Advanced Search

Guiyang Construction Of New Residential Buildings In Urban Areas Water Supply Facilities Maintenance Management

Original Language Title: 贵阳市城区居民新建住宅供水设施建设维护管理办法

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

Article 1, in order to regulate the construction, maintenance and management of new residential water facilities for residents of urban areas, to secure water security and to meet the normal water use of users, to develop this approach in line with the provisions of the National People's Republic of China's Urban Water Supply Regulations, the People's Republic of China Regulation for the Management of Goods, the Water Supply Regulations of the Hyin City and the relevant legal regulations.

Article II applies to the construction, maintenance and management of new residential water facilities for residents of the city's administrative region.

Article III of this approach refers to the construction of new homes, including residential commodities, secure housing (two restricted) commodities, economic application of housing, policy rental housing, integral rental housing, and central housing, etc.), integrated buildings and small-scale zones inhabited by residents and public facilities in small-scale areas.

This approach refers to the construction of new residential water supply facilities for residents of the urban area, which is intended to be used as user-owned water pipelines prior to the settlement of the water table, water tanks, pumps, electricity lorages, automated control facilities, distribution facilities, poisoning equipment, stress water containers, settlement of water tables and their subsidiary facilities, and other water facilities that do not contain the provision of equipment, fire fire, heat water, immediate drinking water, and water recycles.

This approach refers to a “one household table” to a single household with a settlement of the water table, where the water table has been installed and the water industry is copied to the household.

Article IV. New residential water facilities for residents of the urban area should be designed, accompanied by construction and delivery, in accordance with the principles of integrated planning design, harmonization of organizational construction and the harmonization of management.

Article 5 The design, construction, probation and operation of new residential water supply facilities (including two water supply) in urban areas should be consistent with national standards, implementation of water industry standards without national standards, and implementation of local standards by national and water supply industries.

Article 6. The urban water supply administration authorities are responsible for monitoring the construction, maintenance and management of new residential water facilities for residents in the urban area.

Sectors such as urban health, housing and rural and urban construction, rural and urban planning, development and reform, quality technical supervision, urban management should be guided by their respective responsibilities by the construction, maintenance and management of new residential water facilities for urban residents.

Article 7 provides for the construction of new residential water supply facilities for residents of the urban water supply administration and urban water providers are responsible for implementation.

The construction of new residential water facilities projects should be carried out in accordance with the relevant provisions.

The new residential development unit of article 9 should be entrusted with the preparation of the proposed construction of the project's municipal water supply performance report, which is submitted to the rural and urban planning sector for approval by law.

The construction of new residential water supply facilities is designed by the development of construction units entrusted with the appropriate qualifications design units and the design of programmes should seek advice from the water supply industry and report the construction map design document to the administrative authorities for housing and urban and rural construction without review or review of inadmissibility.

Article 11. New housing construction units should design and build water supply facilities in accordance with a household table, as required by the water tables.

The construction design map for new residential water facilities was reviewed with qualifications and the construction of the new housing development unit entered into a water facility construction contract under the law with water supply enterprises.

The construction of new dwellings from urban public water pipelines to the construction of water pipes on the margins of the line, as well as the collapse of green procedures and costs, is responsible for the development of construction units.

The development of construction units should provide water facility accommodation, land use and corridors for the duration of the time period, channel the electricity source to the designated location for the construction of water facilities, with separate ITU measurements.

The construction of new residential development units should pay for the construction of water facilities in accordance with the area approved by the construction of construction planning licences.

Maintenance standards for the construction of new residential water facilities for residents of the urban areas are established by law.

Article 15 provides for the payment of two additional incremental costs for the construction of new homes by the top-level building users of two heavy water supplies. The second incremental costs are established by the development and reform sectors, and are managed by water-saving enterprises to households, beds to households, fees to households.

The cost of maintenance of water facilities paid by new residential development units shall not be charged to the purchaser for other costs related to the construction of water facilities after taking into account the cost of construction of new homes.

The construction of new residential water facilities should be centrally managed, with exclusive storage and dedicated to the management of residential water facilities. The municipal audit bodies should monitor the payment and use of water facilities on a regular basis.

Following the completion of the construction of new residential water supply facilities construction work, a water supply contract was signed between water providers and users and harmonized management.

Unless experienced receipts or receipts are not qualified, water facilities cannot be used.

Article 19 Construction units shall apply to the local health administrative authorities for the processing of a water licence prior to the completion of the construction of a new residential water facility, which is eligible for access to the water supply. No water is available without access to a water sanitation permit.

The water supply facility established in accordance with this approach shall be transferred to the integrated management of water supply enterprises by using water points from the urban public water pipeline to the user prior to the water table.

Water-water enterprises should establish a functioning maintenance and management system for the sound water supply facility, strict implementation of the relevant technical standards and operating protocols for the operation of water supply facilities, and guarantee the integrity and operation of water supply facilities.

Article 21 Water-water enterprises should ensure that water supply facilities are processed for 24 hours. When water facilities fail, they should be treated in accordance with prescribed time frames to ensure the proper water use of users.

Article 22 Water providers should establish water complaints systems and make public complaints telephones. Complaints against users should be made within 24 hours of the date of receipt of the complaint and to respond to the user.

Article 23. In the construction and management of new residential water facilities, the relevant departments and their staff have been able toys negligence, abuse of authority, provocative fraud, and to dispose of them by law by the relevant authorities.

Article 24

Article 25

Article 26