499/2006 Sb.
DECREE
of 10 June 1999. November 2006
a documentation of buildings
Change: 62/Sb.
Ministry for regional development shall determine pursuant to section 193 of the Act No. 183/2006
Coll., on zoning and the building code (the building Act):
§ 1
the title launched
(1) this Ordinance shall determine the scope and content of the
and) documentation for a decision on the location of the building or facility,
(b) documentation for the issue) the decision to change land use,
(c) documentation for the issue) the decision to change the impact of the use of the building on
territory,
d) common documentation common area decision and
a building permit,
e) project documentation for construction of the notification referred to in § 104 paragraph. 1
(a). a) to (e)) of the building code or design documentation for issuance of the
a building permit,
(f)) for the implementation of construction and documentation
g) documentation of the actual construction.
(2) this Decree also provides for requirements documentation demolition,
the content requirements for the building of the journal, a simple record of the structure and
the way their leadership.
(3) this Ordinance shall not apply to the project documentation for construction
air, railway and construction on the runway, including equipment on the runway, buildings
highways, roads, local roads and public purpose
communications pursuant to section 194 (a). (c)) to the building Act.
§ 1a
Documentation for the issuance of the decision on the location of the building or facility
(§ 86 para. 7 of the building Act)
The scope and content of the dossier for the issuance of the decision on the location of the building or
the device is set out in annex 1 to this notice.
section 1b
Documentation for the decision about the change of land use
(§ 86 para. 7 of the building Act)
The scope and content of the documentation for the decision about the change of land use
is set out in annex 2 to this Decree.
§ 1 c
Documentation for the issuance of the decision to change the influence of the use of the construction works on the territory of the
(§ 86 para. 7 of the building Act)
The scope and content of the documents for the issuance of the decision to change the influence of the use of
construction in the territories is set out in annex 3 to this notice.
§ 1 d
Common documentation for issuance of zoning and planning decision and joint
a building permit
(Section 94a 7 construction law)
The scope and content of a joint common spatial documentation
decision and building permit is set out in annex 4 to this
the Decree.
§ 2
Project documentation
(§ 105 para. 8 and section 110 (5) of the building Act)
The scope and content of the project documentation for construction of the Declaration referred to in §
paragraph 104. 1 (b). a) to (e)) of the building Act or building
authorization is set out in annex 5 to this Decree.
§ 3
Documentation for the execution of the project
(§ 134 para. 6 of the construction Act)
The scope and content of the project documentation for implementation of construction is determined by the
in annex 6 to this Ordinance.
§ 4
Documentation of the actual construction
(§ 125 (6) for the building of the Act)
(1) the scope and content of the documentation of the actual construction is determined by the
in Appendix 7 to this Decree.
(2) documentation of the actual construction can consist of copies of certified
project documentation, supplemented by drawings of the derogations, provided that this does not prejudice the
clarity and readability of the documentation.
§ 5
Demolition documentation
(Section 128 paragraph 8 for the building of the Act)
Demolition documentation requirements set out in annex 8 to this
the Decree.
§ 6
Construction journal, and a simple record of the construction
(To § 157 (4) of the building Act)
The content requirements for the building of the journal and a simple record of the construction
and the way their guidance set out in annex 9 to this Decree.
Transitional and final provisions
§ 7
This Ordinance shall not apply to the documentation referred to in § 2, 3, or section 5,
assessed after 1. January 2007, if they have been processed, mostly before the date
entry into force of this Decree.
§ 8
This Decree shall enter into force on 1 January 2000. January 1, 2007.
Minister:
Mgr. Gandalovič in r.
Č. 1
The scope and content of the dossier for the issuance of the decision on the location of the building or
device
The documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) drawing documentation
E Book part
The documentation must always include parts A to E, with the scope and content of
the various parts will be adapted to the nature and size of the construction or
equipment (hereinafter referred to as "building") and the conditions in the territory.
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land),
(c)) the subject of documentation.
A.1.2. Information on the applicant
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b) main) name and surname of the designer, including the number, under which the
registered in the register of authorized people led by Czech architects
or the Czech Chamber of authorised engineers and technicians active in
construction, with the declared scope or specialization of its authorization,
(c)) first and last names of designers of different parts, including documentation
numbers under which are entered in a register kept by the authorized persons
The Czech Chamber of architects or the Czech Chamber of authorised engineers and
technicians in the construction, with the declared scope, where appropriate,
a specialization of their authorization.
And 2 a list of input documents
And 3 information on the territory
and the solution to the range of the territory;) built-up/undeveloped territory,
(b) the present use and built-up areas) of the territory,
(c) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
d) details of the runoff ratios
e) data on the line with the spatial planning documentation, with the objectives and tasks of the
town and country planning,
(f) General) information on the requirements for the use of the territory,
g) data on the meet the requirements of the bodies concerned,
h) exception list, and úlevových solutions
I) list of related and underlying investments
j) list of land and buildings affected by the location of buildings (according to the cadastre
real estate).
And 4 information about construction
and new construction) or change the finished structure,
(b) the purpose of use of construction works,)
c) permanent or temporary building,
(d) protection of data on buildings) under other legislation (^ 1) cultural
Monument etc.),
(e) compliance with) the data on technical requirements for the construction and General
belonging to the barrier-free use of the technical requirements of buildings,
f) data on compliance with the requirements of the concerned bodies and the requirements
from other legislation ^ 2)
g) exception list, and úlevových solutions
(h) the proposed capacity building) (built-up area, built-up area,
floor area, number of functional units and their sizes, the number of
users/workers, etc.),
I) basic balance construction (needs and consumption of media and materials,
management of rainwater, the total produced quantity and types of
waste and emissions, etc.),
j) basic assumptions of the construction (the time data on the implementation of the construction work,
breakdown on stage),
indicative costs of the building).
And 5 the breakdown of the construction on the objects and the technical and technological equipment
(B) a summary technical report
(B) a description of the territory of construction 1
and characteristics of building land,)
(b)) and the conclusions of the surveys carried out by the enumeration and analysis (geological survey,
hydrogeological survey, architectural and historical survey, etc.),
(c)) the current protection and safety zones,
(d)) position relative to the záplavovému territory poddolovanému territory, etc.
(e) the construction of the surrounding) the effects of construction and land protection area, the influence of the construction
the flow conditions in the territory,
f) requirements for sanitation, demolition, cutting down trees,
g) requirements for the maximum land agricultural land resources or
the land intended for the performance of the functions of the forest (temporary/permanent),
h) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure),
I) accruals binding construction, contingent upon, developed, related
investment.
(B) a general description of the construction of the 2.
(B) the purpose of use of construction works 2.1, the basic capacity of the functional units
(B). 2.2 the overall urban planning and architectural design
and urban-territorial control), composition space,
(b)) architectural design-composition shape, material and solutions
the color of the solution.
(B) 2.3 Disposition and operational solutions, production technology
(B) the use of the buildings accessible to the disabled.
(B) 2.5 safety during the use of the building
B. technical description Basic construction 2.6
B. 2.7 technical and technological equipment
Equipment solutions, policy needs and consumption of decisive media.
B. 2.8 fire safety solutions
Assessment of technical conditions of fire protection:
calculation and assessment) and odstupových distance and the definition of fire
the danger zone,
(b) ensure the necessary quantity of fire) of water or other extinguishing media,
(c) the estimated construction equipment) dedicated fire-safety
devices, including determination of the requirements for the construction,
(d) evaluation of the access roads) boarding areas for fire
technology including the ability to perform intervention units of fire protection.
B. 2.9 Energy Management Policy
Heat-technical evaluation criteria.
B. 2.10 health requirements for building work and
municipal environment
Resolution policy parameters of the building (ventilation, heating, lighting,
water supply, waste, etc.) and resolution policy construction
around (vibration, noise, dust, etc.).
(B) Protection Policy 2.11 construction before the negative effects of the external environment
The penetration of radon from the ground, wandering streams, seizmicita, noise,
flood protection measures, etc.
(B) 3 connection to the technical infrastructure
and the adjacent places) technical infrastructure, relocation,
b) connecting dimensions, power capacity and length.
B 4 transport solutions
and a description of the transport solutions)
(b)) to the existing territory, transport infrastructure,
(c)) to the right still.
B. related 5 solve vegetation and landscaping
(B) 6 Description of the effects of construction on the environment and its protection
and) impact on the environment-the air, noise, water, waste and soil
b) influence on nature and landscape protection (tree species, protection of protected trees,
protection of plants and animals, etc.), preserving the ecological functions and
linkages in the landscape,
c) influence on the system of protected areas Natura 2000,
(d) taking into account the conditions of) proposal for the conclusion of the fact-finding procedure, or
the opinions of the EIA,
(e)), the proposed conservation and safety zones, the scope of restrictions and conditions
protection under other legislation.
(B) the protection of the population of 7.
Meet the essential requirements in terms of performance of the tasks of the protection
of the population.
(B) 8 principles of organization of construction
and the construction site on) existing transport and technical
infrastructure,
(b) around the construction site and protection) requirements related to the remediation of,
demolition, cutting down trees,
(c) the maximum land for construction site) (temporary/permanent),
(d)) of earthwork, the requirements for the supply or the repository of Earth.
(C) the Situational drawings
C (1) block plan of the wider relations
a) scale 1:1 000 and 1:50 000,
(b) building on the transport) and the technical infrastructure,
c) existing and proposed safeguards and safety zones,
(d) the designation of the boundaries of the territory).
(C) 2 Total block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000,
(b) existing buildings, transport) and technical infrastructure,
c) boundaries,
(d)) the boundaries of the territory being tackled,
e) base and positioning, altimetry
(f)), designed the building,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
h) communications and paved areas,
I) areas of vegetation.
C. 3 Coordinating block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000 for changes to the building, which is a listed building, in the building in the historic
reservation or in the zone at a scale of 1:200,
(b) existing buildings, transport) and technical infrastructure,
(c) the boundaries of the land parcel) number,
(d)) the boundaries of the territory being tackled,
e) existing altimetry and positioning,
f) represent each designed and of buildings and
the technical infrastructure,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
(h)) to the proposed communication and paved area, connection to public transport
infrastructure,
I) solution of vegetation,
j) dimensioned spacing of buildings,
the plot of the new technical infrastructure), the connection of the constructions of the technical
infrastructure,
l) existing and proposed safeguards and safety zones, conservation
reservations, zone, etc.
m) maximum land (temporary/permanent),
n) geodetic data, specify the coordinates of the layout of the network
o) distances including the definition of fire hazardous areas,
access communications and boarding areas for fire equipment and resources
fire water.
(C). 4 the cadastral block plan
and according to the scale used) the cadastral maps,
(b)) the plot of building land, the desired location of the building,
(c)) the designation of the links and impacts on the surrounding area.
C. 5 Special block plan
Drawings, drawn up as appropriate situational awareness in an appropriate scale
showing the special requirements of objects, technological equipment,
technical networks, infrastructure or related engineering
measures.
(D) drawing documentation
D. 1 Distinctive floor plans
D. 2 Characteristic slices
(including the sections documenting the maintenance of existing buildings, in particular with
given the depth of the Foundation of the proposed buildings and structures of existing)
D. 3 views
(including views of documenting the integration of the building into the existing development
or landscape)
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons and documentation processed by persons authorised under other
legislation.
