591/2006 Sb.



GOVERNMENT REGULATION



of 12 October. December 2006



about the detailed minimum requirements for safety and health at

work sites



The Government has ordered pursuant to article 21 (b). and) to implement section 3 (2). 3, § 15, § 18

paragraph. 1 (b). (c)) and § 18 para. 2 (a). b) of Act No. 309/2006 Coll.

adjusting the additional requirements for safety and health at work in the

labor relations and to ensure the safety and health

When the activity or the provision of services outside of the employment relationships Act (law

to ensure further the conditions for safety and health at work):



§ 1



(1) this regulation incorporates the relevant provisions of the European

Community ^ 1) and edits



and more) the minimum requirements for safety and health at work

on construction sites,



(b)) the details to the notice of commencement of works,



(c)) work and activities of the issuing a physical person, the increased threat

life or damage health and



(d)) other activities, which is the Coordinator for safety and health

While working on the construction site (hereinafter referred to as "the Coordinator") required to perform when

preparation and realization of the construction.



(2) the Regulation does not apply to work carried out at the construction site when the

underground mining activities and activities carried out using mining techniques in the

Underground ^ 2) and ground work carried out for the use of machinery and explosives,

If one site has relocated more than 100 000 m3 of rock, with

the exception of foundation engineering.



§ 2



(1) the contractor shall organize a construction site shall ensure that compliance with the

site requirements established by special legislation ^ 3) and to

construction site General requirements applicable to the construction of the suit under a special

^ 4) legislation and other requirements on the construction site laid down in

Annex 1 to this regulation; If the site is handled by the plan

safety and health at work on the site (hereinafter referred to as the "plan"),

arranges the contractor building site in accordance with the plan and within the time limits in it

referred to.



(2) the contractor shall define the site for each individual work performance and

activities; in doing so, it shall proceed according to the specific legislation

governing the terms of protection of the health of workers at work ^ 5).



(3) A building site, or a defined arrangement of the workplace, according to the

paragraphs 1 and 2 corresponds to the contractor whom the construction site,

where appropriate, the workplace, given and that is over the case. In the minutes of the transmission and

the takeover of all known facts, that are important from the

to ensure the safety and health of natural persons

staying on the job site or workplace.



§ 3



The contractor shall ensure that the



and) when operating and use of machinery and technical equipment (hereinafter referred to as

"the machine"), tools and means of transport on a construction site in addition to the

the requirements of the specific legislation ^ 6) followed more minimum

the requirements for safety and health at work laid down in the annex

# 2 of this regulation,



b) satisfy the requirements on the Organization of work and working methods

set out in annex 3 to this regulation, if the site

plan or carry out



1. the work associated with the rozpojováním and moving the Earth, including its

compaction or other reinforcement, or associated with other modifications

associated with these works, which are carried out when setting up

construction or landscaping, under the conditions laid down in the specific

^ 7) law and which include setting the technical routes

^ 8) infrastructure (hereinafter referred to as "ground work"),



2. work related to the implementation and the dismantling of the formwork and shoring

design, manufacture, transport and storage of steel reinforcement and concrete

mixtures, including its compaction machines (hereinafter referred to as "concrete work"),



3. work related to the zděním and modification of structures of zdicího material

such as bricks, blocks, blocks, fittings, or stone, including

installation of precast panels in masonry construction, plastering walls and ceilings,

pair of masonry, flooring, tiles, mazanin or modifying

the surface of the walls such as chopping or dlabáním (hereinafter referred to as "masonry

the work "),



4. the work of the Assembly and joining, as well as removing and

demolition of steel, wood, concrete, reinforced concrete,

where appropriate, other elements of different shape and function, such as a rod,

area, or 3-d, to structures or technological

construction of the desired shape and design (hereinafter referred to as "the Assembly"),



5. works connected with agitation, opening or removing

construction of the building or part thereof, that are carried out when

the removal or change of the building under the terms of the specific

^ 9) legislation (hereinafter referred to as "demolition"),



6. welding and heating in hot melt resin containers under a special

^ 10) legislation,



7. gluing coverings for floors, walls, ceilings, or other construction,



8. maintenance the building ^ 11) and its technical equipment and

devices, such as painting and glazing, washing and

cleaning Windows, facades or gutters, further examinations, tests, inspections,

revision and repair of technical equipment and installations, as well as the installation and

disassembly of the parts to the extent necessary to perform these

surveys, tests, checks, inspections or repairs (hereinafter referred to as "maintenance

the work "),



9. the Manager,



10. work related to the storage and handling of materials, where appropriate,

products,



11. diving work and work carried out in increased air pressure,



12. work over water or in its close proximity to the dangers

drowning,



13. work related with the use of aircraft under a special legal

prescription ^ 12).



§ 4



If, after a limited period of time, in particular, depending on the construction and

When the installation work or maintenance work, it is not possible to ensure that the

the work was carried out in workplaces that meet the requirements of

special legal regulation ^ 3), and when their implementation or

during access to the workplace is a risk of falling or of natural persons

objects from a height, or depth, the contractor shall obtain safe implementation

These works, as well as secure access to the workplace in accordance with the

the requirements of a special legal regulation ^ 1).



§ 5



The details to the notice of the commencement of work in the implementation of the construction work, which is

Contractor shall deliver to the district labour inspectorate, shall lay down the

Annex 4 to this regulation.



§ 6



The work and activities of the issuing a physical person, the increased threat to life

or damage to health, for which an obligation arises to process

the plan, set out in annex 5 to this regulation.



§ 7



During the preparation of the construction Coordinator



and gives suggestions and recommended) technical solutions or organizational

the measures, which are, in terms of providing a safe and healthy

non-threatening work environment and conditions of work suitable for

planning of individual works, particularly those that are carried out

at the same time or in sequence; ensure that the recommended solution was technically

feasible and in accordance with the laws and other regulations in order to ensure

safety and health at work and that, with regard to the

the purposes laid down by the contracting authority building, economically reasonable,



(b)) provides professional consultations and recommendations concerning requests for

ensure a safe and healthy work, estimate the length of time

required for the implementation of the planned work or activities with respect to the

specific measures, the working or processing procedures and processes, and

the necessary organisation of work in the course of construction,



(c)) provides that the plan include, as appropriate, the nature and scope of the construction and

local and operational conditions of the construction site, data, information, and procedures

processed in the details necessary to ensure the health and safety

There is no work, and that has been agreed and signed by all contractors,

If you are in the time of processing the plan known;



(d)) shall ensure that the processing requirements for safety and health at

work in maintenance work.



§ 8



(1) the Coordinator during the construction



and coordinates the cooperation) contractors or persons in charge of when you

the adoption of measures to ensure the safety and health at work

in view of the nature of the building and to the General principles of risk prevention and

activities carried out on the construction site at the same time, where appropriate, in close,

in order to protect the health of individuals, preventing work accidents and

prevent the occurrence of occupational diseases,



b) gives impetus and upon request of the contractor recommended technical solutions

or measures to ensure the safety and health at work for

the determination of the work or processes and planning

the safe execution of the works, that with regard to benefits in kind and time binding

during construction implementation take place simultaneously or in the

immediately,



(c) in determining the time) works to secure the implementation of the

each individual work or activities,



(d)) shall monitor the implementation of works on the construction site with a focus on discovery,

compliance with the requirements for safety and health at work,


draws attention to the shortcomings and demands without undue delay

redress,



(e) the security perimeter of the construction site) controls, including the entrance and the entrance to the

the construction site in order to prevent the entry of unauthorized individuals,



f) cooperates with the representatives of the employees for the safety and

health at work and with the relevant trade unions ^ 14)

where appropriate, the natural person conducting the technical supervision of the Builder ^ 7),



g) takes part in visits to the building, to which he was invited

construction Office under a special legal regulation ^ 7).



(2) the Coordinator during the construction



and the proposed dates the control) days to comply with the plan, with the participation of

contractors or persons in charge and arranges their venue,



b) monitors contractors ' compliance with the plan and discuss with them the adoption

measures and deadlines, to remedy any identified deficiencies,



(c)) performs writes about the observed deficiencies in security and protection

health at work at the construction site, which demonstrably said

the contractor, and then writes the information about whether and how the

These shortcomings are removed.



§ 9



This Regulation shall enter into force on 1 January 2000. January 1, 2007.



Prime Minister:



Ing. Topolanek in r.



The Deputy Prime Minister



and the Minister of labour and Social Affairs:



RNDr. Nečas in r.



Č. 1



Additional requirements for construction site



General requirements



I. requirements to ensure the construction site



1. Buildings, workplaces and equipment must be at risk or

otherwise secured against the entry of unauthorized individuals, when

compliance with the following principles:



and the construction site in a built-up area) must be on the border of the continuously

fenced to a height of not less than 1.8 m. the establishment of the construction site, taking into account

on related adjacent spaces and infrastructures with a view to the

communication, facilities and traffic to disturb them. Replacement

communication is necessary to properly mark and illuminate,



(b)) for line structures or construction sites, or sites on which

only short-term work, you can make the fence railing

composed at least of the top Rod mounted in the amount of 1.1 m

stable columns and one intermediate medium rods; with regard to the

local and operational conditions can be replaced by a barrier fence

According to annex 3, part III, section 2. to this regulation,



(c)) If you cannot for work carried out on the road from operating

or technological reasons, fences or guards must be

the safety of traffic and persons is ensured by other means, for example, the management of

operation or by watching,



d) openings, depressions, pits, hollows and other places where

There is a danger of falling of natural persons must be covered at risk according to

Annex 3, part III. point 2. This regulation or so.



2. The contractor shall determine the method of construction site security against entry

untrained individuals, ensure that mark the boundaries of the construction site,

to be clearly recognizable even in poor visibility, and provides

the deadline for this security checks. No entry for unauthorized physical

persons must be marked with a label ^ 15) on all inputs, and

on the access roads that lead to them.



3. If the requirements for the security of the construction site for the visually and physically

with disabilities contained in the project documentation, the contractor shall ensure that the

the replacement of the communication and, where appropriate, fencing, fence construction site on

public spaces and public highways allow

safe movement of physical persons with mobility impairments, as well as the

the visually impaired.



