146/2008 Sb.



The DECREE



of 9 June. April 2008



on the scope and content of the project documentation of transport constructions



The Department of transportation shall determine under section 194 (a). c) of Act No. 183/2006

Coll. on territorial planning and the building code (the building Act):



§ 1



The subject of the edit



This Decree lays down the scope and content of the project documentation for air

construction, for the construction of railways and on the runway, including equipment on the runway, buildings

highways, roads, local roads and public purpose

Communications ^ 1).



§ 2



Project documentation



(1) the scope and content of the project documentation



and buildings for the announcement) air is given in Appendix 1 of this

the Decree,



(b)) air structures for building permit or notification

building construction management summary is given in annex 2 to this

the Decree,



(c)) for the implementation of building air structures is given in annex 3 of this

the Decree,



(d) buildings and structures) on the runway for the announcement of the building is listed in the

Annex No. 4 of this order,



(e) the construction of runways and buildings) on the runway for the issue of a building permit, or

notice in the shortened construction management is given in annex 5 to this

the Decree,



(f) the construction of runways and buildings) on track for the implementation of the building is listed in the

Annex No. 6 of this Ordinance,



g) buildings, roads, motorways, local roads and publicly available

targeted communications for the announcement of the building is given in annex No. 7 of this

the Decree,



h) buildings, roads, highways, local roads and publicly available

targeted communications to issue a building permit or notification

building construction management summary is given in annex 8 of this

the Decree,



I) buildings, roads, motorways, local roads and publicly available

targeted communications for the execution of the project is given in annex No 9 of this

the Decree.



§ 3



The transitional provisions of the



This Ordinance shall not apply to the design documentation prepared before the

date of entry into force of this order.



§ 4



The effectiveness of the



This Decree shall take effect on the 15th day after the date of its publication.



Minister:



Ing. Řebíček in r.



Annex 1



The scope and content of the project documentation of buildings for air report

the construction.



Officially certified copies of the documents certifying the authorization for designing

Air ground equipment, or the approval of project documentation

authorised organisations is part of the project documentation.



Project documentation contains a section



And the accompanying message.



B. Summary technical report



(C) Drawing and part of the Appendix.



(D) the principles governing the Organization of construction.



E. Documents



Project documentation must always be part of and to (E) broken down to

each item that the range of the individual parts must correspond to the

the nature and importance of the building, its location, the building-technical

the implementation, use, impact on the environment and the duration of the

the construction.



The contents of each part of the project documentation



And the accompanying message.



and construction, identification data) name and surname, place of residence

the Builder, business name (natural persons), business name, COMPANY REGISTRATION NUMBER, registered office

the Builder (legal persons), the name and contact address

Designer (permissions, authorization),



(b)) basic data to characterize the building, its purpose and operation, (c))

an overview of the default documents



(d)) territory, building land, property relations,



e) data on the surveys, and the possibilities for connection to the engineering networks,

infrastructure,



(f) General) information on the requirements for the construction, including the requirements

barrier-free use of the buildings belonging to the persons with reduced

mobility,



g) Division of the construction,



h) substantive and time links to the surrounding area and on related investments,



I) estimated period, beginning and end of the construction,



j) compliance regulatory plan, zoning decision. territorial

planning information for buildings pursuant to § 104 paragraph. 1 of the building Act.



B. Summary technical report



1. The territory of construction, architectural and town planning engineering

solution of the construction



and appreciation of the site, buildings), space, an overview of the surveys,

the buffer zones of protected parts of nature, historic building survey

the building, which is a cultural monument, the phenomenon of conservation reserve or phenomenon

heritage zone,



(b)), architectural, and urban art solutions



(c)) with a description of the technical solution of building land and engineering objects

and surfaces, heat technical parameters, properties of building structures,



d) mechanical resistance and stability-pass static calculation, that

the building is designed so that the load on her acting in the course of construction

and use does not result in the collapse of the construction works or a part thereof,

undue deformation, damage to other parts of the construction, technical

the device or installed equipment as a result of major deformation of the

the supporting structure, or in the case of damage which is disproportionate to the scope

the original cause,



(e)) of the construction on the transport and technical infrastructure, solutions

transport, including transport in peace,



(f)) the requirements for final adjustments to the territory, the balance of earthworks,



(g) the impact on the surrounding buildings), buildings and land-information on existing

concerned the protection zones and protected areas, the establishment of new

the protection provided for in the building Act and Act No 114/1992 Coll., on the

nature and landscape protection,



h) ensure the safety in use of the building.



2. Care for the environment and the protection of the health and environmental conditions



and) protection against noise, internal, external,



(b)) and the use of building access solution by persons with limited abilities

motion and orientation, for the visually impaired, hearing impaired, possibly including

the list of specific and selected construction products for these individuals,



(c)) the protection from harmful effects of the construction of the external environment (radon,

aggressive bottom water wandering streams, etc.), the protection and security

bandwidth, or vegetation, editing



(d) the expected security) data on the implementation of the standards laid down for the

protection of the atmosphere and of the noise indicators and their limit

values.



3. the basic concept of fire-security solution



and proof of load-bearing capacity and conservation) the stability of the structure after a certain period of time,

restrictions on development and spread of fire and smoke in the building, construction and distribution

objects into fire departments,



(b) the calculation of the fire risk and the) determination of the degree of fire safety,

the determination of the fire resistance of building structures,



(c)) the assessment of the security requirements of the building fire safety

devices, limit the spread of fire to neighbouring construction or space,



(d) to allow the evacuation of persons and) the animals, allowing a safe intervention units

fire protection.



4. the basic requirements for the Organization and implementation of constructions



5. the solution to the barrier-free use-solution approach and use of buildings

person with reduced mobility



(C) Drawing and part of the Appendix.



Overview of the situation of the building) and its surroundings in the scale of 1:1000, 1:2000,

1:5000, the plot to the cadastral maps,



(b)) total (coordinating) the situation of the building (stopping), usually in the

a scale of 1:500 or 1:1000 or possibly as needed 1:2000, 1:5000 with

showing the borders of the land and their adjacent parcelních numbers, including

land, existing and proposed buildings and civil engineering of objects

networks of technical equipment and connections to network engineering, with solutions

traffic, designating the protective and safety zones,

height dimensions of geological probes, odstupových distance, borders

the construction site, permanent and temporary works, adaptations for persons with reduced

mobility on roads; the changes of the construction, which is

cultural monument, the building in the conservation reserve or in a conservation zone

total (coordinating) the situation of the building (stopping the plan) in the scale of 1:200,



(c) the marking of the network design)



(d)) architectural drawings from a range of professions,



e) plans the foundations, individual floors, roofs, cuts, views,

the facade and other necessary attachments according to professions,



(f) the scale drawing 1): 200, 1:100, 1:50.



(D) the principles governing the Organization of construction.



and a description of the basic solution site), the characteristics of the construction site,



(b)) use of existing objects for the site facilities,



(c) the security of energy and networks) for the construction site and equipment



(d)) position of the surfaces of the equipment



(e) on the construction site, arrivals) transport routes, landfills,



f) requirements in terms of taking care of the environment for the realization of

construction-noise, dust, etc.,



g) ensuring construction site with regard to the safe and a separate movement of persons with

limited mobility,



(h) the period of construction, the term) of the commencement and completion of construction, a brief

the schedule of work and activities, liaison to the nodal points during construction,



and the establishment of conditions for the implementation) of the construction from the perspective of safety and

the protection of health at work.



E. Documents



Observations, opinions and the opinions of the interested public binding

authorities, the results of the negotiations conducted in the course of processing project

documentation, proof that the information was passed according to § 104 paragraph. 1

the building Act.



Annex 2



The scope and content of the project documentation of buildings for air release
the building permit or notification of construction in partial building

the proceedings.



Officially certified copies of the documents certifying the authorization for designing

Air ground equipment, or the approval of project documentation

authorised organisations is part of the project documentation.



Project documentation contains:



And the accompanying message.



B. Summary technical report



(C). The overall situation of the building (stopping the plan)



(D) the coordination of the construction drawing.



E. Documentation structures (construction)



F. Documentation of operational files



(G) the principles governing the Organization of construction.



(H).



Project documentation must always contain part of A to H broken down to

each item that the range of the individual parts must correspond to the

the nature and importance of the building, its location, the building-technical

the implementation, use, impact on the environment and the duration of the

the construction.



The common principles



1. construction project documentation specifies the space, its

breakdown, dimensions and types of structures and technological equipment. It proposes the

Special-purpose, civil construction technical and economic solution, meeting the

the conditions for its implementation, future use and maintenance.



2. Project documentation must



and) be treated in accordance with the terms of the zoning decision or

land use consent



(b)) must satisfy the General requirements for the construction and use of buildings, including the

the barrier-free use



(c)) to deal with changes to current structures of transport concerned and of the

technical infrastructure or connected to them,



(d)) allow access to the building and the technical and economical implementation of the

the construction,



(e)) to be complete, clear, and processed by an authorised person,



(f) include a way to ensure safety) and the protection of health at work on

the construction site.



3. The breakdown of construction on building objects and operational files and their

the designation.



The building is broken down according to these principles



and separately, are considering comprehensive) engineering and technology section

equipment, IE. building objects and operational files,



(b) building and operating objects) files to indicate the number and the name,



(c) construction and operation objects) files are divided into parts labeled

number sequence according to their nature, the way and the kind of discussion

documentation and purpose during construction implementation,



(d)) according to the nature of construction it is possible to create a separate group of construction

objects, and separate group operating files or associated with

operational files for building objects.



4. For sorting and numbering of parts applies the following basic breakdown

Number sequence Group parts



100 architectural-construction

200 Statics

300 Disabled-technical installation

400 heating, cooling

500 air conditioning

600 system, control of technological processes

700 electro-heavy-current distributions

800 Electric fire alarm system, evacuation

900 Electro-weak-current wiring

1000 security systems

1100 Elevators, escalators, travelators

1200 Gastronomy

1300 Interior

1400 Built fire equipment

1500 Forced heat and smoke

1600 waste management, cleaning

1700 Natural heat and smoke

Free 1800 series parts

1900 Free series parts

2000 information system



Fitness sorting of parts into each series depends on the nature of the construction,

the importance of the objects from the perspective of the whole construction and other circumstances. Free

many of the parts is reserved for any kind of object, which is not possible or

appropriate to include in the previous series.



5. If the client Asks for a building permit, gradually to buildings

the file contains the project documentation of the first construction of the overall situation

(urbanistic plan) file structures, including construction sites.



6. In the case of the planned transformation of the construction contains the overall situation

(urbanistic plan) indicate the range of the individual stages.



7. The overall situation of the construction and main constructional drawings (in particular plans,

the cuts, the street facade) in the implementation of providing stability

printing.



The contents of each part of the project documentation



And the accompanying message.



construction, identification and) name and surname, place of residence

the Builder, business name (natural persons), business name, COMPANY REGISTRATION NUMBER, registered office

the Builder (legal persons), name and surname of the designer, his

the contact address, the number under which it is registered in the register of authorized

persons, led by the Czech Chamber of architects or the Czech Chamber of Commerce

engineers and technicians working in construction with the declared

scope, where appropriate, the specialization of its authorization, and basic

characteristics of the building and its purpose,



(b) information on the current usage) and the fact that the territory of construction land

and the related relations,



(c) information on the surveys), and a connection to the public transport and the technical

infrastructure,



d) information on the compliance with the requirements of the authorities concerned,



(e) General) information on the requirements for the construction, including ensuring

the barrier-free use of the buildings,



f) data on compliance with the conditions of the regulatory plan, planning,

where appropriate, the planning information for buildings pursuant to § 104 paragraph. 1

the building Act,



(g)) and the associated time-binding and contingent upon the construction of the building and

other measures in the relevant territory,



h) estimated period of construction, the term start and completion of construction,

including a description of the procedure of construction,



I) statistical data on the indicative value of the construction of residential, commercial,

protection of the environment and the other in thousands of CZK



j) data on the floor of the residential building or residential area in m2, and the number of

apartments in residential and non-residential buildings,



for information on the implementation of the law) set the standards for the protection of the atmosphere and

noise indicators and their emission limit values in accordance with Act No. 472/2005

Coll., on the protection of the air, and Act No. 258/2000 Coll., on the protection of the public

health, and Decree No. 523/2006 Coll., laying down the values of noise

indicators in relation to the surrounding buildings.



B. Summary technical report



1. Town Planning, architectural and engineering solutions



and evaluation of the site for) changes in finished works, also the evaluation of the

current state of construction, structural and historical survey of the building,

that is a cultural monument, is a monument in the reservation or the phenomenon of conservation

zone, urban planning, architectural and art design, technical solutions

with descriptions of the buildings and civil engineering structures and external areas

the proposals of the green vegetation planting, editing,



(b) building on the transport) and the technical infrastructure,



(c) transport solutions, including solutions) traffic,



(d) compliance with the conditions laid down for) design of structures on undermined

and svážném territory



(e)) the influence of buildings on the environment and its protection, solutions



(f)) solution of infrastructure (technical and transport equipment) and connection

construction on the transport network and the network of the technical equipment of the territory,



g) compliance with the requirements by specific provisions,



(h) the Organization and safety of the construction site) in terms of the protection of the public

interests,



compliance with the conditions laid down, even) by the concerned authorities in accordance with the Special

regulations,



j) surveys and measurements, their evaluation and integration of their results to the

project documentation,



the basis for determining the building),



l) Division of the construction on the individual building and engineering objects and

technological operational files



the impact of the construction on m) of the surrounding land and buildings, the protection around the building before

negative effects of traffic construction during the execution of the project and its

complete, or minimize, by specific regulations,



n) way to ensure the protection of the health and safety of workers, if it is not

listed in the principles of organization of construction.



2. Solutions to mechanical resistance and stability of the construction



Pass the preliminary calculation of the static that the structure complies with the basic

requirements for the mechanical resistance and stability in accordance with Council directive

89/106/EEC.



3. The solution from the standpoint of fire safety



and the essential requirements for) the determination of building solutions construction and siting

in terms of fire safety,



(b)) limit the spread of fire to neighbouring construction,



(c) the indication of the volume and area) parameters of buildings with regard to their

equipment fire-safety equipment and emergency and solutions

escape routes.



4. Ensure the protection of health, healthy living conditions and the environment

environment



and the impact of the construction on) environment,



(b) the implementation of the conclusions of the EIA),



(c)) meet the essential requirements on the siting and construction of building solutions

the protection of the population and the implementation of the directive of the European Parliament and of the

2002/49/EC of 25 November 2003. June 2002 on evaluation and management of environmental noise

the outdoor environment.



5. Ensure the safety in use of the building



6. Protection against noise



and) data on predicted noise situation with the use of a noise

indicators,



(b)) the presentation of noise maps illustrating the exceedance of limit values

noise indicators and sophisticated maps on which the current situation

compared with various possible future situations.



7. Energy saving and heat protection



8. access and use of the Solution of the construction of persons with restricted mobility

motion and orientation



and communications solutions and policy) areas for the motion and visually impaired,
(b) policy inputs and solution) in the object for the physically and visually

people with disabilities,



(c)), or a solution of the health policy. and further background for the motion

people with disabilities,



(d) the principles of editing solutions) for the hearing impaired,



(e)) and selected list of special construction products for people

with reduced mobility.



9. protection of the building against the adverse effects of the external environment



Radon, aggressive water, seismicita, mining, trade and

safety zones.



10. Civil Engineering



and drainage of the territory)



(b)), water supply,



(c)) energy supply,



(d) transport solutions)



e) electronic communication.



11. production and nonproduction technological equipment of buildings (if in the

the construction of the present)



and the purpose, function,) capacity and the main technical parameters of technological

the device,



(b) a description of the technology, production)



(c) information on the number of workers),



(d) energy consumption data),



(e) the balance of raw materials, materials) and waste,



(f)) water management,



(g) transport solutions)



(h)) and protection of the working environment.



(C). The overall situation of the building (stopping the plan)



1. Contains, in particular,



and the planimetry and altimetry) territory of the construction and its nearest

the surrounding area, including the land register and putting height and coordinate

the system,



(b)) position and height of the designation of all the existing buildings and their

parts, IE. including underground engineering networks and other covered

the device according to the data provided and certified by their Manager, and including

the names of the streets and the other named spaces



(c) the plot to the cadastral maps),



(d) the circumference of the building and designations) temporary circuit construction site outside the territory

the construction,



(e) the designation of the areas of the land) vyjímaných of the soil and of the forest fund, with

a resolution of the permanent and temporary annexation,



(f) a designation of the demolition and cancelled) underground or above-ground

engineering networks, any felling accrued Green



(g)) position and altitude of the designation of the proposed construction, including its

the connection to the existing buildings and their parts, any realignment

underground or above-ground pipelines and the newly proposed Green, with

its basic dimensions that specify the position and size of the proposed

development activities in relation to the marking of the networks,



h) modifications for persons with reduced mobility on

communications,



I) designation of protection zones,



(j)) the designation of the probes carried out by the geological survey.



2. The overall situation of the building shall be made generally at a scale of 1:500,

exceptionally, in the scale of 1:1000. For separate cases of large structures

and for large scale construction of the liner shall be used appropriate to the nature of

These buildings, usually 1:2000 or 1:5000, for changes of construction, which is

cultural monument, the building in the conservation reserve or in a conservation zone

on a scale of 1:200.



3. Graphical processing of the overall situation of the building must be carried out in a manner

the corresponding competent CSN and allow unambiguous resolution

the proposed construction of the plot from the plot and the existing State of the

the designation of the other data, which are part of the project.



(D) the coordination of the construction drawings.



and the expression of the proposed relations) emphasizes the construction and especially

engineering networks, or outdoor technology and other distributions

the resulting development of the territory and the relationship between the utility networks or

any other distribution to each other,



(b)) characterized by way of utility networks crossing each other and with the other,

mainly engineering, objects, including required protections,



(c) the dimensional and positional) refines, also marking the height of the

data,



(d)), in the identical processes scale with the overall situation of the building, to which the

usually translates to printing.



In construction with a simple technical solutions details

coordination of the relations expressed directly in the overall situation.



E. Documentation of construction objects



1. Land (building) objects



1.1. The architectural and engineering solutions



1.1.1. Technical report



the purpose of the object),



(b) the principles of architectural, functional), layout and art

solutions, including solutions for access and use by persons with restricted object

mobility,



(c) special-purpose units (capacity), utility area, the premises,

built-up area), object orientation, lighting, sunbathing,



(d) the technical and structural design) buildings, its justification in relation to the

the use of the object and its desired service life,



e) heat technical characteristics of building structures and fill the holes,



(f) the method of establishing object) with regard to the results of the geotechnical and

of the survey,



(g) the effect of the construction) (object) and its use on the environment and the solutions

any negative effects,



h) transport solutions.