E. 1 Binding opinions, opinions, decisions, opinions of the concerned
authorities
E.2. The opinions of the owners of public transport and technical infrastructure
E.2.1 the opinions of the owners of public transport and technical infrastructure
the possibility and the way of connection, for example, drawing on the situation noted
E.2.2 the opinion of the owner or operator to the conditions for the establishment of a
construction, execution of works and activities in the trade and
security zones under other legislation
E. 3 Document under special legislation ^ 3) to demonstrate the conformity of the
characteristics of a product that performs the function of the building, with construction requirements
pursuant to section 156 of the Act for the building or the technical dossier of the manufacturer or
the importer or any other document from which it is possible to verify compliance with the
requirements for the construction
E. 4 Geodetic basis for project activities handled by other
legislation ^ 4)
E. 5 other opinions, observations, opinions, and the results of the negotiations conducted
during the processing of the dossier
Č. 2
The scope and content of the documentation for the decision about the change of land use
The documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) drawing documentation
E Book part
The documentation must always include parts A to E, with the scope and content of
the various parts will be adapted to the conditions in the territory and nature
the proposed changes.
And the accompanying message
A.1 identification data
A.1.1. Information on the territory
and a proposed change to land use),
(b)) instead of (cadastral area, parcel numbers land),
(c)) the subject of documentation.
A.1.2. Information on the applicant
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b) main) name and surname of the designer, including the number, under which the
registered in the register of authorized people led by Czech architects
or the Czech Chamber of authorised engineers and technicians active in
construction, with the declared scope or specialization of its authorization,
(c)) first and last names of designers of different parts, including documentation
numbers under which are entered in a register kept by the authorized persons
The Czech Chamber of architects or the Czech Chamber of authorised engineers and
technicians in the construction, with the declared scope, where appropriate,
a specialization of their authorization.
And 2 a list of input documents
And 3 information on the territory
and the solution to the range of the territory;) built-up/undeveloped,
(b) the present use and built-up areas) of the territory,
(c) the characteristics of the territory) land and buildings on them,
(d) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
e) data on runoff ratios
f) data on compliance with the spatial planning documentation, with the objectives and tasks of the
town and country planning,
g) data on compliance with the General requirements on the use of the territory,
h) details of the meet the requirements of the bodies concerned,
I) exception list, and úlevových solutions
j) list of related and underlying investments
to) a list of land and buildings affected by a change in land use (according to the
the land registry).
And 4 Information on changing land use
and the total area of the territory concerned),
(b) data on runoff ratios),
(c) transport capacity requirements) and the technical infrastructure,
(d) the estimated period of implementation changes) land use.
(B) a summary technical report
B.1. Description and assessment of the territory
and the characteristics of the territory)
(b)) and the conclusions of the surveys carried out by the enumeration and analysis,
(c)) the current protection and safety zones,
(d)) position relative to the záplavovému territory poddolovanému territory, etc.
e) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure),
(f)) accruals binding, contingent upon, developed, related investments.
(B). 2 description of the proposed changes to land use
basic characteristics of changes) land use,
(b) the justification for the changes) due to the current use of
territory,
(c) ensure the technical conditions) the principles of fire protection in the
territory from the perspective of the presumed mode of land use,
(d) the principle of the protection of the territory) from the negative effects of the external
environment (floods, floods, erosion and landslides, undermining,
seizmicita, radon, noise, emissions, waste, etc.).
(B) 3 connection to the technical infrastructure
B 4 transport solutions
Vegetation b 5 Solutions
(B) a description of the impact of a proposed 6 method of land use on the environment and
its protection
and) impact on the environment-the air, noise, water, waste and soil
b) influence on nature and landscape protection (tree species, protection of protected trees,
protection of plants and animals, etc.), preserving the ecological functions and
linkages in the landscape,
c) influence on the system of protected areas Natura 2000,
(d) taking into account the conditions of) proposal for the conclusion of the fact-finding procedure, or
the opinions of the EIA,
(e)), the proposed conservation and safety zones, the scope of restrictions and conditions
protection under other legislation.
(C) the Situational drawings
C (1) block plan of the wider relations
(e)), scale 1:1 000 and 1:50 000,
(f)) indicate a relationship of the territory to the urban structure of the territory and the
the location of the headquarters.
(C) 2 Total block plan by changing the question
a) scale 1:500 or 1:1, 000, for large plans 1:2 000, or 1
: 5 000,
(b) existing buildings and) technical infrastructure,
(c) the boundaries of the land parcel) number,
(d)) the boundaries of the territory being tackled,
(e)) the existing and proposed altimetry and positioning,
(f) a designation of a connection to transport) and the technical infrastructure,
g) existing and proposed safeguards and safety zones, conservation
reservations, zone, etc.
C. 3 Cadastral block plan
and according to the scale used) the cadastral maps,
(b) the designation of the boundaries of the territory), new uses
(c)) the designation of the links and impacts on the surrounding area.
(D) drawing documentation
Drawings showing the change in land use (drawings in a sufficiently
a clear scale, documenting the overall town planning and
architectural design of the proposed changes to land use; Basic vertical
cuts, documenting the proposed landscaping, the level of existing and
a modified terrain with an indication of the levels of ground water; the plot of the solution
drainage of the territory in the event of changes in runoff ratios, etc.).
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons and documentation processed by persons authorised under other
legislation.
E. 1 Binding opinions, opinions, decisions, opinions of the concerned
authorities
E.2. The opinions of the owners of public transport and technical infrastructure to
conditions of protection and the safety zones, marked
for example, drawing on the situation
E.3. Geodetic basis for project activities handled by other
legislation ^ 4)
E. 4 Other opinions, observations, opinions, and the results of the negotiations conducted
during the processing of the dossier
Č. 3
The scope and content of the documents for the issuance of the decision to change the influence of the use of
construction on the territory of the
The documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) drawing documentation
E Book part
The documentation must always include parts A to E, with the scope and content of
the various parts will be adapted to the conditions in the territory and nature
the proposed changes to the impact of the use of the construction works on the territory.
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land),
(c)) the subject of documentation.
A.1.2. Information on the applicant
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b) main) name and surname of the designer, including the number, under which the
registered in the register of authorized people led by Czech architects
or the Czech Chamber of authorised engineers and technicians active in
construction, with the declared scope or specialization of its authorization,
(c)) first and last names of designers of different parts, including documentation
numbers under which are entered in a register kept by the authorized persons
The Czech Chamber of architects or the Czech Chamber of authorised engineers and
technicians in the construction, with the declared scope, where appropriate,
a specialization of their authorization.
And 2 a list of input documents
And 3 information on the territory and on changing the impact of the use of the construction works on the territory of
and the solution to the range of the territory;) built-up/undeveloped,
(b) the present use and built-up areas) of the territory,
(c) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
d) details of the runoff ratios
e) data on the line with the spatial planning documentation, with the objectives and tasks of the
town and country planning,
(f) General) information on the requirements for the use of the territory,
g) data on the meet the requirements of the bodies concerned,
h) exception list, and úlevových solutions
I) list of related and underlying investments, the requirements for
other decisions or measures,
j) list of land and buildings affected by a change in the impact of the use of the building on
territory (according to the land registry).
And 4 information about construction and change in use of the building
the purpose of use of construction works) (existing and proposed)
(b) permanent or temporary building),
(c) data on the protection of the building) under other legislation (^ 1) cultural
Monument etc.),
(d) compliance with) the data on technical requirements for the construction and General
belonging to the barrier-free use of the technical requirements of buildings,
e) details of the authorities concerned, and compliance requirements
from other legislation ^ 2)
f) exception list, and úlevových solutions
(g)) the proposed amendment to the capacity of the buildings (floor area, number of function
units and their sizes, the number of users/workers, etc.),
(h) the balance of the construction () of the underlying needs and consumption of media and materials, the total
the produced quantities and types of waste and emissions, energy
performance of buildings, etc.),
I) basic assumptions.
And 5 the influence of changes of use the building's justification in the territory
(B) a summary technical report
(B) 1 description of the territory
and the characteristics of the territory)
(b)) and the conclusions of the surveys carried out by the enumeration and analysis,
(c)) the current protection and safety zones,
(d)) position relative to the záplavovému territory poddolovanému territory, etc.
e) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure),
(f)) accruals binding, contingent upon, developed, related investments.
(B). 2 description of the proposed changes to the impact of the use of the construction works on the territory of the
existing and proposed) purpose of use of construction works,
(b)) the principle of protection against negative effects caused by territory, by changing the influence
the use of the building,
(c) assessment of technical conditions) of fire protection in the territory of the
the perspective of the changes in the use of the building.
(B) 3 new demands on the technical infrastructure
and the adjacent places) technical infrastructure, relocation,
b) connecting dimensions, power capacity and length.
(B) 4 new demands for transport infrastructure
and a description of the transport solutions)
(b)) to the existing territory, transport infrastructure,
(c)) to the right still.
B. 5 landscaping and vegetation in the context of the solution by modifying the impact of
the use of the construction works on the territory of the
Data on induced noise control measures-ramparts,
acoustic walls, etc.
(B) a description of the changes to 6 effect of use of the construction on the environment and its
the protection of the
and) impact on the environment-the air, noise, water, waste and soil
b) influence on nature and landscape protection (tree species, protection of protected trees,
protection of plants and animals, etc.), preserving the ecological functions and
linkages in the landscape,
c) influence on the system of protected areas Natura 2000,
(d) taking into account the conditions of) proposal for the conclusion of the fact-finding procedure, or
the opinions of the EIA,
(e)), the proposed conservation and safety zones, the scope of restrictions and conditions
protection under other legislation.
(B) a description of the changes to 7 the impact of use of the construction on the barrier-free use of the building
(C) the Situational drawings
C (1) block plan of the wider relations
a) scale 1:1 000 and 1:50 000,
(b) the designation of the connection of the constructions of the) transport and technical infrastructure,
c) existing and proposed safeguards and safety zones,
(d) the designation of the boundaries of the territory).
(C) 2 Total block plan by changing the question
a) scale 1:500 or 1:1, 000, for large buildings 1:2 000, or 1
: 5 000,
(b) the boundaries of the territory being tackled)
(c) the boundaries of the land parcel) number,
(d) the designation of the connection of the constructions of the) transport and technical infrastructure,
e) existing and proposed safeguards and safety zones, conservation
reservations, zone, etc.
C. 3 Cadastral block plan
and according to the scale used) the cadastral maps,
(b) the designation of the new building) the purpose of use,
(c)) the designation of the links and impacts on the surrounding area.
(D) drawing documentation
Drawings showing the change in the use of the building (floor plans with an indication of
the existing and the proposed manner of use of the individual rooms and the
areas, sections, perspectives).
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons.
E. 1 Binding opinions, opinions, decisions, opinions of the concerned
authorities
E.2. The opinions of the owners of public transport and technical infrastructure to
conditions of protection and the safety zones, marked
for example, drawing on the situation
E. 3 other opinions, observations, opinions, and the results of the negotiations conducted
during the processing of the dossier
Č. 4
The scope and content of a joint common spatial documentation
decision and building permit
Common documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) Documentation of the objects and technical and technological equipment
E Book part
Common documentation must always include parts A to E, with the range
and the content of the various parts will be adapted to the nature and size of the building,
conditions in the territory, construction and technical design, purpose, usage, impact
on the environment and the duration of the construction.
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land),
(c)) the subject of documentation.
A.1.2. Information on the applicant/client
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processors of the common documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b) main) name and surname of the designer, including the number, under which the
registered in the register of authorized people led by Czech architects
or the Czech Chamber of authorised engineers and technicians active in
construction, with the declared scope or specialization of its authorization,
(c)) first and last names of designers of different parts of the common documentation
including the number under which you are enrolled in the register of authorized persons
led by Czech architects or the Czech Chamber of authorized
engineers and technicians active in construction, with the declared scope, where appropriate,
a specialization of their authorization.
