Home Work Rate For The Manufacture Or Processing Of Brushes And Brushes Of All Kinds (Commercial And Industrial) By Maidservant

Original Language Title: Heimarbeitstarif für die Herstellung oder Bearbeitung von Bürsten und Pinseln aller Art (Gewerbe und Industrie) durch Heimarbeiter/innen

Read the untranslated law here: http://www.ris.bka.gv.at/Dokumente/BgblAuth/BGBLA_2013_II_166/BGBLA_2013_II_166.html

166. Regulation of the Federal Agreement Office in the Federal Ministry of labour, Social Affairs and consumer protection, of a home work rate for the manufacture or processing of brushes and brushes of all kinds (commercial and industrial) by home worker is adopted the Federal Agreement official at the Federal Ministry of labour, Social Affairs and consumer protection is in accordance with article 34, paragraph 1 homework Act 1960, BGBl. No. 105 / 1961, as amended by Federal Law Gazette I no. 74 / 2009 authorised , to be issued at the request of a collective agreement-enabled corporate of employee home working rates.

The Federal Agreement official at the Federal Ministry of labour, Social Affairs and consumer protection has adopted with decision by June 7, 2013 to hold a Senate hearing following home working rates: home work rate for the manufacture or processing of brushes and brushes of all kinds (commercial and industrial) by Maidservant

H 5/20132/VIII/38/3

Scope of section 1.

(a) space: for the Federal Republic of Austria.

(b) technical: for the manufacture or processing of brushes and brushes of all kinds, as far as their production or processing not in another generation branch falls and is not already governed by an overall contract of work at home or home working rates.

c) personally: for all clients, for which see b) work carried out at home worker deal with.

Working hours

§ 2. Retraction of 1 000 bundles, without cutting the material winding of wire brushes properly drilled, wood (puncture the drilling needles not part of working time), following working hours are priced:

 



1.



Shine brush about 3 mm bore and lubrication and pasta brushes



161 minutes



2.



Horse brushes over 3 mm bore and similar short-cut products



152 minutes



3.



Drums and similar Facon with double beard from any material change brushes



246 minutes



4.



Stencil bundle of bristles, Fibris, B Chinese, or riffling and truncation



197 minutes



5.



Stencil bundle of C Chineserborsten with truncation



213 minutes



6.



Room brush without a template of bristles, Fibris, B Chinese, or riffling



187 minutes



7.



Room brush without a template from C-Chineserborsten



206 minutes



8.



Friction, detergents, Kot brushes and scrubber with easy Bart from any material



197 minutes



9.



Carpet beard wische, broom, tar brush and narrow pool broom, two - and three-row from any material including cutting off



222 minutes



10.



Piassava broom from basin



296 minutes



11.



Broom made of horsehair, Fibris or coconut fibres



187 minutes



12.



Bart wische Fibris, horsehair, coir



197 minutes



13.



Toilet brushes from any material including cutting off



317 minutes



14.



Polishing disks two to six-row from hair



274 minutes



15.



Painter discs, bakery and flour wiper inlet broom indented on the buttons



280 minutes



16.



Handle brushes



213 minutes



17.



Glass brushes



181 minutes



18.



Horse brushes, clothes brushes, brushes under 3 mm hole and brush



145 minutes



19.



Head brushes, also highly cambered



157 minutes



20.



Billiards and furniture brush bristles and hair



180 minutes



21.



Billiards or furniture brushes made from coconut fibers or Fibris



169 minutes charges

3. (1) all piece charges (also for the work items listed in § 2) workers are in work at home in the context of businesses to calculate with an hourly wage of €7.49.

(2) for enterprises which manufacturing industry belong to the Trade Association of the wood, is the collective agreement for the wood processing industry, to calculate V with an hourly wage of €9,45 according to wage group.

Homework extra

§ 4. On the so calculated piece charges get in work at home employees separately to be increased of working at home by 10%, in provision of our own tool one separately to be assigned homework supplement of 20%.

Beginning of the effectiveness

§ 5. The effectiveness of beginning of this homework tariff is set for the industry and for the industry may 1, 2013.

Cooperative