation, deepening and the reconstruction of the jam



(1) to protect the people on the bottom of the pit must be set up representing protection conducted

under special legislation. ^ 7)



(2) when used to digging, deepening or reconstruction of mining

the device must not be the pit during the work in a pit used for other purposes.



(3) for the excavation, the deepening and the reconstruction of the jam project also determine

the security measures, in particular to protect persons from falling into the pit,

measures against falling rocks and objects and how to fit the worker

povalu.



section 35



Digging in the zvodněných or gassy rocks



(1) the Excavation in rocks, where you can expect sprains or gases,

průvaly or zvodněných of the materials is allowed only after verification

rocks within the specified project or technological procedure.



(2) the provisions of paragraph 1 shall also apply to the excavation, whose bottom is

zpevněno injection or by freezing.



(3) when the dredging and deepening of the jam by freezing shall designate a project or

technological process of special measures to prevent the formation of ice

stalactites in profile pits or measures for their timely removal and

increase the frequency of checks of návěštních devices.



section 36



Excavation pits with předvrtem or with the předrážkou



(1) work on the bottom of the pit without a hedge against falling into the předvrtu or

předrážky is disabled. Project or technological procedure determines how the

ensure, as well as a way to ensure the safety of workers at

improve production under the bottom mouth of předvrtu or předrážky.



(2) the race will determine the way the release and removal of rocks in the blockage of the předvrtu

or předrážky. This work is carried out under constant surveillance.



§ 37



Groundwater remediation work



(1) Groundwater remediation work may only be started up after verifying the status of the
the underground and surface objects and surroundings in the scope of the envisaged

the impact of these works.



(2) Underground space, in which the remedial work carried out must be

properly secured.



section 38



Excavations and Valley



(1) the sides of the excavation must be secured against a smothering when reaching a depth of

1.5 m; in the process, or where rocks can be expected external influences

(for example, seismic strain), from depth 0.7 m.



(2) When zmáhání or making a hole it is necessary to proceed from the

predicted outer edge of the hole to hole, or the center of the

Valley. Measures in case of landslide or forfeiture shall designate operational

the documentation.



(3) it is prohibited to leave the unsecured material under his, than

is the angle of repose of the material.



(4) removal of dangerous převěsů is performed standing.



section 39



Demolition work in the underground



(1) before commencing cutting, it is necessary to define the affected area. This

the space must be secured against the entry of unauthorized persons.



(2) project or technological process of demolition shall determine the measures

against the threat of adjacent structures, and building elements and výztužních

static method to ensure the affected objects.



(3) the demolition work above him are prohibited. Escape route from the workplace

must still be free.



(4) the ceiling construction must not be subjected to over load carrying capacity referred to in

operational documentation.



(5) for leaving the workplace at risk shall be determined by a distress signal significantly

different from the other used signals. With an emergency signal is to be

meet all the employees involved in the demolition works.



section 40



Maintenance works in the underground



(1) access to works in the underground or its part, threatens the status of

the safety of persons is permitted only for the purpose of removal of hazardous

the State, on a written order.



(2) Zmáhací work is carried out according to the routing. His

the development shall not be required, if the control of the crash.



§ 41



The depredations of the reinforcement



When the depredations of the reinforcement of employees may stay in the locked

the area with the free way exit. Other work may only be carried out at the same time

only if you do not endanger the safety of persons.



THE HEAD OF THE THIRD



PERMANENT REINFORCEMENT (LINING) WORKS IN THE UNDERGROUND



section 42



Sprayed concrete



(1) the use of sprayed concrete determined project or technological process,

that includes, in particular,



and production of transport policy and) storing the mixture,



(b) the time limit and method of control) finished the reinforcement,



c) means for protecting workers from flying a mixture,



(d)) the size of the nadvýrubu, which can be zastříkat through the completed reinforcing

network.



(2) reinforcing the networks may not produce a hollow space.



§ 43



Transport and storage of concrete mixtures



(1) the concrete mixture is allowed to transport and store only such

in a way, that the employees were not at risk of zavalením concrete mixtures

or zabořením.



(2) the understanding between the control device for the transport of concrete mixtures

and the place of storage ensures the appropriate alarm. From this it is possible to

waived in the case of mutual visibility.



(3) technological procedure shall determine, in particular,



and how to save and link) pipes, hoses, conveyor belts and other

device for the transport of concrete so that it cannot cause an overload of the

or excessive stress on the reinforcement, rigging, scaffolding, or formwork and

threats to the safety and operation,



(b)) method of cleaning the pipes,



(c)) load hinges of the pipeline taking into account the weight of the full pipe and on

potential impacts.



(4) for transport via a gravity pipeline is each tube should be attached to

equipment or the most rope.



(5) in the transportation of concrete mix must be no creasing of the hose.



§ 44



Formwork



(1) Formwork and odbedňování is performed according to the routing,

which specifies in particular the



and the way to ensure tightness), load carrying capacity and spatial rigidity of the formwork,



(b) the carrying capacity of supporting structures the formwork),



(c)) the minimum strength of concrete, which can be registered in construction,



(d) filling checks) formwork and shoring structures before

the concrete,



(e)) for the inflatable boarding and inspection on the set the internal pressure in the

over the concrete.



(2) when using sliding formwork, technological procedure shall determine



and translating sections and) way of concreting,



(b)) the way the understanding between the place of service and drag the drive station

formwork.



(3) the provisions of paragraph 1 shall not apply to the shuttering of simple elements

or up to 1 m formwork.



section 45



Assembly of stacked lining



(1) installation of lining stacked of building components is permitted only by using the

trimmers. The gate can be used for this activity only in the establishment of

ukladač, the site for the exchange of elements, when fitting the connecting elements and

locking pieces and, in the cases where the total length of the section of stacked lining

shall not exceed 10 m.



(2) the release of the osazovaného element ukladače from the shoulder is allowed only if the

If it is secured against falling. Keep the element attached to the lining of the shoulder

ukladače is prohibited.



(3) when installing the lining by using the windlass must be an element of the lining connect to

rope winch so as to guarantee the security of the connection and handling.

When lifting it is prohibited to transfer control from one winch rope on the rope

the second winch and disconnect cable from the element, which has not been safely secured

against a fall.



section 46



Anchoring and svorníková reinforcement



(1) the Svorníkovou reinforcement is allowed to use only where there is a guaranteed

the required strength of its entrenchment.



(2) the operational documentation will determine the way and time the implementation of controls

load-bearing capacity of bolts in cast and full load.



(3) the Bolts should be mounted from the secured area in the direction of

to nezajištěnému.



(4) the bolts tight at the end of the borehole must foot with washer firmly

the excavation.



section 47



Grouting



Grouting is carried out according to the project or process, which

Specifies in particular the



and the highest injection pressure),



(b)) the place where the operator may keep rigs, to be protected from

the possible effects of the works,



(c) the width of the equipment and the way) the injection needle into the slots in the reinforcement bars

or hole so that it could not pressure the injection mass release,



(d)) way to connect hoses, as well as the way of connection of injection needles.



section 48



The underground walls, drilled piles for reinforcement (lining)



The construction of the underground wall and pile for reinforcement (lining) is carried out

According to the project or technological procedure, which shall determine, in particular,



and the groundbreaking procedure),



(b)) the stability of the walls during the excavation and after its completion,



(c)), after which time the underground wall reaches the required load capacity,



(d) the quantity of materials that) must be in stock available for concentration

the suspension in the range by the work,



e) measures in the sharp decrease in the level of suspension or a borehole,

including measures to ensure the area.



THE HEAD OF THE FOURTH



TIPS



section 49



The waste pile is operated by ^ 16) according to the technological procedure, which shall determine the

in particular, the



and) way to store and subscription,



(b)) the disposal of dust,



(c)) the security measures during the operation of machinery and equipment,



(d)) the stability of odvalu.



PART THE THIRD



VENTILATION



section 50



The composition of the atmosphere



(1) in the works in the underground, in which present or may delay

the person must contain air volume at least 20% of oxygen and

the concentration of the gaseous pollutants shall not exceed the following

values:



and) carbon monoxide (CO) 0.003%



(b)) of carbon dioxide (CO2) 1.0%



c) oxides of nitrogen (nitrozní gas) (NO + NO2) 0.00076%



d) hydrogen sulphide (H2S) 0.00072%.



(2) into the subsoil must be supplied such a quantity of fresh winds to

the composition of the atmosphere has been complied with in accordance with paragraph 1.



(3) the determination of the gaseous pollutants in the atmosphere above the values specified in the

paragraph 1, other inflammable gas or other gaseous pollutants ^ 17)

It is necessary to the operation of the work in the underground stop. The work is possible only

with the consent of the district mining Office.



(4) If the composition of the atmosphere does not comply with the conditions laid down in paragraph 1,

It is necessary to work to mark ban entry or unavailable.



(5) in a cave must be verified by the external influence of climatic conditions on

ventilation.



section 51



The method of ventilation



(1) Works in the underground must be ventilated. The method, the types of equipment for ventilation

the divorce of the winds and the like shall designate the project. The project also addresses cases of possible

ingress of flammable gases.



(2) natural ventilation or by diffusion is allowed ventilate if

You cannot assume exceedances referred to in section 50, paragraph. 1

(a). and (d)).) In other cases, must be set up artificial ventilation.



(3) If a project Is determined by the artificial ventilation, ventilation must be continuously

for the presence of people in the underground. The race will determine the needed time

lead time to start airing before the entry of persons into the underground and measures to

to ensure work safety and operation when the artificial ventilation when

his failure.



(4) in the opening episode of icing, underground or above must

or other means to ensure that the work does not endanger the safety and

operation. Open fire for direct heating of the vtažných winds shall not be

used.



section 52



The main fan
(1) if it is to be the underground work or underground construction of ventilated průchodním

větrním shock and is not intended to pressure the project achieved

Naturally, the fan must be installed to create the necessary

pressure drop (hereinafter referred to as "the main fan"). The main fan has

be equipped with devices for measuring the pressure drop.



(2) before the main fan to continuous operation, or when the

significant change its parameters it is necessary to verify its operational

characteristic.



(3) the main fan and its accessories must be in detail

check at least once a year and clean up as necessary and

mothball.



(4) on the operation and controls the main fan leads the book.



section 53



The divorce of the winds



(1) all the unwanted links in the větrní network to be isolated.



(2) Větrní the door must close automatically. They may not stay open

unnecessarily. As soon as their need to pass away, is to be discontinued, or

in the open position.



(3) where the opening of the door interferes with proper ventilation, it is necessary to build

at least two doors at such a distance that some of them have always been

closed.



(4) in the places where they cannot be built or properly maintained větrní

the door and the leak does not interfere with the distribution of the winds, it is possible to use větrní

simple curtains or doors.



§ 54



Ventilation of separate and compressed air



(1) separate ventilation must be established, if the composition of the atmosphere

does not meet the requirements of section 50.



(2) where it is not possible for technological reasons, such as when using the

driving rigs, during the excavation of the underground works or small-profile extrusions

to set up a separate ventilation, compressed air may be větráno.



(3) a separate ventilation must not be in any place průchodního větrního

stream collected more winds than the leakage rate this větrního

stream.



(4) Ventilation is to be diverted to stroke průchodního větrního stream or on

the surface to such a distance, that used to have not been kept, the winds again

neproraženého the underground works.



(5) control of the first fan separately ventilated underground works is

permitted only from the průchodního větrního or the surface of the stream.



(6) may be Used only from a material plate ducting, which precludes the spread of

fire.



(7) in the face of the underground works separately ventilated, it is possible for

improve ventilation ducting use secondary stroke.



(8) a kind of separate ventilation, the type and location of the fans and dampers

the noise, the kind and the cross-section of the luten including their outlet in průchodního

větrního stream or on the surface, their distance from the face,

lengthening or shortening, stringing, joining and sealing and the way

disposal of the dust extraction will determine project or technological process.



