146/2008 Sb.
The DECREE
of 9 June. April 2008
on the scope and content of the project documentation of transport constructions
The Department of transportation shall determine under section 194 (a). c) of Act No. 183/2006
Coll. on territorial planning and the building code (the building Act):
§ 1
The subject of the edit
This Decree lays down the scope and content of the project documentation for air
construction, for the construction of railways and on the runway, including equipment on the runway, buildings
highways, roads, local roads and public purpose
Communications ^ 1).
§ 2
Project documentation
(1) the scope and content of the project documentation
and buildings for the announcement) air is given in Appendix 1 of this
the Decree,
(b)) air structures for building permit or notification
building construction management summary is given in annex 2 to this
the Decree,
(c)) for the implementation of building air structures is given in annex 3 of this
the Decree,
(d) buildings and structures) on the runway for the announcement of the building is listed in the
Annex No. 4 of this order,
(e) the construction of runways and buildings) on the runway for the issue of a building permit, or
notice in the shortened construction management is given in annex 5 to this
the Decree,
(f) the construction of runways and buildings) on track for the implementation of the building is listed in the
Annex No. 6 of this Ordinance,
g) buildings, roads, motorways, local roads and publicly available
targeted communications for the announcement of the building is given in annex No. 7 of this
the Decree,
h) buildings, roads, highways, local roads and publicly available
targeted communications to issue a building permit or notification
building construction management summary is given in annex 8 of this
the Decree,
I) buildings, roads, motorways, local roads and publicly available
targeted communications for the execution of the project is given in annex No 9 of this
the Decree.
§ 3
The transitional provisions of the
This Ordinance shall not apply to the design documentation prepared before the
date of entry into force of this order.
§ 4
The effectiveness of the
This Decree shall take effect on the 15th day after the date of its publication.
Minister:
Ing. Řebíček in r.
Annex 1
The scope and content of the project documentation of buildings for air report
the construction.
Officially certified copies of the documents certifying the authorization for designing
Air ground equipment, or the approval of project documentation
authorised organisations is part of the project documentation.
Project documentation contains a section
And the accompanying message.
B. Summary technical report
(C) Drawing and part of the Appendix.
(D) the principles governing the Organization of construction.
E. Documents
Project documentation must always be part of and to (E) broken down to
each item that the range of the individual parts must correspond to the
the nature and importance of the building, its location, the building-technical
the implementation, use, impact on the environment and the duration of the
the construction.
The contents of each part of the project documentation
And the accompanying message.
and construction, identification data) name and surname, place of residence
the Builder, business name (natural persons), business name, COMPANY REGISTRATION NUMBER, registered office
the Builder (legal persons), the name and contact address
Designer (permissions, authorization),
(b)) basic data to characterize the building, its purpose and operation, (c))
an overview of the default documents
(d)) territory, building land, property relations,
e) data on the surveys, and the possibilities for connection to the engineering networks,
infrastructure,
(f) General) information on the requirements for the construction, including the requirements
barrier-free use of the buildings belonging to the persons with reduced
mobility,
g) Division of the construction,
h) substantive and time links to the surrounding area and on related investments,
I) estimated period, beginning and end of the construction,
j) compliance regulatory plan, zoning decision. territorial
planning information for buildings pursuant to § 104 paragraph. 1 of the building Act.
B. Summary technical report
1. The territory of construction, architectural and town planning engineering
solution of the construction
and appreciation of the site, buildings), space, an overview of the surveys,
the buffer zones of protected parts of nature, historic building survey
the building, which is a cultural monument, the phenomenon of conservation reserve or phenomenon
heritage zone,
(b)), architectural, and urban art solutions
(c)) with a description of the technical solution of building land and engineering objects
and surfaces, heat technical parameters, properties of building structures,
d) mechanical resistance and stability-pass static calculation, that
the building is designed so that the load on her acting in the course of construction
and use does not result in the collapse of the construction works or a part thereof,
undue deformation, damage to other parts of the construction, technical
the device or installed equipment as a result of major deformation of the
the supporting structure, or in the case of damage which is disproportionate to the scope
the original cause,
(e)) of the construction on the transport and technical infrastructure, solutions
transport, including transport in peace,
(f)) the requirements for final adjustments to the territory, the balance of earthworks,
(g) the impact on the surrounding buildings), buildings and land-information on existing
concerned the protection zones and protected areas, the establishment of new
the protection provided for in the building Act and Act No 114/1992 Coll., on the
nature and landscape protection,
h) ensure the safety in use of the building.
2. Care for the environment and the protection of the health and environmental conditions
and) protection against noise, internal, external,
(b)) and the use of building access solution by persons with limited abilities
motion and orientation, for the visually impaired, hearing impaired, possibly including
the list of specific and selected construction products for these individuals,
(c)) the protection from harmful effects of the construction of the external environment (radon,
aggressive bottom water wandering streams, etc.), the protection and security
bandwidth, or vegetation, editing
(d) the expected security) data on the implementation of the standards laid down for the
protection of the atmosphere and of the noise indicators and their limit
values.
3. the basic concept of fire-security solution
and proof of load-bearing capacity and conservation) the stability of the structure after a certain period of time,
restrictions on development and spread of fire and smoke in the building, construction and distribution
objects into fire departments,
(b) the calculation of the fire risk and the) determination of the degree of fire safety,
the determination of the fire resistance of building structures,
(c)) the assessment of the security requirements of the building fire safety
devices, limit the spread of fire to neighbouring construction or space,
(d) to allow the evacuation of persons and) the animals, allowing a safe intervention units
fire protection.
4. the basic requirements for the Organization and implementation of constructions
5. the solution to the barrier-free use-solution approach and use of buildings
person with reduced mobility
(C) Drawing and part of the Appendix.
Overview of the situation of the building) and its surroundings in the scale of 1:1000, 1:2000,
1:5000, the plot to the cadastral maps,
(b)) total (coordinating) the situation of the building (stopping), usually in the
a scale of 1:500 or 1:1000 or possibly as needed 1:2000, 1:5000 with
showing the borders of the land and their adjacent parcelních numbers, including
land, existing and proposed buildings and civil engineering of objects
networks of technical equipment and connections to network engineering, with solutions
traffic, designating the protective and safety zones,
height dimensions of geological probes, odstupových distance, borders
the construction site, permanent and temporary works, adaptations for persons with reduced
mobility on roads; the changes of the construction, which is
cultural monument, the building in the conservation reserve or in a conservation zone
total (coordinating) the situation of the building (stopping the plan) in the scale of 1:200,
(c) the marking of the network design)
(d)) architectural drawings from a range of professions,
e) plans the foundations, individual floors, roofs, cuts, views,
the facade and other necessary attachments according to professions,
(f) the scale drawing 1): 200, 1:100, 1:50.
(D) the principles governing the Organization of construction.
and a description of the basic solution site), the characteristics of the construction site,
(b)) use of existing objects for the site facilities,
(c) the security of energy and networks) for the construction site and equipment
(d)) position of the surfaces of the equipment
(e) on the construction site, arrivals) transport routes, landfills,
f) requirements in terms of taking care of the environment for the realization of
construction-noise, dust, etc.,
g) ensuring construction site with regard to the safe and a separate movement of persons with
limited mobility,
(h) the period of construction, the term) of the commencement and completion of construction, a brief
the schedule of work and activities, liaison to the nodal points during construction,
and the establishment of conditions for the implementation) of the construction from the perspective of safety and
the protection of health at work.
E. Documents
Observations, opinions and the opinions of the interested public binding
authorities, the results of the negotiations conducted in the course of processing project
documentation, proof that the information was passed according to § 104 paragraph. 1
the building Act.
Annex 2
The scope and content of the project documentation of buildings for air release
the building permit or notification of construction in partial building
the proceedings.
Officially certified copies of the documents certifying the authorization for designing
Air ground equipment, or the approval of project documentation
authorised organisations is part of the project documentation.
Project documentation contains:
And the accompanying message.
B. Summary technical report
(C). The overall situation of the building (stopping the plan)
(D) the coordination of the construction drawing.
E. Documentation structures (construction)
F. Documentation of operational files
(G) the principles governing the Organization of construction.
(H).
Project documentation must always contain part of A to H broken down to
each item that the range of the individual parts must correspond to the
the nature and importance of the building, its location, the building-technical
the implementation, use, impact on the environment and the duration of the
the construction.
The common principles
1. construction project documentation specifies the space, its
breakdown, dimensions and types of structures and technological equipment. It proposes the
Special-purpose, civil construction technical and economic solution, meeting the
the conditions for its implementation, future use and maintenance.
2. Project documentation must
and) be treated in accordance with the terms of the zoning decision or
land use consent
(b)) must satisfy the General requirements for the construction and use of buildings, including the
the barrier-free use
(c)) to deal with changes to current structures of transport concerned and of the
technical infrastructure or connected to them,
(d)) allow access to the building and the technical and economical implementation of the
the construction,
(e)) to be complete, clear, and processed by an authorised person,
(f) include a way to ensure safety) and the protection of health at work on
the construction site.
3. The breakdown of construction on building objects and operational files and their
the designation.
The building is broken down according to these principles
and separately, are considering comprehensive) engineering and technology section
equipment, IE. building objects and operational files,
(b) building and operating objects) files to indicate the number and the name,
(c) construction and operation objects) files are divided into parts labeled
number sequence according to their nature, the way and the kind of discussion
documentation and purpose during construction implementation,
(d)) according to the nature of construction it is possible to create a separate group of construction
objects, and separate group operating files or associated with
operational files for building objects.
4. For sorting and numbering of parts applies the following basic breakdown
Number sequence Group parts
100 architectural-construction
200 Statics
300 Disabled-technical installation
400 heating, cooling
500 air conditioning
600 system, control of technological processes
700 electro-heavy-current distributions
800 Electric fire alarm system, evacuation
900 Electro-weak-current wiring
1000 security systems
1100 Elevators, escalators, travelators
1200 Gastronomy
1300 Interior
1400 Built fire equipment
1500 Forced heat and smoke
1600 waste management, cleaning
1700 Natural heat and smoke
Free 1800 series parts
1900 Free series parts
2000 information system
Fitness sorting of parts into each series depends on the nature of the construction,
the importance of the objects from the perspective of the whole construction and other circumstances. Free
many of the parts is reserved for any kind of object, which is not possible or
appropriate to include in the previous series.
5. If the client Asks for a building permit, gradually to buildings
the file contains the project documentation of the first construction of the overall situation
(urbanistic plan) file structures, including construction sites.
6. In the case of the planned transformation of the construction contains the overall situation
(urbanistic plan) indicate the range of the individual stages.
7. The overall situation of the construction and main constructional drawings (in particular plans,
the cuts, the street facade) in the implementation of providing stability
printing.
The contents of each part of the project documentation
And the accompanying message.
construction, identification and) name and surname, place of residence
the Builder, business name (natural persons), business name, COMPANY REGISTRATION NUMBER, registered office
the Builder (legal persons), name and surname of the designer, his
the contact address, the number under which it is registered in the register of authorized
persons, led by the Czech Chamber of architects or the Czech Chamber of Commerce
engineers and technicians working in construction with the declared
scope, where appropriate, the specialization of its authorization, and basic
characteristics of the building and its purpose,
(b) information on the current usage) and the fact that the territory of construction land
and the related relations,
(c) information on the surveys), and a connection to the public transport and the technical
infrastructure,
d) information on the compliance with the requirements of the authorities concerned,
(e) General) information on the requirements for the construction, including ensuring
the barrier-free use of the buildings,
f) data on compliance with the conditions of the regulatory plan, planning,
where appropriate, the planning information for buildings pursuant to § 104 paragraph. 1
the building Act,
(g)) and the associated time-binding and contingent upon the construction of the building and
other measures in the relevant territory,
h) estimated period of construction, the term start and completion of construction,
including a description of the procedure of construction,
I) statistical data on the indicative value of the construction of residential, commercial,
protection of the environment and the other in thousands of CZK
j) data on the floor of the residential building or residential area in m2, and the number of
apartments in residential and non-residential buildings,
for information on the implementation of the law) set the standards for the protection of the atmosphere and
noise indicators and their emission limit values in accordance with Act No. 472/2005
Coll., on the protection of the air, and Act No. 258/2000 Coll., on the protection of the public
health, and Decree No. 523/2006 Coll., laying down the values of noise
indicators in relation to the surrounding buildings.
B. Summary technical report
1. Town Planning, architectural and engineering solutions
and evaluation of the site for) changes in finished works, also the evaluation of the
current state of construction, structural and historical survey of the building,
that is a cultural monument, is a monument in the reservation or the phenomenon of conservation
zone, urban planning, architectural and art design, technical solutions
with descriptions of the buildings and civil engineering structures and external areas
the proposals of the green vegetation planting, editing,
(b) building on the transport) and the technical infrastructure,
(c) transport solutions, including solutions) traffic,
(d) compliance with the conditions laid down for) design of structures on undermined
and svážném territory
(e)) the influence of buildings on the environment and its protection, solutions
(f)) solution of infrastructure (technical and transport equipment) and connection
construction on the transport network and the network of the technical equipment of the territory,
g) compliance with the requirements by specific provisions,
(h) the Organization and safety of the construction site) in terms of the protection of the public
interests,
compliance with the conditions laid down, even) by the concerned authorities in accordance with the Special
regulations,
j) surveys and measurements, their evaluation and integration of their results to the
project documentation,
the basis for determining the building),
l) Division of the construction on the individual building and engineering objects and
technological operational files
the impact of the construction on m) of the surrounding land and buildings, the protection around the building before
negative effects of traffic construction during the execution of the project and its
complete, or minimize, by specific regulations,
n) way to ensure the protection of the health and safety of workers, if it is not
listed in the principles of organization of construction.
2. Solutions to mechanical resistance and stability of the construction
Pass the preliminary calculation of the static that the structure complies with the basic
requirements for the mechanical resistance and stability in accordance with Council directive
89/106/EEC.
3. The solution from the standpoint of fire safety
and the essential requirements for) the determination of building solutions construction and siting
in terms of fire safety,
(b)) limit the spread of fire to neighbouring construction,
(c) the indication of the volume and area) parameters of buildings with regard to their
equipment fire-safety equipment and emergency and solutions
escape routes.
4. Ensure the protection of health, healthy living conditions and the environment
environment
and the impact of the construction on) environment,
(b) the implementation of the conclusions of the EIA),
(c)) meet the essential requirements on the siting and construction of building solutions
the protection of the population and the implementation of the directive of the European Parliament and of the
2002/49/EC of 25 November 2003. June 2002 on evaluation and management of environmental noise
the outdoor environment.
5. Ensure the safety in use of the building
6. Protection against noise
and) data on predicted noise situation with the use of a noise
indicators,
(b)) the presentation of noise maps illustrating the exceedance of limit values
noise indicators and sophisticated maps on which the current situation
compared with various possible future situations.
7. Energy saving and heat protection
8. access and use of the Solution of the construction of persons with restricted mobility
motion and orientation
and communications solutions and policy) areas for the motion and visually impaired,
(b) policy inputs and solution) in the object for the physically and visually
people with disabilities,
(c)), or a solution of the health policy. and further background for the motion
people with disabilities,
(d) the principles of editing solutions) for the hearing impaired,
(e)) and selected list of special construction products for people
with reduced mobility.
9. protection of the building against the adverse effects of the external environment
Radon, aggressive water, seismicita, mining, trade and
safety zones.
10. Civil Engineering
and drainage of the territory)
(b)), water supply,
(c)) energy supply,
(d) transport solutions)
e) electronic communication.
11. production and nonproduction technological equipment of buildings (if in the
the construction of the present)
and the purpose, function,) capacity and the main technical parameters of technological
the device,
(b) a description of the technology, production)
(c) information on the number of workers),
(d) energy consumption data),
(e) the balance of raw materials, materials) and waste,
(f)) water management,
(g) transport solutions)
(h)) and protection of the working environment.
(C). The overall situation of the building (stopping the plan)
1. Contains, in particular,
and the planimetry and altimetry) territory of the construction and its nearest
the surrounding area, including the land register and putting height and coordinate
the system,
(b)) position and height of the designation of all the existing buildings and their
parts, IE. including underground engineering networks and other covered
the device according to the data provided and certified by their Manager, and including
the names of the streets and the other named spaces
(c) the plot to the cadastral maps),
(d) the circumference of the building and designations) temporary circuit construction site outside the territory
the construction,
(e) the designation of the areas of the land) vyjímaných of the soil and of the forest fund, with
a resolution of the permanent and temporary annexation,
(f) a designation of the demolition and cancelled) underground or above-ground
engineering networks, any felling accrued Green
(g)) position and altitude of the designation of the proposed construction, including its
the connection to the existing buildings and their parts, any realignment
underground or above-ground pipelines and the newly proposed Green, with
its basic dimensions that specify the position and size of the proposed
development activities in relation to the marking of the networks,
h) modifications for persons with reduced mobility on
communications,
I) designation of protection zones,
(j)) the designation of the probes carried out by the geological survey.
2. The overall situation of the building shall be made generally at a scale of 1:500,
exceptionally, in the scale of 1:1000. For separate cases of large structures
and for large scale construction of the liner shall be used appropriate to the nature of
These buildings, usually 1:2000 or 1:5000, for changes of construction, which is
cultural monument, the building in the conservation reserve or in a conservation zone
on a scale of 1:200.
3. Graphical processing of the overall situation of the building must be carried out in a manner
the corresponding competent CSN and allow unambiguous resolution
the proposed construction of the plot from the plot and the existing State of the
the designation of the other data, which are part of the project.
(D) the coordination of the construction drawings.
and the expression of the proposed relations) emphasizes the construction and especially
engineering networks, or outdoor technology and other distributions
the resulting development of the territory and the relationship between the utility networks or
any other distribution to each other,
(b)) characterized by way of utility networks crossing each other and with the other,
mainly engineering, objects, including required protections,
(c) the dimensional and positional) refines, also marking the height of the
data,
(d)), in the identical processes scale with the overall situation of the building, to which the
usually translates to printing.
In construction with a simple technical solutions details
coordination of the relations expressed directly in the overall situation.
E. Documentation of construction objects
1. Land (building) objects
1.1. The architectural and engineering solutions
1.1.1. Technical report
the purpose of the object),
(b) the principles of architectural, functional), layout and art
solutions, including solutions for access and use by persons with restricted object
mobility,
(c) special-purpose units (capacity), utility area, the premises,
built-up area), object orientation, lighting, sunbathing,
(d) the technical and structural design) buildings, its justification in relation to the
the use of the object and its desired service life,
e) heat technical characteristics of building structures and fill the holes,
(f) the method of establishing object) with regard to the results of the geotechnical and
of the survey,
(g) the effect of the construction) (object) and its use on the environment and the solutions
any negative effects,
h) transport solutions.
