Amendment Of The Regulation On Approval-Free Construction Of Ropeways (Vgbseil 2006)

Original Language Title: Änderung der Verordnung über genehmigungsfreie Bauvorhaben bei Seilbahnen (VgBSeil 2006)

Read the untranslated law here: https://www.global-regulation.com/law/austria/2997891/nderung-der-verordnung-ber-genehmigungsfreie-bauvorhaben-bei-seilbahnen-%2528vgbseil-2006%2529.html

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$20 per month, or Get a Day Pass for only USD$4.99.
412th regulation of the Federal Minister for transport, innovation and technology, modifies the Ordinance, permit-free construction of Ropeways (VgBSeil 2006)

Due to § 18 para 2 and 20 of the cableway Act 2003, Federal Law Gazette I no. 103/2003, as last amended by the Federal Act Federal Law Gazette I no. 83/2007, is prescribed:

The regulation on approval-free construction of Ropeways (VgBSeil 2006), Federal Law Gazette II 287/2006, is amended as follows:

1. in article 1, paragraph 2, the phrase "Minor to and tags and minor deduction measures" by the phrase "Not extensive to and tags and removal measures associated" is replaced.

2. § eliminates 1 para 3.

3. paragraph 2:

"Construction of ropeways in accordance with §§ 2 and 119 para 2 SeilbG 2003 require any tramway construction licence and operating licence, unless"



1 in § § given 2003 stated conditions are 18 and 19 SeilbG is no direct factual and technical link with an approved construction project 2., 3. There are no innovative features."

4. paragraph 3 No. 2:



"2. this construction projects have no adverse effect on safety."

5. first sentence is § 6:

"Construction projects pursuant to § 18 paragraph 1 Z 1 SeilbG 2003, the implementation of which has to be SeilbG in 2003, headed by a person within the meaning of article 20 are below map to or conversions and removal measures related:"

6 paragraph 6 No. 7:



"7-signalling devices not included in safety circuits of funicular with a connection to electric systems;"

7 paragraph 6 Z 8:



"8 underground connections between stations or supports including supports wiring, unless there are links to electrical systems;"

8 paragraph 6 Z 10:



"10 Windows from operating rooms to the observation of passenger transport or the course of the operation;"

9 paragraph 6 Z 14:



"14 measures to identify an aviation obstacle referred to in aviation law, BGBl. I no. 253/1957, as amended by Federal Law Gazette I no. 83/2008;"

10 paragraph 6 Z 15:



"15 work platforms and rest platforms on supports and in stations, except in the Abstellbahnhöfen or sidings and maintenance tracks;"

11 paragraph 6 Z 18:



"18 design and control technical changes in Abstellbahnhöfen;"

12 paragraph 6 Z 19:



"19 buildings and sheds up to maximum 100 m² of built-up area with no more than an above-ground floor and a basement, if they serve not to the permanent residence of persons or the storage of dangerous substances, including the related infrastructural facilities;"

13 paragraph 6 Z 22:



"22 additional wind warning devices connecting to the cable car control, are not involved in safety circuits of funicular Conversions of such running wind warning devices, if their site is not changed;"

14 paragraph 6 Z 23:



"23 lighting systems for rule rides in the dark at cable railways;"

15 paragraph 6 Z 25:



"25 rappelling equipment, which are not identical to the one approved at the cable car;"

16 paragraph 6 Z 26:



"26 audiovisual information facilities for passengers;"

17 paragraph 6 Z 29:



"29 location monitoring of tow discs and reverse rotation monitoring of deflection plates axes as well as design changes to prevent a crash of the tow washer from the axle and the axle together with sheave for tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;"

18 paragraph 6 Z 30:



"30 Earth - and Kurzschlussüberwachungseinrichtungen of track circuit safety tow lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car are made;"

19 paragraph 6 Z 31:



"31 hanger tubes, retractable devices in tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car are made;"

20. in paragraph 6, the following Z 32 to 46 to append the Z 31:



"32. grade crossings of Mattings with ski slopes, including necessary structural facilities (such as iron supplement ramp and associated safety facilities, hedges and passenger information);

33. additional safety features to monitor collected able of tow lift slings and overrun fuses in tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

34. operating with fewer compared to the approved State on hangers (max. minus 10%) with ski-tows;

35. ventilation installations of driving equipment;

36. additional installation of cable derailment switches together with the mounting part and possibly serious roles in tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

37. rocker rotation limits rolls batteries;

38. additional mounting vehicles that are identical to the approved at the cable car, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

39. additional loads vehicles that are identical to the approved at the cable car, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

40. maintenance hanger at ski lifts;

41. lighting installations for rides in the dark at ski lifts including the necessary facilities for lighting and track speakers during power failure (such as batteries);

42. additional installation of revision drives for tow-lifts with high rope guide including the monitoring facilities for concurrent operation with the drive, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

43. additional devices for monitoring of the open state of the brakes on tow lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

44. additional facilities to monitor the speed of variable-speed drives for tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

45. additional ground facilities for the tow in tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled;

46. additional surge arrester and earthing switches for control and telecommunication cables in tow-lifts, if these building measures not under assistance of a professional company involved in the construction of the cable car will be cancelled."

