Zibo City Archives Management Of Pipeline Engineering (Amended 2004)

Original Language Title: 淄博市城市管线工程档案管理办法(2004年修正本)

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.

(Prelease No. [1999] 189 of 20 November 1999]

Article I, in order to strengthen the management of the urban gateway engineering archives, develops this approach in line with the People's Republic of China Urban Planning Act and the San Oriental Archives Regulations.
Article II of this approach refers to documentation materials that are directly generated in national and social possessions, books, maps, graphs, Voices, Voices, Voices, Voices, Voices, Voices, Voices and Voices, etc.
Article 3 governs the management of the archives of construction works in the urban areas.
Article IV The City Archives are specifically responsible for the operation of the Urban Line Engineering Archives.
The management of the various professional lines should be guided by their respective responsibilities by the establishment of administrative authorities in conjunction with the management of the Urban Line Engineering Archives.
Article 5 activities such as construction, excavations, spoilers, drilling, drilling, etc. in urban roads, various pipelines and their surroundings, and construction units must be identified before the start-up process.
Article 6. Construction, construction units should be constructed in accordance with approved design maps, which would require changes in designs, and should be designed in accordance with regulations and be reflected in the completion map.
Article 7. Priorities for the sub-roitation of the line, the construction unit must entrust the holding of units of the Nationally Harmonized Mapping Licence certificate to complete the survey in accordance with the municipal system.
Article 8. When the construction of the town's Archives is completed, it is important to inform the City's Archives to participate in the important line works, the city's Archives should conduct on-site nuclear tests and the construction units and the related sectors should be synchronized.
Within six months after the completion of the construction process, the construction units shall transfer the following archives to the City Archives:
(i) Construction of engineering plans, planning, design, use, start-up approval documents and other clearance materials;
(ii) Measuring analysis, mapping results and completion measurement data;
(iii) Technical documentation for the construction of the line works and material for the completion of the receipt of documents;
(iv) The completion of the works map;
(v) Other relevant archival information.
Article 10 alterations, abandonments and maintenance of key departments should be revised by construction units and construction units, based on actual changes, and completed by the construction of the engineering archives to the city within three months of completion.
Article 11. The completion of the engineering archives must be complete, accurate, real and clear and reflective of the status quo and be co-signed by the facilitators of the technology of the unit.
Article 12 is not in accordance with the requirements for the completion of the work files, and the establishment of the Archives in the city should be retroactive. Reimbursement is still unqualified and is organized by the establishment of the Archives in the city, which is charged by the construction units.
Article 13
Article 14. The establishment of the Archives in the city should be based on the professional line maps of the gateway engineering archives and the professional gateway management of the receiving embassies, with a timely revision of the comprehensive gateway map and dynamic management of the urban gates archives.
Mapping units should be transferred to the City Archives for the construction of urban gates to 1:500 terrain maps, control results and management measurement results.
The management of the professional line should provide the city's Archives with professional trajectory maps and relevant information, as well as the timely presentation of the current map of the delivery, debriefing and diametering.
Article 15. Urban line surveys are organized by municipal, district-building administrative authorities to detect, measure requirements are borne by the management property rights unit and office and integrated mapping costs are charged from urban maintenance costs.
Article 16 should be kept confidential in the run-line engineering archives, which must be administered in accordance with the relevant national provisions.
Article 17, in violation of the provisions of this approach, is punishable by the establishment of administrative authorities in accordance with the relevant legislation.
Article 18
Article 19 is implemented since the date of publication.