1.1.2. Drawing part



and floor plans in bases), scale 1:200 or 1:100 is shown by plotting their

the design, location, shafts, ducts, fittings of engineering course

networks and their height, groundwater solutions, design, insulation

against the bottom of the water or natural moisture as needed,



(b)) plans of individual floors and roofs in the scale of 1:200 or 1:100,

expressing architectural and construction solutions in the chosen design

the system with its basic dimensions of the rooms, spaces, and the main

construction, the dimensions of the elements, for the panelling of the ground plan of the roof position

gutters and downspouts and designating the technical equipment of buildings, including solution

sanitary and other facilities for persons with reduced mobility

the orientation of the plot, including sound leadership for the visually impaired and

drawings of details and sound leadership, haptic



c) cuts in the scale of 1:200 or 1:100, with schématickým showing the load bearing

construction, height dimensions of individual floors, entrances, adaptations of the original

I modified the field, related to the elevation of the first above-ground

floor,



d) ceilings schematically documenting the total architectural solutions with

showing the architectural elements such as balconies, balcony, Bay Windows

etc.,



(e) proposal on public connections) of the distribution network and sanitation,



(f) a proposal for a connection to the public) communication, traffic solutions,



g) drawing in the scale of 1:100 or 1:200 modifications to communications for persons

with mobility or Visual impairment,



h) additional drawings, where the character of buildings requires (perspective,

axonometrie, panoramic views, etc.), processed on special

the order.



The building, which is a cultural monument and building in the conservation reserve

or in the conservation zone, according to the letters and drawings) to c) processing in the

scale of 1:50.



1.2. Building components



1.2.1. The technical report



and a description of the proposed design of the system) of the building (the object). Description

and evaluation of the current state of the support system of the construction (of object) when

the draft amendments,



(b) the quality of the materials and dimensions) of main structural elements,



(c)) usable values, climate and other loads anticipated when

the design of the structure,



(d) a special warning,) unusual construction, construction details,

technological procedures, etc.,



e) technological conditions of progress of the work, which could have an impact on the

the stability of your own design, or construction of adjacent structures,



(f)) for the implementation of the demolition policy, podchycovacích work and consolidation

structures or penetrations,



g) control requirements zakrývaných construction,



(h) a list of the supporting documents, standards), literature, used software, etc.,



I) requirements on the scope and content of the documentation for the implementation of the construction

(object) and vendor documentation.



1.2.2. Drawing part



Show separate schematic drawings, if not enough data in the

technical report, or view the load-bearing structures in construction

drawings (plans and cuts)



and) basics (flat, depth),



(b)) the shape of monolithic concrete structures,



(c) report tracks drawing parts) prefabricated concrete structures,



(d)) the report of the metal and the drawings of wooden structures, etc.



1.2.3. Static. dynamic calculation



and the underlying conceptual solution) validation of the structure,



(b) the assessment of the stability of the structure)



(c)) the main elements of determining the dimensions of the structure, including its

the establishment,



(d)) dynamic static calculation (if the construction works of the dynamic

stress) that verifies the stability of the structure and the load carrying capacity of each

the proposed elements, including the establishment of the.



1.3. Fire safety solutions



1.3.1. Technical report



and a description and location of objects),



(b) the Division of objects into fire) sections,



(c) calculation of fire load) and the determination of the degree of fire safety,



(d)) the calculation of the fire resistance of building structures,



e) character of the escape routes, the assessment of their widths and lengths,



f) distances of buildings,



(g)) the requirements for the scope of the fire water supply,



h) number and placed fire extinguishers,



I) fire protection design requirements on the projects of other professions

(fire alarm, air conditioning, etc.),



j) access roads and entrance area.



1.3.2. Drawing part



Drawings show only for buildings, where fire brigade

It will require.



and the designation of fire sections,)



(b) the designation of the structure, resilience)
(c)), the design fire closures



(d)) proposal for a means of escape,



(e)) the location of fire hydrants, fire extinguishers, stable extinguishing

devices (sprinklers),



(f) proposal for electric fire alarm system),



g) design of emergency lighting,



(h)), the design of the fire ventilation



I) solution entry intervention areas.



1.4. The technique of environmental engineering



Process separately for each device and is usually broken

on



and equipment for the heating of buildings),



(b) equipment for the cooling of buildings),



(c) air conditioning) equipment,



d) equipment for measurement and control



(e)) device disabled the technical installations,



f) gas installations,



heavy-current electrical engineering equipment g) including lightning rods,



low-voltage electrical equipment) (including sound system

guidance and information for the visually impaired).



1.4.1. The technical report



Basic information according to individual types of equipment



and heating is noted) for the balance of the needs for heat, with indication of the heat-carrying medium,

the method of connecting to a custom source or on the outdoor divorce, a system

the regulatory equipment; justifies the choice of the heating system and training

warm and hot water.



b) boiler rooms and transfer station-technical report contains a balance of

the needs for heat, hourly and annual balance needs fuel and raw materials

hourly and annual, dimensioning of all machinery (boilers,

pumps, boilers, heat exchangers, etc.), dimensioning, determination of the number of

the labour force, the principles of control and measurement and indication of the requirements for the

ensure the care of the environment, work safety and fire protection.



(c) equipment for the cooling of buildings)-contains a basic guide

information about each of the internal distribution and equipment, their

the basic dimensions and wiring, a description of the location of the appliance and the cold end

elements, requirements for the construction and solution of some special

areas such as engine cooling, outdoor equipment allocation

cooling systems, transfer stations, the heat engine of a divorce,

switchboards and control stations.



(d) air handling equipment-lists) basic data (parameters

outdoor and indoor environment, characteristics and concepts

the proposed device, the default background for the dimensioning of the equipment),

Description and function of air conditioning equipment and their operation, the requirements of

on energy and the media (electricity, heat, cold, steam, water), overview

the proposed performance and balance energy consumption, the proposal for the protection of health and

protection against noise and vibration, the fire safety solutions

air-conditioning equipment, how to protect the environment, the way

ensure safety in the implementation and subsequent operation of the equipment,

measurement and control equipment-enter a brief description of each

circuits, their functions, the characteristic data of measured and controlled

the media and the characteristics of the traffic and the environment, the default parameters for the

the calculations of the device and regulation.



e-Health technical installation) documentation needs of the water balance,

domestic hot water, the quantity of sewage, the operating conditions (pressure,

speed, conditions for connecting on the outdoor network), a description of the situation with the

the location of the object with the výškopisem in absolute dimensions, position of the

engineering networks.



(f)) for gas devices balance the needs, the number of connected appliances

operating conditions on the outdoor network, connection type and pressure of the gas

media, the media, the operating pressure balance of gas consumption, a description of the billing

and a secondary gas sampling measurement and its regulation, including

parameters measuring and regulatory devices, a description of the technical solution

(description schema), and pipeline routes in the building.



(g) for high voltage electrical device) are given operating data for

the individual spaces, energy balance is installed and the maximum

contemporary input, how to connect to public electrical distribution

energy, the kind of lighting with data on the intensity; in the case of low-voltage

wiring, switches and switching States description and justification of the concept

solutions for Lightning indicates the technical report, a brief description of the device,

How to perform with an indication of the local uzemňovacích conditions.



(h) low-voltage electrical equipment) for a description of how the technical

the solution in terms of the requirements on the way and the character of the distribution, the

How to store the cable line to the construction techniques, types of

the proposed equipment.



1.4.2. Drawing part



It contains only the basic orientation of the individual schemes of internal

wiring and equipment, their basic dimensions and the leadership, on any

location of fixtures. Requirements for the construction and solution

some special areas such as boiler rooms, heat exchange stations

switchboards, switches and control stations, whose layout is

usually part of the drawings of the building part.



1.4.3. calculation of



The necessary calculations, thermal, acoustic, lighting, insolation,

etc.



2. Engineering objects



This category includes bridges, tunnels, subways, culverts,

hydrotechnical and hydro power objects, communication vehicle, pedestrian,

operating areas, parking areas and parking, the preparation of the territory,

landscaping, green areas, playground, civil engineering (water supply, sanitation,

gas, heat distributions, collectors, including connections engineering

networks), external heavy-current distributions, public lighting and additional engineering

objects, which are addressed again as a separate project documentation

in the following sections.



2.1. The technical report



and engineering, object) with a description of its functional and technical solutions,



(b) the requirements on equipment)



(c)) the current engineering networks,



(d)) on the relationship mode of surface water,



e) data on the processed technical calculations and their results, and

the implications for the proposed solution,



(f) the requirements for the procedure of the work),



(g)) the requirements for the operation of equipment, information on materials, energy,

transport, storage, etc.



h) communications solutions in terms of access and use by persons with

mobility and visual impairments,



I) consequences on the environment, safety, etc.



2.2. Drawing part



and engineering, including object) induced realignment of roads,

liquid discharges, engineering networks, the objects intended for demolition or

reconstruction,



b) longitudinal profiles and sample cross sections (for underground leadership only in the

particularly complex cases),



c) characteristic cross sections usually at a scale of 1:100, to determine

estimate the range of earthworks and technical adjustments,



d) drawings of the technical object (gas station, transformer substation, the shaft

etc.) in the scale of 1:100,



e) technical adjustments to the drawings (including the main dimensions and material

solution) for persons with mobility communications and visual impairment in the

a scale of 1:100 or 1:200,



f) marking drawings.



Objects of the associated routes (collectors, technical passages, and channels)

document similar to terrestrial objects.



2.3. The static calculations and drawings



Shall be carried out only for the buildings and objects of design

and of the reasons for the assessment of the stability of the buildings require (bridges, tunnels,

culverts, subways, sink, etc.).



2.4. other calculations



Shall be carried out for example. hydraulic engineering calculations, design of networks, including the

the energy of the objects, the determination of capacity needs, etc.



F. Documentation of operational files (technology section)



1. The technical report



description of the program),



(b) the list of documents)



(c)) the need of materials, raw materials and the quantities of finished products,



(d) a description of the technology, production)



(e)) the basic structure of technological equipment (purpose, description and basic

parameters),



(f) a description of the warehouse and) material handling in the production,

the requirements for the transport of both internal and external,



(g) the impact of technology on the building) solutions,



(h) information about the need for energy), fuels, water and other media, including

requirements and the places of connection.



2. Drawing part



and the basic technological schemes), supporting the purpose and the level of

the proposed manufacturing process,



(b) the disposition and the main location), machinery and equipment and their

Incorporation (floor plans, sections, usually at a scale of 1:100).



(G) the principles governing the Organization of construction.



1. Technical Management



1.1. basic solutions to the construction site and site facilities



and site characteristics, capacity) and the use of existing objects

for the purposes of the site facilities, the requirements for existing

objects, including the requirements needed to bring these objects into the

original or otherwise the desired status,



(b) building capacity and utilization) of objects, carried out in the framework of object-oriented

system construction; requirements on editing these objects for the purposes of the device

the site, including the necessary adaptations for persons with reduced mobility

and orientation,



(c)) the way the water supply security, electricity, gas, etc. on

construction method of connection of telecommunications equipment on

telecommunications network during the period of construction, method of connection of the drain on

device objects and method of the construction site, the construction site drainage

the estimated need for pumping of groundwater and how their payment

from the construction site,
(d) the estimated number of workers) in the construction and the creation of

satisfactory social conditions for their activities, e) the effects of the implementation of the

the construction on the environment and the way the exclusion or restriction of undesirable

the effects,



f) data on specific measures and or how to carry out the activities

requiring special security measures, the quantities and types of waste

arising from the construction and Assembly activities (including municipal

waste) and the conditions for handling and storage of waste,



(g)), on the proposal for a landfill that could be stored wastes arising from

construction and Assembly activities, design space for temporary storage of soil

(the repository), which stores the soil from the construction site, and then uses the

on the reverse, a design space for backfilling mining of soil (zemníků) for its imports

on the construction site, if necessary,



(h) requirements for construction site fencing) or other measures to prevent

entry of unauthorized persons on the construction site. The way of vocational treatment and

protection stands for the construction,



I) data on the establishment of the environment in the various areas carried out by the

the construction,



j) definition of safety zones and protection zones,



the requirements for the implementation of the work) in cases that are being implemented for the construction

traffic conditions for progress of work (construction); the coordination of work (construction)

with the current operation, the requirements for the protection of the newly implemented parts of the

construction requirements for any traffic restrictions,



l) comply with safety and health at work, including the conditions for the

the provision of first aid, the application of the requirements for familiarization of workers with

the safety, operational and fire protection directives in force in the

operated by objects or files; requirements for fire

safety of operation and carried out of the building; requirements for the maintenance of order and

purity on the adjacent public spaces.



1.2. Organization of transport Project, which addresses the



and transport routes for transporting) of crucial supplies and material,

transport routes for the transport of soil, waste and other unnecessary

materials of construction, the proposal on the adjustment of transport routes, including the proposal on the

the change of road signs,



(b) traffic restrictions and) any movement of pedestrians in the immediate vicinity

the construction site, the requirements for the processing of permits for special uses

public communications



(c) a proposal for the Organization of transport) and the movement of persons on the construction site, including

road signs,



(d)) proposal for measures to prevent the pollution of the public communications networks in the

exit traffic and building mechanisms from the construction site.



1.3. Conditions and requirements on the implementation of the construction



and the determination of the timing) assurance of realization of the projects,

description of the procedure for the implementation of the work of the (construction) of each building

objects and operational files, including a proposal for the requirements for the machines and

mechanisms, design work for the transport of materials, products,

machinery and equipment to be carried out of the building (using the mounting holes),



(b)) the list of documents that the contractor shall deliver to the purchaser no later than

When the submission and receipt of the relevant structures and operational

files,



(c)) start dates, completion, submission and acceptance of individual

structures and operational files, dates and scope of the construction

preparedness, dates back submission of construction objects and or

their parts after installation for the completion of the construction work,



(d) a proposal for follow-up action), the location of building mechanisms (cranes,

including the crane tracks, elevators), start dates and duration of the comprehensive

try, start and duration of trial operation, start dates

and the period of guarantee tests, dates to the early indication of certain parts of the

structures and operational files into operation, evacuation of the term

the construction site and bringing it to its original state,



(e) a comprehensive evaluation) requirements for operational files, where appropriate,

part of the documentation requirements for comprehensive testing.



1.4. Requirements for the trial operation of the completion of construction



1.5. requirements for rules of operation



1.6. the requirements for the implementation of the guarantee tests



The design parameters that will demonstrate the contractor within the guarantee

the tests.



2. Plan for safety and health at work



Within the meaning of the provisions of section 15, paragraph. 2 of the Act No. 309/2006 Coll. and section 6 and

Annex 5 of the regulation of the Government No. 591/2006 Sb.



2.1. the rules on the implementation of the works on the construction site



and specific measures for the implementation of) the work, increased danger,



b) data and information on health and safety at work, which is

must comply when carrying out any construction and Assembly works

on the construction site.



3. The situation of the site facilities



Handles are in scale with the overall situation in the same building, to which the

usually reflects the trapping or directly to zakresluje. The situation of the

must be handled in accordance with the technical standards and must clearly

to distinguish the proposed construction of an existing condition, etc.



Contains the drawing



and the boundaries of the site and or) construction sites, where the secondary site

under consideration, including ensuring construction site with regard to the safe and

a separate movement of persons with reduced mobility,



(b)), the definition of the areas of communications, quarries or other areas for landfills and the temporary

device objects construction site without their factual and hasového usage



(c)) the location of the deponií soil or topsoil and zemníků set up for the

the purpose of the construction,



(d)), on the main and side entrances of the construction site, water intakes and

energy to the construction site, including offtake points, connecting the individual

objects the device construction site on sanitation and drainage construction site,

the connection to the interbank telecommunications network, the location of the wells in case of need

the pumping of groundwater,



(e)) the designation, which will be removed in the construction, the designation of the

the crop, which will be professionally treated and protected during the construction,



(f) the designation of the safety zones) from the existing buildings and facilities.



4. The timetable of the construction



and) chart (lhůtovém) preparation of the construction according to the

individual structures and operational files, indicating the

critical dates,



b) chart (lhůtovém) procedure of realization of each of the

structures and operational files, stating the dates,

terms of preparedness for the installation, after mounting, the submission deadlines for the

the completion of the construction work and deadlines, submission and acceptance



(c) the time the layout of financial volumes), construction (if they are the subject of

monitoring), claims for the estimated number of workers for the implementation of the

building objects and for the Assembly of technological equipment (if it is

required).



5. the documents



Part of the book "the Organization of construction Project" contains in particular the following

documents



and a discussion of the connection) the construction site on water and energy resources,



(b) the record of discussion) connection objects to the site facilities and drainage

the construction site on sanitation,



(c) the record of discussion) connection of the building to public communication,



(d) the record of discussion of the connection), the construction of the telecommunications network,



(e) the record of discussion) Organization of transport,



(f) the record of discussion) deposit of waste and surplus excavations into landfill,



(g) the record of discussion) location of skladek for saving the Earth,

subsequently applied to the reverse of landscapes,



(h) the record of discussion options) excavates soils for construction needs.



(H).



and the binding opinion of the institutions concerned) and other documents on the results of

discussion of the project with relevant authorities and organisations responsible for

the performance of State administration,



(b) a decision on the location of the building),



(c)) or other documents.



Annex 3



The scope and content of the project documentation for implementation of air.



Officially certified copies of the documents certifying the authorization for designing

Air ground equipment, or the approval of project documentation

authorised organisations is part of the project documentation.



Project documentation for the implementation of the building contains the part of the



And ground structures



B. Engineering objects



(C) the Operational files.



Project documentation must always contain part and (C) broken down to

each item that the range of the individual parts must correspond to the

the nature and importance of the building, its location, the building-technical

the implementation, use, impact on the environment and the duration of the

the construction.



The breakdown of project documentation



The breakdown is based on the breakdown of the structures proposed in the project documentation

certified in construction management (see annex No. 2 of this order) with the

the launch of a comprehensive technical report.



Highlights the derogations, or supplement the information against documentation

together with the building permit.



The Division shall comply with the construction on objects and on any sections (partial

the construction).



For large and large buildings may split on the part of the customer of the construction,

that enters the different contractors. In this case, the individual parts

include only the relevant objects, or their part.



The common principles



Project documentation for implementation of construction works specifies requirements for construction

the resulting from the technical and qualitative aspects. Must be

drawn up to detail that clearly define the subject of the works,
i.e.. the building, its technical features and allow you to draw up an inventory of the work

as the basis for valuation of the construction of the building.



In the preparation of project documentation for the execution of the project must

to comply with the proposal for the construction of the specified project documentation according to annex No 2

This order certified in construction management and building requirements

authorisation, consent and vodoprávního vodoprávního decision. Project

the documentation for the implementation of the construction requires the completion of the design of construction in

the project documentation for the clear definition of the realization of the construction

works, supplies and services.



Part of the project documentation for implementation of construction it is not documentation

for auxiliary work, production technical documentation and product documentation

delivered to the building.



