Zhejiang Electric Power Facility Protection (Revised 2005)

Original Language Title: 浙江省电力设施保护办法(2005年修正本)

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
(September 4, 1995, Zhejiang Province people's Government of the 65th, released on October 26, 2005, the Zhejiang Provincial people's Government on changes of Zhejiang Provincial swimming administrative measures 7 revision of the regulatory decision) Chapter I General provisions article for power production and construction of power facilities, according to the State Council for the protection of power facilities Ordinance (hereinafter referred to as the regulations) and the facts of the province, these measures are formulated.
    Article in the province has built or under construction in power generation, transmission, transformation, distribution facilities and ancillary facilities (hereinafter referred to as electric utilities) protection shall comply with the Ordinance and these rules.
    Article III the protection of power facilities, according to the Administrative Division, dominated by blocks, bars combine, implement power authorities, public security organs, people's combined, publicity and education, the strengthening of the principle of combining prevention and governance according to law.
    Article fourth all units and individuals have the obligation to protect the safety of power facilities, have the right to prohibit acts against power facilities, and to report to the electricity sector or public security organs.
    Fifth article County above power competent sector is responsible for this area within of power facilities protection work, its main duties is: (a) supervision, and check Ordinance and this approach of implement implementation situation; (ii) is responsible for power facilities protection of publicity education work; (three) with about sector and units established power facilities protection group anti-organization, and developed and implementation power facilities protection accountability; (four) with sibling police organ is responsible for power facilities of security defend work; (five) law investigation violation Ordinance and this approach of behavior;
    (Vi) the development of technical security measures, promote electric power facilities.
    Power administrative departments at and above the county level law enforcement officials, in accordance with the Ordinance and these rules, the provisions of the performance of their duties, shall produce the certificate of Zhejiang electric power facilities protection law enforcement.
    Sixth levels of public security organ responsible for investigating sabotage power facilities and cases of theft, looting of power facilities.
    Urban construction, planning at all levels, industry and commerce, transport, forestry, land and resources, and other relevant departments, in accordance with their respective responsibilities, in collaboration with power authorities and police protection of power facilities.
    Chapter II protection of power facilities range and reserves clause seventh of power plant and substation facilities protection, apart from the eighth article of the regulations provides, and include the legally approved the construction of a variety of specialized ship berthing areas and related facilities.
    Scope of protection facilities of power lines, according to section Nineth of the Ordinance shall apply. Eighth overhead power line safety width of the protected area, designated in accordance with the following provisions: (a) in the General area power line wire line to the lateral extension of the horizontal safety distance is: 1-10,000 volt 5.35-meter-110,000-volt 220,000-volt 10 m 15 m 500,000 volts, 20 m (b) towns                     , And industrial and mining areas and other populated areas, power lines traverse the sideline after the design maximum (does not include the common distance) to the lateral extension of the minimum safety distance is: 1 to 10,000 volts 1.5 35,000 volts 3 metres 110,000 volts 4 m 220,000 volts, 5 m 500,000 volt
    8.5 meters Nineth article power cable line security reserves of width, in accordance with following provides delineation: (a) underground cable for line sides the extends 0.75 meters by formed of two parallel Zhijian of level security distance; (ii) harbour cable General for line sides the 2 sea (Hong Kong within for sides the 100 meters, beach regional for sides the 25 meters); (three) rivers cable General not is less than line sides the 100 meters (in the, and small river General not is less than the 50 meters).
    Tenth new construction, reconstruction and expansion planning of electric power facilities and programs after they have been approved by law, electric power facilities for urban and Rural Planning Department should be in accordance with approved plans and plans approved by location and boundaries; power authority established by the regulations, in conjunction with relevant departments in electric power facility protection zones.
    Chapter III protection of the 11th people's Governments at various levels of power facilities develop and implement urban and rural planning should be integrating power infrastructure, ensuring the safety of power facilities.
    12th levels of planning, forestry, transportation, urban greening, land and resources department in planning site, afforestation, greening or issuance of mining licenses, relating to electric utilities, should seek the views of power administrative departments.
    13th power facilities property unit at the main power line protection zones boundaries shall be established by the provincial power Department uniform signs. 14th article any units and personal shall not engaged in following against power plant, and substation facilities of behavior: (a) disrupt power plant, and substation of production and work order, or mobile, and damaged power plant, and substation of production facilities, and equipment and security logo real; (ii) in power plant for lost water, and row gray of pipeline, or ditches rims to sides extends 5 meters of regional within take soil, and dug sand, and quarrying, and piling, and drilling and for other mining job, and built buildings, or dumping garbage, and mine ballast and contains acid, and alkali, and
    Salt, chemical corrosion material and the other waste; (three) in power plant cooling tower pool, and cooling pool, and for lost water of pipeline, and ditches of take water mouth to around extends 100 meters of waters within, engaged in fish, and fishing, and swimming, and boating and the other endanger hydraulic buildings security of behavior; (four) unauthorized cut with power plant water, or to water within dumping garbage, and mine ballast, and contains chemical corrosion material of liquid and other waste; (five) effect power plant, and substation of dedicated railway, and highway, and bridge, and terminal of using;
    (Six) in for hydro-electric power factory of reservoir within, into hydraulic buildings to around extends 300 meters of waters within, engaged in fish, and fishing, and swimming, and boating and the other endanger hydraulic buildings security of behavior; (seven) in substation wall to outside extends 5 meters of regional within stacked or burning grain, and forage, and wood, and rice stalk and oil, flammable easy burst items, in substation, and power plant near engaged in pollution power facilities job.
