Administrative Measures On Construction Site Wall Set In Anshan City

Original Language Title: 鞍山市建筑工程施工现场围挡设置管理办法

Read the untranslated law here: http://www.chinalaw.gov.cn/article/fgkd/xfg/dfzfgz/201209/20120900376462.shtml

Administrative measures on construction site wall set in Anshan city

    (March 22, 2012, Anshan city, 14th session of the Standing Committee of the people's Government of the 134th review through May 6, 2012, Anshan city people's Government announced come into force on the date of promulgation, 174th) Chapter I General provisions

    First to strengthen the management of construction site wall set, improving urban management, in accordance with the regulations on safety production management of construction project and the construction market management regulations of Liaoning province and Anshan city construction site management regulations and other relevant provisions, based on actual city, these measures are formulated.

    Anshan city, the second urban area construction site walls set and management activities to apply this approach.

    Third construction site walls in these measures include building, rebuilding, expansion construction site walls and down chop block and building block construction site wall.

    Fourth municipal urban and rural construction Committee (hereinafter referred to as the municipal construction Committee) is a construction site wall management administrative departments, is responsible for the oversight and management of the construction site walls set.

    Fifth construction project legal person wall unit is responsible for the construction site set up and maintenance.

    Sixth construction construction site walls set management should follow the same leadership, principles of territorial responsibility, supervision, self-discipline of enterprise.

    Chapter II wall set of types and standards

    Seventh architectural engineering construction site must be set continuous closed walls.

     Construction site walls set according to the set criteria are divided into four types: (A)-landscape walls.

    With an angle (square) steel skeleton structure panels using galvanized iron making, surface of promotional fabrics, brick and brick wall tiling to beautify the surface treatment.

    Standard one: 5 meters high and 8 meters wide, 8 metres per interval set 1000mmx600mm brick or reinforced concrete columns, walls set high 800mm bricks in a row at the bottom.

    Standard two: 4 meters high and 6 meters wide, each 6 m intervals set 800mmx600mm brick or reinforced concrete columns, walls set high 800mm bricks in a row at the bottom. (B) combine color wall plate.

    Using light steel skeleton structure panels using color plates, brick and brick wall tiling to beautify the surface treatment.

    Standard: 3 meters high and 4 meters wide, each 4 m intervals set 400mmx400mm brick, walls set high 500mm bricks in a row at the bottom. (C) the brick walls.

    Wall beautification lateral whole tiles or inkjet printer.

    Standard: 3 meters high, brick wall thickness of not less than 240mm, 100mm thick on the top eaves, each 4 m intervals set 400mmx400mm brick. (D) temporary walls.

    Use of light steel skeleton structure, Panel with color steel plate continuous sets.

    Standard: height of 2.5 meters.

    Article eighth the following regions and places should be set different types of walls at construction site:

    (A) the station area to the construction site by landscape wall standard setting.

    (B) on both sides of the main road to the construction site by landscape wall standard two sets or one side of the main road landscape wall standard second set, the other three sides by brick-wall setting.

    (C) Industrial Park industrial projects construction site by group color wall plate set.

    (D) other areas of the construction site Street, road-side landscape wall standard second set or brick wall set, the other side combine color wall plate set. Remove chops plots and building block construction site walls in accordance with the above standards set.

    Among them, remove chops period not exceeding 3 months down chop block to set up a temporary wall.

    Before Nineth station area and main street, road construction site on the side walls should be buried LED lights, roof-mounted, built-in LED lamp LED spot light lamp-lighting, tube and combination of point light source for lighting. Tenth-landscape walls should be in accordance with the relevant provisions of article used to promote public welfare, corporate image and the industrial, commercial and residential real estate related content.

    Among them, the public content shall not be less than published content of the one-third.

    Chapter III administration of wall set and maintain

    11th construction project legal person units in the surrounding block settings, should be submitted to SMCC walls set up the program. Walls set the programmes should include engineering, wall color picture, wall layout, wall construction programme, wall lighting schemes and so on. Among them, the programme include lighting, wall lighting lighting efficiency plans; wall construction scheme including walls and doorways of forms, dimensions, materials, colours, structure.

    Landscape walls should also be submitted to propaganda.

    12th, wall settings programme as a condition for project legal person units to obtain construction permits should be reviewed by the municipal construction Committee in accordance with, and acceptance of the wall-building before they can apply for construction permits.

    13th, wall settings should be responsible to set the security wall, keeping walls intact, clean, and do the following routine maintenance:

    (A) the walls broken, breaking, oblique, should be repaired or replaced in a timely manner;

    (B) the walls defaced, faded, it should be clean, whitewashed;

    (C) the words spill surrounding bezel surface should be corrected in a timely manner;

    (D) not show all wall lighting lighting facilities should be repaired in a timely manner.

    14th construction unit shall, before construction works, demolition of walls.

    The fourth chapter legal liability

    15th article violates these rules, you should set up walls and do not set or set up a wall is not a continuous closed by the municipal construction Commission rectification; fails to make corrections, shall be ordered to stop construction, and a fine of 50,000 yuan and 100,000 yuan fines; causing serious accidents, constitutes a crime, the persons directly responsible, in accordance with the relevant provisions of the criminal law liability.

    16th article violates this approach one of the 13th article of the by the municipal construction Committee in accordance with the provisions on work safety of construction projects management in Liaoning province a rectification; fails to mend, fined 30,000 yuan fine.

    17th article violates these rules, other laws, regulations and rules have been stipulated, be dealt with according to law by the relevant administrative departments.

    The fifth chapter by-laws

    18th down chop block and construction site walls to be built blocks set management, by the city people's Government, the development zone management Committee as the main body and routine maintenance, in accordance with these rules.

    19th article, haicheng, Taian County, xiuyan Manchu autonomous county construction site walls set management in accordance with the measures implemented. 20th purposes herein from the date of publication.