(9) the separate ventilation may be stopped temporarily under conditions which

determine the race.



section 55



Ventilation of underground establishments



(1) Vozovnu mining locomotives, machines with diesel engines,

the electric station, warehouse and the warehouse of explosives studded with flammable liquids

and solid lubricants is necessary to ventilate průchodním větrním shock, or must be

equipped with separate ventilation.



(2) in the Chamber for charging the batteries must not be the concentration of hydrogen in the

the air greater than 0.5%. The requirements referred to in section 50, paragraph. 3 must be

met when exceeding this value. Requires at least

dvanáctinásobná air exchange per hour. If the Chamber is ventilated

separate ventilation fan shall be positioned inside the charging

the Chamber. The operation of the guidance unit must be functionally dependent on the operation of the

the fan.



(3) in the warehouse of flammable liquids and solid lubricants, and in the premises where the

manipulates these substances or gases, requires at least quadruple

air exchange per hour.



(4) Ventilation Chamber with oil transformer or electric

equipment with oil and store flammable liquids and solid lubricants

It is necessary to organize so that testing the winds have already been used to

ovětrávání workplaces.



section 56



Check the composition of the air in the underground



(1) determine the kinds of pollutants, Racing ^ 17) to be detected,

the frequency and location of their discovery. There, where the suspected occurrence of the

gaseous pollutants, it is necessary to always check for them.



(2) the result of the control of the composition of the air in the workplace must be the one who

carried out, to the foreman.



§ 57



Measurement and sampling the air in underground



(1) in all the used underground must be measured at least

once per half a year volume flow and temperature, winds and samples

the air to perform analysis on oxygen, carbon monoxide and carbon

dioxide.



(2) the race shall establish time limits for sampling air concentration

nitrozních gas and carbon monoxide in the places, where it is carried out

blasting, and in places with the operation of diesel engines. Collection of samples

the air is checked at random and the length of the specified waiting period after

the blast and a celosměnový average maximum permissible pollutants in

air. ^ 17)



(3) in the Chamber for charging the batteries it is necessary to once every three months

remove a sample of the air concentration of hydrogen, as also in the

places where there is danger of a buildup of gases, and this at a time when

You can assume their highest concentration.



(4) the analysis of air samples to determine their gaseous components may be

replaced by measuring instruments and equipment permitted under a special

18. ^ ^)



PART THE FOURTH



FIRE PROTECTION IN UNDERGROUND



section 58



Areas with increased fire danger



(1) Areas with an elevated fire danger will determine the race. Always, however,

for space with an increased fire hazard shall be deemed



and work with the underground) flammable reinforcement,



(b)) and the device object above the Yama, or šachticí,



(c)) space machinery and equipment, in which tanks and distribution is more

than 40 l of flammable liquids,



d) warehouse of combustible materials,



(e) establishment of the underground)



(f))-run warehouse of explosives.



(2) Areas with increased fire hazard shall be provided with a table

with the smoking ban that is located before the entrance to this space.



(3) from the underground and out of the area with an elevated fire danger on the surface

must be regularly removed unneeded flammable substances.



section 59



The use of open flame



(1) the use of an open flame is permitted only in the strictly necessary

cases, with the agreement of the race, in a space with an increased fire hazard

danger only on his written order.



(2) a written order to use open fire in place with increased

fire hazards in particular



and the workplace, a place) the type and scope of work,



b) instruments and equipment, with which it will work, and for their

the use,



c) safety measures to prevent the risk of fire,



d) extinguishers, emergency



(e) carrying out checks on the vulnerable) places for work and after its

the end of the,



(f) an employee for the performance of the Standing) surveillance,



(g) an employee of the specified device),



(h) an employee at the workplace) dozírajícího and its surroundings

§ 18.



(3) the Employees designated to perform standing, in addition to monitoring is to be

the obligations laid down in section 8 (2). 3, demonstrably save the obligation to

check before starting work with the open fire meet

the security measures specified in the order for the use of an open flame.



(4) the employee overseeing the breaks on the workplace and the

the surrounding area has an obligation after the end of the work is to ensure that there

There is no danger of fire. Tours of the workplace and its surroundings after

the end of work with the open fire is to be carried out for a period of at least eight

hours, and it continuously or at intervals of not longer than one hour.

In the latest of repeated tours must remain in place using an open

fire extinguishing media specified.



(5) the results of the inspections are recorded in the statement referred to in paragraph 2.



section 60



Benefits in kind means of fire protection



(1) benefits in kind means of fire protection, such as fire alarm,

fire extinguishers, fire extinguisher, it is necessary to keep on alert and

at least once a year check. Shall not be used for other

purposes than for fire fighting and to practice this activity. Used

means it is necessary to immediately prepare for a new use or

replace.



(2) fire-extinguishing equipment and fire extinguisher is necessary to ensure against the

freezing up.



section 61



The deployment of fire-fighting resources



(1) in the establishment, or before entering into it, for each of the stationary

machinery and on a mobile machine, in addition to the equipment and machinery,

air power, and with the danger of fire is a must

place the appropriate fire-extinguishing means. In place of the ventilated průchodním větrním

shock, the fire-extinguishing appliances placed on the vtažné side.



(2) on a single unit may be stored only one kind of fire extinguishers.

instruments. If using multiple types of fire extinguishers,

must be stored separately, and at a distance of at least 5 m apart.



(3) on the surface of underground structures it is necessary to establish a fire warehouse equipped with

the necessary supply of fire extinguishers and equipment for use in

underground. Its location, design, equipment and method of storage determines the
Racing.



section 62



Ensure the fire at the mouth of the initial object of underground works



(1) in a building at the mouth of the opening of the underground works or at a distance of less

than 60 m from him with flammable materials. For storage

does not consider such quantities of these materials, which will be no later than

during the following shift brought into the underground.



(2) If it is not possible, due to the local conditions, comply with the requirements

referred to in paragraph 1, it is possible to store flammable materials in the quantities and

When the measures intended project or racing.



section 63



Fire ensuring the leading works on underground structures



(1) On underground structures shall not be flammable reinforcement jam, galleries and úpadnic

feature on the surface, nárazišť and other works in the introductory works

underground construction, to a distance of at least 10 metres from the intersection.



(2) the building jam, the galleries and the úpadnic, the engine room of the main fan and extracting

the Tower may not be made of combustible material. Must be protected against

Lightning and from all adjacent objects from combustible material

nehořlavě separated.



(3) the project will determine the security measures in the non-application of the fire hatches.



section 64



Requirements for non-reinforcement



(1) where it is provided for the use of flame-retarding reinforcement may not be from

no combustible material elements in addition to the reinforcement, stabling points, inserts

block reinforcement and sills under the reinforcing elements.



(2) the free space behind the reinforcing bar in the place where it is provided for the use of

flame-retarding reinforcement may be filled only fire-resistant materials.



section 65



Transport, handling and storage of gases, flammable liquids and solid

lubricants



(1) in the underground may be, in addition to diesel fuel, stored only flammable

liquid and solid lubricants with a flashpoint higher than 55 ° C.



(2) flammable liquids may be stored only in the underground workplace

the amount of the corresponding consumption in 24 hours, and it's in the hard, tight,

closed and non-combustible containers marked with a warning sign about

the species, the degree of flammability and the quantity of liquid or solid lubricants, and where

There is no accumulation of electrostatic discharge. These containers must be

used only for designated types of substances.



(3) in addition to the place, where according to the operational documentation is necessary for regular

welding, is the storage of flammable gases in other parts of the underground

disabled.



(4) flammable liquids may be přelévány or odčerpávány only on the specified

places.



(5) flammable liquids in the underground may not expel from a closed container

pressure of compressed air or gas, nor to pour from the transport container

into the tank without using a funnel.



(6) the tank and flammable liquids and solid lubricants must not be, with the exception of the

pouring, spillover or a subscription, open, even if they are empty.



(7) the checking and cleaning the inside of the tank on a flammable substance may not be

implement, if not validated, that the concentration of flammable gases in them is

below 50% of the lower explosive limit, and is not to ensure that this limit

will not be exceeded during operation. At work it is necessary to use respiratory

the appliance.



(8) Over or leaked flammable liquid or grease must be

removed immediately. To do this, it is necessary to have the place racing

promptly supply the absorption of the substance.



(9) the used cleaning material is necessary to conclude the incombustible impermeable

the containers and carry from the underground.



(10) the tram and trolley, which transported containers with gases or

flammable liquids may be in the kit, vehicles ranked only on the

the end of the.



(11) the repair of tanks or equipment, which might cause ignition of

or explosion of flammable gases, must be carried out in the underground.



section 66



Requirements for warehouses, gases, flammable liquids and solid lubricants



(1) Inventory of gases, flammable liquids and solid lubricants may have just

waterproof flooring, chemically-resistant storage substance,

progression to emergency sump covered grate. The volume of emergency must not sink

be less than the volume of the largest tank or than the volume of the connected

tanks.



(2) under the valve through which the liquid from the tank pours, it should be

place a tray or other capture device.



(3) the inventory may be equipped with only a fixed lights in the inexplosive design

It is clearly indicated by the switch located on the front of the stock vtažné

side.



(4) the tank cover or base stable and mobile tanks may be of

flammable material.



(5) the Conductive tank, cover, stand and equipment inventory, in addition to

rolling chassis are located on the Rails, must be grounded.



(6) the ventilation openings of the stores shall be fitted with valves tightly

closable, and if the occurrence of a fire hazard do not close

automatically, manipulated from the outside. Before the stock is to be

place at least four pieces of vzduchopěnových or similar small

fire extinguishers and crate with 150 kg of sand or other fire-extinguishing powder

and a shovel.



(7) in the warehouse, or on the door to him must be



and the list of persons authorised to handle) with the substance in the warehouse,



(b) the operational rules of the store)



(c)) the notice to ban the entry of unauthorized persons and the prohibition

work with an open fire,



(d)) book about the receipt and delivery of stored substances,



e) a sufficient number of spare containers carrying flammable liquids.



§ 67



Plastic



Plastic conveyor belts and belts, including the wedge must not

increase the risk of fire or promote its spread.



section 68



The fire in the underground



Immediately after the fire detection must be revoked by any person from the underground. To

the affected works it is necessary to prevent the access of unauthorised persons.



PART THE FIFTH



DRAINAGE



§ 69



Protection against a sudden inflow of surface water



(1) the mouth of the works in the underground and on the surface of the mouth of the boreholes to the surface it is necessary to

to ensure against sudden intrusion of surface water into the underground.



(2) to protect against the sudden inflow of surface water into the underground project

Specifies the



and the method and frequency) of the monitoring and control of surface water flows, water

tanks and permanent water discharges near the mouth of the works in the underground and wells on the

the surface gravity and the relevant territory as possible sources of hazardous

the inflow of water,



b) safety measures for work in the underground, which could be

threatened by the waters from the surface water flows, water reservoirs, boreholes from the surface and

Similarly.



section 70



Work in underground parts of the endangered průvaly water and zvodněných materials



(1) work in the underground in the zvodněných or the plynonosných horizons and

near the mine or underground works with them hydraulically United

or flooded mine or underground works is allowed only if the

If they are verified as far as possible their physico-mechanical and hydraulic

values and the chemical composition of the waters and gases to the extent necessary to determine the

security measures and effective way their early drainage

or degassing. Safety precautions to be determined by the project. This

the measures must be included in the routing.



(2) if in the work in the underground water inrush fo flags or zvodněných

materials, work must be stopped, the affected work under options

and people from the underground immediately revoked. Proceed

in accordance with paragraph 1.



section 71



Zmáhání works in the underground after water inrush fo and zvodněných materials



(1) the method and procedure of zmáhání works after inrush fo water and zvodněných materials

Specifies the routing.



(2) Zmáhání may start only when it is in these works

protect employees, secured the draining of water, zvodněný material

ensure sufficient ventilation of the dewatered, and rescue the path and made

measures against further inrush fo.



