WEAPONS OF MASS DESTRUCTION ACT 2004

Principal Act Act. No. 2004-19 Commencement (LN. 2004/105) 4.11.2004 Assent 17.8.2004

Amending enactments

Relevant current provisions

Commencement date

LN. 2004/082 Corrigendum Act. 2005-38 ss.2, 7(3), 18(2)(b) and (c), 35(7),

52(1) and (3), Sch.2 Part A

23.5.2005 2006-35 s. 10A & Sch.4 14.12.2006

English sources: None cited

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

ARRANGEMENT OF CLAUSES

Clauses PART I

Preliminary

1. Title and commencement. 2. Interpretation.

PART II Biological weapons

3. Restriction on development etc. of certain biological agents and

toxins and of biological weapons. 4. Extraterritorial application of section 3. 5. Prosecution for biological weapons. 6. Prosecution of offences for biological weapons. 7. Offence by body corporate. 8. Powers to search and obtain evidence.

PART III

Chemical weapons

9. Chemical weapons. 10. Use etc. of chemical weapons. 10A. Import of chemicals. 11. Application of section 10. 12. Suspicious objects. 13. Power to remove or immobilise objects. 14. Power to destroy removed objects. 15. Power to enter premises and destroy objects. 16. Compensation for destruction. 17. Offences relating to destruction, etc. 18. Use of objects for permitted purposes and destruction, etc. 19. Premises or equipment for producing chemical weapons. 20. Suspicious equipment or buildings. 21. Notice requiring destruction or alteration. 22. Power where notice not complied with. 23. Position where no notice can be served. 24. Compensation for destruction or alteration. 25. Offences relating to destruction etc. 26. Destruction, etc: Supplementary. 27. Restriction on use etc. 28. Licences. 29. Information for the purposes of the Act. 30. Information and records for the purposes of the Chemical Weapons

Convention. 31. Identifying persons who have information. 32. Inspections: Interpretation.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

33. Rights of entry, etc. for the purposes of inspections. 34. Offences in connection with inspections. 35. Privileges and immunities in connection with inspections. 36. Reimbursement of expenditure. 37. Power to search and obtain evidence. 38. Forfeiture in case of conviction. 39. Prosecutions for chemical weapons. 40. Offences: other provisions. 41. Disclosure of information. 42. Services of notice.

PART IV

Nuclear weapons 43. Use etc. of nuclear weapons. 44. Exceptions. 45. Defences. 46. Assisting or inducing certain weapons-related acts overseas. 47. Extraterritorial application of section 43 or 46. 48. Powers of entry for search of evidence of any offence under section

43 or 46. 49. Prosecution for nuclear weapons. 50. Offences for making false or misleading statement. 51. Consent to prosecution for nuclear weapons.

PART V

Miscellaneous 52. Guidelines for Schedules of chemicals. 53. Power to make Regulations.

SCHEDULE 1

List of Toxic Chemicals and Precursors

SCHEDULE 2

SCHEDULE 3

SCHEDULE 4 Annex on Implementation and Verification to the Chemical Weapons

Convention

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

AN ACT TO MAKE PROVISION FOR THE PURPOSES OF PROHIBITING THE DEVELOPMENT, PRODUCTION, ACQUISITION AND POSSESSION OF CERTAIN WEAPONS OF MASS DESTRUCTION; IMPLEMENTING IN GIBRALTAR THE CONVENTION ON THE PROHIBITION OF THE DEVELOPMENT, PRODUCTION AND STOCKPILING OF BACTERIOLOGICAL (BIOLOGICAL) AND TOXIN WEAPONS AND THEIR DESTRUCTION, SIGNED AT WASHINGTON, LONDON, AND MOSCOW 10 APRIL, 1972 AND THE CONVENTION ON THE PROHIBITION OF THE DEVELOPMENT, PRODUCTION, STOCKPILING AND USE OF CHEMICAL WEAPONS AND ON THEIR DESTRUCTION, SIGNED AT PARIS ON 13 JANUARY 1993; AND FOR CONNECTED PURPOSES.

PART I

Preliminary Title and commencement. 1. This Act may be cited as the Weapons of Mass Destruction Act 2004 and shall come into operation on the day appointed by the Government by notice in the Gazette. Interpretation. 2. In this Act, unless the context otherwise requires−

“biological agent” means any microbial or other biological agent; “Chief Justice” means the Chief Justice of Gibraltar; “Commissioner” means the Commissioner of Police within the meaning

of the Police Act; “Court of Appeal” means the Court of Appeal for Gibraltar; “Gibraltarian” means a person who is registered as a Gibraltarian under

the Gibraltarian Status Act; “Governor” has the meaning assigned to it by section 2 of the

Interpretation and General Clauses Act; “normally resident” means a person resident in Gibraltar by virtue of a

certificate or permit of residence issued under the Immigration Control Act;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

“notice” means a notice in writing given under any provisions of this Act;

“occupier” includes a partnership or unincorporated association and, in

relation to premises that are unoccupied, means any person entitled to occupy the premises;

“police officer” means any member of the Royal Gibraltar Police Force

established under the Police Act; “prescribed” means prescribed by Regulations; “Supreme Court” means Her Majesty’s Supreme Court of Gibraltar; “toxin” means any toxin, whatever its origin or method of production.

PART II Biological Weapons

Restriction on development etc. of certain biological agents and toxins and of biological weapons. 3.(1) No person shall develop, produce, stockpile, acquire or retain−

(a) any biological agent or toxin of a type and in a quantity that has no justification for prophylactic, protective or other peaceful purposes; or

(b) any weapon, equipment or means of delivery designed to use

biological agents or toxins for hostile purposes or in armed conflict.

(2) A person shall not−

(a) transfer any biological agent or toxin to another person or enter into an agreement to do so; or

(b) make arrangements under which another person transfers any

biological agent or toxin or enters into an agreement with a third person to do so,

if the biological agent or toxin is likely to be kept or used (whether by the transferee or any other person) otherwise than for prophylactic, protective or other peaceful purposes and he knows or has reason to believe that that is the case. (3) Any person contravening this section shall be guilty of an offence and shall, on conviction on indictment, be liable to imprisonment for life.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

Extraterritorial application of section 3. 4.(1) Section 3 applies to acts done outside Gibraltar but only if they are done by a Gibraltarian or a person normally resident in Gibraltar. (2) Proceedings for an offence committed under section 3 outside Gibraltar may be taken, and the offence may, for incidental purposes, be treated as having been committed, in Gibraltar. (3) Nothing in this section affects any criminal liability arising otherwise than under this section. Prosecutions for biological weapons. 5.(1) Proceedings for a biological weapons offence may be instituted by the Attorney General if it appears to him that the offence has involved−

(a) the development or production outside Gibraltar of any thing

mentioned in section 3(1)(a) or (b); (b) the movement of any such thing into or out of any country or

territory; or (c) any proposal or attempt to do anything falling within paragraph

(a) or (b).

(2) In this section “biological weapons offence” means an offence under section 3 or 46 (including an offence of aiding, abetting, counselling, procuring or inciting the commission of, or attempting or conspiring to commit, such an offence). Prosecution of offences. 6.(1) Proceedings for an offence under section 3 shall not be instituted except by or with the consent of the Attorney General. (2) Subsection (1) shall not prevent the issue or execution of a warrant for the arrest of any person in respect of an offence, or the remanding in custody or on bail of any person charged with an offence. Offence by body corporate. 7. Where an offence under section 3 which is committed by a body corporate is proved to have been committed with the consent and connivance of, or to be attributed to any negligence on the part of, any director, manager, secretary or other similar officer of the body corporate, or any person who was purporting to act in any such capacity, he as well as

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

the body corporate shall be guilty of that offence and shall be liable to be proceeded against and punished accordingly. Powers to search and obtain evidence. 8.(1) If a magistrate or justice of the peace is satisfied by information on oath that there is reasonable ground for suspecting that an offence under section 3 has been, or is about to be, committed, he may grant a search warrant authorising a police officer named therein−

(a) to enter at the time within one month from the date of the warrant, any premises or place named therein, if necessary by force, and to search the premises or place and every person found therein;

(b) to inspect any document found in the premises or place or in

the possession of any person found therein, and to take copies of, or seize or detain any such document;

(c) to inspect, seize and detain any equipment so found; and (d) to inspect, sample, seize and detain any substance so found.

(2) A warrant issued under subsection (1), authorising a police officer to take the steps mentioned in that subsection, may also authorise any person named in the warrant to accompany the police officer and assist him in taking any of those steps.

PART III

Chemical weapons Chemical weapons. 9.(1) For the purposes of this Act, chemical weapons are−

(a) toxic chemicals and their precursors;

(b) munitions and other devices designed to cause death or harm

through the toxic properties of toxic chemicals released by them;

(c) equipment designed for use in connection with munitions and

devices falling within paragraph (b). (2) Subsection (1) is subject to sections 10(2) and (3), 18(1) and 19(2) (by virtue of which an object is not a chemical weapon if the use or intended use is only for permitted purposes).

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(3) Permitted purposes are−

(a) peaceful purposes; (b) purposes related to protection against toxic chemicals; (c) legitimate military purposes; (d) purposes of enforcing the law.

