Eco Power Funding Contribution Regulation 2015 And Eco Power Package Regulation 2015

Original Language Title: Ökostromförderbeitragsverordnung 2015 und Ökostrompauschale-Verordnung 2015

Read the untranslated law here: https://www.global-regulation.com/law/austria/2994947/kostromfrderbeitragsverordnung-2015-und-kostrompauschale-verordnung-2015.html

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$20 per month, or Get a Day Pass for only USD$4.99.
359. Regulation of the Federal Minister for science, research and industry 2015 adopted the eco power funding contribution regulation 2015 and eco power package regulation

Table of contents article 1: eco stream funding contribution regulation 2015 article 2: eco power package regulation 2015 article I

Ordinance of the Federal Minister for science, research and economy, with the subsidy for green electricity determined by 2015 for the calendar year (eco power funding contribution regulation 2015)

On the basis of § 48 para 2 of the eco-electricity Act 2012 (ÖSG 2012), Federal Law Gazette I no. 75/2011, in the version of the by-laws Federal Law Gazette I no. will 11/2012, prescribed:

§ 1. The 2012 payable eco electricity subsidy is ÖSG by all end users connected to the public network, in accordance with article 48, paragraph 1 for the calendar year 2015 30,76% of the nationwide average, set in accordance with the regulation of the Regulation Commission of E-control, be determined by which the fees for the use of the system, each power level of payable encompassing - and power pay of loss of.

§ 2 (1) by 2015 the following amounts apply for the net remuneration component network use charge (performance) for the calendar year: 1 on the power levels 1 and 2 1.231 euro / kW;

2. at the network level 3 7,907 euro / kW;

3. on the network level 4 11,288 euro / kW;

4. at the network level 5 10,467 euro / kW;

5. at the network level 6 11,005 euro / kW;

6. at the network level 7 (measured performance) 11,951 euro / kW;

7. at the network level 7 (interruptible) 0 euro/kW;

8. at the network level 7 (inappropriate performance) 4,946 euro / counting point.

(2) by 2015 the following amounts apply for the net remuneration component network use charge (labour) for the calendar year: 1 on the power levels 1 and 2 0.022 cents / kWh;

2. at the network level 3 0,114 cents / kWh;

3. on the network level 4 0.176 cents / kWh;

4. at the network level 5 0,274 cents / kWh;

5. at the network level 6 0.442 cents / kWh;

6. at the network level 7 (measured performance) 0,691 cent / kWh;

7 at the network level 7 (interruptible) 0,692 cent / kWh;

8. at the network level 7 (inappropriate performance) 1,280 cents / kWh.

(3) by 2015 the following amounts apply for the calendar year for the net remuneration component network loss charge: 1 on the power levels 1 and 2 0.012 cents / kWh;

2. at the network level 3 0.016 cents / kWh;

3. on the network level 4 0.023 cents / kWh;

4. at the network level 5 0.038 cents / kWh;

5. at the network level 6 0.034 cents / kWh;

6. at the network level 7 0.085 cents / kWh.

§ 3. This Regulation shall enter into force 1 January 2015.

Article II

Ordinance of the Federal Minister for science, research and economy with which the eco power package for the years 2015 to 2017 is determined (eco power package regulation 2015)

On the basis of § 45 para 4 of the eco-electricity Act 2012 (ÖSG 2012), Federal Law Gazette I no. 75/2011, in the version of the by-laws Federal Law Gazette I no. will 11/2012, prescribed:

§ 1. Which ÖSG 2012 payable eco power fee by all consumers connected to the public network pursuant to § 45 para 1 is for the calendar year 2015 2017 including: 1 for the network users connected on the power levels 1 through 3 104.444 euro;

3. for the network users connected to the network level 4 104.444 euro;

4. for network users connected at the network level 5 15.517 euro;

5. for network users connected at the network level 6 955 euros;

6. for network users connected at the network level 7 33 euros.

§ 2. This Regulation shall enter into force 1 January 2015.

Mitterlehner