4. The construction site for the vehicle must be identified by means of

marks, ^ 16) implementing a local modification of the use of vehicles on

the construction site. No entry by unauthorized individuals must be marked with a

label ^ 15) at all entrances, and on the access

roads that lead to them.



5. Before starting work in the protection zones, the management, construction or

equipment technical equipment, the contractor will carry out the appropriate measures

to comply with the conditions laid down by the operators of such leadership, structures

or device ^ 17) and during the execution of the works is observes.



6. Throughout the period of execution of the works on the construction site must be secured

safe workplaces and means of communications; requirements for lighting

lays down specific legislation. ^ 5)



7. access to any surface that is not viable, it is enough

enabled only if an appropriate technical equipment or other

the means to ensure the safe conduct of work, or allow

safe movement after this area.



8. materials, machines, means of transport and transport of the load and

handling on the building site must not jeopardise the safety and health of physical

people staying on the site, or its immediate

nearby.



II. Energy distribution installations



1. the temporary energy distribution installations on the site must be designed,

implemented and used in such a way that it is not a source of danger

the risk of fire or explosion; natural persons must be adequately protected

against the risk of electric shock. The design, the implementation and the choice of

temporary power distribution installations and protection devices must

match the type and performance is sold/distributed energy, external influences and conditions

professional competence of individuals that have access to the components

device. Power distribution, existing before the establishment of the construction site, the

be identified, checked and clearly marked.



2. the temporary electrical installations on the site must comply with the standard

requirements and must be subject to regular inspections and revisions in the

set intervals. The main switch of the electrical equipment must be

placed so that it is easily accessible, it must be marked and secured

against tampering and its location must be given notice of

all natural persons shall mean, on the construction site. If, on the

the site does not work, it must be electrical devices that may not stay

for operational reasons is enabled, disconnected and secured against unauthorized

handling.



3. If the above-ground power lines cannot be moved outside the construction site

or is disconnected from the electrical power source, it is necessary to prevent the entrance of

transport equipment and machinery into the protection zone. If you cannot

the operation of vehicles and mobile machinery under the leadership of excluded

It is necessary to place the appropriate warning and suspension.



III. requirements for workplaces outdoors on the construction site



1. Movable or fixed workstations located at the height or depth

must be solid and stable, taking account of the



and) the number of individuals that are simultaneously present on them,



(b)), the maximum load that can occur, and its distribution,



c) weather conditions, which could be exposed.



2. If the supports or other components of the workplace is sufficiently stable

by themselves, it is necessary to ensure the appropriate and secure stability anchor,

to eliminate unwanted or spontaneous movement of the entire workplace, or

parts of it.



3. The contractor shall ensure the implementation of professional inspections of the workplace

in a way, and at the intervals specified in the accompanying documentation, however,

After a change of position, and after emergency situations, which may affect its

stability and strength.



4. The contractor shall be stored material, tools and machinery referred to in annex No. 3

Part I of this regulation and in accordance with the manufacturer's instructions and in accordance with the

requirements for specific legislation) and 18 ^ ^ requirements for your organization

work and working practices laid down in annex 3 to this regulation,

so as to avoid the risk of individuals, property or

of the environment.



5. The contractor shall, as soon as he interrupts its continuation would lead to

endangering the lives or health of natural persons on the construction site or in its

the surrounding area, as appropriate, to the threat to property or the environment influence

adverse weather influences, unsatisfactory technical condition of the

construction or machinery, natural events, or due to other

unforeseeable circumstances. The grounds for interruption of work will examine and

interruption of work, the physical person in charge shall decide by the contractor.



6. when work is interrupted the contractor shall obtain the necessary measures

to protect the safety and health of individuals, and copies of the minutes of the

the work carried out.



7. If in the course of work to change the weather situation, or

geological, hydrogeological, or operating conditions which

could adversely affect the safety of work especially when using and

operation of machines, the contractor shall obtain without undue delay, the implementation of

necessary changes to the technological procedures so as to ensure the

occupational safety and health protection of individuals. With the change of

technological procedures, the contractor shall immediately learn appropriate physical

of the person.



8. In areas with danger of explosion, burial, poisoning, drowning, falling from

the height or depth of the contractor to ensure that natural persons working

on this workplace alone were made familiar with the rules of communication

in case of an accident and provides an effective form of supervision for the need for early

first aid supplies.



Č. 2




More detailed minimum requirements for health and safety in operation and

the use of machines and tools on a construction site



I. General requirements for machine operators



1. Before using the machine the operator contractor familiar with local

operating and working conditions having an impact on safety at work,

notably the load carrying capacity of the soil, level crossings and bridges, slopes of the rolling

the plane, saving the underground leadership of the technical equipment, where applicable,

other underground obstacles, the location of the aerial cables and obstacles.



2. when operating the machine, the operator ensures the stability of the machine during

all work activities of the machine. If the machine is equipped with stabilizers,

handles or hinges, are in working position set up in accordance with the instructions

to use and secured against sinking, slide or release.



3. If the machine required a special warning signal

the device is indicated by the machine running the audio, or

light warning signal. After the warning signal shows the operator

the machine into operation only when all of the affected individuals have left the

the affected premises; If it is not in the documentation accompanying the machine set

otherwise, the affected area is delimited by the maximum range of machines activities

his work equipment enlarged about 2 m. On the small workplaces

the machine may be put into operation until after the time sufficient to

leaving the affected area all natural persons.



4. If the machine is being used on a road and it is equipped with a special

warning light orange color, its activity is governed by the Special

legislation. ^ 19)



5. when using the machine for use on the road, the contractor

shall act in accordance with the conditions laid down by specific legal

legislation; ^ 20) surveillance and also to safety on the

the road provides a sufficient number of eligible

natural persons when used as personal protective

work means high visibility warning clothing. When you mark a

obstacles to road safety are governed by the provisions of the

special legislation. ^ 16)



6. Machine whose activities arise from vibration, can only be used

in such a way and at such construction sites where dangerous

transferring the vibration damage to nearby structures, excavations,

underground wiring, equipment, and so on.



II. machines for earthworks



1. The machine moves or performs work at such a distance from the

the edge of the slopes and excavations, with regard to the carrying capacity of the land has not been

the collapse of the. If this distance is not fixed in the technological procedure,

It provides for the contractor in charge of the natural person before starting work.



2. Under the wall or fold the machine moves or carries out his work

at such a distance, to avoid the risk of its collapse.



3. When using multiple machines on one site is preserved between them

such a distance to prevent the mutual threat to the operation of machines.



4. when driving downhill, and when working on a slope, the operator uses the

safe riding techniques so as to avoid a dangerous slide

the Centre of gravity of the machine and the loss of its stability.



5. when the loading of the material means of transport can be manipulated with

work equipment machines only over patient area and to

means of transport nenaráželo. If you cannot avoid when loading

handling of work device of the machine over the cab of the transport

for a resource, it is necessary to ensure that the cab during loading

no natural person. The loading area must be handled

evenly.



6. when driving machine with laden material is work equipment

established, or served in the transport position so as to avoid

dangerous loss of stability of the machine and the limitations of vision of the operator.



7. The operator abandons his post, without having a working device

the machine runs on the ground or on a mat on the ground or placed in a

prescribed transport position and secured in accordance with the instructions

the use of.



8. when Earth-rock dozerem lip does not exceed his blades or shovels

the edge of the slope, or excavation; This does not apply when you include a trench.



9. Jib rope excavators is rebuilt with only the eyes work

device, unless the manufacturer in the instructions otherwise.



10. Overhangs, which, when complaints may arise, it is necessary to immediately

delete.



11. If it is not in the instructions for use unless otherwise provided for, not in operation

the machines allowed to



and the stone on the day roztloukat) shovels,



(b)) to settle the terrain by turning the bucket,



c) pluck college work device of the machine.



12. Bucket machines may be cleaned only when the engine is switched off the machine and

a place where there is no landslide of soil.



13. When using additional lifting equipment supplied to the machine

by the manufacturer in addition to the conditions laid down by the manufacturer, shall apply mutatis mutandis

requirements for the safe operation and use of the equipment for lifting and

movement of suspended loads. ^ 6)



14. Before the start of earthwork, the skrejprem are made

by the contractor or by any other natural person the necessary measures to ensure that

the machine encountered blade on protruding fixed obstacles such as

rocks, stumps or strong roots that need to be removed in advance,

disrupt, or mark. Equipment technical equipment,

for example, fire hydrants, water and gas or sewer

hatches must be secured so as not to damage it.



15. If the skrejpr in motion, not in his dangerous work

area in front of the machine in the direction of his drive to keep individuals.



16. it is not allowed to enter into the space between the skrejpr and the tractor and

move through any part of the towed with.



17. When moving a loaded and empty with the hull must be always

raised and closed.



Iii. Concrete Mixers



1. Before starting up the mixer must be properly set up and

locked in the horizontal position.



2. the Mixer may only be filled only when the rotating drum.



3. When manually inserting the ingredients of the mixture into the mixer with a shovel is prohibited

interfere with the rotating drum.



4. Drum mixers are not allowed to clean hot tools or objects

held in his hand. The end of hand tools must not be inserted into the rotating

the drum.



5. operation does not enter into the affected area by moving the hopper.

Repair, maintenance and cleaning of the mixers are equipped with násypným the is

allowed to enter under the Recycle Bin only when the basket securely mechanically

secured in the up position, hook the chain, hub or other protective

means of communication.



6. Enter into the design of the mixer may only if the machine is

disconnected from the power supply.



Iv. Concrete Plants



1. Track hopper must be ensured the fence or covering.

Inspection, maintenance and repair, or other necessary activities, in

the area affected by the movement of the basket to carry out only if the rubble bin

reliably blocked against motion.



2. the Rubble bin must not be used for the transportation of individuals.



3. transport and storage of bulk cement from the filling

pipes, stacks up to the point of collection, including the mixer should be used

and maintained in accordance with the accompanying documentation, in order to prevent

unwanted establishment and swirling dust.



4. Loading and unloading each star dumps

the aggregates is done evenly, to avoid unilateral

the load counters. The entry of individuals to the landfill and to

the area affected by the movement of přihrnovače aggregate is not allowed; space

access to the landfill shall be marked with safety signs. ^ 15)



V. means of transport for the transport of concrete and other mixtures



1. Before driving, in particular after the loading and unloading of

transport equipment, means of transport, the driver checks, hereinafter referred to as

the vehicle, ensure the výsypného device in the transport position, or is

in this position, in accordance with the instructions for use.