(4) Legitimate military purposes are all military purposes except those which depend on the use of the toxic properties of chemicals as a method of warfare in circumstances where the main object is to cause death, permanent harm or temporary incapacity to humans or animals. (5) A toxic chemical is a chemical, which through its chemical action on life processes can cause death, permanent harm or temporary incapacity to humans or animals; and the origin, method of production and place of production are immaterial. (6) A precursor is a chemical reactant which takes part at any stage in the production (by whatever method) of a toxic chemical. (7) References to an object include references to a substance. (8) In this Part, and in the Schedules to this Act, “the Convention” or “this Convention” means the Convention on the Prohibition of the Development, Production, Stockpiling and Use of Chemical Weapons and on their Destruction, signed at Paris on 13 January 1993. Use etc. of chemical weapons. 10.(1) No person shall−

(a) use a chemical weapon;

(b) develop or produce a chemical weapon; (c) have a chemical weapon in his possession; (d) participate in the transfer of a chemical weapon; or

(e) engage in military preparations, or in preparations of a military

nature, intending to use a chemical weapon.

(2) For the purposes of subsection (1)(a) an object is not a chemical weapon if the person uses the object only for permitted purposes; and in

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

deciding whether permitted purposes are intended, the types and quantities of objects shall be taken into account. (3) For the purposes of subsection (1)(b), (c), (d) or (e) an object is not a chemical weapon if the person does the act there mentioned with the intention that the object will be used only for permitted purposes; and in deciding whether permitted purposes are intended, the types and quantities of objects shall be taken into account. (4) For the purposes of subsection (1)(d) a person participates in the transfer of an object if−

(a) he acquires or disposes of the object or enters into a contract to acquire or dispose of it; or

(b) he makes arrangements under which another person acquires or

disposes of the object or another person enters into a contract to acquire or dispose of it.

(5) For the purposes of subsection (4)−

(a) to acquire an object is to buy it, hire it, borrow it or accept it as a gift; and

(b) to dispose of an object is to sell it, let it on hire, lend it or give

it. (6) In proceedings for an offence under subsection (1)(a), (c) or (d) relating to an object it is a defence for the accused to prove−

(a) that he neither knew nor suspected nor had reason to suspect that the object was a chemical weapon; or

(b) that he knew or suspected it to be a chemical weapon and as

soon as reasonably practicable after he first so knew or suspected he took all reasonable steps to inform the Governor or a police officer of his knowledge or suspicion.

(7) Nothing in subsection (6) prejudices any defence which it is open to a person charged with an offence under this section to raise apart from that subsection. (8) A person contravening this section is guilty of an offence and liable, on conviction on indictment, to imprisonment for life. Import of chemicals.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

10A.(1) No person shall import into Gibraltar any chemicals listed in Schedule 1 and Schedule 2 without a prior licence issued by the Government. (2) A licence may be issued on an application to the Chief Secretary on such conditions as the Government may see fit to impose. (3) A person who contravenes subsection (1) shall be guilty of an offence and liable on conviction on indictment to imprisonment for a term not exceeding five years or to a fine or to both. Application of section 10. 11.(1) Section 10 applies to acts done in Gibraltar or elsewhere. (2) So far as it applies to acts done outside Gibraltar, section 10 applies to Gibraltarians or persons normally resident in Gibraltar, and bodies incorporated under the law of Gibraltar. Suspicious objects. 12.(1) If−

(a) the Governor has grounds to suspect that an object is a chemical weapon; and

(b) at least one person falls within subsection (2),

the Governor may serve on any person falling within that subsection a copy of a notice falling within subsection (3). (2) The persons falling within this subsection are−

(a) any person who appears to the Governor to have the object in his possession; and

(b) any person not falling within paragraph (a) and who appears to

the Governor to have an interest which the Governor believes is materially affected by the notice.

(3) A notice falling within this subsection is a notice which−

(a) describes the object and states its location;

(b) states that the Governor suspects that the object is a chemical weapon and gives the reasons for his suspicion;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) states that he is considering whether to secure its destruction under sections 13 to 15;

(d) states that any person may make representations that the object

is not a chemical weapon;

(e) states that a person on whom the notice is served and who has the object in his possession must not relinquish possession before a date specified in the notice.

Power to remove or immobilise objects. 13.(1) If the Governor has reasonable cause to believe that−

(a) an object is on premises to which the public has access or which are occupied by a person who consents to action being taken under this subsection; and

(b) the object is a chemical weapon,

the Governor may authorise a police officer to enter the premises and to search them. (2) If a magistrate is satisfied on information on oath that there is reasonable cause to believe that an object is on premises and that the object is a chemical weapon, he may issue a warrant in writing authorising a police officer to enter the premises, if necessary by force, at any time within one month from the time of the issue of the warrant and to search them. (3) A police officer who acts under an authorisation given under subsection (1) or (2) may take with him such other persons and such equipment as appear to him to be necessary. (4) If a police officer enters premises under an authorisation given under subsection (1) or (2) and the object is found there he may make the object safe and−

(a) he may seize and remove it if it is reasonably practicable to do so; or

(b) he may in any other case affix a warning to the object or to

something in a conspicuous position near the object, stating that the object is not to be moved or interfered with before a date specified in the warning.

(5) For the purposes of subsection (4) an object is made safe if, without being destroyed, it is prevented from being an immediate danger (as where a fuse is neutralised or the object is smothered in foam).

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(6) This section applies whether or not any copy of a notice has been served under section 12. Power to destroy removed objects. 14.(1) This section applies if an object is removed from premises under section 13, and for the purposes of this section−

(a) the first six-month period is the period of six months beginning with the day after the removal; and

(b) the second six-month period is the period of six months

beginning with the day after the first six-month period ends.

(2) If at any time in the second six-month period the Governor decides that the object should be destroyed, he may authorise such person as he deems appropriate to destroy it; but this is subject to subsections (3) to (5). (3) If at any time in the first six-month period−

(a) any person appears to the Governor to have had the object in his possession immediately before its removal; or

(b) any person not falling within paragraph (a) appears to the Governor to have an interest which the Governor believes would be materially affected by the object’s destruction,

the Governor shall serve on such a person a copy of a notice falling within subsection (4). (4) A notice falling within this subsection is a notice which−

(a) describes the object and states its location;

(b) states that the Governor proposes to secure its destruction and gives the reasons for his proposal;

(c) states that the person on whom the copy of the notice is served

may object to the Governor’s proposal;

(d) states than an objection, if made, must be made in writing to the Governor before such date as is specified in the notice and must state why the object should not be destroyed.

(5) Before reaching a decision under subsection (2) the Governor shall−

(a) allow, any person on whom a copy of a notice has been served under subsection (3), time to respond; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) take into account any objections to the object’s proposed

destruction (whether made in response to a notice or otherwise).

(6) If an object is removed from premises under section 13 and destroyed under this section the Governor may recover from a responsible person any costs reasonably incurred by the Governor in connection with the removal and destruction; and a responsible person is any person who had possession of the object immediately before its removal. (7) If−

(a) an object is removed from premises under section 13;

(b) at the end of the second six-month period the Governor has not

authorised the destruction of the object; and (c) a person had possession of the object immediately before its

removal,

the Governor shall return the object to the person mentioned in paragraph (c) or, if there is more than one, to such of them as the Governor thinks appropriate. Power to enter premises and destroy objects. 15.(1) This section applies if a warning has been affixed under section 13(4)(b) and for the purposes of this section−

(a) the first six-month period is the period of six months beginning with the day after the warning was affixed; and

(b) the second six-month period is the period of six months

beginning with the day after the first six-month period ends.

(2) If at any time in the second six-month period the Governor decides that the object should be destroyed it may be destroyed as provided by subsections (6) to (9); but this is subject to subsections (3) to (5). (3) If at any time in the first six-month period−

(a) any person appears to the Governor to have had the object in his possession immediately before the warning was affixed; or

(b) any person not falling within paragraph (a) appears to the

Governor to have an interest which the Governor believes would be materially affected by the object’s destruction,

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

the Governor shall serve on such a person a copy of a notice falling within subsection (4). (4) A notice falling within this subsection is a notice which−

(a) describes the object and states its location;

(b) states that the Governor proposes to secure its destruction and gives the reasons for his proposal;

(c) states that the person on whom the copy of the notice is served

may object to the Governor’s proposal; and

(d) states that an objection, if made, must be made in writing to the Governor before such date as is specified in the notice and must state why the object should not be destroyed.

(5) Before reaching a decision under subsection (2), the Governor shall−

(a) allow, any person on whom a copy of a notice has been served under subsection (3), time to respond; and

(b) take into account any objections to the object’s proposed

destruction (whether made in response to a notice or otherwise).

(6) If−

(a) at any time in the second six-month period the Governor decides that the object should be destroyed; and

(b) the object is on premises to which the public has access or

which are occupied by a person who consents to action being taken under this subsection,

the Governor may authorise a person to enter the premises and to destroy the object if it is found there. (7) If, whatever the nature of the premises concerned, a magistrate is satisfied on information on oath that a warning has been affixed under section 13(4)(b), and that the Governor has decided at any time in the second six-month period that the object should be destroyed, the magistrate may issue a warrant in writing authorising such person as he deems appropriate to enter the premises, if necessary by force, at any time within one month from the time of the issue of the warrant and to destroy the object if it is found there.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(8) A person who acts under an authorisation given under subsection (6) or (7) may take with him such other persons and such equipment as appear to him to be necessary. (9) The powers conferred on an authorised person under this section shall only be exercisable in the presence of a police officer. (10) Where an object is destroyed under this section the Governor may recover from a responsible person any costs reasonably incurred by the Governor in connection with the destruction; and a responsible person is any person who had possession of the object immediately before the warning was affixed under section 13(4)(b). Compensation for destruction. 16.(1) This section applies if a person claims that−

(a) an object has been destroyed under section 14 or 15;

(b) he had an interest which was materially affected by the destruction and he sustained loss as a result; and

(c) no copy of a notice was served on him under the section concerned (whether or not one was served on any other person).

