Advanced Search

Implementing The Law On Road Traffic

Original Language Title: , kterou se provádí zákon o pozemních komunikacích

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
104/1997.



DECREE



The Ministry of transport and communications of 23 June. April 1997 implementing the

the law on road traffic



Change: 300/1999 Coll.



Change: 355/2000 Sb.



Change: 355/2000 Coll. (part)



Change: 367/2001 Sb.



Change: 555/2002 Sb.



Change: 490/2005 Sb.



Change: 527/2006 Sb.



Change: 317/2011 Sb.



Change: 288/2009 Sb.



Modified: 26/2014 Sb.



Modified: 9/2015 Sb.



The Ministry of transport and communications shall establish in accordance with § 46 para. 1 with regard to the

the provisions of § 6 (1). 4, § 8 para. 3, § 9 para. 3, section 10, paragraph 1. 6, § 16

paragraph. 3, section 20 (2). 2, § 22 para. 2, § 24 para. 9, § 25 para. 7, section 27

paragraph. 7, § 36 odst. 8, § 37 para. 1 and § 41 para. 4 of Act No. 13/1997

Coll., on the road, (hereinafter referred to as the "Act"):



PART THE FIRST



BASIC PROVISIONS



§ 1



Introductory provisions



(1) For the purposes of this Ordinance, means the



and the construction of the highway, road) or local communication (hereinafter referred to as

"the communication") a permanent or temporary establishment of new communications or its

changes (construction work) associated with the reconstruction of a grading; reconstruction of the

grading involves the extension of the Crown communications, change

length or move the axis of communication so that you cannot keep the original

external ground or height, border



(b) communication change patch) of the finished structure, which preserves

the outer border of the construction and the improving of its parameters and

increases operating safety,



(c) communication of the work file maintenance), which maintains the communication in

operationally and technically satisfactory condition in all weather conditions

and removing defects and deficiencies prior to the initial state,



d) Highway with unlimited access each road outside speed

Road,



e) neproměnnými parameters properties for specifying transport technical condition

communication without building the intervention of unchanging (directional and vertical lines,

the width arrangement, construction of the road crossing and objects),



f) variables parameters properties specifying building communication status,

that changes over time by the effects of weather, traffic and load

Ageing (roughness, longitudinal and transverse inequality, disorders of the cover,

load carrying capacity. residual service life),



g) with the road management systems providing up-to-date information about the

State Highways and roads to the competent administrative authorities and road administrators

These communications, whose purpose is to optimize the construction activities

based on the obtained data and knowledge about the technologies available with

order to achieve the best use of the invested funds. the achievement of

other selected priorities.



(2) the intersection is not level connection



and) field or forest paths,



(b) special-purpose communication) is not accessible to the public,



c) stop personal regular services, fuel station,

Motel, motor lodge, parking, rest stop, etc.,



d) adjacent real estate property



on the road or on the local road.



(3) a separate knockout (wedge) is used for the exit of vehicles from the

the road or local communication on adjacent property is not added

the bar, and part of the communication in question.



§ 2



Designation of highways, roads and local roads



(section 6, paragraph 4, and article 9, paragraph 4, of the Act)



(1) of the highway and the road indicates numbers owner (§ 9 (2) of the Act).

Highway and road I class, the numbers from 1 to 99; in the case of

the highway, it is reported in the register before the digit of the letter "D", if the

speed the road, before the digit of the letter "R". Road II.

class numbers from 101 to 999. The Road III. classes are referred to

only registered four to pětimístnými numbers according to the nearest road.

or (II). class, where applicable, supplemented by a small letter index. The shoulders

one-way roads are referred to by the index with an uppercase letter.



(2) the road laid down by special regulation ^ 1) for international traffic

to indicate whether or not the letter "E" and a number.



(3) the Kilometrovníky is characterized by the distance in kilometres from the start of

the alignment of the highway or the road I class.



(4) specimens of the markings referred to in paragraphs 1 to 3 shall establish a special prescription. ^ 2)



(5) For accounting purposes, the local communication indicate in Arabic

numbers starting with 1, and fundamentally it separately for each class of

local roads. To indicate a class uses the alphabetic character:



and communication) for the local first class letter a, for example. 1A, 2a,



(b)) for the local communication II. (b) class, for example. 1B, 4b,



(c)) for local communication III. (c) class, for example. 1 c, 8 c,



(d)) for local communication IV. (d) class, for example. 1 d, 12d.



(6) the Bridge and other objects (underpasses, level crossings, tunnels) on

roads are called serial numbers beginning with the number 1 from the

the beginning of the communication station. On the highways and roads with the number object consists

from the numbers concerned communication and dash separated sequence number

the object of the padded or three indexes. Number of the object on a local

the communication consists of the designation of a local road (number and class),

the dash character separated object (e.g.. M = Bridge) and its sequence

numbers. The details of the numbering of the bridges on roads contains binding CSN

73 6220.



§ 3



(section 6, paragraph 4, of the Act)



(1) Local roads class I are speed local roads and

easily the most important collective communication in cities.



(2) Local communications II. classes are a collection of communication

combine parts of cities to each other, or connected, or a part of the city

on the road of higher class or category.



(3) Local roads (III). classes are the local communication in

towns and villages to allow direct transport servicing of individual

If the objects are accessed in the normal operation of motor vehicles.



(4) Local roads IV. the classes are separate walkways, paths

for hiking, biking trails, paths in the chat areas, underpasses,

the footbridge, stairs, walkways, your communications, residential and pedestrian zone, etc.



§ 4



The stretch of motorway and road transit



(section 8, paragraph 3, of the Act)



(1) in determining the boundaries of a transit section is based on the building

Office ^ 3) from the actual state of the continuous sealed along the communication;

building spaces up to 200 m as a rule, do not interrupt the continuous sealed.



(2) the location of traffic signs ^ 2) indicating the municipality or municipalities may not end

be the same as the border transit section of the highway or road.



PART TWO



THE OWNER OF THE CARE COMMUNICATIONS AND RECORD KEEPING



(to section 9, paragraph 3, of the Act)



§ 5



Register of communications



(1) the basic evidence is the pasport, who lead their

Administrators.



(2) the extent and manner of keeping highways and roads (geodetic) provides for the owner (§

9. 2 of the Act).



(3) the smallest range of evidence of local communications includes the length of the

local roads i. to III. the classes in the km, the number and the total length of bridges

in km on them and the amount of funds spent on their

construction and particularly their maintenance.



§ 6



Tours of the communications



(1) the Tour provides the owner or Manager of the communication in question and the

the result keeps a record. The tour is divided into regular, main,

emergency and safety inspections of communications listed in

the trans-European road network ^ 16).



(2) Regular inspection is determined primarily by the correct function of the transport

marking, safety devices and defects in the skiing conditions on (feasibility)

the following time limits:



Freeway and Expressway. .. every working day,



other roads class I. .... twice a week,



Road II. class. .... twice a month,



the road III. class. .... 1 x a month.



§ 7



The main and the emergency inspection of communication



(1) unless provided otherwise below, provides the main tour

the owner or Manager of the communication concerned, where appropriate in cooperation with the

natural or legal person responsible for the data acquisition systems

management of the ground. The aim is to identify building tours

technical condition of the communications, including its parts and accessories.



(2) the inspection shall be carried out:



and new or) when placing the reconstructed section into service of communication

and before the end of the warranty period,



(b)) when the inventory of communications.



(3) the scope and implementation of the survey and recording method of the

These are listed in Appendix 2.



(4) an extraordinary tour provides the owner or Manager outside of the terms

common and major inspections, and in particular:



and sudden damage to roadway) (e.g., an accident, a natural disaster

scourge)



(b)) when the significant change of congestion (e.g. as a result of regulation

detours),



(c)) at the need to get the input data for road management systems.



(5) the data obtained from the main or outstanding inspection can be effectively

updated diagnostic measurements of variable parameters and is used

When recording and management systems with the ground.



Section 7a



Security inspections



(1) safety inspections ^ 17) means an assessment of the impacts of construction,

technical and operational characteristics of the communication on road safety

When operating in its use and evaluation of the risks that arise from

properties of communication for road users. Safety

inspection ensures the owner or Manager of communications listed in


the trans-European road network. Safety inspection performed by the auditor

road safety together with at least one other

a natural person.



(2) safety inspections shall be conducted once in 5 years.



(3) the minimum range of safety inspections is given in annex No 11.



§ 8



Tours of the bridge structures



(1) tours of the bridges are divided into regular, main, control and emergency.



(2) guided tours of the bridges secures their owner or

administrator. Obligation of the survey takes in the time of the suspension

the bridge from the operation or before re-commissioning.



(3) the extent and method of carrying out searches of bridge structures, their

intervals, keeping a record of these and other details are listed in the

featured ČSN 73 6221.



(4) when the findings of the critical state of the bridge must be urgently carried out

measures necessary to ensure the safety of operations, in particular the closure of the bridge

and the designation of the detours, the interim fix the broken places, etc.



§ 9



Maintenance and repair of communications



(1) the purpose of the maintenance and repair is to remove the defects in the skiing conditions on, wear

or damage to the communication, its components and accessories. The scope and

How to perform depends on the evaluation of the results of inspections. on

the recommendations of the management system with the ground.



(2) are also part of the maintenance of the measures immediately after the findings of the

defects provide direct the traffic on the bad sections of the communications. It comes

in particular:



and) roadblock objectionable (including zavátého) section,



(b)) indicate a detour and the location of the relevant road signs and

the device,



c) immediate temporary ensure safety (e.g. optical

compensation restraint devices, emergency support or overlay sinks and

landslides, removal of hard barriers).



The measures carried out under letters a) and b) the administrator is obliged to immediately

notify the competent road administrative authority.



(3) according to the extent and nature of work activities referred to in the preceding paragraphs

they are divided into a regular and continuous maintenance and repair.



(4) routine maintenance includes minor locally defined work, including

care of the road.



(5) the Continuous maintenance includes, in particular, more work for

conservation and to restore the original properties of the road communication recovery

or improvement of variable parameters its layer.



(6) construction work within the corrections to eliminate defects, wear

or damage to the communication, its components and accessories, or. with

improves the quality of the construction, and increasing the safety of the operation. Repair occurs

the restoration or improvement of all parameters of the road, where appropriate, to improve the

some of the parameters of other components and accessories for communication.



(7) the extent and method of the maintenance and repair of roads is set out in annex No.

5.



§ 10



Maintenance and repair of bridges



(1) maintenance and repairs shall be carried out in the framework of the technical care of bridges

on the basis of the technical documentation and the results of the surveys, diagnostic

the survey, respectively. documentation fixes. The obligation to carry out maintenance and repair

the bridge begins on the date of commissioning decision issue and persists in time before the

putting into service and the bridge at the time of his suspension.



(2) maintenance and repair of bridges (including the embankments and slopes below zářezových

them) secures the owner (Administrator) of the bridge. Maintenance and repair of communication,

watercourse, reservoir, another object, or a territory under the bridge (with the exception of

of the slopes). Foreign device on the bridge or below it secures

the owner (Administrator) of the device or of the territory, and this always after

the agreement with the owner (Administrator) of the bridge.



(3) maintenance and repairs of the bridge must not result in contamination of the area under

in particular, bridges, waterways and water-protected territory.



(4) the maintenance of bridges consists of a summary of the work which the bridges and their equipment

maintained in a safe and roadworthy, behind all-State sjízdném

weather and under normal traffic conditions. This maintenance is performed

on an ongoing basis throughout the year.



(5) in the repair of the bridge construction work carried out according to the approved

they remove the documentation recorded damage or defects.



(6) for more details on the maintenance and repair of bridges contains the recommended

ČSN 73 6221.



section 10a



Terms of the contract to provide the management and maintenance of motorways or roads.

class



(1) the part of the contract are always the following:



and the designation of the Contracting Parties), including the names and surnames of the persons authorized to

for them to act,



(b) the precise definition of the sections of the highway) or the road I class, which are

subject of the contract, that had them,



c) range, the method and time limits for troubleshooting in the skiing conditions on the

the winter and in the rest of the period,



d) fixing the price to carry out the management and maintenance of motorways or roads.

the class, including the method of payment and the period of her maturity,



(e) the effective date of the contract),



f) the period for which the contract is concluded,



g) penalties for failure of the contract,



h) how changes and termination of the contract,



I) additional terms and conditions, the content of which shall determine by mutual agreement the two Contracting

the parties,



j) signatures of the persons authorized to act for the Contracting Parties.



(2) the contract must also include special arrangements for security management

and maintenance of the highway or the road I class in crisis conditions. ^ 3a)



(3) the contract and its amendments, if any, must be concluded in writing.



PART THREE



TECHNICAL CONDITIONS FOR CONNECTING ROADS AND ADJACENT REAL ESTATE PROPERTY ON

COMMUNICATION



(article 10, paragraph 5, of the Act)



§ 11



Conditions for mutual connecting roads



(1) mutual road connections are set up so that your

location and follow the suit of road safety,

ensure the necessary transport performance required, terms and conditions

for smooth management and transit traffic flows and proper drainage.

The smallest distance of junctions on roads newly built,

the location and layout of intersections contains binding ČSN 73 6102 and more

details are listed in the recommended STANDARD ČSN 73 6101 and ČSN 73 6110.



(2) the determination of the boundary between terrestrial communications, the higher and lower categories

or class in the area of intersections and roads be fixed bushing

Annex No. 3, with the main communication is considered to be ground

communication of the larger meaning of the higher traffic categories, or

class.



§ 12



The conditions for connecting adjacent to roads and local real estate

communications



(1) the Descents and raids on the road and local communication can be established only

If they meet the following conditions:



and the view for the decision) roll on communication,



(b)), at least for the view user communication vehicle; the vehicle,

that stops when turning left at the exit, shall not impede the passage of the

other vehicles in a straight line, or it must be views from

the distance required to stop the vehicle,



(c) the mutual distance of the connection) viable in terms of safety and

the flow of traffic.



More detailed information is contained in the recommended STANDARD ČSN 73 6101 and ČSN 73

6110.