PART SIX



LIGHTING



section 72



The lighting in the underground



All works in the underground at the time of the operation must be lit.



section 73



Personal lights



(1) as a personal lighting fixtures in the underground may use only electric

luminaire, the racing.



(2) for the personal status of the fixture corresponds to the one to whom it is issued, and from the

his acceptance into the submission. Taken personal luminaire each before

the entrance to the underground to try and satisfy itself that is not obviously damaged.

If it finds a lamp defects that prevent its safe

the use of, or if there is damage, swapping them for a replacement.

Damaged or unsatisfactory personal lamps must not be used.



(3) every person who is provided with a personal lamp, must have them in the underground when

themselves.



(4) when the manipulations with the explosives, gases, flammable warehouses

liquids and solid lubricants may only use approved personal lamps

type ^ 18) (hereinafter referred to as "mining personal light").



§ 74



Mining personal lamps



(1) Mining personal luminaire may only be issued clean and locked, with the

battery charged to the specified capacity.



(2) Whoever took over the mining personal light, is not open or

fix.



(3) Mining personal light checks specified by the employee at least once

for the three months and shall draw up a record of it.



§ 75



Lampovna



(1) if lampovna Is set up, must have



and space for) delivery and receipt of mine lamps and charging personal

accumulators,



(b)) for the maintenance of the personal space of mine lamps,



(c)) enjoy the hot and cold water,



(d)) and easily washable walls
e) floor waterproof material resistant to the action of the

the electrolyte and the drain pipe to the odtokovému location.



(2) the top plate of the working tables on which to clean and fill mining

personal light fixtures, must be washable and resistant to the action of the

the electrolyte.



(3) it is necessary to ventilate the Room lampovny so that the concentration of hydrogen in the

the air was not greater than 0.5%. Smoking and using open fire in the

lampovně is prohibited. This ban shall be placed on the table inside and

outside the lampovny.



(4) where there is an electrolyte, it is necessary for the provision of the first

assist in the damage to the skin and eyes of the electrolyte and destruction

the electrolyte in a odtokovém place to have a neutralizing solution.

Spilled electrolyte must be immediately removed.



§ 76



Preparation and completion of the electrolyte and charge the rechargeable batteries



The preparation, completion, charging and checking of the electrolyte in the battery

employees must be carried out according to the manufacturer's instructions.



PART SEVEN



CONSTRUCTION AND ASSEMBLY WORK IN THE UNDERGROUND



§ 77



Construction and Assembly work



(1) construction and installation work and the installation of technological structures may be

carried out only by the technological procedure, which contains in particular the



and the time sequence of Assembly),



(b) the conditions of the deployment and movement) of the machinery,



(c)) access road staff



(d) to ensure the protection of workers) and the concerned departments,



(e)) the way to shore, podepírání, anchoring and other stabilization

ensure.



(2) Mounting the protective devices and lifting slings must be before

Assembly and during the controlled. Damaged or defective equipment and

funds may not be used.



(3) the mounting preparations for the temporary securing of parts must not be

removed before the final fastening and surround ztužením prefab

construction.



§ 78



Handling of loads



(1) binding and hanging loads must be carried out by the employee who has been

for this to work zacvičen.



(2) when handling a lifted load for them not to enter or

procrastinate working tools and material.



(3) Under dopravovanými loads or in their vicinity, no one

delay. The person may be closer to the load to its fixing in place,

where it will be fitted with or composed.



(4) the transport and handling of the load is allowed to launch, if

agreed way of communication between who and the burden of, tied between the

all those involved in the transport and handling, and the foreman intended the one who

These controls work.



PART EIGHT



WORK IN THE HEIGHT AND ABOVE FREE DEPTH



section 79



Basic provisions



In the height and above free depth shall be considered as work and movement

employees, which is threatened by falling from a height, depth,

forfeiture or sesutím. In this activity, the employee must be

secured against the fall in the manner prescribed by the code.



§ 80



Hedge against the fall



(1) a workplace and a path for walking and road transport over the water or

other substances where there is risk of damage to health, and on the other from the

height 1.5 m must be taken to protect persons against falling collective or

personal by ensuring, if this Ordinance provides otherwise.



(2) protection from falling from a height of 1.5 m is not required



and if the workplace or path) for walking or public transport journey are on

areas with a slope of 10 degrees, including from the horizontal plane and are

defined (jednotyčové rail clamp height at least 1.1 m

It is not intended to protect against a fall of persons or objects from an increased level of

etc.) located at least 1.5 m from the edge of the fall,



(b) if the work at the workplace) and path for walking and public transport route to

height 3 m, their character and the procedure makes it impossible to comply with the measures

referred to in paragraph 1, if the work will be carried out by staff and poučenými

such a workflow, which employees produce gradually

around the area, from which they can work safely. Technological

the procedure must contain the exact enumeration of activities, which is necessary to carry out

at a distance of not less than 1.5 m from the edge of the fall, and the number of employees,

who can move in this area at the same time,



(c) short-term installation work) when the inevitable for fitting construction

the elements and their mutual merger. These works may be performed from the

consoles, from navařených or other fixed bars, profile

additional stiffening the design or similar land areas

If it is in range of the employee the option of mounting a personal resource

hedge against falling.



(3) at the same time with the procedure work in height must immediately cover all

apertures and cavities, if the dimension of the shorter sides or average

greater than 0.25 m.



§ 81



Collective collateral



(1) when working on the contiguous areas at a height shall be the collective

ensure to beyond the extreme positions of the desktop of 1.5 m

each side. As the definition of the area in the direction of the area can be

use a barrier under section 80 (2). 2 (a). and).



(2) on the desktop with a slope of 10 degrees is carried out collective collateral and

along the edge in the direction of the gradient.



(3) the protection and construction of the facilities, which are the protective railing,

protective fences, scaffolding, the hatch, the capture of protections, capturing the scaffolding and

waste network, must be sufficiently strong and resistant to outside forces and

adverse effects and fitted so as to safely withstand any anticipated

stress.



section 82



Personal ensure



(1) Personal security or safety harness

safety harness when working in the height and above free depth must be

used in cases where you cannot use the collective security.



(2) protect against the free fall is allowed to use only safety

the harness with a silencer stalling power. The height of the free fall may be the most

4 m.



(3) the means of personal protection is allowed to allocate, where to

the use of approved by the State Department. This test should be repeated

at least once every two years, unless otherwise provided in the terms and conditions of the manufacturer.

Functional test of personal collateral is also needs to be done after each

emergency (fall arrest persons, extreme stress, and the like).



section 83



Construction for the raising of the places of work



(1) when work progress to the height must be a place of work and the level of the workplace

increase so that workers can work safely, mutually

no threat and can work in normal working height. For the usual

working height is considered heavy work (masonry bricks and blocks,

handling of loads, heavier tools and the like) to a height of 1.5 m,

for other work (painting, tiling, attachment and bonding

light objects, and so on) to a height of 2 m above the level of the working

the floor.



(2) the ladder must not be used as a prop or the carrier element flooring

scaffolding, ladders, except lešeňových.



(3) to increase the place of work or to use the unstable

articles and items intended for any other use.



PART NINE



ELECTRICAL AND MECHANICAL EQUIPMENT



HEAD FIRST



COMMON PROVISIONS



§ 84



The requirements on the equipment and its parts



(1) the Use is permitted only a device that



and satisfies the operating conditions) in the place of its operation and

the anticipated load,



(b)) allows safe handling, cleaning, maintenance, installation and dismantling,



(c)) allows safe access of employees to places that require access

for the purpose of control, adjustment, cleaning, lubrication and so on,



(d)) ensures that the intended operation is not exceeded the values or

positions, which would result in a threat to the security of the work, or

the operation,



e) excludes the possibility of unwanted marketing the device and its

starting from multiple locations at the same time,



(f)) can't rise to the fire or the explosion of combustible gases and vapours. ^ 19)

the device must not cause an unwanted accumulation of flammable liquids.



(2) on the measuring instruments to monitor the traffic data necessary for the

the safe operation of the device must be marked with the maximum permissible values

the measured quantities.



(3) the portion of the equipment, the material being processed or transported equipment and

working medium, if its movement, energy, temperature, shape or

otherwise threaten the safety or operation, it must be secured

suitable protective devices. If this is not possible, the dangerous part and place

permanently marked significantly.



(4) the Establishment of a technological line must allow the shutdown from

the operating position and of the places where the operator during the operation.

At the same time shutting down the technological line must be automatically stopped

all other devices line against the flow of the material, which could

endanger the safety of work and traffic.



§ 85



Protective devices



(1) the protective device must



and to perform its function) when the interruption of power supply,



(b)) to enable the inspection, lubrication, adjustment, servicing or repair of equipment.



(2) protective cover must be hard.



§ 86



Drivers and signaling



(1) the main driver must be within easy reach of the operator, and allow for disconnecting

the entire device from the power source.



(2) it is permitted to Use a driver that his constructions

excludes the possibility of turning on or off the device and has a
the designation of the position or function, and a device that they control.



(3) signals used in emergency situations must be significantly

distinguished from operating signals and operating noise.



§ 87



Servicing equipment



(1) the operation of the shift is allowed to begin until after operation



and to review the status of the device)



(b)) convince for the correct function of the protective and safety equipment,



(c)) shall check that no one is in dangerous proximity to the device, and if it is not

possible, on the endangered space warning sign as specified in the guidelines for

operation, maintenance and inspection.



(2) where the operator before the start of the operation of a device malfunction or

damage that could impair the safety or operation may not

to operate the device. If it finds such a malfunction during operation,

the device immediately stops and ensure against unwanted entry into operation.



(3) the operational documentation to determine in which cases the service monitors

remove equipment and records.



section 88



Instructions for operation, maintenance and inspection



The employer shall ensure that the instructions for operation, maintenance and inspection

electrical and machinery equipment (hereinafter referred to as "equipment") to ensure the

work safety and operation (hereinafter referred to as "the guidelines"). The instructions shall determine, in particular,



and the obligations of the operator) before the start of the operation in the inning,



(b) the obligations of the operator in the operation) of equipment,



(c)), the time limits range and method of carrying out maintenance, tests, surveys, inspections

and revisions,



(d)) way to ensure the device when its operation, movement,

shut-down of the operation and repair and against accidental start-up,



(e)) the way of communication and giving the label



(f)) and to ensure the device location after their operation,



g) prohibited acts and activities,



(h)) the way and extent of the records about the operation and maintenance of the equipment.



§ 89



Requirements for automatic and remote control



(1) the design of the automatic or remote control must ensure that

Automatic stopping devices, if



and disorder arise) on this device,



(b)) are not complied with specified operating values



(c)) power failure occurs.



(2) the design of the automatic or remote control must also ensure



and disposal of device function) when switched to manual control,



(b) the placing of the device to prevent) the running of the demand valve when you switch on the

manual control,



c) locking of the driver.



§ 90



Pipe



The pipe must be stored, suspended, or otherwise secured against

release or a fall. The pipeline is suspended and each separately on the

the other independently. To hang the pipe must not be used.



§ 91



Diesel engines



(1) if the work of oil engine for longer than 15 minutes,

the engine must be stopped and closed the supply of diesel fuel.



(2) for the oil the engine must be operated at least once a month

perform analysis of exhaust gases on the concentration of carbon

monoxide and oxides of nitrogen. The concentration shall be determined after warm up

the engine to operating temperature, and at idling speed and at

the rated load.



(3) a diesel engine may be operated only when in

the exhaust gases is less than 0.1% of the carbon monoxide and 0.075%

oxides of nitrogen.



section 92



Maintenance, Assembly and disassembly of equipment



(1) the race to decide which cases to draw up a working procedure

for Assembly, disassembly and maintenance of the equipment.