    15th article any units and personal shall not engaged in following against power line facilities of behavior: (a) to power line facilities shooting or throwing objects; (ii) in power line of wire sideline to outside side extends 300 meters of regional within put kite; (three) using Tower, and pull tied livestock, and hanging objects, and clings to crop, and for lifting brake and traction to anchor; (four) in power line Tower, and pull of based protection range within engaged in surrounding (dug) Tang and the this approach 14th article subsection (ii) items provides of behavior;
    (V) between the power-line towers and cable or tower road; (vi) removal of power line towers, pull on the equipment or mobile facilities, damaged power lines, permanent markers and signs.
    The preceding paragraph (d) provides basic protection of power line towers, cable is: 35,000 volts and below, towers, cable extends from the outer edge of the base to around 5 m; 110,000 volts and above, towers, cable extends from the outer edge of the base to around 10 meters.
    16th article in overhead power line reserves within, any units and personal shall not engaged in following behavior: (a) stacked this approach 14th article subsection (seven) items provides of flammable easy burst items, or stacked garbage, and mine ballast, effect security power of items; (ii) burn kiln, and burning, and play, or burning straw,; (three) built buildings; (four) planting natural growth eventually height and power line of wire Zhijian not meet vertical security distance provides of bamboo, and trees.
    17th overhead power line wires and bamboo, trees or other objects vertically between a safe distance, and in the calculation of the maximum after sagging power lines, determined in accordance with the following provisions: 1 to 10,000 volts not less than 3.35-meter to 110,000 volts not less than 4 metres and 220,000 volts not less than 4.5 m 500,000 volts of not less than 7 m
    18th in the underground within the power cable line protection zones shall not be planting trees, or engaged in the article 14th (b) and paragraph (g) provided.
    Article 19th approved by power administrative departments at and above the county level, and after taking reliable safety measures according to the relevant regulations of the State, may engage in the following activities: (a) in the overhead power line protection zones within the farmland capital construction and pile driving, drilling and mining operations, except as otherwise provided in the Ordinance and these rules, and (b) any part of lifting machinery into the overhead power line protection zones and construction; (Three) height and overhead power line of wire Zhijian not meet vertical security distance provides of vehicles and carries objects or other objects, through overhead power line reserves; (four) in power cable line of reserves within job; (five) climbing power line Tower or in overhead power line facilities Shang joins electrical equipment, and erection power communications, and broadcast, and TV line and placed other facilities; (six) retained or planting natural growth eventually height and power line of wire Zhijian meet vertical security distance of bamboo, and
    Trees and other crops.
    Within 300 m of the power facility in the distance (horizontal distance) blasting operations, drafted into the power authority agreed, and reliable security measures. 20th article any units and personal shall not engaged in following against power facilities construction of behavior: (a) occupation law approved of power facilities construction with to; (ii) altered, and mobile, and damaged or removal power facilities construction of measurement standard pile and mark; (three) damage, and seal blocking power plant, and substation and the power facilities construction units of dedicated railway, and highway, and channel, and waters, and dam, and bridge, and Terminal, truncated construction water, and power, and gas source, or hinder power facilities construction units of personnel and vehicles, and mechanical, and equipment, and Equipment to the construction site;

    (Iv) disrupt the power facilities units of production and work order, or destroy vehicles, machinery, equipment, and construction equipment. Article 21st as approved by the Administrative Department for industry and Commerce registered license Enterprise, it shall purchase power facilities and equipment.
    Industrial and commercial administrative departments should be approved at the end of the last quarter of each year buying companies registration copy to the local electricity authorities.
    To purchase power facilities and equipment of the enterprises and other economic organizations shall establish purchase and sales ledger, register to purchase power facilities and equipment specifications, quantity, origin and selling conditions, to retain for future reference.
    22nd power administrative departments and private communication facilities and ancillary facilities of electric power enterprise protection, in accordance with the relevant provisions of laws, regulations and policies of the State. Fourth chapter of electric power facilities and other facilities hamper the 23rd electric power lines and communication lines and other lines, pipes must not hinder each other.
    New wiring, plumbing and the original wiring, plumbing when the inevitable parallel or cross through the new line unit should consult with the original line, and according to the electric power industry, the Ministry of railways, the PLA communications Ministry and issued by the broadcasting service of the overhead power lines close to the weak current lines and cross-device code provisions.