And 2 a list of input documents
And 3 information on the territory
and the solution to the range of the territory;) built-up/undeveloped territory,
(b) the present use and built-up areas) of the territory,
(c) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
d) details of the runoff ratios
e) data on the line with the spatial planning documentation, with the objectives and tasks of the
town and country planning,
(f) General) information on the requirements for the use of the territory,
g) data on the meet the requirements of the bodies concerned,
h) exception list, and úlevových solutions
I) list of related and underlying investments
j) list of land and buildings affected by the location and execution of a project
(according to the land registry).
And 4 information about construction
and new construction) or change the finished structure,
(b) the purpose of use of construction works,)
c) permanent or temporary building,
(d) protection of data on buildings) under other legislation (^ 1) cultural
Monument etc.),
(e) compliance with) the data on technical requirements for the construction and General
belonging to the barrier-free use of the technical requirements of buildings,
f) data on compliance with the requirements of the concerned bodies and the requirements
from other legislation ^ 2)
g) exception list, and úlevových solutions
(h) the proposed capacity building) (built-up area, built-up area,
floor area, number of functional units and their sizes, the number of
users/workers, etc.),
I) basic balance construction (needs and consumption of media and materials,
management of rainwater, the total produced quantity and types of
waste and emissions, energy performance of buildings, etc.),
j) basic assumptions of the construction (the time data on the implementation of the construction work,
breakdown on stage),
indicative costs of the building).
And 5 the breakdown of the construction on the objects and the technical and technological equipment
(B) a summary technical report
(B) a description of the territory of construction 1
and characteristics of building land,)
(b)) and the conclusions of the surveys carried out by the enumeration and analysis (geological survey,
hydrogeological survey, architectural and historical survey, etc.),
(c)) the current protection and safety zones,
(d)) position relative to the záplavovému territory poddolovanému territory, etc.
(e) the construction of the surrounding) the effects of construction and land protection area, the influence of the construction
the flow conditions in the territory,
f) requirements for sanitation, demolition, cutting down trees,
g) requirements for the maximum land agricultural land resources or
the land intended for the performance of the functions of the forest (temporary/permanent),
h) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure),
I) accruals binding construction, contingent upon, developed, related
investment.
(B) a general description of the construction of the 2.
(B) the purpose of use of construction works 2.1, the basic capacity of the functional units
(B). 2.2 the overall urban planning and architectural design
and urban-territorial control), composition space,
(b)) architectural design-composition shape, material and solutions
the color of the solution.
(B) 2.3 Overall operational solutions, production technology
(B) the use of the buildings accessible to the disabled.
(B) 2.5 safety during the use of the building
B. basic characteristics of objects 2.6
and building solutions)
(b) structural and material solutions),
c) mechanical resistance and stability.
B. basic characteristics of technical and 2.7 of the technological equipment
and the technical solution)
b) enumeration of technical and technological equipment.
B. 2.8 fire safety solutions
and the Division of buildings and objects) into the fire sections,
(b)) the calculation of the fire risks and determine the degree of fire safety,
(c) the assessment of the proposed structures) and construction products
including the requirements to increase the fire resistance of building structures,
(d) evacuation of persons including) an assessment evaluation of the escape routes,
(e) the assessment distance and odstupových) definition of fire-hazardous
space,
(f) ensure the necessary quantity of fire) of water or other extinguishing media,
including the deployment of internal and external consumption points,
(g)) the appreciation of the design possibilities (firefighting access
communications, emergency trip),
h) an assessment of technical and technological equipment of buildings (distribution
pipes, air handling units),
I) assessment of the security requirements of the building fire safety
devices,
(j)), the scope and the deployment of warning and safety signs and
tables.
B. 2.9 Energy Management Policy
and heat-technical evaluation criteria),
(b) assessment of the use of alternative sources of) energy.
B. 2.10 health requirements for building work and
municipal environment
Resolution policy parameters of the building (ventilation, heating, lighting,
water supply, waste, etc.) and resolution policy construction
around (vibration, noise, dust, etc.).
(B) Protection of construction before 2.11 negative effects of the external environment
and protection against the penetration of radon) from the ground,
b) protection against stray currents,
(c) technical protection seizmicitou),
(d)), noise protection
e) flood control,
(f)) other effects (effect of undermining, the occurrence of methane, etc.).
(B) 3 connection to the technical infrastructure
and the technical infrastructure of the adjacent places),
b) connecting dimensions, power capacity and length.
B 4 transport solutions
and a description of the transport solutions)
(b)) to the existing territory, transport infrastructure,
(c)) the right in a calm,
(d)) walking and cycling trails.
B. related 5 solve vegetation and landscaping
a) landscaping,
(b)) used the vegetation elements
c) biotechnical measures.
(B) 6 Description of the effects of construction on the environment and its protection
and) impact on the environment-the air, noise, water, waste and soil
b) influence on nature and landscape protection (tree species, protection of protected trees,
protection of plants and animals, etc.), preserving the ecological functions and
linkages in the landscape,
c) influence on the system of protected areas Natura 2000,
(d) taking into account the conditions of) proposal for the conclusion of the fact-finding procedure, or
the opinions of the EIA,
(e)), the proposed conservation and safety zones, the scope of restrictions and conditions
protection under other legislation.
(B) the protection of the population of 7.
Meet the essential requirements in terms of performance of the tasks of the protection
of the population.
(B) 8 principles of organization of construction
and critical needs and consumption) of media and materials, their security,
(b) drainage of construction site)
c) connection of the construction site on the existing transport and technical
infrastructure,
(d) the impact on the execution of the project), the surrounding buildings and land,
(e) around the construction site and protection) requirements related to the remediation of,
demolition, cutting down trees,
f) maximum land for construction site (temporary/permanent),
g) maximum produced quantities and types of waste and emissions during construction,
their disposal,
h) earthwork, requirements for the supply or the repository of Earth,
I) environmental protection during the construction,
j) principles of safety and health at work on the construction site,
assess the need for the Coordinator for safety and health at work
under other legislation ^ 5),
to edit for barrier-free use of) the construction of the buildings concerned,
l) policy for traffic engineering measures
m) the determination of the special conditions for the execution of the project (implementation
construction operation, measures against the effects of the external environment when
construction, etc.),
n) construction, partial dates.
(C) the Situational drawings
C (1) block plan of the wider relations
a) scale 1:1 000 and 1:50 000,
(b) building on the transport) and the technical infrastructure,
c) existing and proposed safeguards and safety zones,
(d) the designation of the boundaries of the territory).
(C) 2 Total block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000,
(b) existing buildings, transport) and technical infrastructure,
c) boundaries,
(d)) the boundaries of the territory being tackled,
e) base and positioning, altimetry
(f)), designed the building,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
h) communications and paved areas,
I) areas of vegetation.
C. 3 Coordinating block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000 for changes to the building, which is a listed building, in the building in the historic
reservation or in the zone at a scale of 1:200,
(b) existing buildings, transport) and technical infrastructure,
(c) the boundaries of the land parcel) number,
(d)) the boundaries of the territory being tackled,
e) existing altimetry and positioning,
f) represent each designed and of buildings and
the technical infrastructure,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
(h)) to the proposed communication and paved area, connection to public transport
infrastructure,
I) solution of vegetation,
j) dimensioned spacing of buildings,
the plot of the new technical infrastructure), the connection of the constructions of the technical
infrastructure,
l) existing and proposed safeguards and safety zones, conservation
reservations, zone, etc.
m) maximum land (temporary/permanent),
n) designation of geotechnical probes
about the data, determine the geodetic) coordinates of the layout of the network
p) distances including the definition of fire hazardous areas,
access communications and boarding areas for fire equipment and resources
fire water.
(C). 4 the cadastral block plan
and according to the scale used) the cadastral maps,
(b) the plot of building land) and the proposed building,
(c)) the designation of the links and impacts on the surrounding area.
C. 5 Special block plan
Drawings, drawn up as appropriate situational awareness in an appropriate scale
showing the special requirements of objects, technological equipment,
technical networks, infrastructure or related engineering
measures:
and transportation, including editing) the situation for persons with reduced mobility
and orientation,
(b)) the situation of the vegetation.
(D) Documentation of the objects and technical and technological equipment
Documentation structures, engineering, technical or
technological equipment is processed through the objects and files
technical or technological devices in the following breakdown in
a reasonable range:
(D) 1 of the building or the engineering Documentation object
D. 1.1 architectural-building solutions
and) technical report (architectural, fine art, material, the disposition
and operational solutions, barrier-free use of the work; the design and construction
the technical solution and the technical characteristics of the building; building physics-
thermal technology, lighting, insolation, acoustics/noise, vibration-description
the solution, a statement of the standards).
(b) the Drafting section (s) of the construction trench, floor plans of the foundations, floor plans
individual floors and roofs indicating the dimensions of the main dividing
structures, openings in the peripheral structures and the overall dimensions of the mass
construction; with a description of the purpose of use of the rooms, equipped with automatic surface acreage including the
graphical resolution characteristic material solution basic
structures; characteristic slices are the basic design solutions
including the sections documenting the maintenance of existing buildings, in particular with
given the depth of the Foundation of the proposed buildings and structures existing, with the
number of dimensions linked to the existing terrain including graphic
resolution characteristic material solution basic
structures; views showing the basic height solutions
use of color and characterization of materials surfaces; postcards documenting
the integration of the building into existing buildings or landscapes).
D. 1.2 Design Construction
(a) technical report for a description of the proposed design of the building,
the result of the survey of the current status of the carrying system construction in the design
its amendment; the proposed materials and the main structural elements; the values of the
utility, climate and other loads anticipated in the design of load-bearing
construction; proposal for a special, unusual structures or
technological processes; ensure the construction trench; technological
the conditions for the progress of work that could affect the stability of your own
construction, or neighbouring buildings; guidelines for the implementation of the demolition and
podchycovacích work and the consolidation of structures or penetrations; the requirements of the
on the control of zakrývaných structures; list of supporting documents, standards,
technical regulations, technical literature, computing programs, etc.;
specific requirements for the scope and content of the documentation for the implementation of the
construction, or documentation provided by the contractor).
(b) the Drafting section (s) of the foundations, if these structures are not
displayed in the construction drawings of the foundations; the shape of the monolithic
concrete structures; drawings of parts of prefabricated concrete
construction; layout drawings of metal and wooden structures, etc.).
(c) assessment (validation) static basic conceptual solution support
construction; assessment of the stability of the structure; determining the dimensions of the main
elements of the structure, including its foundation; dynamic calculation, if
on the construction works dynamic loading).
(d)) the control plan (determination of the structure reliability checks
reliability design of the building in terms of their future use).
D. 1.3 fire safety solutions
(a) technical report used documents listing, description, and location of the building
and their objects, Division of works and objects into fire departments,
assessment of the size of the fire departments, fire risk, calculation
determination of the degree of fire safety assessment of proposed construction
structures in terms of fire resistance, including requests to increase the
their fire resistance evaluation of construction products in terms of
classes of reaction to fire, dripping in terms of fire, speed of propagation
the flame on the surface, the appreciation of the evacuation and the determination of the type and number of
escape routes, their capacity, design and facilities, the determination of the
odstupových distance, where appropriate, safety distance and their
appreciation in relation to the surrounding buildings, the definition of fire-hazardous
the space and its evaluation in relation to the surrounding buildings and the neighboring
land, evaluation of the implementation of the intervention, including the definition of the fire
escape routes, the appreciation of the access roads, boarding areas
for fire technology, security building fire water and other
hasebními resources, including the deployment of external and internal consumption
determining the number of places, the species and how the deployment of fire extinguishers,
or other material means of fire protection or fire
techniques, evaluation of technical or technological equipment
construction, assessment of the security requirements of the building fire
safety devices including the conditions and the way they design
location, installing them into the buildings and the determination of requirements for
building construction, the scope and the deployment of warning and
safety signs and tables).