(2) the width of the exit or RAID must allow vehicles to smooth turn

from the road, or from a local road and exit at them. Parameters

junction of the arcs are contained in binding to ČSN 73 6102. If there is a

part of the exit or RAID the laissez-passer must have at least the rated

the lightness of trumpets:



a) 400 mm for the length of a pass to 6.00 m,



b) 600 mm for the length of a pass from 6.00 to 10.00 m and for the length of the pass

over 10.00 m when the inclination of the pass above 2%,



c) 800 mm for the length of the pass over 10.00 m when the inclination of a pass to 2%.



(3) Congress and the reinforcement shall RAID, which complies with the

the anticipated traffic, and is easy to clean the road

cover. Building design must be such as to prevent the transport of

rainwater on communication and its pollution.



(4) if the establishment of the exit and drive or that they modify. cancellation

invoked the need for a natural or legal person that is the owner of the

property or other rights it has, then this person by Builder ^ 4)

connection. In the case that the need for changes or cancellation of the exit or RAID

as a result of the implementation of the works on communication, is

the exit ramp Builder by Builder or the communication concerned.



(5) if it is established, civil or part of Congress modifies or

the RAID on the property's owner, the communication link real estate

or a person with other laws to ensure the prior consent of the real estate

the owner of the communication in question.



(6) the owner of the exit or RAID ensures proper maintenance of the entire

connections, including pass.



section 13 of the



Terms and conditions for the affixing of other real estate on the communication



(1) On the road, off the road speed, connect the equipment referred to

in section 1 (1). 2 (a). c) according to the local conditions so as not to be reduced

the fluidity and safety of transport, preferably on their transit

sections. These connections are set up odbočovacími and connection bars;

by decision of the administrative authority of the road may be allowed to connect

only a single-elimination segment, without a spool section.



(2) the equipment referred to in section 1 (1). 2 (a). (c)) shall be proposed to the right

on separate one-way lanes or strips, or on


areas separate from ongoing free width side-splitting zones

or find an island, or a horizontal traffic signs. On

the double-lane road or a local communication with low-intensity operations

can the road Administrative Office to enable level turning left, if it

does not compromise safety and the flow of traffic.



(3) the technical parameters of connection and junction bars

the finals and the inclusion of sections, arcs and radii of extension

Lane in the arch and rozhledové ratios are contained in the binding

ČSN 73 6102. Further details are contained in the recommended STANDARD ČSN 73

6101 and ČSN 73 6110. Determine the connection boundaries set out in annex 3.



PART FOUR



BUILDING COMMUNICATIONS



(section 16 (3) of the Act)



§ 14



Building modifications requiring notification



(1) notification of special building Office are subject to all of the work,

If they are not listed in section 15, shall not affect the rights of third parties and it is

about:



and the portal construction of traffic signs), technical equipment and their

components intended for the assessment, selection and control of the payment of the fee for the use of

the infrastructure and maintenance of bulk materials landfill



b) construction work which does not change the appearance of the building nor the way it is

use, does not intervene into the load-bearing structures or buildings does not increase

a permanent load of the bridge



(c) the maintenance work), the implementation of which could affect the stability of the

the building, its appearance, or the environment, and all maintenance work

at the construction site, which is a listed building or situated in the territory

conservation area or zone,



(d)), in which the communication editing to change the original length shall not exceed



1.3 cm for communications with adjacent buildings directly or directly

the adjacent sidewalks, at level crossings, bridges, in

telephone connection and in places where utilities are located, and other

leadership,



2.10 cm for communications, which are not listed in the previous point.



(2) subject to the conditions laid down in paragraph 1 are the following works

in particular:



and road and road side) over a range of common and continuous maintenance of listed

in annex 5,



(b) establishment of the frames to the road),



(c)) the local extension chokepoints road Crown and the road in the wild

the landscape,



d) increase or intensification of the sidewalk with the height by adjusting the eyeglasses frames,



e) redevelopment work in landslides or in voids,



(f) the renewal of culverts and the wall),



g) establishment of drainage chutes on the slopes of the road body

nadsvahových-gravel trenches or drainage ditches,



(h) establishment of other crossings) median strip,



(I) an existing or) building a new electric lighting

communication,



j) expansion of the existing paved areas on odpočívkách,



to) fix bridge or insulation systems on the bridges.



§ 15



Construction work and activities that do not require notification



(1) a building permit nor report a special building Office with

not required for work carried out on roads within their maintenance,

If



and their implementation) cannot affect the stability of the construction (intervention in the

load-bearing structures), its appearance, or the environment,



(b)) are not carried out on the building site, which is a cultural monument, or

situated in a conservation area or zone,



(c) there is no spreading) communication, change its routes or

length,



(d)) cannot be without prejudice to the legally protected interests and rights of other persons,

including the rights that arise from contact with other means of communication

roads, utility networks, other lines, water and

water parts and with protected areas (sections 36 and 37 of the Act).



(2) a Work referred to in paragraph 1 are specified in annexes 5 and 7.



PART FIVE



GENERAL TECHNICAL REQUIREMENTS FOR COMMUNICATION



(section 16 (3) of the Act)



section 16 of the



Preparation of buildings, construction and construction work



In the preparation of buildings, construction of roads and their construction work

the process according to special regulations, binding ^ 6) Czech

the technical standards referred to in annex No. 1 under no 1 to 29. More

the details are contained in the best Czech technical standards

listed in annex No. 1 under no. 30 to 66. When construction work

existing roads must be according to local conditions improve

the quality of the communication by increasing security and the flow of traffic on it

or at least contribute to the homogeneity of the entire stroke.



§ 17



Design elements and categories



(1) the design elements of the communication must be chosen so as to provide all

users of the appropriate conditions for a smooth and safe ride in the light

to the communication function and taking into account the load únosného

territory. ^ 7)



(2) design elements and arrangement of communications depend on the choice of design

category communication, which is chosen by the prospective transport intensity,

the characteristics of the territory. buildings and the General technical and

economic context.



(3) any communication design category is given by the width of the communication and

design speed. The design speed is the speed at which they can

After this communication safely drive through the individual vehicles. Details

to the range design speed for each design category

communications contain featured ČSN 73 6101 and ČSN 73 6110.



section 18



Directional and vertical lines



(1) directional and excavation routes of communication must be matched

and adapted to the means of the importance and the communication category, as well as

Security and the flow of traffic on it.



(2) the Minimum design values of the direction and elevation of the elements are designed

only in justified cases and shall not be combined or used shall not be

in and near intersections or on other sites critical of

for safety operation.



(3) the length of the vision must be across the newly built route communications

equal to the runway needed to stop before an obstacle on the road.



(4) on the road with one lane must be bidirectional in order to

sections with greater than the minimum length of the vision for overtaking involved what

the total length of the largest degree of communication and increase her what

evenly as possible.



(5) to the smallest Details the design values of the direction and altitude

elements of the largest longitudinal and resultant tendencies, the smallest lengths

vision for stopping and for overtaking contain featured ČSN 73

6101 and ČSN 73 6110.



§ 19



A transverse arrangement of the sections between junctions



(1) Crown communication includes driving, additives and associated bars,

guide strips, kerbside, or medium or even side separating belt,

walkways and tracks or lanes for pedestrians and cyclists. Public walkways and

strips or bands for pedestrians and cyclists are not permitted in the Crown of the motorways

and expressways.



(2) Additional lanes for slow vehicles or an enlarged number of bicycles

the bars shall be established, in particular, to the sections in the pitch, if the share of

slow moving vehicles in the transport stream and their driving speed

cause an unacceptable reduction in the flow of traffic.



(3) the individual bars of a regular passenger transport on the roads are connected,

off the road speed, and on local roads in binding to CSN

73 6425.



(4) the Unsurfaced part of the hard shoulder must be wide enough to

facilitate and provide sufficient space for the location of the

components and accessories for communication, where it is necessary.



(5) the width of the median strip on the very narrow sections can be

reduce, however, must be preserved width necessary for fitting the retaining

the safety device. It must, however, be provided insight for

stop in the direction of the arc. Central southbound motorways and

roads must be fitted with a safety device-independent

for the other direction hyphenated clues communications safety

the device places depending on the intensity and track transport, enabled

driving speed and the width of the median.



(6) basic degree on the newly constructed road sections must be

at least 2.5% on refurbished in increments of at least 2%. For a more detailed

information on the roads, where the angle of Bank is changing two-sided to

single-sided, and the provisions of paragraphs 2 to 5 contain the featured CSN

73 6101 and ČSN 73 6110.



section 20



The intersection



(1) the shape of the intersection is chosen according to the intensity of the intersecting traffic

streams, intersecting categories of communications and the location of the junction in the

terrain. The nature and type of the junction and its design elements contains mandatory

ČSN 73 6102.



(2) when designing the level crossings must be secured best

rozhledové ratios, geometry of the junction shall be settled in accordance with its functions

as simply as possible, in order to be clear and understandable to the user and

to highlight the main and secondary directions in terms of priority in

driving.



section 21



Housing communication



Construction of the road and grading, drainage and communication

protection, the nature and quality of the materials used shall be designed on the basis of

the evaluation of the transport of the importance of communication, the kind of congestion

the subsoil and the climatic conditions under the Czech technical

the standards referred to in annex No. 1 No. 5 to 16 and 23. The details of the


natural body communication contain featured Czech technical standards

listed in annex No. 1 under no. 36 to 40, 44, 49 and 52.



section 22



The environment and integration into the landscape



(1) in the preparation and execution of works and communications building

is based on the requirements of the protection of nature and the environment by

the specific legislation. ^ 8)



(2) the integration of routes of communication into the landscape and planting of greenery are dealt with

considerate according to local conditions, with regard to protection against glare

and against adverse weather conditions (wind, snow, etc.).

Noise barriers along the communication must be built so as to what

to make integrated into the surrounding landscape, and there shall be established only

cases where it is not possible to reduce the harmful effects of traffic noise other

way.



Article 23 of the



Components and accessories



The technical and functional requirements for light-signalling devices

contain binding CSN 36 5601 and ČSN 73 6021. For details on the technical

design and space layout of other components and accessories

communications are listed in the recommended STANDARD ČSN 73 6101 and ČSN 73 6110.



section 24



Road signs, traffic and safety devices



(1) vertical and horizontal traffic signs shall be designed, implemented and

placed under a special prescription. ^ 2) contains more details

the recommended ČSN 01 8020.



(2) Artificial shades or hedges shall be set up in the median strip

sections of motorways and expressways, or between parallel

ongoing communications.



(3) the escape zone shall be established to ensure the safe operation

trucks on the extremely steep or long descents.

Zpomalovacími of Prague and elevated pedestrian crossing is enforced

compliance with the prescribed speed. Before the Governor in the threshold must

be equipped with the appropriate traffic signs under the special regulation. ^ 2)

Further details are listed in the recommended STANDARD ČSN 73 6101 and ČSN 73

6110.



(4) on motorways and dual carriageways are placed separately marked

emergency phone or other posts of the coupling device (sound)

connected to the dispatch centre operating 24 hours. Sounds

placed on the outer part of the shoulder with the passage from the structures,

usually after 2 km, and secure the shoulder guards.



§ 25



Public lighting



Highways and roads are always illuminate in a built-up area. Outside of this

the territory is only specific sections, such as. at border

crossings, in tunnels and in their adjacent sections, exceptionally, on the

intersections, subject to the conditions contained in binding to ČSN 73 6102 and ČSN 73

7507. Lighting can be established even in areas where it justifies the intensity

transport, or the frequency of pedestrians and cyclists. For details, see

featured Czech technical standards referred to in annex No. 1 under No 33, 34,

35, 49 and 51.



section 26



The rest stop



(1) the rest stop are built as part of the highways and expressways in accordance with

the nature of the service and in accordance with Czech technical standards referred

in annex No. 1. The rest stop are located in areas outside of the intersection.

In the basic version the rest stop parking area must be at least 25

passenger cars, 10 trucks, 4 buses, a sanitary

equipment of adequate capacity set out special legal

^ 8a) regulations and a 24-hour year-round, the source of drinking water and

electric current, relaxation areas with tables, benches and containers

to the trash.



(2) all newly built traffic and parking areas must rest stop

to be physically separated from the driving belt (belts) or motorway speed

the road and allow their use whether or not citizens left on trolley

for people with disabilities.



(3) details of the newly built odpočívkám when other roads

contains the recommended ČSN 73 6101.



section 27 of the



Transit and through-space



(1) the shape and dimensions of a transit and through-space determined by the

the width arrangement, category and class communication binding ČSN 73 6201;

except in the cases specified therein shall not interfere with any in this space

part of the buildings and equipment.



(2) the height of the bridge and in the telephone connection shall be at the

the basis of the shape and dimensions of transit and through space. In conversation

ČSN 73 6201 binding determines the safety distance between the upper contour of the

transit area and the lower edge of the structure, as well as

safety distance to any of the overhead line.



(3) pursuant to the provisions of paragraph 2 shall be determined, even the smallest free height above

the surface of the roadway and sidewalks.



section 28



The width of the bridge layout objects



(1) width and the number of driving belts. lanes, and

associated with the bars, the guide strips, road side, walkways and the Middle

reserve the bridge object or in the underpass provides a fundamentally

as well as the adjacent sections of the communications. With the approval of the road

the administrative authority is allowed to propose a reduction in justified cases

the width of the road side on bridges longer than 100 m, directional split

roads with traffic, pedestrians and cyclists excluded and further reduce the

the width of the emergency lanes. The bridge objects and in conversation with

proposed for the parking, stopping and the individual bars. Unsurfaced part

shoulder solidifies to form an object without přesypávky.



(2) belts for pedestrians or cyclists are taking place on the bridge objects

as a rule, when separated (elevated) sidewalks. The width of the public

pavement includes the width of the through-space. the width of the road barriers,

supports additional devices and the width increased beading, which extends

not more than 0.50 m in the transit area of communication. Emergency walkways are

ČSN 73 6201 are proposed according to the binding.



(3) a permanent pedestrian footbridges and subways must have permanent free width

at least 2.00 m.



section 29



Waste safety and stable equipment



(1) The containment level and the requirements for the location and construction of the

barriers and railing barriers contains binding ČSN 73 6201.



