Chapter I General
Article 1, in order to strengthen the management of fire safety monitoring in construction works, to guarantee the lives and property security of the people, to develop this approach in the light of the relevant laws, regulations, such as the People's Republic of China Fire Act, the People's Republic of China Security Production Act, the construction of the Safety Production Regulations.
Article 2 fire safety management activities in construction construction sites, such as construction, alteration, expansion, etc., in the administrative area of the city, should be subject to this approach.
The construction work described in this approach refers to the construction of ground works, construction works, route pipeline works and engineering.
Article 3. The public security authority is the administrative authority for the construction of fire safety in the city. The public safety firefighting agencies are specifically responsible for the day-to-day supervision of the construction of fire safety on the ground.
The executive branch, such as construction, safety and production supervision, should be responsible for the construction of the relevant work on fire safety monitoring, in accordance with their respective statutory responsibilities.
Article IV. Construction units, design units, construction units, engineering units and other units related to the construction of ground fire safety must be subject to fire safety laws, regulations and regulations guaranteeing the safety of fire construction works and assume responsibility for the safety of fire safety on the ground under the law.
Chapter II Liability for fire safety in construction, design, engineering units
Article 5 Construction units should clarify the responsibility of both parties in the area of fire safety management in the construction contract and the letter of responsibility.
Article 6. The construction units shall not impose requirements for units such as design, construction, engineering and engineering administration that are not in compliance with fire safety laws, regulations and mandatory standards and shall not expressly or imply the purchase, lease, use of security protective equipment, mechanical equipment, construction machines and spare parts, facilities and equipment that are not in compliance with fire safety requirements.
Article 7. The construction units shall pay in full and on time the cost of construction safety operations and security construction measures, including requirements for fire safety construction measures.
Article 8 is in line with the construction work of the Emphasis on Fire Safety in the Province of Susang Province, which should ensure that the construction units perform the duties of the fire safety focus unit in accordance with the law and the fire safety responsibilities, fire safety managers are reported to local public safety fire safety firefighting agencies; and the public safety firefighting agencies should be urged to perform the fire safety focus unit.
Article 9 provides for construction of new structures, new materials, new processes and special structures, covering fire safety, and design units should propose measures to prevent fire safety accidents during the construction process.
The design cell shall, at the time of the roll-out of the construction map, provide detailed information on the fire safety and security measures in the construction units, construction units and be confirmed by the parties in accordance with the characteristics of the work.
Article 10 shall be carried out by the engineering inspectorate in accordance with the mandatory standards established by law, regulations and engineering, and the construction units shall be responsible for the safety of the construction site fire safety.
Chapter III Liability for fire safety in construction units
Article 11. Fire safety at construction sites is the responsibility of the construction unit. The construction works are carried out by the overall contractor unit, which should be subject to the overall contractor's fire safety management of the construction site and not subject to management leading to fire safety accidents, with the primary responsibility of the subcontractor.
Article 12 Construction units should develop safety and security programmes for construction on-site fires and include them in construction organization design or construction programmes. The construction fire safety and security programme is supported by the technical staffing of the construction unit and the construction unit is reviewed by the head of the security production.
The implementation of the treasury project should clarify the responsibilities of the parties in implementing the construction of the safety and security programme in the field, and the construction safety and security programme should be confirmed by the PAE. The construction fire safety and security programme should be stored on the construction site.
Article 13. The construction of the safety and security programme on the ground should include the following:
(i) Construction of a safety management system for fire safety on the ground;
(ii) The construction of temporary firefighting corridors, outdoor firewater, indoor fire water and safety evacuation safeguards;
(iii) Concrete construction programmes for temporary buildings such as construction sites, living houses;
(iv) The management system for flammable chemical dangerous products;
(v) The extinguishment of fire, emergency evacuations;
(vi) Training plans for fire safety education;
(vii) Other provisions of the law, regulations.
Article 14. The construction units should establish a robust safety responsibility for fire safety at a level-by-step fire safety and a variety of fire safety management systems, operating protocols, organize regular fire safety inspections of construction works undertaken and track records.
The fire safety management system includes, inter alia, the construction of fire safety management, fire safety inspections, the use of fire clearances on the construction site, the training of fire brigades, material warehouses, charcoal, air conditioners, ITU, edwellers, paints, staff accommodations, fire protection management, etc.
The project manager of the construction unit is specifically responsible for fire safety work on the construction site, the implementation of fire safety responsibilities, fire safety management systems and operational protocols, the elimination of fire safety accidents and the timely and factual reporting of fire safety accidents.
Article 16 Technicians responsible for project management, and prior to construction work, the safety and production technologies for fire safety elements should be included in detail to the construction operation team, operational personnel.
Article 17, the security production management established by the construction unit and the dedicated (a) security manager responsible for overseeing the safety of the construction site fire safety.
Article 18 The construction unit should guarantee the input and effective use of the funds required for the construction of fire safety, and should not be diverted from the procurement and updating of the equipment and facilities that are included in construction work safety operations and security construction measures.
