Advanced Search

Subscribe to a Global-Regulation Premium Membership Today!

We are constantly working to improve the site, and to add more laws to our database. If you are receiving value from using our site please consider signing up for a subscription to support the site and to get many additional benefits for you.

Key Benefits:

  • Unlimited Searches
  • Weekly Updates on New Laws
  • Access to 5,345,848 Global Laws from 110 Countries
  • View the Original Law Side-by-Side with the Translation
  • No Ads

Subscribe Now for only USD$40 per month.

(You can close this ad by clicking anywhere on the page.)

WAC 296-127-01318: Drywall Finishers (Tapers)


Published: 2015

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
Print







WACs > Title 296 > Chapter 296-127 > Section 296-127-01318











296-127-01317    

296-127-01320







No agency filings affecting this section since 2003







WAC 296-127-01318









Drywall finishers (tapers).









For the purpose of the Washington state public works law, chapter 39.12 RCW, drywall finishers perform all the preparatory work and finishing work involved in covering interior walls and ceilings with decorative or protective finish materials.
The work includes, but is not limited to:
• Handling of all materials after the initial unloading at the job site, including the distribution to the points of application.
• Erecting, moving and dismantling of all scaffolding.
• All preparatory work of taping, sealing, finishing and sanding of joints between plasterboard or other wallboard.
• Spotting, caulking, pointing and sealing of cracks and holes in walls and ceilings.
• Applying protective coverings prior to the application of the finish materials.
• Spackling of surfaces and application of texture finishes where adhesive materials are used.
• Applying all primers, sealers, decorative or protective finish materials, regardless of the method of application.
• Installing metal moulding at corners instead of sealant and tape.
• Removing all drywall material scraps and all cleaning work, including scraping of floors.
[Statutory Authority: Chapter 39.12 RCW, RCW 43.22.270 and 43.22.051. WSR 00-15-077, § 296-127-01318, filed 7/19/00, effective 7/19/00.]