1.1.2. Drawing part
and floor plans in bases), scale 1:200 or 1:100 is shown by plotting their
the design, location, shafts, ducts, fittings of engineering course
networks and their height, groundwater solutions, design, insulation
against the bottom of the water or natural moisture as needed,
(b)) plans of individual floors and roofs in the scale of 1:200 or 1:100,
expressing architectural and construction solutions in the chosen design
the system with its basic dimensions of the rooms, spaces, and the main
construction, the dimensions of the elements, for the panelling of the ground plan of the roof position
gutters and downspouts and designating the technical equipment of buildings, including solution
sanitary and other facilities for persons with reduced mobility
the orientation of the plot, including sound leadership for the visually impaired and
drawings of details and sound leadership, haptic
c) cuts in the scale of 1:200 or 1:100, with schématickým showing the load bearing
construction, height dimensions of individual floors, entrances, adaptations of the original
I modified the field, related to the elevation of the first above-ground
floor,
d) ceilings schematically documenting the total architectural solutions with
showing the architectural elements such as balconies, balcony, Bay Windows
etc.,
(e) proposal on public connections) of the distribution network and sanitation,
(f) a proposal for a connection to the public) communication, traffic solutions,
g) drawing in the scale of 1:100 or 1:200 modifications to communications for persons
with mobility or Visual impairment,
h) additional drawings, where the character of buildings requires (perspective,
axonometrie, panoramic views, etc.), processed on special
the order.
The building, which is a cultural monument and building in the conservation reserve
or in the conservation zone, according to the letters and drawings) to c) processing in the
scale of 1:50.
1.2. Building components
1.2.1. The technical report
and a description of the proposed design of the system) of the building (the object). Description
and evaluation of the current state of the support system of the construction (of object) when
the draft amendments,
(b) the quality of the materials and dimensions) of main structural elements,
(c)) usable values, climate and other loads anticipated when
the design of the structure,
(d) a special warning,) unusual construction, construction details,
technological procedures, etc.,
e) technological conditions of progress of the work, which could have an impact on the
the stability of your own design, or construction of adjacent structures,
(f)) for the implementation of the demolition policy, podchycovacích work and consolidation
structures or penetrations,
g) control requirements zakrývaných construction,
(h) a list of the supporting documents, standards), literature, used software, etc.,
I) requirements on the scope and content of the documentation for the implementation of the construction
(object) and vendor documentation.
1.2.2. Drawing part
Show separate schematic drawings, if not enough data in the
technical report, or view the load-bearing structures in construction
drawings (plans and cuts)
and) basics (flat, depth),
(b)) the shape of monolithic concrete structures,
(c) report tracks drawing parts) prefabricated concrete structures,
(d)) the report of the metal and the drawings of wooden structures, etc.
1.2.3. Static. dynamic calculation
and the underlying conceptual solution) validation of the structure,
(b) the assessment of the stability of the structure)
(c)) the main elements of determining the dimensions of the structure, including its
the establishment,
(d)) dynamic static calculation (if the construction works of the dynamic
stress) that verifies the stability of the structure and the load carrying capacity of each
the proposed elements, including the establishment of the.
1.3. Fire safety solutions
1.3.1. Technical report
and a description and location of objects),
(b) the Division of objects into fire) sections,
(c) calculation of fire load) and the determination of the degree of fire safety,
(d)) the calculation of the fire resistance of building structures,
e) character of the escape routes, the assessment of their widths and lengths,
f) distances of buildings,
(g)) the requirements for the scope of the fire water supply,
h) number and placed fire extinguishers,
I) fire protection design requirements on the projects of other professions
(fire alarm, air conditioning, etc.),
j) access roads and entrance area.
1.3.2. Drawing part
Drawings show only for buildings, where fire brigade
It will require.
and the designation of fire sections,)
(b) the designation of the structure, resilience)
(c)), the design fire closures
(d)) proposal for a means of escape,
(e)) the location of fire hydrants, fire extinguishers, stable extinguishing
devices (sprinklers),
(f) proposal for electric fire alarm system),
g) design of emergency lighting,
(h)), the design of the fire ventilation
I) solution entry intervention areas.
1.4. The technique of environmental engineering
Process separately for each device and is usually broken
on
and equipment for the heating of buildings),
(b) equipment for the cooling of buildings),
(c) air conditioning) equipment,
d) equipment for measurement and control
(e)) device disabled the technical installations,
f) gas installations,
heavy-current electrical engineering equipment g) including lightning rods,
low-voltage electrical equipment) (including sound system
guidance and information for the visually impaired).
1.4.1. The technical report
Basic information according to individual types of equipment
and heating is noted) for the balance of the needs for heat, with indication of the heat-carrying medium,
the method of connecting to a custom source or on the outdoor divorce, a system
the regulatory equipment; justifies the choice of the heating system and training
warm and hot water.
b) boiler rooms and transfer station-technical report contains a balance of
the needs for heat, hourly and annual balance needs fuel and raw materials
hourly and annual, dimensioning of all machinery (boilers,
pumps, boilers, heat exchangers, etc.), dimensioning, determination of the number of
the labour force, the principles of control and measurement and indication of the requirements for the
ensure the care of the environment, work safety and fire protection.
(c) equipment for the cooling of buildings)-contains a basic guide
information about each of the internal distribution and equipment, their
the basic dimensions and wiring, a description of the location of the appliance and the cold end
elements, requirements for the construction and solution of some special
areas such as engine cooling, outdoor equipment allocation
cooling systems, transfer stations, the heat engine of a divorce,
switchboards and control stations.
(d) air handling equipment-lists) basic data (parameters
outdoor and indoor environment, characteristics and concepts
the proposed device, the default background for the dimensioning of the equipment),
Description and function of air conditioning equipment and their operation, the requirements of
on energy and the media (electricity, heat, cold, steam, water), overview
the proposed performance and balance energy consumption, the proposal for the protection of health and
protection against noise and vibration, the fire safety solutions
air-conditioning equipment, how to protect the environment, the way
ensure safety in the implementation and subsequent operation of the equipment,
measurement and control equipment-enter a brief description of each
circuits, their functions, the characteristic data of measured and controlled
the media and the characteristics of the traffic and the environment, the default parameters for the
the calculations of the device and regulation.
e-Health technical installation) documentation needs of the water balance,
domestic hot water, the quantity of sewage, the operating conditions (pressure,
speed, conditions for connecting on the outdoor network), a description of the situation with the
the location of the object with the výškopisem in absolute dimensions, position of the
engineering networks.
(f)) for gas devices balance the needs, the number of connected appliances
operating conditions on the outdoor network, connection type and pressure of the gas
media, the media, the operating pressure balance of gas consumption, a description of the billing
and a secondary gas sampling measurement and its regulation, including
parameters measuring and regulatory devices, a description of the technical solution
(description schema), and pipeline routes in the building.
(g) for high voltage electrical device) are given operating data for
the individual spaces, energy balance is installed and the maximum
contemporary input, how to connect to public electrical distribution
energy, the kind of lighting with data on the intensity; in the case of low-voltage
wiring, switches and switching States description and justification of the concept
solutions for Lightning indicates the technical report, a brief description of the device,
How to perform with an indication of the local uzemňovacích conditions.
(h) low-voltage electrical equipment) for a description of how the technical
the solution in terms of the requirements on the way and the character of the distribution, the
How to store the cable line to the construction techniques, types of
the proposed equipment.
1.4.2. Drawing part
It contains only the basic orientation of the individual schemes of internal
wiring and equipment, their basic dimensions and the leadership, on any
location of fixtures. Requirements for the construction and solution
some special areas such as boiler rooms, heat exchange stations
switchboards, switches and control stations, whose layout is
usually part of the drawings of the building part.
1.4.3. calculation of
The necessary calculations, thermal, acoustic, lighting, insolation,
etc.
2. Engineering objects
This category includes bridges, tunnels, subways, culverts,
hydrotechnical and hydro power objects, communication vehicle, pedestrian,
operating areas, parking areas and parking, the preparation of the territory,
landscaping, green areas, playground, civil engineering (water supply, sanitation,
gas, heat distributions, collectors, including connections engineering
networks), external heavy-current distributions, public lighting and additional engineering
objects, which are addressed again as a separate project documentation
in the following sections.
2.1. The technical report
and engineering, object) with a description of its functional and technical solutions,
(b) the requirements on equipment)
(c)) the current engineering networks,
(d)) on the relationship mode of surface water,
e) data on the processed technical calculations and their results, and
the implications for the proposed solution,
(f) the requirements for the procedure of the work),
(g)) the requirements for the operation of equipment, information on materials, energy,
transport, storage, etc.
h) communications solutions in terms of access and use by persons with
mobility and visual impairments,
I) consequences on the environment, safety, etc.
2.2. Drawing part
and engineering, including object) induced realignment of roads,
liquid discharges, engineering networks, the objects intended for demolition or
reconstruction,
b) longitudinal profiles and sample cross sections (for underground leadership only in the
particularly complex cases),
c) characteristic cross sections usually at a scale of 1:100, to determine
estimate the range of earthworks and technical adjustments,
d) drawings of the technical object (gas station, transformer substation, the shaft
etc.) in the scale of 1:100,
e) technical adjustments to the drawings (including the main dimensions and material
solution) for persons with mobility communications and visual impairment in the
a scale of 1:100 or 1:200,
f) marking drawings.
Objects of the associated routes (collectors, technical passages, and channels)
document similar to terrestrial objects.
2.3. The static calculations and drawings
Shall be carried out only for the buildings and objects of design
and of the reasons for the assessment of the stability of the buildings require (bridges, tunnels,
culverts, subways, sink, etc.).
2.4. other calculations
Shall be carried out for example. hydraulic engineering calculations, design of networks, including the
the energy of the objects, the determination of capacity needs, etc.
F. Documentation of operational files (technology section)
1. The technical report
description of the program),
(b) the list of documents)
(c)) the need of materials, raw materials and the quantities of finished products,
(d) a description of the technology, production)
(e)) the basic structure of technological equipment (purpose, description and basic
parameters),
(f) a description of the warehouse and) material handling in the production,
the requirements for the transport of both internal and external,
(g) the impact of technology on the building) solutions,
(h) information about the need for energy), fuels, water and other media, including
requirements and the places of connection.
2. Drawing part
and the basic technological schemes), supporting the purpose and the level of
the proposed manufacturing process,
(b) the disposition and the main location), machinery and equipment and their
Incorporation (floor plans, sections, usually at a scale of 1:100).
(G) the principles governing the Organization of construction.
1. Technical Management
1.1. basic solutions to the construction site and site facilities
and site characteristics, capacity) and the use of existing objects
for the purposes of the site facilities, the requirements for existing
objects, including the requirements needed to bring these objects into the
original or otherwise the desired status,
(b) building capacity and utilization) of objects, carried out in the framework of object-oriented
system construction; requirements on editing these objects for the purposes of the device
the site, including the necessary adaptations for persons with reduced mobility
and orientation,
(c)) the way the water supply security, electricity, gas, etc. on
construction method of connection of telecommunications equipment on
telecommunications network during the period of construction, method of connection of the drain on
device objects and method of the construction site, the construction site drainage
the estimated need for pumping of groundwater and how their payment
from the construction site,
(d) the estimated number of workers) in the construction and the creation of
satisfactory social conditions for their activities, e) the effects of the implementation of the
the construction on the environment and the way the exclusion or restriction of undesirable
the effects,
f) data on specific measures and or how to carry out the activities
requiring special security measures, the quantities and types of waste
arising from the construction and Assembly activities (including municipal
waste) and the conditions for handling and storage of waste,
(g)), on the proposal for a landfill that could be stored wastes arising from
construction and Assembly activities, design space for temporary storage of soil
(the repository), which stores the soil from the construction site, and then uses the
on the reverse, a design space for backfilling mining of soil (zemníků) for its imports
on the construction site, if necessary,
(h) requirements for construction site fencing) or other measures to prevent
entry of unauthorized persons on the construction site. The way of vocational treatment and
protection stands for the construction,
I) data on the establishment of the environment in the various areas carried out by the
the construction,
j) definition of safety zones and protection zones,
the requirements for the implementation of the work) in cases that are being implemented for the construction
traffic conditions for progress of work (construction); the coordination of work (construction)
with the current operation, the requirements for the protection of the newly implemented parts of the
construction requirements for any traffic restrictions,
l) comply with safety and health at work, including the conditions for the
the provision of first aid, the application of the requirements for familiarization of workers with
the safety, operational and fire protection directives in force in the
operated by objects or files; requirements for fire
safety of operation and carried out of the building; requirements for the maintenance of order and
purity on the adjacent public spaces.
1.2. Organization of transport Project, which addresses the
and transport routes for transporting) of crucial supplies and material,
transport routes for the transport of soil, waste and other unnecessary
materials of construction, the proposal on the adjustment of transport routes, including the proposal on the
the change of road signs,
(b) traffic restrictions and) any movement of pedestrians in the immediate vicinity
the construction site, the requirements for the processing of permits for special uses
public communications
(c) a proposal for the Organization of transport) and the movement of persons on the construction site, including
road signs,
(d)) proposal for measures to prevent the pollution of the public communications networks in the
exit traffic and building mechanisms from the construction site.
1.3. Conditions and requirements on the implementation of the construction
and the determination of the timing) assurance of realization of the projects,
description of the procedure for the implementation of the work of the (construction) of each building
objects and operational files, including a proposal for the requirements for the machines and
mechanisms, design work for the transport of materials, products,
machinery and equipment to be carried out of the building (using the mounting holes),
(b)) the list of documents that the contractor shall deliver to the purchaser no later than
When the submission and receipt of the relevant structures and operational
files,
(c)) start dates, completion, submission and acceptance of individual
structures and operational files, dates and scope of the construction
preparedness, dates back submission of construction objects and or
their parts after installation for the completion of the construction work,
(d) a proposal for follow-up action), the location of building mechanisms (cranes,
including the crane tracks, elevators), start dates and duration of the comprehensive
try, start and duration of trial operation, start dates
and the period of guarantee tests, dates to the early indication of certain parts of the
structures and operational files into operation, evacuation of the term
the construction site and bringing it to its original state,
(e) a comprehensive evaluation) requirements for operational files, where appropriate,
part of the documentation requirements for comprehensive testing.
1.4. Requirements for the trial operation of the completion of construction
1.5. requirements for rules of operation
1.6. the requirements for the implementation of the guarantee tests
The design parameters that will demonstrate the contractor within the guarantee
the tests.
2. Plan for safety and health at work
Within the meaning of the provisions of section 15, paragraph. 2 of the Act No. 309/2006 Coll. and section 6 and
Annex 5 of the regulation of the Government No. 591/2006 Sb.
2.1. the rules on the implementation of the works on the construction site
and specific measures for the implementation of) the work, increased danger,
b) data and information on health and safety at work, which is
must comply when carrying out any construction and Assembly works
on the construction site.
3. The situation of the site facilities
Handles are in scale with the overall situation in the same building, to which the
usually reflects the trapping or directly to zakresluje. The situation of the
must be handled in accordance with the technical standards and must clearly
to distinguish the proposed construction of an existing condition, etc.
Contains the drawing
and the boundaries of the site and or) construction sites, where the secondary site
under consideration, including ensuring construction site with regard to the safe and
a separate movement of persons with reduced mobility,
(b)), the definition of the areas of communications, quarries or other areas for landfills and the temporary
device objects construction site without their factual and hasového usage
(c)) the location of the deponií soil or topsoil and zemníků set up for the
the purpose of the construction,
(d)), on the main and side entrances of the construction site, water intakes and
energy to the construction site, including offtake points, connecting the individual
objects the device construction site on sanitation and drainage construction site,
the connection to the interbank telecommunications network, the location of the wells in case of need
the pumping of groundwater,
(e)) the designation, which will be removed in the construction, the designation of the
the crop, which will be professionally treated and protected during the construction,
(f) the designation of the safety zones) from the existing buildings and facilities.
4. The timetable of the construction
and) chart (lhůtovém) preparation of the construction according to the
individual structures and operational files, indicating the
critical dates,
b) chart (lhůtovém) procedure of realization of each of the
structures and operational files, stating the dates,
terms of preparedness for the installation, after mounting, the submission deadlines for the
the completion of the construction work and deadlines, submission and acceptance
(c) the time the layout of financial volumes), construction (if they are the subject of
monitoring), claims for the estimated number of workers for the implementation of the
building objects and for the Assembly of technological equipment (if it is
required).
5. the documents
Part of the book "the Organization of construction Project" contains in particular the following
documents
and a discussion of the connection) the construction site on water and energy resources,
(b) the record of discussion) connection objects to the site facilities and drainage
the construction site on sanitation,
(c) the record of discussion) connection of the building to public communication,
(d) the record of discussion of the connection), the construction of the telecommunications network,
(e) the record of discussion) Organization of transport,
(f) the record of discussion) deposit of waste and surplus excavations into landfill,
(g) the record of discussion) location of skladek for saving the Earth,
subsequently applied to the reverse of landscapes,
(h) the record of discussion options) excavates soils for construction needs.
(H).
and the binding opinion of the institutions concerned) and other documents on the results of
discussion of the project with relevant authorities and organisations responsible for
the performance of State administration,
(b) a decision on the location of the building),
(c)) or other documents.
Annex 3
The scope and content of the project documentation for implementation of air.
Officially certified copies of the documents certifying the authorization for designing
Air ground equipment, or the approval of project documentation
authorised organisations is part of the project documentation.
Project documentation for the implementation of the building contains the part of the
And ground structures
B. Engineering objects
(C) the Operational files.
Project documentation must always contain part and (C) broken down to
each item that the range of the individual parts must correspond to the
the nature and importance of the building, its location, the building-technical
the implementation, use, impact on the environment and the duration of the
the construction.
The breakdown of project documentation
The breakdown is based on the breakdown of the structures proposed in the project documentation
certified in construction management (see annex No. 2 of this order) with the
the launch of a comprehensive technical report.
Highlights the derogations, or supplement the information against documentation
together with the building permit.
The Division shall comply with the construction on objects and on any sections (partial
the construction).
For large and large buildings may split on the part of the customer of the construction,
that enters the different contractors. In this case, the individual parts
include only the relevant objects, or their part.
The common principles
Project documentation for implementation of construction works specifies requirements for construction
the resulting from the technical and qualitative aspects. Must be
drawn up to detail that clearly define the subject of the works,
i.e.. the building, its technical features and allow you to draw up an inventory of the work
as the basis for valuation of the construction of the building.
In the preparation of project documentation for the execution of the project must
to comply with the proposal for the construction of the specified project documentation according to annex No 2
This order certified in construction management and building requirements
authorisation, consent and vodoprávního vodoprávního decision. Project
the documentation for the implementation of the construction requires the completion of the design of construction in
the project documentation for the clear definition of the realization of the construction
works, supplies and services.
Part of the project documentation for implementation of construction it is not documentation
for auxiliary work, production technical documentation and product documentation
delivered to the building.