21 first sentence is § 7:

"Construction projects pursuant to § 18 paragraph 1 Z 2 SeilbG 2003, which an assistance of a person within the meaning of section 20 SeilbG does not require 2003, are below map to or conversions and removal measures related:"

22 paragraph 7 (2):



"2. measures to improve the energy supply (electrical installations up to 1 000 v DC);"

23 § 7 No. 4 is not available in the word sequence ", which are not included in safety circuits of funicular".

24. in paragraph 7, Z 5 eliminates the phrase ", between the stations of one or several cable cars".

25 paragraph 7 Z 8:



"8 window with the exception of those of operating rooms to the observation of passenger transport or the course of the operation;"

26 paragraph 7 Z 13:



"13 buildings and sheds (including carports) to eaves height of 3.0 m and 20 m 2 of built-up area, unless they serve not to the permanent residence of persons or the storage of dangerous substances, including the related infrastructural facilities;"

27 paragraph 7 Z 20:



"20 illuminated signs" ironing to / CLOSE ', light bars "Red-green", as well as signs "bar to";"

28. in article 7, the following Z 21 to 41 after append the Z 20:



"21 mountain equipment, excluding descender devices;

22 additional mobile rescue equipment or components thereof, which are identical to the approved at the cable car;

23 platforms in the Abstellbahnhöfen or sidings and maintenance tracks;

24 wind warning devices without connection to the cable car control;

25 additional safety devices for monitoring confiscated able of tow lift slings and overrun fuses in tow-lifts, in the assistance of a professional company involved in the construction of the cable car.

26 location monitoring of tow discs and reverse rotation monitoring of deflection plates axes as well as design changes to prevent a crash of the de-boarding washer from the axle and the axle together with sheave for ski-tows under assistance of a professional company involved in the construction of the cable car;

27 Earth and Kurzschlussüberwachungseinrichtungen of track circuit safety tow lifts under assistance of a professional company involved in the construction of the cable car;

28 hanger pipes and retractable devices at ski-tows under assistance of a professional company involved in the construction of the cable car;

29 internal telecommunication facilities;

30 operating radio equipment, as long as no system change will be made;

31 equipment for operational announcements to the passengers in the stations and on the track, except in driving equipment;

32.

Information carrier to chair closing brackets, provided that the agreement was made with the manufacturers of the Chair;

33. additional installation of cable derailment switches together with the mounting part and possibly serious roles in tow-lifts, under assistance of a professional company involved in the construction of the cable car;

34. additional mounting vehicles, which are identical to the approved at the cable car, under assistance of a professional company involved in the construction of the cable car;

35. additional loads vehicles, which are identical to the approved at the cable car, under assistance of a professional company involved in the construction of the cable car;

36. additional installation of revision drives for tow-lifts with high rope guide including the monitoring facilities for concurrent operation with the drive, under assistance of a professional company involved in the construction of the cable car;

37. additional devices for monitoring of the open state of the brakes on tow lifts, under assistance of a professional company involved in the construction of the cable car;

38. additional facilities to monitor the speed of variable-speed drives for tow-lifts, under assistance of a professional company involved in the construction of the cable car;

39. additional ground facilities for the tow on tow lifts, under assistance of a professional company involved in the construction of the cable car;

40. additional surge arrester and earthing switches for control and telecommunication cables in tow-lifts, under assistance of a professional company involved in the construction of the cable car;

41. supports for devices (for example, optical cable testing equipment)."

29 paragraph 8:

„§ 8. About changes of safety components according to § 18 para 3 SeilbG 2003 is the competent authority of the cable car company to put at least six weeks prior to scheduled start of construction by connecting a detailed description of the construction and safety analysis in knowledge. The competent authority can Z require 5 SeilbG 2003 pursuant to article 18, para. 3, that more documents to assess the freedom of approval are presented. Prior to implementing the change the decision of the competent authority is to be seen."

30 § 9 para 2 No. 3 is:



"3. confirmation of a notified body, that the project has no adverse effect on other components of the cable car. The construction completion report and the declarations of conformity in single copy shall be the competent authority promptly after completion."

31. in article 9 the following paragraph 3 is added pursuant to par. 2:

"(3) Z-1 and Z are permit-free construction pursuant to § 18 para 1 2 SeilbG 2003 safety components in accordance with § 9 SeilbG 2003, are declarations of conformity according to 2003 to obtain section 7 SeilbG." The declarations of conformity are each in single copy immediately after completion to submit to the competent authority."

32. the section heading and the section name are after section 14:

              "Section 6: persons according to § 20 SeilbG 2003"

33. According to article 20, the following paragraph 21 is attached:

"§ 21. As far as this regulation are personal names only in the male form, they relate to women and men in the same way."

Bures