(b) the Drafting section () block plan of fire protection in a scale of 1:500
or 1:1, 000, the floor plans of individual floors with the designation and description
fire departments, in accordance with the requirements of other legislation that
regulates the technical conditions for fire protection).
D. 1.4 Environmental Engineering Technology
The documentation of the individual professions shall designate in technical equipment and systems
details illustrating the compliance with the code of values and legal
regulations. Define the basic material, technical and technological,
disposition and operating characteristics of equipment and systems. Presents the basic
quality and safety requirements for equipment and systems.
The documentation is processed separately for each part (the profession)
According to the specific building characteristics such as:
-sanitary installations,
-air-conditioning and heating, cooling,
-measuring and regulation,
-heavy-current electrical engineering,
-electronic communications and more.
The content and extent of the documentation is processed in accordance with common principles. Will
adapted to the nature and the technical complexity of the buildings and equipment.
The organizational arrangement of the documentation of the individual parts (professions)
expedient to organize under the procedure construction.
In particular, the documentation includes:
(a) technical report listing the standards-standard values and
legislation; the default background and building program; requirements for the profession-
the award, the climate of the site-the calculated parameters
outdoor air-winter/summer; the required climatic conditions-
Winter/summer, minimum health benefits of fresh air, the share of
air circulation; information on the determination of emissions of pollutants and their
the concentration; operating conditions-the number of people, heat loss, heat
loads, etc., operating mode-continuous, intermittent, continuous; Description
the proposed solution and the dimensioning, the description of the functions and arrangement of the installation and
System; the balance of energy, the media and the necessary materials; privacy policy
health, safety in the operation of the equipment; the protection of the
environment, protection against noise and vibration, fire-fighting measures; the requirements of the
on the process of implementation of the work and the conditions of the designer for the realization of works,
putting into service and operation during the lifetime of the building).
(b) the drafting section of the location and arrangement of critical equipment,
machines, basic mechanical components, power sources, etc.;
the basic definition of the area to their location in the building; Basic
the overview diagrams wiring and equipment, basic technology
schemes; floor plans of the Basic pipeline and cable distribution systems in
1-line display, any cuts coordination nodes; the location of the
fixtures; requirements for the construction and solution
Special spaces of the art environment of buildings).
(c)) the list of machinery and equipment and technical specifications (a list of
the critical machinery and equipment, the essential mechanical components,
energy sources, etc.; description of the basic technical and performance
parameters and related requests).
D. 2 Documentation technical and technological equipment
The building can be, depending on the nature, broken down into operating units, which are further
divided into operational files and partial operational or functional files files.
Technological equipment are the manufacturing and nonmanufacturing.
Non-productive technological equipment are e.g.:
-power cord and wiring all the technical infrastructure
(electric energy, electronic communications, gas,
heating plants, media distribution systems, etc.) including related equipment,
-shifting management of the technical infrastructure,
-device, vertical and horizontal transport of persons and goods, equipment
for the transport of persons with reduced mobility, evacuation
or fire equipment,
-dedicated technical equipment,
-dedicated fire-safety devices and more.
The documentation is processed by the operational or functional
files and devices.
The following content and extent of the documentation is listed as maximum and
the specific case will be adapted to the nature and the technical complexity of
the construction. Characteristics:
(a) technical report description of the program for non-production structures;
description of the purpose, the list of supporting documents; description of the technological process
production, the need for materials, raw materials and the quantity of the products, the basic composition
technological equipment-purpose, description and basic parameters of, description
warehouse management and material handling requirements for the manufacture,
internal and external transport, the impact of technological equipment for construction
the solution, the data about the need for energy, fuels, water and other media, including
requirements and places the connection).
(b)) the drafting section (contains only the position and arrangement of the decisive
equipment, machinery, basic mechanical components, energy sources
, etc.; the basic definition of the area to their location in the building,
basic overview diagrams wiring and fittings, floor plans of the basic
pipe and cable distribution systems in 1-line display, any cuts
coordination nodes, building requirements and solutions special
areas of technological equipment, whose layout is
usually a part of construction drawings; the basic technology
documenting the purpose of the schemes and the level of the proposed manufacturing process,
the layout and location of the main machinery and equipment and the way they
installation-floor plans, sections, usually at a scale of 1:100).
(c)) the list of machinery and equipment and technical specifications (a list of
the critical machinery and equipment, the essential mechanical components,
energy sources, etc.; description of the basic technical and performance
parameters and related requests).
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons and documentation processed by persons authorised under other
legislation.
E. 1 Binding opinions, opinions, decisions, opinions of the concerned
authorities
E.2. The opinions of the owners of public transport and technical infrastructure
E.2.1 the opinions of the owners of public transport and technical infrastructure
the possibility and the way of connection, for example, drawing on the situation noted
E.2.2 the opinion of the owner or operator to the conditions for the establishment of a
construction, execution of works and activities in the trade and
security zones under other legislation
E.3. Geodetic basis for project activities handled by other
legislation ^ 4)
E. 4 project processed Mining Designer ^ 6)
E. 5 energy performance of the building according to the law on the management
energy ^ 7)
E. 6 other opinions, observations, opinions, and the results of the negotiations conducted
during the processing of the dossier
Č. 5
The scope and content of the project documentation for construction of the Declaration referred to in §
paragraph 104. 1 (b). a) to (e)) of the building Act or building
enable
Project documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) Documentation of the objects and technical and technological equipment
E Book part
Project documentation must always include parts A to E, with the
the scope and content of the various parts will be adapted to the nature and importance of
the building, its location, constructional and technical implementation, use,
impact on the environment and the duration of the construction.
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land),
(c)) the subject of the project documentation.
And data on the client;
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor project documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b) main) name and surname of the designer, including the number, under which the
registered in the register of authorized people led by Czech architects
or the Czech Chamber of authorised engineers and technicians active in
construction, with the declared scope or specialization of its authorization,
(c)) first and last names of designers of different parts of project
documentation including the number under which you are enrolled on the register
authorized people led by Czech architects or the Czech
Chamber of Chartered Engineers and technicians active in construction, with
indicate the scope, where appropriate, specialising their authorization.
And 2 a list of input documents
And 3 information on the territory
and the solution to the range of the territory)
(b) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
(c) data on runoff ratios),
d) details of the conformity with the spatial planning documentation, if it has not been released
planning decision or territorial measures, where applicable, the absence of a territorial
consent,
e) details of the conformity with the land use decision or public-law agreement
land use planning decision or approval of the replacement, or with
the regulatory plan, to the extent in which replaces territorial decision, and in
case of a change in the use of the prerequisites for the adjustment of the construction details of the
its consistency with spatial planning documentation,
(f) General) information on the requirements for the use of the territory,
g) data on the meet the requirements of the bodies concerned,
h) exception list, and úlevových solutions
I) list of related and underlying investments
j) list of land and buildings concerned by any construction (according to the cadastre
real estate).
And 4 information about construction
and new construction) or change the finished structure,
(b) the purpose of use of construction works,)
c) permanent or temporary building,
(d) protection of data on buildings) under other legislation (^ 1) cultural
Monument etc.),
(e) compliance with) the data on technical requirements for the construction and General
belonging to the barrier-free use of the technical requirements of buildings,
f) data on compliance with the requirements of the concerned bodies and the requirements
from other legislation ^ 2)
g) exception list, and úlevových solutions
(h) the proposed capacity building) (built-up area, built-up area,
floor area, number of functional units and their sizes, the number of
users/workers, etc.),
I) basic balance construction (needs and consumption of media and materials,
management of rainwater, the total produced quantity and types of
waste and emissions, energy performance of buildings, etc.),
j) basic assumptions of the construction (the time data on the implementation of the construction work,
breakdown on stage),
indicative costs of the building).
And 5 the breakdown of the construction on the objects and the technical and technological equipment
(B) a summary technical report
(B) a description of the territory of construction 1
and characteristics of building land,)
(b)) and the conclusions of the surveys carried out by the enumeration and analysis (geological survey,
hydrogeological survey, architectural and historical survey, etc.),
(c)) the current protection and safety zones,
(d)) position relative to the záplavovému territory poddolovanému territory, etc.
(e) the construction of the surrounding) the effects of construction and land protection area, the influence of the construction
the flow conditions in the territory,
f) requirements for sanitation, demolition, cutting down trees,
g) requirements for the maximum land agricultural land resources or
the land intended for the performance of the functions of the forest (temporary/permanent),
h) territorial technical conditions (in particular, the possibility of connection to the existing
transport and technical infrastructure),
I) accruals binding construction, contingent upon, developed, related
investment.
(B) a general description of the construction of the 2.
(B) the purpose of use of construction works 2.1, the basic capacity of the functional units
(B). 2.2 the overall urban planning and architectural design
and urban-territorial control), composition space,
(b)) architectural design-composition shape, material and solutions
the color of the solution.
(B) 2.3 Overall operational solutions, production technology
(B) the use of the buildings accessible to the disabled.
(B) 2.5 safety during the use of the building
B. basic characteristics of objects 2.6
and building solutions)
(b) structural and material solutions),
c) mechanical resistance and stability.
B. basic characteristics of technical and 2.7 of the technological equipment
and the technical solution)
b) enumeration of technical and technological equipment.
B. 2.8 fire safety solutions
and the Division of buildings and objects) into the fire sections,
(b)) the calculation of the fire risks and determine the degree of fire safety,
(c) the assessment of the proposed structures) and construction products
including the requirements to increase the fire resistance of building structures,
(d) evacuation of persons including) an assessment evaluation of the escape routes,
(e) the assessment distance and odstupových) definition of fire-hazardous
space,
(f) ensure the necessary quantity of fire) of water or other extinguishing media,
including the deployment of internal and external consumption points,
(g)) the appreciation of the design possibilities (firefighting access
communications, emergency trip),
h) an assessment of technical and technological equipment of buildings (distribution
pipes, air handling units),
I) assessment of the security requirements of the building fire safety
devices,
(j)), the scope and the deployment of warning and safety signs and
tables.
B. 2.9 Energy Management Policy
and heat-technical evaluation criteria),
(b)) the energy performance of buildings,
(c) assessment of the use of alternative sources of) energy.
B. 2.10 health requirements for building work and
municipal environment
Resolution policy parameters of the building (ventilation, heating, lighting,
water supply, waste, etc.) and resolution policy construction
around (vibration, noise, dust, etc.).
(B) Protection of construction before 2.11 negative effects of the external environment
and protection against the penetration of radon) from the ground,
b) protection against stray currents,
(c) technical protection seizmicitou),
(d)), noise protection
e) flood protection measures.
(B) 3 connection to the technical infrastructure
and the technical infrastructure of the adjacent places),
b) connecting dimensions, power capacity and length.
B 4 transport solutions
and a description of the transport solutions)
(b)) to the existing territory, transport infrastructure,
(c)) the right in a calm,
(d)) walking and cycling trails.
B. related 5 solve vegetation and landscaping
a) landscaping,
(b)) used the vegetation elements
c) biotechnical measures.
(B) 6 Description of the effects of construction on the environment and its protection
and) affect construction on the environment-the air, noise, water, waste and
soil,
(b) the impact of the construction on nature) and landscape (protection of species, protection of protected
trees, protection of flora and fauna, etc.), the preservation of ecological
functions and relations in the countryside,
(c) the impact of the construction on the system) protected areas Natura 2000,
(d) taking into account the conditions of) proposal for the conclusion of the fact-finding procedure, or
the opinions of the EIA,
(e)), the proposed conservation and safety zones, the scope of restrictions and conditions
protection under other legislation.
(B) the protection of the population of 7.
Meet the essential requirements in terms of performance of the tasks of the protection
of the population.