(2) the Barriers must also be placed where it is needed to protect the braces

in the underpass of the communication or to ensure road safety

into a fixed collision barrier.



(3) on the bridges with the holiday of up to 60 km/h speed can be separated

the sidewalks curbs ranging from reflective only 0.12 m 0.20 m.



(4) on the outside walkways, footbridges for pedestrians and cyclists, review

benches and ledges přesypaných objects at a height greater than 2.00 m

the railing is established according to the ČSN 73 6201 binding.



(5) For a permanent facility on the bridges are special prescription. ^ 9)



section 30



Load of bridge structures



(1) the bridge structures are designed for loads which are divided into two

classes:



and load A-class) for all bridges transferring Highway, road

I., II. classes, on the road III. classes that have been determined by the competent

administrative authority in the road, and the local communication I and II. class



(b)) load class B-for local communication III. class and the road III.

classes that were not designed to the class and to the provisions of subparagraph (a)).



Further details contains the recommended ČSN 73 6203.



(2) exceptional load bridges special vehicles or combinations that

for road traffic are admitted only to the authorisation, shall be assessed on

the basis of the static calculation as a special use of the communication in accordance with § 25

the law.



section 31



Load capacity of bridges



(1) the determination of the thermal bridges, or its designation on the bridges

provides the owner or Manager of the bridge.



(2) for all existing bridges on roads down load

According to ČSN 73 6220 binding; When you lower the load capacity (normal, exclusive

or one axle) must be fitted with the appropriate transportation tag. ^ 2)



§ 32



Tunnels



(1) the spatial arrangement of the tunnels on roads must comply with the

via cross section provided for under other provisions. Into this

cross-section must not-except for the retention of the safety devices-

to tamper with any part of the buildings, structures and equipment

(lighting, ventilation, signalization, traffic signs, drainage,

electrical equipment, etc.).



(2) the minimum width of the carriageway between the borders for a driving belt in

tunnel oven 7.50 m, the smallest width of traffic lanes in the tunnel

It is 3.50 m and guide strips of 0.25 m. the smallest width of official sidewalks

is 0.75 m height clearance of the tunnel is usually 4.50 m.



(3) the detailed conditions for the transverse arrangement of tunnel safety

construction work (emergency and escape routes Turnable bays), and equipment

the tunnel (lighting, ventilation, safety devices, operations management)

contains binding ČSN 73 7507 depending on the length of the tunnel, the category

communication, design speed, intensity and organization of road

operation.



§ 33



Gallery and similar devices



(1) in areas where the traffic on the roads may be vulnerable to the fallout from the

stones, other foreign objects and avalanches, are set up in the odřezu

shelters (Gallery) or similar protective structures, for example. protective nets,

the capture of the wall and other facilities according to ČSN 73 6201 binding; more

the details are contained in the featured ČSN 73 6101.




(2) the requirements for transit through space, and the width and height

the arrangement, design guidelines (e.g. protection of broken down props) are

the same as for underpasses (section 27).



§ 34



Wall



(1) Retaining walls and doorframes that immediately provide stability

solid communication, shall be designed according to the ČSN 73 6201 binding.



(2) the width arrangement of transit space above the nepřesypanými support

the walls higher than 2.00 m and principles for designing the retention

safety devices are listed in the binding of ČSN 73 6201.



(3) the information to a paragraph 1 and of the width arrangement of clearance space

above the nepřesypanými of the support walls with a height of less than or equal to 2.00 m above the

přesypanými the support walls, regardless of their height and along the retaining

the walls contain featured Czech technical standards referred to in annex No. 1.

under no 40, 49, 52, 57.



§ 35



Culverts



Culvert in the housing, communication is the object of the transferring of surface water with

any shape with a hole in the vertical lighting, 2.00 m, inclusive.

The dimensions of the openings of the culverts shall be determined by calculation, and hydrotechnickým

the smallest dimension of the hole is 600 mm. Details modifies the binding ČSN 73

6201.



section 36



Acoustic walls and bulwarks



(1) the noise barriers along the road shall be located outside the

transit and through-space according to their resistance to

impact of vehicles and deformation, depth or offset crash barriers. In the wall

more than 300 m escape holes shall be not more than 150 m.

Details of the location of the noise barriers include featured ČSN 73

6101 and ČSN 73 6110.



(2) If on the outer edge of the sidewalk on the bridge placed noise-protection

wall, must always be maintained perpendicular space according to the binding

ČSN 73 6201.



(3) Natural mounds are placed vegetation or procure another protection against

erosion. Wall combined with natural mound less than 1.50 m protects

svodidlem.



PART SIX



§ 37



The minimum scope of the audit of the safety of road infrastructure



The minimum scope of the audit of the safety of road infrastructure ^ 17) is given

in annex 12.



§ 38



Scopes related to the audit of the safety of road infrastructure



Scopes related to the audit of the safety of road infrastructure are

traffic engineering and traffic engineering.



§ 38a



The scope and content of the training of Auditors of road safety



(1) the scope of training to obtain the necessary knowledge, skills and

procedures for auditing the security of roads is 40

hours. Training is focused on



and accidents and theory) road safety,



(b) the formation of safe roads) road and



(c)) the legal and technical standards for road safety and

audit of the safety of road infrastructure.



(2) the training consists of theoretical teaching in 24 hours, practical

teaching in the range of 16 hours and the processing of the case studies.



(3) periodic training shall be carried out in the form of theoretical instruction in the range of 16

hours with a focus on enhancing and maintaining the knowledge gained by

of paragraph 2.



section 38b



The test to demonstrate the competence of Auditors of road safety

communications



(1) the test to demonstrate the competence of the Auditor security

the infrastructure consists of a written test and an oral interview

before the examining board.



(2) the written test consists of 45 questions divided into 3 groups according to the

thematic training referred to in section 38, paragraph 1. Each group

consists of 15 questions. Each question is assigned 4 possible answers, from the

which only 1 is correct. Each correct answer is 1 point.



(3) the oral interview consists of open-ended questions to examine the deeper

knowledge of thematic topics referred to in paragraph 2 and the mutual

context.



(4) the result of the test shall be assessed by grade of "pass" or

"failed". To assess the degree of "passed" you need to get in the test

at least 39 points and correctly answer questions from at least two thematic

circuits at an oral interview.



(5) the Protocol of the test result, contains



and the "Protocol on) indication of the result of the test to demonstrate the professional

the eligibility of the auditor of the safety of road infrastructure ",



(b) the name or names), surname, birth date and home address

of the test,



c) place and date of the test,



(d)) the total test result and



e) name, surname and the signatures of all the members of the examination Board.



PART SEVEN



ROAD CLOSURES AND DETOURS AND SPECIAL USE OF COMMUNICATIONS



§ 39



Road closures and detours



(section 24 para. 9 of the Act)



(1) an application for a permit closures and detours of communications regulation includes:



and accurate determination of closures by) mark the distances in km and meters from

the beginning of the communication concerned (hereinafter referred to as "the station"), or

Gazetteer,



(b)) duration of the closures with the eventual possibility of interruption in days

public holidays and public holidays,



(c)) the reason for the closures (if the reason the execution of construction work as well as their

the scope, method of implementation and identification of the person who has carried out this work),



(d) route detours) proposal for including graphic attachments,



(e)) the name or names and surname of the officer responsible for the

organizing and security actions, which is the reason of the request,

address and telephone connections to his workplace and residence,



(f)) if the requested duration of road closures and detours more than three

days, and if the works schedule must be provided

containing the quantity and timing of the individual types of work,



(g) the transport authority concerned) If you will require the temporary closure

relocation of bus stops line passenger transport.



(2) unless an accident (section 24 para. 8 of the Act), the application for authorisation

closures shall be forwarded to the competent road administrative authority no later than 30

days before the date of the desired conclusion of the communication.



(3) the designation of road closures or detours modifies the specific prescription. ^ 2) in the

the cases referred to in paragraph 1 (b). (f)) must be at the beginning of closures

In addition, the directories located, indicating the start and end

closures, the name and address of the legal person, where applicable, the name and address of the

the natural person at whose request it was closure enabled.



(4) the decision to permit closures and detours of the regulation provides:



and precise indication of the closures by) the alignment of the communication in question,

where appropriate, the gazetteer,



(b)) duration of the closures,



(c) the determination of the route detour)



(d)) the name or names and surname of the officer responsible for the

organizing and security actions (works),



(e) the location of the stop line passenger) transport, as long the closure requests

its temporary relocation,



(f) road signs in) the determination of the place of route closures and detours.



section 40



Special use of communications



(§ 25 para. 13 of the Act)



(1) an application for the authorization of the special use of the communication presents the

Road administrative authority that, in whose interest or because of the activities of the

to be a special use of communication enabled; If such a reason

the construction works, the contractor shall submit an application, if the competent road

the Administrative Office provides otherwise.



(2) the application for authorisation of a specific use under § 25 para. 6 (a). and)

the Act includes:



and) the purpose, scope and duration of transport, whether and when it will be repeated,



(b) route transport), specifying the course route and approximate

specifying timesheet transport,



(c)) the type, the type and registration of vehicles, to be in

the transport used,



(d)), the number of vehicle weight, the load of the individual axles and wheelbase,

the number, size, and type of tyre inflation pressure for each axle, the smallest

the turning radius of the vehicle or rig and the smallest

outer turning radius,



e) diagram of the vehicle or combination, with an indication of dimensions and the location of the

cargo.



(3) Transport under the preceding paragraph with a total weight of more than

60 tons or oversized ^ 10) can be enabled only in exceptional cases, if the

the applicant shows that it is not technically real to reduce weight or dimensions

the transport or use of another mode of transport and that the load capacity of bridges and

the load carrying capacity of the roads certified to implement the static assessment

transport.



(4) the application for authorisation of a specific use, pursuant to section 25 para. 6 (a). (b)), and

(f)) of the Act contains the requirements set out in paragraph 2 (a). a) to (c)), and

in paragraph 5 (b). (d)); in the case of special use pursuant to § 25 para. 6

(a). (f)) of the Act, the application also contains a proposal for a method of protection of the road

the affected roads or local roads from damage.



(5) the application for authorisation of a specific use under § 25 para. 6 (a). (c)) to

e) of the Act provides:



and accurate determination of the place), the purpose and duration of the special use and the manner of its

(what kind of realization of the works, what method of sales and in what

the device, what range of events, etc.),



(b)) first and last name of the person who has the progress of special use

answer, his date of birth, phone, and address (for legal entities

their name, address and IDENTIFICATION NUMBER),



(c) the estimated impact of the special use) (or, as this use of tourism


induced) safety and traffic flow on segment

communication and proposal for solving the situation,



(d) the authorisation for the operation of the subject) activities in the framework of the special use,

If such authorisation is required by the specific provisions, ^ 11)



(e) the opinion of the concerned administrative offices), if necessary by

the specific legislation. ^ 12)



(6) the application for authorisation of a specific use under § 25 para. 6 (a). (g))

the Act contains



and) the purpose, scope and term of special use,



(b)) first and last name of the person who has the progress of special use

match, his address and date of birth, telephone (with legal entities

name, registered office and identification number),



(c) the route of movement of the vehicle),



(d) basic technical data of the vehicle)



1. type of vehicle,



2. make, type (if identifiable),



3. the serial number (if indicated on the vehicle),



4. dimensions (length, width and height),



5. operating weight, where appropriate, the maximum technically permissible mass,



6. number of axles and axle load,



7. lighting equipment of the vehicle (type, number and location)



8. the maximum design speed,



(e) the vehicle contour) diagram, in which the dimensions of the vehicle are marked and

the location of lighting equipment, or vehicle photos from the front, from the hips and

from the rear.



(7) the authorisation of a specific use under § 25 para. 6 (a). and) Act

contains the route, method and time of carriage; It can also contain, in particular,

speed driving, escorts and other measures to ensure the safety and

the flow of traffic, the protection of other road users, roadways, bridges, and

railway equipment (level crossings, the tracks, the catenary), leadership and

other engineering networks, owners of adjacent real estate, etc.



(8) in the authorization referred to in paragraph 6 may be further saved to the applicant

in writing to all affected by the administrative authorities and the owners of the real estate

the necessary construction and other edits. In the notice, the applicant

indicate the execution time (or delete), place, purpose, scope and

a simple technical description of the adjustments. They relate to the necessary adjustments

railways, utility networks and other lines, waterways,

water and other works and protected areas, proceed as

the specific legislation. ^ 12)



(9) to enable a special use according to § 25 para. 6 (a). (b)), and (f)) of the Act

It contains the same elements as the application for the authorization referred to in paragraph

4.



(10) to allow the use of special methods in accordance with § 25 para. 6 (b), (c)) to

e) of the Act provides:



and accurate determination of the place), the purpose and duration of the special use and the manner of its

(what kind of realization of the works, what method of sales and in what

the device, what range of events, etc.),



(b)) first and last name of the person who has the progress of special use

answer, his date of birth, phone, and address (for legal entities

their business name, registered office and IDENTIFICATION NUMBER),



(c)) the determination of the road markings, if is a special use of the raised

his need or change,



(d)) and how putting a communication to its original state (cleaning,

cleanup, etc.).



(11) special use according to § 25 para. 6 (a). g) of the Act

contains



and the determination of the route of movement of the vehicle) and the time in which the specific use

permissible,



(b)) first and last name of the person who has the progress of special use

match, his address and date of birth, telephone (with legal entities

name, registered office and identification number),



(c) the technical requirements of the vehicle)



1. ensuring the proper technical condition of the braking system,



2. no leakage of fluids,



3. vehicle equipment functional lighting equipment (spotlights with

the low lights, front and rear position lamps, front and rear

directional lights and design speed of 6 km/h also brake

of light), which has its location and color match special

legislation. ^ 12a)



(12) the authorisation referred to in paragraph 11 may include the determination of terms and conditions

the accompanying vehicle, or other conditions to ensure the safety,

fluency and the protection of other road users or the requirements of the

the special character of the vehicle (use of portable lights, kits

the use of hazard warning device of orange color, etc.). In

the authorisation shall also lay down the condition that self-propelled work machines or

trailers of tractors which are fitted with pneumatic tyres, must be

When driving on communication equipped with so as to avoid damage to the road,

and that it was supported by the device must be secured so as to prevent their

towing, to communicate.