(2) If the person concerned makes an application under this section to the Supreme Court, and the court finds that his claim is justified, the court may order the Governor to pay to the applicant such amount, if any, by way of compensation as the court considers just. (3) If the court believes that the object would have been destroyed even if a copy of a notice had been served on the applicant under the section concerned, the court must not order compensation to be paid under this section. Offences relating to destruction, etc. 17.(1) If−

(a) a copy of a notice is served on a person under section 12;

(b) the notice relates to an object in his possession at the time the copy is served;

(c) he relinquishes possession before the date specified under

section 12(3)(e); and (d) he has no reasonable excuse for so relinquishing possession,

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

he is guilty of an offence.

(2) If a person wilfully obstructs a person in−

(a) entering or searching premises under an authorisation given under section 13(1) or (2) or 15(6) or (7);

(b) making an object safe, seizing or removing an object, or

affixing a warning, under section 13(4);

(c) destroying an object under an authorisation given under section 14(2) or 15(6) or (7); or

(d) attempting to do anything mentioned in paragraphs (a) to (c),

the person so obstructing is guilty of an offence. (3) If−

(a) a warning is affixed under section 13(4); and

(b) a person interferes with the warning, or moves or interferes with the object before the date specified in the warning; and

(c) he has no reasonable excuse for doing so,

he is guilty of an offence. (4) A person guilty of an offence under any of the preceding provisions of this section is liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to a fine at level 5 on the standard

scale.

(5) A person who knowingly makes a false or misleading statement in response to a copy of a notice served under section 12, 14 or 15 is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both.

Use of objects for permitted purposes and destruction, etc.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

18.(1) If an object is in the possession of a person who intends that it will be used only for permitted purposes, it is not a chemical weapon for the purposes of sections 12(1) and (3) and 13(1) and (2); and in deciding whether permitted purposes are intended, the types and quantities of objects shall be taken into account. (2) For the purposes of sections 12 to 17−

(a) to the extent that an object consists of a toxic chemical or precursor, it is destroyed if it is permanently prevented from being used other than for permitted purposes;

(b) to the extent that an object consists of a munition or other

device designed to cause death or harm through toxic chemicals released by it, it is destroyed if it is permanently prevented from doing so;

(c) to the extent that an object consists of equipment designed for

use in connection with a munition or other device, it is destroyed if it is permanently prevented from being so used.

(3) In sections 13 to 17 “premises” includes land (including buildings), moveable structures, vehicles, vessels, aircraft and hovercraft. (4) Nothing in sections 12 to 17 affects any power arising otherwise than by virtue of those sections (such as a power to dispose of property in police possession in connection with the investigation of a suspected offence). Premises or equipment for producing chemical weapons. 19.(1) No person shall−

(a) construct premises he intends to be used to produce chemical weapons;

(b) alter premises in circumstances where he intends that they will

be used to produce chemical weapons;

(c) install or construct equipment he intends to be used to produce chemical weapons;

(d) alter equipment in circumstances where he intends that it will

be used to produce chemical weapons;

(e) permit the construction on land he occupies of premises he intends to be used to produce chemical weapons;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(f) permit premises on land he occupies to be altered in circumstances where he intends that they will be used to produce chemical weapons;

(g) permit the installation or construction on land he occupies of

equipment he intends to be used to produce chemical weapons; or

(h) permit equipment on land he occupies to be altered in

circumstances where he intends that it will be used to produce chemical weapons.

(2) For the purposes of subsection (1) an object is not a chemical weapon if the person intends that the object will be used only for permitted purposes; and in deciding whether permitted purposes are intended, the types and quantities of objects shall be taken into account. (3) A person contravening this section is guilty of an offence and liable, on conviction on indictment, to imprisonment for life. Suspicious equipment or buildings. 20.(1) If−

(a) the Governor has grounds to suspect that any equipment or building is a chemical weapons production facility; and

(b) at least one person falls within subsection (2),

the Governor may serve on any person falling within that subsection a copy of a notice falling within subsection (3). (2) The persons falling within this subsection are−

(a) any person who appears to the Governor to occupy the land on which the equipment or building is situated;

(b) if the Governor’s suspicion relates to equipment, any person

not falling within paragraph (a) and who appears to the Governor to have the equipment in his possession; and

(c) any person not falling within paragraph (a) or (b) and who

appears to the Governor to have an interest which the Governor believes is materially affected by the notice.

(3) A notice falling within this subsection is a notice which−

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) describes the equipment or building and states its location;

(b) states that the Governor suspects that the equipment or building is a chemical weapons production facility and gives the reasons for his suspicion;

(c) states that he is considering whether to require the equipment

or building to be destroyed or altered; and

(d) states that any person may make representations that the equipment or building is not a chemical weapons production facility.

(4) If the notice relates to equipment, it must state that a person on whom the notice is served and who has the equipment in his possession must not relinquish possession of, or alter or use, the equipment before a date specified in the notice. Notice requiring destruction or alteration. 21.(1) If−

(a) the Governor has reasonable cause to believe that any equipment or building is a chemical weapons production facility; and

(b) at least one person falls within subsection (2),

the Governor may serve on each person falling within that subsection a copy of a notice falling within subsection (3).

(2) The persons falling within this subsection are−

(a) any person who appears to the Governor to occupy the land on which the equipment or building is situated;

(b) if the Governor’s belief relates to equipment, any person not

falling within paragraph (a) and who appears to the Governor to have the equipment in his possession; and

(c) any person not falling within paragraph (a) or (b) and who

appears to the Governor to have an interest which the Governor believes would be materially affected by the destruction or alteration of the equipment or building.

(3) A notice falling within this subsection is a notice which−

(a) describes the equipment or building and states its location;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) states that the Governor believes the equipment or building is a

chemical weapons production facility; and

(c) requires the equipment or building to be destroyed or altered, as the case may be, in a manner, and before a date, specified in the notice.

(4) If a notice under this section requires any equipment or building to be altered, a further notice under this section may−

(a) revoke the first notice; and (b) require the equipment or building to be destroyed;

and the preceding provisions of this section shall apply to the further notice accordingly. (5) This section applies whether or not any copy of a notice has been served under section 20. Power where notice not complied with. 22.(1) For the purposes of this section the qualifying condition is that−

(a) a notice has been prepared under section 21;

(b) the provisions of section 21(1) to (3) have been complied with in relation to the notice;

(c) the notice has not been revoked; and

(d) any requirement set out in the notice has not been complied

with.

(2) If a magistrate is satisfied on information on oath that the qualifying condition is fulfilled, he may issue a warrant in writing authorising a police officer to take remedial action under this section. (3) If a police officer is authorised by a warrant to take remedial action under this section he may−

(a) enter the land on which the equipment or building is situated, if necessary by force;

(b) do whatever is required to secure that the equipment or

building is destroyed or altered in a manner specified in the notice; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) take with him such other persons and such equipment as appear

to him to be necessary to help him to exercise the powers mentioned in paragraphs (a) and (b).

(4) If anything is done in exercise of the powers mentioned in this section, the Governor may recover from a responsible person any costs reasonably incurred by the Governor in connection with the exercise of those powers; and a responsible person is−

(a) in the case of equipment, any person in possession of the equipment at the time the land is entered; and

(b) in the case of a building, any person occupying the building at

the time it is entered.

Position where no notice can be served. 23.(1) For the purposes of this section the qualifying condition is that−

(a) the Governor has reasonable cause to believe that any equipment or building is a chemical weapons production facility;

(b) in the period of six months beginning with the day after he

formed his belief it has not been possible to serve a copy of a notice under section 21 because of the circumstances mentioned in subsection (2); and

(c) the Governor has drawn up proposals for the destruction or

alteration of the equipment or building in a manner specified in the proposals.

(2) The circumstances are that−

(a) no person appeared to the Governor to occupy the land on which the equipment or building is situated;

(b) if the Governor’s belief relates to equipment, no person

appeared to the Governor to have the equipment in his possession; and

(c) no person appeared to the Governor to have an interest which

the Governor believed would be materially affected by the destruction or alteration of the equipment or building.

(3) If a magistrate is satisfied on information on oath that the qualifying condition is fulfilled, he may issue a warrant in writing authorising a police

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

officer acting under the authority of the Governor to take remedial action under this section. (4) If a person is authorised by a warrant to take remedial action under this section he may−

(a) enter the land on which the equipment or building is situated, if necessary by force;

(b) do whatever is required to secure that the equipment or

building is destroyed or altered in a manner specified in the proposals drawn up by the Governor; and

(c) take with him such other persons and such equipment as appear

to him to be necessary to help him to exercise the powers mentioned in paragraphs (a) and (b).

(5) If anything is done in exercise of the powers mentioned in this section, the Governor may recover from a responsible person any costs reasonably incurred by the Governor in connection with the exercise of those powers; and a responsible person is−

(a) in the case of equipment, any person in possession of the equipment at the time the land is entered;

(b) in the case of a building, any person occupying the land at the

time it is entered. Compensation for destruction or alteration. 24.(1) This section applies if a person claims that−

(a) any equipment or building has been destroyed or altered in compliance with a notice falling within section 21(3) or has been destroyed or altered under section 22;

(b) he had an interest which was materially affected by the

destruction or alteration and he sustained loss as a result; and

(c) no copy of a notice was served on him under section 21.