Article 19 The construction units should set clear fire safety alert signs in line with national standards, at the construction site, at the temporary power facility, the foot, the access route, the floor gradient and the location of hazardous items.
Article 20 should ensure that the safe evacuation route within the construction site is in line with fire safety standards and that it is open.
Article 21, construction units should establish office areas for construction sites, living areas and operating areas, as specified. Staff do not be installed in buildings that have not yet been completed.
In the temporary building on the construction site (other than in the living area) the use of electrical heaters and fuel-uses should be in line with fire safety requirements.
The temporary building on the construction site should be in accordance with fire safety requirements and non-use of fuel materials to be constructed and partially separate.
The construction units should establish temporary outdoor firewater, indoor firewater facilities and fire safety corridors in accordance with relevant fire safety standards and the construction of ground fire safety safety programmes.
Indoor firewater and indoor firewater facilities must be fully effective. Until formal firefighting in construction works are deployed to the water system, no demolition or suspension shall be removed.
It is prohibited to block the transit of temporary firefighting routes by slots, slots.
Article 23 provides for a construction of the ground and shall be in line with the relevant standards for fire safety management.
Article 24 provides fire response lighting and fire extinguishing on the construction site, which should be in line with the relevant fire safety standards.
Article 25 Construction units should train fire safety administrators and practitioners in appropriate fire safety education, and education training is recorded in the personal work files. Non-qualified personnel without education training or education training are not allowed to take up the job.
Special practitioners with fire risk, such as electrical and fertile work, should be given evidence in accordance with the relevant provisions.
Article 26, e.g. pyrethroids, requires the use of light fire operations, which should be subject to fire safety provisions and take appropriate fire safety measures, in accordance with pre-empt procedures.
The construction units and the units should also take joint measures to separate the construction area and the use of the area from fire, to guarantee construction and the safety of the range of fires, in addition to the relevant laws, regulations and regulations that have not yet been completed but have already been used by the Department or between the buildings that are co-used by the two units.
Article 27 provides that safety nets, peripheral networks and subsistence materials used on the construction site should be in compliance with fire safety requirements and non-use of fuel materials.
Article 28 should be stored in accordance with the requirements for the safe management of fires in the warehouse, in order to maintain fuel and inflammable construction materials.
Article 29 stores of hazardous items that are vulnerable to fuel explosions should be subject to a dedicated pool of stores in their nature, which should not be stored in construction.
In the course of construction, fire safety measures should be put in place when they use hazardous items that could be fuelled. It is not possible to load and reproduce in operating places, and the use of flammable hazardous items that have been abandoned should be removed in a timely manner.
The use of liquid gas is prohibited in construction works.
Chapter IV Corporal punishment
In violation of this approach, the construction unit failed to guarantee the safe evacuation of the temporary firefighting route and fire safety corridors or that the construction site was not provided with fire-required lighting and fire extinguishing, and was converted by a public safety fire safety fire agency to a fine of up to 2,000.
In violation of this approach, the construction unit consists of one of the following acts, a period of time being converted by a public safety fire agency, a fine of up to two thousand yen:
(i) No temporary firefighting corridors, outdoor fire water sources and indoor fire water supply facilities are required;
(ii) Non-protected temporary outdoor firewater and indoor fire water supply facilities are fully effective or unauthorizedly dismantled;
(iii) The construction rate established on the construction site does not meet the fire-related standards;
(iv) The safety nets used on the construction site, the peripheral network and the saving materials are not in compliance with fire safety requirements or the use of fuel materials;
(v) No fuelable construction material has been stored in accordance with the requirements for fire safety management in the warehouse.
In violation of this approach, there are one of the following acts, which are being converted by the establishment of an administrative authority and may impose a fine of up to two thousand dollars in the unit:
(i) The design units involved fire safety in construction designs using new structures, new materials, new processes and special structures, and do not recommend measures to prevent production safety accidents, including fire safety elements;
(ii) The engineering inspectorate and the custodian do not perform the functions of the Fire Safety Service;
(iii) Technicians responsible for project management are not required to provide fire safety requirements to the construction operation team, operating personnel;
(iv) The accommodation, management and use of office areas installed on the construction site, living areas and operating areas and temporary buildings are not in compliance with fire safety requirements.
Article 33, in violation of the provisions of this approach, provides for sanctions under the laws, regulations and regulations of the People's Republic of China Fire Act, the People's Republic of China Act on Security Production, the construction of the Safety of Engineering and Production Regulations.
Article 34 staff members who have oversight responsibility for the safety of the construction site fire safety, have abuses of their functions, omissions, provocative fraud and administrative disposition by their units or superior authorities; constitutes an offence punishable by law.
Chapter V
Article XV does not apply to the safe management of fire safety in the construction of low-scale homes by farmers.
Article 36 Safety management of fire safety at the military construction work site is carried out in accordance with the relevant provisions of the Central Military Commission.
Article 37 of this approach was implemented effective 1 March 2008.