§ 40a



The amount of compensation for providing police escorts



(1) the amount of compensation for providing police escorts shall be determined as

sum of the amount of $ 600 for each calendar day on which police

escorts provided, and the total amount of the additional costs associated with the

by providing police escorts.



(2) other costs associated with providing police escorts are



and 400 Czk) per 1 hour service officers involved in the police

escorts



(b)) 15 CZK per 1 km of crazy staff vehicle of the police of the Czech Republic,

that was used when the police escorts, and



(c) the cost of materials consumed) by the police of the Czech Republic in

a police escort, with the exception of fuel.



PART EIGHT



THE SCOPE, METHOD AND TIME LIMITS FOR TROUBLESHOOTING IN THE SKIING CONDITIONS ON



(§ 27 para. 7 of the law)



§ 41



Basic provisions



(1) Winter maintenance, according to the order of the importance of mitigating the glitches

arising from the weather and winter conditions, at a situation in

skiing conditions on roads and in the feasibility of local roads and transit

sections of roads.



(2) winter maintenance is carried out according to the schedule of winter maintenance. In a normal winter

the situation of the owner (admin) removes or at least mitigate the communication

defects in the skiing conditions on (feasibility) communication within the time limits

the plan provided for winter maintenance, a specimen of which is given in annex 6.



(3) the measures before the start of winter maintenance and technology overview

used in winter maintenance are detailed in the annex No. 7, pattern

Journal of winter maintenance and the method of its evaluation are listed in

Annex No. 8.



(4) for the purpose of this order is the winter time from 1. November to

31 March of the following year. During this period, performs a winter maintenance

According to the schedule of winter maintenance. If there is a winter weather situation outside the

This period, defects in the skiing conditions on (feasibility) communication

without undue delay, appropriate to the situation.



§ 42



Winter maintenance plan



(1) for the purposes of the plan are the road winter maintenance activities be allocated according to the order

the importance of the following:



and order)-the road I class and enjoys important road II. class



(b)) II. order-the remaining road sections II. not included in the class as well.

the order and transportation significant road III. class



(c)) III. order-other roads (III). not included in class II. the order and

maintained usually only pluhováním,



(d))-roads, unmaintained on which is not operated by personal line

to the right, and where it is not necessary for their slight importance of transport

to perform winter maintenance [on this fact, users must be

notified in the manner prescribed in the specific rules ^ 2)].



(2) the processing plan winter maintenance for local communication decisions

the municipality according to the size of the village and the transport of the importance of local roads.

If municipalities decide on handling plan ensure skiing conditions on local

communication i. to III. class, shall take into account this order of importance:



and order)-speed and the collection of the local communication with the public

by public transport, and with regular passenger transport, access local

communication to medical facilities and other major local

communication,



(b)) II. the order-capture local roads not included in the order and I.

an important local road,



(c)) III. order-other the local road,



(d))-local road unmaintained, on which there is no need to perform winter

maintenance of traffic (on this fact to the irrelevance of the municipality

notifies the user in place of the usual way).



§ 43



Highway and expressway



(1) defects in the skiing conditions on the cushion on all ongoing road

stripes, then gradually on the lane intersections, lanes for

slow vehicles on paved areas, on arrivals and exits from

odpočívek and odpočívkách. Then mitigate the defects in the feasibility

odpočívek, always in daylight.



(2) under adverse weather conditions, alleviate malfunctions

in the skiing conditions on at least one lane in each driving direction.



(3) for sprinkling or spraying shall be carried out in principle chemical rozmrazovacími

materials, particularly through the mechanisms or devices which

allow accurate dosing and spreading chemical

gritting of the substances on the road. Buffer materials are used

only in the case where, for a given segment of a prohibited use of chemical

gritting materials, or where their use could not be in

due to the weather situation to alleviate deficiencies in the skiing conditions on.



§ 44



Other roads




In the performance of winter maintenance in accordance with the approved plan of the winter maintenance

It's such an available technology that best meets the local

the conditions and the order of the importance of the road (section 42 (1)):



and order)-keeps the whole width and length of the road



1. ice and residual layer of snow after the pluhování of a thickness of less than 3

cm removes chemical rozmrazovacími materials, scattering



2. the slipperiness of ice and snow layers when the ineffectiveness of chemical

gritting materials, zdrsňuje materials for zdrsňovacími granules



(b)) II. order-the same technology as in the order that in the event of

buying the roads leave the uježděné snow layers that are

zdrsňují floured zdrsňovacími materials. Sprinkling can be carried out only

in places where it's required conveyor communication status

(crossroads, United climb, sharp bends, the stop line passenger

transport),



(c)) III. the order-keeping the after treatment of roads i. and II. the order of the

the importance of pluhováním in principle, and in places where traffic demands

the technical condition of the communication is done by sprinkling zdrsňovacími materials.



§ 45



The deadline for the mitigation of the defects in the skiing conditions on highways and roads



(1) Communications Manager provide winter maintenance in order to instruct it to

initiate appropriate intervention was issued immediately after its discovery

needs, and that pluhování has been carried out already during the fallout of snow and

as needed, even after its termination.



(2) the period from when the formation of defects in the skiing conditions on motorways or roads

by the time the first exit mechanisms to mitigate this defect may not be in the

the winter season longer than 30 minutes. Outside the winter period, the defects in the

skiing conditions on relieve without delay.



(3) Private performances of winter icebergs must be ensured in these

the time limits from the grit of the mechanisms:



and) on motorways and dual carriageways ... to 2 hours,



(b)) on the road included



I order ... within 3 hours,



II. order ... to 6 hours,



III. order ... within 12 hours.



(4) the period referred to in paragraph 3 shall be valid for the highway and roads listed in

I order 24 hours a day, for roads listed in (II). and (III). the order of the

After the period provided for in the plan of the winter maintenance.



§ 46



The deadline for the mitigation of the defects in the skiing conditions on local roads



Municipalities provide practicability of local communications i. to III. classes in these

time limits:



and order of importance) I.................., within 4 hours



(b)) II. the order of importance of the ... ... ... ... ... ... ... within 12 hours,



(c)) III. order of importance ... after the treatment of communications I and II. the order,

but no later than 48 hours.



§ 47



Providing skiing conditions on cleaning of roads and bridges



(1) cleaning of roads is carried out in such cases and dates:



and after the winter period) on highways, roads class I and local

Road I class by 30. April, on the road II. and (III).

class and on local roads (II). and (III). class no later than 31 December 1998.

may (removal of zdrsňovacích materials, cleaning means

brands and equipment, etc.),



(b)) in the period to 30. November removal of fallen leaves and ensure

functional drainage



(c)) before starting work on a continuous maintenance or repair,



(d)) shall immediately upon detection of emergency pollution, especially for disaster

and disorders of the vehicles, which result in reductions of anti-skid

properties of bituminous road surface (spilled oil and fuel), or

When the risk of environmental damage, and that if the pollution

could not delete immediately, the one who is obliged to do so pursuant to § 28 para. 1 of the Act,



(e)), if possible, during the winter period of excess

zdrsňovacího material.



(2) the administrator of the highway or road provides cleaning their transit

sections in the same range and time limits as in the adjacent sections of Highway

or roads outside built-up areas.



(3) further details about cleaning bridges contains recommended ČSN 73 6221.



Section 47a



cancelled



PART NINE



CONTACT COMMUNICATIONS WITH WATER FLOW, TRACKS, ENGINEERING STRUCTURES AND OTHER

GUIDES



(§ 36 para. 8 and § 37 para. 1 of the law)



§ 48



The crossing of water flows



(1) for new bridges over streams must be in the form of the hole

preserved height of at least 0.50 m above the level of the design flow.

The design flow rates, spatial arrangement of bridge holes over other water

obstacles, the environmental assessment in backwater and cases where it is allowed to bypass

the water flow by the object, which is calculated by flooding of the strainer,

as well as other conditions of the crossing with the water contains binding ČSN 73

6201.



(2) if the communication crosses the waterway transport and a significant within the meaning of

specific rules, or ^ 13) must comply with the conditions laid down by the bridge opening

special provision. ^ 14)



§ 49



Cross lanes



(1) on the bridge objects through the electrified railways, tramways

or trolley bus of the track must be fitted with barriers (shields & networking

, etc.) against contact with live parts of the overhead line. In the case of coasters with

diesel traction must be equipped with protection against smoke gases.

The conditions for such barriers and protection involve binding ČSN 73 6201 and

ČSN 73 6223.



(2) the establishment and security method level crossing roads and local

communications with an expensive in cases of small transport importance lays down

Special regulations ^ 2) ^ 3) and binding to ČSN 73 6380. For more details

they contain also featured ČSN 73 6101 and ČSN 73 6110.



§ 50



Leadership in housing communications



(1) when traversing the underground engineering networks with the road or local

communications must be technically and economically viable used

tunneling and puree. The main body should not be allowed on the highway, speed

of the road and speed local roads outside built-up areas of villages. When

the parallel imposition of a larger number of engineering networks inside the built

the territory of the municipalities of these networks is to be preferably store the combined routes

According to ČSN 73 7505 binding.



(2) the communication outside built-up areas of villages and into the tunnels may not be

to place the above-ground or underground network for the transport of flammable liquids,

hydrocarbon gases in the zkapalněném State, or other flammable or

explosive media.



(3) the smallest permissible coverage of underground engineering networks contains

binding to ČSN 73 6005. For more details about how and spatial

the arrangement of the contact communication with engineering structures and other lines

contain featured Czech technical standards referred to in annex No. 1 under no.

49, 51, 65, and 66.



§ 51



Leadership on the bridge objects



(1) the conditions for the conduct of the foreign device on the bridge of the object when it is

crossing or overlapping with the ČSN 73 6201 it modifies the binding.



(2) after the bridge object in its holes and in distance protection

the bandwidth of the cable must not be laid in gas pipeline, pipelines or other

Foreign facilities if the location, operation and sudden disturbances

could cause the destruction of or damage to the bridge object, to defend his

maintenance or endanger the safety of traffic on the bridge.



PART TEN



CONTROL WEIGHING OF VEHICLES



Low-speed check weighing



(To section 38b (6) of the Act)



§ 51a



How to perform a low-speed checkweighing



The driver of the vehicle hit the device for checkweighing, where it is carried out

low-speed check weighing. Weighing is carried out in the presence of

the driver and other members of the crew in the cabin of the vehicle.



section 51b



The elements of the document about the result of the low speed checkweighing



(1) a document must contain



and) date, time and place made checkweighing, low-speed



b) manufacturer and type designation weight, which was carried out

low-speed check weighing, including serial number and data

the validity of the verification of this established according to a special legal

prescription ^ 18),



(c)), indication of the maximum permitted weight of the vehicle, the maximum permitted

weight on the axle and the Group of axles of the vehicle, an indication of the immediate

mass of the vehicle, or an indication of the immediate load on the

the axle of the vehicle and on vehicle dimensions measurement data and its

cargo arising from the special legal regulation ^ 10),



(d)) the measurement result immediate weight on the axle and axle group

the vehicle and immediate vehicle weight,



(e)) the exceeding of the maximum permitted weight on the axle and vehicle

the Group of axles in kilograms and as a percentage under a special legal

prescription ^ 10) after deducting the relative error of measurement based on the

special legal regulation ^ 18) and exceeding the largest

authorised mass of the vehicle in kilograms and as a percentage under the Special

Law ^ 10) after deducting the relative error of measurement laid down on

under a special legal regulation ^ 18),



(f) exceeding the dimensions of the vehicle) or cargo arising from the

special legal regulation ^ 10),



(g)) the name or name, surname, date of birth, address space

permanent or other residence or residence in a foreign country and State

the jurisdiction of the driver of the vehicle,



h) license plates, factory brand and vehicle type, distinguishing

sign of the State of registration of the vehicle,




I) status, the odometer of the vehicle upon arrival at the control

Instead,



(j) the designation of the operator) ^ 17) vehicles or of the towing vehicle kits

(name, address, identification number of the person, if any, in the case of

a legal entity or a natural person entrepreneur; the name or

name, last name, social security number, if assigned, otherwise, the date of birth,

address of permanent or other residence or domicile abroad,

in the case of a natural person),



to) the name or name, surname and signature of the competent representative of the

the owner of the infrastructure or its designee or region,

the weighing, or its designee, who took part

checkweighing, low-speed



l) the name or names and surname of the person carrying out the low-speed

checkweighing,



m) a written statement of the content of the document to the driver of the vehicle along with its

signature,



n) registration markings of the special use permit (if it has been issued according to §

25 of the Act),



about) the method of payment of costs associated with low speed control

weighing,



p) date and time of the copies of the document,



q) indicate the cargo sender (name, address, identification number

person, if it was allocated, in the case of a legal person or a natural person

entrepreneurs; the name or names, surname, permanent address

or else stay or residence in a foreign country, in the case of a natural person).



(2) the model this document is given in annex No 10 point 1.



