(Adopted at the 5th ordinary meeting of the People's Government of the State of Land on 6 April 2006 [2006], by Order No. 5 of 20 April 2006 of the People's Government of the State of the Interior, No.

Article 1, in order to strengthen the oversight management of the sabotage of fires, ensure that fire relief is removed, prevent and reduce fire hazards, protect public property and the security of citizens' life property, and develop this approach in line with the People's Republic of China Fire Act and the Zantang Province approach to the implementation of the People's Republic of China Fire Act.
Article 2, this approach applies to the management of the management of fire planning and maintenance within the city's administration.
Article 3 of this approach refers to the sterilization of the water supply network, consisting of fire-water devices, such as veterans, water slogans and crusts for fire prevention and rescue, and their subsidiary equipment, including the sabotage of fires constructed by the municipal road, the abundance of units and the slack of fires constructed in the residential area.
Article IV governs the supervision of the entire municipal fire.
The municipal, district and regional public safety firefighting sectors are specifically responsible for the use, management and supervision of fires.
The relevant administrations, such as planning, construction, parking and forestry, should be managed in conjunction with the public safety firefighting sector throughout the city.
Article 5 states that any unit and individual should report to the public safety fire sector in a timely manner on the identification of violations of safety and effective use.
Article 6. Municipal fires should be put in place in strict compliance with the Land Town Fire Plan, with specific planning, construction programmes in the municipal sector, as well as review by the municipal public safety firefighting sector.
Contrarys constructed in the residential area are pushed by the construction units to make specific planning, programming in accordance with the relevant fire industry standards and norms and to report to the municipal public safety firefighting sector for clearance.
Article 7 sabotage and its design of the water line must be in line with the standards for construction of fire safety technologies in the country and in the city.
The construction of fire safety technology standards in the city is developed by the municipal public safety firefighting sector with the planning, construction of the administration.
The construction of the fire sabotage should be carried out in accordance with the design of consents to be reviewed by the public safety firefighting sector; the construction has been completed and the eligible parties have been activated by the security firefighting sector.
The distribution of municipal fires must be in line with the national technical requirements, with a clear signal of the installation and use of the denunciation requirements.
Article 9. The quality of fires should be consistent with national standards or industry standards.
It is prohibited to test qualified fires by testing bodies not established under the product quality law.
Article 10. Municipal fires are thwarted by the public safety firefighting sector to maintain, maintain and replace them.
Article 11. The public safety firefighting sector should be maintained and maintained on a regular basis for municipal fires, which are not less than once a quarter; major holidays or celebrations should be specifically checked once.
In the maintenance, maintenance and inspection, the public safety firefighting sector found that the municipal fire was damaged by spare parts and should be replaced, rehabilitated and ensured the good and effective use of municipal fires.
Article 12
Article 13. The public safety firefighting sector should monitor the management, maintenance and maintenance of fires in units, subsidiaries.
Article 14. The removal or modification of fires for reasons such as urban construction shall be carried out in accordance with the provisions of the fire safety monitoring process, with the consent of the public safety fire service.
No unit or individual shall be damaged or otherwise misappropriated, dismantled, stopped using fires, and shall not be buried, trajectory.
Article 16, in violation of this approach, provides that one of the following acts is punished by the public safety firefighting sector:
(i) The failure of the unit or the property management unit to carry out the responsibility for the management, maintenance and maintenance of the fire sabotage, affecting the normal use of the fire, rendering the period of time correcting; and the warning of its supervisors and direct responsibilities with a fine of up to $200,000.
(ii) Reimbursement, depression or unauthorized misappropriation, dismantlement, suspension of fire blues, order their duration, restatement or compensation for losses; and uncorrected warning of their direct responsibilities and fines of up to $300,000.
Article 17, in violation of other acts under this approach, is punishable by the public safety firefighting sector in accordance with the relevant provisions of the laws, regulations and regulations, such as the People's Republic of China Fire Act.
Article 18 The public safety firefighting sector and its staff misuse their functions, play negligence, favouring private fraud in the management of fire sabotage, are governed by the law by their own units or superior authorities, and criminal responsibility is lawful by law.
Article 19 units and individuals do not impose administrative penalties on the public safety firefighting sector in accordance with this approach, may apply under law for administrative review or administrative proceedings.
Article 20 The Modalities for the management of fires in the city of Land, enacted on 17 November 1980, and the Supplementary Provisions of the Government of the State of the Interior for the Roll Backage Management of the Land State (document Live [1986]82) were repealed simultaneously.