Project documentation for implementation of construction is the document, which is intended

for the contractor of the construction, for the investor and for the building authority to control

inspections. Project documentation for implementation of construction determines the

contractor what to produce and what kind of quality. These requirements must

be unambiguous and sufficiently.



1. The technical report



Process in the same composition and structure as in the project documentation

referred to in annex 2 of this order, of which the relevant data takes over with

by



and), supplements and further justifies any data and any derogations

against the certified project documentation,



(b)) justifies and refining the technical, design, material or

layout,



(c)), where appropriate, the specific conditions for the implementation, installation, or

technological procedures.



2. Drawing part



Process in an appropriate scale (usually 1:50)



and drawing documentation) in the range of point and 1.2 or (B) 2,



(b)) the drawings the details (details) for binding to the contractor's or

the shape of complex design (elements) which are subject to special

requirements and which must be respected in the implementation of the construction,



(c) complementary drawings only) legends in the extent of information that

cannot be represented graphically.



3. The calculations



Handle to the necessary extent and controllable form. Calculations

they are part of the documentation and connect as documents in two

copies.



4. the documents



Evidence of the results of the negotiations with the competent authorities and organisations

responsible for the performance of State administration and with other participants in the construction and

other documents required for the implementation of the construction and the inspection tours

the construction.



And ground structures



1. Architectural and construction solutions



1.1. Technical report



Process according to common principles and lists



and the purpose of the object, purpose) units, capacity, built-up area,

obestavený space



(b) the results of the surveys and supplementary) calculations,



(c)) any changes to the architectural, technical and layout

construction, dazzle, a description of the technical solution, data on the construction-physical

the properties of the external cladding, or other critical

structures according to the purpose, treatment of surfaces, a type of Windows and doors, internal

equipment, solutions, security system



(d)) data on the technical equipment of the object (medical technology, Central

heating, air conditioning, electrical installations and artificial lighting, etc.),

an overview of the technological equipment located in the object



e) detailed requirements of technical and materials solutions suitable for disabled guests

adaptations for persons with reduced mobility,



f) characteristics of environment premises, protection against noise and other

negative effects, safety and health protection, protection against corrosion,

or stray currents, vegetation, editing



g) solution for fire protection, civil defence, adjustments for disabled persons

If it comes into consideration,



h) energy consumption for heating (thermal characteristics).



1.2. Drawing documentation



According to the nature, size and complexity of the znázorňovaného object, and with the

taking into account the purpose and readability is usually at a scale of

1:100 and contains



layout drawing of the object), including the distance from adjacent objects and with

information about the coordinate and elevation system,



(b) the excavation and foundations) drawing (usually at a scale of 1:100 or 1:50)



(c) drawings, floor plans, sections) and views (usually at a scale of 1:100 or

1:50 pm), which displays spaces and rooms, vertical and

the horizontal load-bearing and non-loadbearing structure, stairs, ramps, roof and

curtain walls, gutters and downspouts, the range and type of insulation, the outlines of the

the main internal installations, including all fixtures

health technology and the designation of the tiles, the treatment of surfaces, floors,

dilation, ventilation system, chimney and ventilation vents, holes, including

their fill, construction (approaches, obezdění, plento tion,

ducts, foundations under machinery and equipment),



(d) the adjustment in the wheelchair-accessible drawings), scale 1:50, including the necessary

the details,



(e) complementary drawings as needed),



(f)) statement of Bill of construction work, statements and a list of carpentry,

locksmith and plumbing products, concrete and other products and

the major elements of the construction of light prefabrication,



g) views of the all surfaces of the facades of the object,



h) drawings of the wheelchair modifications in the scale of 1:50, including the necessary

details.



Documentation of machines and devices that are part of the construction section

handles reasonably similar as documentation of machines and equipment

the technological parts.



2. Construction structural part



Process for concrete, metal, wooden and other support structures.



2.1. The technical report



and a detailed description of the proposed carrier) system construction with a resolution

each of the constructs according to species, and the proposed technology

materials,



(b) the cross-sectional dimensions of the individual) components by reference to

drawings,



(c) description of non-traditional technology) procedures and specific requirements on

the implementation and quality of the proposed structure,



(d) the determination of the required checks) zakrývaných construction and any

control measurements and tests, if they are required in excess of the

mandatory,



(e) reconstruction of existing buildings) or their changes-a description of the current

the status of the construction of the necessary measures to maintain

stability in the proposed route, or the stability of the

neighboring objects,



f) requirements and specifications to the elaboration of the documentation provided by the

the contractor of the construction,



(g) fire protection) requirements for structures,



h) safety requirements in the implementation of load-bearing structures.



2.2. Drawing part



floor plans and drawings of the load-bearing structures) in the scale of 1:50, 1:100,

including the folded down cuts, views and details in the required details,



(b) establishment of special types of drawings)-the foundations of the monolithic,

prefabricated, manned and others



(c) the details of the relationship, anchoring), etc. on a scale of 1:20 or 1:10 or 1:5,



d) prefabricated building components, the schema



e) reinforcement scheme of monolithic concrete structures, or as

surface processed by the contractor of the construction reinforcement drawings,



(f)), the report details and anchorage of steel structures-plans,

Modular networks, cuts and specifying clearly the views of the structure with the

marking sections of all structural elements, details of anchoring

construction,



(g)) of the report, the details and anchoring wooden structures-plans,

Modular networks, cuts and specifying clearly the views of the structure with the

marking sections of all structural elements, details of anchoring

construction.



2.3. Detailed static calculation



Is a complete basis for drawing up the technical specifications of the design

parts and drawings for construction. Contains

Dimensioning of all structures, provided by the contractor of the construction.

The static calculation must be controlled, it must be clear, so that the

It was possible to track the progress of the calculation, design load, the considered

static schema and computational model.



Detailed static calculation contains, in particular,



and the accompanying message) to calculate with a brief overview of the basic

the concept of the solution structure and the differences against the preliminary calculation,

referred to in the preceding stage of project documentation,



(b)) used documents: standards, legislation, literature, programs, sizing,



(c) static structure, schema)



(d)) the materials and technologies,



(e)), the load conditions load recap including factors

load combination factors, and



f) models of computation, computational schemes,



(g)) the design and assessment of all load-bearing elements



h) calculation of the effects on the fundamentals, dimensioning, foundations



I) proposal and the assessment of all of the details of Assembly, contacts and other

the decisive and affecting the safety of the construction,



j) the production process-the concrete, odbedňování, Assembly, prestressing,

throwing the completed structures, etc.



3. The technique of environmental engineering



3.1. technical installation Disabled



3.1.1. Technical report



and water consumption) of the cold, warm, and productive, a description of metering

and the required water treatment,



(b) a description of the technical solution) tap the operating conditions (pressure,

speed, top required) description of the materials used,



(c)), the technical solution of the fire water system of divorce, mechanical
the equipment and the proposed system device,



(d)), the technical solution drains, the materials used, pumping equipment,



(e)) capacity data of discharged sewage, stormwater and industrial

waste water treatment and their modification,



(f) the conditions of connection to the public) or local area network technical

infrastructure,



g) description of fixtures for use by persons with reduced construction

mobility and orientation.



3.1.2. drawings (in scale construction drawings)



and) the situation with the connections, layout of machinery and equipment

non-technological nature,



(b)) scheme of the divorce with longitudinal profiles and the necessary cuts,



(c) the foundations of the plan) is shown by plotting svodného sewer piping including

dimensions, materials and fittings, its position in relation to the basics, shafts

and execution of the basics,



(d) the disposition of sewage and tap water) at a scale of 1:100 or 1:50, with the

showing the layout and distance of the pipeline including equipment and other

elements (layout is drawn in the ground plans and sections required in order to achieve

full compliance and link the whole project). Isometric view

Alternatively, tap the advanced cuts



e) developed the cuts waste and sewage pipe with the connection

the designation of the dimensions and the material of the pipes and fittings and designating the ceiling

structures and roofs in place of the sewer line, penetration



(f) the designation of the material listing) in the drawings,



(g) the details of the report, the water meter)



h) drawings of the hydrometric shafts, input manholes located

outside the buildings,



I) lists of machines and equipment.



3.2. The heating of buildings



3.2.1. The technical report



States, in particular,



and the heat source type) boiler room (fuel type), heat exchange, pass-through

the station, equipment, heat recovery, the justification for choice of system

heating and hot water preparation and production,



b) climatic conditions of the place of the construction and operating conditions,



(c) an overview of the proposed values) heat-technical properties

building structures,



(d) the heat loss of the building) after rooms and an overview of the thermal

the profits of the building,



e) overview of the air-conditioning equipment connected to the heat distribution with

indicating the nominal thermal inputs needed,



(f) the determination of the required heat output) heat source and the required

heat consumption for heating, air conditioning differentiated and preparation

hot water with the indication of the media,



(g) a description of the primary media connections), the nominal parameters negotiated

the amount of the subscription



(h) a description of the method of heating) of each type of space and traffic



I) description of the heating surfaces, the location, the connection method on thermal

system, temperature control in the area,



j) vertical scheme of the heating system.



In the case of the objects of heat sources (boiler rooms, heat exchange stations) technical report

It also contains



and the heat source) the location of the disposition and construction solutions, balance

heat consumption, the balance of the fuel consumption, the dimensioning of the machine

equipment, Proportioning chimneys or other calculations (fly ash, particulates

ventilation of boiler rooms, etc.),



(b) a description of the heat exchanger)/heat transfer stations, parameters, primary and

secondary parties, signalling and control system,



(c) a description of the relevant heating system) and the distribution of the individual circuits,

nominal temperature gradient, pressure zone, the type of circuits of divorce

(single pipe, twin pipe),



(d)) the parameters of the circulators and safety valves,



(e) the principles of heat consumption measurement), balancing and regulating the system of divorce

heat,



f) pressure conditions in the cooled system (boost pressure, operating pressure,

the maximum pressure, the opening pressure of the safety valve),



g) description of how the preparation of hot water, connection to the heating system,

thermal power, a way of regulating the preparation of hot water,



h) materials listing the individual parts of the pipeline system, the definition of coatings,

thermal insulation, a description of how the suspension piping, storage and method

the compensation,



I) security care for the environment, safety of work and technical

equipment and fire protection.



3.2.2. Drawings of the



and the disposition and schema) boiler rooms and machine rooms, including details of distributors,

pantographs and structural parts of boiler rooms,



(b) a device for plotting) supply of heat to the floor plans of each

floors in the scale of 1:50 and more (for large objects 1:100),



(c) the distribution and the relevant schema) slices



(d)) the lists of machines and equipment.



3.3. Ventilation device



3.3.1. The technical report



and climatic conditions of the site), considered the highest and lowest

the outdoor temperature, calculated



(b) a description of the operation, type of) fully automatic, manual, mode of operation-continuous,

occasional, intermittent, etc.,



(c)), the required parameters of the internal microclimate,



d) concept, the basic data and characteristics of the device,



e) types of spaces ventilated naturally or artificially, minimum benefits

the fresh air, the proportion of air circulation,



(f) the location of the outdoor air intake), ventilation exhaust,



(g)) of the selected air performances for each room



h) noise load on the indoor and outdoor environment, data on

pollutants, emissions and their concentrations,



I) number and location central-air adjustment,



j) heat loss and air conditioned spaces, load the required

the parameters for the summer/winter operation,



k) description of ventilation and air conditioning of the individual spaces and facilities



l) description of air-conditioning equipment, the list of devices with

indication of performance parameters,



m) requirements for heat, cooling equipment and electric příkony,



n) device location-editing engine air management in the

serviced areas, the distribution of the air in the space,



of noise control and fire-fighting measures) on the air handling

devices,



p) concept and the ranges of pipe networks, the numbers and types of pumps, road closures

and other fittings,



q) concept and range of pipe networks, ways of hanging, storage,



r) instructions for Assembly, the requirements for putting into service.



The technical reports can also be connect



-table room with basic required parameters temperature,

air and noise parameters



-a table of the device with the basic parameters of the air and energy

individual air-conditioning equipment, fire control table

flaps.



3.3.2. drawings



and plotting the distribution systems and air-conditioning) equipment to floor plans

each floor in the scale of 1:50 and more (for large and complex

engine detailed drawings of the 1:25, cuts the space 1:50)



b) cuts in space outside the machinery space,



(c)) and diagram of air-conditioning equipment,



(d)) and diagram of pipe networks and location of pipe networks and drawings

their accessories,



e) data necessary for the setup of the system,



(f)) the list of machinery and equipment.



3.4. the heavy-current electrical engineering and electric



3.4.1. Technical report



and) basic technical data, information on the nature of each environment

spaces following the construction part,



(b) a description of the type of power supply to divorce),



(c)) the energy balance and the maximum current input of the installed and

split to individual types of appliances,



d) way of measuring consumption of electrical energy, its estimated annual

consumption on the basis of operating hours,



(e)) way to connect to a public distribution of electricity if the

occurs,



f) substitute resources including backed-up divorces,



(g) a description of the technical solution) lighting system including control,



(h) a description of the technical solution)-current circuits,



I) description of the technical solution of the connection of air conditioning, cooling systems

heating, sanitary, fire systems, security

alarm system, CCTV system, including the method of measurement and control

the regulation,



j) description of the technical solution linking technological units (elevators,

escalators, etc.),



the kind of grounding to) (work, trade),



l) short-circuit currents calculation results on the power distribution panels,



The technical report also connects



-in the case of a transformer station in the following solutions to connect the VN



-proposals for comprehensive testing of the wiring



-a description of any changes and differences in the technical solution against

the previous level of project documentation



3.4.2. drawings



and heavy current wiring and equipment) that are plotted to floor plans in the recommended

a scale of 1:100 or 1:50,



(b) drawings, floor plans) broken down on part of the lighting and power distribution systems

including the current circuits,



(c) the scheme of control that way), the service, the binding and blocking solutions

other special requirements



(d) detailed installation scheme) (plan), drawings showing the distribution routes

the dimensions of the profiles of channels, footbridges, etc.,



an additional specification drawings) switchboards, cabinets and panels



(f)) the list of machinery and equipment, including an inventory of cables and conductors,



(g)), the justification and description of used equipment will



h) drawings of the earthing system, the connection to the zachytávačů schema

the earthing system and laying Foundation earthing connections, connections



I) layout drawing zachytávačů on the rooftops, or Faraday

the network,



(j)) of metal structures, object link



to save cable) the way or another lead to construction

constructs.



3.5. devices and low-voltage distribution system and sound management and
information for visually impaired



3.5.1. Technical report



Contains a description and justification of the concept of the solution in relation to the technological

the device, or to a single telecommunications network



and a description of the technical solution), depending on the method and the nature of

the distribution,



(b)) types of proposed equipment,



(c) enumeration of the main standards), used in the processing of documentation and

binding for Assembly,



(d) proposal on the comprehensive tests).



3.5.2. drawings



the basic technical data and), the power supply voltage, the way

protection,



(b)) all equipment into a clear drawing floor plans scale 1:100

or 1:50,



(c)), schema



(d) the disposition of equipment) and is shown by plotting the main

combined routes



an additional specification drawings) switchboards, cabinets and panels, a list of

machinery and equipment,



(f) the cable line to) the imposition of building constructions.



3.6. System control, measurement and control, electrical signaling



3.6.1. The technical report



Contains a brief description of each of the circuits (boiler room, heat exchange

the station, air handling equipment, etc.)



and technical data) the basic measurement and control, the power supply voltage

system, method of protection against electric shock,



(b)) the way of the technical solution of the individual technological regulation

units of air conditioning, heating, refrigeration and medical equipment or

alarm systems,



(c) the proposed establishment, types)



(d) a list of the main device)



e) enumeration of the main standards used in the processing of documentation and

binding for Assembly,



f) inventory data points divided by the distributors,



(g)) proposal on the comprehensive tests of measuring and regulation, control system or

electrical signaling.



3.6.2. drawings



and) disposition of machines and equipment, with an indication of the measured and controlled

places in connection to the main switchboard (substation)



(b) the disposition of the control rooms), distributors, device boxes, showing the main

dimensions,



(c)) how to save cable or another leadership against building

constructions,



(d) the supplementary specification drawings) switchboards, cabinets and panels



(e)) proposal to comprehensive tests of measuring and regulation, control system or

electrical signaling.



3.7. Equipment for the cooling of buildings



3.7.1. The technical report



and climatic conditions of the place) the construction and the operating conditions (intended

the highest outdoor temperature, outdoor air enthalpy, the number of operating

hours with details of opening hours, the number of working days in the week and the year),



(b) a description of the basic concepts) refrigeration equipment



(c)) enumerates the types refrigerated spaces



(d) the location of the outdoor air intake) for equipment, waste removal

the air, the number and the location of the central-air adjustment,



e) entering the thermal loads, air-conditioned spaces, the

parameters in air-conditioned spaces-summer/winter,



(f)) the need in different types of spaces,



(g)) of noise parameters in indoor and outdoor environments,



h) data on chladivech and their potential harmfulness,



I) description of ventilation and air conditioning of the individual spaces and facilities

with the supply of cold,



(j) a description of the device) resources,



for descriptions of each end appliances),



l) engine location resources and individual device resources



m) a description of the distribution of cold and a description of the accessories of the divorce,



n) requirements on cooling performance and electric příkony,



about) a brief description of how the operation and regulation of the equipment and

air conditioning, a description of the concepts of measurement and control device for cooling

buildings,



p) a description of how the suspension or the imposition of the pipes,



q) noise control and fire-fighting measures



r) description of stringing the pipes,



Part of the report may also be



-table room with basic parameters and the required temperature

noise,



-table with the basic device temperature and energy parameters

individual air-conditioning equipment for the supply of cold in the building



3.7.2. drawings



and plotting the distribution of cold and) device to the floor plans of each

floors in the scale of 1:50 and larger



(b) the floor plan drawings and slices) engine resources cold



c) cuts in the space outside the engine room,



(d) individual air-conditioning equipment) schemas with subscriptions to the cold,



(e)) the designation of the insulation.



3.8. Gas equipment



3.8.1. The technical report



and the gas type and pressure) media, operating pressure media, consumption

gas,



(b) a description of the technical solution), internal schemas,



c) description of the machinery, appliances, gas appliances for regulation,

gas boiler room equipment, the location of the main caps and gas description

the route,



(d) distribution of appliances according to the parameters) input,



(e) the testing of the safety device) before commissioning, the way

safety checks during operation,



f) measurement of the gas and its regulation, including the parameters of the measuring and

regulatory devices,



(g) the conditions of connection to) pipeline network in accordance with a binding

the opinion of the operator.



3.8.2. drawings



and the plans for the gas pipeline routes) in each of the floors in the scale 1:100

or 1:50, the dimension and the pressure of the media, with pipes, numbering

the designation of the material and dimensions of pipes, valves and meters,



b) risers in the scale of 1:100 or 1:50,



c) mechanical equipment gas boiler at a scale of 1:50,



(d)), possibly isometry developed cuts pipeline with description

all the elements,



(e)) including connection to external distribution network.