(B) 8 principles of organization of construction
and critical needs and consumption) of media and materials, their security,
(b) drainage of construction site)
c) connection of the construction site on the existing transport and technical
infrastructure,
(d) the impact on the execution of the project), the surrounding buildings and land,
(e) around the construction site and protection) requirements related to the remediation of,
demolition, cutting down trees,
f) maximum land for construction site (temporary/permanent),
g) maximum produced quantities and types of waste and emissions during construction,
their disposal,
h) earthwork, requirements for the supply or the repository of Earth,
I) environmental protection during the construction,
j) principles of safety and health at work on the construction site,
assess the need for the Coordinator for safety and health at work
under other legislation ^ 5),
to edit for barrier-free use of) the construction of the buildings concerned,
l) policy for the engineering measures,
m) the determination of the special conditions for the execution of the project (implementation
construction operation, measures against the effects of the external environment when
construction, etc.),
n) construction, partial dates.
(C) the Situational drawings
C (1) block plan of the wider relations
a) scale 1:1 000 and 1:50 000,
(b) building on the transport) and the technical infrastructure,
c) existing and proposed safeguards and safety zones,
(d) the designation of the boundaries of the territory).
(C) 2 Total block plan of the building
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000,
(b) existing buildings, transport) and technical infrastructure,
c) boundaries,
(d)) the boundaries of the territory being tackled,
e) base and positioning, altimetry
(f)), designed the building,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
h) communications and paved areas,
I) areas of vegetation.
(C) Coordination of the situation 3.
a) scale 1:200 or 1:1, 000, for large buildings 1:2 000, or 1
: 5 000, for changes to the building, which is a listed building, in the building
the conservation reserve or historic in scale of 1:200,
(b) existing buildings, transport) and technical infrastructure,
(c) the boundaries of the land parcel) number,
(d)) the boundaries of the territory being tackled,
e) existing altimetry and positioning,
f) represent each designed and of buildings and
the technical infrastructure,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
(h)) to the proposed communication and paved area, connection to public transport
infrastructure,
I) solution of vegetation,
j) dimensioned spacing of buildings,
the plot of the new technical infrastructure), the connection of the constructions of the technical
infrastructure,
l) existing and proposed safeguards and safety zones, conservation
reservations, zone, etc.
m) maximum land (temporary/permanent land),
n) designation of geotechnical probes
about the data, determine the geodetic) coordinates of the layout of the network
p) distances including the definition of fire hazardous areas,
access communications and boarding areas for fire equipment and resources
fire water.
(C). 4 the cadastral block plan
and according to the scale used) the cadastral maps,
(b) the proposed building, plot)
(c)) the designation of the links and impacts on the surrounding area.
C. 5 a special situational drawings
Drawings, drawn up as appropriate situational awareness in an appropriate scale
showing the special requirements of objects, technological equipment,
technical networks, infrastructure or related engineering
measures:
and transportation, including editing) the situation for persons with reduced mobility
and orientation,
(b)) the situation of the vegetation.
(D) Documentation of the objects and technical and technological equipment
Documentation structures, engineering, technical or
technological equipment is processed through the objects and files
technical or technological devices in the following breakdown in
a reasonable range:
(D) 1 of the building or the engineering Documentation object
D. 1.1 architectural-building solutions
and) technical report (architectural, fine art, material, the disposition
and operational solutions, barrier-free use of the work; the design and construction
the technical solution and the technical characteristics of the building; building physics-
thermal technology, lighting, insolation, acoustics/noise, vibration-description
the solution, a statement of the standards).
(b) the Drafting section (s) of the construction trench; floor plans the foundations, floor plans
individual floors and roofs indicating the dimensions of the main dividing
structures, openings in the peripheral structures and the overall dimensions of the mass
construction; with a description of the purpose of use of the rooms, equipped with automatic surface acreage including the
graphical resolution characteristic material solution basic
structures; characteristic slices are the basic design solutions
including the sections documenting the maintenance of existing buildings, in particular with
given the depth of the Foundation of the proposed buildings and structures existing, with the
number of dimensions linked to the existing terrain including graphic
resolution characteristic material solution basic
structures; views showing the basic height solutions
use of color and characterization of materials surfaces; postcards documenting
the integration of the building into existing buildings or landscapes).
D. 1.2 Design Construction
(a) technical report for a description of the proposed design of the building,
the result of the survey of the current status of the carrying system construction in the design
its amendment; the proposed materials and the main structural elements; the values of the
utility, climate and other loads anticipated in the design of load-bearing
construction; proposal for a special, unusual structures or
technological processes; ensure the construction trench; technological
the conditions for the progress of work that could affect the stability of your own
construction, or neighbouring buildings; guidelines for the implementation of the demolition and
podchycovacích work and the consolidation of structures or penetrations; the requirements of the
on the control of zakrývaných structures; list of supporting documents, standards,
technical regulations, technical literature, computing programs, etc.;
specific requirements for the scope and content of the documentation for the implementation of the
construction, or documentation provided by the contractor).
(b) the Drafting section (s) of the foundations, if these structures are not
displayed in the construction drawings of the foundations; the shape of the monolithic
concrete structures; drawings of parts of prefabricated concrete
construction; layout drawings of metal and wooden structures, etc.).
(c) assessment (validation) static basic conceptual solution support
construction; assessment of the stability of the structure; determining the dimensions of the main
elements of the structure, including its foundation; dynamic calculation, if
on the construction works dynamic loading).
(d)) the control plan (determination of the structure reliability checks
reliability design of the building in terms of their future use).
D. 1.3 fire safety solutions
(a) technical report used documents listing, description, and location of the building
and their objects, Division of works and objects into fire departments,
assessment of the size of the fire departments, fire risk, calculation
determination of the degree of fire safety assessment of proposed construction
structures in terms of fire resistance, including requests to increase the
their fire resistance evaluation of construction products in terms of
classes of reaction to fire, dripping in terms of fire, speed of propagation
the flame on the surface, the appreciation of the evacuation and the determination of the type and number of
escape routes, their capacity, design and facilities, the determination of the
odstupových distances, respectively. safety distances and their
appreciation in relation to the surrounding buildings, the definition of fire-hazardous
the space and its evaluation in relation to the surrounding buildings and the neighboring
land, evaluation of the implementation of the intervention, including the definition of the fire
escape routes, the appreciation of the access roads, boarding areas
for fire technology, security building fire water and other
hasebními resources, including the deployment of external and internal consumption
determining the number of places, the species and how the deployment of fire extinguishers,
or other material means of fire protection or fire
techniques, evaluation of technical or technological equipment
construction, assessment of the security requirements of the building fire
safety devices including the conditions and the way they design
location, installing them into the buildings and the determination of requirements for
building construction, the scope and the deployment of warning and
safety signs and tables).
(b) the Drafting section () block plan of fire protection in a scale of 1:500
or 1:1, 000, the floor plans of individual floors with the designation and description
fire departments, in accordance with the requirements of other legislation that
regulates the technical conditions for fire protection).
D. 1.4 Environmental Engineering Technology
The documentation of the individual professions shall designate in technical equipment and systems
details illustrating the compliance with the code of values and legal
regulations. Define the basic material, technical and technological,
disposition and operating characteristics of equipment and systems. Presents the basic
quality and safety requirements for equipment and systems.
The documentation is processed separately for each part (the profession)
According to the specific building characteristics such as:
-sanitary installations,
-air-conditioning and heating, cooling,
-measuring and regulation,
-heavy-current electrical engineering,
-electronic communications and more.
The content and extent of the documentation is processed in accordance with common principles. Will
adapted to the nature and the technical complexity of the buildings and equipment.
The organizational arrangement of the documentation of the individual parts (professions)
expedient to organize under the procedure construction.
In particular, the documentation includes:
(a) technical report listing the standards-standard values and
legislation; the default background and building program; requirements for the profession-
the award, the climate of the site-the calculated parameters
outdoor air-winter/summer; the required climatic conditions-
Winter/summer, minimum health benefits of fresh air, the share of
air circulation; information on the determination of emissions of pollutants and their
the concentration; operating conditions-the number of people, heat loss, heat
loads, etc., operating mode-continuous, intermittent, continuous; Description
the proposed solution and the dimensioning, the description of the functions and arrangement of the installation and
System; the balance of energy, the media and the necessary materials; privacy policy
health, safety in the operation of the equipment; the protection of the
environment, protection against noise and vibration, fire-fighting measures; the requirements of the
on the process of implementation of the work and the conditions of the designer for the realization of works,
putting into service and operation during the lifetime of the building).
(b) the drafting section of the location and arrangement of critical equipment,
machines, basic mechanical components, power sources, etc.;
the basic definition of the area to their location in the building; Basic
the overview diagrams wiring and equipment, basic technology
schemes; floor plans of the Basic pipeline and cable distribution systems in
1-line display, any cuts coordination nodes; the location of the
fixtures; requirements for the construction and solution
Special spaces of the art environment of buildings).
(c)) the list of machinery and equipment and technical specifications
(a list of critical machinery and equipment, basic mechanical
components, power sources, etc.; description of the basic technical and
performance parameters and related requests).
D. 2 Documentation technical and technological equipment
The building can be, depending on the nature, broken down into operating units, which are further
divided into operational files and partial operational or functional files files.
Technological equipment are the manufacturing and nonmanufacturing.
Non-productive technological equipment are e.g.:
-power cord and wiring all the technical infrastructure
(electric energy, electronic communications, gas,
heating plants, media distribution systems, etc.) including related equipment,
-shifting management of the technical infrastructure,
-device, vertical and horizontal transport of persons and goods, equipment
for the transport of persons with reduced mobility, evacuation
or fire equipment,
-dedicated technical equipment,
-dedicated fire-safety devices and more.
The documentation is processed by the operational or functional
files and devices.
The following content and extent of the documentation is listed as maximum and
the specific case will be adapted to the nature and the technical complexity of
the construction. Characteristics:
(a) technical report description of the program for non-production structures;
description of the purpose, the list of supporting documents; description of the technological process
production, the need for materials, raw materials and the quantity of the products, the basic composition
technological equipment-purpose, description and basic parameters of, description
warehouse management and material handling requirements for the manufacture,
internal and external transport, the impact of technological equipment for construction
the solution, the data about the need for energy, fuels, water and other media, including
requirements and places the connection).
(b) the drafting section of the location and arrangement of critical equipment,
machines, basic mechanical components, power sources, etc.;
the basic definition of the area to their location in the building, the basic
the overview diagrams wiring and fittings, floor plans of the Basic pipeline
and cable distribution systems in 1-line display, any cuts
coordination nodes, building requirements and solutions special
areas of technological equipment, whose layout is
usually a part of construction drawings; the basic technology
documenting the purpose of the schemes and the level of the proposed manufacturing process,
the layout and location of the main machinery and equipment and the way they
installation-floor plans, sections, usually at a scale of 1:100).
(c)) the list of machinery and equipment and technical specifications (a list of
the critical machinery and equipment, the essential mechanical components,
energy sources, etc.; description of the basic technical and performance
parameters and related requests).
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons and documentation processed by persons authorised under other
legislation.
E. 1 Binding opinions, opinions, decisions, opinions of the concerned
authorities
E.2. The opinions of the owners of public transport and technical infrastructure
E.2.1 the opinions of the owners of public transport and technical infrastructure
the possibility and the way of connection, for example, drawing on the situation noted
E.2.2 the opinion of the owner or operator to the conditions for the establishment of a
construction, execution of works and activities in the trade and
security zones under other legislation
E.3. Geodetic basis for project activities handled by other
legislation ^ 4)
E. 4 project processed Mining Designer ^ 6)
E. 5 energy performance of the building according to the law on the management
energy ^ 7)
E. 6 other opinions, observations, opinions, and the results of the negotiations conducted
during the processing of the dossier
Annex 6
The scope and content of the dossier for the execution of the project
Project documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) Documentation of the objects and technical and technological equipment
E Book part
Project documentation must always include parts A to E, with the
the scope and content of the various parts will be adapted to the nature and importance of
the building, its location, constructional and technical implementation, use,
impact on the environment and the duration of the construction.