Project documentation for implementation of construction is the document, which is intended
for the contractor of the construction, for the investor and for the building authority to control
inspections. Project documentation for implementation of construction determines the
contractor what to produce and what kind of quality. These requirements must
be unambiguous and sufficiently.
1. The technical report
Process in the same composition and structure as in the project documentation
referred to in annex 2 of this order, of which the relevant data takes over with
by
and), supplements and further justifies any data and any derogations
against the certified project documentation,
(b)) justifies and refining the technical, design, material or
layout,
(c)), where appropriate, the specific conditions for the implementation, installation, or
technological procedures.
2. Drawing part
Process in an appropriate scale (usually 1:50)
and drawing documentation) in the range of point and 1.2 or (B) 2,
(b)) the drawings the details (details) for binding to the contractor's or
the shape of complex design (elements) which are subject to special
requirements and which must be respected in the implementation of the construction,
(c) complementary drawings only) legends in the extent of information that
cannot be represented graphically.
3. The calculations
Handle to the necessary extent and controllable form. Calculations
they are part of the documentation and connect as documents in two
copies.
4. the documents
Evidence of the results of the negotiations with the competent authorities and organisations
responsible for the performance of State administration and with other participants in the construction and
other documents required for the implementation of the construction and the inspection tours
the construction.
And ground structures
1. Architectural and construction solutions
1.1. Technical report
Process according to common principles and lists
and the purpose of the object, purpose) units, capacity, built-up area,
obestavený space
(b) the results of the surveys and supplementary) calculations,
(c)) any changes to the architectural, technical and layout
construction, dazzle, a description of the technical solution, data on the construction-physical
the properties of the external cladding, or other critical
structures according to the purpose, treatment of surfaces, a type of Windows and doors, internal
equipment, solutions, security system
(d)) data on the technical equipment of the object (medical technology, Central
heating, air conditioning, electrical installations and artificial lighting, etc.),
an overview of the technological equipment located in the object
e) detailed requirements of technical and materials solutions suitable for disabled guests
adaptations for persons with reduced mobility,
f) characteristics of environment premises, protection against noise and other
negative effects, safety and health protection, protection against corrosion,
or stray currents, vegetation, editing
g) solution for fire protection, civil defence, adjustments for disabled persons
If it comes into consideration,
h) energy consumption for heating (thermal characteristics).
1.2. Drawing documentation
According to the nature, size and complexity of the znázorňovaného object, and with the
taking into account the purpose and readability is usually at a scale of
1:100 and contains
layout drawing of the object), including the distance from adjacent objects and with
information about the coordinate and elevation system,
(b) the excavation and foundations) drawing (usually at a scale of 1:100 or 1:50)
(c) drawings, floor plans, sections) and views (usually at a scale of 1:100 or
1:50 pm), which displays spaces and rooms, vertical and
the horizontal load-bearing and non-loadbearing structure, stairs, ramps, roof and
curtain walls, gutters and downspouts, the range and type of insulation, the outlines of the
the main internal installations, including all fixtures
health technology and the designation of the tiles, the treatment of surfaces, floors,
dilation, ventilation system, chimney and ventilation vents, holes, including
their fill, construction (approaches, obezdění, plento tion,
ducts, foundations under machinery and equipment),
(d) the adjustment in the wheelchair-accessible drawings), scale 1:50, including the necessary
the details,
(e) complementary drawings as needed),
(f)) statement of Bill of construction work, statements and a list of carpentry,
locksmith and plumbing products, concrete and other products and
the major elements of the construction of light prefabrication,
g) views of the all surfaces of the facades of the object,
h) drawings of the wheelchair modifications in the scale of 1:50, including the necessary
details.
Documentation of machines and devices that are part of the construction section
handles reasonably similar as documentation of machines and equipment
the technological parts.
2. Construction structural part
Process for concrete, metal, wooden and other support structures.
2.1. The technical report
and a detailed description of the proposed carrier) system construction with a resolution
each of the constructs according to species, and the proposed technology
materials,
(b) the cross-sectional dimensions of the individual) components by reference to
drawings,
(c) description of non-traditional technology) procedures and specific requirements on
the implementation and quality of the proposed structure,
(d) the determination of the required checks) zakrývaných construction and any
control measurements and tests, if they are required in excess of the
mandatory,
(e) reconstruction of existing buildings) or their changes-a description of the current
the status of the construction of the necessary measures to maintain
stability in the proposed route, or the stability of the
neighboring objects,
f) requirements and specifications to the elaboration of the documentation provided by the
the contractor of the construction,
(g) fire protection) requirements for structures,
h) safety requirements in the implementation of load-bearing structures.
2.2. Drawing part
floor plans and drawings of the load-bearing structures) in the scale of 1:50, 1:100,
including the folded down cuts, views and details in the required details,
(b) establishment of special types of drawings)-the foundations of the monolithic,
prefabricated, manned and others
(c) the details of the relationship, anchoring), etc. on a scale of 1:20 or 1:10 or 1:5,
d) prefabricated building components, the schema
e) reinforcement scheme of monolithic concrete structures, or as
surface processed by the contractor of the construction reinforcement drawings,
(f)), the report details and anchorage of steel structures-plans,
Modular networks, cuts and specifying clearly the views of the structure with the
marking sections of all structural elements, details of anchoring
construction,
(g)) of the report, the details and anchoring wooden structures-plans,
Modular networks, cuts and specifying clearly the views of the structure with the
marking sections of all structural elements, details of anchoring
construction.
2.3. Detailed static calculation
Is a complete basis for drawing up the technical specifications of the design
parts and drawings for construction. Contains
Dimensioning of all structures, provided by the contractor of the construction.
The static calculation must be controlled, it must be clear, so that the
It was possible to track the progress of the calculation, design load, the considered
static schema and computational model.
Detailed static calculation contains, in particular,
and the accompanying message) to calculate with a brief overview of the basic
the concept of the solution structure and the differences against the preliminary calculation,
referred to in the preceding stage of project documentation,
(b)) used documents: standards, legislation, literature, programs, sizing,
(c) static structure, schema)
(d)) the materials and technologies,
(e)), the load conditions load recap including factors
load combination factors, and
f) models of computation, computational schemes,
(g)) the design and assessment of all load-bearing elements
h) calculation of the effects on the fundamentals, dimensioning, foundations
I) proposal and the assessment of all of the details of Assembly, contacts and other
the decisive and affecting the safety of the construction,
j) the production process-the concrete, odbedňování, Assembly, prestressing,
throwing the completed structures, etc.
3. The technique of environmental engineering
3.1. technical installation Disabled
3.1.1. Technical report
and water consumption) of the cold, warm, and productive, a description of metering
and the required water treatment,
(b) a description of the technical solution) tap the operating conditions (pressure,
speed, top required) description of the materials used,
(c)), the technical solution of the fire water system of divorce, mechanical
the equipment and the proposed system device,
(d)), the technical solution drains, the materials used, pumping equipment,
(e)) capacity data of discharged sewage, stormwater and industrial
waste water treatment and their modification,
(f) the conditions of connection to the public) or local area network technical
infrastructure,
g) description of fixtures for use by persons with reduced construction
mobility and orientation.
3.1.2. drawings (in scale construction drawings)
and) the situation with the connections, layout of machinery and equipment
non-technological nature,
(b)) scheme of the divorce with longitudinal profiles and the necessary cuts,
(c) the foundations of the plan) is shown by plotting svodného sewer piping including
dimensions, materials and fittings, its position in relation to the basics, shafts
and execution of the basics,
(d) the disposition of sewage and tap water) at a scale of 1:100 or 1:50, with the
showing the layout and distance of the pipeline including equipment and other
elements (layout is drawn in the ground plans and sections required in order to achieve
full compliance and link the whole project). Isometric view
Alternatively, tap the advanced cuts
e) developed the cuts waste and sewage pipe with the connection
the designation of the dimensions and the material of the pipes and fittings and designating the ceiling
structures and roofs in place of the sewer line, penetration
(f) the designation of the material listing) in the drawings,
(g) the details of the report, the water meter)
h) drawings of the hydrometric shafts, input manholes located
outside the buildings,
I) lists of machines and equipment.
3.2. The heating of buildings
3.2.1. The technical report
States, in particular,
and the heat source type) boiler room (fuel type), heat exchange, pass-through
the station, equipment, heat recovery, the justification for choice of system
heating and hot water preparation and production,
b) climatic conditions of the place of the construction and operating conditions,
(c) an overview of the proposed values) heat-technical properties
building structures,
(d) the heat loss of the building) after rooms and an overview of the thermal
the profits of the building,
e) overview of the air-conditioning equipment connected to the heat distribution with
indicating the nominal thermal inputs needed,
(f) the determination of the required heat output) heat source and the required
heat consumption for heating, air conditioning differentiated and preparation
hot water with the indication of the media,
(g) a description of the primary media connections), the nominal parameters negotiated
the amount of the subscription
(h) a description of the method of heating) of each type of space and traffic
I) description of the heating surfaces, the location, the connection method on thermal
system, temperature control in the area,
j) vertical scheme of the heating system.
In the case of the objects of heat sources (boiler rooms, heat exchange stations) technical report
It also contains
and the heat source) the location of the disposition and construction solutions, balance
heat consumption, the balance of the fuel consumption, the dimensioning of the machine
equipment, Proportioning chimneys or other calculations (fly ash, particulates
ventilation of boiler rooms, etc.),
(b) a description of the heat exchanger)/heat transfer stations, parameters, primary and
secondary parties, signalling and control system,
(c) a description of the relevant heating system) and the distribution of the individual circuits,
nominal temperature gradient, pressure zone, the type of circuits of divorce
(single pipe, twin pipe),
(d)) the parameters of the circulators and safety valves,
(e) the principles of heat consumption measurement), balancing and regulating the system of divorce
heat,
f) pressure conditions in the cooled system (boost pressure, operating pressure,
the maximum pressure, the opening pressure of the safety valve),
g) description of how the preparation of hot water, connection to the heating system,
thermal power, a way of regulating the preparation of hot water,
h) materials listing the individual parts of the pipeline system, the definition of coatings,
thermal insulation, a description of how the suspension piping, storage and method
the compensation,
I) security care for the environment, safety of work and technical
equipment and fire protection.
3.2.2. Drawings of the
and the disposition and schema) boiler rooms and machine rooms, including details of distributors,
pantographs and structural parts of boiler rooms,
(b) a device for plotting) supply of heat to the floor plans of each
floors in the scale of 1:50 and more (for large objects 1:100),
(c) the distribution and the relevant schema) slices
(d)) the lists of machines and equipment.
3.3. Ventilation device
3.3.1. The technical report
and climatic conditions of the site), considered the highest and lowest
the outdoor temperature, calculated
(b) a description of the operation, type of) fully automatic, manual, mode of operation-continuous,
occasional, intermittent, etc.,
(c)), the required parameters of the internal microclimate,
d) concept, the basic data and characteristics of the device,
e) types of spaces ventilated naturally or artificially, minimum benefits
the fresh air, the proportion of air circulation,
(f) the location of the outdoor air intake), ventilation exhaust,
(g)) of the selected air performances for each room
h) noise load on the indoor and outdoor environment, data on
pollutants, emissions and their concentrations,
I) number and location central-air adjustment,
j) heat loss and air conditioned spaces, load the required
the parameters for the summer/winter operation,
k) description of ventilation and air conditioning of the individual spaces and facilities
l) description of air-conditioning equipment, the list of devices with
indication of performance parameters,
m) requirements for heat, cooling equipment and electric příkony,
n) device location-editing engine air management in the
serviced areas, the distribution of the air in the space,
of noise control and fire-fighting measures) on the air handling
devices,
p) concept and the ranges of pipe networks, the numbers and types of pumps, road closures
and other fittings,
q) concept and range of pipe networks, ways of hanging, storage,
r) instructions for Assembly, the requirements for putting into service.
The technical reports can also be connect
-table room with basic required parameters temperature,
air and noise parameters
-a table of the device with the basic parameters of the air and energy
individual air-conditioning equipment, fire control table
flaps.
3.3.2. drawings
and plotting the distribution systems and air-conditioning) equipment to floor plans
each floor in the scale of 1:50 and more (for large and complex
engine detailed drawings of the 1:25, cuts the space 1:50)
b) cuts in space outside the machinery space,
(c)) and diagram of air-conditioning equipment,
(d)) and diagram of pipe networks and location of pipe networks and drawings
their accessories,
e) data necessary for the setup of the system,
(f)) the list of machinery and equipment.
3.4. the heavy-current electrical engineering and electric
3.4.1. Technical report
and) basic technical data, information on the nature of each environment
spaces following the construction part,
(b) a description of the type of power supply to divorce),
(c)) the energy balance and the maximum current input of the installed and
split to individual types of appliances,
d) way of measuring consumption of electrical energy, its estimated annual
consumption on the basis of operating hours,
(e)) way to connect to a public distribution of electricity if the
occurs,
f) substitute resources including backed-up divorces,
(g) a description of the technical solution) lighting system including control,
(h) a description of the technical solution)-current circuits,
I) description of the technical solution of the connection of air conditioning, cooling systems
heating, sanitary, fire systems, security
alarm system, CCTV system, including the method of measurement and control
the regulation,
j) description of the technical solution linking technological units (elevators,
escalators, etc.),
the kind of grounding to) (work, trade),
l) short-circuit currents calculation results on the power distribution panels,
The technical report also connects
-in the case of a transformer station in the following solutions to connect the VN
-proposals for comprehensive testing of the wiring
-a description of any changes and differences in the technical solution against
the previous level of project documentation
3.4.2. drawings
and heavy current wiring and equipment) that are plotted to floor plans in the recommended
a scale of 1:100 or 1:50,
(b) drawings, floor plans) broken down on part of the lighting and power distribution systems
including the current circuits,
(c) the scheme of control that way), the service, the binding and blocking solutions
other special requirements
(d) detailed installation scheme) (plan), drawings showing the distribution routes
the dimensions of the profiles of channels, footbridges, etc.,
an additional specification drawings) switchboards, cabinets and panels
(f)) the list of machinery and equipment, including an inventory of cables and conductors,
(g)), the justification and description of used equipment will
h) drawings of the earthing system, the connection to the zachytávačů schema
the earthing system and laying Foundation earthing connections, connections
I) layout drawing zachytávačů on the rooftops, or Faraday
the network,
(j)) of metal structures, object link
to save cable) the way or another lead to construction
constructs.
3.5. devices and low-voltage distribution system and sound management and
information for visually impaired
3.5.1. Technical report
Contains a description and justification of the concept of the solution in relation to the technological
the device, or to a single telecommunications network
and a description of the technical solution), depending on the method and the nature of
the distribution,
(b)) types of proposed equipment,
(c) enumeration of the main standards), used in the processing of documentation and
binding for Assembly,
(d) proposal on the comprehensive tests).
3.5.2. drawings
the basic technical data and), the power supply voltage, the way
protection,
(b)) all equipment into a clear drawing floor plans scale 1:100
or 1:50,
(c)), schema
(d) the disposition of equipment) and is shown by plotting the main
combined routes
an additional specification drawings) switchboards, cabinets and panels, a list of
machinery and equipment,
(f) the cable line to) the imposition of building constructions.
3.6. System control, measurement and control, electrical signaling
3.6.1. The technical report
Contains a brief description of each of the circuits (boiler room, heat exchange
the station, air handling equipment, etc.)
and technical data) the basic measurement and control, the power supply voltage
system, method of protection against electric shock,
(b)) the way of the technical solution of the individual technological regulation
units of air conditioning, heating, refrigeration and medical equipment or
alarm systems,
(c) the proposed establishment, types)
(d) a list of the main device)
e) enumeration of the main standards used in the processing of documentation and
binding for Assembly,
f) inventory data points divided by the distributors,
(g)) proposal on the comprehensive tests of measuring and regulation, control system or
electrical signaling.
3.6.2. drawings
and) disposition of machines and equipment, with an indication of the measured and controlled
places in connection to the main switchboard (substation)
(b) the disposition of the control rooms), distributors, device boxes, showing the main
dimensions,
(c)) how to save cable or another leadership against building
constructions,
(d) the supplementary specification drawings) switchboards, cabinets and panels
(e)) proposal to comprehensive tests of measuring and regulation, control system or
electrical signaling.
3.7. Equipment for the cooling of buildings
3.7.1. The technical report
and climatic conditions of the place) the construction and the operating conditions (intended
the highest outdoor temperature, outdoor air enthalpy, the number of operating
hours with details of opening hours, the number of working days in the week and the year),
(b) a description of the basic concepts) refrigeration equipment
(c)) enumerates the types refrigerated spaces
(d) the location of the outdoor air intake) for equipment, waste removal
the air, the number and the location of the central-air adjustment,
e) entering the thermal loads, air-conditioned spaces, the
parameters in air-conditioned spaces-summer/winter,
(f)) the need in different types of spaces,
(g)) of noise parameters in indoor and outdoor environments,
h) data on chladivech and their potential harmfulness,
I) description of ventilation and air conditioning of the individual spaces and facilities
with the supply of cold,
(j) a description of the device) resources,
for descriptions of each end appliances),
l) engine location resources and individual device resources
m) a description of the distribution of cold and a description of the accessories of the divorce,
n) requirements on cooling performance and electric příkony,
about) a brief description of how the operation and regulation of the equipment and
air conditioning, a description of the concepts of measurement and control device for cooling
buildings,
p) a description of how the suspension or the imposition of the pipes,
q) noise control and fire-fighting measures
r) description of stringing the pipes,
Part of the report may also be
-table room with basic parameters and the required temperature
noise,
-table with the basic device temperature and energy parameters
individual air-conditioning equipment for the supply of cold in the building
3.7.2. drawings
and plotting the distribution of cold and) device to the floor plans of each
floors in the scale of 1:50 and larger
(b) the floor plan drawings and slices) engine resources cold
c) cuts in the space outside the engine room,
(d) individual air-conditioning equipment) schemas with subscriptions to the cold,
(e)) the designation of the insulation.
3.8. Gas equipment
3.8.1. The technical report
and the gas type and pressure) media, operating pressure media, consumption
gas,
(b) a description of the technical solution), internal schemas,
c) description of the machinery, appliances, gas appliances for regulation,
gas boiler room equipment, the location of the main caps and gas description
the route,
(d) distribution of appliances according to the parameters) input,
(e) the testing of the safety device) before commissioning, the way
safety checks during operation,
f) measurement of the gas and its regulation, including the parameters of the measuring and
regulatory devices,
(g) the conditions of connection to) pipeline network in accordance with a binding
the opinion of the operator.
3.8.2. drawings
and the plans for the gas pipeline routes) in each of the floors in the scale 1:100
or 1:50, the dimension and the pressure of the media, with pipes, numbering
the designation of the material and dimensions of pipes, valves and meters,
b) risers in the scale of 1:100 or 1:50,
c) mechanical equipment gas boiler at a scale of 1:50,
(d)), possibly isometry developed cuts pipeline with description
all the elements,
(e)) including connection to external distribution network.