2. acceptance and storage of mixtures of the vehicle shall be placed on

a clear and sufficiently únosném the place with no obstacles hampering

the handling and the necessary Visual inspection.



Vi. Pumps and mechanical mixing mixture



1. Pipes, hoses, conveyor belts, skluzné and vibrating troughs and other

device for the transport of concrete mixtures must be routed and secured so

that did not cause congestion or excessive strain, such as scaffolding,

formwork, trench walls or parts of the structure.



2. pressure vessel Lid cannot be opened, if the pressure inside the vessel

cancelled in accordance with the instructions for use, for example, the venting valve.



3. Outlet pipe on pumping the mixture must be ensured,

to the risk of injury as a result of the individuals ' sudden movement

the influence of the dynamic effects of the mixture was transported minimized.



4. When using the spray gun machine mixing has stable operation

position. When the mechanical mortar must be ensured a good way

communication between individuals carrying out mortar and

operation of the pump.



5. Machinery for surface treatment is not allowed to clean and

disassemble it under pressure.




6. For the carriage of mixtures to the pump must be taken to ensure safe arrival

not requiring complex and recurring reversing vehicle.



7. During operation of the pump is not allowed



fold up the hose, and)



b) tamper with the connector and manually move the hoses and pipes,

If they are not designed for it,



(c)) to enter on the design of the pump and to the danger zone for

hose endings.



8. Mobile pump (hereinafter referred to as "autočerpadlo") must be positioned so

that the place was clear and in the area of handling with bracket

and pipes were not obstacles hamper this manipulation.



9. When using split-beam of the autočerpadlo must be positioned so

that is not to be unnecessarily displacing and to comply with the safe

the distance from the edges of the excavations, scaffolding and other obstacles.



10. In the area of the beam of the autočerpadla no one is not present.



11. Boom autočerpadla cannot be used for lifting and moving

loads.



12. handling of the jib boom arm developed (with piping and

hoses) may only be performed only in ensuring the stability of the autočerpadla

drop-down and pull-out outriggers (stabilizers) in accordance with the instructions

the use of.



13. Move autočerpadlo only with bracket comprised in transport

position.



VII. Trailers and stable storage of bulk materials



1. Before connecting the hose or pipe to transport pipeline series for

pressure tanks, as cement and similar bulk solids

(hereinafter referred to as "bulk cement"), the operator checks to see if a series is not

under pressure.



2. Transport hose and pipes must be prior to the transfer of bulk

cement. Functionally, the damaged device is not allowed to use.



3. Connect hose to each other and with the fixed pipeline can only be

faultless and designated couplings and ferrules.



4. in the course of the transfer operator monitors the Cup to stack

avoid overfilling.



5. the shuttles in operation and maintenance of bulk cement is progressing

According to the instructions for use, where appropriate, in accordance with local operating

the security code; in doing so, shall apply mutatis mutandis apply the requirements

special legal regulation ^ 6), relating to stable storage

equipment bulk materials.



VIII. Mechanical shovels



1. The surface of the terrain, where necessary, the construction, after which they are loose materials

přihrnovány mechanical shovel, must be adjusted so that it is not

occur to capture bucket about inequality, fixed obstacles or greater

objects.



2. Connection of traction rope shovels with the winch shall be provided

fuse against overloads.



3. the movement of empty buckets into servicing only the

Drag, not by pushing or carrying in front of him.



4. When operating the machine, no one does not stay in the space between the winch and the

a shovel. The operator shall ensure that the Commission has not established to the towing rope loop, and

shovel in the shot holds with both hands. When removing the bulk materials must

be carried out measures to prevent the filling of the servicing of the bucket.



5. Connecting the nodes of the traction rope is not allowed. Join the rope in place

fit the bucket must be carried out reliably at least two rope

couplings.



Ix. The Vibrators



1. the length of the moving between the power supply unit and supply parts, Shaker

that is held in the hand or is manually operated, must be at least 10

m. the same applies to the length of the moving between the unit and the power supply

motor if the motor unit is out of power

Unit and parts held in hand-Shaker.



2. immersion vibrating head of the vibrator and her pulling out of

zhutňovaného concrete is done just for the running of the vibrator. Flexible shaft

the vibrator must not be bent in an arc about a smaller RADIUS than the

specified in the instructions for use.



X. Battering Rams and vibratory pile drivers-machinery



1. When you pile driving elements, such as sheet piling or piles, may not be in the

1.5 times the radius of the corresponding height of the towers or jib crane (

"the carrier") carried out other work.



2. the preparation of elements for the pile driving should be carried out in a safe

the distance from the place of pile driving.



3. the carrier shall be provided For paved and settled on the desktop

sufficient size corresponding to the size and type of Battering Rams.



4. the Carrier must be secured against tipping over.



5. Snap or building element of a diagonal stroke is only allowed to

the specified device.



6. Sink the element must be in the pile-stabilized so reliably,

in order to guarantee its correct position and to prevent its displacement.



7. guidance elements must be used only safe and reliable

preparations. Manual guidance is only allowed in lifting equipment

equipped with mikrozdvihem.



8. when pile driving is not entering below the suspended elements. Suspended element

After the necessary period only the natural person designated to

guidance and stabilizing its position.



9. for the use of the freely suspended pile drivers, such as pneumatic or

the vibration, it processes the contractor a detailed technological process

incorporating requirements to ensure safety at work.



10. If it is not a natural person acting on the carrier backed by anti crash

technical design, safety must be ensured

employment resources for fall arrest.



XI. Construction electrical winches



1. The operating position must be placed so as not to jeopardise the

the load or the main rope and to be seen on all of the loading

and the place of unloading, if not mutual communication between the operator and the

a natural person at the loading or unloading place ensured

a signalling device.



2. the Windlass has to be placed at a safe distance from the vertical track

the transported load, protected from other traffic on the site and

properly anchored, or stabilized. Unless otherwise specified by the manufacturer in the instructions for

otherwise, use the weight of the load must not be used to stabilize the

windlass less than twice its rated load.



3. The Pulley must be mounted so that its axis be perpendicular to the direction of winding

the rope, and at most in a position such that, when the lowest position of the load

to remain on the drum of the winch at least 3 coils of rope.



4. The gate cannot be used unless it is ensured that the operation of the automatic

stop as soon as the load hook its highest parts closer to the

set a safe distance to the fixed obstacle, such as a pulley or

housing a windlass. If the manufacturer does not provide otherwise, this safe

distance to 0.3 m.



5. In the place of removal or disposal of the material at a height of is ensured

the protection of individuals against falls from heights. ^ 13) if the Central rod

handrails or breakpoint on the floor to do safe handling

the transported load, you can skip to the extent necessary, where appropriate,

delete. The procedure under a special legal regulation is not

. ^ 21)



6. the Door may not come into operation until after the completion of its

installation, including the hanging construction pulleys, passed and the contractor

taken into operation and until this transfer and acceptance has been made

write.



7. Before putting into operation the winch operator checks to ensure that no one

not present in the area affected by falling of the load.



8. During operation of the winch is not allowed



and the burden on the winch) above its carrying capacity,



(b) encumbrances that) transported their dimensions threaten around if

appropriate security measures are carried out,



(c) to lift the burdens of a diagonal stroke),



d) leave the operating position, the windlass is a burden suspended from a hook,



(e)) at the tip of the hook to lift weight burden,



f) abstaining from under a suspended load and in its dangerous proximity,



g) to guide your hands or feet of winding of the rope on the winch drum,



h) continue to work with the winch, a rope loop or knot

and if there is a slippage of the rope from the Groove pulleys,



I) haul loads, there is a danger of damage to the cable or

slings,



j) cause surges when starting or stroke burden,



to lift the burdens of that), přimrzlá or přilnutá,



l) making changes to the brakes, which could endanger the safety of the

natural persons,



m) use electric windlass for raising the lift platform

guides, unless they fulfil the technical requirements applicable to the placing

construction elevators into service. platforming



9. the Windlass may only be used for towing, only if it is modified, and

If there is a



and adapted to cover the winding) drum,



(b) the correct device installed) store the rope when winding on

drum,



c) control the windlass furnished so that when you release the button the specified for the

putting into operation the operation of the winch windlass stops.



10. the contractor specified intervals, the operator performs a windlass or

a natural person designated by the contractor, a tour of a windlass, rope and harness by

manual or instructions for the operator.



XII. Simple pulleys for manual lifting of loads



1. Supporting the textile rope must have a minimum diameter of 10 mm rope is Damaged

excluded from the application.



2. Perform the load-bearing structure roller before first use

proven to be approved by a natural person specified by the contractor.



XIII. Construction site hoists




A construction platform lifts must be in the course of the operation in the specified

intervals to be checked in order to ensure their safe operation.



XIV. Common provisions on the security of the machines when you interrupt and termination

work



1. The operator records the defect machines or deviations

observed during the previous operation or use of the machine and with the

any defects are properly acquainted rotation operation.



2. Unintentional movement of the machine must be secured after completion of work in

accordance with the instructions for use, for example, the incorporation of wedges, the

devices running on the ground or the inclusion of the lowest speed

instance and the actuation of the parking brake. Also, when the interruption of work must

be secured against spontaneous movement at least actuation

the parking brake or work equipment running on the ground.



3. upon termination of the work and its interruption must be unintentional

the movement provided a working device of the machine you run it on the ground or

entry into the transport position, which shall ensure, in accordance with the instructions

to use.



4. operation of the machine, which intends to move away from the machine so that it cannot in

If necessary, intervene immediately, it shall take, in accordance with the instructions

use measures to prevent accidental starting of the machine and its

the unauthorized use of another natural person, such as locking the cab and

remove the key from the ignition switch or lock the machine control.



5. The machine must be shut down on a suitable location, where it does not interfere with

communications, where stability is not compromised machines and where the machine is not compromised

falling objects or activities carried out in its surroundings.