(2) the examination shall be checked, in particular, whether the device including wiring

is not damaged or incorrectly used, whether it is maintained around the device

order and cleanliness, free space for the operator, and whether they are in

the proper state of the protective equipment and extinguishing agents.



(3) the State of the machine at least once every 14 days, validates the tour.



THE HEAD OF THE SECOND



ELECTRICAL EQUIPMENT



Part the first



Requirements for the establishment of electrical equipment



§ 93



Basic provisions



(1) the status of the electrical equipment shall be checked before commissioning.



(2) distribution of electricity shall be drawn in the overview

recipe.



§ 94



Power supply system in underground works and construction works



(1) for the distribution of electrical energy is allowed to use in the underground

works and buildings only



and) isolated system with protection and State guard grounded the insulation

or the use of a residual current device in protection systems to 1000 V,



(b)) system with earthed to the node with the protection of a fast shutdown.



(2) the isolated system distribution to 1000 V and with over 5 kVA is

allowed to operate only with the device for checking the insulation State and

signalizováním decrease in insulation condition under the 15 ohm/phase voltage.



section 95



The grounding system in the underground



(1) protection against hazardous touch voltages, adverse effects

electrostatic and heretic branches streams is ensured

the grounding system. With this system may not associate devices whose

protection is ensured by another in a secure manner.



(2) the grounding system shall be considered satisfactory if



and mechanical strength when the request) is made with bare wire Cu

cross-section of more than 50 mm2 or conductors with a cross-section of more than FeZn 95

mm2,



(b) satisfies the conditions of protection method) before dangerous touch voltage,



(c)) is accessible to Visual inspection with the exception of the ground wires and cables

grounding of structures.



section 96



Location of electrical equipment



Electric equipment in underground must be placed so that they cannot be

damaged and was easily accessible for servicing and maintenance.



§ 97



The electrical station and distribution equipment



(1) in a closed power station may enter only those staff members,

who serve, maintain or control electrical equipment, if

meet the qualification requirements under special legislation. ^ 20)



(2) in the electric station is prohibited storage material before the

an electric switchboard.



(3) a closed electric station is to be equipped with



and a carpet of dielectric) 1 x 1 m,



(b)), dielectric gloves,



(c)), the security tables



(d)), hasebními resources



e) Rescue Hook isolation.



(4) Power Station with the equipment above 1 kV to be further equipped



and a surface tension)



(b)) shorting Kit.



§ 98



Cables and cable management



(1) it is necessary to store the Cable, connect and connect so as not to

negatively loaded or damaging.



(2) Connecting cable in the borehole is not allowed.



(3) to the vertical works in length over 30 m cable stores or runs under

the workflow.



(4) the Coupling and socket connections may only be used for

Mobile and portable cables and must not lie in water and on

muddy places. The two jointed parts must be in aluminium

protected by a cover against mechanical damage and pollution.



§ 99



Mobile equipment cables



(1) For the moving of the equipment must not be used in the join the tractor cable.



(2) Towing cable must be secured against the Rapture of the bushing. Veins

towed cable must not be in vývodce are pulling or torsional stress.



(3) if not used residual current device, such a device shall be used which

during the interruption of the protective conductor automatically disconnects the cable from the tractor

the voltage.



(4) the method of storing the towing cable, control, storage and handling

a towing cable determines the operational documentation.



§ 100



Control and safety circuits



(1) for the control circuits, it is possible to use the isolated system or

jednopólově system linked to the protective conductor.



(2) for the device you specified is exceeded, the position may be

threat to safety or operation, must be



and defining the end switch) the specified position of the force involved in the circuit

or



(b)) two end stops in the control circuit; in this case, must be

one final switch involved in the control circuit of the appropriate drive and

the second in the circuit control switch coil or



(c) intended for a controlled device) programming the processor two end position

in the software.



Part the second



Operation of electrical equipment



§ 101



Conditions for operation of electrical equipment



(1) if the shutdown of the electrical equipment from unknown causes

allowed to turn on the device again until after the findings because of the shutdown and

the removal of any faults.



(2) power supply cable must be disconnected after the end of the work.



§ 102



Nadproudových protection test



(1) Test Method specifies the operational documentation.



(2) the Overcurrent protection device for direct and indirect above 1 kV must be

tested and functionally validated before commissioning and

once every three years.



(3) test and functional verification of an over-current protection shall maintain a record.



section 103



A guard of the insulating State and protectors



(1) how to check the status of the insulation determines the operational documentation.



(2) in the electric network, where the decline in the condition of the insulating or natural

join the guard or the insulation State indicated, shall be immediately

work began on finding the causes and locations of natural links. After a period of

the duration of the natural connection it is necessary to ensure the safety and operation of the

in an appropriate manner.



(3) the accuracy of the insulating State guard features including alarm or

shutdown must be checked once a week.
(4) the guard of the insulating State of power network in the underground may not be disposed

from the operation. If it is not connected to the State guard insulation off secure

electrical network when the insulating State, must be fall

insulating the status indicated in the place designated by the race.



(5) the functions of the earth leakage circuit breaker shall be tested at least once a month.



(6) Electrical network may not be at fault current protectors

operated.



THE HEAD OF THE THIRD



MACHINERY



section 104



Die-cutting machines



(1) in the tunnelling machine tunnelling machine.



(2) the operation of the excavation machines is allowed only when the operation of the protiprašného

the device.



(3) the machine is allowed to run only after a warning sign of significantly

odlišeném from the operating signals and operating noise and after

at least 5, no more than 15 seconds.



(4) the device must be fitted next to the main drivers and driver,

which can be used in emergency situations, turn off the device.



§ 105



Trackless machine underground



(1) for the bezkolejový machine and motor vehicle, cart

a mobile machine intended for the loading and transport and a mobile machine intended for

transport.



(2) Bezkolejový the machine must be equipped with a



and independent) two braking systems, both operable from the

the driver, at least one of which is independent of the engine is running,



(b) brake independent of) the safety running of the engine operating mechanical

means at least on one axle, which can be used at the same time

as a parking brake.



(3) when the machine may only be replaced by the parking brake function

stabilization of the machine on which the nadzvednou of at least one axle

and are fitted with locks; If it is not satisfied, the following condition must be

bezkolejový machine equipped with two podkládacími and wedges.



(4) the operation of the machine is bezkolejového a person shall not delay in range

loading or other work of the institution of the machine.



(5) the Trailer bezkolejového machine must have its own braking system. Trailer

for the transport of persons must not have the brake system start-up.



Section 106



Excavators and loaders



(1) the operation of excavators or loaders are no one in range

the working body of the machine.



(2) the determination of risk must immediately stop the rock

complaints, leave the machine in a safe place and a threat to workers must

be alerted to this danger.



(3) manipulate the shovel or spoon over the cab driver transport

the resource is prohibited.



(4) a shovel or trowel must be cleaned only when the engine is switched off the machine and

in a place where there is no danger to rock. Shovel or trowel

must be placed on a firm surface. The engine after cleaning bucket

or spoon may turn on to verify that the worker who cleaned the

shovel or spoon, is at a safe distance.



(5) the burden of Suspension and handling must be carried out according to the

the conditions of the manufacturer of the machine.



(6) Wheeled machines must be equipped with two podkládacími wedges against the

Re-tighten.



§ 107



The use of earthmoving and construction equipment in the underground



In the underground may be natural and construction machines, used only if they fulfil the

requirements of part nine of this order.



section 108



Mining, rail and locomotives



(1) the Mining railway locomotive must have



and at least two) independent brake systems, of which at least one must

be independent of the engine is running,



(b)), the effectiveness of the service brakes shall be such that the stopping distance

not in the transport of materials of more than 40 m and transport more than 20 persons

m.



(2) Mining lifting locomotive must have



and at least two) independent brake systems, of which at least one must

be independent of the engine is running,



(b)) a speed limiter, in the activities of the safety brake when

exceeding the maximum permissible speed



c) safety brake, whose efficiency must be such that the stopping distance

not more than 15 m and the delay was greater than 9.81 m. s-2.



section 109



Carrier trucks towing and their connecting rods



(1) the connecting rod must have at least a four-headed safety due to

the maximum static load in cross section subjected to stroke and Struts. Eye

and connection instead of the eye with the core trolley or the connecting rod must be

at least six changes.



(2) the connection handle for the transport of persons must not have adjustable length,

color must be distinguished from the coupling handle for the transport of materials and not

use in the transport of materials.



(3) in Conjunction with the handle or push the locomotive must be

secured against unintentional disconnection.



section 110



Stopping trucks towing track



(1) the design of braking the carriage must ensure its automatic braking

when exceeding the maximum permitted speed in both directions of travel. Braking

the wheelchair must be controlled manually.



(2) the effectiveness of the braking device must be such that the stopping distance was longer than the

11 m and the delays in the transport of persons not greater than 9.81 m. s-2.



section 111



Documentation supporting the runway



Documentation supporting the track will determine the requirements to ensure

the safe operation and maintenance, and also determines the



and the location of underground lines) work with respect to the compliance with the established

gaps and passes



(b) the type and distribution of load-bearing) of the hinges and the way their attachment in

underground work



(c)) and the security lines against the lateral longitudinal displacement,



(d)) the deployment of movable stops,



(e)), the type and location of a windlass or a fuel station,



(f) the method and type of label) and the location of the návěštních and communication

the device.



section 112



Mining cars



(1) the clutch or other connecting devices the mining car for the transport of materials

must have at least six changes and safety for the transport of persons, not less than

desetinásobnou safety relative to the maximum static load

the stroke.



(2) the coupling device must not spontaneously disconnect. For the transport of persons

must be used in fixed handles secured against unintentional disconnection.



(3) Car with the front walls, used to manually transport must have the

both front walls protected the handle.



(4) Deformed or worn coupling device must be replaced.



(5) the provisions of paragraphs 1 to 4 shall also apply to other vehicles

transport in underground work.



§ 113



Belt conveyors



(1) prior to the introduction of the belt on the hopper, drive and reverse roller

must be the wipers, side covers and barriers against engaging the extremities.



(2) the Connection of the conveyor belt must not endanger persons and enable the sinkhole

pulp.



(3) Suspension for suspension conveyor lines must have at least four

safety due to the maximum static load.



(4) the Automatically controlled set of belt conveyors must in addition

the requirements referred to in § 89 meet also the following requirements:



and before the conveyor belt into) the running of the opportunity to give the label audible after

the entire length of the conveyor,



(b)) from anywhere to stop the conveyor belt along the conveyor

a means attainable from its construction and identified,



(c) ensure the automatic conveyor stop) in the fail, particularly when

breakage and slippage of the belt, the overcrowding of the přesypných posts and overheating

electric motor,



(d) indicate a dangerous fuel temperature) and the return of the station.



(5) the conveyor must be modified so as to avoid spadávání

the transported material and unwanted friction.



(6) the Dune and the filling station must be constructed so that



and bulk) height was the smallest,



b) dune hřeblového conveyor did Earth pulp under the conveyor,



(c) with the dust generation) was equipped with protiprašným device active

in the transport sector.



(7) when the movement of the conveyor belt rope must have a rope and belt with

a rope of at least double the security given to the largest of the stroke

the towing device.



section 114



Drag conveyors



(1) Hřeblový conveyor, which is not from the site control přehlédnutelný,

shall not operate without návěštních device. Hřeblový conveyor must only be

run only after a warning sign of significantly different from operational

signals and noise, and after a period of at least 5, no more than 15 seconds,

slyšitelném on control points, u drive, return and tensioning station

conveyor, for dune and other dangerous places. The conveyor is

to be equipped with electric locking against accidental startup.



(2) stopping the conveyor shall be possible from anywhere along the

of the conveyor.



THE HEAD OF THE FOURTH



ENERGY AND OTHER EQUIPMENT



section 115



Equipment for the production of compressed air



(1) the conditions for the location and operation of the compressor in the underground of determined project

or operational documentation.



(2) Between the compressor and the vzdušníkem or tlakovzdušným the divorce must be

shut-off valves.