2.4. The interiors and interior equipment
3.9.1. The technical report
and the proposed policy,) the architectural and Visual solutions
including disabled access, editing solution
(b) the technical description of the solution and the) structure of interior parts and the internal
the device,
(c)) the conditions for installation and technological procedures,
(d) building, construction)
(e)), the color of the solution.
3.9.2. drawings
and) plans (usually at a scale of 1:100 or 1:50) showing the adjustments
interiors,
(b)) slices and views of the exposed parts of the Interior,
(c) the layout of each room),
(d) report, details) links to construction and other professions,
(e)) the designation of the building, the details of the anchoring ties,
(f)), the mouth of the other professions of the solution schema (medical technology,
electrical installations, air conditioning, computer network, etc.),
(g)) the report of individual items with the indication of the details,
h) the list of equipment.
3.10. other equipment
If they are not included in previous entries-management system
cooling device, assurance, fire alarm, active
anticorrosive protection of underground facilities, etc.
3.10.1. Technical report
Process according to common principles.
3.10.2. drawings
The purpose of the process, including a list of machinery and equipment.
3.11. the external equipment of buildings
3.11.1. Technical report
Description of the total solution, including barrier-free use, technical description
adjustments, minor elements of architecture and their description.
3.11.2. drawings
and) outdoor garden and landscaping,
(b)) the sidewalks,
c) paved surfaces,
(d)), wall
(e)),
(f) the elements of small architecture).
3.12. The requirements for comprehensive evaluation
Shall be shown in the technical reports of the individual parts of a project.
B. Engineering objects
The documentation is processed separately for the different types of engineering
buildings and objects.
and preparation of the territory, gross) landscaping,
b) clean landscaping, public green areas, playground,
(c)) (vehicle, pedestrian, operational areas, supporting
parking, flat objects),
d) bridges, tunnels, hydrotechnical and hydro power objects,
e) civil engineering (water supply, sewerage, gas, heat distributions,
collectors), outdoor high voltage power distribution systems, public lighting, outdoor
media distribution,
(f)) other engineering objects.
1. Structural and technical solutions (outside of the outdoor light, heavy
and media distribution systems)
1.1. Technical report
description of object) engineering and ancillary equipment,
(b) assessment of the results of the survey),
(c) a description of the functional and technical) solutions
(d) a description of the details of the adjustments) belonging to the use of the construction of persons with
limited mobility,
(e)) edit mode, surface water and groundwater,
(f) the processing of technical) data on the calculations and the results thereof,
(g) a description of the connection to the existing) engineering networks,
(h)) special requirements for how the building work and the operation and maintenance
the device,
I) characteristics and description of the technical solution of the object from the point of care
for the environment and in terms of safety and health at
the work,
j) civil defense solutions,
description of the solution to) protection against corrosion,
l) detailed static calculations, hydraulic engineering calculations and other additional
calculations.
For civil engineering objects, the nature of the land-based objects are reasonably
It shall apply the provisions of part A.
1.2. The drawings
Be drawn up on the basis of detailed measurements in the place of routes and objects
Overview of the situation) (in reasonable scale),
(b) drawing showing the layout) link on the points marking the network
(c)), the longitudinal profile, with an indication of all the cruising,
d) master and characteristic transverse slices at a scale of 1:100,
(e) drawings, excavation and výlomových) work and delivery,
f) drawings, retaining walls, bridges, subways, etc.,
g) drawings of the complex cruising, connections and branches communications and
subways remote management,
h) arranged drawings of the objects, their floor plans, sections and views
(usually at a scale of 1:100 or 1:50), including the establishment of the drawings of the lower
buildings, supporting structures, tracks of prefabricated structures,
I) drawings of other supporting structures, shapes, drawings and reinforcement,
include installation drawings,
j) details, drawings
to) traffic signs, the wiring diagram of the device active, or
joint protection,
l) statement of Bill (the list of machinery and equipment),
m) drawings of the wheelchair modifications in the scale of 1:50, including the necessary
details.
2. Outdoor light and heavy-current distributions
2.1. The technical report
Process according to common principles and contains further
and the results of the calculations for smoothing),
b) grounding,
(c) the loss of voltage)
(d)) the intensity of the lighting.
2.2. The drawings
and single pole wiring scheme),
(b)), or single pole vícepólová schema with the type designation and type
the device, which captures the way of power, protection, measurement and protection
c) schema and a description of how the management, service, solutions, blocking, and bindings
other special requirements, with an indication of the location of the devices of different
device, indicate the intensity of lighting,
(d) the disposition of the device) is shown by plotting divorce HVAC
e) situational drawings zakótovaných cable routes,
f) marking of the objects and drawing routes,
g) sample cross sections of cables, excavations and save drawings and transitions
the crossing,
h) drawings of the earthing system,
even the location of lighting fixtures) disposition, poles and appliances with an indication of the type and
performance,
j) the list of equipment.
3. Outdoor media distribution
3.1. Technical report
Process according to common principles.
3.2. The drawings
and all the outdoor plans) joint media distribution,
b) situational and aligning drawing objects and routes,
c) sample cross sections of cables, excavations and save
d) drawings of the crossings and crossings,
e) drawings and construction for cable hangers,
(f))-list of device list with an indication of the length of the cables.
4. Active or common protection against corrosion
4.1. Technical report
Contains the description and the method of solution.
4.2. The drawings
and the disposition of the stored equipment) showing the individual components
active protection
(b)), the protection scheme
(c)) the list of machinery and equipment.
C. Documentation of operational files (technology section)
In the technical reports to each of the operational files shall describe the changes
and deviations compared to the project for a building permit, in particular with regard to
set the binding conditions.
1. the system of technological process control-measurement and regulation
1.1. Technical report
and description management system), including a description of the individual parts,
(b) an overview of controlled variables), the way and the required accuracy of measurements and
operating range,
(c) the characteristics of the traffic and environment),
(d) a description of the connection of the power supply system),
(e)) the requirements for safety and health at work and the protection of
of the environment.
1.2. The drawings
and clear wiring diagram),
b) wiring diagram switchboards, cabinets and panels
(c) the supplementary specification drawings) switchboards, cabinets and panels
d) disposition of machines and equipment, with an indication of the measured and controlled
places,
e) drawings of the routes of cable and pipe distribution systems with the layout
distance,
f) drawings for the appropriate installation and operation
(g)) the list of machinery and equipment-inventory lines indicating the parameters,
(h) a specification of the elements referred to in items) supplies (cabinets, appliances, action
the elements),
I) inventory of cables, wires, and other elements,
(j)) way to deal with subscription.
2. The power and operational distribution of HVAC
2.1. The technical report
and systems, and the choice of the current) voltage,
(b)) the way of connection, the beginning and the end of the operation,
(c)) data on the total maximum current consumption and an overview of the consumption on the
individual jet systems broken down by voltage;
the installed output,
(d) protection against short circuit) solutions,
(e) the results of the calculations) short-circuit currents, currents protection solution against
overload and against a dangerous contact voltage
f) voltage and power factor compensation,
(g)) the way of grounding,
h) description of the solution of blocking control, measuring and signaling; separate
requirements for the handling and operation of the equipment under all operating conditions,
I) requirements on safety and health at work and the protection of
of the environment.
2.2. The drawings
and clear wiring diagram) switchboards,
(b)), or the vícepólová single pole wiring diagram,
(c) auxiliary circuits),
(d) outdoor wiring scheme), which captures the involvement of individual devices
with the designation of the species and the cross-section of the cables and wires including marking of terminals,
e) disposition of machines and equipment, is shown by plotting divorce HVAC
drawings of cable routes with distance, the layout of the
(f)) the list of machinery and equipment-specification for each of the items
supply (switchboards, cabinets, transformers, etc.),
(g)), the list of appliances
h) inventory of power cables and wires (type, cross-section, length).
3. operating the pipeline
3.1. Technical report
and) a brief technical description of species selected pipeline, the beginning and the end
operating the pipeline,
(b)) surface protection, color solutions
(c) how to perform option) thermal insulation,
(d)) the requirements for testing,
e) requirements in terms of safety at work and of technical equipment.
3.2. The drawings
and the pipeline schema)
b) disposition (at a scale of 1:100 or 1:50) designating and layout
distance of the pipeline including of fittings and other elements (disposition draws
in ground plans and sections required in order to achieve full compliance and transfer
in the context of the technological parts),
(c) specification of pipeline-list) pipeline branches,
(d) a breakdown of the pipe elements) of pipeline parts and metal constructions,
e) insulation and coatings.
3.3. List of machinery and equipment
and a breakdown of the pipe components) of pipeline parts and metal constructions,
(b)), indicating the device specifications characteristics and parameters
uniquely identifying the device.
4. operating air conditioning
4.1. Technical report
and operational file) description of the characteristics of the device and the calculation of the
selected performances
(b)) surface protection and solution
(c) how to perform option) thermal insulation,
d) requirements for the manufacture, Assembly and test.
4.2. The drawings
and the overall scheme)
b) disposition (at a scale of 1:100 or 1:50) designating and layout
distance of the pipeline including air conditioning equipment and other elements
(layout is drawn in the ground plans and sections required in order to achieve full
compliance and interconnection within the framework of technological parts),
(c)) the list of machinery and equipment-specification of machinery and equipment, piping and
metal structures,
(d)), specification
e) specification of the insulation and coatings.
5. Active protection against corrosion and heretic branches before the streams
5.1. Technical report
and a description of how the solution)
(b)), the characteristics and specifications of the device parameters for unique
the determination of the relevant equipment.
5.2. The drawings
and the disposition of the stored equipment) designating individual elements of active
protection,
(b)), the protection scheme
(c) the disposition of the individual elements of protection),
(d)) the list of machinery and equipment-device specifications including Assembly in
the details of the relevant method of security of supply and installation.
6. electronic communication devices, low-voltage equipment and wiring
6.1. Technical report
and) description and justification of the concept of a solution in relation to the technological
the device,
b) links to the existing facilities.
6.2. the Drawings
and distribution, schema)
(b) the disposition of equipment), and is shown by plotting cable routes,
(c)) the list of machinery and equipment,
d) specifications, including cables and the installation of the device.
7. maintenance of machinery and equipment
7.1. Technical report
and identification and solution areas), areas and access paths for disassembly
the device and its nodes,
(b) the necessary adaptations) of building structures,
(c)) the accessibility and conditions of interchangeability of elements and nodes,
d) capacity and the technical data of the device, the operator intended for
maintenance,
(e)) the principles of technological procedures and conditions for the maintenance and
repairs of selected device
(f)), the safety and health protection at work and the protection of
of the environment.
7.2. the Drawings
and the equipment needed for maintenance), which have the character of fundamental
the funds shall be documented, as production (operating),
(b)) the list of machinery and equipment-shall draw up, as appropriate, as
in the case of the (operational) of the device.
Process in the range according to the requirements of the customer (building contractor).
8. requirements for comprehensive evaluation
Annex 4
The scope and content of the project documentation of buildings on the runway for the Declaration
the building, listed in the building Act.
Project documentation contains eight sections, which are governed by the annex No. 1
Decree No. 499/2006 Coll., on the documentation of buildings, as amended
regulations.
And the accompanying report, which should include in particular the identification of the
construction, stavebníkovi, territory, meet any of the requirements of the concerned
the authorities and participants in the proceedings.
B. Summary technical report, from which it is apparent, in particular,
architectural and technical solutions to the construction, infrastructure,
the impact of construction on the environment, addressing the legal requirements on
building safety, health protection, protection against noise, policy solutions
for persons with reduced mobility, including the list of
used special and selected construction products for these individuals
etc.
C. the situation of the building, i.e.,. map showing the connection to the engineering networks,
communication, stopping the plan.
(D) the portion of the Drawing and the Appendix., which consists, in particular, technical report,
floor plans of the foundations and individual floors and roofs, cuts, views,
suggestions of connections, the assessment of the stability of the structure, detail drawings
wheelchair-accessible cabins with WC and wheelchair-accessible checkout (bulkhead) and details
haptic and sound management, including phrases in the future, guiding
etc.
E. Vacant.
(F) the Organization of construction Policy. (IE. in particular, a description of the site and its
link to the engineering networks, etc., indicative of the period of construction, including the
ensure the conditions for the use of the publicly available communications
related to construction sites by persons with reduced mobility
orientation).
(G) the costs of the construction, it serves. for the needs of the Builder.
H. Book part, which includes opinions, opinions for the purposes of construction.
The other project documentation for construction on the runway as referred to within the meaning of
the building Act contains the following sections.
And the accompanying message.
(B). the summary part
(C) the situation of the building.
(D) Drawing and part of the Appendix.
(E) Vacant.
(F) the principles governing the Organization of construction.
(G) the costs of the construction.
(H).
Binding is the breakdown of project documentation and identification of their parts.
The contents of each of the parts shall apply mutatis mutandis to the nature, importance, and
the extent of construction, construction-technical design, purpose and duration
the construction.
The contents of each part of the project documentation
And the accompanying message.
1. Identification data of the construction
and the name of the building) the same specification and approved the preparatory
documentation (the number of characters in the 100 is based on the requirements of the ISPROFIN),
containing the subject of the investment and instead of investment, place or
the area of the construction,
(b)) identification data to the contracting authority-stavebníkovi (name, address, identification number,
VAT REGISTRATION NUMBER),
(c) project-supplier) name and address, identification number, TAX ID NUMBER, manufacturing Department
processors (the person with permission to the project hinnosti), individual
subcontractors (name and seat or the name and address, COMPANY REGISTRATION NUMBER, VAT REGISTRATION NUMBER).
2. basic data on the location of the building (category of the track, the track section,
the municipality, location etc.)
and) village, region, cadastral territory
(b)) and building land property relations to him,
c) transport and technical infrastructure in the territory.
3. Basic information about construction
and construction (the length) the extent, nature and size of the finished construction,
equipment),
(b)), a brief description of the purpose of the construction and function
(c) compliance with the General requirements of the) construction and meet the requirements of
the institutions concerned,
(d)) and the time of the binding of the surroundings,
(e) the method and execution time).
(B). the summary part
1. the summary technical report contains a simple technical description of the building
and the evaluation of the construction site, including evaluation) of the current status, measurement and
surveys and the integration of their results to the project construction and historical
a survey of the building, which is a cultural monument, the phenomenon of conservation reserve
or the phenomenon of conservation zone
(b) the technical solution of the construction with) a description of its implementation,
c) mechanical resistance and stability
(d) the connection of the building to transport) and the technical infrastructure,
(e) the impact of the construction on the transport) and its organization, the surrounding land and buildings,
the minimization of the negative effects of the construction on the environment,
(f) the basis for determining the building).
2. Barrier-free use
The barrier-free use of the solution (the list of used special and selected
construction products)-solution approach and the use of the construction of persons with
limited mobility, including placing conditions,
ensuring the use of the publicly available communications
related to construction sites by persons with reduced mobility
orientation.
3. Waste management and other influences on the environment
4. Ensure the safety in use of the building
(C) the situation of the building.
1. Overview of the situation of the location of the buildings and the wider relations that are plotted in a
map of the substrate in the scale 1:5000 and 1:50000. This situation is
draw up as a separate annex or placed on the free space on a
the situation of the building.
2. the situation of the building in scale 1:1000 or 1:500, for large buildings in
scale 1:5000 or 1:2000; Displays the current status of the territory (or
used as the base frame of the map), the proposed construction, binding on around,
the protection concerned, transport and technical infrastructure.
(D) Drawing and part of the Appendix.
Project documentation will be processed to the extent of the building Act.
1. If the nature of the construction requires the sample cross sections shall draw up
in the scale of 1:50 or 1:100, the characteristic cross sections of 1:100 or
1:200 and details of the proposed structures in the scale of 1:20 1:50 or 1:100.
2. modifications for persons with reduced mobility on
communications, drawings of details and barrier-free wheelchair-accessible cabins WC
Treasury (bulkhead) and details of the haptic and sound management, including
the phrase indicative of bollards.
3. Greening Project (layers of editing), including drawing.
4. for changes of construction, which is a cultural monument, the construction of the monument
reservation or in a heritage zone in the scale of 1:200, including the addition of
views or drawings of the construction of railways in the photos, and visualization.
(F) the principles governing the Organization of construction.
and the principles of leadership and management) of the public service, detours, traffic
marking,
(b)) the material and timetable of work, moving materials, landfill materials
(c) the estimated period of construction), a description of the process of the construction,
(d) determining the conditions for the implementation) of the construction from the perspective of safety and
health protection at work,
(e) a provisional designation) construction site with regard to the safe movement of persons with
limited mobility during construction (e.g., access to
the platform during construction).
(G).
Is used only for the needs of the Builder. Part of this part is a statement of the Bill
with the name of the item, including the technical specifications.
(H).
Opinions, opinions, and the results of the negotiations conducted in the course of processing
project documentation.
Annex 5
The scope and content of the project documentation of buildings and structures on the track for
the issue of the building permit or notification in the shortened construction
the proceedings.
Project documentation contains a section
And the accompanying message.
(B). the summary part
(C) the situation of the building.
D. the technological part
E. construction
(F) the principles governing the Organization of construction.
(G) construction costs (note is used only for the needs of the Builder)
(H).
I. Geodetic documentation
Project documentation must always be part of and to and broken down to
each item that the range of the individual parts must correspond to the
the nature and importance of the building, its location, the building-technical
the implementation, use, impact on the environment and the duration of the
the construction.
Project documentation for construction of the runways and buildings on the runway with handles
in one level and at the level of documentation that includes both
the design documentation for issuance of a building permit or notification
Summary and project documentation for implementation
the building, with the exception of selected operational files of the technological parts,
that work their way up separately as part of the delivery.
If any part of the documentation is not an option (e.g., the construction does not
the technological part), discards, but while maintaining the designation (e.g..
D. the technological part-vacant).
The contents of each part of the project documentation
And the accompanying message.
1. the Processes within the meaning of Annex No. 1 of the Decree No 499/2006 Coll., on
documentation of buildings, in the wording of later regulations.
2. Basic information about construction
and location of the construction) (categories of the track, the track section, village,
localization, etc.),
(b)), a brief description of construction from the perspective of special purpose functions,
(c) the projected capacity building including) the basic technical parameters
and traffic data and proposed technologies and equipment,
(d) the characteristics of the territory of the building),
(e) the requirements for the implementation of the construction).
3. the list of default documents
and operating buildings) Division and building objects (files, changes in
object composition),
(b) changes in the composition of the object) from the previous level of documentation,
including appropriate justification.
4. Justification of the building and its location
justification for the necessity of the building) on the basis of prepared and negotiated
the previous instance of the documentation,
(b) an evaluation of the technical condition of the incumbent) and hitherto utilization
assets,
(c)) data on higher quality technical and technological
the parameters of the construction.
5. Early usage of buildings, the provisional construction to the test usage
operation, its duration, in relation to the completion of the acceptance and use of the
construction
and the gradual transmission of data), parts of the buildings in use, which will be
separately, put into trial operation,
(b)), the list of temporary objects (e.g. rail link, the temporary bridge,
etc.).