XV. the transport of machines



1. transport, handling, stacking, securing and fastening of a machine or

work equipment shall be carried out according to the instructions and procedures laid down in

the instructions for use. If there is no progress in the transport machinery and its

work equipment listed in the instructions for use, the it contractor

on the local production safety rules.



2. When loading, folding and the transport of truck transport machines

resource, as well as towing machines and its connecting and disconnecting

from the towing vehicle must be complied with the requirements of a specific legal

prescription ^ 22) and the following further requirements.



3. When transporting the machine on the loading area of the means of transport in the cabin

transported on the machine or machines on the platform of the transport

the resource requirement of the natural person, if it is not in the instructions for use of the

unless otherwise provided for.



4. When transporting the machine on the loading area of the means of transport are

work equipment, or other floating device provided in the

transport position according to the instructions for use and with the machine is fixed and

mechanically secured against longitudinal and lateral displacement and cons

tipping over or on the loading area of the means of transport are stored and

fastened separately.



5. Means of transport must be in the loading and stacking machines

built on the firm ground, safely stalled and mechanically locked

against unwanted movement.



6. when approaching the machines for the means of transport and loading area

leave it to all the natural persons with the exception of the operation moves away

from space, in which could be at risk from falling or tipping over

machinery, breakage of the traction rope or other accident.



7. The natural person pointed to the machine on the means of transport is always

outside of the machine outside the means of transport and in the field of servicing the machine after

all the time and start-up of the machine.



8. When transporting the machine on your own you must be his work equipment,

or other floating device provided in the transport position by

the instructions for use.



9. Mount the machine must be used when connecting to the towing vehicle safely

stalled and mechanically secured against unintended movement. When

connecting the trailer the machine, which has a maximum authorised mass of the

not exceeding 750 kg may only be approached during the trailer to the towing vehicle, machine

If they are taken to protect the health of manual handling

loads. ^ 5)



10. the driver of the towing vehicle to the stop zacouvá trailer hitch and allows

a natural person who performs the connection, perform any necessary

the handling of the machine only at the hanging device to instruct properly

informed pointed to a natural person. After the fence is a towing vehicle parking.



Č. 3



Requirements for the organisation of work and working methods



I. storage and material handling



1. Secure supply and collection of material must be secured in accordance with the

the procedure works. Material must be stored in accordance with the conditions laid down

the manufacturer, preferably in such a position in which it will be built into the

construction.



2. Equipment for facilities such as landfills, support or stability

the design must be such as to allow storage, removing

or completion of elements and parts in accordance with the accompanying documentation without

the risk of damage. Locations to be tied, odvěšování and

material handling equipment should be safely accessible.



3. Storage areas shall be flat, drained and compacted. The deployment of

the stored materials, dimensions and loading capacity of storage areas, including

means of communications must conform to the dimensions and weight of the stored

material and used machinery.



4. the material must be stored so that all the storage period was

ensured its stability and prevent its deterioration. Washers,

stops, outriggers, stands, wedges or a link must be provided

all the elements, parts or assemblies, which would otherwise be unstable and

for example, you could flip, tilt, move or roll.



5. the elements of the storage just bear down and are not equipped with

for a secure grip, for example, STS, hooks or hangers, must always be

interspersed with each other supporting documents. As a handout is not allowed to use

round timber or laminated substrates consisting of two or more elements freely

laid on each other.



6. Bulk material can be fully mechanizovaném storage and

subscription stored to any height. When removing materials should be

to avoid creating overhangs. If the wall creates, modifies the subscription

the height of the wall does not exceed 9/10 maximum range used

the loading of the machine.



7. When manually storing and removing the bulk material may be positioned to

height up to 2 m If it is necessary to remove them manually, or

mechanical shovel from piles higher than 2 meters, instead of the

Subscribe to avoid overhangs and wall height does not exceed 1.5 m.



8. Landfill of bulk materials, the collection must be marked

label of the prohibition on the entry of unauthorized individuals. 15)

Natural persons, which ensure the implementation of the subscription shall not delay the

in the affected area of the sampling point.



9. Loose materials in bags manually saved to a height not exceeding 1.5 m and

mechanizovaném storage, if they are on pallets, to a height of not more than 3 m.

If the edges of the piles are not secured, for example, supports or walls, it must

be stored in a secure bag trim and binding, so that it cannot be

their landslide.



10. Liquid material must be stored in closed containers so that

opening for filling or emptying. Open tank

must be secured against falling of individuals into them. Casks, barrels and

similar containers are stored lying down, must be secured against

rozvalení. When stored in multiple layers, each layer must be

among themselves, interspersed with the elements, if the casks, drums and similar containers

they are not stored in structures to ensure their stability.



11. the sheet glass must be stored upright in frames with soft

washers and secured against tilting.



12. Hazardous Chemicals and chemical products must be stored

in packages marked with type and the method of storage, which specifies the manufacturer,

and marked in accordance with the requirements of the specific legislation. ^ 23)



13. Cans and other rounded objects may be manual caching

built up to a height of 2 m while ensuring their stability. Pipes and tubes,

the logs and items like shape must be secured against rozvalení.



14. the elements and components of regular shapes can be mechanizovaném

store and subscription are saved but not more than 4 m in height unless the manufacturer

provide otherwise and provided that the load carrying capacity of the subsoil is not exceeded and that the

safe handling.



15. the clamping and opening elements, sections and reports must be performed from the

country or safe floors so that they are not clamped or odepínány in

greater than 1.5 m working height. Clamping and opening elements, parts and

reports from ladders can be performed only according to the established technological

procedure.



16. it is necessary to dispose of the waste in accordance with the requirements laid down

special legislation. ^ 24)



II. preparation before starting the excavations



1. on the basis of the data referred to in the project documentation must be

set out the route of the technical infrastructure, in particular, the energetic ^ 25) and

communication lines, water supply and the sewerage network, at the point of their conflict


the construction, or other underground and above-ground obstacles located

on the construction site. If the project documentation does not process, shall ensure

contractor making and marking of trails and other underground and

the aerial obstacles in any other way.



2. Before starting the excavations must be determined by the distribution of construction

excavations and jam and their dimensions and designed ways of conveying the soil, ensuring

the walls of the trenches against the kind of collapsed, particularly rail and prone slopes, excavations,

security surrounding buildings at risk by carrying out earthworks

the corresponding classes of rocks in the trenches and the modalities and scope of the

measures to prevent the inflow of water to the site.



3. If, according to project documentation hitting Earth works under the

the level of surface or underground water, must be determined in advance the extent and

How to lower the level of the water, under the conditions laid down by specific legal

Regulation, in particular by its ^ 26) by diverting or draining, unless used

technologies enable the implementation of work scheduled under the surface of the water and

at the same time measures are taken against falls of natural persons in the water.



4. Before starting the excavations must be marked on the ground location,

where the height of the route of the technical infrastructure, in particular

the underground leadership of the technical equipment, according to a special legal

prescription ^ 27) and other underground obstacles.



5. With the kinds of management of technical equipment, their routes, or

the depth of the deposit within the perimeter of the construction site, with their protective zones and

the terms of implementation of the earthwork in these zones must be

the start of work demonstrably familiar machines, and other physical

the people who will carry out the ground work.



6. troubleshooting when the accidents from simple manual

the works shall designate a natural person designated by the contractor before work

way of ensuring the technical infrastructure and measures to ensure

safety at work.



III. Ensure the excavation



1. Before beginning the earthwork surrounding construction must be secured

endangered kickoff.



2. Excavations in a built-up area, in public places and in

closed objects, where other activities take place simultaneously, it must be

covered, or in the margin, where there is a risk of natural persons to the

the trench, secured railing under a special legal regulation, ^ 28)

the space between the upper pole and the stop on the floor it is necessary to ensure

against the confiscation of the people in a manner appropriate to the local and operational

conditions, regardless of the depth of the excavation. At a distance of greater than 1.5 m

from the edge of the excavation can take appropriate barrier preventing assurance

access of persons to the affected area to a depth of. As an appropriate

the rail is considered to be a barrier, which might not be respected

strength or to ensure the space under the top against forfeiture,

portable sectional rail, safety signs indicating the risk of falling

people mounted at the height of the upper bar of the railing, barrier of at least 0.6 m

high or soil from excavation, stored in the shifting status to the level of at least 0.9

m. railings and barriers may be interrupted only at points of transition or

level crossings. If the excavation constitute an obstacle to the publicly accessible communications

for walking, always a handrail must be provided in the first sentence, and

breakpoint on the floor also serves as a stop for a white cane.



3. On public spaces and public highways must

be through the excavations established transitions or crossovers, the corresponding capacity

the operation, sufficiently reasonable and safe. The transitions of a width of

1.5 m of railings shall be provided in accordance with section 2. including breakpoints for

a white stick on both sides.



4. On the construction site, where it is designed to prevent the entry of unauthorized persons, shall be

against the fall of individuals to a depth of ^ 13) secured the edge of excavations in those

the places where the outer edge of the road closer to the edge of the

the trench at a distance of less than 1.5 m. Transition of a width of 0.75 m

must be set up through a kickoff deeper than 0.5 m; If the depth does not exceed

excavation 1.5 m must be fitted with a handrail transition at least one

hand, in other cases on both sides.



5. The edge of the excavation shall not be charged to a distance of 0.5 m from the edge of

the excavation. The surface of the ground in a strip from the edge of the trench or pit up to the border of

shear wedge set out in the project documentation, the affected

usmýknutím, not to be bothered with, in particular, building, buildings

equipment, machinery or equipment, excluding cases, when

the stability of the walls of the excavation is secured in the manner prescribed in the project

the documentation.



6. for natural persons working in excavations must be set up safe

descent and ascent by ladders, stairs or sloped ramps. The surface of the

sloping ramps on the slope more than 1:5 must be adjusted against slipping

properly fixed the cross rails or tab stops.



IV. implementation of the groundbreaking



1. Implementation of the excavation shall not be compromised the stability of the other

buildings and their parts. If, when carrying out excavations will

unforeseeable threats to the stability of the surrounding buildings or in violation of the

some of their parts, must be adopted without delay by the contractor

measures to ensure their stability.



2. before the first entry of natural persons into the trench, or after an interruption of work

more than 24 hours of peeks at the contractor or his designated status

the walls of the excavation, sheeting and approaches; If there is a danger of occurrence in the trench

hazardous vapours or gases shall ensure that measuring their concentration.