Common principles:
Project documentation for implementation of construction is processed separately
for each building and civil engineering objects and for technology
device.
The approved project documentation for the announcement of the construction, or
building permit for construction of technical infrastructure
not requiring a building permit or notification of documentation
for the issuance of zoning and planning decision or consent.
Project documentation is processed in the details of enabling
draw up an inventory of the works, supplies and services, with a summary of the assessment.
Project documentation includes technical characteristics, descriptions and
conditions for the implementation of the works.
Detail drawings (detail) binding for the vendor displayed, or
dimensionally complex structures (elements), which puts the designer specific
requirements and that must be respected in the implementation of the construction.
Part of the project documentation for implementation of construction it is not documentation
for odd jobs and construction, production and technical documentation,
documentation of the products to the construction, drawings and installation
documentation. If it is necessary to handle any of these documents,
It is always a part of contractor documents.
Processing plan for safety and health at work on the construction site
other legislation regulates the ^ 5) (plan for safety and health at
work on the site is not included in this annex).
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land).
And data on the client;
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor project documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name or the name of the
(legal person), corporate ID, if allocated, the address of the registered office,
(b) main) name and surname of the designer, including the number, under which the
registered in the register of authorized people led by Czech architects
or the Czech Chamber of authorised engineers and technicians active in
construction, with the declared scope or specialization of its authorization,
(c)) first and last names of designers of different parts of project
documentation including the number under which you are enrolled on the register
authorized people led by Czech architects or the Czech
Chamber of Chartered Engineers and technicians active in construction, with
indicate the scope, where appropriate, specialising their authorization.
And 2 a list of input documents
and) basic information about the decisions or measures on the
the basis of the construction was allowed (the designation/name of the Office building
authorized inspector, date and reference number of the decision
or measures),
(b)) basic information about the documentation or the project documentation, the
the basis was prepared project documentation for implementation
the construction work,
(c)) for more handouts.
And 3 information on the territory
and the solution to the range of the territory)
(b) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
(c) data on runoff ratios),
d) details of the conformity with the spatial planning documentation, if it has not been released
planning decision or territorial measures, where applicable, the absence of a territorial
consent,
e) details of the conformity with the land use decision or public-law agreement
land use planning decision or approval of the replacement, or with
the regulatory plan, to the extent in which replaces territorial decision, with
the authorization of the construction, and in case of a change in the underlying editing
the use of the construction details of its compliance with the spatial planning documentation,
(f) General) information on the requirements for the use of the territory,
g) data on the meet the requirements of the bodies concerned,
h) exception list, and úlevových solutions
I) list of related and underlying investments
j) list of land and buildings concerned by any construction (according to the cadastre
real estate).
And 4 information about construction
and new construction) or change the finished structure,
(b) the purpose of use of construction works,)
c) permanent or temporary building,
(d) protection of data on buildings) under other legislation (^ 1) cultural
Monument etc.),
(e) compliance with) the data on technical requirements for the construction and General
belonging to the barrier-free use of the technical requirements of buildings,
f) data on compliance with the requirements of the concerned bodies and the requirements
from other legislation ^ 2)
g) exception list, and úlevových solutions
(h) the proposed capacity building) (built-up area, built-up area,
floor area, number of functional units and their sizes, the number of
users/workers, etc.),
I) basic balance construction (needs and consumption of media and materials,
management of rainwater, the total produced quantity and types of
waste and emissions, energy performance of buildings, etc.),
j) basic assumptions of the construction (the time data on the implementation of the construction work,
breakdown on stage),
indicative costs of the building).
And 5 the breakdown of the construction on the objects and the technical and technological equipment
(B) a summary technical report
The points will be taken from the project documentation for the report
construction or building permit for construction of the technical
infrastructure not requiring a building permit or notification will be
taken from the documentation for issuance of zoning and planning decision or territorial
consent, where revisions and additions to them
result:
a) requirements for the processing of vendor documentation,
b) processing requirements plan for safety and health at work
on the construction site,
(c)) the conditions of implementation work will be carried out in the trade or
security zones, the other structures,
d) special conditions and requirements for the Organization of the construction site and the implementation of the
work on it, resulting in particular from the nature of the works, property
a building site or a builder's requirements on the implementation of construction, etc.,
(e)) environment protection during construction.
(C) the Situational drawings
C (1) block plan of the wider relations
a) scale 1:1 000 and 1:50 000,
(b) building on the transport) and the technical infrastructure,
c) existing and proposed safeguards and safety zones,
(d) the designation of the boundaries of the territory).
(C) 2 Total block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000,
(b) existing buildings, transport) and technical infrastructure,
c) boundaries,
(d)) the boundaries of the territory being tackled,
e) base and positioning, altimetry
(f)), designed the building,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
h) communications and paved areas,
I) areas of vegetation.
C. 3 Coordinating block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000 for changes to the building, which is a listed building, in the building in the historic
reservation or in the zone at a scale of 1:200,
(b) existing buildings, transport) and technical infrastructure,
(c) the boundaries of the land parcel) number,
(d)) the boundaries of the territory being tackled,
e) existing altimetry and positioning,
f) represent each designed and of buildings and
the technical infrastructure,
g) determination of altitude 1. floor in buildings (+-0, 00) and
the height of the modified terrain; the maximum height of buildings,
(h)) to the proposed communication and paved area, connection to public transport
infrastructure,
I) solution of vegetation,
j) dimensioned spacing of buildings,
the plot of the new technical infrastructure), the connection of the constructions of the technical
infrastructure,
l) existing and proposed safeguards and safety zones, conservation
reservations, zone, etc.
m) maximum land (temporary/permanent),
n) designation of geotechnical probes
about the data, determine the geodetic) coordinates of the layout of the network
p) distances including the definition of fire hazardous areas,
access communications and boarding areas for fire equipment and resources
fire water.
(D) Documentation of the objects and technical and technological equipment
Documentation structures, engineering, technical or
technological equipment is processed through the objects and files
technical and technological devices in the following breakdown in
a reasonable range:
(D) 1 of the building or the engineering Documentation object
D. 1.1 architectural-building solutions
(a) technical report the purpose of an object, function, capacity data;
architectural, fine art, material and layout
barrier-free use of the work; the total service solutions, technology
production; the design and construction technical solutions and technical characteristics
construction; safety in the use of the construction works, health and work
environment; building physics-thermal technology, lighting, sunlight,
Acoustics/noise, vibration-description solutions, energy management, policy
protection of buildings from the negative effects of the external environment; the requirements for the
fire protection of structures; information on the quality of the proposed
materials and the required quality of workmanship; description of non-traditional
technological procedures and the specific requirements for the implementation and quality of the
the proposed structures; the requirements for the drawing up of documentation provided by the
contractor of the construction-the content and scope of manufacturing and shop floor documentation
the contractor; the determination of the required checks and zakrývaných structures
any control measurements and tests, if they are required above
the framework of mandatory-technological regulations and by applicable
standards; a listing of the standards).
(b) the Drafting section (s) of the construction trench, floor plans and foundations-
If they are not contained in part D of the 1.2, floor plans of individual floors with
indicating the dimensions of all structures, openings in structures, with a description of
the purpose of the use of rooms with an areal acreage including the video resolution
the characteristic material solution structures, with a description or
marking of products and links to the details; the characteristic cuts
the basic design solutions, with dimensions related to the
the existing terrain including the video resolution of the characteristic
material solution design; minor cuts to the extent necessary and
scale; drawings of roofs or roof; views on all the faces
the façade with base dimensions height solution related to the
the existing terrain, with an indication of color and characteristics of materials
surfaces).
c) documents the details (of the song structures, lists of parts, products and
the work, a critical detail design and atypical products).
D. 1.2 Design Construction
(a) technical report for a detailed description of the proposed support system construction
resolution of individual structures by type, technology and
the proposed materials; final cross-sectional dimensions of each
structural elements, where appropriate, a reference to the drawings; data on the
anticipated loads in static calculation-stable, usable,
the climate, from antenna systems, extra, etc.; information on the
the quality of the materials proposed; description of non-traditional technology
procedures and specific requirements for the implementation and quality of the proposed
structures; ensure the construction trench; the determination of the required checks
zakrývaných structures and any control measurement and testing, if
are required, beyond the mandatory-laid down by the competent
technological regulations and standards; in the case of alterations to existing buildings-
description of the construction, its current status, technological process with
calling attention to the necessary measures to maintain the stability and loading capacity of the own
construction, or immediately adjacent objects; the requirements for the
elaboration of documentation provided by the contractor of the construction-content and
range, the minimum load carrying capacity, which must
construction must comply; fire protection requirements for structures; for a list of
used documents-regulations, standards, literature, computing programs
, etc.; safety requirements in the implementation of load-bearing structures-link
the appropriate regulations and standards).
(b)) detailed static calculation
Static calculation must be controlled, must therefore be clear to
It was possible to track the progress of the calculation, design load, the considered
static schema, and computational model.
The static calculation of the documentation for the construction is based on the
the static calculation, referred to in the preceding stage of project
documentation. Is a complete basis for the drawing up of technical specifications
components and drawings for construction.
Provides sizing of all structures that are part of the
the documentation provided by the contractor of the construction (drawings of concrete
monolithic and prefabricated structures, supply documentation
metal and wooden structures). Detailed static calculation contains
in particular, the accompanying message to the static (dynamic) calculation, briefly
book to recap the basic concept of the solution structure and the differences from the
the preliminary calculation, which was drawn up in the framework of the previous grade
project documentation; supporting documents-used standards, legislation, literature,
computer programs, etc.; static schema design; data on the
materials and technologies; recap of the load, load
including load factors and combinations of factors; models of computation,
Computational schemes; design and assessment of all support elements; the calculation of the
effects on the fundamentals, dimensioning of the Foundation; the design and
the assessment of all of the details of Assembly, contacts, etc., that the decisive
way affect the safety of the structure; the production process-casting,
the formwork, Assembly, prestressing, backfilling the completed structures
etc.
(c) the Drafting section (s) of the floor plans of supporting structures in the scale of 1:
50, 1:100, including the folded down slices; the corresponding slices
views and details with the necessary accuracy display; from the drawings must
be clearly identifiable shape design, all construction elements
and details; drawings of the monolithic or prefabricated area
the foundations, pile foundations and base grid, if these constructs
are not sufficiently concise way shown in construction drawings
the foundations; the details of the contacts, anchoring, etc. on a scale of 1:20 or 1:10 or
1:5; Assembly drawings, details, and anchoring of prefabricated
building components, parts of metal, composite or wooden
structures; drawings of the locations of structures containing floor plans and the island
NET, cuts and views of uniquely identifying the support structure with the designation
cross sections of all the elements and details of a structure and its
anchoring; scale/contour drawing of prefabricated building components;
layout drawing of the reinforcement, monolithic concrete structures
containing the views and a sufficient amount of sample lines clearly
determining the quality of concrete and steel, location and cross-sectional area, or
the number of inserts the appropriate profile; layout drawing of the reinforcement is used to
the static calculation as a basis for drawing up the
detailed drawings provided by the contractor of the reinforcement-documentation
of the building).
D. 1.3 fire safety solutions
Revisions and additions to the documentation for the announcement of the construction, or for the issue of
a building permit for construction of technical infrastructure maintenance-
a building permit nor report the revision of and additions to the documentation
zoning and planning decision or consent, including the designation of land use changes in the
fire safety solutions processed the documentation for reporting
construction or building permit for construction of the technical
infrastructure not requiring a building permit nor report in
documentation for issuance of zoning and planning decision or consent.
