Advanced Search

Proclamation No. 2035, s. 2010


Published: 2010-04-19

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
MALACAÑANG

MANILA

PROCLAMATION NO. 2035

DECLARING A CERTAIN PARCEL OF LAND SITUATED IN BARANGAY PUCSUSAN CITY OF BAGUIO, ISLAND OF LUZON AS WATERSHED RESERVATION

Upon the recommendation of the Secretary of the Department of Environment Natural Resources and by virtue of the powers vested in me by law, I, GLORIA MACAPAGAL-ARROYO, President of the Republic of the Philippines, do hereby withdraw from sale or settlement and reserve for watershed purposes, subject to private rights, if any there be, a parcel of land situated in Barangay Pucsusan, Baguio City, Island of Luzon, more particularly described as follows

Swo-131102-000430

Barangay Pucsusan

A parcel of land (Swo-131102-000430) being a portion, proposed watershed, situated at Res. Sec. “D”, City of Baguio, Island of Luzon. Bounded on the W., along line 1-2 by Outlook Drive (20.00 m. wide); on the SW., along line 2-3-4, by existing Barangay Road (3.00 m. wide); on the N. and NE., along lines 4-5-6-7 by Pasiteng Basilio; on the E., along lines 7-8-9; by Baroy Cois; on the SW., along lines 9-10-11 by Baroy Cois; on the S., and SE., along lines 11-12-13 by Mid-Pasig Land Development Corporation (T-30481, TSI-V-6748-D); on the S., along line 13-1 by Lot 212, RS-899 Elizabeth K. Fairchild.

Beginning at a point marked “1” on plan being S. 70 deg. 40’E., 417.18 m. from Triangulation station “GULLICK”, Baguio Townsite, thence;

N.
10-06’E.,
16.93m. to
point 2;

N.
06-15’W.,
85.37 m, to
point 3;

N.
46-29’W.,
16.59 m. to
point 4;

N.
86-13’E.,
47.22 m. to
point 5;

S.
71-28’E..
28.85 m. to
point 6;

S.
82-15’E.,
38.00 m. to
point 7;

S.
21-26’E.,
66.43 m. to
point 8;

S.
02-37’W.,
20.77 m. to
point 9;

N.
54-48’W.,
26.61 m. to
point 10;

S.
51-55’W.,
0.47 m. to
point 11;

DUE WEST
32.82 m. to
point 12;

S.
57-52’W.,
62.19 m. to
point 13;

S.
83-05’W.,
9.56 m. to
point of

beginning, containing an area of Nine Thousand Five Hundred Ninety-Three (9,593) Square Meters, more or less. All points referred to          are indicated on the plan and are marked on the ground as follows: all points are B.L. cylindrical concrete monuments, 15 x 40 cms.; Bearings true; Date of subdivision survey on August 2 – 3, 1955 executed by Engr. Nicomedes O. Mogamog and was approved on November 17, 1997.

IN WITNESS WHEREOF, I have hereunto set my hand and caused the seal of the Republic of the Philippines to be affixed.

DONE in the City of Manila, this 6th day of April, in the year of Our Lord, Two Thousand and Ten.

(Sgd.) GLORIA MACAPAGAL-ARROYO

President of the Philippines

By the President:

(Sgd.) LEANDRO R. MENDOZA

Executive Secretary