(November 29, 2007 the Ministry of water resources announced come into force on the date of promulgation, 31st) first to strengthen the supervision and management of water project construction, water engineering construction meets the requirements of integrated watershed planning and flood control plan, in accordance with the People's Republic of China water and the People's Republic of China flood control law and the People's Republic of China Law on administrative licensing, these measures are formulated.
    Article in the rivers, lakes, new construction, expansion and reconstruction project and make adjustments to the original function of the water, these measures shall apply.
    Water in these measures, refers to the reservoir and sluice dam, (, and) water project, dikes, hydroelectric plants (including shipping hydropower project) in rivers and lakes, such as the development, use, control, provisioning, and protection of water resources in all kinds of projects.
    Article III Ministry of water resources for water engineering construction supervision and management system of consent.
    Ministry of water resources basin management organs (hereinafter referred to as watershed management) and local people's Governments at or above the county level Department of water administration in accordance with the classification of administrative permissions, specifically responsible for planning consent system and water engineering construction supervision and management.
    Fourth project of (pre) feasibility study (project application report, filing) submitted to the examination and approval (approval, for the record), it should be attached with the river basin authorities or competent administrative departments of local people's Governments at or above the county level water water engineering construction planning review signed consent.
    Water project on preparation of project proposals shall be submitted to the approval of the project proposal attached to river basin management bodies or competent administrative departments of local people's Governments at or above the county level water water engineering construction planning review signed consent.
    Water engineering construction plan agreed with the content of the book, including the compliance of water engineering construction with integrated watershed planning and flood control planning, review and sign comments.
    Fifth article following water engineering construction planning agreed book, by basin management institutions is responsible for review and signed: (a) Yangtze River, and Yellow River, and huaihe River, and haihe River, and Pearl River, and Songhua River, and liaohe of river and main level tributaries and Taihu Lake and other across province, and autonomous regions, and municipalities of important rivers Shang construction of water engineering; (ii) province inter border river (River), and Lake Shang construction of water engineering; (three) international river (containing across territories, and border river and Lake) and main tributaries Shang construction of water engineering;
    (D) the direct management of the river basin management (River), Lake construction of water projects.
    In the first item of the preceding paragraph the main tributary and other provinces, autonomous regions and municipalities directly under the major rivers, third in the main branch and direct management of river basin management institutions in the fourth River (River), Lake's list and scope stipulated by the Ministry of water resources.
    Provisions of the first paragraph of this article other than the water engineering construction planning consent by the competent administrative departments of local people's Governments at or above the county level water by provinces, autonomous regions and municipalities water management authority as prescribed by the Administrative Department is responsible for reviewing and signing.
    Sixth article water engineering construction units (following referred to units) should in water engineering of (pre) feasibility research report (project application report, and record material) reported to the approval (approved, and record) Qian, to has water engineering construction planning agreed book review signed permission of basin management institutions or County above place Government water administrative competent sector (following referred to review signed organ) proposed water engineering construction planning agreed book application, and submitted following material: (a) water engineering construction planning agreed book application table;
    (B) the proposed water project for approval (pre) feasibility study (project application report, for the record); (c) the descriptions of third party interests and (iv) other materials required by examination and signing authorities. Seventh article review signed organ should since received application of day up 5 a days within on application material for review, and according to following situation respectively made processing: (a) belongs to this organ accepted range, application material complete, and meet statutory form of, should be accepted, and issued written accepted voucher; (ii) application material not complete or not meet statutory form of, should once told units be correction; (three) not belongs to this organ accepted range of, should made not accepted of decided,
    Institutions receiving permissions and inform the employer to apply.
    Eighth article review signed organ on accepted of water engineering construction planning agreed book application, should according to about legal, and regulations and basin integrated planning and flood control planning for review; on meet following conditions of, made approved of decided, and signed water engineering construction planning agreed book: (a) water engineering construction scale, and task meet basin integrated planning and flood control planning of General requirements; (ii) construction scale grade (don't) and standard meet flood control standard and the other about technology and management provides of requirements;
    (C) do not affect other water projects, or eliminate the effects of remedial measures.
    Water engineering construction does not meet one of the conditions prescribed in the preceding paragraph, signing authority shall not approve a decision under review, and release water engineering construction planning consent and refused to sign the notice.
    Water engineering construction planning consent to water engineering design and management measures on the request. Water engineering construction planning examination and signing authority sign consents relating to the project shall be sent to the next level the water conservancy Administrative Department.
    Water engineering construction planning of river basin authorities signed consent, shall be sent to water-related provinces, autonomous regions and municipalities water conservancy Administrative Department.
    Nineth rivers and lakes where the water project of comprehensive River basin planning or flood control plan has not yet been prepared or approved by, the construction unit shall entrust the corresponding qualification of engineering consulting units or units of river basin flood control planning integrated planning or, on whether water project was consistent with watershed management, development, protection requirements or the requirements of flood control development of targeted report.
    Examination and signing authority shall organize the review report of the expert on the special demonstration, water meets the requirements of watershed management, development, protection and flood control, make an approval decision and signing water engineering construction planning consent. Tenth examination and signing authority in the review process, when necessary, seek the works relating to the next level with water views of the water conservancy Administrative Department.
    River basin management agencies in the review process, when necessary, seek water-related provinces, autonomous regions and municipalities views of the water conservancy Administrative Department. Article 11th signing authority shall accept applications construction plan of water within 20 working days from the date of decision.
    Cannot make a decision within 20 working days, approved by the head of this body, can be extended by 10 working days, and the extension should be informed of the reasons for the construction unit.
    Implementation of the Nineth time required these measures not included in the provisions of the preceding paragraph within the period of review, the review time required for signing authority shall inform the owner.
    12th water engineering construction plan after signing the consent, water (pre) feasibility study (project application report, filing material) without approval (approval, for the record) need to be prepared, the construction unit shall reapply for water engineering construction planning consent. 13th provincial water conservancy administrative departments shall, before March 1 of each year, submission to catchment management agencies within their respective administrative regions signed its first annual water engineering construction planning consent.
    River basin management institutions shall, before April 1 of each year, on the submission to the Ministry of water resources within the basin signed its first annual water engineering construction planning consent. 14th examination and signing authorities should be planning consent for their review to sign water engineering construction of water engineering construction supervision and management.
    Examination and signing authority when conducting supervision and inspection, right to conduct field investigations, the construction unit shall cooperate with and provide relevant information and materials.
    15th examination and signing authority and their staff members in violation of the rules, in accordance with the People's Republic of China water and the People's Republic of China flood control law and the People's Republic of China dealt with the relevant provisions of the administrative licensing law.
    16th construction units without planning consent without construction of water engineering construction projects, or violations of water engineering construction planning consent to build water projects, in accordance with the People's Republic of China water and the People's Republic of China flood-relevant provisions of the law will be punished.
    17th water engineering construction planning consents to the application tables, water engineering construction planning consent, water construction plan and refused to sign the notice of consent form see Appendix.
    18th of provinces, autonomous regions and municipalities water conservancy administrative departments, or catchment management agencies, can be based on these measures, formulate implementing rules.