(2) This section also applies if a person claims that− (a) any equipment or building has been destroyed or altered under

section 23; and (b) he had an interest which was materially affected by the

destruction or alteration and he sustained loss as a result.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(3) If the person concerned makes an application under this section to the Supreme Court, and the court finds that his claim is justified, the court may order the Governor to pay to the applicant such amount, if any, by way of compensation as the court considers just. (4) If the court believes that the equipment or building would have been destroyed or altered even if a copy of a notice had been served on the applicant under section 21, the court must not order compensation to be paid under this section. Offences relating to destruction, etc. 25.(1) If−

(a) a copy of a notice is served on a person under section 20; (b) the notice relates to equipment in his possession at the time the

copy is served;

(c) he relinquishes possession of, or alters or uses, the equipment before the date specified under section 20(4); and

(d) he has no reasonable excuse for doing so,

he is guilty of an offence. (2) If−

(a) a copy of a notice is served on a person under section 21;

(b) the notice relates to equipment in his possession at the time the copy is served or to a building situated on land he occupies at that time;

(c) any requirement set out in the notice is not fulfilled; and

(d) he has no reasonable excuse for the requirement not being

fulfilled, he is guilty of an offence. (3) If a person wilfully obstructs−

(a) a person exercising, or attempting to exercise, the powers mentioned in section 22(3)(a) or (b) or 23(4)(a) or (b); or

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) any other person taken with him as mentioned in section 22(3)(c) or 23(4)(c) and helping him, or attempting to help him, to exercise those powers,

the person so obstructing is guilty of an offence. (4) A person guilty of an offence under any of the preceding provisions of this section is liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to a fine at level 5 on the standard

scale.

(5) A person who knowingly makes a false or misleading statement in response to a notice served under section 12 is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both.

Destruction, etc: supplementary. 26.(1) In sections 20 to 23 “chemical weapons production facility” has the meaning given by the definition of that expression in the Convention, and for this purpose−

(a) expressions used in the definition in the Convention shall be construed in accordance with the Convention; and

(b) section 9 shall be ignored.

(2) For the purposes of sections 20 to 24 “destroyed” and “destruction”, in relation to a building, mean demolished and demolition. (3) Nothing in sections 20 to 23 affects any power arising otherwise than by virtue of those sections (such as a power to dispose of property in police possession in connection with the investigation of a suspected offence). Restriction on use etc. 27.(1) Subject to section 28 (which relates to licences) no person shall−

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) use a Schedule 1 toxic chemical or precursor for a permitted purpose; or

(b) produce or have in his possession a Schedule 1 toxic chemical

or precursor with the intention that it will be used for a permitted purpose.

(2) A “Schedule 1 toxic chemical or precursor” is a toxic chemical or precursor listed in Schedule 1 to the annex on chemicals to the Convention; and for ease of reference that Schedule is set out in Schedule 1 to this Act. (3) A person contravening subsection (1) is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to a fine at level 5 on the standard

scale. Licences. 28.(1) Section 27 does not apply to anything done in accordance with the terms of a licence granted by the Governor and having effect at the time it is done. (2) The Governor may−

(a) grant a licence in such circumstances and on such terms as he thinks fit; and

(b) vary or revoke a licence by serving a notice to that effect on

the person to whom the licence was granted.

(3) A variation or revocation shall take effect at such reasonable time as is specified in the notice served under subsection (2)(b). (4) The Governor may by regulations make provision with respect to appealing against a refusal to grant, renew or vary a licence or against a variation or revocation of a licence. (5) A person who knowingly makes a false or misleading statement for the purpose of obtaining a licence or a renewal or variation of a licence, or of opposing a variation or revocation of a licence, is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both. Information for the purposes of the Act. 29.(1) If the Governor has grounds to suspect that a person is committing or has committed an offence under this Act the Governor may by notice served on the person require him to give in such form as is specified in the notice, and within such reasonable period as is so specified, such information as−

(a) the Governor has reasonable cause to believe will help to establish whether the person is committing or has committed such an offence; and

(b) is specified in the notice.

(2) A person who without reasonable excuse fails to comply with a notice served on him under subsection (1) is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to a fine at level 5 on the standard

scale.

(3) A person on whom a notice is served under subsection (1) and who knowingly makes a false or misleading statement in response to it is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both. Information and records for the purposes of the Chemical Weapons Convention. 30.(1) The Governor may by notice served on any person require him to give in such form as is specified in the notice, and within such reasonable period as is so specified, such information as−

(a) the Governor has reasonable cause to believe is or will be needed in connection with anything to be done for the purposes of the Convention; and

(b) is specified in the notice;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

and the information required by a notice may relate to a state of affairs subsisting before the coming into force of this Act or of the Convention. (2) The Governor may by notice served on any person require him to keep such records as−

(a) the Governor has reasonable cause to believe will facilitate the giving of information the person may at any time be required to give under subsection (1); and

(b) are specified in the notice.

(3) A person who without reasonable excuse fails to comply with a notice served on him under subsection (1) or (2) is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to a fine at level 5 on the standard

scale.

(4) A person on whom a notice is served under subsection (1) and who knowingly makes a false or misleading statement in response to it is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both.

Identifying persons who have information. 31.(1) The Governor may make Regulations requiring persons of any description specified in the Regulations to inform him that they are of such a description. (2) Any such description must be so framed that persons within it are persons on whom the Governor is likely to want to serve a notice under section 30. (3) A person who without reasonable excuse fails to comply with a requirement imposed by the Regulations is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) on conviction on indictment, to a fine at level 5 on the standard scale.

(4) A person who knowingly makes a false or misleading statement in response to a requirement imposed by the regulations is guilty of an offence and liable−

(a) on summary conviction, to a fine up to level 5 on the standard scale;

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both.

Inspections: interpretation. 32. For the purposes of sections 33 to 36−

(a) the verification annex is the annex on implementation and verification to the Chemical Weapons Convention as set out in Schedule 4 to the Act;

(b) a routine inspection is an inspection conducted pursuant to

Parts II to IX of that annex ;

(c) a challenge inspection is an inspection conducted pursuant to Parts II and X of that annex ;

(d) an assistance inspection is an inspection conducted pursuant to

Parts II and XI of that annex ;

(e) “in-country escort”, “inspector”, “inspection team” and “observer” have the meanings given by Part I of that annex .

Rights of entry etc. for the purposes of inspections. 33.(1) If it is proposed to conduct a routine inspection, a challenge inspection or an assistance inspection in Gibraltar, the Governor may issue an authorisation under this section in respect of that inspection. (2) An authorisation under this section shall−

(a) contain a description of the area (the specified area) in which the inspection is to be conducted;

(b) specify the type of inspection concerned;

(c) state the names of the members of the inspection team by

whom the inspection is to be carried out; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(d) in the case of a challenge inspection, state the name of any

observer who may accompany the team.

(3) Such an authorisation shall have the effect of authorising the inspection team−

(a) to exercise within the specified area such rights of access, entry and unobstructed inspection as are conferred on them by the verification annex; and

(b) to do such other things within that area in connection with the

inspection as they are entitled to do by virtue of the verification annex (including things concerning the maintenance, replacement or adjustment of any instrument or other object).

(4) Such an authorisation shall in addition have the effect of−

(a) authorising an in-country escort to accompany the inspection team in accordance with the provisions of the verification annex; and

(b) authorising any police officer to give such assistance as the in-

country escort may request for the purpose of facilitating the conduct of the inspection in accordance with the verification annex ;

and the name of the person in charge of the in-country escort shall be stated in the authorisation. (5) An authorisation under this section in the case of a challenge inspection shall in addition have the effect of authorising the observer to exercise within the specified area such rights of access and entry as are conferred on him by the verification annex. (6) Any police officer giving assistance in accordance with subsection (4)(b) may use such reasonable force as he considers necessary for the purpose mentioned in that provision. (7) The occupier of any premises−

(a) in relation to which it is proposed to exercise a right of entry in reliance on an authorisation under this section; or

(b) on which an inspection is being carried out in reliance on such

an authorisation,

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

or a person acting on behalf of the occupier of any such premises, shall be entitled to require a copy of the authorisation to be shown to him by a member of the in-country escort. (8) The validity of any authorisation purporting to be issued under this section in respect of any inspection shall not be called into question in any court of law at any time before the conclusion of that inspection. (9) Accordingly, where an authorisation purports to be issued under this section in respect of any inspection, no proceedings (of whatever nature) shall be brought at any time before the conclusion of the inspection if they would, if successful, have the effect of preventing, delaying or otherwise affecting the carrying out of the inspection. (10) If in any proceedings any question arises whether a person at any time was or was not, in relation to any routine, challenge or assistance inspection, a member of the inspection team or a member of the in-country escort or the observer, a certificate issued by or under the authority of the Governor stating any fact relating to that question shall be conclusive evidence of that fact. (11) If an authorisation is issued under this section the Governor may issue an amendment varying the specified area, and

(a) from the time when the amendment is expressed to take effect this section shall apply as if the specified area were the area as varied;

(b) subsection (8) shall apply to the amendment as it applies to the

authorisation;

(c) the Governor may issue further amendments varying the specified area and in such a case paragraphs (a) and (b) shall apply.

Offences in connection with inspections. 34.(1) If an authorisation has been issued under section 33 in respect of any inspection, a person is guilty of an offence if he−

(a) refuses without reasonable excuse to comply with any request made by any police officer or a member of the in-country escort for the purpose of facilitating the conduct of that inspection in accordance with the verification annex;

(b) interferes without reasonable excuse with any container,

instrument or other object installed in the course of that inspection in accordance with the verification annex; or

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) wilfully obstructs any member of the inspection team or of the

in-country escort, or the observer, in the conduct of that inspection in accordance with the verification annex.

(2) Subsection (1)(b) applies to interference which occurs at any time while the container, instrument or other object is retained in accordance with the verification annex.

(3) A person guilty of an offence under this section is liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to a fine at level 5 on the standard

scale.

Privileges and immunities in connection with inspections. 35.(1) Members of inspection teams and observers shall enjoy the same privileges and immunities as are enjoyed by diplomatic agents in accordance with the following Articles of the Vienna Convention On Diplomatic Relations signed in 1961 (the 1961 Convention) as set out in the Schedule to the Diplomatic Privileges Act−

(a) Article 29;

(b) paragraphs 1 and 2 of Article 30;

(c) paragraphs 1, 2 and 3 of Article 31; and

(d) Article 34.