6. The operational files and building objects subject to technical and
safety test
The list shall be called. designated technical facilities and structures
(e.g. the railway superstructure, permanent and temporary bridges, etc.).
7. list owners or administrators of tangible investment
resources
List of the owners shall be, where appropriate, administrators material
investment funds broken down by each operational files
and building of objects or their parts.
8. information on compliance with the General requirements for the construction, including the
the barrier-free use of the building.
9. Breakdown of the project documentation of buildings and structures on the track for
the issue of the building permit or notification in the shortened construction
the management of
Enter the structure, content and scope of the project documentation.
10. the list of operational files and building objects with a direct link to the
the parameters of the interoperability
For the assessment of conformity with the technical specifications of interoperability (u
buildings selected railway network of the Czech Republic) to draw up a list of
operational files and building of objects that have a direct link to the
one of the Basic or other binding parameters for interoperability
According to the relevant decree on the operational and technical connectivity
the European rail system. Operational files and building objects
will be broken down in this list from "subsystems" infrastructure, energy,
management and security (energy subsystem will contain a separate
technology and construction).
(B). the summary part
1. the summary technical report
Evaluation of the construction site, the construction also completed the evaluation of the changes
current state of construction; construction-historical survey of the building,
that is a cultural monument, is a monument in the reservation or the phenomenon of conservation
zone.
2. Surveys and handouts
and carried out surveys), measurements and conclusions arising therefrom
for the processing of the project and construction,
(b) the suitability of the geological and hydrogeological) conditions in the territory,
(c)) used surveying and map data, and the conditions for establishing marking
the network of global positioning and height (the primary system).
3. The protection
and historical data concerned) protection zones and protected
territories,
(b) the establishment of new protection zones) (dimensions and location in the field),
(c) the data on the protected bearing) areas and specification of mine
the conditions for processing the proposal ensure the construction against the effects of
undermining (protection-according to the Act on nature and landscape protection in the
as amended),
(d)) data on the Green,
e) data on the záborech agricultural and Forestry Fund.
4. The concept of the construction
the purpose of the building (and) the overall concept solution, justification of the proposed solution
regard to the purpose of the building, its location),
(b)) an overview of the General technical requirements for the construction,
including the use of barrier-free construction
(c)) architectural and urban integration of the building into the territory, its
appearance and art design,
(d)), a brief description of the technical solution proposed by
operational files and building objects, e.g.. useful length
tracks the length of platforms, traffic rate, including breakdowns,
parking, wheelchair accessible transport routes, the type of solution
the signalling system of the traction management, etc.,
(e) a proposal for the requirements for rolling) execution of the project and on the gradual placing
construction of operation (use) and the estimated period of construction,
(f) construction requirements on resources) (electricity, water, gas-balance
energy consumption, the conditions for increased power,
the conditions for the increase of the technical maximum),
g) diversion of surface waters, the connection to the sewer system (claims on water
economy, the discharge of waste water, including consents, the protection
-the zone of sanitary protection, the qualitative and quantitative
indicators wastewater treatment, operation and emergency orders, solutions of connection
building on the existing network of technical equipment),
h) connection to the transport system (the number of parking spaces, transport routes and transport
frequency),
I) range and the greening of the replacement planting,
j) safety at work (the source of the threat to the health and safety of workers,
How to limit the risk of the effects, safety zones and escape routes,
protection of workers and the environment from the effects of harmful substances,
storage of hazardous substances and handling),
to the construction from the perspective of) an assessment of the technical requirements for the use of the building
persons with reduced mobility, information on the fulfilment of the
the requirements for barrier-free solutions to the construction,
l) shall be contingent upon, and other related investments and
assumptions or claims on their security,
m) indicate the static calculations demonstrating that the building is designed,
to load on her acting in the course of construction and use, not
results in
-damage (collapse) of the building or part thereof,
-more to an inadmissible degree.
5. information on the fulfilment of the conditions laid down
and the decision on the location of the) conditions of buildings,
(b) environmental impact assessment) conditions of the environment,
(c) compliance with the capacity and other) provided data and justification
any proposed changes compared to the previous level of documentation.
6. Preparation for construction
and the release site) (land and buildings),
(b)) the use of existing or constructed objects,
(c)) the temporary use of existing buildings for the construction,
(d)) method to perform demolition and landfill space,
e) liquidation (transplanting, felling, re-utilization)
(f) disposal of harmful waste) (to deal with according to the type of waste),
g) security buffer zones of protected objects and stands for
the construction,
h) shifting of underground and aerial lines, transport routes, water
flows,
I) restrictive or safety measures in preparation of the construction site and in
during construction (blasting object or rocks),
j) lockout transport and other transport (rail, road, etc.),
to the restrictions in the supply of energy).
7. Purchase of land and buildings or their parts (apartments and non-residential premises)
Enter the total range of permanent and temporary confiscation or other prejudice
land and buildings or dwellings and non-residential premises or parts of
required for construction.
8. Exceptions to the provisions
List of approvals, exceptions and úlevových of the regulations, which is
subject to the proposed technical solutions, including evidence of their grant.
9. operating and transport technology
If the changes compared to the previous level of documentation,
influence on the scope of the railway infrastructure and operation, the operational and
transport technology updated to the date of submission of the project
documentation of buildings and structures on the track building
the authorization or notification in the shortened construction management. Detail is
handled by the operating and transport technology during construction with direct
link to construction procedures and with the design of transport and construction
measures, if they are needed.
10. the impact of construction on the environment
The extent of the influence of processing of the construction on the environment in the project
documentation of buildings and structures on the track building
the authorization or notification in the shortened construction management arises from the
clarifications and changes in the technical section of the documentation from the previous
the degree of documentation, including the protection against noise. If there was a change
compared to the noise study, which was part of the preparatory documentation
make up and noise studies, biological research and environmental impact assessment
the environment in cases where assessment is ordered according to the
Act No. 100/2001 Coll., on the assessment of the effects on the environment, in
as amended.
11. Project documentation of buildings in terms of incorporating all
the necessary requirements for safety and health at work, resistance and
the security of the building in terms of fire protection, hygiene, and defense of the State,
resistance and protection against the effects of traction and energy management (in the
pursuant to section 41 of the Decree No 246/2001 Coll., on the determination of the conditions of the fire
the safety and performance of State Fire supervision (Decree on fire
Prevention), in the wording of later regulations).
A description indicating how the proposed solution meets the requirements
the relevant Ordinances, regulations, and standards (health and safety at
work, including potential risks, the technical solution of the construction and operation of the
aspects of fire protection, including water resources, external fire
hydrants, fire alarm, fire stations or houses, etc.
Further characteristics of the objects and operations in terms of fire protection. Will
given the specific proof of fulfilling the required conditions and
from the previous instance of the documentation).
Fire protection construction will be discussed with the integrated
rescue system. In the case of tunnels longer than 1 000 m as part of the
the project documentation is handled by the "plan of fire-safety tests",
under the trial operation.
12. Energy calculations
and) addresses the energy consumption for electric traction, power
Dimensioning of power stations and supporting documents for current and voltage
the dimensioning of the fixed electrical traction equipment
(b)) addresses the effects of reverse traction circuits on the power network of energy and
It proposes a way of reducing rear impacts,
(c) the balance control) addresses the active and reactive power outputs and proposed measures
to ensure the prescribed factor. The results of the calculations, it is necessary to discuss
the builders and then with the suppliers of electricity.
13. Corrosion protection
Enter the protection of objects against the effects of corrosion caused by the heretic branches.
To prevent a negative influence, above all zložných devices
It is necessary to ensure that the requirements on corrosion survey
and DC electrified lines) for the traction system 3 kV,
as before the construction of the (preliminary survey and design of construction of corrosion
measuring points) and before putting the device into operation
(additional corrosion survey),
(b)) in the place of contact DC and independent traction, and 5 km from the
isolated contact towards the traction of the independent,
(c)) in places of contact of DC and AC traction system to
a distance of 5 km from the neutral field in the direction of the lines supplied by alternating
traction power supply system
(d)) in places of strong DC sources (e.g. public
to the right).
On the basis of the results of corrosion surveys shall be submitted
solution of safeguard measures against the effects of stray currents according to the valid
regulations. To prevent a negative influence particularly storage
equipment and electrical equipment, it is necessary to ensure that receivers
corrosion survey requirements.
14. the dynamic course of the Chart speed (applies only to national and
regional railways)
Specifying the processed Dynamic Chart over the speed of the previous
the degree. Shall be drawn up for the fastest passenger trains and for continuous
freight trains. Contains the proposed line speed for classic
(with the lack of superelevation in the arc to the 100 mm and 130 mm) and for
units with tilting casings on the existing track speed, description
direction and sklonových conditions, including their station, marking the position of the
transported and stops. Shows dynamic progress of speed building
on the neighboring track sections (only for construction processes of modernization and
reconstruction to increase speed).
15. Traffic measures
All measures of transport (rail and road), in particular the
lockouts, replacement transport, possible detours, closures, etc.
16. Permanent and temporary land plots of agricultural land fund and
land intended for the performance of the functions of the forest
Enter the total range of permanent and temporary annexation of the land or the scope of the
the restriction of the use of the land in the subdivision according to type of agricultural soil Fund
and the land intended for the performance of the functions of the forest and the deviations from the previous
the degree.
17. Energy saving and heat protection
and meet the requirements on energy) of the performance of buildings and the fulfilment of the
comparative indicators according to a uniform method of calculating the energy
performance of buildings,
(b) the determination of total energy consumption).
18. protection of the building against the harmful effects of the external environment
Radon (for the purposes of realization of constructions), aggressive water,
seizmicita, mining, protective and safety zones, etc.
19. Protection of the population
Compliance with the essential requirements for the siting and construction solutions construction
the protection of the population.
20. Barrier-free use
and policy solutions for persons) with reduced mobility,
(b) the principles for the solution of the person) of the visually impaired,
(c) policy solutions for persons) with hearing disabilities
(d)) and selected list of special construction products for these
persons, including the use of information systems solutions.
(C) the situation of the building.
The situation of the building consists of a summary and simple construction drawings,
where appropriate, the architectural drawings of the construction works, or notable objects to
assess compliance solution of the construction with the surrounding buildings or landscapes with
the following breakdown.
1. Overview of the situation of the building
Overview of the situation is generally at a scale of 1:5000 and 1:10000
(1:50000), with an indication of the scale of the construction, the decisive
objects, or with ties to the surrounding, the determination of transport routes for
transport of material for construction.
2. the coordination of the situation of the building
Coordinating construction usually handles the situation in a scale of 1:1000,
station 1:500, 1:200, ground objects for changes of construction, which is
cultural monument, the building in the conservation reserve or in a conservation zone
on a scale of 1:200. Coordination is also used for the construction of the situation, the needs of the
Organization of construction.
Contains
planimetry and altimetry) territory of the construction and its nearest surroundings
showing the borders of the land and buildings and their parcelních numbers
According to the land registry, including the neighboring land and land
buildings, coordinate and elevation systems,
(b)) position and height of the designation of all of the existing fixed
tangible assets, including all engineering networks and other covered
devices certified their owners where appropriate, administrators,
(c) the designation of the perimeter of the building,) the perimeter of the construction site, including areas of the device
the construction site,
(d) the designation of the areas of the land) odnímaných from the soil and forest fund with
a resolution of the settlement of permanent and temporary,
(e)) the designation of all existing buffer zones and protected areas and
safety distances
(f) the designation of the newly proposed) protection zones,
(g) the designation of the boundaries of the existing and) a new perimeter track,
h) modifications for persons with reduced mobility on
communications,
(I) the designation of the demolitions, namely) of underground and above-ground engineering
networks, or the felling of mature green,
(j)) position and altitude of the designation of the proposed construction of all operating
files and building objects, including its connection to the existing situation,
the combo box and the legend) the numbers of all operational files and building
objects,
l) indicate the anticipated border drop kotlin (zones of influence)
the tunnel construction.
For structures with complex technical solutions, in addition to coordinating the situation
construction process and coordinating cross sections.
3. Drawings of the architectural design of the building, or notable objects
and if it is necessary) are drawings of architectural design
construction or prominent objects, e.g.. the plot details of barrier-free
cabin with WC and wheelchair-accessible checkout (bulkhead) and details of the haptic and
sound management, including phrases in the future, guiding
(b)) for the construction, which is a cultural monument and building in the conservation
reservation or in the conservation zone, whether drawings, floor plan, floor plan basics
the individual floors and roofs, with schématickým showing slices of load-bearing
design, editing, input the original and modified the terrain, at a scale of 1:50.
D. the technological part
The technological part consists of individual operational files
processed separately. More technical and technological details
are dealt with by Decree No. 177/1995 Coll. issuing the construction and
technical regulations, as amended. The breakdown of the documentation
the technological part is determined as follows, unless agreed
otherwise, that part of the relevant operational file is also
the security of the Transitional State for construction (provisional
security devices, etc.).
1. A generic list of technological parts of broken down on the basis of national regulations.
1.1. Safety equipment
and) interlocking system,
(b)) the track signalling equipment,
(c)) of the level crossing safety installation,
(d)) spádovištní security device
e) remote control of signalling equipment,
(f)), and indicators indicators hot flat rounds.
1.2. Communication equipment
and local cabling),
(b) radio equipment)
(c)), integrated telecommunications equipment,
(d)), electric fire and security alarm systems,
e) remote cable, remote optical cable, mounting an optical cable,
(f) the involvement of the remote cable) a remote optical cable and lifting
the optical cable into operation,
g) information system for passengers,
h) track radio communication,
I) other communication equipment.
1.3. the heavy-current technology
and dispatching management technique)
(b)) technology VVN/VN (energy),
(c) heavy-current technology) substations (substation infrastructure,
traction transformoven)
(d) the power of traction technology) of switching stations
e) technology transformation stations, HV/LV (energy),
(f) heavy-current technology electric stations) 6 kV, 50 Hz for power supply
signalling equipment,
g) operating HVAC distribution
h) power signalling and telecommunication equipment of traction.
1.4. other equipment
and) passenger lifts, stair lifts,
b) escalators,
c) measurement and control, automatic control system, electrical fire
signaling.
For the assessment of conformity with the technical specifications of interoperability (u
buildings selected railway network of the Czech Republic) handles supplier
documentation list of operational files and building objects that have
a direct link to any of the Basic or other binding parameters
broken down according to the subsystems "infrastructure, management and security
the energy ". Whereas the previous breakdown is performed at national
basis, and the list from the breakdown in the European Union.
2. A generic list of technological parts of broken down according to the subsystems "of management and
security, energy "
2.1. Control-command and signalling "
2.1.1. Safety equipment
and) interlocking system,
(b)) the track signalling equipment,
(c)) of the level crossing safety installation,
d) remote control signalling
e) indicators and indicators for flat hot wheels.
2.1.2. Communication equipment
and local cabling),
(b) the remote cable, remote) optical cable, mounting an optical cable,
c) track radio communication.
2.2. Energy subsystem
Heavy-current technology
and VVN) technology/VN (energy),
(b) heavy-current technology) substations (substation infrastructure,
traction transformoven)
(c) the power of traction technology) of switching stations
d) technology transformation stations, HV/LV (energy),
(e) heavy-current technology electric stations) 6 kV, 50 Hz for power supply
signalling equipment,
f) operating HVAC distribution
g) power signalling and telecommunication equipment of traction.
NB. Construction of the energy subsystem is contained in part E.
3. Project documentation of the various operational structures and files
construction on the runway for the issuance of a building permit or a notification in
shortened construction management consists of technical reports, drafting
part of the works, supplies, and the main material (statement of the Bill)
including the technical specifications, and drawings must be obvious
existing and proposed State.
3.1. Technical report all operational files contains
and description and basic data) about the current state, including the identification
the operating data of the file
(b)) a list of input documents, the
(c) a description and justification of the proposed) the technical solution and main
technical parameters
(d) a description of the proposed solution) in relation to the care of the environment and in
relation to the use,
(e) the justification for any of the exceptions) the operating rules of the file and
deviations from the previous instance of the documentation,
(f) compliance with the relevant) details of the conditions of the previous degree of documentation
on the operational file,
g) connection to other operational files and building objects
(h) the protection against hazardous touch) voltage,
I) building construction, installation procedures
j) the calculation of power consumption, or other media,
the necessary calculations to) necessary for the justification of the proposed solution
are not included in part B (summary),
l) overview of the standards, rules, sample sheets, etc.
m) a summary of the relevant conclusions from the working meetings, including putting
link to the book section,
n) summary of critical opinions affecting the technical solution
including a link to the book section that contains all the necessary
consultation,
a list of input documents).
If it is not to be given to the factual nature of one of the points) to o)
accept, it is possible to omit it.
3.2. The drawings
3.3. List of works, supplies and the main material (used only for the
the need for a Commissioner)
E. construction
Construction section consists of individual building of objects processed
separately.
More technical and technological details are dealt with by Decree No.
177/1995 Coll. issuing the construction and technical regulations, as amended by
amended.
1. A generic list of building part of the broken down on the basis of national regulations.
1.1. Engineering objects
and the track superstructure and substructure),
(b)),
(c)), level crossings,
d) bridges, culverts and the wall,
e) other engineering objects (civil engineering and hydraulic engineering
objects),
f) piping (water, gas, sewerage)
g) tunnels,
h) infrastructure
also, collectors, cabelling)
j) noise control objects.
1.2. Land buildings and technical equipment of road construction
objects
and terrestrial objects) buildings (operational, technological, inventory)
b) roofing, shelters on the platforms of the stations,
(c)) the individual noise protection measures,
(d) guidance system)
(e)), demolition
(f)), the internal health technical installation of the gas pipeline, fire water supply,
g) heating,
h) ventilation equipment,
and the public part of the information system) installed in buildings,
j) artificial lighting and internal heavy-current distributions,
to) lightning,
l) internal communications,
m) indoor equipment of buildings (Interior),
n) external equipment of buildings.
1.3. the Traction and power equipment
and overhead lines,)
(b)) power station (substation, traction substation)-construction,
(c) the switching station building)-part
(d)), heating (electric, gas),
(e) the electric pre-heating device),
f) distribution of VN, NN, lighting and disconnectors remote control,
(g)), a part of the metal structures,
h) external grounding.
For the assessment of conformity with the technical specifications of interoperability (u
buildings selected railway network of the Czech Republic) handles supplier
documentation list of operational files and building objects that have
a direct link to any of the Basic or other binding parameters
broken down according to the subsystems "infrastructure, management and security
the energy ". Whereas the previous breakdown is performed at national
basis, and the list from the breakdown in the European Union.
2. General list building part broken down according to the subsystems "infrastructure,
the energy "
2.1. the "Telephony" infrastructure "
2.1.1. Engineering objects
and the track superstructure and substructure),
(b)),
(c)), level crossings,
d) bridges, culverts and the wall,
e) tunnels,
noise control f) objects.