2.4. The interiors and interior equipment



3.9.1. The technical report



and the proposed policy,) the architectural and Visual solutions

including disabled access, editing solution



(b) the technical description of the solution and the) structure of interior parts and the internal

the device,



(c)) the conditions for installation and technological procedures,



(d) building, construction)



(e)), the color of the solution.



3.9.2. drawings



and) plans (usually at a scale of 1:100 or 1:50) showing the adjustments

interiors,



(b)) slices and views of the exposed parts of the Interior,



(c) the layout of each room),



(d) report, details) links to construction and other professions,



(e)) the designation of the building, the details of the anchoring ties,



(f)), the mouth of the other professions of the solution schema (medical technology,

electrical installations, air conditioning, computer network, etc.),



(g)) the report of individual items with the indication of the details,



h) the list of equipment.



3.10. other equipment



If they are not included in previous entries-management system

cooling device, assurance, fire alarm, active

anticorrosive protection of underground facilities, etc.



3.10.1. Technical report



Process according to common principles.



3.10.2. drawings



The purpose of the process, including a list of machinery and equipment.



3.11. the external equipment of buildings



3.11.1. Technical report



Description of the total solution, including barrier-free use, technical description

adjustments, minor elements of architecture and their description.



3.11.2. drawings



and) outdoor garden and landscaping,



(b)) the sidewalks,



c) paved surfaces,



(d)), wall



(e)),



(f) the elements of small architecture).



3.12. The requirements for comprehensive evaluation



Shall be shown in the technical reports of the individual parts of a project.



B. Engineering objects



The documentation is processed separately for the different types of engineering

buildings and objects.



and preparation of the territory, gross) landscaping,



b) clean landscaping, public green areas, playground,



(c)) (vehicle, pedestrian, operational areas, supporting

parking, flat objects),



d) bridges, tunnels, hydrotechnical and hydro power objects,



e) civil engineering (water supply, sewerage, gas, heat distributions,

collectors), outdoor high voltage power distribution systems, public lighting, outdoor

media distribution,



(f)) other engineering objects.



1. Structural and technical solutions (outside of the outdoor light, heavy

and media distribution systems)



1.1. Technical report



description of object) engineering and ancillary equipment,



(b) assessment of the results of the survey),



(c) a description of the functional and technical) solutions



(d) a description of the details of the adjustments) belonging to the use of the construction of persons with

limited mobility,



(e)) edit mode, surface water and groundwater,



(f) the processing of technical) data on the calculations and the results thereof,



(g) a description of the connection to the existing) engineering networks,



(h)) special requirements for how the building work and the operation and maintenance

the device,



I) characteristics and description of the technical solution of the object from the point of care

for the environment and in terms of safety and health at

the work,



j) civil defense solutions,



description of the solution to) protection against corrosion,



l) detailed static calculations, hydraulic engineering calculations and other additional

calculations.



For civil engineering objects, the nature of the land-based objects are reasonably

It shall apply the provisions of part A.



1.2. The drawings



Be drawn up on the basis of detailed measurements in the place of routes and objects



Overview of the situation) (in reasonable scale),



(b) drawing showing the layout) link on the points marking the network



(c)), the longitudinal profile, with an indication of all the cruising,
d) master and characteristic transverse slices at a scale of 1:100,



(e) drawings, excavation and výlomových) work and delivery,



f) drawings, retaining walls, bridges, subways, etc.,



g) drawings of the complex cruising, connections and branches communications and

subways remote management,



h) arranged drawings of the objects, their floor plans, sections and views

(usually at a scale of 1:100 or 1:50), including the establishment of the drawings of the lower

buildings, supporting structures, tracks of prefabricated structures,



I) drawings of other supporting structures, shapes, drawings and reinforcement,

include installation drawings,



j) details, drawings



to) traffic signs, the wiring diagram of the device active, or

joint protection,



l) statement of Bill (the list of machinery and equipment),



m) drawings of the wheelchair modifications in the scale of 1:50, including the necessary

details.



2. Outdoor light and heavy-current distributions



2.1. The technical report



Process according to common principles and contains further



and the results of the calculations for smoothing),



b) grounding,



(c) the loss of voltage)



(d)) the intensity of the lighting.



2.2. The drawings



and single pole wiring scheme),



(b)), or single pole vícepólová schema with the type designation and type

the device, which captures the way of power, protection, measurement and protection



c) schema and a description of how the management, service, solutions, blocking, and bindings

other special requirements, with an indication of the location of the devices of different

device, indicate the intensity of lighting,



(d) the disposition of the device) is shown by plotting divorce HVAC



e) situational drawings zakótovaných cable routes,



f) marking of the objects and drawing routes,



g) sample cross sections of cables, excavations and save drawings and transitions

the crossing,



h) drawings of the earthing system,



even the location of lighting fixtures) disposition, poles and appliances with an indication of the type and

performance,



j) the list of equipment.



3. Outdoor media distribution



3.1. Technical report



Process according to common principles.



3.2. The drawings



and all the outdoor plans) joint media distribution,



b) situational and aligning drawing objects and routes,



c) sample cross sections of cables, excavations and save



d) drawings of the crossings and crossings,



e) drawings and construction for cable hangers,



(f))-list of device list with an indication of the length of the cables.



4. Active or common protection against corrosion



4.1. Technical report



Contains the description and the method of solution.



4.2. The drawings



and the disposition of the stored equipment) showing the individual components

active protection



(b)), the protection scheme



(c)) the list of machinery and equipment.



C. Documentation of operational files (technology section)



In the technical reports to each of the operational files shall describe the changes

and deviations compared to the project for a building permit, in particular with regard to

set the binding conditions.



1. the system of technological process control-measurement and regulation



1.1. Technical report



and description management system), including a description of the individual parts,



(b) an overview of controlled variables), the way and the required accuracy of measurements and

operating range,



(c) the characteristics of the traffic and environment),



(d) a description of the connection of the power supply system),



(e)) the requirements for safety and health at work and the protection of

of the environment.



1.2. The drawings



and clear wiring diagram),



b) wiring diagram switchboards, cabinets and panels



(c) the supplementary specification drawings) switchboards, cabinets and panels



d) disposition of machines and equipment, with an indication of the measured and controlled

places,



e) drawings of the routes of cable and pipe distribution systems with the layout

distance,



f) drawings for the appropriate installation and operation



(g)) the list of machinery and equipment-inventory lines indicating the parameters,



(h) a specification of the elements referred to in items) supplies (cabinets, appliances, action

the elements),



I) inventory of cables, wires, and other elements,



(j)) way to deal with subscription.



2. The power and operational distribution of HVAC



2.1. The technical report



and systems, and the choice of the current) voltage,



(b)) the way of connection, the beginning and the end of the operation,



(c)) data on the total maximum current consumption and an overview of the consumption on the

individual jet systems broken down by voltage;

the installed output,



(d) protection against short circuit) solutions,



(e) the results of the calculations) short-circuit currents, currents protection solution against

overload and against a dangerous contact voltage



f) voltage and power factor compensation,



(g)) the way of grounding,



h) description of the solution of blocking control, measuring and signaling; separate

requirements for the handling and operation of the equipment under all operating conditions,



I) requirements on safety and health at work and the protection of

of the environment.



2.2. The drawings



and clear wiring diagram) switchboards,



(b)), or the vícepólová single pole wiring diagram,



(c) auxiliary circuits),



(d) outdoor wiring scheme), which captures the involvement of individual devices

with the designation of the species and the cross-section of the cables and wires including marking of terminals,



e) disposition of machines and equipment, is shown by plotting divorce HVAC

drawings of cable routes with distance, the layout of the



(f)) the list of machinery and equipment-specification for each of the items

supply (switchboards, cabinets, transformers, etc.),



(g)), the list of appliances



h) inventory of power cables and wires (type, cross-section, length).



3. operating the pipeline



3.1. Technical report



and) a brief technical description of species selected pipeline, the beginning and the end

operating the pipeline,



(b)) surface protection, color solutions



(c) how to perform option) thermal insulation,



(d)) the requirements for testing,



e) requirements in terms of safety at work and of technical equipment.



3.2. The drawings



and the pipeline schema)



b) disposition (at a scale of 1:100 or 1:50) designating and layout

distance of the pipeline including of fittings and other elements (disposition draws

in ground plans and sections required in order to achieve full compliance and transfer

in the context of the technological parts),



(c) specification of pipeline-list) pipeline branches,



(d) a breakdown of the pipe elements) of pipeline parts and metal constructions,



e) insulation and coatings.



3.3. List of machinery and equipment



and a breakdown of the pipe components) of pipeline parts and metal constructions,



(b)), indicating the device specifications characteristics and parameters

uniquely identifying the device.



4. operating air conditioning



4.1. Technical report



and operational file) description of the characteristics of the device and the calculation of the

selected performances



(b)) surface protection and solution



(c) how to perform option) thermal insulation,



d) requirements for the manufacture, Assembly and test.



4.2. The drawings



and the overall scheme)



b) disposition (at a scale of 1:100 or 1:50) designating and layout

distance of the pipeline including air conditioning equipment and other elements

(layout is drawn in the ground plans and sections required in order to achieve full

compliance and interconnection within the framework of technological parts),



(c)) the list of machinery and equipment-specification of machinery and equipment, piping and

metal structures,



(d)), specification



e) specification of the insulation and coatings.



5. Active protection against corrosion and heretic branches before the streams



5.1. Technical report



and a description of how the solution)



(b)), the characteristics and specifications of the device parameters for unique

the determination of the relevant equipment.



5.2. The drawings



and the disposition of the stored equipment) designating individual elements of active

protection,



(b)), the protection scheme



(c) the disposition of the individual elements of protection),



(d)) the list of machinery and equipment-device specifications including Assembly in

the details of the relevant method of security of supply and installation.



6. electronic communication devices, low-voltage equipment and wiring



6.1. Technical report



and) description and justification of the concept of a solution in relation to the technological

the device,



b) links to the existing facilities.



6.2. the Drawings



and distribution, schema)



(b) the disposition of equipment), and is shown by plotting cable routes,



(c)) the list of machinery and equipment,



d) specifications, including cables and the installation of the device.



7. maintenance of machinery and equipment



7.1. Technical report



and identification and solution areas), areas and access paths for disassembly

the device and its nodes,



(b) the necessary adaptations) of building structures,



(c)) the accessibility and conditions of interchangeability of elements and nodes,



d) capacity and the technical data of the device, the operator intended for

maintenance,



(e)) the principles of technological procedures and conditions for the maintenance and

repairs of selected device



(f)), the safety and health protection at work and the protection of

of the environment.



7.2. the Drawings



and the equipment needed for maintenance), which have the character of fundamental

the funds shall be documented, as production (operating),



(b)) the list of machinery and equipment-shall draw up, as appropriate, as

in the case of the (operational) of the device.



Process in the range according to the requirements of the customer (building contractor).



8. requirements for comprehensive evaluation



Annex 4



The scope and content of the project documentation of buildings on the runway for the Declaration

the building, listed in the building Act.
Project documentation contains eight sections, which are governed by the annex No. 1

Decree No. 499/2006 Coll., on the documentation of buildings, as amended

regulations.



And the accompanying report, which should include in particular the identification of the

construction, stavebníkovi, territory, meet any of the requirements of the concerned

the authorities and participants in the proceedings.



B. Summary technical report, from which it is apparent, in particular,

architectural and technical solutions to the construction, infrastructure,

the impact of construction on the environment, addressing the legal requirements on

building safety, health protection, protection against noise, policy solutions

for persons with reduced mobility, including the list of

used special and selected construction products for these individuals

etc.



C. the situation of the building, i.e.,. map showing the connection to the engineering networks,

communication, stopping the plan.



(D) the portion of the Drawing and the Appendix., which consists, in particular, technical report,

floor plans of the foundations and individual floors and roofs, cuts, views,

suggestions of connections, the assessment of the stability of the structure, detail drawings

wheelchair-accessible cabins with WC and wheelchair-accessible checkout (bulkhead) and details

haptic and sound management, including phrases in the future, guiding

etc.



E. Vacant.



(F) the Organization of construction Policy. (IE. in particular, a description of the site and its

link to the engineering networks, etc., indicative of the period of construction, including the

ensure the conditions for the use of the publicly available communications

related to construction sites by persons with reduced mobility

orientation).



(G) the costs of the construction, it serves. for the needs of the Builder.



H. Book part, which includes opinions, opinions for the purposes of construction.



The other project documentation for construction on the runway as referred to within the meaning of

the building Act contains the following sections.



And the accompanying message.



(B). the summary part



(C) the situation of the building.



(D) Drawing and part of the Appendix.



(E) Vacant.



(F) the principles governing the Organization of construction.



(G) the costs of the construction.



(H).



Binding is the breakdown of project documentation and identification of their parts.

The contents of each of the parts shall apply mutatis mutandis to the nature, importance, and

the extent of construction, construction-technical design, purpose and duration

the construction.



The contents of each part of the project documentation



And the accompanying message.



1. Identification data of the construction



and the name of the building) the same specification and approved the preparatory

documentation (the number of characters in the 100 is based on the requirements of the ISPROFIN),

containing the subject of the investment and instead of investment, place or

the area of the construction,



(b)) identification data to the contracting authority-stavebníkovi (name, address, identification number,

VAT REGISTRATION NUMBER),



(c) project-supplier) name and address, identification number, TAX ID NUMBER, manufacturing Department

processors (the person with permission to the project hinnosti), individual

subcontractors (name and seat or the name and address, COMPANY REGISTRATION NUMBER, VAT REGISTRATION NUMBER).



2. basic data on the location of the building (category of the track, the track section,

the municipality, location etc.)



and) village, region, cadastral territory



(b)) and building land property relations to him,



c) transport and technical infrastructure in the territory.



3. Basic information about construction



and construction (the length) the extent, nature and size of the finished construction,

equipment),



(b)), a brief description of the purpose of the construction and function



(c) compliance with the General requirements of the) construction and meet the requirements of

the institutions concerned,



(d)) and the time of the binding of the surroundings,



(e) the method and execution time).



(B). the summary part



1. the summary technical report contains a simple technical description of the building



and the evaluation of the construction site, including evaluation) of the current status, measurement and

surveys and the integration of their results to the project construction and historical

a survey of the building, which is a cultural monument, the phenomenon of conservation reserve

or the phenomenon of conservation zone



(b) the technical solution of the construction with) a description of its implementation,



c) mechanical resistance and stability



(d) the connection of the building to transport) and the technical infrastructure,



(e) the impact of the construction on the transport) and its organization, the surrounding land and buildings,

the minimization of the negative effects of the construction on the environment,



(f) the basis for determining the building).



2. Barrier-free use



The barrier-free use of the solution (the list of used special and selected

construction products)-solution approach and the use of the construction of persons with

limited mobility, including placing conditions,

ensuring the use of the publicly available communications

related to construction sites by persons with reduced mobility

orientation.



3. Waste management and other influences on the environment



4. Ensure the safety in use of the building



(C) the situation of the building.



1. Overview of the situation of the location of the buildings and the wider relations that are plotted in a

map of the substrate in the scale 1:5000 and 1:50000. This situation is

draw up as a separate annex or placed on the free space on a

the situation of the building.



2. the situation of the building in scale 1:1000 or 1:500, for large buildings in

scale 1:5000 or 1:2000; Displays the current status of the territory (or

used as the base frame of the map), the proposed construction, binding on around,

the protection concerned, transport and technical infrastructure.



(D) Drawing and part of the Appendix.



Project documentation will be processed to the extent of the building Act.



1. If the nature of the construction requires the sample cross sections shall draw up

in the scale of 1:50 or 1:100, the characteristic cross sections of 1:100 or

1:200 and details of the proposed structures in the scale of 1:20 1:50 or 1:100.



2. modifications for persons with reduced mobility on

communications, drawings of details and barrier-free wheelchair-accessible cabins WC

Treasury (bulkhead) and details of the haptic and sound management, including

the phrase indicative of bollards.



3. Greening Project (layers of editing), including drawing.



4. for changes of construction, which is a cultural monument, the construction of the monument

reservation or in a heritage zone in the scale of 1:200, including the addition of

views or drawings of the construction of railways in the photos, and visualization.



(F) the principles governing the Organization of construction.



and the principles of leadership and management) of the public service, detours, traffic

marking,



(b)) the material and timetable of work, moving materials, landfill materials



(c) the estimated period of construction), a description of the process of the construction,



(d) determining the conditions for the implementation) of the construction from the perspective of safety and

health protection at work,



(e) a provisional designation) construction site with regard to the safe movement of persons with

limited mobility during construction (e.g., access to

the platform during construction).



(G).



Is used only for the needs of the Builder. Part of this part is a statement of the Bill

with the name of the item, including the technical specifications.



(H).



Opinions, opinions, and the results of the negotiations conducted in the course of processing

project documentation.



Annex 5



The scope and content of the project documentation of buildings and structures on the track for

the issue of the building permit or notification in the shortened construction

the proceedings.



Project documentation contains a section



And the accompanying message.



(B). the summary part



(C) the situation of the building.



D. the technological part



E. construction



(F) the principles governing the Organization of construction.



(G) construction costs (note is used only for the needs of the Builder)



(H).



I. Geodetic documentation



Project documentation must always be part of and to and broken down to

each item that the range of the individual parts must correspond to the

the nature and importance of the building, its location, the building-technical

the implementation, use, impact on the environment and the duration of the

the construction.



Project documentation for construction of the runways and buildings on the runway with handles

in one level and at the level of documentation that includes both

the design documentation for issuance of a building permit or notification

Summary and project documentation for implementation

the building, with the exception of selected operational files of the technological parts,

that work their way up separately as part of the delivery.



If any part of the documentation is not an option (e.g., the construction does not

the technological part), discards, but while maintaining the designation (e.g..

D. the technological part-vacant).



The contents of each part of the project documentation



And the accompanying message.



1. the Processes within the meaning of Annex No. 1 of the Decree No 499/2006 Coll., on

documentation of buildings, in the wording of later regulations.



2. Basic information about construction



and location of the construction) (categories of the track, the track section, village,

localization, etc.),



(b)), a brief description of construction from the perspective of special purpose functions,



(c) the projected capacity building including) the basic technical parameters

and traffic data and proposed technologies and equipment,



(d) the characteristics of the territory of the building),



(e) the requirements for the implementation of the construction).



3. the list of default documents



and operating buildings) Division and building objects (files, changes in

object composition),



(b) changes in the composition of the object) from the previous level of documentation,

including appropriate justification.



4. Justification of the building and its location



justification for the necessity of the building) on the basis of prepared and negotiated

the previous instance of the documentation,



(b) an evaluation of the technical condition of the incumbent) and hitherto utilization

assets,



(c)) data on higher quality technical and technological
the parameters of the construction.



5. Early usage of buildings, the provisional construction to the test usage

operation, its duration, in relation to the completion of the acceptance and use of the

construction



and the gradual transmission of data), parts of the buildings in use, which will be

separately, put into trial operation,



(b)), the list of temporary objects (e.g. rail link, the temporary bridge,

etc.).