3. leadership in protection zones, or buildings or equipment

technical equipment, you can carry out excavation works only in compliance with the

conditions laid down by their owners or operators under

special legislation. ^ 17) the contractor shall take, in accordance with the following

conditions, the necessary measures to prevent a dangerous approach

natural persons or machines to these leadership structures, as appropriate, or

device.



4. the use of machinery or the pneumatic and electric tools near

the underground lines, or buildings or equipment technical equipment,

the contractor shall discuss with the operator or owner of the management

If the conditions for the use of these machines and tools are not included in

the conditions in section 3.



5. The contractor when carrying out excavation, where the prejudice to the

the underground leadership of the technical equipment, observes in particular:



and leadership that can) be carrying out excavation at risk are

properly ensured,



b) exposed piping in the wall of the trench is immediately provided against

deflection, buckling or disconnection.



6. when carrying out excavation no one shall not delay on an affected

the area, in particular in the parallel machine and manual execution in excavation

work, manual cleaning of the trench or in the transport of the material to

the excavation and excavation. If it is not in the documentation accompanying the machine set

otherwise, the affected area is delimited by the maximum range of machines activities

his work equipment enlarged by 2 m.



7. If the machine operator with a parallel machine and manual implementation

groundbreaking on the one shot enough views

all locations of the affected area, does not continue to work with the machine.



8. When manually executing excavation must be natural persons when

positioned to work with each other.



9. the Larger boulders, remnants of building structures or incoherent

materials in the walls of trenches that could release its pressure, soil,

must be secured against loosening or deleted.

The accumulated soil, fallen material and side barriers must be from

an excavation removed without undue delay.



10. When detecting dangerous objects, ammunition or explosives shall be

work in the trench is interrupted until you delete or secure these

subjects.



11. after a period of interruption of the excavation, the contractor provides regular

professional inspection and necessary maintenance of barriers or railings,

the rail, bridges, crossings, crossings, safety signs, markings and

signals, or other devices to ensure the safety of the physical

people in the trenches.



12. mechanical soil compaction using cylinders, Packers or other

zhutňovacích resources must be carried out so as to avoid risks

the stability of the walls and trenches or neighbouring buildings.



13. In remote locations where there is no supervision, must not be

excavation works carried out from depth 1.3 m alone.



In ensuring the stability of the walls and trenches.



1. The walls of the trench must be secured against collapsed.



2. the determination of the vertical side walls of hand-excavation must be provided pažením

When the trench depth greater than 1.3 m in a built-up area and 1.5 m in

undeveloped territory. In the loose, water-saturated soils, or otherwise

prone to collapsed and in places where it is necessary to count with repeated

tremors, the walls must be secured according to the established in these excavations

the technological procedure even in the depths of the smaller, than provided in the

the first sentence.




3. the walls of the trench Sheeting must be designed and constructed so as to reliably

catching the pressure of soil and secured the safety of individuals in the

excavations, prevent a reduction in the surrounding terrain and slumping of wall of the trench,

where appropriate, to eliminate threats to the stability of the buildings in the neighbourhood

the excavation.



4. To machine dug nezapažených excavations shall not enter,

If they are not secured against the wall because of the protective frame,

safety cage constructions or other technical spreader

structures. Mechanically excavated trenches and pits with a displaced

the walls, which are not in accordance with the technological procedure

Enter physical person can be left nezapažené for the time specified

technological procedure.



5. the Minimum clear width of trenches with vertical walls, to which

Enter physical person amounts to 0.8 m. size of excavations must be so selected,

to allow safe execution of all related installation work

associated in particular with the imposition of pipes, fittings and valves,

connections connections, making connections or by welding.



6. when removing the bracing the walls of the trench, one must proceed

from the bottom of the trench backfilling of odpaženého at present so as to

ensure the safety of the work.



7. If there is a danger of přepažování or the removal of the bulkhead collapsed

the walls of the trench or damage buildings in its vicinity, the rail must be

left at the necessary height in the trench.



Vi. excavations Embankment



1. the Slants of the slopes excavations specifies the contractor with a view, in particular, on the

geological and operational conditions, so that during the execution of the works have not been

individuals in the trench and its vicinity at risk sesuvem of soil.

The approximate inclined slopes, excavations up to 3 m deep, that will be after their

the works covered and the conditions which have to be complied with,

for some types of Earth laid down the standards requirements.



2. A natural person designated by the contractor, to control the execution of excavations

the work of the



and) when changing geological and hydro-geological conditions compared to

project documentation shall specify the designated walls and trenches, svahovaných



(b)) if doubts about the stability of the slope, establish and ensure implementation

measures to prevent the landslide slope and to ensure the security of physical

persons.



3. the Undermining of the slopes is not permitted.



4. For the adverse weather situation, which may be compromised

the stability of the slope, there must be no delay on the slope or slope.



5. When working on slopes with an incline of steepening than 1:1 and more

than 3 m it is necessary to take precautions against slipping of the natural persons or

slumping of material.



6. Work simultaneously on multiple stages in the hillside above them, you can then,

If the implementation of the measures set out in the technological procedure

created the conditions for ensuring the security of individuals, as well as

at earlier stages.



VII. Special requirements for ground work affected the frozen soil



1. the method of mining, transportation and eventual thawing of frozen soil

provides for the contractor in the technological procedure so as to ensure the

the safety of individuals and the protection of affected groundwater networks

the technical equipment of the territory.



2. the area in which the defrosting is carried out and where it could in its

due to the danger of burns or confiscation of natural persons,

must be clearly defined.



VIII. The manual transport of Earth



1. construction work platforms to temporarily save the excavated soil must

be fixed so that it does not compromise the safety of individuals and

the stability of the rail or wall of the trench. On the part of the rail can be referred to

rig fasten only if the rail for this purpose

customized.



2. For the transport of soil must be provisioned wheel wide enough and

viable communications inclination of 1:5, without the steep gradients; her

the surface must not be slippery and must be consolidated.



3. whenever the soil for backfill of the trench deeper than 1.5 m

the wheel, at the edge of the trench shall be established by a fixed stop to prevent

wheel rolling off into a ditch. If required by the handling of the wheel removal

part of the railing, under special legislation. ^ 26)



IX. Concrete work and work related



IX. 1 Formwork



1. the Formwork must be tight, reasonable and solid space. The formwork must be in

each stage of Assembly, disassembly, ensured against falling and its elements

parts. When assembling, dismantling and the use of proceeds in accordance with the

accompanying documentation of the manufacturer and with regard to the safe and

hedge against the fall of natural persons. Support formwork construction, as

are props and frame support, you must have sufficient load carrying capacity and be

diagonal ztuženy in the longitudinal, transverse and vertical plane.



2. the Supporting structure must be designed and fitted so as to make them

When the formwork can be gradually removed or loosened without danger.



3. The carrying capacity of supporting structures and formwork shall be accompanied by a static

calculation with the exception of elements without structural risks.



4. Before starting concrete work shall be of the formwork as a whole and its

part, and in particular supports, duly inspected and identified defects have been eliminated.

On handover and takeover of the finished construction formwork and control it makes

natural person responsible for the contractor to control concrete work written

record.



IX. 2 the transport and storage of concrete mixtures



1. When pumping concrete into containers or trays and

its construction is to be saving to work from a safe working

floors, platforms, where appropriate, to ensure the protection of individuals

in particular, falling from a height or in depth, against the smothering and pouring

concrete mixtures. If you cannot establish such places, the contractor shall obtain

protection of individuals by other means set out in the technology

procedure, such as personal protective equipment against falls or

protective guard.



2. for access and for manual transportation of concrete mix must be built

safe access communications, for example, the ^ 13) work or access

scaffolding, where appropriate, the floor so as to exclude individuals walk

immediately after the stored reinforcement bars.



3. The contractor shall ensure the implementation of the health check of the supporting structure

formwork during the pouring. The detected defects must be immediately

deleted.



4. Transported to concrete mix to the point of storing the pump,

the contractor shall establish and shall ensure that the method of communication between a natural person

performing storage and servicing of the pump.



IX. 3 the formwork



1. Formwork supporting structures, or parts thereof, for

early stripping of the danger of collapse or structural damage,

may be initiated only at the direction of the natural person designated by the contractor.



2. If there is a risk of falling from the formwork construction height or to

depth, adheres to the contractor for more specific legal requirements

prescription. ^ 13) Ladder can be used only when the pieces work in

the height of 3 m above the floor of the odbedňované construction work and for

provided that they do not emit nor do not eliminate the carrier of the formwork and

the stability of the ladder is not dependent on the dismantled parts of the formwork and

supports.



3. The affected space pieces of work is necessary to ensure against the entry

untrained individuals.



4. formwork Components immediately after stripping of the saved to a designated

place so that they were not the source of the risk of injury and to avoid overloading the

construction.



IX. 4 Prestressing reinforcement



1. Workspace pre-loading device must be marked. The entrance to the

This space is allowed only to natural persons executing

Prestressing work or supervision.



2. The operating position must be placed next to the pre-loading device

outside tensioning wire direction and with the option to fall back in securely

When his deflection.



3. using a windlass, which is done by pulling out the tubes or retraction

cables must be protected by a screen in case damage to the towing rope

tow cable or pipe.



4. Pumps, hoses, nozzles, couplings and pressure gauges must be always in front

the start of the shift, checked by the contractor responsible for the physical

person.



5. Cracked or torn out wires or rods, rods with pitting corrosion and

elements must not be subjected to mechanical damage. When unwinding

of tendon wire supplied in bundles or rolls, it must be

used equipment is memorialized by the end of the wire to negative odvíjeného.



6. after tightening the tensioning and after removing the pistol must be

removed the bottom end of the front pre-crash reinforcement.



7. when winding reinforcement may not be carried out at the same time protection of winding,

for example, torkretováním.



IX. 5 Working hardware



1. the premises, machinery, medicines and other equipment for the manufacture of the valve must

be so arranged, that natural persons are not endangered by the movement of material

and its storage.



2. When cutting a few rods rods must be secured at the same time in

fixed position of structures or machines with suitable products.