High speed check weighing



(Section 38d, paragraph 5, of the Act)



§ 51 c



The elements of the document about the result of high-speed checkweighing



(1) a document must contain



and) date, time and place of the inspection carried out by the high speed

Dear,



b) manufacturer and type designation weight, which was carried out

high speed check weighing, including serial number and data

the validity of the verification of this established according to a special legal

prescription ^ 18),



(c)), indication of the maximum permitted weight of the vehicle, the maximum permitted

weight on the axle and the Group of axles of the vehicle, an indication of the immediate

mass of the vehicle, or an indication of the immediate load on the

the axle of the vehicle resulting from a specific legal

prescription ^ 10),



(d)) the measurement result immediate weight on the axle and axle group

the vehicle and immediate vehicle weight,



(e)) the exceeding of the maximum permitted weight on the axle and the Group

axles in kilograms and as a percentage under a special legal

prescription ^ 10) after deducting the relative error of measurement based on the

special legal regulation ^ 16) and exceeding the largest

permitted weight in kilograms and as a percentage under a special legal

prescription ^ 10) after deducting the relative error of measurement based on the

special legal regulation ^ 16),



f) license plates of a vehicle or combination of vehicles where the tractor

make and type of vehicle, the distinguishing sign of the State of registration

the towing vehicle, trailer license plates, factory

the make and type of vehicle, the distinguishing sign of the State of registration of the mount

of the vehicle,



g) photograph of the vehicle or combination of vehicles where the tractor and its State

license plates, photo, trailer, and his state license plate

brand,



h) indication of the operator ^ 17) vehicles or of the towing vehicle kits

(name, address, identification number of the person, if any, in the case of

a legal entity or a natural person entrepreneur; the name or

name, last name, social security number, if assigned, otherwise, the date of birth,

address of permanent or other residence or domicile abroad,

in the case of a natural person),



the owner of the mark I) infrastructure or its designee or

the County provides a weighing, or its designee, which carried out the

high speed check weighing,



j) the name or name, surname and signature of the authorised person of the owner

infrastructure or its designee or region, provides a

Dear, or its designee,



k) method of payment of the costs associated with high-speed control

weighing,



l) date and time of the copies of the document.



(2) the model this document is given in annex No 10 point 2.



PART ELEVEN



FINAL PROVISIONS



§ 52



cancelled



§ 53



The effectiveness of the



This Decree shall take effect on the date of publication.



Minister:



Ing. Roman v. r.



Č. 1



A LIST OF RELATED CZECH TECHNICAL STANDARDS



Binding the Czech technical standards



1. the CSN 36 5601 Light signaling devices. The technical and functional

requirements. SSZ for traffic control, SSZ for highlighting

dangerous places.



2. ČSN 73 6005 spatial arrangement of networks of technical equipment.



3. STANDARD CSN 73 6021 Light signaling devices. Location and use

signals.



4. the CSN 73 6102 Designing road junctions.



5. ČSN 73 6114 Road infrastructure. The basic provisions for the

designing.



6. ČSN 73 6121 construction of roadways. Compacted asphalt layer.



7. the CSN 73 6122 construction of roadways. Cast Asphalts.



ČSN 73 6123 8 construction of roadways. Cementobetonové covers.



9. the CSN 73 6124 construction of roadways. Aggregates hardened hydraulic binder.



10. The CSN 73 6125 construction of roadways. Stabilized bases.



11. The CSN 73 6126 construction of roadways. Nestmelené layers.



12. The CSN 73 6127 construction of roadways. Marbled milk layer.



13. The CSN 73 6128 construction of roadways. Pressed layer.



14. The CSN 73 6129 construction of roadways. Sprays and paints.



15. The CSN 73 6130 construction of roadways. Emulsion sludge layer.



16. The CSN 73 6131 construction of roadways. Tiles and panels.



Part 1: the covers of floor tiles



Part 2: the covers of road sections



Part 3: covers from the growing segments



ČSN 73 6201 17 design of bridge structures.



6. ČSN 73 6207 Design of prestressed concrete bridge structures.



19. ČSN 73 6212 Designing wooden bridge structures.



20. ČSN 73 6213 Designing masonry bridge structures.



21. The CSN 73 6220-carrying capacity and evidence of road bridges.



22. ČSN 73 6223 protection against contact with hazardous live parts

the contact line system and against the effects of exhaust gases on the subjects above

the rails of the national railways and sidings.



23. ČSN 73 6242 design and implementation of roadway bridges road

communications.



24. ČSN 73 6266 shock-absorbing barriers bridges over roads.



25. ČSN 73 6380 railway crossings and crossings.



26. ČSN 73 6425 Bus, trolley bus and tram stops.



27. ČSN 73 7505 Combined routes of urban management of technical equipment.



28. The CSN 73 7507 Projektovanie tunelov on cestných komunikáciach.



29. The CSN 75 6101 sewerage network and sewage connections.



Featured Czech technical standards



30. ČSN 01 3466 road Drawings.



31. ČSN 01 3467 Drawings of bridges.



32. STANDARD CSN 01 8020 traffic signs on the road.



33. the CSN 36 0400 public lighting.



34. the CSN Lighting 36 0410 local roads.



35. the CSN 36 0411 Lighting of roads and motorways.



36. ČSN 72 1002 Classification of soils for highway construction.



37. ČSN 72 1006 Check compaction of soils and sypanin.



38. ČSN 73 0031 Reliability of building structures and subsoils.

The basis for the calculation.



39. the CSN P ENV 1991-1 principles of design and construction of the load. 73 0035

Part 1: principles of design



40. ČSN 73 0037 Natural pressure on the building structure.



41. ČSN 73 2401 implementation and control of prestressed structures.



42. the CSN P ENV 206 concrete. Properties, manufacturing, storing, and criteria

reviews. 73 2403



43. ČSN 73 2603 Implementation of steel bridge structures.



44. ČSN 73 3050 earthworks.



45. ČSN 73 6056 Parking and parking areas of road vehicles.



46. ČSN 73 6059 Servicing and repair of motor vehicles. Pumping station

of fuel. The basic provisions.



47. ČSN 73 6075 Navrhovanie bus staníc.



48. ČSN 73 6100 road Terminology.



49. ČSN 73 6101 Designing roads and motorways.



50. ČSN 73 6108 Forest transport network.



51. ČSN 73 6110 Designing local roads.



52. ČSN 73 6133 design and implementation of a grading land

communications.



53. the ČSN 73 6175 measurement of roughness surface.



54. ČSN 73 6177 measurement and evaluation of anti-skid surface properties

roadways.



55. ČSN 73 6192 Shock load tests of the roads and the subsoil.



56. ČSN 73 6200 Bridge terminology.



57. ČSN 73 6203 Loading bridges.



58. ČSN 73 6205 design of steel bridge structures.



59. ČSN 73 6206 Designing of concrete and reinforced concrete bridge

structures.



60. ČSN 73 6209 load tests of bridges.



61. ČSN 73 6221 tours of the bridges on roads.



62. ČSN 73 6244 road bridges Transitions.



63. ČSN 73 7501 mined underground design objects.



64. ČSN P 74 2871 Systems an additional building. General requirements and

testing.



65. the CSN 75 5630 Subways water pipe under the rail and road

communications.



66. the CSN 75 6230 Sewer subways under the railway and roads.



Č. 2



MAIN TOURS



The aim is to establish a uniform way of recording phenomena monitored within the framework of

the major tours. Part of it is the determination of the criteria for the assessment of

the established facts.



1.



IMPLEMENTATION PRINCIPLES THE MAIN TOURS




1.1. the main tour is carried out in the median location of the system, for

the highway is permissible and localization system line. In the case of local

communication with the system of data collection and their subsequent processing

adapt to the system used by the Mozilla localization.



1.2. the focus is on the entire body, including part of the communication and

accessories. In the case of a divided four-lane directional communication is

each of the driving belt taken as a standalone communication.



1.3. main tours of the bridges are carried out according to the recommended STANDARD ČSN 73 6221.



2.



HOW TO RECORD THE OBSERVED PHENOMENA



2.1. The road and communication (including hard shoulder) in disorders is being monitored

their scope (area, length), and location on the road. The phenomena found in the

during the major tours are supplemented by available data variables

parameters (roughness, longitudinal and transverse inequality, residual life),

the measured and evaluated on the basis of the applicable ČSN listed in annex No.

1.



2.2. the bridge structures are tracked according to ČSN 73 6220 and binding

featured ČSN 73 6221.



2.3. Grading, drainage device communication and other objects outside

Bridge Is recorded of their occurrence, location (position and length), civil

technical condition and functionality.



Classification of structural and technical condition



I. excellent without any apparent defects



II. for minor defects do not affect the functionality and immediately or

the life of



III. complying with more severe disorders having a partial influence on the functionality and

without maintenance or repair also on lifetime



IV. serious fault, almost non-compliant rendering functionality,

the service life is minimum



In the emergency control is broken, the lifetime is zero



2.4. other components and accessories for communication is recorded

occurrence location (position, length) and technical condition. Real state

is checked with the data in the Passport. Increased attention is paid to the State

road markings and transport equipment.



3.



EVALUATION OF DETECTED PHENOMENA



3.1. The road of communication (including hard shoulder)



Evaluation of detected phenomena is usually in systems management

the ground.



The design level of the violation of, depending on the traffic load

communications and its traffic importance.



Measurement and evaluation is carried out by the approved types of measuring instruments in

accordance with best CSN referred to under no. 53, 54 and 55 in annex No. 1.

In justified cases, the measurement must be accompanied by the probes into the construction

road conditions and laboratory testing of embedded materials.



When overlapping two or more disorders, is always given to the disorder

the most serious.



On the basis of the values of the characteristics of operational capacity and

or extent of individual failures, the roadway splits into the road

homogeneous sections and hashes to five classification and decides

How to maintenance or repair.



Maintenance (regular and continuous) or patch can be mostly suggest more

variants of the technology. Their selection is dependent on the

the economic assessment.



3.2. Evaluation of bridge structures discovered phenomena and the draft measures

carried out according to ČSN 73 6220 binding and featured ČSN 73 6221.



3.3. Grading, drainage device communication and other objects outside

bridge



The proposed measures correspond to the classification of the civil status according to section 2.3.



I. excellent-no action



II. matching-routine maintenance according to plan



III. good-normal, or continuous maintenance, inclusion in a plan of correction



IV. non-compliant-perform repair or continuous maintenance



In the emergency-immediate correction, reconstruction,

transport-organizational measures



Measures, with the exception of emergency conditions, are incorporated into the

the schedule of work for the next period.



3.4. other components and accessories for communication On the basis of the

the fact is the timetable adjusted later, Communications Manager.



Č. 3



THE DETERMINATION OF THE BOUNDARY BETWEEN THE LAND COMMUNICATIONS WITH EACH OTHER AND BETWEEN THEM AND

REAL ESTATE (SCHEME JUNCTIONS AND CONNECTIONS)



Figure 1-the intersection without routing the islets on the side

communication or with routing the islets off the free width of the major

communication



Figure 2-intersection with routing the islets on the side

communication



Figure 3-level junction with the separated bar for branching

to the right



Figure 4-the intersection with the separated bar for branching

to the right, and the connection bar



Figure 5-Circular intersection



Figure 6-cloverleaf interchange trubkovitá



Figure 7-cloverleaf interchange without průpletových sections or with

průpletovými sections



Figure 8-cloverleaf interchange kosodélná



Figure 9-real estate Connection (service facilities) to Highway,

road or local communication



Explanatory notes to your pictures



1. the boundary between terrestrial communications at the connection point is indicated

the pictures show a strong a dashed line. The fracture points boundaries are marked with the

a cross in places where it can be configured with milestones and ring on paved

the areas where the studs are used to indicate the quarries.



2. the part of the boundary followers grain direction main road is placed in the

the level of edge hardening on the main road (see Figure 1) or to the

the level closest to the side routing islets (see communication

figures 1 to 4).



3. the part of the boundary separating the branch connection is recorded as the connector

edge of the reinforcement of the island and the edge of the reinforcement at the beginning of the arc for

branching (branch junctions).



4. the boundary between the minor and major roads on circular intersection in

the connection point of the perpendicular from a point farther from the arc branch from

the roundabout to the axis of the side of communication.



Č. 4



cancelled



Č. 5



MAINTENANCE AND REPAIR OF COMMUNICATIONS



1.



ROUTINE MAINTENANCE OF ROADS



Routine maintenance includes small, locally defined work, whose needs

It was found in the searches of communications.



In particular the following work:



1.1. road maintenance and road side



-piecing asphalt covers



-piecing cementobetonových covers



-settlement and maintenance of paved covers



-maintenance of gravel guards



-scraping, replenishment, firming and cleaning of road side



1.2. maintenance of traffic signs, transport facilities and other

accessories (vertical and horizontal traffic signs and devices, mirrors,

sound, public lighting, light signaling devices used to

traffic management, rail, fenders, crash barriers, pružidla, directional

pillars, snow fence, storage and landfill maintenance materials, etc.)



1.3. maintenance of drainage works (culverts, ditches, gravel, chutes,

trativody and seepage pits, sewer, road, street drains and

splavenin traps)



1.4. the maintenance of slopes and embankments grading communication



1.5. maintenance of sidewalks and other non-motorist Communications Division

belts and traffic Islands



1.6. maintenance of surfaces and equipment odpočívek, parking and parking areas

and other components of communication (staničníky, milestones, speed bumps,

escape the zone, acoustic walls and bulwarks)



1.7. maintenance objects (tunnels, galleries, support, door frames, obkladní and

parapet wall, tarasy)



1.8. the treatment of road vegetation



2.



CONTINUOUS MAINTENANCE



Continuous maintenance includes more extensive work in the contiguous sections

for the conservation and restoration of the original property. The basis for the

the decision on the implementation of the results of the management systems

the ground, or the evaluated data from surveys of communications.



In particular the following work:



2.1. the restoration of the vozovkového formation, strengthening and modifying road pavements

and other non-motorist communications



-the road with asphalt cover housing recovery recovery of anti-skid

the properties of the housing renovation housing equality method using recycling

the original cover



-the road with cementobetonovým cover the restoration of anti-skid properties

cover of the renewal of the equality of the cover



-Road with a cobbled the cover or with the cover of road parts recovery

anti-skid properties and housing equality amplification



-gravel paver restoration equality housing boost



2.2. the restoration of individual types of components and accessories for communications (in the

a continuous stroke)



2.3. edit a grading and its security establishment of the walls



2.4. delete výmrazků in contiguous sections



2.5. the restoration of vegetation in contiguous stretches of road



3.



REPAIR



Fixes include in particular the following work:



3.1. the amplification or extension of the road and road side



3.2. setting up the sidewalks, their gain, respectively. the increase in length



3.3. removal of landslides, reinforcement of rocks in the excavations and odřezech



3.4. the removal of mining damage to housing communication



3.5. correction of Crown communication, including parts and accessories



3.6. the restoration of the objects referred to in point 1.7.