(3) the safety valve of the compressor is to be set up so that after his

the opening of the crossing not permissible operating pressure when

rated power of the compressor for more than 10%.



(4) as the filter of the inlet air compressor may be used only

non-combustible material.



(5) the maximum permissible temperature of the compressed air is 180 degrees (C).



(6) for the cooling of the compressor in the radiator and mezistupňovém dochlazovači may

use water that does not contain flammable or toxic substances, and

mechanical impurities.
section 116



Aftercoolers, separators, air tanks and connecting pipes



Traffic separators, chillers, air tank and pipe

It is allowed only if the requirement for cleaning



and for collectors and chillers) once per year,



(b)) and the associated reservoir for pipe once per three years,



(c)) for the pipe always, when the thickness of the deposits of more than 2 mm.



section 117



Distribution of compressed air



(1) the maximum permissible temperature of the compressed air rozváděného is 60

degrees (C)



(2) the hose and its connections with the piping must be sized to the highest

working pressure, for moving machinery secured against the Rapture of

and must not be sharp bends.



(3) Work on the pneumatic divorce under pressure is disabled.



§ 118



Drills and hammers



(1) when using the drill and hammer drill is prohibited



and the use of electric drive to) the rotation of the drill bit, which stuck in the bore hole,



b) drill blow dust into the air,



(c) disconnect the dust-proof device).



(2) when using the drill guide is prohibited to drill or drilling rod

the hands.



PART TEN



WALK, TRANSPORTATION AND STORAGE



HEAD FIRST



PATHS FOR WALKING AND TRANSPORT



section 119



Paths for walking



(1) A path for walking, for the purposes of this Ordinance be deemed each

space in the basement, which is. Areas, which must not be used

for walking, it is necessary to indicate the entry or the entry ban to prevent

in a different way. The requirements on the path laid down in this part do not apply

to the workplace.



(2) the path for walking, floor, deck, bridge, bridge, the walkway and staircase

as well as the scaffolding for walking it is necessary to establish and maintain a nezavodněné and

to walk along them was safe and that its match

the anticipated load and operating conditions. The path with his more

than 30 must be equipped with handles and the ascension pipes or stairs.



(3) if the transport path intended for walking on the workplace and back again, is

on her at the time defined for such walking mechanical transport is disabled.



(4) on the way with his more than 30 must be carried out at the same time walk

and to the right.



(5) every person who enters the transport path must devote increased

attention to the operation of vehicles.



(6) between the vehicles must go through, just when is is between them in

the direction of movement distance of at least 2 m.



(7) the path for walking at a height greater than 1.5 m and a path along the dangerous

the recesses are to be fixed on the free side of supply and good

under railings with upper handle fitted at a height of 1.1 m and more

the longitudinal bars in approximately half of the height.



(8) the path for walking, led over another way or a place where they can

people, it is necessary to raise the protective Strip on the floor height

at least 0.1 m, if not drop objects from her otherwise prevented.



(9) For walking in the underground with his more than 45, which is not

equipped with těžním or transport facilities, it is necessary to establish a lezní

Department equipped with odpočívadly, which is the vertical distance must not be

greater than 8 m.



(10) all along the lezního of the Department, including the průlezních holes must be

keep the průlezní space of the light measuring at least 0.7 m perpendicular to the

ladder and 0.6 m.



(11) Ladder leading from the lezního Department, starting with the first level

landing may be vertical only to a length of 8 m; from 3 m length must be

used only vertical ladder provided with protective basket with průlezním hole

0.6 x 0.7 m.



§ 120



The dimensions of the paths for walking, transitions and passages on roads



(1) the dimensions of the routes for walking and the dimensions of the passes will determine the project with regard to the

the future use of works in the underground.



(2) the dimensions must be capable of walking, possibly extrication affected when

the accident.



(3) through the conveyor, including the conveyor belt located on the surface, it is necessary to

make transitions.



§ 121



Ladder



(1) the ladder to build so as to cover a hole in the landing and ensure

against slipping or movement. The clear width of the ladder shall be not less

than 0.3 m, the distance between the rungs higher than 0.3 m and free space for

feet behind the bars of less than 0.18 m. Bleed the ladder above the output

opening or platform shall be not less than 1.1 m, if not over them

attached to the same amount the fixed grips.



(2) on the same ladder must not stand out or to descend at the same time two or

more persons and must not be used for carrying or toleration of loads on the

the weight of more than 20 kg.



(3) if it is necessary to set up the ladder, the connection may not be inclined

the distance between the rungs of the ladder nor changed.



§ 122



Traffic routes



(1) traffic along the way, for the purposes of this order means a path for manual

or to the transport of persons or goods. For the horizontal shall be deemed

the traffic path with bowed to 35 mm. m-1, with more of his up to 45

degrees, including, transport routes are úklonné, over 45 degrees to the vertical.



(2) transport routes, which criss-cross or converge, it is necessary to equip the

security device, which can be dispensed with, if it is otherwise

ensure to avoid the collision.



(3) Sudden narrowing of the cross-section of the traffic routes (větrní doors and the like) is

rail transport must be at the machine in time signal touch

předvěštím.



(4) if the traffic passes through a path over another road or a place where

present a person, it is necessary to ensure that no one was threatened by means of

resources, materials or objects from falling.



(5) access to the traffic way, which may not be used to walking in time

transport, it is necessary to indicate the entry prohibition of entry or otherwise prevented.



(6) the Inclined path shall be equipped with barriers against running

or driving cars. Their location and method of operation determines the operating

the documentation.



section 123



Transport routes with the rail tracks



(1) prior to the introduction of mechanical transport is necessary to rail track focus.



(2) the end of rail lines to be secure against driving vehicles.



(3) when machinery transport switches Languages must not be equal; in extreme

positions must be secured by the weight of the heat exchanger, spring, or other

in a way. Remotely controlled switch is necessary to supply the optical control

position. Points may not be placed on the crossing the rail tracks.



(4) the fifth wheel and přesuvnu must be made so that their position was

zajistitelná. The machine must not be operated on the right track

equipped with točnicí, or Union.



(5) the internal side of the arch in the section of the line the Rails where they are mining cars

driven shunting crew or another device, and where could derail, is

to be equipped with the Guide bar.



(6) the crossing of narrow-gauge railways with communications on the surface road

the operation of the vehicle it is necessary to mark the road signs. "^ 21)



section 124



The location of the rail tracks and room for servicing



(1) it is necessary to build a Rail line so as to preserve the spaces



and between the widest parts) that bypass the vehicles on the concurrent

rail lines for at least 0.2 m,



(b)) between the reinforcement (lining), equipment, device, or object stored

the subject and outline the largest vehicles including cargo at least 0.25 m.

In a circular profile, as well as in transport and transport is the manual rope

permitted space required under subparagraph (b)), to reduce the 0.1 m,

not risk catching vehicles or persons.



(2) traffic On the road with rolling lines, where all the lines are

filled with vehicles and vehicles combine or rozpojují manually, it is

to be on one side of each track to leave room for the width of the

at least 0.6 m and a height of not less than 1.8 m.



section 125



Úklonné security infrastructure with rail lines to transport the rope



(1) in úklonné transport with rail lines to transport the rope, in addition

transport podstavníkem, it is necessary to build a movable barrier under the zhlavím,

at the foot of and below the connecting and disconnecting of the vehicles to the cable. When

stamping winzes shall determine the distance from the face of the moving barrier technologies

the procedure.



(2) Distance bolts from the station must allow the bolt when closed

could be on the inclined route running in tensioned rope all

at the same time dopravovaná vehicle.



(3) the Latch under the zhlavím may be operated only from the winch operator

or fuel stations; other barriers control staff.



(4) the winch Operator should have unobstructed views of the place of mounting and

disconnecting the vehicles. If this space is not possible, it is necessary to

establish and ensure a suitable way of communication between the connecting

and dismounting vehicles and servicing unit.



(5) On the foot is to be set up to handle the hiding place from which you can give

the label.



(6) transport in the bow more than 15 vehicles must be equipped with

safety device against overturning.



(7) All with podstavníkovou transport has a protective device

prevents the insertion of vehicles on inclined transport path before it is

podstavník added and secured against movement. The podstavníku must be

lock-off device for vehicles.



(8) If, when the transports the minting work in underground via the dovrchního pulley,

Specifies the way of ensuring the safety and operation of the technological process.



§ 126



The path is suspended track



(1) the Suspended transport may be equipped with only the traffic path, which
load capacity reinforcement and its stability or other fastening bearing hinges

the lines are sufficient and with regard to the means of transport and load

dopravovanými materials.



(2) points and fifth wheel towing track must



and be firmly associated with) connecting the parts of the track,



(b)) to be suspended on the reinforcement of separate curtains,



(c) preclude moving vehicles)



(d) enable the control of settings) of the place of service.

Union of turnouts and the fifth wheel must be secured in extreme positions

to change the position and to enter into neprůjezdnou branch line.



(3) the end of the track the track must be suspended supply stop or fixed

the stop.



(4) Switches the line hanging track control from the point of operation (enclosure

the driver, the conductor's cab, the vrátkaře and the like).



§ 127



The location of the lines suspended railways



(1) the space under the bottom edge of the vehicle must not be less than 0.1 m.



(2) in the handling, including loading and unloading stations, is

necessary to maintain the whole length on at least one side of the room for

servicing at least 1.8 m and a width of at least 1 m.



(3) On the towing line of the runway, in addition to transport an endless rope, it must be

place the movable stop



and zhlavím úklonné), under the track and under the point of connecting and disconnecting

the rope,



(b)) at both ends of the loading, unloading and reloading station and on-the-spot

joining and splitting of vehicles,



(c)) over the workplace when punching in the distance specified winzes

technological procedure of the underground works.

On the places referred to in (b)) is allowed on the horizontal section of the

the line to set up another way to ensure the vehicles against driving.



(4) it is necessary to build a Floating tab so that it could service from

secure unit to control and check its settings. When the transport

hanging the locomotive may be variable the breakpoint to operate from hanging

locomotives.



(5) the distance variable breakpoints under zhlavím at the beginning of úklonné lines

must allow that when closed stop could be on the inclined track

running all at the same time dopravovaná vehicle.



(6) on the track hanging with an endless rope must be

moving tab stops positioned so as to avoid driving vehicles.



§ 128



Traffic routes with conveyors



Space on roads with conveyors in the underground may not be less than



0.8 m) between the structures of the conveyor and reinforcement on the side walk and 0.2 m

on the other hand,



b) 0.5 m above the upper branches of the conveyor and 0.8 m for the transport of persons on the belt,



c) 0.2 m between the lower branches of the conveyor or rotating parts and

počvou.



§ 129



Traffic routes for trackless mining machines, construction machines and motor

trucks



(1) the gap between the reinforcing bar, equipment, object, device or stored

the subject and the outline of the mining machines, building machines, bezkolejového

or cargo must not be less than 0.6 m if the driver or

transported persons protected construction, is this gap from

These persons.



(2) the measures to ensure the safety of the people before by reversing the machine determines the

the traffic regulations.



(3) at the výsypného space is necessary to build up against the passing of the machine to the výsypu

breakpoint, raised edge of sýpu or similar measures, and this space for

operation shed light permanent lighting.



section 130



Infrastructure for transport by gravity



(1) and Slide pipe should be made of the catchment, consolidate and each other

join to avoid fluctuations.



(2) the Slip, the catchment tray is the pipeline and must be equipped



and feed materials) on the side stop enabling their

supply,



(b)) on the drain side of the reliable closure.



(3) the transport equipment must not endanger persons by the fall of the masses.



§ 131



Tour routes



(1) traffic routes and their equipment must be inspected at least

Once a week, designated by the staff.



(2) the status of the traffic routes, where the transport of the person, and its equipment is

must see at least once a day.