3. When the cutting and bending of rods must not be overloaded by the machine. Rods must

be fastened or secured so that it cannot endanger the physical

persons.



X. bricklaying




1. Machines for the production, processing and transport of mortar on the same site

placed so that when the operation could endanger individuals.



2. When the machine mortar must be secured by an effective way

communication between the natural person conducting the deposition (saving) of Malta

and operation of the pump.



3. Activities related to the dangers of lime mortars or express

milk it is necessary to use appropriate personal protective equipment.

Lime should not be put out in a narrow and deep containers.



4. the material prepared for the masonry must be stored so that to work

He remained free working space wide at least 0.6 m.



5. For the transport of material you can use auxiliary trays when they are slipping

positioned and secured so as to prevent the transfer of materials

threats to natural persons.



6. On vyzdívanou the wall must not enter or otherwise

burden, even when performing a check verticality of masonry and binding

the corners.



7. Assembling of structures, equipment and technological equipment in masonry

must be addressed in terms of stability of masonry in the project documentation,

If this is not about articles a small weight that the stability of masonry, apparently

cannot distort. Equipped items must be attached, or docked

so that they cannot become loose and move.



8. In the work place and access roads, which are physical

persons performing masonry work exposed to the risk of falling from a height or

in depth, or risk forfeiture of the under 30

structures, the contractor shall obtain compliance with the detailed requirements set out

special legislation. ^ 13)



9. Enter the mounted with horizontal supporting structure with prefabricated

allowed only if they are secured against loosening and slumping.



XI. Installation work



1. installation work must be started only after appropriate takeover

the mounting of the workplace by a natural person for controlling installation work

and responsible for their implementation. Of the transmission assembly facility is

shall prepare a written record. The contractor shall ensure that installation work

Assembly allowed the safe implementation of Assembly work without

the threat to individuals and construction and meet the requirements laid down in

Annex 1 to this regulation.



2. A natural person carrying out the installation of the Assembly and use

safety equipment and products laid down in the technological procedure.



3. mounting and security preparations to ensure the security of

natural persons when mounting, especially when working at a height of, it is necessary to

mount the parts before they are cast by emphasizing to, does not exclude the

This technological procedure of the installation.



4. The selected attachment devices must allow for the suspension of parts according to the accompanying

the manufacturer's documentation.



5. method and mounting, as well as the adjustment of the lifting slings

must be elected, so that the fastening and lifting slings may release

be carried out safely.



6. for access to the Assembly and for the establishment of a safe work

the floor is used in the permanent structures that are at the same time with the procedure

installation in buildings zabudovávány, such as a staircase or a ceiling

Panel. Conditions are set by the technological Assembly process.



7. Vertical transport of people on site, located more than 30 m is ensured

lift or hanging basket, if the character design or procedure

the work does not exclude.



8. natural persons suspension using Motorola trash can only be according to the

Routing and processed in accordance with the requirements of

a special legal regulation, ^ 11) where to put proven

the consent of the competent natural person designated by the contractor.



9. When removing the parts from or from means of transport must be

ensure safe storage of the remaining parts according to part I of this

of the annex.



10. Lifting and movement of suspended loads or moving by using the

mobile equipment shall be carried out in accordance with the requirements of

special legislation. ^ 6) it is prohibited to lift or move

the load includes, fixed, přimrzlá, přilnutá, or otherwise

hinder the determination of the force required to lift, if it is not

ensure that the load capacity of the equipment is not exceeded.



11. during lifting and moving parts is a natural person residing in the

a safe distance. It was only after fixing the panels above the place of installation can

from the safe of the platform or the floor to perform his shoulders and a hedge against

misalignment. Odvěšuje Panel from the sling lifting device only after

This collateral.



12. vertical parts, after the cast must be secured against tipping over the screws,

mounting blocks, Struts, zaklínováním in the Foundation foot or

other appropriate means. The way the release of lifting slings

mounted parts, in particular, vertical, provides technological process

mounted so that the safety of persons not subject to the stability

mounted parts and to the stability of the components has not been compromised in this business.



13. the Panel may be mounted only when the previous

Panel and fixed stored securely according to the routing.



14. Assembly preparation for temporary securing of parts may only be removed

After fastening of panels and spatial design of the bracing as provided for in

the project documentation.



15. The technological process provides for reinforcement of those parts,

the cast is the safety of the individuals at risk as a result of

These components of wind can cause vibrations.



16. Steel structures must be for their fitting is permanently grounded.



XII. Demolition work



1. the demolition work, which affect the load-bearing building elements

construction may be carried out only by the routing

set out in the documentation of the demolition works. ^ 12) when the demolition works,

documentation for demolition under a special legal

the regulation does not handle, the contractor shall obtain processing technology

the procedure, based on our survey of the current state of the cut

construction work, its a static assessment of the findings of the leadership, and, where appropriate, of the structures

and equipment, technical equipment and concerned neighboring structures. To

survey of the use of existing documentation available about the building itself and the

adjacent buildings, a statement of the owners or administrators of technical

infrastructure and its own inspection of the construction site. On the basis of the static

the assessment will ensure that, in the course of work to avoid uncontrolled

violations of the stability of the building or part thereof. The survey carried out

the contractor shall prepare a write.



2. The exploration discovered the underground areas, such as cavities, wells or

other underground objects must be buried before demolition

or otherwise secured.



3. Demolition of buildings higher than the ground, stripping or cutting

vertical structures from a height of 3 m, demolishing staircases and extruded parts

reconstruction and cutting process, in which a change of design

the safety of the construction, mechanical cutting, cutting with specific methods,

such as cutting and demolition work in accordance with section 26, may be

carried out only by natural persons designated by the contractor, if

surveillance is ensured by a natural person to the contractor

a legacy; natural person responsible for the permanent supervision throughout the period of performance

permanent surveillance monitors the specified site, for the work and the movement

individuals on it, not detract from this site and does not

no activity other than supervision.



4. Surveillance under the preceding paragraph is necessary to ensure that, if the

demolition work taking place at two or more locations in a single cut

construction at the same time.



5. If in the course of demolition works come to light that were not

According to point 1 of the survey revealed, the contractor shall obtain, without undue

delay adjustment the above routing,

to always ensure the safety of the works.



6. Before starting the demolition is the affected area needs to be defined and

against the entry of unauthorized individuals, it is necessary to

safely, ensuring inputs to cut construction, as well as on the individual

the workplace, and to take the necessary measures to protect the public interest, which

These works could be at risk.



7. The affected area must be defined in a built-up area of fencing

at least 1.8 m, if the technology used for cutting.

If it is not possible to enclose the space, shall be provided to any other appropriate

in a way, for example, by watching the traffic or exclusion.



8. Internal wiring and installation embedded in cut construction must be

before starting work disconnected and secured against use. According to the

circumstances, against damage and shall ensure that management of technical equipment, to

which is building through connections linked. If u

reconstructed buildings cannot be for operational reasons, the internal wiring and

installation disconnect, provides for measures to ensure that the contractor

safe operation during the execution of the demolition work.



9. To ensure the supply of electric power for the execution of demolition

It is necessary to set up temporary electrical equipment complying with the standard


requirements. This equipment, as well as a temporary water supply for the water spray to

control of dust, it is necessary in the course of demolition work to secure against

damage.



10. Demolition work must not be started, if not by a person designated by the

the contractor issued a written order and if the workplace is equipped with

auxiliary constructions, material and equipment set out in the

the technological procedure.



11. Before starting the demolition is necessary to establish a signal that in the

an emergency, imminent threat can be the person designated by the contractor

to control the demolition instruction to the immediate evacuation of the workplace.

The contractor shall ensure that any natural person holding the

the workplace have been proven to be familiar with this signal.



12. The contractor shall ensure that when carrying out demolition work was

static hedging of adjacent buildings in the manner prescribed in

demolition documentation, where appropriate, in the technological process

in order not to jeopardize their stability.



13. temporary building set up inside the building or on a crashed car

its external sides must not be loaded with cut material

Nor must it be pulled through the material from the cut buildings, unless they are

designed for this purpose.



14. Material from the cut part of the building it is necessary to continuously, to

not overload the floors or ceiling structures as a result of his

the buildup.



15. Demolition work may not be interrupted, if it is not stable

those parts of the crashed car designs which have not yet been torn down. This

requirement also applies in the event of unplanned interruption of the demolition works,

for example, because of a sudden deterioration in the weather situation.



16. If, in the course of demolition or renovation is part of the

the building continued to be used, it must be in the technological procedures provided for

safety assurance and control of workplaces with a view to ensuring

protecting the life and health of individuals, that the construction of the taking.



17. The demolition of the roof structure or roof trusses use ropes and falling

Straddling the machines may be carried out only if it has been made

measures to ensure the stability of the remaining structures and parts of structures.



18. Unless sufficient load carrying capacity of the steel structure cut construction

demolition works are carried out from a separate auxiliary structure.



19. When manually cutting structural elements may be removed only

then, if they are not burdened by it.



20. when cutting walls, which stabilize the protruding structure

for example, balconies or the Bay, is necessary to ensure these constructs

to avoid unwanted loss of their stability.



21. When manually demolishing structures must do essentially

vertical motion from top to bottom.



22. The gradual demolition of constructions built Panel technology may only be

make up to the separation of the individual panels and ensure

their stability.



23. The manual cutting of the ceilings with wooden supporting structure may be carried out

If they are removed to the wall above her, supporting elements are uncovered and of

the ceilings had been cleared of the vybouraný material.



24. Ceiling elements should be uvázáním lifting equipment release

from other structures.



25. The demolition of arch releasing parts of the structure, which ensures it can be

perform only the mechanical way, and if it is ensured that the collapse of the vault

individuals is not compromised.



26. Demolition work in workplaces that are arranged so that the natural person

performing this work may be endangered by falling objects or

material from the site above, may be carried out only if they are

the measures provided for in the technological procedure in order to ensure

safety of individuals in such a way of working.



XIII. Welding and heating in hot melt resin containers



1. When welding, including the surfacing of insulation materials, and

heating in hot melt resin containers, the contractor shall comply with the conditions

fire safety laid down specific legislation. ^ 10)



2. Welding workplace, including the protection zone under the workplace in

When piece measures set out under a special legal regulation, ^ 29) it is necessary to

secure against the entry of unauthorized individuals and mark

safety marks; When arc welding on

Transitional workplace measures should be taken to protect the physical

people in his neighborhood from the effects of radiation from the arc.



