Advanced Search

Approval and Promulgation of Air Quality Implementation Plans; Illinois; Emission Limit Infrastructure SIP Requirements for the 2008 Ozone, 2010 NO2


Published: 2015-05-22

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
ACTION:
Final rule.
SUMMARY:
The Environmental Protection Agency (EPA) is taking final action to approve some elements of state implementation plan (SIP) submissions from Illinois regarding the infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 2008 ozone, 2010 nitrogen dioxide (NO 2 ), and 2010 sulfur dioxide (SO 2 ) National Ambient Air Quality Standards (NAAQS). The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. In this action, EPA is specifically approving infrastructure requirements concerning emission limits and other control measures. The proposed rulemaking associated with today's final action was published on February 27, 2015, and EPA received no comments during the comment period, which ended on March 30, 2015.
DATES:
This final rule is effective on June 22, 2015.
ADDRESSES:
EPA has established dockets for this action under Docket ID No. EPA-R05-OAR-2011-0969 (2008 ozone infrastructure SIP elements), Docket ID No. EPA-R05-OAR-2012-0991 (2010 NO 2 infrastructure SIP elements), and Docket ID No. EPA-R05-OAR-2013-0435 (2010 SO 2 infrastructure SIP elements). All documents in the docket are listed in the www.regulations.gov index. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, will be publicly-available only in hard copy. Publicly-available docket materials are available either electronically in www.regulations.gov or in hard copy at the U.S. Environmental Protection Agency, Region 5, Air and Radiation Division, 77 West Jackson Boulevard, Chicago, Illinois 60604. This facility is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays. We recommend that you telephone Sarah Arra at (312) 886-9401 before visiting the Region 5 office.
FOR FURTHER INFORMATION CONTACT:
Sarah Arra, Environmental Scientist, Attainment Planning and Maintenance Section, Air Programs Branch (AR-18J), U.S. Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 886-9401, arra.sarah@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document whenever “we,” “us,” or “our” is used, we mean EPA. This supplementary information section is arranged as follows:
I. What is the background of these SIP submissions?
II. What is our response to comments received on the proposed rulemaking?
III. What action is EPA taking?
IV. Statutory and Executive Order Reviews.
I. What is the background of these SIP submissions?
A. What state SIP submission does this rulemaking address?
This rulemaking addresses three submissions from December 31, 2012, and a January 9, 2015, clarification from the Illinois Environmental Protection Agency (Illinois EPA) intended to address all applicable infrastructure requirements for the 2008 ozone, 2010 NO 2 , and 2010 SO 2 NAAQS.
B. Why did the state make these SIP submissions?
Under sections 110(a)(1) and (2) of the CAA, states are required to submit infrastructure SIPs to ensure that their SIPs provide for implementation, maintenance, and enforcement of the NAAQS, including the 2008 ozone, 2010 NO 2 , and 2010 SO 2 NAAQS. These submissions must contain any revisions needed for meeting the applicable SIP requirements of section 110(a)(2), or certifications that their existing SIPs for the NAAQS already meet those requirements.
EPA has highlighted this statutory requirement in multiple guidance documents, including the most recent guidance document entitled “Guidance on Infrastructure State Implementation Plan (SIP) Elements under Clean Air Act Sections 110(a)(1) and (2)” issued on September 13, 2013.
C. What is the scope of this rulemaking?
EPA is acting upon the SIP submissions from Illinois that address the infrastructure requirements of CAA sections 110(a)(1) and 110(a)(2) for the 2008 ozone, 2010 NO 2 , and 2010 SO 2 NAAQS. The requirement for states to make a SIP submission of this type arises out of CAA section 110(a)(1). Pursuant to section 110(a)(1), states must make SIP submissions “within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof),” and these SIP submissions are to provide for the “implementation, maintenance, and enforcement” of such NAAQS. The statute directly imposes on states the duty to make these SIP submissions, and the requirement to make the submissions is not conditioned upon EPA's taking any action other than promulgating a new or revised NAAQS. Section 110(a)(2) includes a list of specific elements that “[e]ach such plan” submission must address.
In this specific rulemaking, EPA is only taking action on the CAA 110(a)(2)(A) requirements of these submittals. The majority of the other infrastructure elements were finalized in an October 16, 2014 (79 FR 62042), rulemaking.
II. What is our response to comments received on the proposed rulemaking?
The proposed rulemaking associated with today's final action was published on February 27, 2015 (80 FR 10652), and EPA received no comments during the comment period, which ended on March 30, 2015.
III. What action is EPA taking?