THE HEAD OF THE SECOND



To the RIGHT



§ 132



Manual transport



(1) Hand traffic mining car, trolley tracks and suspension manual

bezkolejovým wheelchair is allowed on the horizontal transport way; on

úklonné transport way is to manually transport permitted only a mining cart

Manual bezkolejovým trolley when the bow up to 50 mm. m-1 to 50

m, when a larger bow, up to 85 mm. m-1 only to a distance of 20 m.



(2) ride on the mine cart or trolley suspension tracks, walk in

transport in front of them or let them go free, is prohibited.



(3) Mining truck, towing the cart tracks and hand bezkolejový cart may only be

shipped individually only. The distance between the individually dopravovanými

mining cars or trucks hanging out all track and filling and

both a station must be at least 20 m.



(4) for the větrních door, in the arch, where the view is not free, and on

intersections must go slowly, and in addition to ourselves

by calling, if there is no other warning sign.



(5) the tram, trolley suspension and a manual bezkolejový cart may only be

only push, in addition to transport to the slopes, when the tram and manual

bezkolejový cart can only pull.



(6) the individual mine cars, trucks towing lines or parts of disintegrated

kits may be odtlačovány only if they are at peace, and it just

a lever or grabbing from the side.



section 133



Machine transport



The introduction of the mechanical transport of materials allows a specified employee, the introduction of

mechanical transport persons authorized racing.



§ 134



Transport of loads or excessive weight loads of excessive dimensions



(1) the burden of excessive weight or burden of excessive dimensions

manually or skid and handling may exercise under the processed

operational documentation approved racing only workers with at least

two years experience in transport. The said means of transport may exercise

only in the presence of technical supervision.



(2) Mechanical transport burden of excessive weight or excess burden

dimensions according to transport regulations approved racing may exercise only

workers with at least two years experience in transport.



(3) before handling and transport of the burden of excessive weight or burden

oversized employee must inspect the specified device designed to

handling and transport of the burden of excessive weight or excess burden

dimensions, whether it corresponds to the operational documentation and is not damaged. The result of the

inspection records.



(4) prior to the transport of the burden of excessive weight or excess burden

the dimensions specified by the worker is obliged to check the capacity of the

traffic routes. The result of the inspection shall be recorded.



(5) the operating of the dossier referred to in paragraph 1 and the procedure referred to in paragraph

2 must contain the conclusions of the assessment of the burden of excessive

the weight or the burden of excessive dimensions and elements of the infrastructure,

in particular, from the perspective of the carrying capacity of the substrate used to transport as the transport

the trip, bow traffic routes, the weights and dimensions of the load, stability

the burden with regard to the position of its centre of gravity during transport, the assessment

the necessary bed area of means of transport and the method of attachment of the load,

and to the extent, in order to avoid unwanted movement of the load,

its folding or rolling over.



(6) where it is carried out by transport and handling with the burden of excessive

the burden of excessive weight or size, may not be exercised no

other activity.



§ 135



Transport regulations



(1) the employer shall issue for machine transport transport of procedure, which shall determine the

in particular, the



and) traffic routes, equipment and machinery,



(b) the marking of traffic routes),



(c)) space for loading, unloading and folding, sorting,

reversing and parking of vehicles, pulling and pushing of vehicles,



(d) transport and time period) the stage for walking,



e) vacation burden of individual transport facilities,



f) instructions for connecting and disconnecting of the vehicles and the way to ensure

against unwanted movement of vehicles,



(g)) the way and use the label, their importance and the method of communication

handlers,



h) safety and operating instructions for the transport of explosives, the burden of

excessive weight or dimensions, tools, objects and materials, for

the current transport and walking and to work on the route with a contact

the guidance,



I) means of identification of the accident,



j) ways and means to nakolejení vykolejených vehicles



the method and time limits) the scope of the inspection of traffic routes and their equipment,



l) range of tours of transport equipment before transport.



(2) the Transport Regulations for the carriage of passengers shall determine



and the path for the carriage of persons),



(b)) the deployment of platforms,



(c)) for the stage, for the transport of persons in the workplace and back again,



(d) the conduct of persons) transport,



(e) the number of persons being transported at the same time),



(f) the duties of the crew and the dohližitelů), and mark dohližitelů,



(g) the conditions for the current transport) utensils, objects and persons.



(3) to the right of the injured has precedence over the other.



(4) traffic regulations should be posted on the platforms, at

the operator, in remízách, garages and parking places.



§ 136



The driver of the



(1) the vehicle may only be operated from the driver. From the moving

the driver of the vehicle must not climb and may not leave the transport path without

supervision, if it is not secured against entry into the movement.



(2) the driver shall follow when driving a routes. There is a danger,
reduce the speed or stop. See if the person or vehicle,

that would jeopardise the dims light, warning sign, and accordingly

the speed of the drive. When she meets people who do not have the option to back up to

safe, or if it has to transport the road barrier, must in time to stop. In

driving may be continued only if it is convinced that the next ride anyone

not compromise.



(3) the driver shall give warning signs before the start of the journey, before entering

in the confused place, větrních doors and other confined places and entrance

the platform and station. Before these sites and in the handling of the

seřadišti, the platform and in the loading, unloading and reloading station

must reduce speed in time.



(4) the driver may leave the management of the vehicle just employees, which

zacvičuje.



(5) if the crew member or a staff member designated to handling vehicles

In addition to moving trains, the driver a maximum speed of his walk and

in doing so, it must follow.



(6) the driver at the beginning of shifts they will learn about the condition of the vehicle and records

traffic routes and at the end of the shift makes a record of the condition of the vehicle.



§ 137



Signaling device



(1) the Signaling device is to be set up there, where the operation of the transport

the device cannot reliably communicate with the persons involved in the transport,

and in the case of the conveyor, the operation without návěštního devices may be

vulnerable persons.



(2) the Signaling device must be placed so that its control was

associated with danger, and to do so, in order to ensure the readability

the label for the various modes of transport in one transport route and

Audible even in places from which they are made.



(3) table with a specified label must be located at návěštního

the device. The label "once" can be used as a sign to the

stopping.



(4) to the right in the inning should not be started, if the service of the transport

device not on the correct function of the návěštního device.



(5) before transport the rope must put a label to the location where

the Motorola, and wait on the back label. The operator must

the device to operate the first 5 seconds and no later than 15 seconds after the receipt of the

the label.



(6) traffic path with transport rope must be equipped in such a návěštním

the device, from any location to transport route can be put

label to stop traffic. May be used just such a sound label

to alert you to the opening of transport, which is audible throughout the length of the

the transport route, if it is not replaced by another in an equivalent manner to the designated

in the transport regulations.



(7) manual label giving the lamp with white or yellow light. The importance of the

small label is given in annex 1.



§ 137a



Transport label and předvěští



(1) to the security infrastructure with an engine must be in

places designated by this decree established the label, or předvěští.



(2) a description of the shape, and colour of the label shall be in accordance with the transport

Annex No 2, dimensions and adjustment of each label, including the shape and

the location of the symbols referred to in annex 3.



(3) Touch předvěští (e.g. hanging chains or belts) there shall be established,

where the environment and conditions are preventing good visibility or

the readability of a label, or in the place of the entrance to the narrow sections of transport

the path. Touch předvěští is established in at least two pairs of remote

Apart from 2 to 3 m width the same as the width of the locomotive, the car for transportation

persons, etc.



(4) Návěšť the "Alert" is placed



and in places of insertion of the train) to the end of the station, and all other

handling spaces



(b) before the passage of the train) seřadištěm reloading station wagons, and násypným

the device,



(c)) in places where the traffic path is working, and that with regard to the length of the

the braking distance of a train.



(5) Návěšť "Reduced" or "cross section Tapered cross-section must be located there,

where is the cross-section of the transport routes, especially before the hrázovými or

větrními door or directly on them and in the places of the násypného device.



(6) the Návěšti indicating the intersection of lines, points, sweep, and

the output station must be placed before the means of places designated by the

the transport regulations. The employer provides that turnouts and curve must

be with regard to safety and traffic flow.



(7) Návěšť "be warning signals" must be located where the

carries out work on road transport, at the distance of a specified transport

of procedure.



(8) Návěšť "no entry" closes the transport path or its section for

any mode of transport. In conjunction with the related table with the text can

also limit the traffic on this route only for a specified (defined)

method of transport.



(9) Návěšť "Námezník" is placed on the marshalling yards, rail cars, in the

transhipment stations and tracks intended for the parking of cars.



(10) Návěšť "the cancellation of the previous label" defines the end of the command,

warnings and bans of návěšťmi No. 1 and 5 in annex No. 2.



(11) the label for trolejovou transport shall be placed on the device of the traction

leadership.



§ 138



Joining and splitting of vehicles



Manually may be associated and disintegrated just standing a vehicle track and

suspended transport and only after agreement with the employee, which could indicate the

in motion. Among the vehicles may not enter or hanging between them.



section 139



The right materials and articles



(1) Materials and articles may only be stored to the vehicle only, so that when

loading, transhipment, transport or unloading their

unwanted movement.



(2) materials and objects inlaid with may be stored only so that

not to the clearance and transport routes that there is

danger of tipping over, or fall.



(3) for manual loading and unloading of the vehicle must be secured against

unwanted movement. The vehicle is in motion is forbidden to manually load and

interpreted from him any materials or objects, in addition to the solids.



(4) Manually may be vyklápěno only the standing vehicle is secured against

shifting or tipping over.



(5) to climb on the vehicle or the part when tipping is forbidden.



(6) the Tipping and samovýsypné the vehicle it is necessary to ensure that, when

the transport could not fork out spontaneously or empty and tipping

Flip. Tipping and emptying of vehicles may be carried out only

that fuel was threatened.



(7) transport of radioactive sources in the closed or its carrying

may be present only a person whose activity is connected with transport

emitters. May be transported only in vehicles for the transport of persons, in addition to

belt conveyors. Right into the underground and back shall be carried out as a priority.



§ 140



Work and the Elimination of accidents on roads



(1) a workplace on the traffic the way it should be for the duration of the work of mark

in the manner specified in the transport regulations; This also applies to accidents on transport

the way and its removal. The marking shall be placed at a distance of

enabling the safe stopping of the vehicle arriving at all

approaches to workplace or place of the accident.



(2) work on the úklonné the traffic path must not be carried out if the vehicle

or burden is not reliably secured against driving or removed from the

úklonné transport routes. Reliable is not providing just a rope

winch or rope fuel station.



§ 141



Lifting vykolejených vehicles



(1) the vehicle may be Disturbed and nakolejovat only in the manner and

the resources identified in the transport regulations.



(2) Disturbed the vehicle is necessary to ensure against the driving and at the same time

avoid running the next vehicle to them.



section 142



Transport speed



(1) the speed of transport locomotives may be only in the range of

technical conditions of locomotives and permission to use their type ^ 18) and

State rail tracks.



(2) transport the rope Speed must not exceed 2 m. s-1.



(3) the speed of transport in other mechanical transport may be determined only in the

the range of technical conditions, the permission to use their type ^ 18) and

the status of the transport area.



§ 143



Conditions for carriage of a rope



(1) the rope may only be kept only so as to avoid excessive friction

and when connecting to the vehicle or to the contingencies of the slack could not

capture other vehicles or endanger persons.



(2) the Latch or the variable the breakpoint may be opened immediately before the

the passage of the vehicles, and only for the duration of the transit.



(3) If on the úklonné the traffic road or around the workplace,

that could be jeopardized by one vehicle or vymrštěným

carried material, may be effected only after the shipping

If all persons from these centers resides in a safe

the spot.



§ 144



Operation of winches and fuel and refundable stations for carriage of a rope



(1) the gate and drive and reverse charge station for the transport of the rope must be

place or protect them could not roll the vehicle transported,

the burden or the compensation weights.



(2) the Winch used for lifting loads may be placed just outside the track

the transported load, and equipped with a pulley so that the axis is perpendicular to the direction

the winding of the rope.