6. The operational files and building objects subject to technical and

safety test



The list shall be called. designated technical facilities and structures

(e.g. the railway superstructure, permanent and temporary bridges, etc.).



7. list owners or administrators of tangible investment

resources



List of the owners shall be, where appropriate, administrators material

investment funds broken down by each operational files

and building of objects or their parts.



8. information on compliance with the General requirements for the construction, including the

the barrier-free use of the building.



9. Breakdown of the project documentation of buildings and structures on the track for

the issue of the building permit or notification in the shortened construction

the management of



Enter the structure, content and scope of the project documentation.



10. the list of operational files and building objects with a direct link to the

the parameters of the interoperability



For the assessment of conformity with the technical specifications of interoperability (u

buildings selected railway network of the Czech Republic) to draw up a list of

operational files and building of objects that have a direct link to the

one of the Basic or other binding parameters for interoperability

According to the relevant decree on the operational and technical connectivity

the European rail system. Operational files and building objects

will be broken down in this list from "subsystems" infrastructure, energy,

management and security (energy subsystem will contain a separate

technology and construction).



(B). the summary part



1. the summary technical report



Evaluation of the construction site, the construction also completed the evaluation of the changes

current state of construction; construction-historical survey of the building,

that is a cultural monument, is a monument in the reservation or the phenomenon of conservation

zone.



2. Surveys and handouts



and carried out surveys), measurements and conclusions arising therefrom

for the processing of the project and construction,



(b) the suitability of the geological and hydrogeological) conditions in the territory,



(c)) used surveying and map data, and the conditions for establishing marking

the network of global positioning and height (the primary system).



3. The protection



and historical data concerned) protection zones and protected

territories,



(b) the establishment of new protection zones) (dimensions and location in the field),



(c) the data on the protected bearing) areas and specification of mine

the conditions for processing the proposal ensure the construction against the effects of

undermining (protection-according to the Act on nature and landscape protection in the

as amended),



(d)) data on the Green,



e) data on the záborech agricultural and Forestry Fund.



4. The concept of the construction



the purpose of the building (and) the overall concept solution, justification of the proposed solution

regard to the purpose of the building, its location),



(b)) an overview of the General technical requirements for the construction,

including the use of barrier-free construction



(c)) architectural and urban integration of the building into the territory, its

appearance and art design,



(d)), a brief description of the technical solution proposed by

operational files and building objects, e.g.. useful length

tracks the length of platforms, traffic rate, including breakdowns,

parking, wheelchair accessible transport routes, the type of solution

the signalling system of the traction management, etc.,



(e) a proposal for the requirements for rolling) execution of the project and on the gradual placing

construction of operation (use) and the estimated period of construction,



(f) construction requirements on resources) (electricity, water, gas-balance

energy consumption, the conditions for increased power,

the conditions for the increase of the technical maximum),



g) diversion of surface waters, the connection to the sewer system (claims on water

economy, the discharge of waste water, including consents, the protection

-the zone of sanitary protection, the qualitative and quantitative

indicators wastewater treatment, operation and emergency orders, solutions of connection

building on the existing network of technical equipment),



h) connection to the transport system (the number of parking spaces, transport routes and transport

frequency),



I) range and the greening of the replacement planting,



j) safety at work (the source of the threat to the health and safety of workers,

How to limit the risk of the effects, safety zones and escape routes,

protection of workers and the environment from the effects of harmful substances,

storage of hazardous substances and handling),



to the construction from the perspective of) an assessment of the technical requirements for the use of the building

persons with reduced mobility, information on the fulfilment of the

the requirements for barrier-free solutions to the construction,



l) shall be contingent upon, and other related investments and

assumptions or claims on their security,



m) indicate the static calculations demonstrating that the building is designed,

to load on her acting in the course of construction and use, not

results in



-damage (collapse) of the building or part thereof,



-more to an inadmissible degree.



5. information on the fulfilment of the conditions laid down



and the decision on the location of the) conditions of buildings,



(b) environmental impact assessment) conditions of the environment,



(c) compliance with the capacity and other) provided data and justification

any proposed changes compared to the previous level of documentation.



6. Preparation for construction



and the release site) (land and buildings),



(b)) the use of existing or constructed objects,



(c)) the temporary use of existing buildings for the construction,



(d)) method to perform demolition and landfill space,



e) liquidation (transplanting, felling, re-utilization)



(f) disposal of harmful waste) (to deal with according to the type of waste),



g) security buffer zones of protected objects and stands for

the construction,



h) shifting of underground and aerial lines, transport routes, water

flows,



I) restrictive or safety measures in preparation of the construction site and in

during construction (blasting object or rocks),



j) lockout transport and other transport (rail, road, etc.),



to the restrictions in the supply of energy).



7. Purchase of land and buildings or their parts (apartments and non-residential premises)



Enter the total range of permanent and temporary confiscation or other prejudice

land and buildings or dwellings and non-residential premises or parts of

required for construction.



8. Exceptions to the provisions



List of approvals, exceptions and úlevových of the regulations, which is

subject to the proposed technical solutions, including evidence of their grant.



9. operating and transport technology



If the changes compared to the previous level of documentation,

influence on the scope of the railway infrastructure and operation, the operational and

transport technology updated to the date of submission of the project

documentation of buildings and structures on the track building

the authorization or notification in the shortened construction management. Detail is

handled by the operating and transport technology during construction with direct

link to construction procedures and with the design of transport and construction

measures, if they are needed.



10. the impact of construction on the environment



The extent of the influence of processing of the construction on the environment in the project

documentation of buildings and structures on the track building

the authorization or notification in the shortened construction management arises from the

clarifications and changes in the technical section of the documentation from the previous

the degree of documentation, including the protection against noise. If there was a change

compared to the noise study, which was part of the preparatory documentation

make up and noise studies, biological research and environmental impact assessment

the environment in cases where assessment is ordered according to the

Act No. 100/2001 Coll., on the assessment of the effects on the environment, in

as amended.



11. Project documentation of buildings in terms of incorporating all

the necessary requirements for safety and health at work, resistance and

the security of the building in terms of fire protection, hygiene, and defense of the State,

resistance and protection against the effects of traction and energy management (in the

pursuant to section 41 of the Decree No 246/2001 Coll., on the determination of the conditions of the fire

the safety and performance of State Fire supervision (Decree on fire

Prevention), in the wording of later regulations).



A description indicating how the proposed solution meets the requirements

the relevant Ordinances, regulations, and standards (health and safety at

work, including potential risks, the technical solution of the construction and operation of the

aspects of fire protection, including water resources, external fire

hydrants, fire alarm, fire stations or houses, etc.

Further characteristics of the objects and operations in terms of fire protection. Will

given the specific proof of fulfilling the required conditions and

from the previous instance of the documentation).



Fire protection construction will be discussed with the integrated
rescue system. In the case of tunnels longer than 1 000 m as part of the

the project documentation is handled by the "plan of fire-safety tests",

under the trial operation.



12. Energy calculations



and) addresses the energy consumption for electric traction, power

Dimensioning of power stations and supporting documents for current and voltage

the dimensioning of the fixed electrical traction equipment



(b)) addresses the effects of reverse traction circuits on the power network of energy and

It proposes a way of reducing rear impacts,



(c) the balance control) addresses the active and reactive power outputs and proposed measures

to ensure the prescribed factor. The results of the calculations, it is necessary to discuss

the builders and then with the suppliers of electricity.



13. Corrosion protection



Enter the protection of objects against the effects of corrosion caused by the heretic branches.

To prevent a negative influence, above all zložných devices

It is necessary to ensure that the requirements on corrosion survey



and DC electrified lines) for the traction system 3 kV,

as before the construction of the (preliminary survey and design of construction of corrosion

measuring points) and before putting the device into operation

(additional corrosion survey),



(b)) in the place of contact DC and independent traction, and 5 km from the

isolated contact towards the traction of the independent,



(c)) in places of contact of DC and AC traction system to

a distance of 5 km from the neutral field in the direction of the lines supplied by alternating

traction power supply system



(d)) in places of strong DC sources (e.g. public

to the right).



On the basis of the results of corrosion surveys shall be submitted

solution of safeguard measures against the effects of stray currents according to the valid

regulations. To prevent a negative influence particularly storage

equipment and electrical equipment, it is necessary to ensure that receivers

corrosion survey requirements.



14. the dynamic course of the Chart speed (applies only to national and

regional railways)



Specifying the processed Dynamic Chart over the speed of the previous

the degree. Shall be drawn up for the fastest passenger trains and for continuous

freight trains. Contains the proposed line speed for classic

(with the lack of superelevation in the arc to the 100 mm and 130 mm) and for

units with tilting casings on the existing track speed, description

direction and sklonových conditions, including their station, marking the position of the

transported and stops. Shows dynamic progress of speed building

on the neighboring track sections (only for construction processes of modernization and

reconstruction to increase speed).



15. Traffic measures



All measures of transport (rail and road), in particular the

lockouts, replacement transport, possible detours, closures, etc.



16. Permanent and temporary land plots of agricultural land fund and

land intended for the performance of the functions of the forest



Enter the total range of permanent and temporary annexation of the land or the scope of the

the restriction of the use of the land in the subdivision according to type of agricultural soil Fund

and the land intended for the performance of the functions of the forest and the deviations from the previous

the degree.



17. Energy saving and heat protection



and meet the requirements on energy) of the performance of buildings and the fulfilment of the

comparative indicators according to a uniform method of calculating the energy

performance of buildings,



(b) the determination of total energy consumption).



18. protection of the building against the harmful effects of the external environment



Radon (for the purposes of realization of constructions), aggressive water,

seizmicita, mining, protective and safety zones, etc.



19. Protection of the population



Compliance with the essential requirements for the siting and construction solutions construction

the protection of the population.



20. Barrier-free use



and policy solutions for persons) with reduced mobility,



(b) the principles for the solution of the person) of the visually impaired,



(c) policy solutions for persons) with hearing disabilities



(d)) and selected list of special construction products for these

persons, including the use of information systems solutions.



(C) the situation of the building.



The situation of the building consists of a summary and simple construction drawings,

where appropriate, the architectural drawings of the construction works, or notable objects to

assess compliance solution of the construction with the surrounding buildings or landscapes with

the following breakdown.



1. Overview of the situation of the building



Overview of the situation is generally at a scale of 1:5000 and 1:10000

(1:50000), with an indication of the scale of the construction, the decisive

objects, or with ties to the surrounding, the determination of transport routes for

transport of material for construction.



2. the coordination of the situation of the building



Coordinating construction usually handles the situation in a scale of 1:1000,

station 1:500, 1:200, ground objects for changes of construction, which is

cultural monument, the building in the conservation reserve or in a conservation zone

on a scale of 1:200. Coordination is also used for the construction of the situation, the needs of the

Organization of construction.



Contains



planimetry and altimetry) territory of the construction and its nearest surroundings

showing the borders of the land and buildings and their parcelních numbers

According to the land registry, including the neighboring land and land

buildings, coordinate and elevation systems,



(b)) position and height of the designation of all of the existing fixed

tangible assets, including all engineering networks and other covered

devices certified their owners where appropriate, administrators,



(c) the designation of the perimeter of the building,) the perimeter of the construction site, including areas of the device

the construction site,



(d) the designation of the areas of the land) odnímaných from the soil and forest fund with

a resolution of the settlement of permanent and temporary,



(e)) the designation of all existing buffer zones and protected areas and

safety distances



(f) the designation of the newly proposed) protection zones,



(g) the designation of the boundaries of the existing and) a new perimeter track,



h) modifications for persons with reduced mobility on

communications,



(I) the designation of the demolitions, namely) of underground and above-ground engineering

networks, or the felling of mature green,



(j)) position and altitude of the designation of the proposed construction of all operating

files and building objects, including its connection to the existing situation,



the combo box and the legend) the numbers of all operational files and building

objects,



l) indicate the anticipated border drop kotlin (zones of influence)

the tunnel construction.



For structures with complex technical solutions, in addition to coordinating the situation

construction process and coordinating cross sections.



3. Drawings of the architectural design of the building, or notable objects



and if it is necessary) are drawings of architectural design

construction or prominent objects, e.g.. the plot details of barrier-free

cabin with WC and wheelchair-accessible checkout (bulkhead) and details of the haptic and

sound management, including phrases in the future, guiding



(b)) for the construction, which is a cultural monument and building in the conservation

reservation or in the conservation zone, whether drawings, floor plan, floor plan basics

the individual floors and roofs, with schématickým showing slices of load-bearing

design, editing, input the original and modified the terrain, at a scale of 1:50.



D. the technological part



The technological part consists of individual operational files

processed separately. More technical and technological details

are dealt with by Decree No. 177/1995 Coll. issuing the construction and

technical regulations, as amended. The breakdown of the documentation

the technological part is determined as follows, unless agreed

otherwise, that part of the relevant operational file is also

the security of the Transitional State for construction (provisional

security devices, etc.).



1. A generic list of technological parts of broken down on the basis of national regulations.



1.1. Safety equipment



and) interlocking system,



(b)) the track signalling equipment,



(c)) of the level crossing safety installation,



(d)) spádovištní security device



e) remote control of signalling equipment,



(f)), and indicators indicators hot flat rounds.



1.2. Communication equipment



and local cabling),



(b) radio equipment)



(c)), integrated telecommunications equipment,



(d)), electric fire and security alarm systems,



e) remote cable, remote optical cable, mounting an optical cable,



(f) the involvement of the remote cable) a remote optical cable and lifting

the optical cable into operation,



g) information system for passengers,



h) track radio communication,



I) other communication equipment.



1.3. the heavy-current technology



and dispatching management technique)



(b)) technology VVN/VN (energy),



(c) heavy-current technology) substations (substation infrastructure,

traction transformoven)



(d) the power of traction technology) of switching stations



e) technology transformation stations, HV/LV (energy),



(f) heavy-current technology electric stations) 6 kV, 50 Hz for power supply

signalling equipment,



g) operating HVAC distribution



h) power signalling and telecommunication equipment of traction.



1.4. other equipment



and) passenger lifts, stair lifts,
b) escalators,



c) measurement and control, automatic control system, electrical fire

signaling.



For the assessment of conformity with the technical specifications of interoperability (u

buildings selected railway network of the Czech Republic) handles supplier

documentation list of operational files and building objects that have

a direct link to any of the Basic or other binding parameters

broken down according to the subsystems "infrastructure, management and security

the energy ". Whereas the previous breakdown is performed at national

basis, and the list from the breakdown in the European Union.



2. A generic list of technological parts of broken down according to the subsystems "of management and

security, energy "



2.1. Control-command and signalling "



2.1.1. Safety equipment



and) interlocking system,



(b)) the track signalling equipment,



(c)) of the level crossing safety installation,



d) remote control signalling



e) indicators and indicators for flat hot wheels.



2.1.2. Communication equipment



and local cabling),



(b) the remote cable, remote) optical cable, mounting an optical cable,



c) track radio communication.



2.2. Energy subsystem



Heavy-current technology



and VVN) technology/VN (energy),



(b) heavy-current technology) substations (substation infrastructure,

traction transformoven)



(c) the power of traction technology) of switching stations



d) technology transformation stations, HV/LV (energy),



(e) heavy-current technology electric stations) 6 kV, 50 Hz for power supply

signalling equipment,



f) operating HVAC distribution



g) power signalling and telecommunication equipment of traction.



NB. Construction of the energy subsystem is contained in part E.



3. Project documentation of the various operational structures and files

construction on the runway for the issuance of a building permit or a notification in

shortened construction management consists of technical reports, drafting

part of the works, supplies, and the main material (statement of the Bill)

including the technical specifications, and drawings must be obvious

existing and proposed State.



3.1. Technical report all operational files contains



and description and basic data) about the current state, including the identification

the operating data of the file



(b)) a list of input documents, the



(c) a description and justification of the proposed) the technical solution and main

technical parameters



(d) a description of the proposed solution) in relation to the care of the environment and in

relation to the use,



(e) the justification for any of the exceptions) the operating rules of the file and

deviations from the previous instance of the documentation,



(f) compliance with the relevant) details of the conditions of the previous degree of documentation

on the operational file,



g) connection to other operational files and building objects



(h) the protection against hazardous touch) voltage,



I) building construction, installation procedures



j) the calculation of power consumption, or other media,



the necessary calculations to) necessary for the justification of the proposed solution

are not included in part B (summary),



l) overview of the standards, rules, sample sheets, etc.



m) a summary of the relevant conclusions from the working meetings, including putting

link to the book section,



n) summary of critical opinions affecting the technical solution

including a link to the book section that contains all the necessary

consultation,



a list of input documents).



If it is not to be given to the factual nature of one of the points) to o)

accept, it is possible to omit it.



3.2. The drawings



3.3. List of works, supplies and the main material (used only for the

the need for a Commissioner)



E. construction



Construction section consists of individual building of objects processed

separately.



More technical and technological details are dealt with by Decree No.

177/1995 Coll. issuing the construction and technical regulations, as amended by

amended.



1. A generic list of building part of the broken down on the basis of national regulations.



1.1. Engineering objects



and the track superstructure and substructure),



(b)),



(c)), level crossings,



d) bridges, culverts and the wall,



e) other engineering objects (civil engineering and hydraulic engineering

objects),



f) piping (water, gas, sewerage)



g) tunnels,



h) infrastructure



also, collectors, cabelling)



j) noise control objects.



1.2. Land buildings and technical equipment of road construction

objects



and terrestrial objects) buildings (operational, technological, inventory)



b) roofing, shelters on the platforms of the stations,



(c)) the individual noise protection measures,



(d) guidance system)



(e)), demolition



(f)), the internal health technical installation of the gas pipeline, fire water supply,



g) heating,



h) ventilation equipment,



and the public part of the information system) installed in buildings,



j) artificial lighting and internal heavy-current distributions,



to) lightning,



l) internal communications,



m) indoor equipment of buildings (Interior),



n) external equipment of buildings.



1.3. the Traction and power equipment



and overhead lines,)



(b)) power station (substation, traction substation)-construction,



(c) the switching station building)-part



(d)), heating (electric, gas),



(e) the electric pre-heating device),



f) distribution of VN, NN, lighting and disconnectors remote control,



(g)), a part of the metal structures,



h) external grounding.



For the assessment of conformity with the technical specifications of interoperability (u

buildings selected railway network of the Czech Republic) handles supplier

documentation list of operational files and building objects that have

a direct link to any of the Basic or other binding parameters

broken down according to the subsystems "infrastructure, management and security

the energy ". Whereas the previous breakdown is performed at national

basis, and the list from the breakdown in the European Union.



2. General list building part broken down according to the subsystems "infrastructure,

the energy "



2.1. the "Telephony" infrastructure "



2.1.1. Engineering objects



and the track superstructure and substructure),



(b)),



(c)), level crossings,



d) bridges, culverts and the wall,



e) tunnels,



noise control f) objects.