To meet the infrastructure element under CAA section 110(a)(2)(A), IEPA has identified rules and regulations that provide control measures and limit emissions of pollutants relevant to the 2008 ozone, 2010 NO 2 , and 2010 SO 2 NAAQS. For the reasons discussed in our proposed rulemaking, EPA is taking final action to approve, as proposed, Illinois' submittal certifying that its current SIP is sufficient to meet the required infrastructure element under CAA section 110(a)(2)(A) for the 2008 ozone, 2010 NO 2 , and 2010 SO 2 NAAQS.
IV. Statutory and Executive Order Reviews.
Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:
• Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
• does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. );
• is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq. );
• does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
• does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
• is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
• is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
• is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
• does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register . A major rule cannot take effect until 60 days after it is published in the Federal Register . This action is not a “major rule” as defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by July 21, 2015. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Ozone, Nitrogen dioxide, Sulfur dioxide, Reporting and recordkeeping requirements.
Dated: May 13, 2015.
Susan Hedman,
Regional Administrator, Region 5.
40 CFR part 52 is amended as follows:
PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
1. The authority citation for part 52 continues to read as follows:
Authority:
42 U.S.C. 7401 et seq.
2. Section 52.745 is amended by revising paragraphs (e), (f), and (g) to read as follows:
§ 52.745
(e) Approval and Disapproval—In a December 31, 2012, submittal, Illinois certified that the State has satisfied the infrastructure SIP requirements of section 110(a)(2)(A) through (H), and (J) through (M) for the 2008 ozone NAAQS except for 110(a)(2)(D)(i)(I). EPA is approving Illinois' submission addressing the infrastructure SIP requirements of section 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(II) with respect to visibility protection, (D)(ii), (E) except for state board requirements, (F) through (H), (J) except for prevention of significant deterioration, and (K) through (M). EPA is disapproving Illinois' submission addressing the prevention of significant deterioration, in (C), (D)(i)(II), and the prevention of significant deterioration (PSD) portion of (J). EPA is not taking action on the state board requirements of (E). Although EPA is disapproving portions of Illinois' submission addressing the prevention of significant deterioration, Illinois continues to implement the Federally promulgated rules for this purpose as they pertain to (C), (D)(i)(II), and the prevention of significant deterioration (PSD) portion of (J).
(f) Approval and Disapproval—In a December 31, 2012, submittal, Illinois certified that the state has satisfied the infrastructure SIP requirements of section 110(a)(2)(A) through (H), and (J) through (M) for the 2010 nitrogen dioxide (NO 2 ) NAAQS. EPA is approving Illinois' submission addressing the infrastructure SIP requirements of section 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(I), (D)(i)(II) with respect to visibility protection, (D)(ii), (E) except for state board requirements, (F) through (H), (J) except for prevention of significant deterioration, and (K) through (M). EPA is disapproving Illinois' submission addressing the prevention of significant deterioration, in (C), (D)(i)(II), and the prevention of significant deterioration (PSD) portion of (J). EPA is not taking action on the state board requirements of (E). Although EPA is disapproving portions of Illinois' submission addressing the prevention of significant deterioration, Illinois continues to implement the Federally promulgated rules for this purpose as they pertain to (C), (D)(i)(II), and the prevention of significant deterioration (PSD) portion of (J).
(g) Approval and Disapproval—In a December 31, 2012, submittal, Illinois certified that the state has satisfied the infrastructure SIP requirements of section 110(a)(2)(A) through (H), and (J) through (M) for the 2010 sulfur dioxide (SO 2 ) NAAQS except for 110(a)(2)(D)(i)(I). EPA is approving Illinois' submission addressing the infrastructure SIP requirements of section 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(II) with respect to visibility protection, (D)(ii), (E) except for state board requirements, (F) through (H), (J) except for prevention of significant deterioration, and (K) through (M). EPA is disapproving Illinois' submission addressing the prevention of significant deterioration, in (C), (D)(i)(II), and the prevention of significant deterioration (PSD) portion of (J). EPA is not taking action on the state board requirements of (E). Although EPA is disapproving portions of Illinois' submission addressing the prevention of significant deterioration, Illinois continues to implement the Federally promulgated rules for this purpose as they pertain to (C), (D)(i)(II), and the prevention of significant deterioration (PSD) portion of (J).
[FR Doc. 2015-12355 Filed 5-21-15; 8:45 am]
BILLING CODE 6560-50-P