(3) the method of mooring winch or fuel station determines the operating
documentation, with the safety of the anchor is at least 1, twice since

the nominal strength of the rope. Safety anchor and winch load

used for lifting loads is doubled due to the load-bearing capacity

a windlass.



(4) the Coiled rope must not be manipulated by hand.



(5) One of the rope winch for the dvoububnového may be used only if the second

the rope secured to the drum so that no one was at risk.



(6) On the drum winch must not transport to stay less than three threads of the rope.



(7) the operating position must be protected against the winch's rope swing when

its possible breakage.



§ 145



Shipping locomotives



(1) to the right train is allowed only if on the front panel

the wall of the locomotive headlight with white light illuminated and the last

vehicle kits or on the back wall of the locomotive, if it is itself, Red

light. If it is set the locomotive pushed, the back of the

the locomotive and the red light on the front wall of the first vehicle luminaire with

white light. When the offset on the seřadišti of light may not be changed.



(2) a mining car may be driven by the side track just in

marshalling yards, and when the "large-volume special car.



(3) Car with long loads must not be included immediately after the

the locomotive.



(4) in a combination of vehicles for the carriage of passengers shall not be classified other

vehicles in addition to the vehicles for the transport of tools; It may, however, be involved

only at the end of the combination.



section 146



To the right of the hanging coaster



(1) the right to the úklonné track hanging tracks must not be launched if the

not each separately dopravovanému vehicle or each kit

vehicles connected to the brake to prevent the trolley vehicle, re-tighten or kits.

When changing the bow line when the transport is to be braking rope trolley

Connect both ends of the rig.



(2) Truck suspension locomotive on the track may only be úklonné if it is

at the end of the set, re-tighten the brake to prevent the trolley connected vehicles

the locomotive being transported. When driving the locomotive itself, whose braking

the system is equipped with a speed limitation device, brake cart may not

to use.



(3) the performance truck transport must not be being phased out of the function.



(4) a person may only be on the úklonné track hanging track Motorola if it is of the

the place of the conductor to allow direct brake kits.



(5) if the lifting equipment part of the carrier, the carriage must be

carried the burden in the raised position.



(6) when using a lifting device, which is the burden of zvedáno or

i started with the core trolley and moving parts track track is suspended,

be a carrier wheelchair at the moving parts of the track to ensure that it

could not go off during handling. The variable part of the track the track must be suspended

in its upper position. Carrier trolley on the fixed part of the line suspension

the track must be secured against rolling off of the track.



(7) for other types of lifting equipment is necessary to ensure that the burden of always

against rolling off of their lifting parts and lifting the part in the end

positions.



§ 147



Transport conveyors



(1) in places where there is a risk of entanglement with moving parts

the conveyor or the fall of materials from conveyor, manual cleaning of the conveyor and is

his running around the disabled. Around the belt conveyors shall not be

left untidy from to the infected materials.



(2) if the conveyor running, not on its design no one

delay.



(3) the Delivered material may be removed from the conveyor belt just behind the rear

the end against the direction of traffic.



§ 148



Right scrapers



(1) to the right škrabákem is disabled in the bow higher than 40 degrees.



(2) the operating position škrabáku it is necessary to protect against the rope swing when

its possible breakage and swipe a spoon against škrabákové.



section 149



Transport by gravity



(1) in the stack and the slip may be released only from the outside of the

safe place as intended.



(2) Work inside the tank is allowed only for standing. To

the stack may enter only after verifying the above certificate of air and

stop filling and improve production. Transport facilities leading to the stack

must be secured against accidental start-up. Inside the stack

may be an employee only if it is protected by two staff from the outside

and strapped a protective harness with a silencer stalling power to

precautionary, still a tight rope. When removing the overhang must not

achieve feet lower than 1 m below the upper limit of the overhang. With

an employee inside the tank must be kept permanent contact.



(3) the Catchment of the pipeline in the pit may not be used for the storage of materials.



THE HEAD OF THE THIRD



VERTICAL TRANSPORT



Part the first



General requirements



section 150



The range of validity of the



The provisions of this section apply to the vertical transport of machinery transport

single-acting devices (hereinafter referred to as "transport device") in vertical works

to a depth of 50 m with bowed from the horizontal plane of more than 45 degrees with the

the speed limit traffic to 1 m. s-1



and with the transport vessel nevedenou) hanging on the rope,



(b)) for the transport of loose hanging loads



(c) with the transport vessel) led by hanging on the rope,



(d)) with the loader hook on a rope.



§ 151



Permit the operation of the



(1) the transport facilities allow racing. The type of the transport equipment must

be assessed oversized lifting equipment technician ^ 8) and if it is

also part of the electrical equipment, the audit technician electrical

device ^ 8)



(2) the Authorization referred to in paragraph 1 shall issue in writing and be determined in racing it range

and the type of operation and the necessary safety measures.



(3) the instructions for operation and maintenance of transport equipment, in addition to

the requirements referred to in section 88 shall determine, in particular,



and the number of persons being transported,)



(b)) the largest permissible load in the transportation of persons,



(c)) the largest permissible load during transport,



(d) the safety measures required) with regard to local circumstances.



§ 152



Book service



All records about the operation, inspection, maintenance, defect reports, inspections and

revision of transport equipment and vertical works are written in the book

operation.



Part the second



Transport equipment and vertical work



§ 153



Mining structure



(1) the Mining structure that is located above the vertical workpiece (tripod, the goat, the tower and the

Similarly,) must be carried out so as to safely shifted all the operating

the load and allow the safe way to remove the transport containers. In

the case of the transport of persons must also allow for safe entry into the transport

container or other structure for the transport of persons, and the output from it.



(2) all parts of the pulleys and sheaves in the mining structure, including their

attaching the required seven times against the largest static safety

load related to the calculated tensile strength of the material. For free

hanging pulley double is required independent of attachment and a hedge against

derailment. The ratio of the nominal diameter sheaves to the nominal

diameter of hoist rope for transport equipment for transport of persons required

at least 20.



(3) the Mining structure must be performed so that above the highest operational

the position of the harness ensure free height that will allow passing

the highest position of at least 0.5 m, without time to hit the

the design or part thereof.



(4) the provisions of paragraphs 2 and 3 shall apply to the transport of the device with an

(loader) hanging on the rope.



§ 154



Drive of transport equipment



(1) Freeze the drive shall be carried out so as to make it solid and should at least

sedminásobnou safety of the largest static load.



(2) if it is to be powered of transport equipment used for the transport of persons,

the load must not exceed 60% of the persons concerned on the load requirements for the

extraction or transportation of the material.



(3) the transport equipment must be fitted with retarder,

that is so effective, for the rest of the drive to keep the largest static

load (superiority) with certainty at least three times.



(4) to invoke the power of the brake retarder you can use weights

or compression spring.



(5) the transport equipment must be structurally adjusted so that

the speed of the hoist rope in vertical work does not exceed 1 m. s-1.



(6) as a drive of transport equipment can be used. On such a

the device is the right of persons is prohibited.



(7) the ratio of the smallest diameter of the winding drum drive traffic

device to the nominal diameter of hoist rope for transport equipment with

transport of persons requires at least 20.



(8) to attach the rope to the drum drive of transport equipment is required

go around at least three windings. In compliance with this requirement shall be

ensured in the largest static loads at least seven times

safety against pulling out of the drum.



(9) the operating position of the drive of transport equipment, if it is not equipped with a

návěštním device must be located so that the operator can monitor the

transport. In the workplace, the operator must be available to the instructions for the operator

and maintenance of transport equipment, and the importance of the label.



(10) the transport facilities with electric cars must be above the highest

the operating position of the transport containers placed the end switch, which when

passing to the relief activities and disconnects the electrical supply

energy.



§ 155



Manual winch



(1) manual winch used for transport must be equipped with at least
Ratchet latch the reporting for the largest-scale static force

at least knock the safety. If it is a manual winch used for

the transport of persons, must be equipped with retarder yet satisfying

the conditions referred to in section 154, paragraph. 4 and the two cliques with a rotating handle.



(2) on the transport device with manually operated winch is the right of persons

permitted only to a depth of 20 m, provided that the gate will

serve two employees.



§ 156



Rope



(1) as the extracting rope is allowed to use little size rope about

diameter of at least 6 mm with the exception of manual transport kladkostrojem, where you can

use only the prescribed by the manufacturer of the rope.



(2) in the case of the hoist rope is required at least ten-fold safety

transport of persons and seven times the safety in the transportation of material to

the maximum static load.



(3) the hoisting rope shall be postponed if the external signs of obvious, that

with its load capacity, in particular the



and if the number of) it has visible broken wires on the length straight

five times the actual height of the winding strands in the rope of 10% of the total carrier

the cross section of the rope,



(b) the rapid increase of faults) wires or quick and significant

lengthening the rope,



(c)) serious damage as a result of loops, knots, corkscrews, extrusion

Inserts and the like, which cannot be removed by cutting the rope.



§ 157



Harnesses



(1) to the rope harness is allowed to use only the corresponding clamp diameter

the rope. Each time must have at least three terminals.



(2) bending radius of cables in the harness to the rope axis measured must not be less than

four times the nominal diameter of the rope.



(3) the safety against pulling the rope from the harness is for the largest static

a load of at least seven times, with the wedge of self-locking harness at least

1, twice.



(4) the provisions of paragraphs 1 and 2 shall not apply to the wedge-shaped locking

harnesses.



section 158



Transport containers, load, and their curtains



(1) when the transport is allowed to use the transport container, which shall ensure the

reliable transport of persons and material. The dimensions of the container must be chosen

so that between it and the face of the excavation, reinforcements or equipment works was

gap at least 0.3 m.



(2) the components of the transport containers, including the suspension of funds must have

at least sedminásobnou static safety against the largest static

the load.



(3) the specific equipment for the transport of persons (work representing, platform,

the seat and the like) must ensure that the person cannot get out of it

and to avoid its capture or flip during transport.



(4) the Hinge must be secured against accidental disconnection from the transport

of the container.



§ 159



Sound label and communication devices



(1) Vertical transport is allowed only if it is part of the

signaling equipment. Signaling devices are not required in the case of

a reliable voice of understanding between units and service

of transport equipment.



(2) the method and significance of the label Specifies the instructions for operation and maintenance of the transport

the device.



(3) the importance of the label:



1 x stand



3 x mining



5 x to the right of the persons



6 x the right material and loads.



(4) the right may commence only after a clear and distinctive label. In the case of

for servicing an inaudible label means the label "State".



(5) a staff member who gave the label, tracks whether the label was correctly

clearly understood. If this is not so, as soon as the label "State".



(6) After the label for the transport of persons or exploitation is prohibited for transport

vessel boarding and stand out from it, store it and interpret it

mass or load.



(7) Where it is not possible to reliably communicate between the unit operator

the transport of the equipment and the operator unit for vertical works, possibly in

vertical work must establish communication between these points for

colloquial understanding.



section 160



To the right in vertical work



(1) the management of transport containers or determine the burden of project.



(2) the ride nevedené extracting the container or the burden of watching the service on the shaft Bank

After the entire length of the runway and directs it as necessary.



Part the third



Operation of transport equipment



§ 161



The conditions of operation of transport equipment



(1) it is prohibited to persons being transported in okovu on its outskirts were

or sitting.



(2) in vertical work is forbidden walk simultaneously with any transportation in

it.



(3) If, during the transport of persons transported material at the same time, for example,

Tools, parts, equipment, reinforcement must be secured so as to prevent

injury to persons.



(4) Transport vessel is filled only to dopravovaná rock could not

fall out, but not more than 50 mm below the upper edge.



(5) the subject matter beyond the edge of the transport container must be appropriately

to ensure that he could not get out and didn't catch on in the transport reinforcement,

equipment or vertical wall works.