2.1.2. The land building objects



and roofing, shelters) platforms at the stations,



(b)) the individual noise protection measures.



2.2. Energy subsystem



Traction and power equipment



and overhead lines,)



(b)), heating (electric, gas),



(c) the electric pre-heating device),



d) divorces VN, NN, lighting and disconnectors remote control,



(e)) part of the metal structures,



f) external grounding.



NB. The technological part of the energy subsystem is contained in section (D).



3. the individual building project documentation of buildings and objects

construction on the runway for the issuance of a building permit or a notification in

shortened construction management consists of technical reports, drafting

parts and measurements and drawings must be clear so far and the

the proposed status. Part of the documentation can be static and dynamic

calculations of the main and decisive building structures, which shall

in the calculation of the appropriate construction of the object.



3.1. Technical report contains all of the structures



and description and basic data) about the current state, including the identification

the data of the contracting authority and the construction of the object



(b)) a list of input documents, the



(c) a description of the proposed technical solution) and technical parameters and its

the rationale,



(d)) static assessment, if some structures technical

standards and regulations required



(e)), hydro and other calculations required for justification

the proposed solution,



(f) the consent of the professional departments of the contracting authority) with the use of unapproved and

nezavedeného equipment, consent to the proposed solution, if it is

technical standards and regulations is required,



(g) exceptions from the rules) proof, placing derogating from

the previous instance of the documentation,



h) standards overview, rules, sample sheets, etc. and putting

their binding for implementation. When processing project

the documentation for the implementation of the construction,



I) summary of critical conclusions of working meetings, including putting

link to the book section,



j) summary of critical opinions affecting the technical solution

including a link to the book section that contains all the necessary

discussion of administrator (roads, police of the Czech Republic,

Fire Brigade, the locations Manager, etc.),



to pass on the incorporation of the results of) additional surveys,



l) connection to other building objects and operating files (ID

coordination, a description of the interface of the construction objects, relationships

on the other-related, foreign, prospective investment),



m) information on the fulfilment of the conditions of accreditation to each

construction of objects of the previous degree of documentation,



n) on the territories must be undermined a technical report to supplement the card

and the solution of the status of the load-bearing capacity,



about) the requirements for the Geotechnical monitoring,



p) requirements for measuring shifts and deformation of the structures,
q) solutions to access and use by persons with reduced construction objects

mobility and orientation.



If it is not to be given to the factual nature of one of the points) to q)

accept, it is possible to omit it.



3.2. Drawing part



3.3. Bills (used only for the needs of the Builder)



(F) the principles governing the Organization of construction.



Organization of construction shall be drawn up for the whole building. Proposes the optimum

the Organization of the construction from the point of view of the requirements of the Commissioner and his restrictive

terms and conditions. Must be minimized the negative impact of the implementation of the construction

the environment. The Organization of construction of binding of individual addresses

operational files and building objects to other parts of the building,

approaches on the construction site and offers into account the coming desktop for

the site facilities. For large or technically challenging parts

the construction is possible, on the basis of the request of the Commissioner, to draw up a separate

procedures for the construction of objects (e.g. large bridges, tunnels, large

railyards).



The content of individual parts of the documentation



1. The technical report



and the characteristics of the site, its) arrangement, including the surfaces of the device

the site, including the provision of the basic conditions for a separate and

the safe movement of persons with reduced mobility on

roads and areas related to construction sites,



(b)) the use of existing or constructed objects,



(c) the possibility of connection to the sewer system), and the source of water, electric power,

gas, telecommunications, transport networks,



(d) the routes of any establishment of new rides from the communications and proposals

transport measures) must be discussed with the competent authorities (police

The Czech Republic, the Directorate of roads and motorways of the Czech Republic, etc.),



(e)), the protection of the security protection of objects and greenery,



f) data on specific measures and implementation that require security

the measures,



(g) implementation of the construction) affect the environment,



(h) a description of the construction process,) the estimated dates of commencement and termination of

the construction,



I) gradual putting into service,



j) requirements for the exclusion of public transport,



to) for the construction, located in flood areas and the flood

emergency plan, if changes occur compared to projednanému povodňovému

the plan from the previous instance of the documentation,



l) a description of the construction site facilities that require reporting,



m) adaptation of the safety and health of third persons, including

the necessary adaptations for persons with reduced mobility,



n) solution to the technical and transportation infrastructure, including transport solutions in the

peace, subject to the conditions laid down for the design of structures for the

stoping and svážném territory



on the determination of the conditions for the implementation) of the construction from the perspective of safety and

the protection of health at work.



2. the Drawings



The data required for the Organization of construction are drawn in a situation that

based on the coordination of the construction of situations (part C). In particular, they are listed

the following data, circuit, including the area of the construction site, the construction site equipment,

entrances to the building site, a source of water and energy. The greening project

(the layers of editing), including drawing.



3. Timetable of work



It will be designed according to the scale and complexity of the building in the days or weeks.

The schedule must cover all of the following technological processes,

demonstrate the feasibility of the proposed výlukových of the times and the total period

the construction.



4. scheme construction procedures



Process, in particular in the construction or reconstruction of the tracks and stations

buildings, where the exclusion of the tracks will be required, or turn off security

the device.



5. The balance of Earth materials



Part of the documentation is also the balance of the Earth, the fixing of the

properties and volume of earthwork materials obtained by building, materials needed

for construction, an assessment of the usability of obtained materials and movement of materials.

Handles are always. For buildings with simple ratios (where the

does not imply the movement of materials between the construction objects) will

statement of the Bill the relevant structures. The buildings, which are being considered with the

using the obtained ground and their movements between

building objects, further processes, taking into account also the quality of hmotnice

and the availability of materials and the construction process. It is also part of the hmotnice

representation of the movements on the mezideponie. Part of the documentation is also

the lenses of the study, setting out the workload of local and special purpose communications

building.



(G) the costs of the construction.



Is used only for the needs of the Builder, part of this part is a statement of the Bill

with the name of the item, including the technical specifications.



(H).



and an overview of the bodies) which was discussed by the project documentation

in the course of processing,



(b)), the zoning and planning decision



(c) evidence of exceptions granted) of the applicable regulations and standards, where appropriate,

the consent of the Office Overhead,



(d) the consent of the Commissioner of the professional departments) using an unauthorised and

nezavedeného equipment



(e)) evidence of consultation with builders and Professional Builder services,



(f) the binding opinion of the institutions concerned), and other documents about the negotiations with the

the authorities concerned and the participants of the construction management,



g) representation of the owners and administrators of the engineering networks concerned,



h) evidence of consultation with the owners of the land and buildings or apartments and

non-residential premises or building concerned. with other authorized

bodies,



I) situation of existing utility networks certified their owners,

that are not part of the previous degree of documentation and of the resulting from the

detailed solutions to project documentation of buildings and structures on the runway

for the issue of a building permit or a notification in the shortened construction

control, or representation of the network administrators if they are older than 2 years,



(j)) if the supplier will be the project to ensure the Declaration of conformity

certification (for buildings the selected railway network of the Czech

of the Republic), this document is part of the documentary section.



I. Geodetic documentation



Geodetic documentation is part of only the selected sets of documentation and

broken down to the following parts:



1. The technical report



2. Financial section



3. design of the layout of the network



4. The coordinating layout drawing



5. Circuit construction



6. the geodetic datum and map data



Annex 6



The scope and content of the project documentation of buildings and structures on the track for

the implementation of the construction.



Project documentation contains a section



D. the technological part



E. construction



Points A, B, C and F, G, H, I are unoccupied by.



Project documentation must always contain the parts (D) and (E) broken down to

each item that the range of the individual parts must correspond to the

the nature and importance of the building, its location, the building-technical

the implementation, use, impact on the environment and the duration of the

the construction.



The contents of each part of the project documentation



(D) the Operational files.



Project documentation of buildings and structures on the runway for issue

a building permit or a notification in the shortened construction management-

Annex No 5 of this order.



E. Building objects



Project documentation of buildings and structures on the runway for issue

a building permit or a notification in the shortened construction management-

Annex No 5 of this order.



Project documentation must always contain part 1. and 2. broken down to

each item that the range of the individual parts must correspond to the

the nature and importance of the building, its location, the building-technical

the implementation, use, impact on the environment and the duration of the

the construction.



Project documentation for construction of the runways and buildings on the runway with handles

in one level and at the level of documentation that includes both

the design documentation for issuance of a building permit or notification

Summary and project documentation for implementation

the building, with the exception of selected operational files of the technological parts,

that work their way up separately as part of the delivery.



1. common principles



1.1. Project documentation of buildings and structures on the runway for the implementation

the construction is processed separately for each building objects

where appropriate, the operating (technological) files, if in the construction

occur; of project documentation for building

the authorization. Process only those parts of the project documentation for the

the implementation of the construction works, which are not identical to the design documentation referred to in

Annex No 5 of this order.



1.2. Part of the documentation of buildings and structures on the runway for the implementation

the building is not documentation for auxiliary work, production and technical

the documentation and the documentation of the products delivered to the building. If it is for

the details necessary to handle any of these documents must be

such a requirement in the project documentation of buildings and structures on the runway

for the implementation of the construction mentioned explicitly.



1.3. Technical and technological details are dealt with by Decree

No. 177/1995 Coll. issuing the construction and technical regulations, in

as amended.



2. Technical report



Process in the same composition and structure as in the project documentation

buildings and structures on the runway for the issue of a building permit, or

notice in the shortened construction management-Appendix 5 of this order

((D) and (E)), from which the relevant information takes that is
and, to complement and specify) justify any data and any derogations

compared to the certified project documentation,



(b)) and specify the technical reasons, design, material or

layout,



(c) lay down the detailed technical requirements) and material solutions

wheelchair modifications,



(d)), where appropriate, the specific conditions for the implementation, installation, or

technological procedures.



3. Drawing part



Process in a reasonable scale according to purpose (e.g. layout drawings

with a list of coordinates and elevations of the main points, etc.).



and detail drawings, details) structures,



b) drawings of non-standard products, as a unique basis for the

the vendor,



c) detailed drawings of construction and Assembly procedures, including auxiliary and

support structures,



(d) the adjustment in the wheelchair-accessible drawings), scale 1:50, including the necessary

the details,



e) greening project (layers of editing), including drawing.



4. Bills



Advanced measurements.



5. The calculations



Handle to the necessary extent and controllable form.



Annex 7



The scope and content of the project documentation of buildings, roads, motorways, local

communications and publicly accessible special purpose communications (hereinafter referred to as

the infrastructure construction for the report.)



Project documentation contains a section



And the accompanying message.



B. Summary technical report



(C). Drawing part



(D) the principles governing the Organization of construction.



E. Documents



If the building is technically simple, does not affect the surrounding territory and

construction can be simplified by merging the content of the project documentation

And the accompanying message, B.. Summary of technical reports, and (D) the Policy of the organization.

the construction of the one part, and the accompanying and the technical report.

The drawing part shall be marked with the letter (B), and may contain only the situation

the appropriate scale of the mapping location of the building. The documents shall be included in the

parts marked (C) or is included in the part.



Binding is the breakdown of project documentation and identification of their parts.

The contents of each of the parts shall apply mutatis mutandis to the nature, importance, and

the extent of construction, construction-technical design, purpose, and the lifetime of the

the construction.



The contents of each part of the project documentation



And the accompanying message.



1. Identification data



and construction) mark



(b) the client or the client of the construction), its registered office or place of business,



(c)), its registered office or place of business, data on trades

permissions and authorization of the person, company and its podzhotovitelé with the identification

the data.



2. information on the location of the building



and) village, region, cadastral territory



(b)) and building land property relations to him,



c) transport and technical infrastructure in the territory.



3. Basic information about construction



and construction (the length) the extent, nature and size of the finished construction,

equipment),



(b) compliance with the General requirements of the) construction and meet the requirements of

the institutions concerned,



(c)) and the time of the binding of the surroundings,



(d) the estimated period of construction), a description of the process of the construction,



e) way of ensuring safety and health at work for the

the construction site.



B. Summary technical report



Contains



and the evaluation of the construction site, including evaluation) of the current status, measurement and

surveys, and the inclusion of their results in the project documentation;

construction-historical survey of the building, which is a cultural monument, is in

Heritage reservation, or is in a conservation zone



(b) the technical solution of the construction with) a description of the implementation of mechanical

resilience and stability,



(c) building on the transport) and the technical infrastructure,



(d) the influence of the construction of transport) and its organization, the surrounding land and buildings,

the minimization of the negative effects of the construction on the environment,



e) solutions to safety requirements of the building and ensure the basic concept

safety in use of the building,



(f) the principles of barrier-free use of the solution)-access and use of the building

persons with reduced mobility,



g) documents for making buildings.



(C). Drawing part



The technical part is



Overview of the situation and location of the construction) and broader relationships appear to

map of the substrate in the scale 1:5000 and 1:50 000, this situation is

draw up as a separate annex or placed on the free space on a

the situation of the building,



(b)) the situation of the construction in scale 1:1000 or 1:500, for large buildings in

scale 1:5000 or 1:2000; Displays the current status of the territory (or

used as the base frame of the map), the proposed construction, binding on around,

protection and concerned transport and technical infrastructure, including

adaptations for persons with reduced mobility,



(c) if the nature of the construction) requires, shall draw up the sample cross sections

in the scale of 1:50 or 1:100, the characteristic cross sections of 1:100 or

1:200 and details of the proposed structures in the scale of 1:20 1:50 or 1:100;

such documentation for construction, which is a cultural monument and buildings

in the conservation reserve or in a heritage zone processes in the scale 1:50

or 1:20.



(D) the principles governing the Organization of construction.



Contains



and leadership and management of the public) traffic detours, traffic signs,



(b)) the material and timetable of work, moving materials, landfill materials



(c)) and waste management and other effects on the environment,



(d) a description of the site, including ensuring) the basic terms and descriptions for

safe use of publicly available communications services and related areas

the construction sites by persons with reduced mobility,



(e) establish the conditions for the implementation) of the building from the point of view in terms of

construction safety and health at work.



E. Documents



The opinions of the institutions concerned, the opinions and the results of the negotiations conducted in the

during the processing of project documentation.



Annex 8



The scope and content of the project documentation of buildings, roads, motorways, local

communications and publicly accessible special purpose communications (hereinafter referred to as

Road) for the issue of a building permit or notification

construction in the shortened construction management.



Project documentation contains a section



And the accompanying message.



(B). the summary solution of the construction



(C) the building part.



D. the technological part



(E) the principles governing the Organization of construction.



(F).



Binding is the breakdown of project documentation and identification of their parts.

The contents of each of the parts and documents shall apply mutatis mutandis with regard to the

the category and the class of the infrastructure, breed and the importance of transport constructions

(object), its location, construction and technical design, the purpose of use,

the impact on the environment and the life of the building.



The common principles



1. Project documentation specifies the spatial solution of the construction, its

breakdown, dimensions and types of structures and technological equipment. It proposes the

Special-purpose, civil construction technical and economic solution, meeting the

the conditions for its implementation, future use and maintenance.



2. Project documentation must



and) be treated in accordance with the terms of the zoning decision or

land use consent



(b)) must satisfy the General requirements for the construction and use of buildings, including the

the barrier-free use



(c)) to deal with changes to current structures of transport concerned and of the

the technical infrastructure and/or links to them,



(d) address the access to the building) and the technical and economical construction,



(e)) to be complete, clear, and processed by an authorised person,



(f)) also contain a way to ensure the safety and health at work

on the construction site.



3. A breakdown of the construction of the infrastructure for building objects and operating

the files and their description



The construction of the infrastructure has to be broken down according to these principles



and separately, are considering comprehensive) engineering and technology section

equipment, IE. building objects and operational files,



(b) building and operating objects) files to indicate the number and the name,



(c) construction and operation objects) files together into groups identified

number sequence according to their nature, the way and the kind of discussion

documentation and purpose during construction implementation,



(d)) according to the nature of construction is possible and under the jurisdiction of the Special

construction of offices, it is appropriate to create a separate group of construction

object or subobjects, and a separate group of operational files

or associated with operating files to the competent construction objects

or subobjects ".



4. For sorting and numbering applies the following basic breakdown

Number sequence Group objects



000 objects, preparation of construction site

100 objects of infrastructure (including culverts)

200 bridge structures and walls

300 water management objects

400 Electric and media objects

500 Objects pipelines

600 Objects of underground structures

650 objects in pathways

700 Objects building

800 Objects editing territory

900 Free series of objects



Notes to individual series



4.1.000-Objects of the preparation of the construction site



Objects in this group are classified primarily demolition work, where appropriate,

other objects that contain extensive auxiliary work (paid)

the preparation of the construction site or work, e.g. zhotovovacích. temporary fencing,

noise-protection measures in construction work, blasting in the preparation

the construction site, the construction of the pit and under.



4.2. A series of 100-road Objects



This series contains in addition to the infrastructure and its
junctions all other objects of the infrastructure concerned or

induced by the construction of the infrastructure, i.e.. Highway, road,

local communications, ad hoc communication, separate bike lanes

etc. Objects in this group include further infrastructure components

(with the exception of those that are contained in separate lines, eg.

bridges and tunnels) and infrastructure equipment, IE. in particular, the transport

signs, traffic signals, permanent infrastructure, fencing

culverts, escape the zone, soundproof walls, screens against glare, etc.

Separate objects of the infrastructure can also be detours and

transport measures and strengthening of existing infrastructure for the

odkloněnou public transport and transport, where appropriate, the Elimination of

the consequences of these transports made after their construction. To this group

include objects maintenance accessories.



4.3. Number of 200-bridge structures and walls



Series 200 includes all types of bridge structures (excluding culverts),

retaining walls and doorframes.



4.4. Series 300-water management objects



The 300 series shall be included in particular objects of drainage infrastructure

(sewage, rainwater settling tanks), editing or construction

flows, water tanks, retention tanks and irrigation equipment,

water supply and wells.



4.5. Number 400-electro and media objects



400 series contains the objects or the construction of above-ground and underground

heavy current and light current wiring, lighting, security systems

or control traffic, etc.



4.6. Number of 500-pipelines



Objects in this group shall be included, or the construction of gas pipelines, editing

steam pipelines, pipelines and other executives.



4.7. Series 600-Objects of underground structures



Group of objects underground constructions includes tunnels, galleries, collectors,

underground garages and parking lots, and other underground facilities. These types of

Special objects require having regard to their complexity more

the breakdown of the subobjects, that marks the next two digits behind the dash in

the base object number (eg. 600-08).



4.8. Number 650-objects of railways



In this series, incorporating all the objects that fall under the purview of the

Office overhead (the construction of railways and on the runway).