D. 1.4 Environmental Engineering Technology
The documentation of the individual professions shall designate in technical equipment and systems
details illustrating the compliance with the code of values and legal
regulations. Define the basic material, technical and technological,
disposition and operating characteristics of equipment and systems. Presents the basic
quality and safety requirements for equipment and systems.
The documentation is processed separately for each device characteristics
for example:
-sanitary installations,
-gas sampling device
-air conditioning,
-heating,
-cooling,
-measuring and regulation,
-heavy-current electrical engineering including lightning protection,
-electronic communications and more.
Each part is processed according to common principles. The content and scope of
documentation is provided as a framework and in the particular case will be
adapted to the nature and the technical complexity of the buildings and equipment and
the link to the above profession. If any part of the building
not occur, it will not be included in the documentation. Organisational set-up
documentation professions it is expedient to organize under the procedure construction
and supply chain security. Therefore, it is possible to merge the professions into one
part.
In General (in relation to professions) documentation contains:
and) technical report (technical data that contains basic parameters
the prescriptive requirements for individual professions-balance needs
media and energy pressures, and the network connections types
of the services provided, the amount of waste generated by the operation, including the
waste water treatment, etc.; description of the technical solution, function and arrangement
installation and system; description of the Terminal elements and devices and systems,
plumbing fixtures; the description and conditions of connection to the public or local
the technical infrastructure; principles of safe operation including the protection
people, animals and property before the injury, or from damage; fire
measures, protection against noise and vibration, noise in the inner
and the outdoor environment; the principle of protection of the environment; technical
the calculations demonstrating the safety of the design, if such a calculation is required;
the list of required documents needed for placing the building into use;
a listing of the standards, including the date of issue).
(b) the drafting section (the situation) with the unions and other necessities
profession; or pre-select the longitudinal profiles of connections including the necessary
details; the location of the individual machines and equipment; drawings, floor plans
pipe and cable routes, where appropriate, on each floor;
axonometric view needed, vertical or flat slices, if
cannot be sufficiently indicate the plans; installation drawings and plans;
drawings of pipe and cable routes, including connecting
equipment and instrumentation for measurement and control circuits or management
System; Briefing power scheme, the scheme of earthing and interception
system and others; the arrangement, binding and communication systems; related
for details, if necessary).
(c)) the list of machinery and equipment and technical specifications (a list of machines and
equipment, mechanical components, power sources, etc.; Description
technical and performance parameters and related requirements; lists
material for construction, wiring, pipes, coatings, insulation).
D. 2 Documentation technical and technological equipment
The building can be, depending on the nature, broken down into operating units, which are further
divided into operational files and partial operational or functional files files.
Technological equipment are the manufacturing and nonmanufacturing.
Technological equipment of buildings and public technical infrastructure:
-elevated and underground electronic communication network management
communications, antennas and masts, including mainstays of overhead,
or vytyčovacích points of underground communication lines, phone booth
and towable communication leadership electronic communications networks and
related communications equipment including electric hook-ups,
-underground and above-ground transmission or distribution system management
electricity including supporting points and measuring systems, protective, control,
security, information and telecommunications technology,
-the management of the transmission or distribution system (or flammable gas
liquids) and related technological objects, including systems management,
security, information and telecommunications technology,
-distribution of heat energy and associated technological objects, including
systems management, security, information and telecommunications technology,
-the management of the public lighting network including masts and systems management,
security, information and telecommunications technology,
-building for the production and transformation of energy, with the exception of the construction of the water
works,
-water, sewage and energy connections, including connections construction
and the sampling device
-tanks for liquefied petroleum gases or flammable liquids,
-water tanks or other non-flammable liquids,
-trays for the storage of agricultural products, animal feed and fertilizers,
-the water tank, if it is not a water works,
-water supply network, water-supply, sewerage and drainage networks, wastewater treatment plant
waste water treatment plants, including systems management, security, information and
telecommunications technology.
Non-productive technological equipment are for example:
-device, vertical and horizontal transport of persons and goods, equipment
for the transport of persons with reduced mobility, evacuation
or fire equipment,
-dedicated technical equipment,
-dedicated fire-safety devices and more.
The documentation is processed after individual operating, or functional
files and devices.
The following content and extent of the documentation is listed as maximum and
the specific case will be adapted to the nature and the technical complexity of
the construction. Characteristics:
(a) technical report description of the program for non-production structures;
description of the purpose, the list of supporting documents; description of the technological process
production, the need for materials, raw materials and the quantity of the products, the basic composition
technological equipment-purpose, description and basic parameters of, description
warehouse management and material handling requirements for the manufacture,
internal and external transport, the impact of technological equipment for construction
the solution, the data about the need for energy, fuels, water and other media, including
requirements, and the places of connection; the list of required documents needed for the
putting the building into use; a listing of the standards, including the date of issue).
(b)) the drafting section (contains the location and layout of equipment, machinery,
mechanical components, power sources, etc.; definition of the area to
their placement in the construction, distribution and equipment inventory schemes,
floor plans of pipeline and cable distribution systems and their possible cuts,
the location of the apparatus, appliances and fixtures; the requirements for the
construction and solution of special areas of technological equipment,
the layout is usually a part of the construction drawings;
technological schemes supporting the purpose and the proposed level of
process layout and location of the machinery and equipment and the way they
installation-floor plans and sections in an appropriate scale).
(c)) the list of machinery and equipment and technical specifications (a list of machines and
equipment, mechanical components, power sources, etc.; Description
technical and performance parameters and related requirements; lists
material for construction, wiring, pipes, coatings, insulation).
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons and documentation processed by persons authorised under other
legislation.
E. 1 Layout drawings of the individual objects processed by the other
legislation ^ 4)
E. 2 Project processed Mining Designer ^ 6)
Annex 7
1. scope and content of the documentation of the actual construction
The documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) drawing documentation
(E) the Geodetic part
The documentation must always include parts A to E, with the scope and content of
the various parts will be adapted to the nature and importance of the construction work, its
location, construction-technical design, the purpose of the use, effects on
the environment and duration of construction.
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land).
And the information about the owner;
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b)) first and last name (individual).
And 2 a list of input documents
and) basic information about all decisions or measures
associated with the construction of the Building Authority (designation/name
authorized inspector, date and reference number of the decision
or measures), if these documents have been preserved, indicate the likely
year of completion of construction,
b) basic information on the documentation, project documentation or other
technical documentation (identification, date of issue, identification
about the contractor, documentation), if preserved,
(c)) for more handouts.
And 3 information on the territory
Information about the protection of areas under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected natural areas, the flood
the territory, etc.).
And 4 information about construction
and the purpose of the use of the building,)
(b) permanent or temporary building),
(c) data on the protection of the building) under other legislation (^ 1) cultural
Monument etc.),
(d) capacity building (built-up) area, built-up space, usable
area, number of functional units and their sizes, the number of users/
workers, etc.),
(e) the balance of the construction () of the underlying needs and consumption of media and materials,
management of rainwater, the total produced quantity and types of
waste and emissions, etc.).
(B) a summary technical report
and a general description of the construction) (technical description of the building and its technical
device),
(b) assessment of the existing building) technical state,
c) connection to transport and technical infrastructure,
(d) the protection and safety zones),
(e)) the effects of construction on the environment and the protection of special interests.
(C) the Situational drawings
C. 1 Coordinating block plan
and) scale of 1:200 to 1:1 000, for large buildings 1:2000 or 1:
5 000 for changes to the building, which is a listed building, in the building in the historic
reservation or in the zone at a scale of 1:200,
(b) the boundaries of the land parcel) number,
(c)) the current objects and the plot of the surface characters of engineering
infrastructure,
d) existing altimetry and positioning,
e) determining the altitude; the height of the object,
f) dimensioned spacing of buildings,
g) existing communication and paved area, connection to public transport
infrastructure,
h) the existing vegetation, the staff
I) protective and safety zones, conservation area, a conservation zone
etc.,
j) distances including the definition of fire hazardous areas,
access communications and boarding areas for fire equipment and resources
fire water.
C (2) Cadastral block plan
and according to the scale used) the cadastral maps,
(b) the designation of the buildings)
(c)) the designation of the links and impacts on the surrounding area.
(D) drawing documentation
Construction drawings prepared by the actual construction with
special sections and views, with a description of all the spaces and rooms
under the current method of use and with an indication of their size and
area assessment.
(E) the Geodetic part
Numerical and graphical representation of the results the focus of construction, positioning with
výškopisnými data, survey sketches with figures, a list of
coordinates and heights, and the technical report in accordance with other legal
prescription ^ 8).
2. Simplified documentation (passport)
Simplified documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) a simplified sketch
(D) the Simplified drawing documentation
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land).
And the information about the owner;
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b)) first and last name (individual).
And 2 a list of input documents
and) basic information about all decisions or measures
associated with the construction of the Building Authority (designation/name
authorized inspector, date and reference number of the decision
or measures), if these documents have been preserved, indicate the likely
year of completion of construction,
b) basic information on the documentation, project documentation or other
technical documentation (identification, date of issue, identification
about the contractor, documentation), if preserved,
(c)) for more handouts.
And 3 information on the territory
Information about the protection of areas under other legislation (historical
reservations, heritage zone, the specially protected territories, floodplain
etc.).
And 4 information about construction
and the purpose of the use of the building,)
(b) permanent or temporary building),
(c) data on the protection of the building) under other legislation (^ 1) cultural
Monument etc.),
(d) capacity building (built-up) area, built-up space, usable
area, number of functional units and their sizes, the number of users/
workers, etc.),
(e) the balance of the construction () of the underlying needs and consumption of media and materials,
management of rainwater, the total produced quantity and types of
waste and emissions, etc.).
(B) a summary technical report
and a general description of the construction) (technical description of the building and its technical
device),
(b) assessment of the existing building) technical state,
c) connection to transport and technical infrastructure,
(d) the protection and safety zones),
(e)) the effects of construction on the environment and the protection of special interests.
(C) a simplified sketch
Simplified sketch in scale according to the cadastral maps with
showing the construction.
(D) the Simplified drawing documentation
Simplified drawings of actual construction in scale and
the details relevant to the type and purpose of the work describing how
the use of all spaces and rooms.
Annex 8
Demolition documentation requirements
The documentation contains sections:
And the accompanying message
(B) a summary technical report
(C) the Situational drawings
(D) Documentation
E Book part
The documentation must always include parts A to E, with the scope and content of
the various parts will be adapted to the nature and importance of the construction work, its
the location, size, materials, and construction and technical implementation.
And the accompanying message
A.1 identification data
A.1.1 information about construction
and the name of the building),
(b)) instead of (address, numbers, cadastral, land
the numbers of the land).
And the information about the owner;
and) name, surname and place of residence (individual) or
(b)) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or
(c) the business name or name), registration number, if assigned, registered address
(legal person).
And 1.3 information about the processor documentation
and) the full name, business name, registration number, if assigned, place
business (natural person-entrepreneur) or business name, or the name,
CORPORATE ID, if allocated, the address of the registered office (legal entity),
(b)) first and last name (individual).
And 2 a list of input documents
And 3 information on the territory
and data on the territory) in which the building is located, to be deleted.
(b) information on the protection of the territory) under other legislation (^ 1) Memorial
reservations, heritage zone, the specially protected territories, floodplain
etc.),
c) details of the meet the requirements of the bodies concerned,
(d) a list of adjacent land) necessary to perform demolition
(according to the land registry).