2.1.2. The land building objects
and roofing, shelters) platforms at the stations,
(b)) the individual noise protection measures.
2.2. Energy subsystem
Traction and power equipment
and overhead lines,)
(b)), heating (electric, gas),
(c) the electric pre-heating device),
d) divorces VN, NN, lighting and disconnectors remote control,
(e)) part of the metal structures,
f) external grounding.
NB. The technological part of the energy subsystem is contained in section (D).
3. the individual building project documentation of buildings and objects
construction on the runway for the issuance of a building permit or a notification in
shortened construction management consists of technical reports, drafting
parts and measurements and drawings must be clear so far and the
the proposed status. Part of the documentation can be static and dynamic
calculations of the main and decisive building structures, which shall
in the calculation of the appropriate construction of the object.
3.1. Technical report contains all of the structures
and description and basic data) about the current state, including the identification
the data of the contracting authority and the construction of the object
(b)) a list of input documents, the
(c) a description of the proposed technical solution) and technical parameters and its
the rationale,
(d)) static assessment, if some structures technical
standards and regulations required
(e)), hydro and other calculations required for justification
the proposed solution,
(f) the consent of the professional departments of the contracting authority) with the use of unapproved and
nezavedeného equipment, consent to the proposed solution, if it is
technical standards and regulations is required,
(g) exceptions from the rules) proof, placing derogating from
the previous instance of the documentation,
h) standards overview, rules, sample sheets, etc. and putting
their binding for implementation. When processing project
the documentation for the implementation of the construction,
I) summary of critical conclusions of working meetings, including putting
link to the book section,
j) summary of critical opinions affecting the technical solution
including a link to the book section that contains all the necessary
discussion of administrator (roads, police of the Czech Republic,
Fire Brigade, the locations Manager, etc.),
to pass on the incorporation of the results of) additional surveys,
l) connection to other building objects and operating files (ID
coordination, a description of the interface of the construction objects, relationships
on the other-related, foreign, prospective investment),
m) information on the fulfilment of the conditions of accreditation to each
construction of objects of the previous degree of documentation,
n) on the territories must be undermined a technical report to supplement the card
and the solution of the status of the load-bearing capacity,
about) the requirements for the Geotechnical monitoring,
p) requirements for measuring shifts and deformation of the structures,
q) solutions to access and use by persons with reduced construction objects
mobility and orientation.
If it is not to be given to the factual nature of one of the points) to q)
accept, it is possible to omit it.
3.2. Drawing part
3.3. Bills (used only for the needs of the Builder)
(F) the principles governing the Organization of construction.
Organization of construction shall be drawn up for the whole building. Proposes the optimum
the Organization of the construction from the point of view of the requirements of the Commissioner and his restrictive
terms and conditions. Must be minimized the negative impact of the implementation of the construction
the environment. The Organization of construction of binding of individual addresses
operational files and building objects to other parts of the building,
approaches on the construction site and offers into account the coming desktop for
the site facilities. For large or technically challenging parts
the construction is possible, on the basis of the request of the Commissioner, to draw up a separate
procedures for the construction of objects (e.g. large bridges, tunnels, large
railyards).
The content of individual parts of the documentation
1. The technical report
and the characteristics of the site, its) arrangement, including the surfaces of the device
the site, including the provision of the basic conditions for a separate and
the safe movement of persons with reduced mobility on
roads and areas related to construction sites,
(b)) the use of existing or constructed objects,
(c) the possibility of connection to the sewer system), and the source of water, electric power,
gas, telecommunications, transport networks,
(d) the routes of any establishment of new rides from the communications and proposals
transport measures) must be discussed with the competent authorities (police
The Czech Republic, the Directorate of roads and motorways of the Czech Republic, etc.),
(e)), the protection of the security protection of objects and greenery,
f) data on specific measures and implementation that require security
the measures,
(g) implementation of the construction) affect the environment,
(h) a description of the construction process,) the estimated dates of commencement and termination of
the construction,
I) gradual putting into service,
j) requirements for the exclusion of public transport,
to) for the construction, located in flood areas and the flood
emergency plan, if changes occur compared to projednanému povodňovému
the plan from the previous instance of the documentation,
l) a description of the construction site facilities that require reporting,
m) adaptation of the safety and health of third persons, including
the necessary adaptations for persons with reduced mobility,
n) solution to the technical and transportation infrastructure, including transport solutions in the
peace, subject to the conditions laid down for the design of structures for the
stoping and svážném territory
on the determination of the conditions for the implementation) of the construction from the perspective of safety and
the protection of health at work.
2. the Drawings
The data required for the Organization of construction are drawn in a situation that
based on the coordination of the construction of situations (part C). In particular, they are listed
the following data, circuit, including the area of the construction site, the construction site equipment,
entrances to the building site, a source of water and energy. The greening project
(the layers of editing), including drawing.
3. Timetable of work
It will be designed according to the scale and complexity of the building in the days or weeks.
The schedule must cover all of the following technological processes,
demonstrate the feasibility of the proposed výlukových of the times and the total period
the construction.
4. scheme construction procedures
Process, in particular in the construction or reconstruction of the tracks and stations
buildings, where the exclusion of the tracks will be required, or turn off security
the device.
5. The balance of Earth materials
Part of the documentation is also the balance of the Earth, the fixing of the
properties and volume of earthwork materials obtained by building, materials needed
for construction, an assessment of the usability of obtained materials and movement of materials.
Handles are always. For buildings with simple ratios (where the
does not imply the movement of materials between the construction objects) will
statement of the Bill the relevant structures. The buildings, which are being considered with the
using the obtained ground and their movements between
building objects, further processes, taking into account also the quality of hmotnice
and the availability of materials and the construction process. It is also part of the hmotnice
representation of the movements on the mezideponie. Part of the documentation is also
the lenses of the study, setting out the workload of local and special purpose communications
building.
(G) the costs of the construction.
Is used only for the needs of the Builder, part of this part is a statement of the Bill
with the name of the item, including the technical specifications.
(H).
and an overview of the bodies) which was discussed by the project documentation
in the course of processing,
(b)), the zoning and planning decision
(c) evidence of exceptions granted) of the applicable regulations and standards, where appropriate,
the consent of the Office Overhead,
(d) the consent of the Commissioner of the professional departments) using an unauthorised and
nezavedeného equipment
(e)) evidence of consultation with builders and Professional Builder services,
(f) the binding opinion of the institutions concerned), and other documents about the negotiations with the
the authorities concerned and the participants of the construction management,
g) representation of the owners and administrators of the engineering networks concerned,
h) evidence of consultation with the owners of the land and buildings or apartments and
non-residential premises or building concerned. with other authorized
bodies,
I) situation of existing utility networks certified their owners,
that are not part of the previous degree of documentation and of the resulting from the
detailed solutions to project documentation of buildings and structures on the runway
for the issue of a building permit or a notification in the shortened construction
control, or representation of the network administrators if they are older than 2 years,
(j)) if the supplier will be the project to ensure the Declaration of conformity
certification (for buildings the selected railway network of the Czech
of the Republic), this document is part of the documentary section.
I. Geodetic documentation
Geodetic documentation is part of only the selected sets of documentation and
broken down to the following parts:
1. The technical report
2. Financial section
3. design of the layout of the network
4. The coordinating layout drawing
5. Circuit construction
6. the geodetic datum and map data
Annex 6
The scope and content of the project documentation of buildings and structures on the track for
the implementation of the construction.
Project documentation contains a section
D. the technological part
E. construction
Points A, B, C and F, G, H, I are unoccupied by.
Project documentation must always contain the parts (D) and (E) broken down to
each item that the range of the individual parts must correspond to the
the nature and importance of the building, its location, the building-technical
the implementation, use, impact on the environment and the duration of the
the construction.
The contents of each part of the project documentation
(D) the Operational files.
Project documentation of buildings and structures on the runway for issue
a building permit or a notification in the shortened construction management-
Annex No 5 of this order.
E. Building objects
Project documentation of buildings and structures on the runway for issue
a building permit or a notification in the shortened construction management-
Annex No 5 of this order.
Project documentation must always contain part 1. and 2. broken down to
each item that the range of the individual parts must correspond to the
the nature and importance of the building, its location, the building-technical
the implementation, use, impact on the environment and the duration of the
the construction.
Project documentation for construction of the runways and buildings on the runway with handles
in one level and at the level of documentation that includes both
the design documentation for issuance of a building permit or notification
Summary and project documentation for implementation
the building, with the exception of selected operational files of the technological parts,
that work their way up separately as part of the delivery.
1. common principles
1.1. Project documentation of buildings and structures on the runway for the implementation
the construction is processed separately for each building objects
where appropriate, the operating (technological) files, if in the construction
occur; of project documentation for building
the authorization. Process only those parts of the project documentation for the
the implementation of the construction works, which are not identical to the design documentation referred to in
Annex No 5 of this order.
1.2. Part of the documentation of buildings and structures on the runway for the implementation
the building is not documentation for auxiliary work, production and technical
the documentation and the documentation of the products delivered to the building. If it is for
the details necessary to handle any of these documents must be
such a requirement in the project documentation of buildings and structures on the runway
for the implementation of the construction mentioned explicitly.
1.3. Technical and technological details are dealt with by Decree
No. 177/1995 Coll. issuing the construction and technical regulations, in
as amended.
2. Technical report
Process in the same composition and structure as in the project documentation
buildings and structures on the runway for the issue of a building permit, or
notice in the shortened construction management-Appendix 5 of this order
((D) and (E)), from which the relevant information takes that is
and, to complement and specify) justify any data and any derogations
compared to the certified project documentation,
(b)) and specify the technical reasons, design, material or
layout,
(c) lay down the detailed technical requirements) and material solutions
wheelchair modifications,
(d)), where appropriate, the specific conditions for the implementation, installation, or
technological procedures.
3. Drawing part
Process in a reasonable scale according to purpose (e.g. layout drawings
with a list of coordinates and elevations of the main points, etc.).
and detail drawings, details) structures,
b) drawings of non-standard products, as a unique basis for the
the vendor,
c) detailed drawings of construction and Assembly procedures, including auxiliary and
support structures,
(d) the adjustment in the wheelchair-accessible drawings), scale 1:50, including the necessary
the details,
e) greening project (layers of editing), including drawing.
4. Bills
Advanced measurements.
5. The calculations
Handle to the necessary extent and controllable form.
Annex 7
The scope and content of the project documentation of buildings, roads, motorways, local
communications and publicly accessible special purpose communications (hereinafter referred to as
the infrastructure construction for the report.)
Project documentation contains a section
And the accompanying message.
B. Summary technical report
(C). Drawing part
(D) the principles governing the Organization of construction.
E. Documents
If the building is technically simple, does not affect the surrounding territory and
construction can be simplified by merging the content of the project documentation
And the accompanying message, B.. Summary of technical reports, and (D) the Policy of the organization.
the construction of the one part, and the accompanying and the technical report.
The drawing part shall be marked with the letter (B), and may contain only the situation
the appropriate scale of the mapping location of the building. The documents shall be included in the
parts marked (C) or is included in the part.
Binding is the breakdown of project documentation and identification of their parts.
The contents of each of the parts shall apply mutatis mutandis to the nature, importance, and
the extent of construction, construction-technical design, purpose, and the lifetime of the
the construction.
The contents of each part of the project documentation
And the accompanying message.
1. Identification data
and construction) mark
(b) the client or the client of the construction), its registered office or place of business,
(c)), its registered office or place of business, data on trades
permissions and authorization of the person, company and its podzhotovitelé with the identification
the data.
2. information on the location of the building
and) village, region, cadastral territory
(b)) and building land property relations to him,
c) transport and technical infrastructure in the territory.
3. Basic information about construction
and construction (the length) the extent, nature and size of the finished construction,
equipment),
(b) compliance with the General requirements of the) construction and meet the requirements of
the institutions concerned,
(c)) and the time of the binding of the surroundings,
(d) the estimated period of construction), a description of the process of the construction,
e) way of ensuring safety and health at work for the
the construction site.
B. Summary technical report
Contains
and the evaluation of the construction site, including evaluation) of the current status, measurement and
surveys, and the inclusion of their results in the project documentation;
construction-historical survey of the building, which is a cultural monument, is in
Heritage reservation, or is in a conservation zone
(b) the technical solution of the construction with) a description of the implementation of mechanical
resilience and stability,
(c) building on the transport) and the technical infrastructure,
(d) the influence of the construction of transport) and its organization, the surrounding land and buildings,
the minimization of the negative effects of the construction on the environment,
e) solutions to safety requirements of the building and ensure the basic concept
safety in use of the building,
(f) the principles of barrier-free use of the solution)-access and use of the building
persons with reduced mobility,
g) documents for making buildings.
(C). Drawing part
The technical part is
Overview of the situation and location of the construction) and broader relationships appear to
map of the substrate in the scale 1:5000 and 1:50 000, this situation is
draw up as a separate annex or placed on the free space on a
the situation of the building,
(b)) the situation of the construction in scale 1:1000 or 1:500, for large buildings in
scale 1:5000 or 1:2000; Displays the current status of the territory (or
used as the base frame of the map), the proposed construction, binding on around,
protection and concerned transport and technical infrastructure, including
adaptations for persons with reduced mobility,
(c) if the nature of the construction) requires, shall draw up the sample cross sections
in the scale of 1:50 or 1:100, the characteristic cross sections of 1:100 or
1:200 and details of the proposed structures in the scale of 1:20 1:50 or 1:100;
such documentation for construction, which is a cultural monument and buildings
in the conservation reserve or in a heritage zone processes in the scale 1:50
or 1:20.
(D) the principles governing the Organization of construction.
Contains
and leadership and management of the public) traffic detours, traffic signs,
(b)) the material and timetable of work, moving materials, landfill materials
(c)) and waste management and other effects on the environment,
(d) a description of the site, including ensuring) the basic terms and descriptions for
safe use of publicly available communications services and related areas
the construction sites by persons with reduced mobility,
(e) establish the conditions for the implementation) of the building from the point of view in terms of
construction safety and health at work.
E. Documents
The opinions of the institutions concerned, the opinions and the results of the negotiations conducted in the
during the processing of project documentation.
Annex 8
The scope and content of the project documentation of buildings, roads, motorways, local
communications and publicly accessible special purpose communications (hereinafter referred to as
Road) for the issue of a building permit or notification
construction in the shortened construction management.
Project documentation contains a section
And the accompanying message.
(B). the summary solution of the construction
(C) the building part.
D. the technological part
(E) the principles governing the Organization of construction.
(F).
Binding is the breakdown of project documentation and identification of their parts.
The contents of each of the parts and documents shall apply mutatis mutandis with regard to the
the category and the class of the infrastructure, breed and the importance of transport constructions
(object), its location, construction and technical design, the purpose of use,
the impact on the environment and the life of the building.
The common principles
1. Project documentation specifies the spatial solution of the construction, its
breakdown, dimensions and types of structures and technological equipment. It proposes the
Special-purpose, civil construction technical and economic solution, meeting the
the conditions for its implementation, future use and maintenance.
2. Project documentation must
and) be treated in accordance with the terms of the zoning decision or
land use consent
(b)) must satisfy the General requirements for the construction and use of buildings, including the
the barrier-free use
(c)) to deal with changes to current structures of transport concerned and of the
the technical infrastructure and/or links to them,
(d) address the access to the building) and the technical and economical construction,
(e)) to be complete, clear, and processed by an authorised person,
(f)) also contain a way to ensure the safety and health at work
on the construction site.
3. A breakdown of the construction of the infrastructure for building objects and operating
the files and their description
The construction of the infrastructure has to be broken down according to these principles
and separately, are considering comprehensive) engineering and technology section
equipment, IE. building objects and operational files,
(b) building and operating objects) files to indicate the number and the name,
(c) construction and operation objects) files together into groups identified
number sequence according to their nature, the way and the kind of discussion
documentation and purpose during construction implementation,
(d)) according to the nature of construction is possible and under the jurisdiction of the Special
construction of offices, it is appropriate to create a separate group of construction
object or subobjects, and a separate group of operational files
or associated with operating files to the competent construction objects
or subobjects ".
4. For sorting and numbering applies the following basic breakdown
Number sequence Group objects
000 objects, preparation of construction site
100 objects of infrastructure (including culverts)
200 bridge structures and walls
300 water management objects
400 Electric and media objects
500 Objects pipelines
600 Objects of underground structures
650 objects in pathways
700 Objects building
800 Objects editing territory
900 Free series of objects
Notes to individual series
4.1.000-Objects of the preparation of the construction site
Objects in this group are classified primarily demolition work, where appropriate,
other objects that contain extensive auxiliary work (paid)
the preparation of the construction site or work, e.g. zhotovovacích. temporary fencing,
noise-protection measures in construction work, blasting in the preparation
the construction site, the construction of the pit and under.
4.2. A series of 100-road Objects
This series contains in addition to the infrastructure and its
junctions all other objects of the infrastructure concerned or
induced by the construction of the infrastructure, i.e.. Highway, road,
local communications, ad hoc communication, separate bike lanes
etc. Objects in this group include further infrastructure components
(with the exception of those that are contained in separate lines, eg.
bridges and tunnels) and infrastructure equipment, IE. in particular, the transport
signs, traffic signals, permanent infrastructure, fencing
culverts, escape the zone, soundproof walls, screens against glare, etc.
Separate objects of the infrastructure can also be detours and
transport measures and strengthening of existing infrastructure for the
odkloněnou public transport and transport, where appropriate, the Elimination of
the consequences of these transports made after their construction. To this group
include objects maintenance accessories.
4.3. Number of 200-bridge structures and walls
Series 200 includes all types of bridge structures (excluding culverts),
retaining walls and doorframes.
4.4. Series 300-water management objects
The 300 series shall be included in particular objects of drainage infrastructure
(sewage, rainwater settling tanks), editing or construction
flows, water tanks, retention tanks and irrigation equipment,
water supply and wells.
4.5. Number 400-electro and media objects
400 series contains the objects or the construction of above-ground and underground
heavy current and light current wiring, lighting, security systems
or control traffic, etc.
4.6. Number of 500-pipelines
Objects in this group shall be included, or the construction of gas pipelines, editing
steam pipelines, pipelines and other executives.
4.7. Series 600-Objects of underground structures
Group of objects underground constructions includes tunnels, galleries, collectors,
underground garages and parking lots, and other underground facilities. These types of
Special objects require having regard to their complexity more
the breakdown of the subobjects, that marks the next two digits behind the dash in
the base object number (eg. 600-08).
4.8. Number 650-objects of railways
In this series, incorporating all the objects that fall under the purview of the
Office overhead (the construction of railways and on the runway).