4.9.700 Series-building Objects



This group of objects includes objects of civil engineering,

they are part of or accessory to the infrastructure or use

Motorists are thrown, or infrastructure building. Include

here in particular, the buildings and their accessories on odpočívkách,

cestmistrovství, custom objects, and the police. The 700 series is included also

acoustic screens (except walls), noise control construction work for buildings and

Permanent fences of foreign land. To the buildings or groups of

a device shall assign the appropriate operational files and

the related objects of other types, which assembled the device.



4.10. The series 800-Objects editing territory



The 800 series is included as a part of the editing of the layers and objects, including the

odhumusování, humusování, the planting of the plants and trees, and the adjustments of the areas after

construction.



4.11. Number of 900-number of Free objects



This series is reserved for any kind of object, which is not possible or

appropriate to include in the previous series.



The suitability of the sort objects and operating files in each series

depends on the nature of the construction, the importance of the objects from the perspective of the whole construction and

other circumstances. If this is necessary for reasons of accounting, can be

before marking a series of objects more number prepend (e.g..

If this is the documentation for the file structures, the number of buildings).



The contents of each part of the project documentation



And the accompanying message.



1. Identification data



and construction) mark



(b) the client or the client of the construction), its registered office or place of business,



(c)) the designer or contractor of the project documentation, its headquarters, or

place of business, data on trade privileges and authorization of persons, ID

and his podzhotovitelé with the identification data.



2. Basic information about construction



and a brief description of the design of the building), its functions, the meaning and the location



(b) the estimated construction)



-Start,



-transformation and putting into service,



-completion of the construction,



c) binding to the regulatory plans, zoning plan, or planning

information and decision on the territorial or territorial agreement including fulfilment of its

conditions (if issued)



(d)), a brief characterization of the territory and its former use,



(e) the effect of the technical solution of the construction) and its operation on the landscape, health and

the environment,



(f) the overall impact of the construction on) the concerned territory and proposed measures



-relations on the existing land use,



-relations to other planned buildings in the territory,



-amendments to the proposed construction of the buildings concerned.



3. the list of default documents and surveys



Enumeration of documents and surveys used for the preparation of project

documentation



and documentation of intent to request) on the issue of the decision on the location of the building

or to notify the intention to obtain zoning approval or a decision on the

the change of the construction,



(b)) the regulatory plans, zoning plan, or planning information



(c)) map data, the focus of the territory and other geodetic documentation



(d)) traffic research (studies, traffic data)



(e) the geotechnical and hydrogeological exploration), basic corrosion survey



f) diagnostic survey of structures,



g) Hydrometeorology and hydrological data, navigation conditions

inundace, water quality in the recipientech,



climatological information (h) prevailing wind direction, the occurrence of fogs and

ground frosts, extreme air temperature, Frost, an episode index

area),



and historical research on construction) construction, which is a cultural monument, is

in the conservation reserve or a phenomenon in the heritage zone.



4. The breakdown of the construction (of the various parts of the building)



and the method of numbering and marking),



(b) the determination of the individual parts of the building),



(c) building on the part of the) Division of the construction, the building objects and operating

files.



5. the conditions of construction



and substantive and time binding) of the associated structures of other builders,



(b)) the construction progress and ensure its continuity and

koordinovanosti,



(c)) access to the building,



(d)) traffic restrictions, detours and the exclusion of transport.



6. An overview of future owners and administrators



and a list of known or anticipated) of legal entities and natural persons

take the individual structures and operational files

their their into the property and persons, which will administer the

(infrastructure, network technical infrastructure, fencing, etc.),



(b) the method of use of each object).



7. The transfer of parts of the building to the use of



and) options (draft) gradual transfer of parts of constructions (section, object) to the

the use,



(b) the justification for the use of the needs of the construction) before the completion of the whole project.



8. Summary the technical description of the construction



8.1. General technical description, the total projected range,

capacity data, the basic technical parameters, basic transport,

layout, construction and technological solutions to the construction, integration of the building into the

the territory, IE. in particular, the relationship of the route and the landscape, the impact of the existing transport and

technical infrastructure construction and technical solution of the construction and

architectural design of exposed objects (portals, tunnels, large

the bridges), the solution to broader relations and technical implications of the requirements of the laws and

technical regulations.



8.2. A technical description of individual objects and their included fixes for the



8.2.1. Ground communications



and) enumeration and marking individual roads construction,



(b) basic characteristics relevant) infrastructure



-category, class, design category or functional group and type

the transverse arrangement,



-parameters and the justification of the route,



-grading proposal, the use of secondary materials, the results of the balance

earthworks,



-input data and the conclusions of the assessment of the design of paved surfaces.



8.2.2. Bridge structures and walls



and enumeration of objects and walls),



(b)) the basic characteristics of individual objects, in particular-basic

the data (length, width, margin, and the transit through space),



-basic technical solutions and equipment,



-types of structures and their rationale,



-the procedure and construction technology.



8.2.3. Drainage infrastructure



Engineering solutions to drainage, its characteristics and scope.



8.2.4. Tunnels, underground structures, and Gallery



and) basic data (length, cross, tendencies),



(b) the technical equipment of the tunnel),



(c) the proposed construction, technology)



(d) the principles of operational information systems), traffic control and fire

the safety.



8.2.5. The facilities, public parking lot, escape zone and

acoustic screens



The proposed facilities that are part of the infrastructure and their

the location, scale and equipment.



8.2.6. the infrastructure Equipment



and waste safety devices)



(b)) traffic signs, traffic signals, lighting equipment, equipment for

operational information and telematics,



(c) public lighting),



(d) protection against the penetration of) Wildlife on communication and

enable their migration through communication,



e) aperture and the network against the glare.



8.2.7. other objects, groups of objects
and) enumeration of objects,



(b)) the basic characteristics,



(c)) related facilities and equipment,



(d)), the technical solution,



e) procedure and construction technology.



9. Results and conclusions from the documents, surveys and measurements



A summary of the established facts, assessing their impact on the

solution of the construction.



10. Interested protection, protected areas, flood the territory, cultural

monuments, conservation, conservation zone



and the extent of the prejudice),



(b) the conditions for intervention)



(c)) method of protection or editing,



(d) the impact on the construction and technical) solution of the construction.



11. The intervention of the construction in the territory of the



Definition and rationale for changes to the current state induced by the construction of



a) demolition work,



(b)) and the mimolesní green cutting any refund,



(c)) the range of earthworks and finishing of the terrain, the



(d)) or other modifications to the greening of the undeveloped areas



e) encroachment on agricultural land fund and any reclamation,



f) intervention in the land intended for the performance of the functions of the forest,



g) intervention in the other land,



h) induced changes in buildings (and edit) the transport and technical

infrastructure and water flows.



12. the rights of construction on resources and its needs



The determination and justification of claims construction



and all kinds of energy)



b) telecommunications,



(c)), water management,



d) connection on the transport infrastructure and parking,



e) options of connection to the technical infrastructure (underground and above-ground

the network),



(f)) the type, quantity and management of waste resulting from the use of the building.



13. The impact of the construction and traffic on the road to health and the

environment



Evaluate the effects of the negative effects of the construction and its use and shall indicate

the proposals for the construction of the measures to prevent, eliminate, or

minimise in accordance with relevant legislation



and protection of landscape and nature conservation),



(b)),



(c) emissions from transport)



(d) effect on polluted water) water flows and water resources,



(e)) the protection of the health and safety of workers in the construction and use of

the construction,



f) waste management.



14. the General requirements for safety and utility properties



The card that the construction as a whole and its objects are designed to

meet the basic requirements, which are



and) mechanical resistance and stability



(b) fire safety allowing intervention units of fire protection

means of escape for people, etc.),



(c)), health protection of healthy living conditions and the environment,



(d)), protection against noise,



safety in use) (on road safety

communications),



(f)) and protection energy saving heat (economy of operation, saving

technology for construction and maintenance, etc.).



15. Other requirements



A description of the design of the building in terms of compliance with the



and utility building (), a sufficient capacity of objects, General

the technical requirements for the construction and products, easy maintenance, lifetime

etc.),



(b)) ensure access and conditions for the use of building-public

accessible communications by persons with reduced mobility

orientation,



(c) protection of construction before) the harmful effects of the external environment (floods,

aggressive underground water, wandering streams, undermining and weather

influences),



(d)) meet the requirements of the institutions concerned.



(B). the summary solution of the construction



1. Total (overview) the situation of the building



The overall situation includes the arrangement of buildings or structures on the file

the map background with the capture of broader relationships in the design area.

The scale of this situation is chosen depending on the extent of the construction and ratios

territory. Usually uses the scale 1:5000, 1:10,000 or 1:50 000.



2. the situation of the building (coordination)



Processes as a situational drawing the current state of the territory on the ground

cadastral map showing the boundaries of the land and their parcelních numbers

including the adjacent plots of land, existing buildings, overhead lines and

the underground networks of technical infrastructure, including the designation of the trade

zones and contours that show the topography of the terrain. In this modified

the substrate will be polohopisné and the basic solution of the construction and the height of the

the perimeter of the construction site. This plot indicate unambiguous solution of the construction in the

the breakdown of the proposed structures and operational files, including the effects of

and links to the surrounding area, IE. in particular, the transport connections and the technical

infrastructure, relocation and modifications concerned the aerial and underground

networks, editing, and demolition of buildings, landscaping and land, the arrangements for

persons with reduced mobility, approaches on the construction and

the upcoming construction of other builders. The choice of scale depends on the

the complexity of the construction, the usual scale of 1:2000, 1:1000, or

1:500. the situation of the proposed construction shall include the details necessary for

Verify the position solution of the construction and its construction.



3. coordinating a GEODESIC drawing



A separate drawing is a GEODESIC dokladuje coordination in the case when

the geodetic documentation is not made out as a special project

the documentation. The drawing contains a sketch of the os with the chainage and

the main points and axes and main points of other construction

objects, if their stabilized network vytyčovacích surges also

indicated on the drawings. In the drawing or in another annex project

documentation shall specify the coordinates of all of the designated points. If you would

Peter coordination does not contain more detail drawing, than

on coordinating the situation, it is possible to omit this drawing.



4. Balance of earthworks



This annex contains the balance of excavations, topsoil and podorničních

layers of the whole construction. To determine the amount of soil and rock gained

at the construction site, the suitability of their direct use, the use of after treatment and the imposition of

any surplus to the dump. Evaluate any lack of

material to backfilling and its coverage of the zemníků or the use of secondary

materials. Shall be the balance of the upper layers of overburden soil and cultural

the deeper the land saved capable of Earth. In the case that it is

required by the competent authority, the protection of agricultural land, shall draw up the

the plan for the relocation of topsoil and podorničních layers and rational use

spreading or saving for another specific use including the use of

for reclamation.



5. Total water solution



If the structure contains multiple objects, assessing water management

the curing, it is possible to classify these objects in a separate

Annex.



6. the barrier-free use



and policy solutions for persons) with reduced mobility,



(b) the principles for the solution of the person) of the visually impaired,



(c) policy solutions for persons) with hearing disabilities



(d) the use of construction products) for solution accessible to disabled people.



(C) the building part.



The object is for each building shall draw up separate documentation, which is

be included in the project documentation to file C. Construction part. The classification and

designation of individual buildings shall be carried out in accordance with point 3. and 4. Chapter

The common principles.



The content of individual buildings, regardless of their inclusion in the

specific object structure



1. the Objects of the infrastructure



1.1. Technical report



and object identification data),



(b)) a brief technical description of the justification of the proposed solution



(c) evaluation surveys and handouts), including their use in documentation

(traffic information, geotechnical survey, etc.),



(d)) relationships to other objects of the infrastructure construction,



(e)) proposal for paved surfaces, including any calculations,



(f)) mode for surface water and groundwater, drainage, protection policy

the infrastructure,



g) design of traffic signs, transport devices, light signals,

the equipment for operational information and transport telematics,



h) specific conditions and requirements on the process of construction or maintenance,



I) binding on any technology equipment,



(j)) made a statement about the static calculations and validation

critical dimensions and cross sections,



to access and use) solutions publicly available communications

related to construction sites by persons with reduced mobility

orientation.



1.2. The drawings



1.2.1. the situation of the infrastructure



The situation of each object is listed in the coordination of the construction situation in parts of the

B. where there is not enough clear solution object from this situation,

the situation shall be accompanied by a separate object (cut out the situation) in the larger

scale. The situation must contain a schematic plot of the adjustments for a separate

and safe movement of persons with reduced mobility.



1.2.2. The longitudinal profile



As a rule, shall be drawn up in the mentioned situation and scale infrastructure

Elevation scale with a ten-fold change in elevation. Typically, the elect benchmark

1:1000/100, or 1:2000/200. For simple technical solutions it is possible to

use the scale 1:5000/500.



1.2.3. The sample cross sections



Renders the characteristic, or different sections of the infrastructure

(notch, excavation, embankment, a varying number of lanes, the branch junctions) in the

scale of 1:50 or 1:100 with regard to the width of the road and the local Crown

the conditions.



Populate the location and types of reinforcement of the ditches, gravel, security

equipment, fences, walls, and other typical details.



1.2.4. The characteristic cross sections



These cross sections to show the inclusion of housing infrastructure to
the terrain in the characteristic places. Produced at a scale of 1:100 or

1:200.



1.2.5. Schematic solutions of intersections



More complex intersections, which detailed the plot in a situation of ground

communication (see C-1.2.1.) would be confusing, is drawn on

separate drawings in scale of the situation of infrastructure or

the larger. In the event that it is necessary to verify the sklonové ratios of branches

the junction (the intersection of complex shape or adverse terrain conditions),

shall draw up simplified longitudinal profiles of critical branches.



1.2.6. Drawings of the event facilities



Process in the cases are part of the object ground

communication, it is a stop of the suburban passenger transport, parking and

other transport areas and places to rest. The drawings must show clearly

structural and technical solutions. The scale of the chosen Designer, taking into account

the nature of the device. The drawings must include information about disabled users

the building (object), including details of reserved seats for vehicles and O1

trims for transitions.



1.2.7. Traffic signs, traffic signals, lighting equipment, equipment

for operational information and transport telematics



Drawings of the proposed traffic signs and devices shall be drawn up

in the scale of the situation of infrastructure or other scale as a separate

drawings. Only for simple solutions to traffic signs and all

other transport equipment shall be marked directly on the situation of land communication.

The drawings must include information about the disabled use of buildings (object)

including details of haptic and sound leadership and phrase Guide

bollards.



1.2.8. The coordinates of main points



In this annex, shall coordinate all the important points, which determine the

the position of the object. If these are not marked in coordination points situation,

GEODESIC shall be accompanied by a separate drawing with their mapping. This annex

shall be drawn up, if the data are not part of the geodetic

coordinating the drawing in part (B).



1.2.9. Project documentation infrastructure or a new object

the extension of an existing object, the infrastructure that has to be placed

on the territory of the conservation, preservation or protection zone zone

immovable cultural monuments, immovable national cultural monuments, monument

booked or zone up on views or drawings of the object

the road to the photos and visualization.



2. Bridge structures and walls



2.1. The technical report



2.1.1. the identification data of the bridge



and the structure and number of the object),



(b) the name of the bridge)



(c) the registration number of the bridge)



d) cadastral territory, municipality, County,



(e) the client/purchaser of the building), its registered office or place of business,



(f) the administrator of the bridge), a superior authority,



(g)), its registered office or place of business, data on trades

permissions and authorization of persons, the Chief Engineer of the project, the responsible

the designer, ID and its podzhotovitelé with the identification data,



h) infrastructure (design category or type of transverse arrangement

local communication, registration number),



I) crossing point (all crossing on the length of the bridge),



(j)), all edits start chainage supports, crossing and end the edit,



obstacles to the chainage) přemosťované (km, km, km of railway land

communications, etc.),



l) angle crossing (all)



m) height (underpass, underpass, fairway height).



2.1.2. Basic information about the bridge



and characteristics of the bridge)



(b)) the length of the bridge,



(c) the length of the bridge),



d) length of the structure,



e) margin of individual fields, or lightness for přesypaných structures,



(f) the skewness of the bridge)



g) free width of the bridge,



(h) through the public space), or the emergency walkway,



I) width of the bridge,



(j) the height of the bridge above the ground),



k) building height,



l) area of the structure of the bridge,



m) load and the load capacity of the bridge.



2.1.3. the justification for the construction of the bridge and its location



and the continuity of the project documentation of the bridge) of the object to the previous

documentation, purpose and requirements (documents) in its solutions,



(b) the nature of the obstacles (přemosťované) transferred communication overhead

housing, water works, etc.),



c) territorial conditions,



d) geotechnical conditions.



2.1.4. A technical solution to bridge



and a description of the structure of the bridge),



(b)) the data establishing the and bottom construction of bridge



(c)),



(d)) static and hydraulic engineering assessment,



e) foreign equipment on the bridge,



(f)) solution corrosion protection, protection of structures against aggressive

environment and stray currents,



(g)) the conditions required and measuring subsidence and deflection (measuring and monitoring)



(h) the required load tests).



2.1.5. the construction of the bridge



and the procedure and technology building) bridge,



(b)) specific requirements for the envisaged construction technology

(approaches, electric energy intakes, storage areas, mounting and

auxiliary construction, etc.),



(c)) related (interested) objects, buildings,



d) relationship to the territory (civil engineering, protective zone, traffic limit

, etc.).



2.1.6. The overview of the carried out calculations and finding critical dimensions

and slicers



and marking data)



(b)) and the geometry of the layout of the bridge,



(c) static calculation bases) of the lower buildings, supporting structures,



d) Hydro calculations.



2.1.7. access and use of the Solution of the construction of persons with restricted mobility

motion and orientation



2.2. The drawings



and the bridge object in) the situation of the scale of 1:500 and its coordination with the

other building objects of the construction of the infrastructure, including their

protection zones, specific limitations and adaptations for persons with reduced

mobility,



(b)) the floor plan in a scale of 1:100 or for large bridges over the 100 m length 1:250

(1:500),



(c) a longitudinal incision in the scale) 1:100 (1:250, 1:500), or at the direction

broken communications separate longitudinal cuts with derived progress

terrain, cross drainage and communications including plotting průjezdných

and cutting areas, shipping lanes and a bridge at the water surface profiles,

flood levels (Q100), level design flow

direction and sklonových ratios, the Earth pokryvných and services

bedrock,



d) sample cross section structure of support and in the 1:50,



e) cross sections at a scale of 1:100 in the cheeks and wings, each axes

Interior, possibly with an eye on the supports,



f) marking scheme in the scale of 1:100 (1:250, 1:500),



(g) drawing support in the shape) of the scale of 1:50,



(h) the shape of the wings and drawing) of the wings in the scale of 1:50,



I) schema construction.



Project documentation of large bridges, bridges that are placed on the territory of the

conservation, preservation or protection zone zone real estate

cultural heritage, immovable national cultural monuments, monument

booked or zone and bridges that are a cultural monument is

make drawings of views or bridge to photos and visualization.