(2) Such persons shall, in addition, enjoy the same privileges as are enjoyed by diplomatic agents in accordance with paragraph 1(b) of Article 36 of the 1961 Convention, except in relation to any article, the importing or exporting of which is prohibited by law or controlled by the enactments relating to quarantine. (3) Samples and approved equipment carried by members of an inspection team shall be inviolable and exempt from customs duties. (4) The privileges and immunities accorded to members of inspection teams and observers by virtue of this section shall be enjoyed by them at any time when they are in Gibraltar−

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) in connection with the carrying out there of a routine inspection, a challenge inspection or an assistance inspection; or

(b) while in transit to or from the territory of another party to the

Convention in connection with the carrying out of such an inspection there.

(5) If−

(a) immunity from jurisdiction of a member of an inspection team is waived in accordance with the verification annex; and

(b) a notice made by the Governor and informing the member of

the waiver is delivered to him in person,

then, from the time the notice is so delivered, this section shall not have effect to confer that immunity on the member. (6) If in any proceedings any question arises whether a person is or is not entitled to any privilege or immunity by virtue of this section, a certificate issued by the Governor stating any fact relating to that question shall be conclusive evidence of that fact. (7) In this section, “approved equipment” and “samples” shall be construed in accordance with the Verification Annex. Reimbursement of expenditure. 36. The Governor may reimburse any person in respect of expenditure incurred in connection with a routine inspection, a challenge inspection or an assistance inspection. Power to search and obtain evidence. 37.(1) If a magistrate is satisfied on information on oath that there is reasonable ground for suspecting that an offence under this Act is being, has been or is about to be committed on any premises or that evidence of the commission of such an offence is to be found there, he may issue a warrant in writing authorising a police officer to enter the premises, if necessary by force, at any time within one month from the time of the issue of the warrant and to search them. (2) A person who enters the premises under the authority of the warrant may−

(a) take with him such other persons and such equipment as appear to him to be necessary;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) inspect any document found on the premises which he has

reasonable cause to believe may be required as evidence for the purposes of proceedings in respect of an offence under this Act;

(c) take copies of, or seize and remove, any such document;

(d) inspect, seize and remove any device or equipment found on

the premises which he has reasonable cause to believe may be required as an evidence;

(e) inspect, sample, seize and remove any substance found on the

premises which he has reasonable cause to believe may be required as an evidence; and

(f) search or cause to be searched any person found on the

premises whom he has reasonable cause to believe to be in possession of any document, device, equipment or substance;

but no woman or girl shall be searched except by a woman nor a man shall be searched except by a man. Forfeiture in case of conviction. 38.(1) The court by or before which a person is convicted of an offence under this Act may order that anything shown to the court’s satisfaction to relate to the offence shall be forfeited, and either destroyed or otherwise dealt with in such manner as the court may order. (2) In particular, the court may order the thing to be dealt with as the Governor may see fit; and in such a case the Governor may direct that it be destroyed or otherwise dealt with. (3) Where−

(a) the court proposes to order anything to be forfeited under this section; and

(b) a person claiming to have an interest in it applies to be heard

by the court,

the court must not order it to be forfeited unless he has been given an opportunity to show cause why the order should not be made. Prosecutions for chemical weapons.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

39.(1) Proceedings for a chemical weapons offence may be instituted by the Attorney General if it appears to him that the offence has involved−

(a) the development or production in Gibraltar of a chemical weapon;

(b) the movement of a chemical weapon into or out of any country

or territory; or (c) any proposal or attempt to do anything falling within paragraph

(a) or (b). (2) In this section “chemical weapons offence” means an offence under section 10 or section 46 (including an offence of aiding, abetting, counselling, procuring or inciting the commission of, or attempting or conspiring to commit, such an offence). Offences: other provisions. 40.(1) Proceedings for an offence under this Part shall not be instituted except by or with the consent of the Attorney General. (2) Where an offence under this Part is committed by a body corporate and is proved to have been committed with the consent or connivance of, or to be attributable to any neglect on the part of−

(a) a director, manager, secretary or other similar officer of the body corporate; or

(b) any person who was purporting to act in any such capacity,

he as well as the body corporate shall be guilty of that offence and shall be liable to be proceeded against and punished accordingly. (3) In subsection (3) “director”, in relation to a body corporate whose affairs are managed by its members, means a member of the body corporate. Disclosure of information. 41.(1) This section applies to information if−

(a) it was obtained under, or in connection with anything done under, this Act or the Convention; and

(b) it relates to a particular business or other activity carried on by

any person.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(2) So long as the business or activity continues to be carried on the information shall not be disclosed except−

(a) with the consent of the person for the time being carrying on the business or activity;

(b) in connection with anything done for the purposes of the

Convention;

(c) in connection with anything done for the purposes of this Act;

(d) in connection with the investigation of any criminal offence or for the purposes of any criminal proceedings;

(e) in connection with the enforcement of any restriction on

imports or exports; (f) in dealing with an emergency involving danger to the public;

(g) with a view to ensuring the security of Gibraltar; or

(h) to the International Court of Justice for the purpose of enabling

that Court to deal with any dispute referred to it under the Convention.

(3) A person who discloses information in contravention of this section is guilty of an offence and liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both.

(4) Where a person proposes to disclose information to which this section applies in circumstances where the disclosure would by virtue of paragraphs (b) to (h) of subsection (2) not contravene this section, he may disclose the information notwithstanding any obligation not to disclose it that would otherwise apply. Service of notices. 42. A notice under any provision of this Act, or a copy of a notice under any such provision, may be served on a person−

(a) by delivering it to him in person;

(b) by sending it by post to him at his usual or last-known residence or place of business in Gibraltar; or

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) in the case of a body corporate, by delivering it to the secretary

of the body corporate at its registered or principal office or sending it by post to the secretary of that body corporate at that office.

PART IV

Nuclear weapons

Use etc. of nuclear weapons. 43.(1) A person who−

(a) knowingly causes a nuclear weapon explosion; (b) develops or produces, or participates in the development or

production of, a nuclear weapon; (c) has a nuclear weapon in his possession;

(d) participates in the transfer of a nuclear weapon; or

(e) engages in military preparations, or in preparations of a

military nature, intending to use, or threaten to use, a nuclear weapon,

is guilty of an offence. (2) Subsection (1) has effect subject to the exceptions and defences in sections 44 and 45. (3) For the purposes of subsection (1)(b) a person participates in the development or production of a nuclear weapon if he does any act which−

(a) facilitates the development by another of the capability to produce or use a nuclear weapon; or

(b) facilitates the making by another of a nuclear weapon,

knowing or having reason to believe that his act has or will have that effect. (4) For the purposes of subsection (1)(d) a person participates in the transfer of a nuclear weapon if−

(a) he buys or otherwise acquires it or agrees with another to do so;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) he sells or otherwise disposes of it or agrees with another to do so; or

(c) he makes arrangements under which another person either

acquires or disposes of it or agrees with a third person to do so.

(5) A person guilty of an offence under this section is liable on conviction on indictment to imprisonment for life. (6) In this section “nuclear weapon” includes a nuclear explosive device that is not intended for use as a weapon. (7) This section applies to acts done outside Gibraltar, but only if they are done by a Gibraltarian or a person normally resident in Gibraltar. (8) Nothing in subsection (7) affects any criminal liability arising otherwise than under that subsection. Exceptions. 44.(1) Nothing in section 43 applies−

(a) to an act which is authorised under subsection (2); or (b) to an act done in the course of an armed conflict.

(2) The Governor may−

(a) authorise any act which would otherwise contravene section 43 in such manner and on such terms as he thinks fit; and

(b) withdraw or vary any authorisation given under this

subsection.

(3) Any question arising in proceedings for an offence under section 43 as to whether anything was done in the course of an armed conflict shall be determined by the Governor. (4) A certificate purporting to set out any such determination and to be signed by the Governor shall be received in evidence in any such proceedings and shall be presumed to be so signed unless the contrary is shown. Defences. 45.(1) In proceedings for an offence under section 43(1)(c) or (d) relating to an object it is a defence for the accused to show that he did not know and had no reason to believe that the object was a nuclear weapon.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(2) But he shall be taken to have shown that fact if−

(a) sufficient evidence is adduced to raise an issue with respect to it; and

(b) the contrary is not proved by the prosecution beyond

reasonable doubt.