    19th article this way come into force on the date of promulgation. 附录一:
=

                         水工程建设规划同意书申请表

                     申请单位:                (盖章)
                              ──────────────

                     申请日期:
                              ───────────
    -=Tbl/> fill in note 1, this application form to apply for water engineering construction of water engineering construction planning consent format text.
    2, "General layout" column needed description of the General layout and project layout.
    3, water construction units also need to submit three copies of the application form. 4, water engineering construction should carefully fill.
About water conservancy administrative departments review and examination and signing authority should be objective and clear. =
┌───────────────────────────────────┐
│                     以下栏目由水工程建设单位填写                     │
├───────┬───────────────────────────┤
│   工程名称   │                                                      │
├─── ────┼───────────────────────────┤

│ 建设单位名称 │                                                      │
├───────┼────────┬─────┬────────────┤
│  法定代表人  │                │ 职   务  │                        │
├───────┼────────┼─────┼────────────┤
│    单位性质   │                │ 行业类别 │                        │
├───────┼────────┴─────┼────┬───────┤
│   通讯地址   │                            │邮政编码│              │
├───────┼────┬──┬──────┼──┬─┴───────┤
│    联系人                                                      │        │联系│            │电子│                  │
│              │        │电话│            │信箱│                  │
├───────┼────┴──┴──────┴──┴─────────┤
│   主管部门   │                                                           │
├───────┴───────────────────────────┤
│                            工  程  概  况                            │
├───────────────────────────────────┤
│1、建设地址                                                           │
│                                                                      │
│                                                                      │
│2、工程任务                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│3、工程规模                                                           │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│4、工程等级(别)                                                     │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│5、工程标准                                                           │
│ │
│                                                                      │
│                                                                      │
│6                                                                      、工程投资                                                           │
│                                                                      │
│                                                                      │
├───────────────────────────────────┤
│                             工程总体布置                             │
├───────────────────────────────────┤
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│ │
│                                                                      │
│                                                                      │