4.9.700 Series-building Objects
This group of objects includes objects of civil engineering,
they are part of or accessory to the infrastructure or use
Motorists are thrown, or infrastructure building. Include
here in particular, the buildings and their accessories on odpočívkách,
cestmistrovství, custom objects, and the police. The 700 series is included also
acoustic screens (except walls), noise control construction work for buildings and
Permanent fences of foreign land. To the buildings or groups of
a device shall assign the appropriate operational files and
the related objects of other types, which assembled the device.
4.10. The series 800-Objects editing territory
The 800 series is included as a part of the editing of the layers and objects, including the
odhumusování, humusování, the planting of the plants and trees, and the adjustments of the areas after
construction.
4.11. Number of 900-number of Free objects
This series is reserved for any kind of object, which is not possible or
appropriate to include in the previous series.
The suitability of the sort objects and operating files in each series
depends on the nature of the construction, the importance of the objects from the perspective of the whole construction and
other circumstances. If this is necessary for reasons of accounting, can be
before marking a series of objects more number prepend (e.g..
If this is the documentation for the file structures, the number of buildings).
The contents of each part of the project documentation
And the accompanying message.
1. Identification data
and construction) mark
(b) the client or the client of the construction), its registered office or place of business,
(c)) the designer or contractor of the project documentation, its headquarters, or
place of business, data on trade privileges and authorization of persons, ID
and his podzhotovitelé with the identification data.
2. Basic information about construction
and a brief description of the design of the building), its functions, the meaning and the location
(b) the estimated construction)
-Start,
-transformation and putting into service,
-completion of the construction,
c) binding to the regulatory plans, zoning plan, or planning
information and decision on the territorial or territorial agreement including fulfilment of its
conditions (if issued)
(d)), a brief characterization of the territory and its former use,
(e) the effect of the technical solution of the construction) and its operation on the landscape, health and
the environment,
(f) the overall impact of the construction on) the concerned territory and proposed measures
-relations on the existing land use,
-relations to other planned buildings in the territory,
-amendments to the proposed construction of the buildings concerned.
3. the list of default documents and surveys
Enumeration of documents and surveys used for the preparation of project
documentation
and documentation of intent to request) on the issue of the decision on the location of the building
or to notify the intention to obtain zoning approval or a decision on the
the change of the construction,
(b)) the regulatory plans, zoning plan, or planning information
(c)) map data, the focus of the territory and other geodetic documentation
(d)) traffic research (studies, traffic data)
(e) the geotechnical and hydrogeological exploration), basic corrosion survey
f) diagnostic survey of structures,
g) Hydrometeorology and hydrological data, navigation conditions
inundace, water quality in the recipientech,
climatological information (h) prevailing wind direction, the occurrence of fogs and
ground frosts, extreme air temperature, Frost, an episode index
area),
and historical research on construction) construction, which is a cultural monument, is
in the conservation reserve or a phenomenon in the heritage zone.
4. The breakdown of the construction (of the various parts of the building)
and the method of numbering and marking),
(b) the determination of the individual parts of the building),
(c) building on the part of the) Division of the construction, the building objects and operating
files.
5. the conditions of construction
and substantive and time binding) of the associated structures of other builders,
(b)) the construction progress and ensure its continuity and
koordinovanosti,
(c)) access to the building,
(d)) traffic restrictions, detours and the exclusion of transport.
6. An overview of future owners and administrators
and a list of known or anticipated) of legal entities and natural persons
take the individual structures and operational files
their their into the property and persons, which will administer the
(infrastructure, network technical infrastructure, fencing, etc.),
(b) the method of use of each object).
7. The transfer of parts of the building to the use of
and) options (draft) gradual transfer of parts of constructions (section, object) to the
the use,
(b) the justification for the use of the needs of the construction) before the completion of the whole project.
8. Summary the technical description of the construction
8.1. General technical description, the total projected range,
capacity data, the basic technical parameters, basic transport,
layout, construction and technological solutions to the construction, integration of the building into the
the territory, IE. in particular, the relationship of the route and the landscape, the impact of the existing transport and
technical infrastructure construction and technical solution of the construction and
architectural design of exposed objects (portals, tunnels, large
the bridges), the solution to broader relations and technical implications of the requirements of the laws and
technical regulations.
8.2. A technical description of individual objects and their included fixes for the
8.2.1. Ground communications
and) enumeration and marking individual roads construction,
(b) basic characteristics relevant) infrastructure
-category, class, design category or functional group and type
the transverse arrangement,
-parameters and the justification of the route,
-grading proposal, the use of secondary materials, the results of the balance
earthworks,
-input data and the conclusions of the assessment of the design of paved surfaces.
8.2.2. Bridge structures and walls
and enumeration of objects and walls),
(b)) the basic characteristics of individual objects, in particular-basic
the data (length, width, margin, and the transit through space),
-basic technical solutions and equipment,
-types of structures and their rationale,
-the procedure and construction technology.
8.2.3. Drainage infrastructure
Engineering solutions to drainage, its characteristics and scope.
8.2.4. Tunnels, underground structures, and Gallery
and) basic data (length, cross, tendencies),
(b) the technical equipment of the tunnel),
(c) the proposed construction, technology)
(d) the principles of operational information systems), traffic control and fire
the safety.
8.2.5. The facilities, public parking lot, escape zone and
acoustic screens
The proposed facilities that are part of the infrastructure and their
the location, scale and equipment.
8.2.6. the infrastructure Equipment
and waste safety devices)
(b)) traffic signs, traffic signals, lighting equipment, equipment for
operational information and telematics,
(c) public lighting),
(d) protection against the penetration of) Wildlife on communication and
enable their migration through communication,
e) aperture and the network against the glare.
8.2.7. other objects, groups of objects
and) enumeration of objects,
(b)) the basic characteristics,
(c)) related facilities and equipment,
(d)), the technical solution,
e) procedure and construction technology.
9. Results and conclusions from the documents, surveys and measurements
A summary of the established facts, assessing their impact on the
solution of the construction.
10. Interested protection, protected areas, flood the territory, cultural
monuments, conservation, conservation zone
and the extent of the prejudice),
(b) the conditions for intervention)
(c)) method of protection or editing,
(d) the impact on the construction and technical) solution of the construction.
11. The intervention of the construction in the territory of the
Definition and rationale for changes to the current state induced by the construction of
a) demolition work,
(b)) and the mimolesní green cutting any refund,
(c)) the range of earthworks and finishing of the terrain, the
(d)) or other modifications to the greening of the undeveloped areas
e) encroachment on agricultural land fund and any reclamation,
f) intervention in the land intended for the performance of the functions of the forest,
g) intervention in the other land,
h) induced changes in buildings (and edit) the transport and technical
infrastructure and water flows.
12. the rights of construction on resources and its needs
The determination and justification of claims construction
and all kinds of energy)
b) telecommunications,
(c)), water management,
d) connection on the transport infrastructure and parking,
e) options of connection to the technical infrastructure (underground and above-ground
the network),
(f)) the type, quantity and management of waste resulting from the use of the building.
13. The impact of the construction and traffic on the road to health and the
environment
Evaluate the effects of the negative effects of the construction and its use and shall indicate
the proposals for the construction of the measures to prevent, eliminate, or
minimise in accordance with relevant legislation
and protection of landscape and nature conservation),
(b)),
(c) emissions from transport)
(d) effect on polluted water) water flows and water resources,
(e)) the protection of the health and safety of workers in the construction and use of
the construction,
f) waste management.
14. the General requirements for safety and utility properties
The card that the construction as a whole and its objects are designed to
meet the basic requirements, which are
and) mechanical resistance and stability
(b) fire safety allowing intervention units of fire protection
means of escape for people, etc.),
(c)), health protection of healthy living conditions and the environment,
(d)), protection against noise,
safety in use) (on road safety
communications),
(f)) and protection energy saving heat (economy of operation, saving
technology for construction and maintenance, etc.).
15. Other requirements
A description of the design of the building in terms of compliance with the
and utility building (), a sufficient capacity of objects, General
the technical requirements for the construction and products, easy maintenance, lifetime
etc.),
(b)) ensure access and conditions for the use of building-public
accessible communications by persons with reduced mobility
orientation,
(c) protection of construction before) the harmful effects of the external environment (floods,
aggressive underground water, wandering streams, undermining and weather
influences),
(d)) meet the requirements of the institutions concerned.
(B). the summary solution of the construction
1. Total (overview) the situation of the building
The overall situation includes the arrangement of buildings or structures on the file
the map background with the capture of broader relationships in the design area.
The scale of this situation is chosen depending on the extent of the construction and ratios
territory. Usually uses the scale 1:5000, 1:10,000 or 1:50 000.
2. the situation of the building (coordination)
Processes as a situational drawing the current state of the territory on the ground
cadastral map showing the boundaries of the land and their parcelních numbers
including the adjacent plots of land, existing buildings, overhead lines and
the underground networks of technical infrastructure, including the designation of the trade
zones and contours that show the topography of the terrain. In this modified
the substrate will be polohopisné and the basic solution of the construction and the height of the
the perimeter of the construction site. This plot indicate unambiguous solution of the construction in the
the breakdown of the proposed structures and operational files, including the effects of
and links to the surrounding area, IE. in particular, the transport connections and the technical
infrastructure, relocation and modifications concerned the aerial and underground
networks, editing, and demolition of buildings, landscaping and land, the arrangements for
persons with reduced mobility, approaches on the construction and
the upcoming construction of other builders. The choice of scale depends on the
the complexity of the construction, the usual scale of 1:2000, 1:1000, or
1:500. the situation of the proposed construction shall include the details necessary for
Verify the position solution of the construction and its construction.
3. coordinating a GEODESIC drawing
A separate drawing is a GEODESIC dokladuje coordination in the case when
the geodetic documentation is not made out as a special project
the documentation. The drawing contains a sketch of the os with the chainage and
the main points and axes and main points of other construction
objects, if their stabilized network vytyčovacích surges also
indicated on the drawings. In the drawing or in another annex project
documentation shall specify the coordinates of all of the designated points. If you would
Peter coordination does not contain more detail drawing, than
on coordinating the situation, it is possible to omit this drawing.
4. Balance of earthworks
This annex contains the balance of excavations, topsoil and podorničních
layers of the whole construction. To determine the amount of soil and rock gained
at the construction site, the suitability of their direct use, the use of after treatment and the imposition of
any surplus to the dump. Evaluate any lack of
material to backfilling and its coverage of the zemníků or the use of secondary
materials. Shall be the balance of the upper layers of overburden soil and cultural
the deeper the land saved capable of Earth. In the case that it is
required by the competent authority, the protection of agricultural land, shall draw up the
the plan for the relocation of topsoil and podorničních layers and rational use
spreading or saving for another specific use including the use of
for reclamation.
5. Total water solution
If the structure contains multiple objects, assessing water management
the curing, it is possible to classify these objects in a separate
Annex.
6. the barrier-free use
and policy solutions for persons) with reduced mobility,
(b) the principles for the solution of the person) of the visually impaired,
(c) policy solutions for persons) with hearing disabilities
(d) the use of construction products) for solution accessible to disabled people.
(C) the building part.
The object is for each building shall draw up separate documentation, which is
be included in the project documentation to file C. Construction part. The classification and
designation of individual buildings shall be carried out in accordance with point 3. and 4. Chapter
The common principles.
The content of individual buildings, regardless of their inclusion in the
specific object structure
1. the Objects of the infrastructure
1.1. Technical report
and object identification data),
(b)) a brief technical description of the justification of the proposed solution
(c) evaluation surveys and handouts), including their use in documentation
(traffic information, geotechnical survey, etc.),
(d)) relationships to other objects of the infrastructure construction,
(e)) proposal for paved surfaces, including any calculations,
(f)) mode for surface water and groundwater, drainage, protection policy
the infrastructure,
g) design of traffic signs, transport devices, light signals,
the equipment for operational information and transport telematics,
h) specific conditions and requirements on the process of construction or maintenance,
I) binding on any technology equipment,
(j)) made a statement about the static calculations and validation
critical dimensions and cross sections,
to access and use) solutions publicly available communications
related to construction sites by persons with reduced mobility
orientation.
1.2. The drawings
1.2.1. the situation of the infrastructure
The situation of each object is listed in the coordination of the construction situation in parts of the
B. where there is not enough clear solution object from this situation,
the situation shall be accompanied by a separate object (cut out the situation) in the larger
scale. The situation must contain a schematic plot of the adjustments for a separate
and safe movement of persons with reduced mobility.
1.2.2. The longitudinal profile
As a rule, shall be drawn up in the mentioned situation and scale infrastructure
Elevation scale with a ten-fold change in elevation. Typically, the elect benchmark
1:1000/100, or 1:2000/200. For simple technical solutions it is possible to
use the scale 1:5000/500.
1.2.3. The sample cross sections
Renders the characteristic, or different sections of the infrastructure
(notch, excavation, embankment, a varying number of lanes, the branch junctions) in the
scale of 1:50 or 1:100 with regard to the width of the road and the local Crown
the conditions.
Populate the location and types of reinforcement of the ditches, gravel, security
equipment, fences, walls, and other typical details.
1.2.4. The characteristic cross sections
These cross sections to show the inclusion of housing infrastructure to
the terrain in the characteristic places. Produced at a scale of 1:100 or
1:200.
1.2.5. Schematic solutions of intersections
More complex intersections, which detailed the plot in a situation of ground
communication (see C-1.2.1.) would be confusing, is drawn on
separate drawings in scale of the situation of infrastructure or
the larger. In the event that it is necessary to verify the sklonové ratios of branches
the junction (the intersection of complex shape or adverse terrain conditions),
shall draw up simplified longitudinal profiles of critical branches.
1.2.6. Drawings of the event facilities
Process in the cases are part of the object ground
communication, it is a stop of the suburban passenger transport, parking and
other transport areas and places to rest. The drawings must show clearly
structural and technical solutions. The scale of the chosen Designer, taking into account
the nature of the device. The drawings must include information about disabled users
the building (object), including details of reserved seats for vehicles and O1
trims for transitions.
1.2.7. Traffic signs, traffic signals, lighting equipment, equipment
for operational information and transport telematics
Drawings of the proposed traffic signs and devices shall be drawn up
in the scale of the situation of infrastructure or other scale as a separate
drawings. Only for simple solutions to traffic signs and all
other transport equipment shall be marked directly on the situation of land communication.
The drawings must include information about the disabled use of buildings (object)
including details of haptic and sound leadership and phrase Guide
bollards.
1.2.8. The coordinates of main points
In this annex, shall coordinate all the important points, which determine the
the position of the object. If these are not marked in coordination points situation,
GEODESIC shall be accompanied by a separate drawing with their mapping. This annex
shall be drawn up, if the data are not part of the geodetic
coordinating the drawing in part (B).
1.2.9. Project documentation infrastructure or a new object
the extension of an existing object, the infrastructure that has to be placed
on the territory of the conservation, preservation or protection zone zone
immovable cultural monuments, immovable national cultural monuments, monument
booked or zone up on views or drawings of the object
the road to the photos and visualization.
2. Bridge structures and walls
2.1. The technical report
2.1.1. the identification data of the bridge
and the structure and number of the object),
(b) the name of the bridge)
(c) the registration number of the bridge)
d) cadastral territory, municipality, County,
(e) the client/purchaser of the building), its registered office or place of business,
(f) the administrator of the bridge), a superior authority,
(g)), its registered office or place of business, data on trades
permissions and authorization of persons, the Chief Engineer of the project, the responsible
the designer, ID and its podzhotovitelé with the identification data,
h) infrastructure (design category or type of transverse arrangement
local communication, registration number),
I) crossing point (all crossing on the length of the bridge),
(j)), all edits start chainage supports, crossing and end the edit,
obstacles to the chainage) přemosťované (km, km, km of railway land
communications, etc.),
l) angle crossing (all)
m) height (underpass, underpass, fairway height).
2.1.2. Basic information about the bridge
and characteristics of the bridge)
(b)) the length of the bridge,
(c) the length of the bridge),
d) length of the structure,
e) margin of individual fields, or lightness for přesypaných structures,
(f) the skewness of the bridge)
g) free width of the bridge,
(h) through the public space), or the emergency walkway,
I) width of the bridge,
(j) the height of the bridge above the ground),
k) building height,
l) area of the structure of the bridge,
m) load and the load capacity of the bridge.
2.1.3. the justification for the construction of the bridge and its location
and the continuity of the project documentation of the bridge) of the object to the previous
documentation, purpose and requirements (documents) in its solutions,
(b) the nature of the obstacles (přemosťované) transferred communication overhead
housing, water works, etc.),
c) territorial conditions,
d) geotechnical conditions.
2.1.4. A technical solution to bridge
and a description of the structure of the bridge),
(b)) the data establishing the and bottom construction of bridge
(c)),
(d)) static and hydraulic engineering assessment,
e) foreign equipment on the bridge,
(f)) solution corrosion protection, protection of structures against aggressive
environment and stray currents,
(g)) the conditions required and measuring subsidence and deflection (measuring and monitoring)
(h) the required load tests).
2.1.5. the construction of the bridge
and the procedure and technology building) bridge,
(b)) specific requirements for the envisaged construction technology
(approaches, electric energy intakes, storage areas, mounting and
auxiliary construction, etc.),
(c)) related (interested) objects, buildings,
d) relationship to the territory (civil engineering, protective zone, traffic limit
, etc.).
2.1.6. The overview of the carried out calculations and finding critical dimensions
and slicers
and marking data)
(b)) and the geometry of the layout of the bridge,
(c) static calculation bases) of the lower buildings, supporting structures,
d) Hydro calculations.
2.1.7. access and use of the Solution of the construction of persons with restricted mobility
motion and orientation
2.2. The drawings
and the bridge object in) the situation of the scale of 1:500 and its coordination with the
other building objects of the construction of the infrastructure, including their
protection zones, specific limitations and adaptations for persons with reduced
mobility,
(b)) the floor plan in a scale of 1:100 or for large bridges over the 100 m length 1:250
(1:500),
(c) a longitudinal incision in the scale) 1:100 (1:250, 1:500), or at the direction
broken communications separate longitudinal cuts with derived progress
terrain, cross drainage and communications including plotting průjezdných
and cutting areas, shipping lanes and a bridge at the water surface profiles,
flood levels (Q100), level design flow
direction and sklonových ratios, the Earth pokryvných and services
bedrock,
d) sample cross section structure of support and in the 1:50,
e) cross sections at a scale of 1:100 in the cheeks and wings, each axes
Interior, possibly with an eye on the supports,
f) marking scheme in the scale of 1:100 (1:250, 1:500),
(g) drawing support in the shape) of the scale of 1:50,
(h) the shape of the wings and drawing) of the wings in the scale of 1:50,
I) schema construction.
Project documentation of large bridges, bridges that are placed on the territory of the
conservation, preservation or protection zone zone real estate
cultural heritage, immovable national cultural monuments, monument
booked or zone and bridges that are a cultural monument is
make drawings of views or bridge to photos and visualization.