(3) In proceedings for such an offence it is also a defence for the accused to show that he knew or believed that the object was a nuclear weapon but, as soon as reasonably practicable after he first knew or believed that fact, he took all reasonable steps to inform the Governor or a police officer of his knowledge or belief. Assisting or inducing certain weapons-related acts overseas. 46.(1) A person who aids, abets, counsels or procures, or incites, a person who is not a Gibraltarian or a person normally resident in Gibraltar to do a relevant act outside Gibraltar is guilty of an offence. (2) For the purpose of subsection (1) a relevant act is an act that, if done by a person normally resident in Gibraltar, would contravene section 3, 10 or 43. (3) Nothing in this section applies to an act mentioned in subsection (1) which−

(a) relates to a relevant act which would contravene section 43; and

(b) is authorised by the Governor;

and section 44(2) applies for the purpose of authorising acts that would otherwise constitute an offence under this section. (4) A person accused of an offence under this section in relation to a relevant act which would contravene a provision mentioned in subsection (2) may raise any defence which would be open to a person accused of the corresponding offence ancillary to an offence under that provision. (5) A person convicted of an offence under this section is liable on conviction on indictment to imprisonment for life. (6) This section applies to acts done outside Gibraltar, but only if they are done by a Gibraltarian or a person normally resident in Gibraltar.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(7) Nothing in this section prejudices any criminal liability existing apart from this section. Extraterritorial application of section 43 and 46. 47. Proceedings for an offence committed under section 43 or 46 outside Gibraltar may be taken, and the offence may for incidental purposes be treated as having been committed, in Gibraltar. Powers of entry for search of evidence of any offence under section 43 or 46. 48.(1) If a justice of the peace is satisfied on information on oath that there are reasonable grounds for suspecting that evidence of the commission of an offence under section 43 or 46 is to be found on any premises, he may issue a warrant authorising a police officer to enter the premises, if necessary by force, at any time within one month from the time of the issue of the warrant and to search the premises. (2) The powers of a police officer who enters the premises under the authority of the warrant include power-

(a) to take with him such other persons and such equipment as appear to him to be necessary;

(b) to inspect, seize and retain any substance, equipment or

document found on the premises; (c) to require any document or other information which is held in

electronic form and is accessible from the premises to be produced in a form-

(i) in which he can read and copy it; or (ii) from which it can readily be produced in a form in which

he can read and copy it; and

(d) to copy any document which he has reasonable cause to believe may be required as evidence for the purposes of proceedings in respect of an offence under section 43 or 46.

(3) A person who enters premises under the authority of a warrant or by virtue of subsection (2)(a) may−

(a) give such assistance as the police officer may request for the purpose of facilitating the exercise of any power under this section; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) search or cause to be searched any other person on the premises who he has reasonable cause to believe may have in his possession any document or other thing which may be required as evidence for the purposes of proceedings in respect of an offence under section 43 or 46.

(4) No police officer shall search a person of the opposite sex. (5) A person who−

(a) wilfully obstructs a police officer or any accompanying person in the exercise of a power conferred by a warrant under this section; or

(b) fails without reasonable excuse to comply with a reasonable

request made by a police officer or any accompanying person for the purpose of facilitating the exercise of such a power,

is guilty of an offence. (6) A person guilty of an offence under subsection (5) is liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both. Prosecutions for nuclear weapons. 49.(1) Proceedings for a “nuclear weapons offence” may be instituted by the Attorney General if it appears to him that the offence has involved−

(a) the development or production outside Gibraltar of a nuclear weapon;

(b) the movement of a nuclear weapon into or out of any country

or territory; (c) any proposal or attempt to do anything falling within paragraph

(a) or (b). (2) In this Part “nuclear weapons offence” means an offence under section 43 or 46 (including an offence of aiding, abetting, counselling, procuring or inciting the commission of, or attempting or conspiring to commit, such an offence). Offences for making false or misleading statement.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

50.(1) A person who knowingly or recklessly makes a false or misleading statement for the purpose of obtaining or opposing the variation or withdrawal of authorisation for the purposes of section 43 or 46 is guilty of an offence. (2) A person guilty of an offence under subsection (1) is liable−

(a) on summary conviction, to a fine not exceeding level 4 on the standard scale; or

(b) on conviction on indictment, to imprisonment for a term not

exceeding two years or to a fine or to both. (3) Where an offence under section 43, 46 or subsection (1) above committed by a body corporate is proved to have been committed with the consent or connivance of, or to be attributable to any neglect on the part of−

(a) a director, manager, secretary or other similar officer of the body corporate; or

(b) any person who was purporting to act in any such capacity, he as well as the body corporate shall be guilty of that offence and shall be liable to be proceeded against and punished accordingly. (4) In subsection (3) “director”, in relation to a body corporate whose affairs are managed by its members, means a member of the body corporate. Consent to prosecutions for nuclear weapons. 51. Proceedings for an offence under section 43 or 46 shall not be instituted except by or with the consent of the Attorney General.

PART V

Miscellaneous

Guidelines for Schedules of chemicals. 52.(1) The following criteria shall be taken into account in considering whether a toxic chemical or precursor should be included in Schedule 1−

(a) it has been developed, produced, stockpiled or used as a

chemical weapon as defined in Article II; (b) it poses otherwise a high risk to the object and purpose of the

Convention by virtue of its high potential for use in activities prohibited under that Convention because one or more of the following conditions are met−

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(i) it possesses a chemical structure closely related to that of other toxic chemicals listed in Schedule 1, and has, or can be expected to have, comparable properties;

(ii) it possesses such lethal or incapacitating toxicity as well

as other properties that would enable it to be used as a chemical weapon; or

(iii) it may be used as a precursor in the final single

technological stage of production of a toxic chemical listed in Schedule 1, regardless of whether this stage takes place in facilities, in munitions or elsewhere; and

(c) it has little or no use for purposes not prohibited under the

Convention. (2) The following criteria shall be taken into account in considering whether a toxic chemical not listed in Schedule 1 or a precursor to a Schedule 1 chemical or to a chemical listed in Schedule 2, part A, should be included in Schedule 2−

(a) it poses a significant risk to the object and purpose of this

Convention because it possesses such lethal or incapacitating toxicity as well as other properties that could enable it to be used as a chemical weapon;

(b) it may be used as a precursor in one of the chemical reactions

at the final stage of formation of a chemical listed in Schedule 1 or Schedule 2, part A;

(c) it poses a significant risk to the object and purpose of this

Convention by virtue of its importance in the production of a chemical listed in Schedule 1 or Schedule 2, part A; or

(d) it is not produced in large commercial quantities for purposes

not prohibited under the Convention. (3) The following criteria shall be taken into account in considering whether a toxic chemical or precursor, not listed in other Schedules −

(a) it has been produced, stockpiled or used as a chemical weapon; (b) it poses otherwise a risk to the object and purpose of the

Convention because it possesses such lethal or incapacitating toxicity as well as other properties that might enable it to be used as a chemical weapon;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) it poses a risk to the object and purpose of the Convention by virtue of its importance in the production of one or more chemicals listed in Schedule 1 or Schedule 2, part B; or

(d) it may be produced in large commercial quantities for purposes

not prohibited under the Convention. Power to make Regulations. 53. The Government may, for carrying out the purposes of this Act, make Regulations.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

SCHEDULE 1

Sections 27(2) and 52(1)

List of Toxic Chemicals and Precursors

A. TOXIC CHEMICALS: CAS registry number

1. O-Alkyl (≤ C10, incl. cycloalkyl) alkyl (Me,Et,n-Pro or i-Pr)- phosphonofluoridates e.g.Sarin:O-Isopropyl methylphosphonofluoridate Soman:O-Pinacolyl methylphosphonofluoridate

(107-44-8) (96-64-0)

2. O-Alkyl (≤ C10, incl. cycloalkyl) N,N-dialkyl(Me,Et,n-Pro or i-Pr) phosphoramidocyanidates e.g. Tabun: O-Ethyl N, N-dimethyl phosphoramidocyanidate

(77-81-6)

3. O-Alkyl (H or ≤ C10, incl. cycloalkyl) S-2-dailkyl (Me, Et, n-Pr or i-Pr)- aminoethyl alkyl (Me, Et, n-Pr or i-Pr) phosphonothiolates and corresponding alkylated or protonated salts e.g. VX: O-Ethyl S-2-diisopropylaminoethyl methyl phosphonothiolate

(50782-69-9)

4. Sulfur mustards: 2-Chloroethylchloromethylsufide Mustard gas: Bis (2-chloroethyl) sulfide Bis (2-chloroethylthio) methane Sesquimustard:1,2-Bis(2-chloroethylthio) ethane 1,3-Bis (2-chloroethylthio)-n-propane 1,4-Bis (2-chloroethylthio)-n-butane 1,5-Bis (2-chloroethylthio)-n-pentane Bis (2-chloroethylthiomethyl) ether O-Mustard:Bis(2-chloroethylthioethyl) ether

(2625-76-5) (505-60-2) (63869-13-6) (3563-36-8) (63905-10-2) (142868-93-7) (142868-94-8) (63918-90-1) (63918-89-8)

5. Lewisites:Lewisite 1: 2-Chlorovinyldichloroarsine Lewisite2:Bis(2-chlorovinyl) chloroarsine Lewisite 3: Tris (2-chlorovinyl) arsine

(541-25-3) (40334-69-8) (40334-70-1)

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

6. Nitrogen mustards: HN1: Bis (2-chloroethyl) ethylamine HN2: Bis (2-chloroethyl methylamine HN3: Tris (2-chloroethyl) amine

(538-07-8) (51-75-2) (555-77-1)

7. Saxitoxin

(35523-89-8)

8. Ricin

(9009-86-3)

B. PRECURSORS:

9. Alkyl(Me,Et,n-Pro or i-Pr) phosphonyldifluorides,e.g.DF: Methylphosphonyldifluoride

(676-99-3)

10. O-Alkyl (H or ⊆=C10, incl. cycloalkyl) O-2-dialkyl (Me, Et, n-Pr or i-Pr) -aminoethyl alkyl (Me, Et, n-Pr or i-Pr) phosphonites and corresponding alkylated or protonated salts,eg.QL:O-Ethyl O- 2diisopropylaminoethyl methylphosphonite

(57856-11-8)

11. Chlorosarin: O-Isopropyl methylphosphonochloridate

(1445-76-7)

12. Chlorosoman:O-Pinacolyl methylphosphonochloridate

(7040-57-5)

NOTES

1. This Schedule sets out Schedule 1 to the annex on chemicals to the Convention as corrected.

2. In this Schedule the reference to the CAS registry is to the chemical abstract service registry.

3. This Schedule must be read subject to the following proposition, which is based on a note in the Convention: Where reference is made to groups of