Č. 6



PLAN AND THE ORGANIZATION OF WINTER MAINTENANCE



1.



Plan a winter maintenance of highways



Plan a winter maintenance of highways is processed in two stages



-the operation plan of the individual centres of administration and maintenance of highways (hereinafter referred to as

"SSÚD")



-the operation plan of the Organization; the Organization shall submit the plan to a 20. October

The Ministry of transport and communications.



1.1. the plan contains SSÚD:




and the highway section) map at a scale of 1:50, 000, which will be marked:



-motorway sections maintained floured chemical rozmrazovacími materials

(red color), spraying chemical solutions (in blue) and

floured zdrsňovacími materials (yellow)



-post mechanisms for winter maintenance and working circuits



-storage zdrsňovacích grit over 1000 m3 (letters),

chemical materials above 100 t of gritting (letters CHRL) and

chemical solutions (CHR)



-the deployment of zásněžek along the highway (brown color)



-telephone connection (letter T)



-station radiotelephone stable stations (letter V)



-warehouses and fuel station (the letters PH-petrol, diesel)



-the location of the detector probes ice (letters HN)



(b)), in which part of the text:



-list of employees responsible for defects in the skiing conditions on mitigation and

feasibility of roadways, parking areas, walkways and a intelligence service

including their place of residence and telephone links



-list of employees enrolled in winter service, including their place of residence

and telephone links



-a list of contracted employees



-a list of important telephone and fax connection on head

employee organization, the other SSÚD, the central authority of State administration,

The police of the CZECH REPUBLIC, medical facilities, etc.



-a list of the sections of the highways, intersections and maintained odpočívek



-the list of sections of highways maintained floured chemical rozmrazovacími

materials, chemical solutions and zdrsňovacími posypovými materials



-organisation of the implementation of the intervention of winter maintenance-process optional

characteristics of climate and weather conditions in

the winter season in the given section of the highway



-Organization of the health check of the skiing conditions on the highway



-Organization of shifts and their management



-inventory storage and liquid materials for road winter maintenance and

their resources



-an inventory of materials, fuel depots and gas stations



-an inventory of the Habitat of the mechanisms, indicating the species and number of mechanisms



-description of the accommodation and catering conditions for winter maintenance personnel



-details of the agreed bailout in case of calamity situations



-method of obtaining weather reports and forecasts.



1.2. Plan of the organization contains:



and maintained highways) map at a scale of 1:50, 000, with an indication of the individual

sections and SSÚD



(b) the tabular overview of the amenities) mechanisms and devices for winter

maintenance, on the number of employees for the performance of winter maintenance and the amount of

grit and liquid materials by SSÚD



(c) the details of the agreed výpomocech) at the time of calamity situations



(d) a list of the staff of the Organization) are responsible for the performance of winter maintenance

Highways including phone connections and residence



(e) the Organization and ensuring) the way intelligence services



(f)) the presumed mode of assistance by individual SSÚD including links to

senior staff SSÚD



(g) the maintenance in winter mode) the protected area, in the area of resources

drinking water, on the bridges according to ČSN 73 6221 recommended.



2.



Plan of the winter maintenance of roads



Winter maintenance of roads plan presents road to the relevant administrative manager

the Office, to submit their comments and until 30 June. September workplace authorized

The Ministry of transport and communications. The plan consists of the following parts:



2.1. Mapping section:



and maintained network) map at a scale of 1:100, 000, with an indication of the order of the

the importance of winter service as follows:



I. order-Red



II. order-blue



III. order-yellow



unkempt-without marks



(b) route map) rides in the usual mechanisms of winter road conditions

the processes, taking into account the order of priority roads in the scale 1:50

000. There shall be marked:



-route (circuits) sypačů-full colour tours different footnote for each

route abbreviation shall be expressed:



CH-gritting chemical deterioration of material



Z-buffer for sprinkling



1-the ...-the circuit number



In-design your own capacity



D-design by a contractor.

(example: CH 12-in)



-the road maintained only pluhováním-dotted-line color



-the road-without any sign of a messy



(c) identifying routes) map pluhování, scale 1:100 000 or 1:50 000.



2.2. the text part:



and) person responsible for winter maintenance. Responsible for winter maintenance is

established organizational rules and Communications Manager job description

Senior employees.



For the performance of winter maintenance corresponds to:



-on the whole managed territory: head of winter maintenance, outside working hours

shift winter maintenance



-on the cestmistrovském circuit: during working hours, non-cestmistr

time authorized employee (dispatcher, shift supervisor)



-on the use of standby time: maintained by the driver, which is route

allocated and found on him at the time shift provided for the proper breakdown.

Any changes to records in the journal winter maintenance center

cestmistr.



(b)) the list of roads and maintenance according to the mileage technologies



An overview of the



---------------------------------------------------------------------------------------------

A total of tohoNeudržováno class

Road km Chem. rozmrazovacími zdrsňovacími just

materials pluhováním materials

---------------------------------------------------------------------------------------------

without the slag, pulp,

moisturizing being humidified slag sand

---------------------------------------------------------------------------------------------

(I).

---------------------------------------------------------------------------------------------

II.

---------------------------------------------------------------------------------------------

III.

---------------------------------------------------------------------------------------------

A total of

---------------------------------------------------------------------------------------------

By a contractor.

---------------------------------------------------------------------------------------------

Homeland. employers and unions.

---------------------------------------------------------------------------------------------



List of roads according to the order of importance



---------------------------------------------------------------------------------------------------

The order of the Designation of the road Gritting km Total km Chainage Pluhování

the importance of km

---------------------------------------------------------------------------------------------------

I. road No.:................

Road no:................

I. order total

Road no:................

Road no:................

II. order total

Road no:................

Road no:................

III. order total

the roads in winter, unmaintained:

Road no:................

Road no:................

the roads in winter, unkempt

total:

---------------------------------------------------------------------------------------------------



A list of individual paths (laps)



For each route:

The designation of the route

The alignment

A staff member (supplier)

Habitat

Connection (telephone, radio, ...)

Specifications and work



Timetable winter rides



Process for individual routes and sets out the chronological order of the rides and the time

for you at the usual winter weather conditions makes

mechanism of road gritting. The timetable is processed so that the

compliance with the time limits for each order of importance and priority

treated easily important places.



(c)) the list of mechanisms (with the Division on its own and supply)



Mechanisms for sprinkling



gritters for gritting chemical substances rozmrazovacími (dry salt, zvlhčená

salt)



-the snow blade



-no blade



gritters for the buffer for sprinkling



-the snow blade



-no blade



Mechanisms for pluhování (without the possibility of the current winter)



carriers with a snow blade



the carrier swept plow



tractors with hanging blade or scraper



Snow metače



snow blowers



Recap:



gritters total



Rack tines without sanding



the share in total



a total of arrow-ploughs



tractor ploughs and scrapers total



a total of loaders



Snow metače total



a total of snow blowers.



d) connection with a 24-hour indication address and the possibility of

24-hour connection responsible for the performance of winter maintenance.



(e) a list of the heads of workers providing) winter maintenance shall be

all the leading employees of the Communications Manager, cestmistři and masters on

cestmistrovských circuits as follows: name and surname, title, place of work,

phone to the workplace, phone in place.



(f) a list of the sorbent material stores): location, type of material,

capacity, a prerequisite in stocks to 1. November.



g) Negotiated the bailout the company (Organization) name, location, operator, phone,

agreed activities.



(h) the maintenance in winter Mode) the protected landscape area and in the area of resources

drinking water, in the protection of natural medicinal resources and

natural sources of mineral waters of table, on the bridges from featured

ČSN 73 6221



The name of the section-the number of the roads, the local name, technology maintenance.



I) Papers



-records of meeting staff of the winter maintenance




-the Treaty on mutual assistance in the winter maintenance of roads

switching from the neighbouring territories, including agreements about used

technologies



-approval clause of the Ministry of transport and communications



-assistance treaty negotiated by the letter g)



-other documents.



3.



Winter maintenance plan of local communications



Winter maintenance plan on processing of local communications and its extent

decisions of the municipality pursuant to § 42 para. 2 Decree.



4.



Winter maintenance operating crews



4.1. the subsidiary bodies are the district road administrators operating staffs winter

maintenance of roads. To participate in the operating staff administrator shall invite the road

the representative of the Department of transport and the Department of the environment of the REGIONAL AUTHORITY, the district

the Directorate of the police of the CZECH REPUBLIC and the legal persons that are decisive

role in material and technical cooperation in the

winter road maintenance assurance.



Winter maintenance operating crews and their manager shall convene the meeting

roads and motorways.



4.2. the Ministry of transport and communications shall be established as a subsidiary body

the main operating crew winter maintenance of roads and highways for the purpose of

the operational emergency response. To participate in the operating staff

the Ministry of transport and communications shall invite, in particular, the representative of the Presidium of the Police

The CZECH REPUBLIC, the Ministry of defence and the Ministry of the environment.



4.3. At their meeting before the start of the winter period, discuss operating

staff plan a winter maintenance, its organization and mutual connection. For more

the meetings are convened as necessary operatively. In cases where the

road or highway administrator is not able to due to extraordinary

the weather situation to handle the emergency situation caused by or at

deploy all its own and all available forces in the area and

funds, shall be convened by the operating crew. In wholly exceptional weather

situations which threaten the life and health of citizens, or immediately

impending large damage to the district authorities to exercise the powers of the assets

According to § 5 para. 2 to 4 of Act No. 425/1990 Coll., as amended

regulations.



4.4. The municipality shall act in accordance with section 3; in the case of a State of emergency in accordance with section

4.3., including the use of the powers under section 47 of Act No. 367/1990 Coll., on

as amended.



5.



News



Administrators of the highways and roads shall be submitted within the deadlines set for information

the skiing conditions on these communications Ministry responsible for workplace

transport and communications, which provides information to the public in the media

resources.



Č. 7



WINTER MAINTENANCE TECHNOLOGY



1. the measures before the start of winter maintenance



In preparation for winter maintenance of roads and highways Manager shall carry out an analysis of the

last winter, and shall in particular ensure:



-preparedness mechanisms for winter maintenance, verification of knowledge

workers performing winter maintenance (technology, the rules for

operation mechanisms, rules on safety at work, etc.) 15. October



-discussion of the bailout agreements until 31 December 2006. October



-discussion of entry to adjacent lands and the status of zásněžek to 30.

November.



and Building zásněžek in places) the recurring danger of zavátí communication

snow fences are placed at a safe distance from the edge of the Crown communications

upwind, if possible at right angles to the direction of the prevailing winds,

in parallel with communications at a distance of 12-18násobku their height,

According to local conditions. When piled the snow drift and reach full height zásněžek

and the surface of the snow, then above their upper edge exactly aligned, stand

the next row of zásněžek before the first series against the prevalent wind direction on the

distance 12 to 25 metres, depending on the depth of the notch. Administrator

communication procedures for placement of zásněžek so that the avoidance of damage

on the grounds and snow fences have been adequately secured against

the effects of the wind.



(b)) the indicative in areas with snow bars excessive snow precipitation

the guide rod is placed into the snow for better orientation during the

pluhování. Bars with reflectors or černožlutě painted have a diameter

about 5 cm. In length, is 1-3 m depending on the height of snow

cover in the area. They are 50 cm outside of the area in the

distances after approx. 50 m this distance shall be reduced accordingly in the

in the maxilla or in places with frequent occurrence of fogs.



(c) the designation of the unmanaged communications Communications), whose practicability is in

Winter does not, it must be before the start of the winter period

indicated by a traffic sign and 22 "other dangers" with the supplementary table

"The road is not maintained in the winter."



(d) changes in technology) indication of where communication occurs in a single route

to change the technology of winter, must be fitted with a traffic sign and 22

"Danger" with the supplementary table, e.g.. "The end of the chemical

do I get it ".



e) concluding contracts with sufficient time closes the Communications Manager

the Treaty on the bailout in case of calamity situations, Treaty on the mutual exchange of

maintained communications and the agreement on uniform maintenance of roads passing through the

territories more administrators to their practicability was provided if

using the same technology as possible. If there is no agreement or if this is not

technically possible, the technology used must be approved by road

the administrative offices. Space technology changes must be marked according to the

paragraph (d)).



(f) training of persons carrying out) winter maintenance of All persons performing

winter maintenance must be properly trained and demonstrably (and persons

performing winter maintenance supply). To outlining the training must include

In addition to the technical and organisational instructions safe work rules in the

winter maintenance and the principle of protection of the environment.



2. mechanical snow removal



Snow removal is done mainly by rote. Perform the desired or

spraying chemical rozmrazovacími materials into a layer of freshly

-fallen snow greater than 3 cm without prior pluhování is ineffective,

and, therefore, inadmissible. Snow is common in winter the situation need to remove

so, to prevent it from driving traffic and přimrznutí to the road surface.

Slush is necessary to remove from the road.



The side you need to extend the snowbanks to maintain transit

space and was possibly restricted views. Thawing must be secured

drainage of water.



At double-lane bidirectional road with snow it removes from the middle of the journey

the track to the right of the road. When the extraordinary fallout snow

transit areas and on local roads snow only summarizes the

the edges of sidewalks and according to the possibilities.



Snow driving in the opposite direction is permissible only in exceptional

cases and under certain security measures.



On multi-lane roads, it is appropriate to clear snow in multi-member

working reports.



On the odpočívkách and parking lots can be summarized in the first snow mounds,

that are then removed.



When a level crossing of the communication with the left layer of snow with the track

It is necessary to see to it that this snow layer smoothly and

railway crossing surface. The underpasses is necessary to maintain a

free height.



On the bridges, the snow removes from the entire width and length of the bridge. In doing so, it has to be

snow moves in longitudinal direction if possible or taken away, if

cast into the sides fell down prostrate on the transport route, or other objects.



Snow commonly used snow plows. If when you

snow drifts or reaches a height of approx. 30-50 cm, with

arrow-ploughs. The snow layer is greater than 70 cm of snow are eliminated

Mills. Snow metače are used to extend the term of the space

of the road.