3. Water management objects-drainage infrastructure
3.1. Technical report
Basic identification data),
(b) a description of the characteristics of the object),
(c) a justification of the functional and technical) solutions (including traffic data and
installed performance)
(d) a description of the connection to the existing) network or the recipient,
(e)) edit mode of surface and groundwater and their protection,
(f)) special requirements for how the building work (operation and maintenance),
g) characteristics and description of the technical solution of an object in terms of
environmental protection and health and safety at work and the
the operation of construction equipment during the construction,
h) description of the solution for protection against the environment or sneak agresívnímu
streams.
3.2. Hydraulic engineering calculations
and to the extent necessary for the) determination of the size of the profiles of sewers and connections,
(b)) to the extent necessary for the determination of the size of settling
tanks,
(c)) to the extent necessary for the determination of the size and type of fortifications gravel
and ditches.
3.3. The static calculations
and for the pipe in the range) required for the design type and load capacity,
(b)) for concrete structures, and other objects on the network for the determination of
the thickness of the walls and the bottom of the tank and any reinforcement.
3.4. drawings
and the situation of the building with výškopisem) and the mapping of underground management as
current and planned on a scale equal to the situation of the objects
the infrastructure,
(b)) hydrotechnická the situation-only arises if the necessity of
the results of the Hydromechanical calculations,
(c)), the longitudinal profile in the recommended scale of 1:1000/100, the scale in the direction
the x axis to correspond with the scale of the situation,
(d)) the sample crosscut the imposition of the proposed pipeline or gravel and
ditches,
(e)), or drawings of the applied type of atypical objects.
3.5. Documents relating to objects.
4. the Objects illuminate the road
4.1. Technical report
and object identification data),
(b) a brief technical description of the building) of the whole device,
c) type masts and lights,
(d) the light-technical calculation)
e) connection to the power grid NN.
4.2. The drawings
and in the same scale) the situation with the situation of the infrastructure,
mapping the position of the mast and cable distribution systems and determine the position of the device in the
coordinates,
(b) the model with crosscut) mapping schematic position of lighting equipment
scale model of the cross-section of the infrastructure,
(c) drawings of the masts).
4.3. Documents relating to objects
5. Objects of underground structures
5.1. Technical report
5.1.1. General part
and) identification,
(b)) Division of the objects,
(c) the binding of the surrounding construction).
5.1.2. the technical part of the
and yet carried out) the evaluation of geotechnical surveys, detailed
description of the geotechnical conditions with regard to the tunnel method used,
the distribution of the rock mass on kvazihomogenní units including
the recommended values of geotechnical parameters
(b)) establishment of the procedure (how) construction, including design technology
the classes of the excavation, the expected value of the deformation of the temporary lining for
each technology class of the excavation,
(c) proposal on liquidation) mine water, the protection of works against the průvalům waters and
zvodnělého material, the protection work during floods,
(d) the protection of works against) external influences (wandering streams, aggressive
environment),
e) fire safety solutions in the range of fire prevention,
(f) the safety documentation for a tunnel) longer than 500 m,
g) documents the individual structures and operational files,
h) documents, the Protocol on the establishment of environment,
I) comprehensive geotechnical monitoring, including a description of the warning States,
(j)) and the implementation of the construction site, the demands on the trial operation, overview
future operators and users, training demands of the future
workers,
for a description of the object and tracks) with regard to the possibility of the use of the observational
methods,
l) requirements for barrier-free use of the building.
5.2. The drawings
and the overall situation in the building) of the scale of 1:5000,
(b)) situation in coordination scale 1:500 with the designation of construction objects and
operational files, including plotting the downturns, and zone
monitoring, management of engineering networks (including temporary) and adjustments for
persons with reduced mobility,
(c) situation in the place of) coordination of portals in the scale of 1:200 is shown by plotting
routes ducts, sewers, drains, sumps, provoznětechnických
objects, the extent of the jam, the rear carried out, etc.,
(d) in the sample cross sections) of the scale of 1:50, the representation of the geometric
the relationship between gauge section and the construction of the lining, the technical
equipment of the tunnel etc., e) the characteristic cuts with geotechnical data
including the extent of the zone, and poklesové is shown by plotting objects and networks in the overburden in the
a scale of 1:100 (1:200),
f) longitudinal profiles with geotechnical data and forecast Division
the mined tunnel section on technological class of the excavation at a scale of 1:500/50
(1:200/200) in a built-up area,
g) drawing of the excavation support classes (the length of the shot, the breakdown of the areas
excavation, anchorage scheme for each partial excavation, a distance of anchoring
from the face, the composition of the temporary lining, types and length of anchors and the network dimension
the support frames, the maximum distances of the rock, the partial measures
carried out in advance of the excavation, etc.) including the statement of a material
for each technology class of the excavation on the 1 shot and 1 m of the tunnel,
(h) a proposal for the method of isolation and) drainage, including the design modifications and payment
the drainage of the water,
I) drawings of the fire protection, the situation dojezdů to fire's intervention,
j) drawings of the individual structures and operational files,
k) coordination and technological scheme of tunnel equipment,
l) the situation of the Organization, including the recommended scope of construction equipment
device construction site contractor.
5.3. The static part of the
and supporting documents)
(b) calculation of the temporary lining) scope and dimension card
(c) the calculation of the final lining) range including card dimensions
and sections,
(d) calculation of the static temporary lining) according to individual stages and for
each technology class of the excavation, the static calculation of the final
lining according to the character of used structures.
6. the device objects for operational information and telematics
6.1. Technical report
and object identification data),
(b)) a description of how the technical solution in terms of the requirements on the type of device
and the method and the nature of the distribution,
(c)) how to save cable line to the other objects of construction,
(d) the proposed device types)
(e) the determination of the main regulations) that have been used in the documentation and
According to which it is necessary to perform the installation,
(f) a proposal for comprehensive tests)
(g) in the case of revision) a brief description of the circuit changes, which the revision
regards,
h) maintenance requirements of the device.
6.2. the Drawings
and the plot device and location) access to land, in the scale of the situation
communication, of plotting the proposed device to the ground plan in the recommended
a scale of 1:100 or 1:50,
(b)) total clearly processed the block containing the number of schemes and
the logical position of each end elements
(c)) the basic technical data power voltage system the method
protection,
(d)), the technical solution in terms of the requirements on the method and the nature of the distribution,
e) imposition of cable line to building constructions.
6.3. the documents relating to objects
7. the objects of the railways
Project documentation of the objects listed in the construction of the infrastructure
or her triggered by having the character of the building and construction on the runway
including device on the track, will be made in the scope and content of annex
No 5 of this order.
8. Objects of building
Project documentation of the objects listed in the construction of the infrastructure,
that have the character of a building shall be drawn up in the scope and content of
in accordance with Decree No. 499/2006 Sb.
9. Other building objects
Project documentation is processed separately for individual objects
in scope and content, according to Decree No. 499/2006 Sb.
D. the technological part
The technological part of the project documentation of the construction of the infrastructure,
divided into operational processes that ensure a special non-production files
activities required for functionality, security, performance, and protection
infrastructure and its components.
For each operation shall be separate file documentation. Operating
files that make up the technical equipment of tunnels, connecting to
appropriate documentation of the construction of the object.
The documentation of each file is divided into the following parts:
1. The technical report
and the Builder/customer's identification), the designer/contractor
documentation and the subject of the action file
(b)) the default documents,
(c) the technological facilities), description and basic
parameters,
(d)) link building solutions, including the proposal on the establishment of structures,
(e) information about the need for energy), fuels, water and other media outlets, including the
requirements and the places of connection.
2. the Drawings
and displays the report and drawings) the location of the machinery and equipment and their
Incorporation (floor plans, sections, perspectives and construction details),
(b)), drawings and diagrams the connection to media, the place of connection, protective
the device,
(c) the scale of the drawings is chosen), depending on the nature and scope of the action
file.
(E) the principles governing the Organization of construction.
This part of the project documentation drawn up for the whole construction with this
content:
1. The technical report
and the overall arrangement and characteristics) of the site, including its
drainage,
(b) determination of the perimeter of the construction site), its rationale and details of the plots
the construction site, including land, which ensures the client/customer,
(c) the design of the equipment construction site policy),
(d) the design and implementation of procedure) construction,
e) objects, which are to be given separately to the operation (early
use),
(f)) can be connected to the resources (water, electricity, or gas,
telecommunications),
g) options for the management of waste from the construction (if there is not a separate
project management of waste),
h) approaches on the construction site (entrances and exits)
even the security protection) requirements for construction site and its surroundings,
(j) special requirements for the implementation of the) construction, requiring security
the measures,
to propose a solution during transport), construction (transportation and access routes,
a special use of the infrastructures, closures, detours, lockouts),
including the provision of basic conditions and indications for a separate and
the safe movement of persons with reduced mobility to public
highways and areas related to construction sites,
l) setting the conditions for the execution of the project in terms of safety and
health plan health and safety at work to
the construction site according to Act No. 309/2006 Coll., on ensuring the conditions
safety and health at work.
2. the Drawings
Organization of construction drawings, designs and displays the information listed in the content.
technical reports. In particular, it shall draw up a
and clear the situation, showing the) construction, mapping the wider relations in
the affected territory, construction of single-purpose circuits areas, approaches to
the site, napojovacích places the sources and transport routes, this situation is
draw up usually at a scale of 1:5000 and 1:10000,
(b)) the situation of the construction on the ground coordinating the situation where the account
links individual parts of buildings (objects) in terms of
the implementation of, the location of the temporary objects (access routes, and
Bridge, installation equipment, etc.), links to the production of equipment
the construction site and the other data referred to in points, technical reports, which are
in consideration for the particular construction, this situation shall be drawn up for more complex
and building elaborate constructions, or for smaller and technically simple
constructions it is possible to develop only one situation, which will contain
all the necessary information,
(c)) with a proposal of the construction of the factual and the progress of work in the
details according to the complexity and scale of the building.
For simple construction it is possible to include in the construction
technical report, section C.
(F).
The opinions of the institutions concerned, opinions, evidence and results of consultations and
consultation conducted in the course of the processing of project documentation.
Annex 9
The scope and content of the project documentation of buildings, roads, motorways, local
communications and publicly accessible special purpose communications (hereinafter referred to as
Road) for the implementation of the construction
Project documentation contains a section
And solution of the construction.
(B) the building part.
C. technological part
The construction of a small scope or simple structures can be classified
drawings of the general solution to the construction section. For these buildings is
documentation of this breakdown
And part of the Building.
(B). Technological part
If the simple construction are not technological objects, then
the documentation do not break down into parts and drawings with the file called
Project documentation for implementation of construction.
Binding is the breakdown of project documentation and marking of its parts.
The contents of each document shall apply mutatis mutandis with regard to the
category and grade roads, the nature and importance of the building (object)
its location, construction and technical design, the purpose of use, the impact on
the environment and the life of the building.
The common principles
1. Project documentation for the construction of road infrastructure
Specifies the requirements for the construction of the infrastructure of technical and
the resulting qualitative aspects. Must be drawn up in
details which clearly define the subject of the works, i.e.. the building, its
technical properties and allow you to draw up an inventory of the work as a basis for
Awards fabrication buildings.
2. in the preparation of project documentation for the execution of the project must
to comply with the proposal for the construction of the specified project documentation for construction announcements
According to annex No. 7 of this order or the project documentation for the
the issue of the building permit or notification of construction summary
construction management in accordance with Annex 8 of this Decree, a certified building
management and the requirements of the building permit, the consent and vodoprávního
vodoprávního decision. Project documentation for implementation of construction
requires the completion of the design of construction works in generally the project documentation
for the announcement of the construction, or for the issuance of the building permit or notification
construction in the shortened construction management to refine the technical and
the qualitative requirements needed for a clear definition of implementation
works, supplies and services.
3. Project documentation for implementation of construction is a document that is
designed for the contractor of the construction. Project documentation for implementation
Specifies what the building contractor has made and what quality. These
requirements must be unambiguous and sufficiently. This document is
classified in the tender documentation, such as project documentation in the sense of
Act No. 137/2006 Coll., on public procurement, as amended
regulations.
4. breakdown of the project documentation for the implementation of the construction is based on
from the breakdown of the structures proposed in the project documentation verified in
construction management (see annex No. 8 or no. 7 of this order). Shall comply with the
the Division works on objects and on any sections of the (partial). U
big and large buildings may be ordered by the construction of the split on the part
that enters the different contractors. In this case, the individual parts
include only the relevant objects or their component (e.g., part of the main
the route).
5. Project documentation for implementation of construction consists of a volume, or
volumes of drawings.
The contents of each part of the project documentation
And solution of the construction.
This part of the project documentation for the implementation of the building contains attachments
in the song, and the content in accordance with project documentation for construction announcements
or for the issue of a building permit or building notice summary
construction management, which make possible the requirements of the building
the authorization and the information that clarified the definition of construction
and) total (overview) the situation of the building showing the overall situation
the arrangement of the buildings on the map of the substrate in the scale 1:5000 and 1:50000,
It shall apply to situations referred to in annex No. 8 or no. 7 of this order,
(b)) the situation of the building (coordination), showing detailed plot structures in
the map of the substrate by Annex No. 8 or no. 7 of this order,
(c)), including coordination of geodetic surveying documents drawing or
geodetic documentation according to annex No 8 or no. 7 of this order,
d) balance of earthworks shall be drawn up according to the balance of earthworks
project documentation according to annex No 8 or no. 7 of this order,
(e) the principles governing the Organization of the construction), which shall be drawn up in the extent required
for project documentation according to annex No 8 or no. 7 of this
the Decree.
(B) the building part.
1. Construction part of the project documentation for the implementation of the building contains
drawings of the objects in the breakdown by Annex No. 8 or no. 7 of this
the Decree. These drawings, what the content should be supplemented in order to meet the
in particular, the following requirements
and clearly and completely) must specify the object (location,
the arrangement of the structure, the resulting quality of the materials required,
structures, objects, the user standards),
(b)) must be detailed enough to build an inventory of the work.
2. In drawing up
and the requirements of the building permit,) vodoprávního and vodoprávního
the decision,
(b) specifying the details of the structural elements) or their parts,
(c)) the requirements for function and quality of products,
(d) a more detailed determination of the positions) shapes and dimensions,
(e) specifying the details of the use of the building) by persons with reduced mobility
and orientation.
3.:: the project nature, which must be affixed to the
the drawings and artwork that cannot be expressed, shall be marked by means of brief
texts, tables, notes, legends, etc.
4. In the design of structural elements and details and images on
drawings of the project documentation for implementation of construction applies
the following principles
and for all the details) used structural elements must include their
the unique technical names, preferably with the use of already established
the terminology and definitions used in Czech technical standards and
technical regulations of the Ministry of transport,
(b)) the details for all the structural elements separately and for their complete
together must contain all the necessary dimensions, cross sections, proposed
references to dimension series, etc., including information on the permissible tolerances
shapes and dimensions of zástavbových,
(c)) the details for all the structural elements must specify the type of proposed
the material with reference to the relevant standard or other technical went
the prescription that sufficiently describes the properties of the material, including
corrosion protection and protection against aggressive environment
(d)) details must contain information on the operational life of the
the product of the element or part, for resistance to mechanical impact
(static and dynamic) load, the resistance to the influence of the environment,
of the required health certificate and possibly fire resistance,
zvukoizolačních properties of recyclability and other
the properties, if it is not already defined in another document of tender
documentation,
(e) contain detailed requirements) details the technical and material
disabled access, editing solution
f) technical specification of the components must not favour or
exclude certain vendors or products.
5. written Annex to the project documentation of the objects is usually
do not assume and if they contain requirements and information needed for the
construction of the building, then according to the nature of the drawings, special
technical qualitative conditions and inventory work.
6. A different way it is necessary to handle the documentation of construction objects
railways and on the runway, building construction, technical infrastructure and
other possible objects that are subject to other legal and technical
legislation and practice is different from the rules for the road. U
These objects, which usually are made by specialized podzhotovitelé,
It is necessary to deal with the content of the documentation of these objects in accordance with the relevant
regulations, the requirements of their owners or managers and project experience in the
the relevant field.
7. In any case, whether the documentation is used object in the range
drawn up for the degree of project documentation for the announcement of the construction, or
for the issue of a building permit or building notice summary
construction management, or make the details necessary for the implementation,
It is necessary that the documentation of these objects meet the basic
the requirements on the project documentation for implementation of construction, i.e., to
clearly and completely identify the object and allow the build
an inventory of the work.
C. technological part
This part of the project documentation for the implementation of the building contains the objects
technological files of nonproductive nature, with the exception of the technical
the equipment of tunnels or major bridges, which is included in the object
the relevant tunnel or bridge. The device shall specify
detailed specifications, scope of work, the
building objects, program testing and commissioning. File
the requirements for the technological files must be sufficient for the Assembly
the relevant part of the inventory work.
Volumes of drawings
1. Compiling volumes of drawings of the project documentation for implementation
the construction must respect the breakdown of the construction according to project objects
documentation for the announcement of the construction, or for the issue of a building permit
or to the notice of the construction in the shortened construction management. With regard to the
the use of drawings in the implementation of the construction, transmission of individual objects
then administrators and simplify the scope of the documentation, it is possible to
Associate individual objects according to the purpose of the construction volumes
and according to the type of object) the number sequences
(b)), the professions of subcontractors,
c) administrators transposing made objects.
2. When determining the volumes, you must follow the requirements of the customer
or, at the discretion of the contractor of the project documentation for implementation
the building, after consultation with builders/client, with the aim of simplifying
documentation while maintaining its practical applicability. The documentation for the
simple construction and construction of small scale can be issued in one
the volume, if it is appropriate.
3. Every single volume of project documentation for implementation of construction
consists of
the main cover sheet),
(b)) included documents (Comprehensive solution of the construction),
c) classified objects (Building volumes or the technological part
the construction).
4. Main title page must contain a
and the name of the contract type) of the building (if it is not obvious from the name of the contract),
(b) the client/sponsor)/client,
(c)) Designer/contractor documentation
(d) the date of manufacture) documentation (month, year)
(e) the name of the volume (e.g.). The comprehensive solution of the construction, bridge structures),
(f) the contents of the volume).
5. Individual objects contain a cover sheet indicating the object with the
and the name of the object and its) numeric designations,
(b)) the list of the drawings,
(c)) the individual drawings of the object with the designation of the drawings.
1) the technical requirements for the construction, the construction of railways, aviation and on the runway
including equipment on the runway, construction of motorways, roads, local roads and
publicly accessible special purpose communications provides, for example, section 102 paragraph.
2 of the Act No. 49/1997 Coll., on civil aviation and amending and supplementing
Act No. 455/1991 Coll., on trades (Trade Act),
in the wording of later regulations, as amended; Decree No.
177/1995 Coll. issuing the construction and technical regulations, as amended by
amended; Decree No 104/1997 Coll., implementing Act
on road traffic, as amended; Decree No.
369/2001 Coll., on general technical requirements for assurance
use of buildings by persons with reduced mobility, in
as amended.