(6) prior to the transport of the burden of excessive weight is necessary to verify whether the

transport equipment sufficiently rated, in particular as regards the strength of the

the individual parts. This transport is not necessary to comply with the prescribed

security, safety and space. Prior to transport, and it is necessary to

see all part of transport equipment, which will be or have been

extremely stressed and could be damaged during transport. When this

transport is necessary to prevent the presence of persons under the burden of displacement

or transport vessel.



(7) to the right of the burden of excessive dimensions may commence only after a check

capacity of the infrastructure.



(8) the Opening wall and bottom of the transport container must be securely to ensure

against unintentional opening.



(9) if it is established at the shaft Bank hatch opens just after strictly

the necessary time for the passage of transport containers.



(10) handling moving nevedenou transport tank is allowed

only at a speed of up to 0.2 m. s-1.



(11) the pusher device, bridge and check gates must be while driving

people locked in the open position.



(12) before leaving the transport facilities are the operation of all equipment

required to ensure against manipulation by unauthorized persons.



§ 162



Inspection and review of transport equipment



(1) the status of transport equipment shall be checked daily. Checks, in particular

drive of transport equipment, the status and function of brakes, cables, visually

end function function návěštního switches, equipment, mounting of pulleys,

hoists and rope sheaves.



(2) every six months carried out a tour operated by the transport

the staff of the plant of destination.



(3) if the transport equipment intended for the transport of persons or in depth

vertical works more than 20 m, carries out the inspection referred to in paragraph 2

revision technicians.



THE HEAD OF THE FOURTH



STORAGE OF MATERIALS



§ 163



Storage of bulk materials



When you manually save and remove loose materials may be stored only in

height 2 m When storing and removing solids machine way is

the subscription must be adjusted to the height of the wall does not exceed nine-tenths

the permissible range of loading machines and avoid overhangs.



§ 164



The storage of other materials



(1) structural elements, which are in storage at each other just drift and

do not have a receiver elements that allow a secure grip, or

hanging with the eye, grab handles and the like, may be imposed only on the

supporting documents; the logs and layered documents may not be used.



(2) Glass material may be stored for regular shapes manually to a height

2 m. Glass material of irregular shapes, such as a stone,

irregular shapes, may be in the solid border is straightened by hand just to

the height of 1.5 m.



(3) to the Round objects to ensure the stability may be manually saved on

just to a height of 2 m Pipe and logs is necessary to ensure against the

sesunutí.



(4) Bags the grains may be manually saved only to a height of 1.5

m, when saving the mechanised way to a height of 3 m, the edges of the piles.

to be secured by means of auxiliary equipment or bags stored in a secure

trim and binding, to avoid sesunutí.



(5) the container with the liquid must remain open. May be stored,

the fountain (emptying) the hole is always at the top. Drums and similar containers

may be stored standing in only one layer. Horizontal may be stored

in multiple layers, provided that the individual layers are mutually

stabilized or are stored in a structure ensuring their

stability.



(6) Radioactive heater may be stored only in the premises for this purpose

the designated race.



PART ELEVEN



TRANSITIONAL AND FINAL PROVISIONS AND CANCELLATION



§ 165



The transitional provisions of the



Underground works construction and initiated prior to the entry into force of this order, and

the equipment referred to in the application before the entry into force of this Decree,

can be used if the requirements of the legislation in force

at the time of their initiation or bringing into use. The device must be

at the latest when reconstruction or overhaul brought into line with the

This Decree.



§ 166



Exceptions



(1) the provisions of this Decree, it is possible to derogate on the necessary time

in cases where there is a risk of delay in the rescue of persons or

disposal of significant operational accident (accident) if they are carried out

the minimum security measures.



(2) except in the cases referred to in paragraph 1, the employer may, from
the provisions of § 25 paragraph. 3, § 26 paragraph. 3, § 29. 1, section 32, 33, § 43

paragraph. 4, section 45, paragraph. 1, § 50 to 57, § 64 to 66, § 72, 75, 91, § 92 paragraph.

3, § 95 and 96, section, paragraph 98. 3, § 99 paragraph. 1, section 103, paragraph. 2 and 5, § 105

paragraph. 2 to 6, § 108 paragraph. 2 and 3, § 110, section 112, paragraph. 1, § 113 paragraph. 3 and

4, § 114, paragraph. 2, § 115, paragraph. 4, § 116, § 117 paragraph. 1, § 123, paragraph. 4, §

124 and 125, 127 to 129, § 131, § 142 paragraph. 2, § 153 paragraph. 2 and 3, § 154

paragraph. 1 to 4, 7 and 8, section 155, paragraph. 1 and 2, section 156, paragraph. 2, § 157 paragraph. 3, §

paragraph 158. 1 and 2, section 161, paragraph. 10 and § 162, paragraph. 1 this order to depart

with the approval of the Czech Mining Authority and under conditions set by the

the design of a race proven necessary alternative measures and recommendations

the competent body representing the employees. The proposal shall be submitted

through the district mining Office, and that only in exceptional

cases and provided that the safety will be ensured, and

operation.



section 167



Cancellation provisions



The yield is repealed the Czech Mining Authority no. 7/1987 [21] CZECHOSLOVAKIA, which

issues rules on health and safety at work and safety

operation at work to making natural caves and works to

keeping them in a safe state (reg. in the amount of 18/1987 Coll.).



section 168



The effectiveness of the



This Decree shall take effect on 1 January 2005. July, 1996.



Chairman:



Ing. Bartos v. r.



Annex 1



Manual label



Annex 2



Transport label



Annex 3



Dimensions and edit label



1) section 3 of the CZECH NATIONAL COUNCIL Act No. 61/1988 Coll. on mining activities, explosives and

the State Mining Administration, as amended by Act No. 542/CNR 1991.



1A) Council Directive 92/104/EEC on minimum requirements for improving the

safety and health protection of workers in surface and underground mineral-

the mining industry.



2) Decree of the Czech Mining Authority no. 22/1989 Coll., on safety and

the protection of health and safety in mining activities and

in the activities carried out in the manner of mining underground, in the text of the Decree

No 477/1991 Coll., Decree No. 340/1992 Coll., Decree No. 3/1994 Coll.

Decree No. 54/1996 Coll.



3) section 10 (1). 1 of Act No. 114/1992 Coll., on nature and landscape protection, in

amended by law No 218/2004 Sb.



4) section 6 (1). the CZECH NATIONAL COUNCIL Act No. 61/1988 Coll. as amended by Act No CNR.

542/1991.



4A) section 2 (a). and) Law No 22/1997 Coll., on technical requirements for

products and amending and supplementing certain acts.



§ 133 paragraph 5). 1 (a). (f)) of the labour code.



6) Decree No. 392/2003 Coll., on the safety of technical equipment

and about the requirements for dedicated technical equipment pressure, lifting and

gas in mining activities and the activities carried out in the manner of mining,

as amended by Decree No 282/2007 Sb.



Decree No 75/2002 Coll. on safety operation of electric engineering

equipment used in mining activities and the activities carried out by the

using mining techniques.



7) Decree No 415/2003 Coll., laying down conditions to ensure

safety and health at work and the safety of traffic in the vertical

transport and walking, as amended by Decree No. 571/2006 Sb.



8) Decree of the Czech Office of work safety and the Czech Mining Authority no.

18/1979, which determined the reserved pressure equipment, and provides

some of the conditions to ensure their safety, as amended by Decree No.

97/1982 Coll. and Decree No. 550/1990 Coll.



Decree of the Czech Office of work safety and the Czech Mining Authority no.

19/1979, which determined the dedicated lifting equipment and provides for the

some of the conditions to ensure their safety, as amended by Decree No.

552/1990 Coll.



Decree of the Czech Office of work safety and the Czech Mining Authority no.

20/1979, which determined the dedicated electrical equipment and provides for the

some of the conditions to ensure their safety, as amended by Decree No.

553/1990 Coll.



Decree of the Czech Office of work safety and the Czech Mining Authority no.

21/1979, which determined the dedicated gas equipment and provides for the

some of the conditions to ensure their safety, as amended by Decree No.

554/1990 Coll.



§ 6, paragraph 9). 5 of Act No. 61/1988 Coll. on mining activities, explosives

and on the State Mining Administration.



10) section 7 (1). 4 of the CZECH NATIONAL COUNCIL No. 61/1988 Coll.



11) section 25 of the Decree the Czech Mining Authority no 435/1992 Coll., on mining

measuring the documentation when mining activity and certain activities

carried out using mining techniques.



12) § 24 of the Decree No. 435/1992 Sb.



13A) point 1. 7.4 of annex 1 of Regulation No 170/1997 Coll., which

sets out the technical requirements for machinery.



14) section 12 of the CNR Act No. 62/1988 Coll., on geological works and the Czech

geological Office, the CZECH NATIONAL COUNCIL as amended by Act No 543/1991.



15) Law No 222/1994 Coll., on conditions for business and about the performance of the State

in the management of energy sectors and the State Energy inspection.



Law No 110/1964 Coll., on telecommunications, as amended by law no 159/1971

Coll. and Act No. 150/1992 Sb.



16) Law No. 238/1991 Coll., on waste.



17) Law No 20/1978 Coll., on the health care of the people, the CZECH NATIONAL COUNCIL as amended by law No.

210/1990 Coll., the CZECH NATIONAL COUNCIL Act No. 425/1990 Coll., the CZECH NATIONAL COUNCIL Act No. 548/1991 Coll.,

the CZECH NATIONAL COUNCIL Act No. 550/1991 Coll., the CZECH NATIONAL COUNCIL Act No. 590/1991 Coll., the CZECH NATIONAL COUNCIL Act No.

15/1993 Coll. and Act No. 161/1993 Coll.



Directive of the Ministry of health no. 46/1978 Coll. Hyg. BC. SV. 39

on the hygiene requirements for the working environment (reg. in amount 21/1978

SB.), as amended by Directive No 66/1985 Coll. Hyg. BC. SV. 58 (reg. in > amount

16/1985 Coll.), as amended by Decree No. 74 MZSV/1989 Coll. Hyg. BC. SV. 66

(in the amount of 9/1989 Coll.).



18) Decree of the Czech Mining Authority no 68/1988 Coll., on selected mine

establishments, as amended by Decree No. 53/1994 Coll.



19) Decree of the Czech Office of work safety and the Czech Mining Authority

No 18/1987 Coll., laying down the requirements for the protection against explosions

flammable gases and vapours.



20) Decree of the Czech Office of work safety and the Czech Mining Authority

No 50/1978 Coll., on professional competence in standardization, as amended by

Decree No. 98/1982 Coll.



21) Decree No 99/1989 Coll., on rules on road

roads (road traffic regulations), as amended

regulations.



section 6 and 7 of Act No. 13/1997 Coll., on the road.



§ 10 (1). 2 of Act No. 12/1997 Coll. on safety and the continuity of the

on the road.



22) Act No 360/1992 Coll., on the exercise of the profession of Chartered architects

and the pursuit of the profession of Chartered Engineers and technicians active in the

the construction, in the wording of later regulations.



23) Law No 183/2006 Coll. on territorial planning and building regulations

(the building Act), as amended.



Decree No 104/1988 Coll., on the efficiency of the bearings on the exclusive

permitting and reporting of mining activity and reporting activities

by using mining techniques, in wording of later regulations.



24) section 5b of Act No. 61/1988 Coll. on mining activities, explosives and

the State Mining Administration, as amended by Act No. 184/2011 Sb.



25) Decree No. 368/2004 Coll., on geological documentation.



Act No. 62/1988 Coll., on geological works, as amended

regulations.



Decree No. 369/2004 Coll., on the design, implementation and evaluation

geological work, notification of risk geofaktorů and about how to

the calculation of the inventory of exclusive bearings, as amended by Decree No. 18/2009 Sb.



§ 5, paragraph 26). 1 of Act No. 61/1988 Coll. on mining activities,

explosives and the State Mining Administration, as amended by Act No. 184//2011 Sb.