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

dialkylated chemicals, followed by a list of alkyl groups in parentheses, all chemicals possible by all possible combinations of alkyl groups listed in the parentheses must be taken to be listed in the Schedule.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

SCHEDULE 2 Section 52(2)

A.Toxic chemicals

1. Amiton: O,O-Diethyl S-[2- (diethylamino)ethyl] phosphorothiolate, and corresponding alkylated or protonated salts

(78-53-5)

2. PFIB: 1,1,3,3,3-Pentafluoro-2- (trifluoromethyl)-1-propene

(382-21-8)

3. BZ: 3-Quinuclidinyl benzilate (*)

(6581-06-2)

B. Precursors

4. Chemicals, except for those listed in Schedule 1, containing a phosphorus atom to which is bonded one methyl, ethyl or propyl (normal or iso) group but not further carbon atoms, e.g. Methylphosphonyl dichloride, Dimethyl methylphosphonate Exemption: Fonofos: O-Ethyl S- phenyl ethylphosphonothiolothionate

(676-97-1)

(756-79-6)

(944-22-9)

5. N, N-Dialkyl (Me Et n-Pr or i-Pr) phosphoramidic dihalides

6. Dialkyl (Me, Et, n-Pr or i-Pr) N,N- dialkyl (Me, Et, n-Pr or i-Pr)- phosphoramidates

7. Arsenic trichloride (7784-34-1)

8. 2, 2-Diphenyl-2-hydroxyacetic acid

(76-93-7)

9. Quinuclidin-3-ol

(1619-34-7)

10. N,N-Dialkyl (Me, Et, n-Pr or i-Pr) aminoethyl-2-chlorides and corresponding protonated salts

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

11. N,N-Dialkyl (Me, Et, n-Pr or i-Pr) aminoethane-2-ols and corresponding protonated salts Exemptions: N,N- Dimethylaminoethanol and corresponding protonated salts N,N-Diethylaminoethanol and corresponding protonated salts

(108-01-0) (100-37-8)

12. N,N-Dialkyl (Me, Et, n-Pr or i-Pr) aminoethane-2-thiols and corresponding protonated salts

13. Thiodiglycol: Bis(2- hydroxyethyl)sulfide

(111-48-8)

14. Pinacolyl alcohol: 3,3-Dimethylbutan- 2-ol

(464-07-3)

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

SCHEDULE 3 Section 52(3)

A.Toxic chemicals:

1. Phosgene: Carbonyl dichloride

(75-44-5)

2. Cyanogen chloride

(506-77-4)

3. Hydrogen cyanide

(74-90-8)

4. Chloropicrin: Trichloronitromethane

(76-06-2)

B. Precursors :

5. Phosphorus oxychloride

(10025-87- 3)

6. Phosphorus trichloride

(7719-12-2)

7. Phosphorus pentachloride

(10026-13- 8)

8. Trimethyl phosphite

(121-45-9)

9. Triethyl phosphite

(122-52-1)

10. Dimethyl phosphite

(868-85-9)

11. Diethyl phosphite

(762-04-9)

12. Sulfur monochloride

(10025-67- 9)

13. Sulfur dichloride

(10545-99- 0)

14. Thionyl chloride

(7719-09-7)

15. Ethyldiethanolamine

(139-87-7)

16. Methyldiethanolamine

(105-59-9)

17. Triethanolamine

(102-71-6)

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

SCHEDULE 4 Section 32

ANNEX ON IMPLEMENTATION AND VERIFICATION TO THE

CHEMICAL WEAPONS CONVENTION ("VERIFICATION ANNEX")

PART I

DEFINITIONS

1. “Approved Equipment” means the devices and instruments necessary for the performance of the inspection team's duties that have been certified by the Technical Secretariat in accordance with regulations prepared by the Technical Secretariat pursuant to Part II, paragraph 27 of this Annex. Such equipment may also refer to the administrative supplies or recording materials that would be used by the inspection team. 2. “Building” as referred to in the definition of chemical weapons production facility in Article II comprises specialized buildings and standard buildings.

“Specialized Building” means:

(a) any building, including underground structures, containing specialized equipment in a production or filling configuration;

(b) any building, including underground structures, which has

distinctive features which distinguish it from buildings normally used for chemical production or filling activities not prohibited under this Convention. (b) “Standard Building” means any building, including underground structures, constructed to prevailing industry standards for facilities not producing any chemical specified in Article II, paragraph 8 (a) (i), or corrosive chemicals.

3. “Challenge Inspection” means the inspection of any facility or location in the territory or in any other place under the jurisdiction or control of a State Party requested by another State Party pursuant to Article IX, paragraphs 8 to 25. 4. “Discrete Organic Chemical” means any chemical belonging to the class of chemical compounds consisting of all compounds of carbon except for its oxides, sulfides and metal carbonates, identifiable by chemical name, by structural formula, if known, and by Chemical Abstracts Service registry number, if assigned.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

5. “Equipment” as referred to in the definition of chemical weapons production facility in Article II comprises specialized equipment and standard equipment.

(a) “Specialized Equipment” means:

(i) The main production train, including any reactor or

equipment for product synthesis, separation or purification, any equipment used directly for heat transfer in the final technological stage, such as in reactors or in product separation, as well as any other equipment which has been in contact with any chemical specified in Article II, paragraph 8 (a) (i), or would be in contact with such a chemical if the facility were operated;

(ii) Any chemical weapon filling machines; (iii) Any other equipment specially designed, built or

installed for the operation of the facility as a chemical weapons production facility, as distinct from a facility constructed according to prevailing commercial industry standards for facilities not producing any chemical specified in Article II, paragraph 8 (a) (i), or corrosive chemicals, such as: equipment made of high-nickel alloys or other special corrosion-resistant material; special equipment for waste control, waste treatment, air filtering, or solvent recovery; special containment enclosures and safety shields; non-standard laboratory equipment used to analyse toxic chemicals for chemical weapons purposes; custom-designed process control panels; or dedicated spares for specialized equipment.

(b) “Standard Equipment” means:

(i) Production equipment which is generally used in the

chemical industry and is not included in the types of specialized equipment;

(ii) Other equipment commonly used in the chemical

industry, such as: fire-fighting equipment; guard and security/safety surveillance equipment; medical facilities, laboratory facilities; or communications equipment.

6. “Facility” in the context of Article VI means any of the industrial sites as defined below (“plant site”, “plant” and “unit”).

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) “Plant Site” (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

(i) Administration and other offices; (ii) Repair and maintenance shops; (iii) Medical centre; (iv) Utilities; (v) Central analytical laboratory; (vi) Research and development laboratories; (vii) Central effluent and waste treatment area; and (viii) Warehouse storage. (b) “Plant” (Production facility, Workshop) means

a relatively self-contained area, structure or building containing one or more units with auxiliary and associated infrastructure, such as–

(i) Small administrative section; (ii) Storage/handling areas for feedstock and

products; (iii) Effluent/waste handling/treatment area; (iv) Control/analytical laboratory; (v) First aid service/related medical section;

and (vi) Records associated with the movement

into, around and from the site, of declared chemicals and their feedstock or product chemicals formed from them, as appropriate.

(c) “Unit” (Production unit, Process unit) means

the combination of those items of equipment, including vessels and vessel set up, necessary

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

for the production, processing or consumption of a chemical.

7. “Facility Agreement” means an agreement or arrangement between a State Party and the Organization relating to a specific facility subject to on- site verification pursuant to Articles IV, V and VI. 8. “Host State” means the State on whose territory lie facilities or areas of another State, Party to this Convention, which are subject to inspection under this Convention. 9. “In-Country Escort” means individuals specified by the inspected State Party and, if appropriate, by the Host State, if they so wish, to accompany and assist the inspection team during the in-country period. 10. “In-Country Period” means the period from the arrival of the inspection team at a point of entry until its departure from the State at a point of entry. 11. “Initial Inspection” means the first on-site inspection of facilities to verify declarations submitted pursuant to Articles III, IV, V and VI and this Annex. 12. “Inspected State Party” means the State Party on whose territory or in any other place under its jurisdiction or control an inspection pursuant to this Convention takes place, or the State Party whose facility or area on the territory of a Host State is subject to such an inspection; it does not, however, include the State Party specified in Part II, paragraph 21 of this Annex. 13. “Inspection Assistant” means an individual designated by the Technical Secretariat as set forth in Part II, Section A, of this Annex to assist inspectors in an inspection or visit, such as medical, security and administrative personnel and interpreters. 14. “Inspection Mandate” means the instructions issued by the Director- General to the inspection team for the conduct of a particular inspection. 15. “Inspection Manual” means the compilation of additional procedures for the conduct of inspections developed by the Technical Secretariat. 16. “Inspection Site” means any facility or area at which an inspection is carried out and which is specifically defined in the respective facility agreement or inspection request or mandate or inspection request as expanded by the alternative or final perimeter. 17. “Inspection Team” means the group of inspectors and inspection assistants assigned by the Director-General to conduct a particular inspection.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

18. “Inspector” means an individual designated by the Technical Secretariat according to the procedures as set forth in Part II, Section A, of this Annex, to carry out an inspection or visit in accordance with this Convention. 19. “Model Agreement” means a document specifying the general form and content for an agreement concluded between a State Party and the Organization for fulfilling the verification provisions specified in this Annex. 20. “Observer” means a representative of a requesting State Party or a third State Party to observe a challenge inspection. 21. “Perimeter” in case of challenge inspection means the external boundary of the inspection site, defined by either geographic coordinates or description on a map.