3. If, when working at a height to ensure the stable and safe for welders

location other than personal protective equipment

against the fall of, these resources must be protected against burning.



4. The contractor shall ensure that staging procedure in which a natural person

conducting the surfacing of insulation materials progresses backwards,

has not been used in a distance of not less than 1.5 m from the free edge

workplace. ^ 30)



5. Measures to protect against burns when working with živicemi down

the contractor in the technological procedure.



6. The contractor shall ensure that the welding of the natural persons who had

are not technically eligible under a special legal regulation, ^ 31) and to

work connected with the patent had been warming up the natural persons who

She is not familiar with the process and with the instructions to use

the appropriate device.



XIV. Gluing coverings for floors, walls, ceilings, and other structures



For the fulfillment of the requirements of safety when gluing coverings of plastic,

rubber, Cork and other materials is considered to be:



1. the observance of the Routing and the instructions for use of the

adhesives, levelling materials and coverings, or else used

material,



2. when bonding in enclosed areas to ensure effective ventilation

prevents you from exceeding the maximum permitted levels of chemicals in the

the air, ^ 5)



3. in the case of the use of adhesives that release flammable vapours, ensuring

explosion protection according to a special legal regulation, ^ 32) in particular



and the definition of workplace) including the affected area and their identification

safety marks,



(b) prevent the entry of unauthorized) of individuals in a defined and

the marked area; the affected area includes in this case

as a rule, a floor where the bonding done, floors below it and above it,

where appropriate, additional adjacent spaces in which flammable vapours could

penetrate,



(c) intensive continuous ventilation) to prevent the formation of

explosive atmosphere, and during the whole period of bonding and at least 24 hours after

termination,



(d)) the exclusion of the manipulation of open fire, such as smoking, welding

local heaters or heating, and close the gas supply line depending on the circumstances

and disconnect the electrical equipment throughout this period,



4. all physical persons residing in buildings, where

These works will be carried out, with the period of holding the work and with the way their

safe behaviour during them,



5. the safe collection of residues of flammable materials, and the materials used, and

ensure their removal in advance in accordance with the procedure laid down

the provisions of the specific legislation. ^ 24)



XV. Painting and glazing work



In compliance with the requirements of safety work in painting and painting

the works shall be considered as:



1. when carrying out surface of the building and other construction paint

or spray compliance with established processes with

taking into account the related instructions for use and the intended method of protection of persons

before the harmful substances arising from the carrying out of such works,



2. the use of ladders in accordance with the requirements of a specific legal

prescription, ^ 13)



3. implementation of these works in the areas of work of the

floors or from ladders to modified.



XVI. Glazier



In compliance with the requirements of safety and health at work

glazing work is considered to be:



1. the State of being when manually handling glass work surface equal to,

a modified and reinforced,



2. when removing the glass from the container ensures that it is not

Tipping and unwanted movement, the



3. compliance with the ban on outdoor spaces with handle boards

glass whose surface area is greater than 1 m2, in strong wind and temperature

during the shift lower than-5 ° C,



4. glazing of the Windows, interpretations, skylights and similar structures at a height of

only from solid and safe working of the floors or moving

working platforms,



5. a glazing and handling of sheets with an area of more than 3 m2

at least three persons,



6. carrying glass sheets longer than 2 m by using the products,



7. compliance with the requirements for storage in accordance with section I of this annex,



8. collect glass waste in containers exclusively for that purpose.



XVII. The work on the maintenance and repair of buildings and their technical equipment



In compliance with the requirements of occupational safety and health at work for

maintenance and repair of buildings and their equipment is considered to be:



1. implementation of the work under the work and technology

procedures for natural persons competent for the performance of certain activities

and intended for their use,




2. the execution of the works and activities of issuing individual increased

a threat to life or health referred to in annex 5 to this

Regulation of persons designated by the contractor and subject to the conditions

laid down.



XVIII. Diving work



1. implementation of the dive site for the work must be sent in

the State agreed between the contracting authority and the contractor of the transmission site

a written record shall be drawn up.



2. Dive work can only be performed according to a predetermined

technology and workflow, and this work may only perform just

physically and technically competent natural person (hereinafter referred to as "the diver"),

designed by a competent natural person responsible for the management of

diving work (hereinafter referred to as "senior Diver").



3. depending on the complexity of the work to be performed, provides for the head of the

the diver specific steps and method of carrying out such work, on the

the basis of the survey of the State of the workplace, the weather conditions, temperature, and

composition of the water.



4. in compliance with the requirements of health and safety in diving

the works shall be considered



and the establishment of conditions for diving) and determination of scuba diving equipment,

equipment and personal protective equipment according to the nature of the

work to be performed and the conditions for diving head diver; wet

diving suits are not used to working in the water, the temperature of which or

the composition of the threat to health of the diver,



(b)) the determination and providing a means of communication and connection with the diver during

stay below the surface through technological means, in particular, the dive

wired telephone with a minimum strength rope 3000 N, or other

the voice device so that it cannot lose the orientation of divers

or lose its connection,



(c) prohibition of the exercise of other activities) in the affected area of diving

the works,



(d)) before the start of work below the surface of the maximum length of time

dive the diver and the overall duration of his stay below the surface during the shift with the

regard to the decompression, the nature of work and conditions of descent,



(e) the determination of decompression times) of decompression stops, including

the security of these stops, alternate source of respiratory media



(f) the prohibition on repetitive dives) divers to depths greater than 9 m during

shift with the exception of emergency interventions,



g) works only under the ice out of the hole in the hard ice of sufficient

the size and with the edge of the secure against breaking the ice; all the time

implementation of the dive work is the diver, in conjunction with the workplace above

the level of immersion cable telephone with a minimum strength rope 3000

N,



h) ensure the diver who descends beneath the surface itself with rope

the minimum strength of 3000 N and (b)); in the case of descent

two or more divers determination and providing a means of communication when you

stay below the surface between them to each other,



I) ensure each descent divers safety diver above the surface;

the degree of readiness to intervene shall designate the senior diver having regard to the conditions,

in which the works are performed,



j) in case control incidents of workplace equipment

first aid equipment including the oživovacího device with sufficient

supply of oxygen, and backup breathing apparatus and technical

resources on call emergency medical services, in

the immediate vicinity of the workplace,



to work) at depths greater than 13 m and sestupech, which are

associated with more than one decompression stop or sestupech

associated with high physical exertion to ensure equipment site

stand-alone standby decompression chamber located in the

the immediate vicinity of the place of descent, whose operator is trained to

its use; for this work is necessary to ensure the supply of breathing

gas hose running from a point above the level held by except

exploration activities,



l) the equipment of the workplace by a heated storage area for relaxation from the closed

the adverse impact of work (ohřívárnou) according to a special legal

prescription, ^ 5)



m) determination of execution of works with the use of pneumatic dive

with regard to compliance with the maximum permitted exposure

levels of vibration under a special legal regulation, ^ 33)



n) implementation of diving work, such as welding, cutting, or

blasting works, only diver qualified for the activity according to the

special legislation,



about) in the implementation of diving work using lifting equipment

start the descent until the divers will not be lifting device or

the burden is vulnerable; any manipulation with the lifting device can be

launched on the potápěčův instruction. Throughout the handling of lifting

device with or without the burden of a submerged diver shall be in

join a dive with a natural person managing work

lifting control over the surface,



p) the use of vessels or floating solids ^ 34) suitable for the implementation of the

work and enabling divers safe entry into the water, and the output from it, in

If necessary, fitted with a rescue boat.



XIX. the work over water or in its close vicinity



1. The contractor guarantees the protection against falling into the water, under a special

legislation. ^ 13)



2. If, exceptionally, protection against falling into the water in accordance with point 1.

reliably ensure the resources for collective protection, must be physical

people who are exposed to the risk of falling into the water, equipped with a suitable

personal protective working device intended for protection against

drowning; with regard to local conditions, in particular, the depth of water, speed

current and the height above the sea level, the personal protective

a resource to enable the capture, or Ascension its users from

water.



3. during the implementation of the work under the conditions referred to in the previous paragraph must be on

the workplace provide the resources for the provision of first aid in drowning

and to ensure the continued presence of natural persons, which is in the provision of

This assistance has proven to be.



4. If the site is not reachable from the shore over the water, ensure

the contractor transporting employees to the workplace and the

a suitable vessel in accordance with the requirements of a specific legal

prescription. ^ 34)



XX. Aerial work in the construction industry



1. Work with the use of aircraft can perform ^ 35) based on pre-decided

the technological procedure and under the conditions laid down by a specific legislative

legislation. ^ 36)



2. the work under item 1. cannot start if it is not secured communication

between flight crew and natural persons involved in the aerial works

on the ground.



3. the Detailed requirements for the hanging, lifting, moving, assembling, and

odvěšování loads, provided for in part XI. of this annex, shall apply

appropriately, taking into account the effect of weather and operational

terms and conditions.



Č. 4



The details to the notice of the commencement of work



1. date of dispatch of the notice.



2. The name and last name, or the identifying number, address/address

the place of residence or place of business of the sponsor of the building

(the Builder).



3. The exact address, a description of the location of the construction site.



4. type of construction, a brief description, including the placing of works and activities

According to annex 5 to this regulation, if they are to be on the construction site

carried out.



5. The name and last name, or the identifying number, address/address

the place of residence or place of business of the contractor of the construction and physical

the person securing expert guidance, where appropriate, the execution of the project

carrying out the construction supervision.



6. Name and surname/name, or the identifying number and location/address

the place of residence or place of business of the Coordinator in the preparation of

construction.



7. Name and surname/name, or the identifying number and location/address

the place of residence or place of business of the Coordinator in the implementation of

construction.



8. date of transmission of the contractor and the planned date of their

the works.



9. estimated maximum number of physical persons on the construction site.



10. Planned number of contractors on a construction site.



11. require identification data on the site.



12. the name, surname and signature of the sponsor of the building, where appropriate, of the natural person

authorized to act on his behalf.