│                                                                      │
│                                                                      │
│                                                                      │
├───────────────────────────────────┤
│水工程建设单位签章:                                                  │
│                                                                      │
│                                  │
│                                                                      │
│                                   负责人      (单位印章)           │

(签章)                            │
│                                           年    月    日             │
├───────────────────────────────────┤
│与水工程有关的水行政主管部门意见:                                    │                                                                      │                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│    │
│                                   负责人      (单位印章)           │
│                                  (签章)                            │
│                                          年                                                                      月    日              │
├───────────────────────────────────┤
│审查签署机关意见:                                                    │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│ │

│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                                                                      │
│                           │
│                                                                      │
│                                    负责人      (单位印章)          │
│                                   (签章) │
│                                            年    月    日            │
└───────────────────────────────────┘
=tbl/>

    附录二:水工程建设规划同意书
=
编号:XXX水建规字[XXXX]XX号
┏━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━ ━━┓
┃工程名称          │                                                  ┃
┠─────────┼─────────────────────────┨
┃建设单位名称      │                                                  ┃
┠─────────┼────────────────────── ───┨
┃建设地址          │                                                  ┃
┠─────────┼─────────────────────────┨
┃工程任务          │                                                  ┃
┠─────────┼─────────────────── ──────┨
┃工程规模          │                                                  ┃
┠─────────┼─────────────────────────┨
┃工程等级(别)    │                                                  ┃
┠─────────┼───────────────────                              -The-the-the-the-the-the ┨ ┃ engineering standard │┃┠-the-the-the-the-the-the-the-the-the ┴-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the-the ┨ ┃ according to water engineering construction planning agreed book system management approach (pilot), by review, this project breaks ┃ ┃ collection about provides, special issued water engineering construction planning agreed book. ┃ ┃ Water engineering construction shall conform to the following requirements and accept supervision and administration: ┃ ┃ 1, ... ... ;                                                         ┃
┃    2、……                                                                      ;                                                         ┃
┃   (编者注:此处竖顿号见原稿)                                       ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃            ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                        签署机关:(盖章) Date of ┃ ┃ ┃┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ =tbl/> Appendix III: water construction plan and refused to sign the notice of consent = number: XXX water regulation [no XXXX]XX ┏━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━┓┃ project                                                                      名称          │                                                  ┃
┠─────────┼─────────────────────────┨
┃建设单位名称      │                                                  ┃
┠─────────┴─────────────────────────┨
┃ ┃┃┃┃ Under the consent scheme for water engineering construction planning management (for trial implementation), after reviewing this project not ┃ ┃ meets ______________________                                                          __________________ Provisions ┃ ┃ refused to sign water engineering construction planning consent.                                                                ┃ ┃ Who was dissatisfied with this decision, from the date of receipt of this notice apply for administrative reconsideration or bring an administrative ┃ ┃ lawsuit.                                                        ┃ ┃ Hereby notified.                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃                                                                      ┃
┃ ┃
┃                                                                      ┃
┃                                                                      ┃

┃                                                                      ┃
┃                                       签署机关:(盖章)             ┃
┃                                           年    月    日             ┃

    ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ =Tbl/> Appendix II and Appendix III number description water project construction planning consents and water engineering construction planning consent and refused to sign the notice number "XXX water regulation [XXXX]XX number". Among them, the "Water Board" before the watershed, provinces (autonomous regions and municipalities), district of the city (prefecture) and County (city of autonomous county, city not divided into districts, municipal districts) for short.
    For example: review signed organ for Yangtze River water Committee Shi, "water built rules word" Qian should fill in "Yangtze River"; review signed organ for Hebei province water Office Shi, "water built rules word" Qian should fill in "JI"; set district of city (autonomous) County (autonomous, and not set district of city, and district) no referred to, can by the city, and County water administrative competent sector itself developed name fill in.
              "(A)" signed for construction of water projects in planning consents or water year construction plan and refused to sign the notice of consent "()" after the Arabic numbers.