System Usage Fees Regulation 2012 - 2016 Novella, Sne-Vo 2012 - Amendment To 2016

Original Language Title: Systemnutzungsentgelte-Verordnung 2012 – Novelle 2016, SNE-VO 2012 – Novelle 2016

Read the untranslated law here: http://www.ris.bka.gv.at/Dokumente/BgblAuth/BGBLA_2015_II_428/BGBLA_2015_II_428.html

428th Commission of of regulation regulation of E-control modifies the system usage fees regulation 2012 (SNE-VO 2012) (system usage fees regulation 2012 - amendment to 2016, SNE-VO 2012 - amendment to 2016)

On the basis of § 49 of Elektrizitätswirtschafts and Organization Act 2010 (ElWOG 2010), Federal Law Gazette I no. 110/2010 as amended by Federal Law Gazette I no. 174/2013, and § 12 ABS. 2 Z 1 Energy Control Act (E-ControlG), Federal Law Gazette I no. 110/2010 in the version of Federal Law Gazette I is no. 174/2013, prescribed:

The Commission of of regulatory regulation of E-control, with the fees for the use of the system be determined (system usage fees regulation 2012), Federal Law Gazette II No. 440/2011 amended the SNE-VO 2012 - amendment to 2015, Federal Law Gazette II No. 369/2014, is amended as follows:

1 § 2 para 1 subpara 1 is:

"1. for the areas of Austria and Vorarlberg 60 VH.

2. § 4 par. 1 Z 1 to 8 are:



3. in article 4, paragraph 1, no. 9 lit. a is, first sentence, the phrase "control energy use" by the phrase "the activation of control energy reserves" and the phrase "obtained work: 0.070/kWh cents" by the phrase "provided work: 0.075/kWh cents" replaces.

4. § 4 para 1 No. 9 lit. b first and second sentence read:

"The control area manager has to transmit the quarter hour values of work provided by the activation of the reserves of the rule the rule reserves provider. The rule reserve provider has this data on the individual counting points on the control energy was provided, to share and to submit the relevant network operator, also for quarters of an hour, in which no activation is done."

5. § 4 paragraph 2 and paragraph 3 are:

"(2) for the power use of the facilities of level 3 of the transmission network following net payments, representing annual amounts (in EUR thousand) are in twelve equal part amounts monthly to the Austrian power grid AG.



(3) for the power use of the facilities of level 3 of the distribution system of AC Upper Austria GmbH a net payment of TEUR is monthly from Linz power network GmbH on the AC Upper Austria GmbH 1.951,1 instalments same in twelve."

6 § 6 Z 1 to 15 are:



7 paragraph 8:

„§ 8. "Für das von Einspeisern, einschließlich Kraftwerksparks, von mehr als fünf MW zu entrichtende Systemdienstleistungsentgelt werden folgende Entgelte bestimmt: a) of Austrian area: cents of 0,2560/kWh b) area Tirol: cents 0,2560/kWh c) Vorarlberg area: 0,2560/kWh cents" 8 § 13 para 2 to 7 are:

"(2) for the lower power range following compensation be set, where are the payments between operators according to the following list:"



(3) for the network scope of Styria, following compensation be set with to make payments between operators according to the following list:



(4) for the network scope of Tyrol, following compensation be set with to make payments between operators according to the following list:



(5) for the network scope of Vorarlberg following compensation be set, with to make payments between operators according to the following list:



(6) for the network area of Upper Austria, following compensation be set where the processing of payments by the AC Upper Austria GmbH has to be done:



(7) for the network scope of Linz, following compensation be set where the processing of payments by the Linz power network GmbH has to be carried out:



9 paragraph 6 is added to § 14 para 5:

"(6) section 2 paragraph 1 Z 1, § 4 ABS. 1 Z 1 to 9, § 4 para 2, § 4 para 3, § 6 Z 1 to 15, § 8 and § 13 para 2 to paragraph 7 as amended by the SNE regulation amendment to 2012 2016, Federal Law Gazette I no. 428/2015 with 1 January 2016 into force."

Schramm