Č. 5



The work and activities of the issuing a physical person, the increased threat to life

or damage to health, an obligation arises when the implementation process

plan



1. Work exposing workers to the risk of damage to health or death

sesuvem loose soil in the trench depth greater than 5 m.



2. work related to the use of dangerous highly toxic

chemical substances and products or on the occurrence of the biological agents

under special legislation.



3. work with sources of ionizing radiation, if not subject to the

specific legislation. ^ 37)



4. working over water or in its close vicinity is associated with the immediate

the danger of drowning.



5. the work which threatens to fall from height or into the depth of more than

10 m.



6. the work performed in the protection zones, energy management,

where necessary, the technical equipment.



7. Water well drilling, earthworks carried out by filtering or


mikrotunelováním of underground work, work in the construction of tunnels, if

not subject to the supervision of the authorities of the State Mining Administration. ^ 7)



8. The diving work.



9. The work carried out in increased the air pressure (in the caisson).



10. work with the use of explosives in accordance with special legislation. ^ 2)



11. the work of the Assembly and dismantling of heavy construction

building parts of metal, concrete, and wood intended for permanent

installation in buildings.



1) Council Directive 92/57/EEC of 24 June 1993. June 1992 on the minimum

requirements for safety and health at temporary or

Transitional construction sites (eighth individual Directive within the meaning of article 16

paragraph. 1 of Directive 89/391/EEC).



2) Act No 61/1988 Coll. on mining activities, explosives and the State

Mining Administration, as amended by Act No. 425/1990 Coll., Act No. 542/1991 Coll.,

Act No. 171/1993 Coll., Act No. 128/1999 Coll., Act No. 71/2000 Coll.

Act No. 124/2000 Coll., Act No. 313/2001 Coll., Act No. 206/2002 Coll.

Act No. 320/2002 Coll., Act No. 228/2003 Coll., Act No 227/2003 Coll.

Act No. 3/2005 Coll. and Act No. 386/2005 Sb.



3) Government Regulation No. 101/2005 Coll., on the more detailed requirements on the

the workplace and working environment.



4) Decree No. 137/1998 Coll., on general technical requirements for

construction.



5) Government Decree No. 178/2001 Coll., laying down the conditions of protection

health of workers at work, as amended by Government Decree No. 523/2002 Coll. and the

Government Regulation No. 441/2004 Sb.



6) of Decree-Law No. 381/2001 Coll., laying down more detailed requirements

on the safe use and operation of machines, technical installations, apparatus

and tools.



7) construction Act.



8) § 2 (2). 1 (b). to) point 2 and § 153 para. 1 of the building Act.



9) § 128 and 130 of the construction law.



10) Decree No 87/2000 Coll., laying down the conditions of the fire

safety in welding and heating in meltable resin containers.



11) § 3 (1). 4 the building Act.



12) Act No. 49/1997 Coll., on Civil Aviation, and amending and supplementing

Act No. 455/1991 Coll., on trades (Trade Act),

as amended, Decree No. 108/1997 Coll., which

performs the Act No. 49/1997 Coll., on Civil Aviation, and amending and supplementing

Act No. 455/1991 Coll., on trades (Trade Act),

in the wording of later regulations.



13) Government Regulation No. 362/2005 Coll., on detailed requirements on the

safety and health at work in workplaces with the risk of falling

from a height or depth.



14) § 108 of Act No. 262/2006 SB., labour code.



15) Government Decree No. 11/2002 Coll., laying down the appearance and location of the

the introduction of the safety signs and signals, as amended by Decree-Law No.

405/2004 Sb.



16) Decree No. 30/2001 Coll., implementing rules

road safety and traffic control on the ground

safety, as amended by Decree No 153/2003 Coll., Decree No. 176/2004

Coll. and Decree No 193/2006 Sb.



17) for example, Act No. 458/2000 Coll., on conditions for business and performance

State administration in the energy sectors and on amendments to certain laws

(Energy Act), as amended by Act No. 260/2002 Coll., Act No.

151/2002 Coll., Act No. 279/2003 Coll., Act No. 356/2003 Coll., Act No.

670/2004 Coll., Act No. 342/2006 Coll., Act No. 309/2002 Coll. and act

No 186/2006 Coll., Act No. 127/2005 Coll., on electronic communications and

amending some related laws (Act on electronic

communications), as amended by Act No. 290/2005 Coll., Act No. 361/2005 Coll.

Act No. 235/2006 Coll., Act No. 309/2006 Coll. and Act No. 186/2006 Sb.



18) Act No. 258/2000 Coll., on the protection of public health and amending

some related laws, as amended by Act No. 254/2001 Coll., Act

No. 276/2001 Coll., Act No. 86/2002 Coll., Act No. 13/2002 Coll., Act

No. 76/2002 Coll., Act No. 120/2002 Coll., Act No. 320/2002 Coll., Act

No 274/2003 Coll., Act No. 356/2003 Coll., Act No. 167/2004 Coll., Act

No. 326/2004 Coll., Act No. 561/2004 Coll., Act No. 127/2005 Coll., Act

No 253/2005 Coll., Act No. 381/2005 Coll., Act No. 392/2005 Coll., Act

No 444/2005 Coll., Act No. 59/2006 Coll., Act No. 74/2006 Coll., Act

No 186/2006 Coll., Act No. 189/2006 Coll., Act No. 222/2006 Coll., Act

No 342/2006 Coll. and Act No. 262/2006 Coll.



Act No. 356/2003 SB., on chemical substances and chemical preparations and

amending certain laws, as amended by Act No. 186/2004 Coll., Act No.

125/2005 Coll., Act No. 346/2005 Coll. and Act No. 222/2006 Sb.



Government Regulation No. 101/2005 Coll., on the more detailed requirements on the

the workplace and working environment.



Government Regulation No. 373/2001 Coll., laying down more detailed requirements on the

safe operation and the use of machines, technical installations, apparatus and

Tools.



Decree No. 231/2004 Coll., laying down the detailed table of contents

safety data sheet for hazardous chemicals and chemical

of the product, as amended by Decree No. 464/2005 Coll.



19) Act No. 361/2000 Coll. on road safety and on

amendments to certain laws (road traffic law), as amended by law

No 60/2001 Coll., Act No. 483/2001 Coll., Act No. 62/2002 Coll., Act

No 311/2002 Coll., Act No. 320/2002 Coll., Act No. 441/2003 Coll., Act

No 53/2004 Coll., the Act No. 229/2005 Coll., Act No. 411/2005 Coll., Act

No 76/2006 Coll., Act No. 227/2006 Coll., Act No. 262/2006 Coll. and act

No 342/2006 Sb.



20 for example, the construction Act), Act No. 361/2000 Coll., on the road

traffic, as amended, and Act No. 13/1997 Coll., on

the road, as amended.



21) part i. point 5 of the annex to Decree-Law No 362/2005 Sb.



22) of Decree-Law No 168/2002 Coll., laying down the method of organization

work and working practices, which the employer is obliged to ensure at

operation of a transport means of transport.



23) Act No. 356/2003 SB., on chemical substances and chemical

preparations and amending certain laws, as amended by Act No. 186/2004

Coll., Act No. 127/2005 Coll., Act No. 346/2005 Coll. and Act No.

222/2006 Sb.



24) Act No. 185/2001 Coll., on waste and amending certain other

laws, as amended by Act No. 477/2001 Coll., Act No. 76/2002 Coll., Act

No 275/2002 Coll., Act No. 320/2002 Coll., Act No. 356/2003 Coll., Act

No. 167/2004 Coll., Act No. 186/2004 Coll., Act No. 317/2004 Coll., Act

No. 7/2005 Coll., Act No. 444/2005 Coll., Act No. 186/2006 Coll., Act

No 222/2006 Coll. and Act No. 314/2006 Sb.



25) § 2 (2). 1 (b). k) (2). and § 153 para. 1 of the building Act.



26) Act No. 254/2001 Coll. on waters and on amendments to certain acts (the water

Act), as amended by Act No. 76/2002 Coll., Act No. 320/2002 Coll., Act

No 274/2003 Coll., Act No. 20/2004 Coll., Act No. 413/2005 Coll., Act

No 444/2005 Coll., Act No. 186/2006 Coll., Act No. 222/2006 Coll.

Act No 342/2006 Sb.



27) § 153 para. 1 of the building Act.



28) part I points 2. and 4. the annex to the Decree-Law No. 362/2005 Sb.



29) § 5 para. 8 of Decree No 87/2000 Coll., laying down the conditions

fire safety in welding and heating in meltable resin containers.



30) § 3 of Decree-Law No. 362/2005 Sb.



31) § 3 (1). 10 (a). d) Decree No 87/2000 Sb.



32) Government Regulation No. 406/2004 Coll., on detailed requirements to ensure

safety and health at work in the environment with the danger of

the explosion.



33) Government Decree No. 148/2006 Coll., on the protection of health from the adverse

effects of noise and vibration.



34) Decree No. 344/1991 Coll. issuing the order of ferry safety

on the inland waterways of the Czech and Slovak Federal

Republic, as amended by Decree No. 223/1995 Sb.



35) § 2 (2). 2 of the Act No. 49/1997 Coll., on civil aviation and amending and

additions to law No. 455/1991 Coll., on trades

(Trade Act), as amended by later regulations, as amended by Act No.

225/2006 Sb.



36) for example, Act No. 49/1997 Coll., on civil aviation and amending and

additions to law No. 455/1991 Coll., on trades

(Trade Act), as amended, Decree No.

108/1997 Coll., implementing Act No. 49/1997 Coll., on civil

Aviation and amending and supplementing Act No. 455/1991 Coll., on trades

business (Trade Act), as amended, Decree

No 466/2006 Coll., on flight safety standard.



37) Act No. 18/1997 Coll. on peaceful uses of nuclear energy and

ionizing radiation (the Atomic Act), and amending and supplementing certain

laws, as amended by Act No. 82/1998 Coll., Act No. 71/2000 Coll., Act

No 132/2000 Coll., Act No. 13/2002 Coll., Act No. 312/2002 Coll., Act

No. 320/2002 Coll., Act No. 279/2003 Coll., Act No. 186/2004 Coll., Act

No 1/2005 Coll., Act No. 251/2005 Coll. and Act No. 413/2005 Sb.