Advanced Search

Ministry Of Water Resources For Annulling The Decision To Declare Failure Changes Of Regulations And Regulatory Documents

Original Language Title: 水利部关于废止宣布失效修改部分规章和规范性文件的决定

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Ministry of water resources for annulling the decision to declare failure changes of regulations and regulatory documents (December 28, 2010 water makes 42nd, announced since announced of day up purposes) according to circular of the on do regulations cleanup work about problem of notification (State sent [2010]28,) requirements, water on existing regulations and normative file for has full cleanup, business about sector, decided abolition Yellow River downstream introduction yellow Canal first engineering water received make and management approach (pilot), 14 pieces normative file, announced owned by water enterprise conversion business mechanism implementation approach

    6 failure of regulations and regulatory documents, amend the regulations on sand mining management in the Yangtze River regulations for implementation measures 1.

Normative documents, repealed

1. the Yellow River Yellow River Headworks project water charge collection and administration procedures (trial implementation) (February 14, 1989, Ministry of water resources water wealth [1989]1 publishing)

2. Water Conservancy and hydropower construction company key positions under certified management (October 20, 1992 the Ministry of water resources water [1992]25 publishing)

3. the key posts of water conservancy and hydropower construction units certified pilot opinion management (September 20, 1993 the Ministry of water resources water [1993]454 publishing)

4. auction "five neglect" (not small watershed governance) the right, speeding up soil and water conservation management procedures (trial implementation) (July 8, 1994, Ministry of water resources and water conservation [1994]340 publishing)

5. soil erosion in the upper and middle reaches of the Yellow River region of trial measures for the control of project management (May 12, 1997 the Ministry of water resources water tube [1997]142 publishing)

6. Water Conservancy and hydropower construction enterprises contracted dike interim provisions on the qualification level (December 12, 1998 the Ministry of water resources water tube [1998]541 publishing)

7. the levee engineering investigation and design qualification grade standard supplementary regulations (December 12, 1998 the Ministry of water resources water tube [1998]541 publishing)

8. interim measures for levee construction management (February 14, 1999 the Ministry of water resources water tube [1999]78 publishing)

9. with regard to strengthening the construction of mine production project of soil and water conservation work of (July 20, 1999, the State coal industry Bureau of water resources and water conservation [1999]398 publishing)

10. with regard to strengthening the construction project of soil and water conservation work of non-ferrous metal production (August 30, 1999 the Ministry of water resources, State Bureau of nonferrous metal industry and water conservation [1999]470 publishing)

11. views on strengthening the safety management of small reservoirs (May 21, 2002 Ministry of water resources water tube [2002]188 publishing)

12. the notice of water project cost engineer certified (December 29, 2003 Office of the Office of water resources management [2003]166 publishing)

13. with regard to notification of establishment of water conservancy construction enterprise project management agency credit file (September 23, 2004 the Ministry of water resources water tube [2004]415 publishing)

    14. notice on strengthening the management of rural hydropower and electrification County construction projects (March 24, 2006 of Ministry of water resources water tube [2006]97 publishing)

Second, announced the failure of regulations and regulatory documents

1. implementation measures for water conservancy enterprises owned by transforming the operating mechanism (April 14, 1994 the Ministry of water resources, the State restructuring Commission, the State economic and Trade Commission, water people Dr [1994]166 publishing)

2. the resettlement implementation in Yellow River xiaolangdi hydro-junction project management approach (October 27, 1994 the Ministry of water resources water transfer [1994]468 publishing)

3. the national soil and water conservation ecological environment construction "shibaiqian" demonstration project management approach (June 1, 1999, Ministry of water resources and water conservation [1999]297 publishing)

4. detailed rules for the implementation of water industry policy (June 1999-11 of Ministry of water resources and water law [1999]311 publishing)

5. acceptance of Changjiang River levee project management approach (November 26, 2001 the Ministry of water resources water tube [2001]525 publishing)

    6. the implementing rules for the acceptance of built-in works on the main levees of the Yangtze River (November 26, 2001 the Ministry of water resources water tube [2001]525 publishing)

Third, to amend the regulations Of the implementation measures for the regulation of sand mining management in the Yangtze River (June 2, 2003 the Ministry of water resources released 19th, May 14, 2010 the Ministry of water resources, the 39th Amendment) tenth article is revised as follows: "engage in sand mining activities outside the provisions of the preceding paragraph, by the water conservancy administrative departments of provinces and municipalities. Beyond the provincial boundary of critical section, single projects and sand reclamation capacity of 100,000 tons, provincial and municipalities water before ratification by the Administrative Department shall solicit the views of the Yangtze River Water Conservancy Committee.

” This decision shall take effect from the date of its promulgation.