When continuous snowfall the pluhování occurs periodically. On transport

important roads after pluhování does not have any residual layer

the snow should not exceed 3 cm.



3. Removal of snow with the use of gritting materials, chemicals



This technology is used only on roads designated plan winter

the service. Gritting salt is initiated, if the snow depth does not exceed 3 cm. To

snow layer higher than 3 cm are not allowed to perform scavenging.



Winter in sodium chloride or calcium chloride to

be carried out depending on the intensity of the snowfall. When small intensity (1-1.5

CM per hour), sprinkles a dose of 10 g m-2, when greater intensity at a dose of 20

g m-2. the use of larger doses already causes the formation of snow Goo. When

extremely long snow, or when the extraordinary intensity of fallout can be in

during a snow sprinkling dose of 10 g m-2 again, but always to

completion of the pluhování to make the salt on the road surface.



4. removing ice or snow layers with the help of the mileage

chemical gritting materials



Chemical materials are fundamentally defrosting applied to the residual

a layer of snow that you can no longer delete or reduce mechanical

resources. These materials can be effectively and quickly deleting layers

packed snow to a thickness of 1-2 cm or ice up to a thickness of 2 mm.

higher layers is required repeated gritting and synergies of mechanical

resources. At temperatures around-5 degrees C, it's the sodium chloride,

at temperatures of around-15 degrees C, it's the calcium chloride-in

the intermediate temperature interval may be used a mixture of both chlorides. Below


the listed dosage applies to sodium chloride and calcium chloride and referred

the maximum dose should not be exceeded.



The minimum sufficient dose, high for this type of scattering is 20

g m-2. When disposing of the higher layers of the ice is usually necessary to use

higher doses, the total consumption of road salts, however, when one

utility date does not exceed 60 g/m2. Only in very exceptional

cases where it is necessary to quickly restore full of icebergs, communication

You can use a dose of greater than 60 g/m2. Doses greater than 20 g/m2 must not be

use the sections of roads exposed to strong winds, if it is not on

sypači used zkrápěcí device.



On a thin layer of ice is allowed to for sprinkling Act takes approximately 2 hours. The stronger

layers of ice to allow gritting to act 2-5 hours. If during this time

layer from the surface completely released, zpluhuje with a loose surface layer

blade with a steel blade, and the whole process is repeated. Total consumption

road salt, it must not exceed the allowed dose referred to above.



The resulting slush or ice must be from the road

immediately remove mechanically.



Only in exceptional circumstances (when freezing rain or freezing

drizzle) may exceptionally be used winter zdrsňovacího and chemical mixtures

material. Dose is chosen so that the total amount of chemical

folder does not exceed the above-mentioned maximum dose-eg. a maximum of 240

g m-2 mixture ratio of 1:5.



5. Roughening ice or snow layers floured zdrsňovacími mileage

materials



Zdrsňovacími materials used for sprinkling on roads that are not

maintained by using chemical gritting materials. Can be implemented in a

only the occasional gritting the important places or in places where

It requires the technical state of the communication traffic (crossroads, United

climb, sharp direction, stop personal regular services). On

these places, it is appropriate to set up a self-service landfill zdrsňovacích

materials.



Black ice is suitable for road gritting fine-grained material (less than 2 mm grain).

For sprinkling nezledovatělých mileage snow layers should be used

material with a higher content of coarse fractions (grains larger than 4 mm).



In built-up areas should not be used with grains of material over 8 mm.



Direct sections of roads with about 70 to fall at a dose of 100 g/m2, where it

requires the conveyor communication status, fall at a dose of about 300

g m-2. icy roads on busy is relative to the

odmetení operation of the appropriate dose increase material about 50 to 100%. Benefits

more than 500 g. m-2, however, are ineffective.



Sprinkling zdrsňovacími materials is carried out in the whole width of the communication,

Alternatively, the whole width of the traffic lane, IE. at least 3.5 metres in one

direction.



6. removal of snow and ice on local roads IV. class



On the removal of snow and ice on local roads IV. class to

ensure their feasibility are decided by the municipality. Feasibility of these communications

the odmetením or odhrnutím, oškrábáním zmrazků and snow

floured zdrsňovacími materials. Chemical deterioration of material is

may sprinkle only those walkways and trails, which are not stored

Engineering network (unless they have a closed cover) and are separated from the Green

areas and the belts for the trees in such a way that they could not flow down the salt

the solution.



7. the mechanisms for winter maintenance



and chemical Spreading of gritting materials) have to meet the following

technical requirements:



-dose chemical rozmrazovacího material in g m-2 on the required

the width should be adjustable within 10-60 g m-2, and preferably continuously,



-When you stepped control of the scattering dose required option settings

10, 20, 30, 40 and 60 g m-2, but not less than 10, 20 and 40 g/m2



-set the dosage to be complied with and automatically when changing the

working speeds within the limits of 10 gritters up to 60 km/h



-width of the sanding to be adjustable at least within the limits of 2-9 m, for sypačů

with a constant width do I get has to be at least 2 m, up to 3.5 m



-the transverse and longitudinal uniformity of scattering depending on the quality of road

Salt has to be listed in the technical conditions of gritters



-Sanders, for which the device is installed zkrápěcí to

compliance with the ratio of dry material and brine 7:3 at 5-20

g m-2. The recommended concentration of sodium chloride in solance is 18-21%.

Before the winter period it is necessary to check the actual dosage in g/1 with

common material and correct the settings according to the results of the dosing

tract so that the real benefits were in accordance with the required

values.



(b)) zdrsňovacích materials to meet Spreading these technical

requirements:



-dose zdrsňovacího the sorbent material should be adjustable within the limits

70-500 g/m2 (at least up to 300 g/m2), corresponding to 0.05-0.33 l. m-2

aggregates when density 1500 kg m-3



-When you stepped control of the scattering dose required option settings

benefits 70, 100, 200, 300 (500) g m-2 when using zdrsňovacích materials

grain max. 18 mm, preferably, however, requires a smooth setting



-set the dose should be automatically kept even when changing the working

the speed of the spreading within the limits of 10-40 km/h



-width of the sanding (adjustable in width for sypačů scattering) has to be

adjustable within 2.5-10 m (minimum of 2.4-5 m)



-width of the winter in sypačů with a constant width should be within the limits of 2.5 up to 3.5

m



-the transverse and longitudinal uniformity of scattering depending on the granulation

the sorbent material should be listed in the technical conditions of gritters.



8. Recommended material for winter maintenance



and defrost) chemical materials



The gritting of roads, highways and local roads, with the exception

non-motorist can use the following chemical communications

thawing materials:



-Sodium chloride



-Calcium chloride



-Mixtures of chloride



Sodium chloride (rock salt, salt kitchen) NaCl-is effective for

removal of ice and snow layers at temperatures down to-5 degrees C and

under certain conditions, and lower.



Calcium chloride, CaCl2-is effective for the removal of ice and snow

layers below-15 degrees C.



The quality of road salts



Used road salt do not contain more than 5% by weight

dust parts of 0.16 mm. Composition of grain is significant for the way

use and technique of winter. Fine particles cause the fast surface

the dissolution, the effect in depth, however, is limited. Coarse particles can penetrate

more in depth, so that the driving snow or icy conditions are stronger

effect of the road therefore diluted.



Salt does not show when you ship more than 2 weight percent of a permanent moisture

and has at least 96% by weight of the active solution

substance.



When the supply of salt must be documented information about the chemical composition, the

the proportion of insoluble matter, humidity and grit in this song

the breakdown:



under 0.16 mm



from 0.16 to 0.80 mm mm



from 0.80 mm to 3.15 mm



from 3.15 mm up to 5.00 mm



over 5.00 mm



Limits for heavy metal content and inappropriate ingredients have not been

established by specific provisions.



Chemical storage of gritting materials Chemical defrosting

materials are not allowed to be stored on open landfills. For

most are wooden halls with a capacity of 500-1000 t

or all-wood silo with a capacity of 40-200 t placed with regard to the

the performance of sypačů options. In closed warehouses must be prevented from leaking

the surrounding area and leakage into the subsoil. In a closed store warehouse

sodium chloride in bulk.



Solutions of gritting resources



For spraying road salts are used, their concentration solutions

18-21%. To prepare the solution (brine) are determined by the outpatient-mixing

station.



The direct use of the solutions for the removal of ice resources of gritting

or driven snow layers is possible, if not expected

the drop in temperatures below-3 degrees (C). Solutions are applied, kropičkami

allow uniform spraying. When determining the limit of benefits solutions

is based on the concentration of the active substance, the quantity must not change

the limit value of the benefits referred to in section 3.



(b)) of the scattering materials in terms of the buffer that is taking care of the environment

he prefers a clean materials-sands and punching. From an economic

point of view it is possible to use bulk materials from local sources, such as

slag and slag. Used slag and clinker must not contain toxic or

otherwise harmful substances, should have adequate grain and grain are to be

ostrohranná. The safety of these materials their supplier

every year to demonstrate certification. Materials for road gritting must not contain aluminum

-sand particles should be sharp, hard and without major grains.



Zdrsňovacích grit grit has got to be in the range of 0.5 to 8

mm. in any case, the buffer that is to contain the material particles smaller

than 0.3 mm or greater than 16 mm.



Storage zdrsňovacích grit



Buffer materials can be stored in the open air,

It is preferable, however, their storage in silos, sheds or under

shelters. Assuming that the storage of this material is built


so, in order to prevent water leakage into the surrounding soil, it is possible against the

freezing piles use a small dose (1-3%) of sodium chloride.



(c)) zdrsňovacích and Chemical Mixtures of gritting materials for a variety of

the negative feature is the use of composite materials may only be used for

in exceptional circumstances, when facing such materials are failing one by one. To

preparation of the mixed material is used suitable sand or grit, to

which is evenly mixed by sodium chloride at a ratio of 1 part on chloride

3 to 6 parts of sand.



The maximum dose of this winter during one intervention is derived from

the amount of chloride in the mixture.



When you use a mixture in the ratio of 1:6 is a 280 g/m2, when using the mixture in

1:3 ratio only 160 g m-2.



Č. 8



THE DAILY RECORD OF WINTER MAINTENANCE AND ITS EVALUATION



Highways and roads lead Manager documentation on the winter maintenance as

a separate journal in which chronologically records all

findings and activities so that the journal could not have been anything Additionally

should be entered by, or subsequently released.



In the course of service shall be recorded all of the reporting, notification, communication,

exits on the control or intervention, returns, report on the skiing conditions on, weather,

sudden changes in temperature, precipitation, wind, given reports on the central or

regional dispatch and a reported traffic accidents, for which there is a presumption,

they were caused by a defect in the skiing conditions on, records

managers or supervisory bodies, etc.



Upon termination of service, writes the practicability or nesjízdnost communications and

the accuracy of the journal confirms by signing the responsible employee. Records

is done chronologically so that it cannot be retrofitted

Enter for more information. The registration is done, with one bound. The completed

the journals are archived for a period of five years.



1.



The diary of winter maintenance of highways and roads



Shift supervisor (for roads also shift and shift master circuit)



-name, surname



Shift workers



-staff list for winter maintenance according to the actual presence of the



A house call



-list of staff to strengthen the shift



Vehicles and mechanisms in operation



-the number and types of mechanisms available for winter maintenance performance in

ready for the shift



Weather situation



-temperature, cloudy, partly cloudy, cloudy, rain, fog, snow, wind, etc.



The status of the skiing conditions on



-a brief description (the roads according to order of importance), the road passable,

sledding snow layer in the limited, cm, ice, drifts in the km, the road

impassable-transport diverted-skiing conditions on the assumption



The progress of the services



-time of onset and termination of service



-a chronological record of the most important events



-record checks the status of the skiing conditions on



-skiing conditions on reports from other institutions-provides the time, content and who

the information filed



-Note on the transitioning to the next shift malfunction.



2.



The diary of winter maintenance of roads



For persons to ensure practicability the winter maintenance of roads on

the territory of hl. Prague, Plzeň, Brno and Ostrava is the keeping of a journal in accordance with point

1. mandatory for other communities featured.



3.



Evaluation of the winter maintenance of highways and roads



Evaluation of winter maintenance activities shall be drawn up in the following basic data:



-the scope of the network maintained



-assessment of the preparation for the winter period in relation to the actual course of the

winter maintenance



-evaluation of the mechanized equipment, number of machines, their

failure rates, repairs, etc.



-evaluation of technologies, their compliance with and the results

checks



-assessment of work organisation-personnel security tasks

compliance with the time limits, etc.



-assessment of the other conditions-location and social facilities

workplaces, bailout, etc.



The evaluation includes the following data:



-Maintained roadway total:............ km



-Used technology: dry salt:....... km vlhčená salt:....... km

slag, slag:....... km pulp, Sands:....... km pluhované only:

... ... km: ... unkept ... km



-Financial costs thous. CZK

------------------------------------------------------------------

The season of

---------------------------

IV. quarter quarter

------------------------------------------------------------------

Overall,

------------------------------------------------------------------

out of it by a contractor.

------------------------------------------------------------------

Conversion to 1 km

------------------------------------------------------------------



-Consumption of road materials

------------------------------------------------------------------

The season of

---------------------------

IV. quarter quarter

------------------------------------------------------------------

Salt t

------------------------------------------------------------------

Brine hl

------------------------------------------------------------------

Aggregates, sand t

------------------------------------------------------------------

Slag, slag t

------------------------------------------------------------------



-The number of emergency days days

------------------------------------------------------------------

Month 10 11 12 1 2 3 4

------------------------------------------------------------------

Road gritting

------------------------------------------------------------------

Pluhování

------------------------------------------------------------------



-Used for winter maintenance

------------------------------------------------------------------

custom alien

------------------------------------------------------------------

Dry salt gritters

roadways

-----------------------------------------------

Vlhčená salt

-----------------------------------------------

Buffer material

-----------------------------------------------

The combined-

2 Chamber

------------------------------------------------------------------

Blades, ploughs, Hanging

-----------------------------------------------

-segment

-----------------------------------------------

Arrow-ploughs

-----------------------------------------------

Hanging blades and scrapers

------------------------------------------------------------------

Snow blower,

metače

------------------------------------------------------------------

Loaders

------------------------------------------------------------------

Brine Maker-mixers

-----------------------------------------------

economy storage tanks

------------------------------------------------------------------

Ice detector

------------------------------------------------------------------



The administrator commits the evaluation work authorized by the Ministry of

transport and communications during the previous winter season to 30. April.