3. Water management objects-drainage infrastructure



3.1. Technical report



Basic identification data),



(b) a description of the characteristics of the object),



(c) a justification of the functional and technical) solutions (including traffic data and

installed performance)



(d) a description of the connection to the existing) network or the recipient,



(e)) edit mode of surface and groundwater and their protection,



(f)) special requirements for how the building work (operation and maintenance),



g) characteristics and description of the technical solution of an object in terms of

environmental protection and health and safety at work and the

the operation of construction equipment during the construction,



h) description of the solution for protection against the environment or sneak agresívnímu

streams.



3.2. Hydraulic engineering calculations



and to the extent necessary for the) determination of the size of the profiles of sewers and connections,



(b)) to the extent necessary for the determination of the size of settling

tanks,



(c)) to the extent necessary for the determination of the size and type of fortifications gravel

and ditches.



3.3. The static calculations



and for the pipe in the range) required for the design type and load capacity,



(b)) for concrete structures, and other objects on the network for the determination of

the thickness of the walls and the bottom of the tank and any reinforcement.



3.4. drawings



and the situation of the building with výškopisem) and the mapping of underground management as

current and planned on a scale equal to the situation of the objects

the infrastructure,



(b)) hydrotechnická the situation-only arises if the necessity of

the results of the Hydromechanical calculations,



(c)), the longitudinal profile in the recommended scale of 1:1000/100, the scale in the direction

the x axis to correspond with the scale of the situation,



(d)) the sample crosscut the imposition of the proposed pipeline or gravel and

ditches,



(e)), or drawings of the applied type of atypical objects.



3.5. Documents relating to objects.



4. the Objects illuminate the road



4.1. Technical report



and object identification data),



(b) a brief technical description of the building) of the whole device,



c) type masts and lights,



(d) the light-technical calculation)



e) connection to the power grid NN.



4.2. The drawings



and in the same scale) the situation with the situation of the infrastructure,

mapping the position of the mast and cable distribution systems and determine the position of the device in the

coordinates,



(b) the model with crosscut) mapping schematic position of lighting equipment
scale model of the cross-section of the infrastructure,



(c) drawings of the masts).



4.3. Documents relating to objects



5. Objects of underground structures



5.1. Technical report



5.1.1. General part



and) identification,



(b)) Division of the objects,



(c) the binding of the surrounding construction).



5.1.2. the technical part of the



and yet carried out) the evaluation of geotechnical surveys, detailed

description of the geotechnical conditions with regard to the tunnel method used,

the distribution of the rock mass on kvazihomogenní units including

the recommended values of geotechnical parameters



(b)) establishment of the procedure (how) construction, including design technology

the classes of the excavation, the expected value of the deformation of the temporary lining for

each technology class of the excavation,



(c) proposal on liquidation) mine water, the protection of works against the průvalům waters and

zvodnělého material, the protection work during floods,



(d) the protection of works against) external influences (wandering streams, aggressive

environment),



e) fire safety solutions in the range of fire prevention,



(f) the safety documentation for a tunnel) longer than 500 m,



g) documents the individual structures and operational files,



h) documents, the Protocol on the establishment of environment,



I) comprehensive geotechnical monitoring, including a description of the warning States,



(j)) and the implementation of the construction site, the demands on the trial operation, overview

future operators and users, training demands of the future

workers,



for a description of the object and tracks) with regard to the possibility of the use of the observational

methods,



l) requirements for barrier-free use of the building.



5.2. The drawings



and the overall situation in the building) of the scale of 1:5000,



(b)) situation in coordination scale 1:500 with the designation of construction objects and

operational files, including plotting the downturns, and zone

monitoring, management of engineering networks (including temporary) and adjustments for

persons with reduced mobility,



(c) situation in the place of) coordination of portals in the scale of 1:200 is shown by plotting

routes ducts, sewers, drains, sumps, provoznětechnických

objects, the extent of the jam, the rear carried out, etc.,



(d) in the sample cross sections) of the scale of 1:50, the representation of the geometric

the relationship between gauge section and the construction of the lining, the technical

equipment of the tunnel etc., e) the characteristic cuts with geotechnical data

including the extent of the zone, and poklesové is shown by plotting objects and networks in the overburden in the

a scale of 1:100 (1:200),



f) longitudinal profiles with geotechnical data and forecast Division

the mined tunnel section on technological class of the excavation at a scale of 1:500/50

(1:200/200) in a built-up area,



g) drawing of the excavation support classes (the length of the shot, the breakdown of the areas

excavation, anchorage scheme for each partial excavation, a distance of anchoring

from the face, the composition of the temporary lining, types and length of anchors and the network dimension

the support frames, the maximum distances of the rock, the partial measures

carried out in advance of the excavation, etc.) including the statement of a material

for each technology class of the excavation on the 1 shot and 1 m of the tunnel,



(h) a proposal for the method of isolation and) drainage, including the design modifications and payment

the drainage of the water,



I) drawings of the fire protection, the situation dojezdů to fire's intervention,



j) drawings of the individual structures and operational files,



k) coordination and technological scheme of tunnel equipment,



l) the situation of the Organization, including the recommended scope of construction equipment

device construction site contractor.



5.3. The static part of the



and supporting documents)



(b) calculation of the temporary lining) scope and dimension card



(c) the calculation of the final lining) range including card dimensions

and sections,



(d) calculation of the static temporary lining) according to individual stages and for

each technology class of the excavation, the static calculation of the final

lining according to the character of used structures.



6. the device objects for operational information and telematics



6.1. Technical report



and object identification data),



(b)) a description of how the technical solution in terms of the requirements on the type of device

and the method and the nature of the distribution,



(c)) how to save cable line to the other objects of construction,



(d) the proposed device types)



(e) the determination of the main regulations) that have been used in the documentation and

According to which it is necessary to perform the installation,



(f) a proposal for comprehensive tests)



(g) in the case of revision) a brief description of the circuit changes, which the revision

regards,



h) maintenance requirements of the device.



6.2. the Drawings



and the plot device and location) access to land, in the scale of the situation

communication, of plotting the proposed device to the ground plan in the recommended

a scale of 1:100 or 1:50,



(b)) total clearly processed the block containing the number of schemes and

the logical position of each end elements



(c)) the basic technical data power voltage system the method

protection,



(d)), the technical solution in terms of the requirements on the method and the nature of the distribution,



e) imposition of cable line to building constructions.



6.3. the documents relating to objects



7. the objects of the railways



Project documentation of the objects listed in the construction of the infrastructure

or her triggered by having the character of the building and construction on the runway

including device on the track, will be made in the scope and content of annex

No 5 of this order.



8. Objects of building



Project documentation of the objects listed in the construction of the infrastructure,

that have the character of a building shall be drawn up in the scope and content of

in accordance with Decree No. 499/2006 Sb.



9. Other building objects



Project documentation is processed separately for individual objects

in scope and content, according to Decree No. 499/2006 Sb.



D. the technological part



The technological part of the project documentation of the construction of the infrastructure,

divided into operational processes that ensure a special non-production files

activities required for functionality, security, performance, and protection

infrastructure and its components.



For each operation shall be separate file documentation. Operating

files that make up the technical equipment of tunnels, connecting to

appropriate documentation of the construction of the object.



The documentation of each file is divided into the following parts:



1. The technical report



and the Builder/customer's identification), the designer/contractor

documentation and the subject of the action file



(b)) the default documents,



(c) the technological facilities), description and basic

parameters,



(d)) link building solutions, including the proposal on the establishment of structures,



(e) information about the need for energy), fuels, water and other media outlets, including the

requirements and the places of connection.



2. the Drawings



and displays the report and drawings) the location of the machinery and equipment and their

Incorporation (floor plans, sections, perspectives and construction details),



(b)), drawings and diagrams the connection to media, the place of connection, protective

the device,



(c) the scale of the drawings is chosen), depending on the nature and scope of the action

file.



(E) the principles governing the Organization of construction.



This part of the project documentation drawn up for the whole construction with this

content:



1. The technical report



and the overall arrangement and characteristics) of the site, including its

drainage,



(b) determination of the perimeter of the construction site), its rationale and details of the plots

the construction site, including land, which ensures the client/customer,



(c) the design of the equipment construction site policy),



(d) the design and implementation of procedure) construction,



e) objects, which are to be given separately to the operation (early

use),



(f)) can be connected to the resources (water, electricity, or gas,

telecommunications),



g) options for the management of waste from the construction (if there is not a separate

project management of waste),



h) approaches on the construction site (entrances and exits)



even the security protection) requirements for construction site and its surroundings,



(j) special requirements for the implementation of the) construction, requiring security

the measures,



to propose a solution during transport), construction (transportation and access routes,

a special use of the infrastructures, closures, detours, lockouts),

including the provision of basic conditions and indications for a separate and

the safe movement of persons with reduced mobility to public

highways and areas related to construction sites,



l) setting the conditions for the execution of the project in terms of safety and

health plan health and safety at work to

the construction site according to Act No. 309/2006 Coll., on ensuring the conditions

safety and health at work.



2. the Drawings



Organization of construction drawings, designs and displays the information listed in the content.

technical reports. In particular, it shall draw up a



and clear the situation, showing the) construction, mapping the wider relations in

the affected territory, construction of single-purpose circuits areas, approaches to

the site, napojovacích places the sources and transport routes, this situation is

draw up usually at a scale of 1:5000 and 1:10000,



(b)) the situation of the construction on the ground coordinating the situation where the account

links individual parts of buildings (objects) in terms of

the implementation of, the location of the temporary objects (access routes, and

Bridge, installation equipment, etc.), links to the production of equipment

the construction site and the other data referred to in points, technical reports, which are
in consideration for the particular construction, this situation shall be drawn up for more complex

and building elaborate constructions, or for smaller and technically simple

constructions it is possible to develop only one situation, which will contain

all the necessary information,



(c)) with a proposal of the construction of the factual and the progress of work in the

details according to the complexity and scale of the building.



For simple construction it is possible to include in the construction

technical report, section C.



(F).



The opinions of the institutions concerned, opinions, evidence and results of consultations and

consultation conducted in the course of the processing of project documentation.



Annex 9



The scope and content of the project documentation of buildings, roads, motorways, local

communications and publicly accessible special purpose communications (hereinafter referred to as

Road) for the implementation of the construction



Project documentation contains a section



And solution of the construction.



(B) the building part.



C. technological part



The construction of a small scope or simple structures can be classified

drawings of the general solution to the construction section. For these buildings is

documentation of this breakdown



And part of the Building.



(B). Technological part



If the simple construction are not technological objects, then

the documentation do not break down into parts and drawings with the file called

Project documentation for implementation of construction.



Binding is the breakdown of project documentation and marking of its parts.

The contents of each document shall apply mutatis mutandis with regard to the

category and grade roads, the nature and importance of the building (object)

its location, construction and technical design, the purpose of use, the impact on

the environment and the life of the building.



The common principles



1. Project documentation for the construction of road infrastructure

Specifies the requirements for the construction of the infrastructure of technical and

the resulting qualitative aspects. Must be drawn up in

details which clearly define the subject of the works, i.e.. the building, its

technical properties and allow you to draw up an inventory of the work as a basis for

Awards fabrication buildings.



2. in the preparation of project documentation for the execution of the project must

to comply with the proposal for the construction of the specified project documentation for construction announcements

According to annex No. 7 of this order or the project documentation for the

the issue of the building permit or notification of construction summary

construction management in accordance with Annex 8 of this Decree, a certified building

management and the requirements of the building permit, the consent and vodoprávního

vodoprávního decision. Project documentation for implementation of construction

requires the completion of the design of construction works in generally the project documentation

for the announcement of the construction, or for the issuance of the building permit or notification

construction in the shortened construction management to refine the technical and

the qualitative requirements needed for a clear definition of implementation

works, supplies and services.



3. Project documentation for implementation of construction is a document that is

designed for the contractor of the construction. Project documentation for implementation

Specifies what the building contractor has made and what quality. These

requirements must be unambiguous and sufficiently. This document is

classified in the tender documentation, such as project documentation in the sense of

Act No. 137/2006 Coll., on public procurement, as amended

regulations.



4. breakdown of the project documentation for the implementation of the construction is based on

from the breakdown of the structures proposed in the project documentation verified in

construction management (see annex No. 8 or no. 7 of this order). Shall comply with the

the Division works on objects and on any sections of the (partial). U

big and large buildings may be ordered by the construction of the split on the part

that enters the different contractors. In this case, the individual parts

include only the relevant objects or their component (e.g., part of the main

the route).



5. Project documentation for implementation of construction consists of a volume, or

volumes of drawings.



The contents of each part of the project documentation



And solution of the construction.



This part of the project documentation for the implementation of the building contains attachments

in the song, and the content in accordance with project documentation for construction announcements

or for the issue of a building permit or building notice summary

construction management, which make possible the requirements of the building

the authorization and the information that clarified the definition of construction



and) total (overview) the situation of the building showing the overall situation

the arrangement of the buildings on the map of the substrate in the scale 1:5000 and 1:50000,

It shall apply to situations referred to in annex No. 8 or no. 7 of this order,



(b)) the situation of the building (coordination), showing detailed plot structures in

the map of the substrate by Annex No. 8 or no. 7 of this order,



(c)), including coordination of geodetic surveying documents drawing or

geodetic documentation according to annex No 8 or no. 7 of this order,



d) balance of earthworks shall be drawn up according to the balance of earthworks

project documentation according to annex No 8 or no. 7 of this order,



(e) the principles governing the Organization of the construction), which shall be drawn up in the extent required

for project documentation according to annex No 8 or no. 7 of this

the Decree.



(B) the building part.



1. Construction part of the project documentation for the implementation of the building contains

drawings of the objects in the breakdown by Annex No. 8 or no. 7 of this

the Decree. These drawings, what the content should be supplemented in order to meet the

in particular, the following requirements



and clearly and completely) must specify the object (location,

the arrangement of the structure, the resulting quality of the materials required,

structures, objects, the user standards),



(b)) must be detailed enough to build an inventory of the work.



2. In drawing up



and the requirements of the building permit,) vodoprávního and vodoprávního

the decision,



(b) specifying the details of the structural elements) or their parts,



(c)) the requirements for function and quality of products,



(d) a more detailed determination of the positions) shapes and dimensions,



(e) specifying the details of the use of the building) by persons with reduced mobility

and orientation.



3.:: the project nature, which must be affixed to the

the drawings and artwork that cannot be expressed, shall be marked by means of brief

texts, tables, notes, legends, etc.



4. In the design of structural elements and details and images on

drawings of the project documentation for implementation of construction applies

the following principles



and for all the details) used structural elements must include their

the unique technical names, preferably with the use of already established

the terminology and definitions used in Czech technical standards and

technical regulations of the Ministry of transport,



(b)) the details for all the structural elements separately and for their complete

together must contain all the necessary dimensions, cross sections, proposed

references to dimension series, etc., including information on the permissible tolerances

shapes and dimensions of zástavbových,



(c)) the details for all the structural elements must specify the type of proposed

the material with reference to the relevant standard or other technical went

the prescription that sufficiently describes the properties of the material, including

corrosion protection and protection against aggressive environment



(d)) details must contain information on the operational life of the

the product of the element or part, for resistance to mechanical impact

(static and dynamic) load, the resistance to the influence of the environment,

of the required health certificate and possibly fire resistance,

zvukoizolačních properties of recyclability and other

the properties, if it is not already defined in another document of tender

documentation,



(e) contain detailed requirements) details the technical and material

disabled access, editing solution



f) technical specification of the components must not favour or

exclude certain vendors or products.



5. written Annex to the project documentation of the objects is usually

do not assume and if they contain requirements and information needed for the

construction of the building, then according to the nature of the drawings, special

technical qualitative conditions and inventory work.



6. A different way it is necessary to handle the documentation of construction objects

railways and on the runway, building construction, technical infrastructure and

other possible objects that are subject to other legal and technical

legislation and practice is different from the rules for the road. U

These objects, which usually are made by specialized podzhotovitelé,

It is necessary to deal with the content of the documentation of these objects in accordance with the relevant

regulations, the requirements of their owners or managers and project experience in the

the relevant field.



7. In any case, whether the documentation is used object in the range

drawn up for the degree of project documentation for the announcement of the construction, or

for the issue of a building permit or building notice summary

construction management, or make the details necessary for the implementation,

It is necessary that the documentation of these objects meet the basic

the requirements on the project documentation for implementation of construction, i.e., to

clearly and completely identify the object and allow the build

an inventory of the work.



C. technological part
This part of the project documentation for the implementation of the building contains the objects

technological files of nonproductive nature, with the exception of the technical

the equipment of tunnels or major bridges, which is included in the object

the relevant tunnel or bridge. The device shall specify

detailed specifications, scope of work, the

building objects, program testing and commissioning. File

the requirements for the technological files must be sufficient for the Assembly

the relevant part of the inventory work.



Volumes of drawings



1. Compiling volumes of drawings of the project documentation for implementation

the construction must respect the breakdown of the construction according to project objects

documentation for the announcement of the construction, or for the issue of a building permit

or to the notice of the construction in the shortened construction management. With regard to the

the use of drawings in the implementation of the construction, transmission of individual objects

then administrators and simplify the scope of the documentation, it is possible to

Associate individual objects according to the purpose of the construction volumes



and according to the type of object) the number sequences



(b)), the professions of subcontractors,



c) administrators transposing made objects.



2. When determining the volumes, you must follow the requirements of the customer

or, at the discretion of the contractor of the project documentation for implementation

the building, after consultation with builders/client, with the aim of simplifying

documentation while maintaining its practical applicability. The documentation for the

simple construction and construction of small scale can be issued in one

the volume, if it is appropriate.



3. Every single volume of project documentation for implementation of construction

consists of



the main cover sheet),



(b)) included documents (Comprehensive solution of the construction),



c) classified objects (Building volumes or the technological part

the construction).



4. Main title page must contain a



and the name of the contract type) of the building (if it is not obvious from the name of the contract),



(b) the client/sponsor)/client,



(c)) Designer/contractor documentation



(d) the date of manufacture) documentation (month, year)



(e) the name of the volume (e.g.). The comprehensive solution of the construction, bridge structures),



(f) the contents of the volume).



5. Individual objects contain a cover sheet indicating the object with the



and the name of the object and its) numeric designations,



(b)) the list of the drawings,



(c)) the individual drawings of the object with the designation of the drawings.



1) the technical requirements for the construction, the construction of railways, aviation and on the runway

including equipment on the runway, construction of motorways, roads, local roads and

publicly accessible special purpose communications provides, for example, section 102 paragraph.

2 of the Act No. 49/1997 Coll., on civil aviation and amending and supplementing

Act No. 455/1991 Coll., on trades (Trade Act),

in the wording of later regulations, as amended; Decree No.

177/1995 Coll. issuing the construction and technical regulations, as amended by

amended; Decree No 104/1997 Coll., implementing Act

on road traffic, as amended; Decree No.

369/2001 Coll., on general technical requirements for assurance

use of buildings by persons with reduced mobility, in

as amended.