And 4 information about construction
and the nature and purpose of use) the discarded buildings,
(b) the protection of deleted data) construction in accordance with other legal
^ Law 1) (information about the cancellation Declaration for cultural heritage
etc.),
c) details of the meet the requirements of the bodies concerned,
(d)) of existing capacity building (built-up area you want, built-up
space, the number of functional units; for the building containing flats-total
floor area of the building, the number and size of insolvent housing, residential and
useful area of insolvent bytes),
(e) the conditions for the removal of) basic construction-time information about the progress of
work breakdown on stage, indicative costs, projected
the removal of the building.
And 5 the breakdown of the discarded construction
(B) a summary technical report
(B) a description of the territory of construction 1
and characteristics of the built) building land,
(b) the existing protection and safety) zone,
c) its position relative to záplavovému territory poddolovanému territory, etc.
(d) removal of the construction on) the effects of surrounding buildings and land, the protection of the area,
the effect of the removal of buildings on flow conditions,
(e) evaluation of the contamination of the building space) substances harmful for the
the environment in the event of their occurrence,
(f) requirements for cutting down trees),
(g)) accruals links; contingent upon, developed, related investments.
(B) a general description of the construction of the 2.
and a brief description of construction or) engineering objects and their
structures,
(b)) a brief description of technical or technological equipment,
(c) the results of the survey, construction) for the presence of asbestos in the building.
(B) 3 connection to the technical infrastructure
and the technical infrastructure of the adjacent places),
b) connecting dimensions, power capacity and length,
(c)) the way to disconnect.
B. 4 landscaping and vegetation after the removal of the construction solutions
and landscaping) after removal of the buildings,
(b)) used the vegetation elements, biotechnical measures.
B. 5 principles of organization demolition
and critical needs and consumption) media and their collateral,
(b) drainage of construction site)
c) connection of the construction site on the existing transport and technical
infrastructure,
(d) removal of the construction on) the effects of surrounding buildings and land,
(e) the protection around the construction site,)
f) maximum land grab,
g) maximum produced quantities and types of waste and emissions during
removal of construction waste, especially hazardous waste,
way to transport and store them or further use or disposal,
h) protection of the environment while removing the structures,
I) principles of safety and health at work on the construction site,
assess the need for the Coordinator for safety and health at work
under other legislation ^ 6)
j) adjustments for barrier-free use of the buildings affected by the removal of the building,
the traffic engineering policy) measures.
(C) the Situational drawings
C (1) block plan of the wider relations
a) scale 1:500 to 1:50, 000, for the removal of buildings, whose declaration
a cultural monument has been canceled, and the removal of buildings in historic
reservation or in the zone at a scale of 1:200,
(b) building on the transport) and the technical infrastructure,
(c) the protection and safety zones),
(d) the designation of the boundaries of the territory).
C (2) Cadastral block plan
and according to the scale used) the cadastral maps,
(b) designation of building and) engineering of objects
(c) the designation of the effects of the demolition works).
(D) Documentation
Documentation of construction or engineering of objects
object handles the following subdivisions within a reasonable range.
(a) technical report description of the demolition and routing
removal of technical or technological equipment; warning on
Special, unusual design, construction details, technology
procedures, etc.),
(b) the Drafting section (documentation) of the current status of designating links to
the adjacent building, schematic drawings of the procedure of the demolition work, if
not sufficient data in the technical report),
(c)) Static assessment of (static or dynamic analysis to assess the
structural stability during the stages of demolition, or
for the design of temporary support structures).
E Book part
This section contains evidence of compliance with the requirements under other
the legislation issued by the competent administrative authorities or the relevant
persons.
E. 1 Binding opinions, opinions, decisions, opinions of the concerned
authorities
E.2. The opinions of the owners of public transport and technical infrastructure
E.2.1 the opinions of the owners of public transport and technical infrastructure
the options and how to disconnect
E.2.2 the opinion of the owner or operator of the conditions of implementation
work and activities in the trade and the safety zones defined in
other legislation
E. 3 other opinions, observations, opinions, and the results of the negotiations conducted
during the processing of the dossier
Č. 9
The elements and way of management of construction and a simple record of journal
the construction of the
Construction diary
A. identification data
and the name of the building) (or part thereof), in its report, the construction
permits, public contracts or notification of construction project with
the certificate of an authorized officer, the date of their issue, or
reference number,
(b)) instead of buildings,
c) business name, business address or registered office of construction participants
(if a participant is not entered in the commercial register of the construction of its name and
last name):
-contractor (or contractors part)
-Builder (Investor)
-Designer
-poddodavatelů
(d)) first and last names of people belonging to the professional guidance of the implementation
construction in accordance with § 153 building Act with the scope of their permissions, and
liability,
(e)) and last names of the persons carrying out technical supervision of the Commissioner and
author supervision (if these surveys established)
(f)) name, surname and function of other persons authorized to perform
entries in the diary under § 157 paragraph. 2 the building Act,
g) data on the project and other technical documentation for construction, including
any amendments thereto,
h) list or links to documents and papers to the construction (of the Treaty,
permits, approvals, administrative decisions, the reports on inspections,
the tests, test procedures etc.),
I) changes to the contractors of the building or responsible persons during construction.
The person carrying out selected activities in construction pursuant to section 158 of the construction
the law, demonstrate the permission to the performance of these activities, the imprint of their
stamp and signature in the construction of the journal. The same applies when you change these
people in the course of construction.
(B) records in the construction of the journal
1. Regular daily records include:
and) first and last names of persons working at the construction site,
b) climatic conditions (weather, temperature, etc.) on a construction site and its
status,
(c) the description and the quantity) of work performed and Assembly and their timetable,
(d) supplies of materials, products), machinery and equipment for the building, their
storage and installation,
e) deployment automation.
2. Additional records documenting details about these facts:
and the transmission and receipt of the construction site) (between builders and contractors),
(b)), or start of work deadlines and the reasons for their break, and
recovery, including technological breaks
c) musters, execution of works and their poddodavatelů activities,
(d)) and trained workers with conditions of work, safety
fire protection, environmental protection, technological
the procedures of work and Assembly, and to the potential risks in the construction work,
(e)), details of measures on safety and health at
work, fire protection and environmental protection,
(f)) special precautions for demolition work, work at heights,
the operation, in the protection zones, etc.,
g) handling of soils, construction debris and waste management,
h) geodetic measurements,
I) Assembly and dismantling of temporary structures (scaffolding, shoring,
formwork, etc.), its transmission and reception,
(j)) and the use of machinery, traffic,
to) the results of the quantitative and qualitative inspections of supply for
construction (input control);
l) measures to ensure the construction of embedded or stored products
and equipment against damage, theft, etc.,
m) the implementation and the results of inspections of all kinds,
n) consent to the making of the work (the footing bottom, the reinforcement of concrete,
the underground lines, etc.),
about the justification and approval of change) of materials, construction and technical solutions
deviations from a validated project documentation,
p) the fact important for material, time, and financial performance of the contracts
(extra, unpredictable factors, the occurrence of obstacles on the job site
the results of the additional technical surveys, extraordinary climatic influences
the archaeological research, work in service, etc.),
q) partial acceptance of completed works,
r) the implementation and the results of the tests and measurements (technical and technological
equipment, connections, etc.),
with) damage caused by the construction or other activities, accident, accidents,
losses, injuries and other emergencies, including the adopted measures,
t) transmission and acceptance of the work or its comprehensive parts,
u) rectification of defects and arrears,
in the results of verification visits of the building) (section 133 and 134 of the construction
of the Act),
w results of the activities of an authorized inspector),
x) the establishment, operation and removal of the equipment,
s) unforeseen discoveries of culturally valuable items, details of the work or
protected parts of nature or archaeological finds.
C. Management diary
1. Construction diary
and leads from the date) the transmission and receipt of the construction site until the date of completion of the
structures, where appropriate, to eliminate the defects and faulty items identified in the
the inspection tour of the construction,
(b)) must be available on the site at any time in the course of work on the construction site
all eligible persons
(c)) contains the original leaves and the required amount of copy to the departments
to other persons. Has numbered pages and must not be omitted free
space.
2. A record of the progress of work and their contexts are written the same
day, no later than the day on which the construction works. U
technically simple structures, the records may, with the approval of the construction
the Office carried out a maximum for the period of one working week.
3. In the case that all interested persons are the owners of electronic
the signature can be construction lead journal electronically.
A simple record of the construction
A. Table Of Contents
1. A simple record of the building contains
and the name and location of the building) by the announcement of the construction of the building Office, date
Declaration, or. reference number,
(b)) name, surname and residence of the Builder, business name, location
business or the registered office of the designer and the contractor (contractors
parts of buildings); If the designer is not entered in the commercial register of the
name and surname,
(c) validated data) project documentation, construction
(d)) the list of or links to documents, and papers to the construction (consent
the Building Authority, contracts, etc.),
e) records of the course of execution of construction and building-assembly works and
about the facts that influence the making of the work,
f) records of incidents during the construction.
2. record the activity and the circumstances that affect the
and the progress of work and the use of) materials
(b)), to ensure stability, quality and serviceability of the buildings,
(c)) and the use of the safe installation of the technical equipment and functional parts
the construction work,
(d) electrical equipment, testing) review and revision of the pressure equipment,
flues, chimneys, etc.,
(e) the conditions for safe execution of the project) and the protection of health at work,
(f) implementation of trade agreements, arrangements),
g) protection of public interests, the environment, etc.
h) comply with the particulars contained in the Declaration of the building including the audited
project documentation, or the need for small deviations from it.
(B) a simple record of leadership building
1. A simple record of the construction
and runs from) the start of works on the construction site to the completion of construction,
where appropriate, to eliminate the defects and arrears found during inspection
inspection, construction,
(b)) must be made within the scope and in time intervals so that
caught the real progress of the construction.
2. (C). paragraph 2 of this annex applies to the simple record keeping
the construction of the analogy.
Selected provisions of the novel
Article. (II) Decree No. 62/Sb.
Transitional provisions
1. Documentation and design documentation according to § 1a to 5 order, which
has been processed before the date of entry into force of this Decree and submitted to the
building Office until 31 December 2006. December 2014, is judged according to the existing
of the legislation.
2. Project documentation according to § 3 of the decree can be processed according to the
Decree No. 499/2006 Coll., in the version in force until the date of entry into force of this
the Ordinance, if construction will be started not later than 31 December 2006. December 2014.
1) Eg. Law No. 20/1987 Coll. on State heritage preservation, as amended by
amended.
2) Eg. Act No. 18/1997 Coll. on peaceful uses of nuclear energy and
ionizing radiation (the Atomic Act), and amending and supplementing certain
laws, as amended.
3) Law No. 22/1997 Coll., on technical requirements for products and amending
and additions to certain laws, as amended.
4) Government Regulation No. 430/2006 Coll., on the establishment of surveying
reference systems and the national map works on the territory of the State and mandatory
the principles of their use, as amended by Government Decree No. 81/2007 Sb.
section 12 and 13 of Act No. 200/1994 Coll., on surveying and amending and supplementing
Some laws related to its introduction, as amended
regulations.
section 13 of Act No. 31/1995 Coll., implementing Act No. 200/1994 Coll.
about surveying and amending and supplementing certain laws related to
his introduction, as amended.
5) Act No. 309/2006 Coll., to regulate other requirements
safety and health at work in labor relations and
ensure the safety and health activities or the provision of
services outside of the employment relationships Act (to ensure further conditions
safety and health at work), as amended.
6) Act No. 61/1988 Coll. on mining activities, explosives and the State
Mining Administration, as amended.
Decree No 298/2005 Coll., on professional qualifications and requirements
competence in mining activities, or activities carried out
using mining techniques and on amendments to certain laws, as amended by
amended.
7) Act No. 406/2000 Coll. on energy management, as amended
regulations.
8) § 13 para. 5 (b). and) Decree No. 31/1995 Coll., implementing the
Act No. 200/1994 Coll., on surveying and amending and supplementing certain