4.



Evaluation of the winter maintenance of roads



On the scale and the method of evaluation of winter maintenance decided by the municipality. As a model

can be reasonably applied to the evaluation of the winter maintenance of roads.



Č. 9



cancelled



Č. 10



1. the form of the document the low speed checkweighing



Evidence of the result of the low-speed checkweighing



Day................ "h. was conducted on ... ... ... ... (the category of roads, checkpoints)

in the place of................. low-speed check weighing scales manufacturer/type designation..............

the serial number ... ... ... ...



These data have been identified:



The name or names and surname of the driver:.................................. Date of birth:.................

The whereabouts of the ^ 1:................................ Nationality:................

State plate number:..............

Make and type of vehicle................ Distinguishing sign of the State:................

The status of the odometer of the vehicle:..............



The vehicle operator:

Name/first name or names and surname: ^ 2................................

Head Office/place of residence, ^ 1, ^ 2:................................

IDENTIFICATION NUMBER/social security number or date of birth ^ 2:................



The shipper of the cargo:

Name/first name or names and surname: ^ 2................................

Head Office/place of residence, ^ 1, ^ 2:................................................

IČO: ................



The records indicate the authorisation of special use (if issued)................



-----------------------------------------------------------------------------------------------------------------------

Instantaneous mass maximum allowable axle load exceeded by.........% where the axle



Č. 1 ............. kg ............... kg ......... kg .........

Č. 2 ............. kg ............... kg ......... kg..........

Č. 3 ............. kg ............... kg ......... kg .........

Č. 4 ............. kg ............... kg ......... kg .........

Č. 5 ............. kg ............... kg ......... kg .........

Č. 6 ............. kg ............... kg ......... kg .........

-----------------------------------------------------------------------------------------------------------------------


Instantaneous mass of the maximum allowable weight on axle group exceeded by.........% accounted for by the Group of axles



Č. 1 ............. kg ............... kg ......... kg .........

Č. 2 ............. kg ............... kg ......... kg .........

Č. 3 ............. kg ............... kg ......... kg .........

Č. 4 ............. kg ............... kg ......... kg .........

Č. 5 ............. kg ............... kg ......... kg .........

Č. 6 ............. kg ............... kg ......... kg .........

-----------------------------------------------------------------------------------------------------------------------

Instantaneous mass of the vehicle exceeded the maximum allowable weight of.........% of the vehicle



............. kg ............... kg ......... kg .........

-----------------------------------------------------------------------------------------------------------------------



Vehicle dimensions including cargo found..............................



Exceeded:................



Check weighing (name or names and surname):



............................................. Signature...............



Checkweighing participated: (name or names and surname of the competent representative of the owner of the infrastructure

or its designee or of the County, a dear, or its authorized person):



............................................. Signature...............



Method of payment of costs associated with low speed control weighing..............



Expression of the driver of the vehicle to the content of the document:..............



Signature of the driver and the confirmation receipt one copy of the document:..............



Proof of completion of the low speed control dear comprising day............................ "h.



------------------------

Notes:

1) place of residence means the address of the place of permanent or other residence or residence abroad

2 relevant data) to be completed with regard to whether it is a legal entity or a natural person entrepreneur

or in the case of a natural person



2. the form of the document of the high-speed checkweighing



Evidence of the result of high-speed checkweighing



Day................ "h. was conducted on ... ... ... ... (infrastructure category)............, in km

................. high speed check weighing weight for high speed control

Dear manufacturer/type designation................. serial number ... ... ... ... ... ... ...



These data have been identified:

State registration number of the vehicle or combination of vehicles where the tractor:..............

Make and type of vehicle.............. Distinguishing sign of the State:..............

Registration plate of the trailer:..............

Make and type of vehicle.............. Distinguishing sign of the State:..............



The vehicle operator:

Name/first name or names and surname: ^ 2............................

Head Office/place of residence, ^ 1, ^ 2:.............................

IDENTIFICATION NUMBER/social security number or date of narození2:..............



-----------------------------------------------------------------------------------------------------------------------

Instantaneous mass maximum allowable axle load exceeded by.........% where the axle



Č. 1 ............. kg ............... kg ......... kg .........

Č. 2 ............. kg ............... kg ......... kg..........

Č. 3 ............. kg ............... kg ......... kg .........

Č. 4 ............. kg ............... kg ......... kg .........

Č. 5 ............. kg ............... kg ......... kg .........

Č. 6 ............. kg ............... kg ......... kg .........

-----------------------------------------------------------------------------------------------------------------------

Instantaneous mass of the maximum allowable weight on axle group exceeded by.........% attributable to the Group of axles



Č. 1 ............. kg ............... kg ......... kg .........

Č. 2 ............. kg ............... kg ......... kg .........

Č. 3 ............. kg ............... kg ......... kg .........

Č. 4 ............. kg ............... kg ......... kg .........

Č. 5 ............. kg ............... kg ......... kg .........

Č. 6 ............. kg ............... kg ......... kg .........

-----------------------------------------------------------------------------------------------------------------------

Instantaneous mass of the vehicle exceeded the maximum allowable weight of.........% of the vehicle



............. kg ............... kg ......... kg .........

-----------------------------------------------------------------------------------------------------------------------



Photo documentation of places performing high-speed control weighing:



Photos of the vehicle or combination of vehicles where the tractor and its vehicle registration plates:...............

Photos of the trailer and its vehicle registration plates:...............

High speed check weighing indication (the owner of the infrastructure or its designee or region,

the weighing, or its designee):...............



The person issuing the document (name or names, last name, and the signature of the authorised person of the owner of the infrastructure

or its designee or of the County, a dear, or its authorized person):



.............................. Signature:...............



Method of payment of the costs associated with high-speed control weighing...............



Evidence of the result of high-speed checkweighing comprising day.............................. "h.



------------------------

Notes:

1) place of residence means the address of the place of permanent or other residence or residence abroad

2 relevant data) to be completed with regard to whether it is a legal entity or a natural person entrepreneur

or in the case of a natural person



Č. 11



The minimum range of safety inspection



1. An examination of the available traffic engineering characteristics (for example,

speed, density, intensity)



2. Examination of the width arrangement of space communication, including how

ensure the transition of the communication to a developed territory



3. assessment of the horizontal and vertical



4. consideration of the arrangement of the junction (rozhledové ratios, connection and

junction bars) and movements of vehicles in the intersection



5. assessment of the status of the road and road side (e.g. skid properties

drainage, surface quality)



6. assessment of parking and parking spaces



7. the assessment of the correctness of the use and implementation of road markings and

Accessories communications including light device

used to control the operation of the transit section of the highways and roads



8. assessment of lighting



9. assessment of existing fixed barriers and applications passive elements

Safety (e.g., supporting structure, foliage, advertising equipment,

dangerous ditch shape, guard rails, railings)



10. evaluation of the safety of all road users, and

visibility under different conditions (e.g. darkness, weather conditions)



11. the assessment of railway level crossings (e.g., vertical and horizontal transport

marking, rozhledové ratios, the angle of the crossing, level crossing safety

device)



12. the assessment of the impact of the work on the communication on road safety

operation



13. the conclusions and recommendations.



Č. 12



The minimum scope of the audit of the safety of road infrastructure



I. criteria for assessing the design intent documentation



1. Clear and the overall situation of the construction of communication, seasonal and climate

conditions and weather conditions



2. assessment of the arrangement of junctions and level crossings (such as

railway crossings) and their distance



3. assessment of the width arrangement of space communication



4. the assessment of the suitability of the chosen communication design category in the light of

on the downstream sections of the song, and the intensity and the expected traffic



5. assessment of the way in the integration of the building into the existing network,

including the impact on the security of communications



6. assessment of the basic traffic engineering characteristics of the proposed

buildings (for example, speed, density, intensity)



7. the assessment of the horizontal and vertical alignment and their combinations



8. Examination of the sight



9. evaluation method of communication to ensure the transition to the built

the territory of the



10. assessment of the needs of all road users (pedestrians,

cyclists, motorcyclists, drivers of cars and trucks and people with

limited mobility)



11. the assessment of the impact of public transportation options



II. criteria for the assessment of the design of the project documentation



1. assessment of the parameters of the design elements, including grading and

drainage



2. assessment of the accuracy, consistency and logical continuity of the vertical and

the horizontal road markings, including the assessment of the possibilities of overtaking



3. Examination of the sight



4. assessment of the immediate vicinity of communication and solid objects



5. assessment of lighting



6. Assessment of green



7. evaluation of the needs of all road users (pedestrians,

cyclists, motorcyclists, drivers of cars and trucks and people with


limited mobility)



8. assessment of parking and parking areas



9. the assessment of applications the passive safety elements (for example, the Central

the dividing strip and inhibitions against collisions to prevent risks for

vulnerable road users)



10. the assessment of possible local and transitional arrangements for communication



11. assessment of the results of the previous phase of the audit of the safety ground

communication



III. criteria for the assessment carried out of the building for trial operation



1. evaluation of the safety of all road users, and

visibility under different conditions (e.g. darkness, weather conditions)



2. assessment of the correctness of the use and implementation of road markings and

Accessories communications including light device

used to control the operation of the transit section of the highways and roads



3. assessment of the status of the road



4. Examination of the drainage



5. assessment of existing hard barriers



6. Verification of visibility and sight



7. the assessment of applications for passive safety elements



8. assessment of the implementation of elements of the Green



9. the assessment of the results of the previous phases of the audit of the safety ground

communication



IV. criteria for the assessment of completed constructions for occupancy



1. the overall assessment of the road safety



2. the situation of broader relations, communication



3. assessment of the needs of all road users (pedestrians,

cyclists, motorcyclists, drivers of cars and trucks and people with

limited mobility)



4. Examination of the visibility and sight



5. evaluation of the immediate vicinity of communication and solid objects



6. assessment of the application of the elements of passive safety



7. the assessment of the accuracy, consistency and logical traffic signs



8. assessment of the results of the previous phases of the audit of the safety ground

communication



Selected provisions of the novel



Article II of Decree No. 490/2005 Sb.



Transitional provision



Construction management relating to constructions odpočívek commenced prior to the effective

the Decree shall be completed according to the existing legislation.



§ 10 Decree No. 9/2015 Sb.



Transitional provision



The existing credentials to exercise State supervision over local roads and

public-purpose communications in the form of a licence issued

in accordance with the specimen in annex No 9 of Decree No. 104/1997 Coll., as amended by

effective before the date of entry into force of this Decree shall remain in

validity until 31 December 2004. December 2017.



1) European Agreement on main international traffic roads (AGR-

Geneva 1975).



2) Federal Ministry of the Interior Decree No. 99/1989 Coll., on

road safety rules (rules of the road

operation), as amended.



3) section 117 of the Act No. 50/1976 Coll., on zoning and the building code

(the building Act), as amended.



3A) for example, Act No. 239/2000 Coll., on the integrated rescue system

and amending certain laws, Act No. 240/2000 Coll., on crisis management and

on amendments to certain acts (the crisis Act), Act No. 242/2000 Coll., on the

economic measures for crisis States and amending certain

related laws.



4) § 139 paragraph 2. 3 of Act No. 50/1976 Sb.



6) for example. Act No. 50/1976 Coll., as amended, Decree

The Ministry of economy no 174/1994 Coll., laying down the General

the technical requirements that protect persons with limited use of buildings

mobility, the Ministry of transport Decree No.

177/1995 Coll. issuing the construction and technical regulations.



7) section 5 of Act No. 17/1992 Coll., on the environment.



8) Eg. Act No. 114/1992 Coll., on nature and landscape protection, law No.

244/1992 Coll., on the assessment of the effects on the environment, Act No.

138/1973 Coll. on waters (Water Act), as subsequently amended,

Law No. 289/1995 Coll., on forests, and amending and supplementing certain laws

(forest law), Act No. 20/1966 Coll., on the health care of the people, as amended by

amended.



8A) for example, the Decree of the Ministry for regional development no 369/2001 Coll.

General technical requirements of use of buildings belonging to the

persons with reduced mobility.



9) of the directive of the Federal Ministry of Defense and the Federal Ministry of

transport for the construction of permanent facilities on the road to destruction

No. 01115-25-81, as amended by Supplements No. 07012/15-88 and no. 013012/1-91.



10) Ministerial Decree No. 341/2002 Coll., concerning the approval of

technical competence and the technical conditions of the use of vehicles on

road traffic, as amended by Decree No. 100/2003 Coll.



11) Eg. Act No. 455/1991 Coll., on trades

(Trade Act), as amended.



12) Eg. Act No. 266/1994 Coll., on rail, law No 222/1994 Coll., on

terms and conditions of business and the performance of State administration in the energy sectors

and the State Energy inspection, Act No. 138/1973 Coll., as amended by

amended, Act No. 44/1988 Coll., on the protection and use of

mineral wealth (the top Act), as amended, the law

No 110/1964 Coll. on telecommunications, as amended,

Law No. 20/1987 Coll. on State heritage preservation, as amended

legislation, Act No. 50/1976 Coll., as amended.



12A) § 2 (2). 1 (b). b) of law no 344/1992 Coll., on the land

real estate United States (Land Registry Act), as amended

regulations.



13) section 3 of the Act No. 117/1995 Coll., on inland navigation.



14) § 8 of Decree No. 222/1995 Coll., on waterways, shipping traffic

in the ports, common accident and transport of dangerous goods.



15) Decree No. 177/1995 Sb.



16) Ministry of industry and trade Decree No. 345/2002 Coll., which

provides for mandatory verification of measuring instruments and gauges subject to approval

type, as amended.



17) Act No. 361/2000 Coll. on road safety and on

amendments to certain laws (road traffic law), as amended by

amended.



18) Act No. 506/1990 Coll., on weights and measures, as amended.