    24th in the overhead power line protection zones of trees and other plants, for security and damaging power lines, power authority shall notify the property management department or individual within a cutting, trimming or to adopt security measures; not in cutting, trimming or to undertake safety measures within a specified period, power authority the right to take enforcement measures.
    25th new construction, renovation or expansion of power facilities, requiring the demolition of buildings, felling trees and removing other facilities, power infrastructure unit should, in consultation with relevant departments, units or individuals, entered into an agreement and in accordance with the relevant provisions of national and provincial procedures are completed.
    Power facilities building, rebuilding, expansion, due to geographical conditions and restrictions access-line corridors, cannot avoid, must go beyond buildings or other facilities, the construction unit should be based on urban and rural planning department approval of alignments, signed an agreement with the relevant departments, units or individuals, and to adopt reliable security measures to ensure that security across the building.
    Fifth chapter legal responsibility 26th article violation this approach 14th article, and 15th article, and 16th article, and 17th article, and 18th article, and 19th article provides of, by power competent sector by following provides for punishment: (a) on endanger power facilities of, by stop invalid or deadline within not corrected of, sentenced 1000 Yuan following of fine; plot serious of, can sentenced 1000 Yuan above 5000 Yuan following of fine.
    (B) has not been damaged power facilities, but endanger the safety of power facilities, Visual plot power administrative departments at and above criticism or fined 30 yuan 1000 Yuan fine; the circumstances are serious, punishable with more than 1000 Yuan fined not more than 5000 Yuan.
    (C) damage to power facilities, the power authority to order damages, and fined 1000 Yuan more than 5000 Yuan fine.
    (Iv) in violation of this article 16th paragraph (d), 19th (SAT) requirement, the power authority ordered to rectify, and fined 1000 Yuan fine; power facility damages caused, to order compensation for loss still do not make the corrections within the time limits, power authorities can force the felling, pruning trees and bamboo.
    (E) violation of these measures article 19th (five) of overhead power lines on the road connecting electrical equipment without approval, ordered to rectify, and fined 1000 Yuan more than 5000 Yuan fines; still do not make the corrections within the time limits, power authorities temporarily stopped power coercive measures can be taken.
    27th in violation of the provisions of article 20th, by the Ministry of land and resources, public security and other departments in accordance with their respective responsibilities, to investigate and punish. 28th article violation this approach provides, has following behavior one of, is enough criminal punishment of, by police organ in accordance with security management punishment legal of provides punishment: (a) damage or disrupt power plant, and substation (station), and scheduling by (room), and power construction site normal of production, and work order, yet caused serious loss of; (ii) refused to, and hinder power sector staff law implementation positions, not using violence, and threat method of; (three) damage, and looting, and theft power facilities equipment, and power plant fuel, and
    Construction of electrical equipment and construction vehicles, machinery, equipment, apparatus, and (d) knowing that it was obtained in violation of power facilities and harbours, destroying, transferring, purchasing, and (v) theft annex or vandalism, street to street; (f) wilful damage to power facilities not having caused serious consequences.
    29th article violates these rules, serious enough to constitute a crime, shall be investigated for criminal responsibility by judicial organs.
    30th article violates these rules, be fined and ordered to pay damages to the unit or individual, must be received fines or pay the compensation within 15th date of decision paid fines and compensation; payment of overdue, from the date of delay is satisfied, plus daily late fee of the total amount of fines and compensation 3%.
    31st damages as compensation for costs of repair costs and protect electricity facilities; a fine management and disposal according to the relevant provisions of the Treasury. 32nd party refuses to accept the decision on administrative penalty may, within 60 days from the date of receipt of the written decision has made the decision of sector-level people's Governments or authorities at a higher level for reconsideration; is not satisfied with the reconsideration decision, from the date of receiving the written reconsideration decision within 15th courts; parties may also directly bring a lawsuit.
    Parties within the statutory time limit does not apply for reconsideration, not prosecution, nor performs the decision from the Department made the decision apply to the people's Court for compulsory execution.
    Reconsideration of the decision on administrative penalty and prosecution, otherwise provided by laws and regulations, from its provisions. Article 33rd power administrative departments at all levels and the departments concerned of the staff, in its work on the protection of power facilities should be devoted to their duties, shall perform their duties.
    For dereliction of duty, abuse of authority or engages in from their work units or higher authorities, impose administrative sanctions constitutes a crime, shall be investigated for criminal responsibility by judicial organs.
    Sixth chapter supplementary articles article 34th province small hydro power facility protection and management of the water conservancy administrative departments at and above the county level in accordance with the measures implemented.
    35th power facility protection work, the costs relating, by power facilities and property units at all levels in accordance with relevant provisions of financial and accounting system of the State expenditures.
              36th these measures come into force on the date of promulgation.