(a) “Requested Perimeter” means the inspection site perimeter as

specified in conformity with Part X, paragraph 8, of this Annex;

(b) “Alternative Perimeter” means the inspection site perimeter as

specified, alternatively to the requested perimeter, by the inspected State Party; it shall conform to the requirements specified in Part X, paragraph 17, of this Annex;

(c) “Final Perimeter” means the final inspection site perimeter as

agreed in negotiations between the inspection team and the inspected State Party, in accordance with Part X, paragraphs 16 to 21, of this Annex;

(d) “Declared Perimeter” means the external boundary of the

facility declared pursuant to Articles III, IV, V and VI. 22. “Period of Inspection”, for the purposes of Article IX, means the period of time from provision of access to the inspection team to the inspection site until its departure from the inspection site, exclusive of time spent on briefings before and after the verification activities. 23. “Period of Inspection”, for the purposes of Articles IV, V and VI, means the period of time from arrival of the inspection team at the inspection site until its departure from the inspection site, exclusive of time spent on briefings before and after the verification activities. 24. “Point of Entry”/”Point of Exit” means a location designated for the in- country arrival of inspection teams for inspections pursuant to this Convention or for their departure after completion of their mission.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

25. “Requesting State Party” means a State Party which has requested a challenge inspection pursuant to Article IX. 26. “Tonne” means metric ton, i.e. 1,000 kg.

PART II

GENERAL RULES OF VERIFICATION

A. DESIGNATION OF INSPECTORS AND INSPECTION ASSISTANTS

1. Not later than 30 days after entry into force of this Convention the Technical Secretariat shall communicate, in writing, to all States Parties the names, nationalities and ranks of the inspectors and inspection assistants proposed for designation, as well as a description of their qualifications and professional experiences. 2. Each State Party shall immediately acknowledge receipt of the list of inspectors and inspection assistants, proposed for designation communicated to it. The State Party shall inform the Technical Secretariat in writing of its acceptance of each inspector and inspection assistant, not later than 30 days after acknowledgement of receipt of the list. Any inspector and inspection assistant included in this list shall be regarded as designated unless a State Party, not later than 30 days after acknowledgement of receipt of the list, declares its non-acceptance in writing. The State Party may include the reason for the objection. In the case of non-acceptance, the proposed inspector or inspection assistant shall not undertake or participate in verification activities on the territory or in any other place under the jurisdiction or control of the State Party which has declared its non-acceptance. The Technical Secretariat shall, as necessary, submit further proposals in addition to the original list. 3. Verification activities under this Convention shall only be performed by designated inspectors and inspection assistants. 4. Subject to the provisions of paragraph 5, a State Party has the right at any time to object to an inspector or inspection assistant who has already been designated. It shall notify the Technical Secretariat of its objection in writing and may include the reason for the objection. Such objection shall come into effect 30 days after receipt by the Technical Secretariat. The Technical Secretariat shall immediately inform the State Party concerned of the withdrawal of the designation of the inspector or inspection assistant. 5. A State Party that has been notified of an inspection shall not seek to have removed from the inspection team for that inspection any of the

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

designated inspectors or inspection assistants named in the inspection team list. 6. The number of inspectors or inspection assistants accepted by and designated to a State Party must be sufficient to allow for availability and rotation of appropriate numbers of inspectors and inspection assistants. 7. If, in the opinion of the Director-General, the non-acceptance of proposed inspectors or inspection assistants impedes the designation of a sufficient number of inspectors or inspection assistants or otherwise hampers the effective fulfilment of the tasks of the Technical Secretariat, the Director- General shall refer the issue to the Executive Council. 8. Whenever amendments to the above-mentioned lists of inspectors and inspection assistants are necessary or requested, replacement inspectors and inspection assistants shall be designated in the same manner as set forth with respect to the initial list. 9. The members of the inspection team carrying out an inspection of a facility of a State Party located on the territory of another State Party shall be designated in accordance with the procedures set forth in this Annex as applied both to the inspected State Party and the Host State Party.

B. PRIVILEGES AND IMMUNITIES. 10. Each State Party shall, not later than 30 days after acknowledgement of receipt of the list of inspectors and inspection assistants or of changes thereto, provide multiple entry/exit and/or transit visas and other such documents to enable each inspector or inspection assistant to enter and to remain on the territory of that State Party for the purpose of carrying out inspection activities. These documents shall be valid for at least two years after their provision to the Technical Secretariat. 11. To exercise their functions effectively, inspectors and inspection assistants shall be accorded privileges and immunities as set forth in subparagraphs (a) to (i). Privileges and immunities shall be granted to members of the inspection team for the sake of this Convention and not for the personal benefit of the individuals themselves. Such privileges and immunities shall be accorded to them for the entire period between arrival on and departure from the territory of the inspected State Party or Host State, and thereafter with respect to acts previously performed in the exercise of their official functions.

(a) The members of the inspection team shall be accorded the

inviolability enjoyed by diplomatic agents pursuant to Article 29 of the Vienna Convention on Diplomatic Relations of 18 April 1961.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) The living quarters and office premises occupied by the

inspection team carrying out inspection activities pursuant to this Convention shall be accorded the inviolability and protection accorded to the premises of diplomatic agents pursuant to Article 30, paragraph 1, of the Vienna Convention on Diplomatic Relations.

(c) The papers and correspondence, including records, of the

inspection team shall enjoy the inviolability accorded to all papers and correspondence of diplomatic agents pursuant to Article 30, paragraph 2, of the Vienna Convention on Diplomatic Relations. The inspection team shall have the right to use codes for their communications with the Technical Secretariat.

(d) Samples and approved equipment carried by members of the

inspection team shall be inviolable subject to provisions contained in this Convention and exempt from all customs duties. Hazardous samples shall be transported in accordance with relevant regulations.

(e) The members of the inspection team shall be accorded the

immunities accorded to diplomatic agents pursuant to Article 31, paragraphs 1, 2 and 3, of the Vienna Convention on Diplomatic Relations.

(f) The members of the inspection team carrying out prescribed

activities pursuant to this Convention shall be accorded the exemption from dues and taxes accorded to diplomatic agents pursuant to Article 34 of the Vienna Convention on Diplomatic Relations.

(g) The members of the inspection team shall be permitted to bring

into the territory of the inspected State Party or Host State Party, without payment of any customs duties or related charges, articles for personal use, with the exception of articles the import or export of which is prohibited by law or controlled by quarantine regulations.

(h) The members of the inspection team shall be accorded the

same currency and exchange facilities as are accorded to representatives of foreign Governments on temporary official missions.

(i) The members of the inspection team shall not engage in any

professional or commercial activity for personal profit on the territory of the inspected State Party or the Host State.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

12. When transiting the territory of non-inspected States Parties, the members of the inspection team shall be accorded the privileges and immunities enjoyed by diplomatic agents pursuant to Article 40, paragraph 1, of the Vienna Convention on Diplomatic Relations. Papers and correspondence, including records, and samples and approved equipment, carried by them, shall be accorded the privileges and immunities set forth in paragraph 11 (c) and (d). 13. Without prejudice to their privileges and immunities the members of the inspection team shall be obliged to respect the laws and regulations of the inspected State Party or Host State and, to the extent that is consistent with the inspection mandate, shall be obliged not to interfere in the internal affairs of that State. If the inspected State Party or Host State Party considers that there has been an abuse of privileges and immunities specified in this Annex, consultations shall be held between the State Party and the Director-General to determine whether such an abuse has occurred and, if so determined, to prevent a repetition of such an abuse. 14. The immunity from jurisdiction of members of the inspection team may be waived by the Director-General in those cases when the Director-General is of the opinion that immunity would impede the course of justice and that it can be waived without prejudice to the implementation of the provisions of this Convention. Waiver must always be express. 15. Observers shall be accorded the same privileges and immunities accorded to inspectors pursuant to this section, except for those accorded pursuant to paragraph 11 (d). C. STANDING ARRANGEMENTS. Points of entry. 16. Each State Party shall designate the points of entry and shall supply the required information to the Technical Secretariat not later than 30 days after this Convention enters into force for it. These points of entry shall be such that the inspection team can reach any inspection site from at least one point of entry within 12 hours. Locations of points of entry shall be provided to all States Parties by the Technical Secretariat. 17. Each State Party may change the points of entry by giving notice of such change to the Technical Secretariat. Changes shall become effective 30 days after the Technical Secretariat receives such notification to allow appropriate notification to all States Parties. 18. If the Technical Secretariat considers that there are insufficient points of entry for the timely conduct of inspections or that changes to the points of entry proposed by a State Party would hamper such timely conduct of

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

inspections, it shall enter into consultations with the State Party concerned to resolve the problem. 19. In cases where facilities or areas of an inspected State Party are located on the territory of a Host State Party or where the access from the point of entry to the facilities or areas subject to inspection requires transit through the territory of another State Party, the inspected State Party shall exercise the rights and fulfil the obligations concerning such inspections in accordance with this Annex. The Host State Party shall facilitate the inspection of those facilities or areas and shall provide for the necessary support to enable the inspection team to carry out its tasks in a timely and effective manner. States Parties through whose territory transit is required to inspect facilities or areas of an inspected State Party shall facilitate such transit. 20. In cases where facilities or areas of an inspected State Party are located on the territory of a State not Party to this Convention, the inspected State Party shall take all necessary measures to ensure that inspections of those facilities or areas can be carried out in accordance with the provisions of this Annex. A State Party that has one or more facilities or areas on the territory of a State not Party to this Convention shall take all necessary measures to ensure acceptance by the Host State of inspectors and inspection assistants designated to that State Party. If an inspected State Party is unable to ensure access, it shall demonstrate that it took all necessary measures to ensure access. 21. In cases where the facilities or areas sought to be inspected are located on the territory of a State Party, but in a place under the jurisdiction or control of a State not Party to this Convention, the State Party shall take all necessary measures as would be required of an inspected State Party and a Host State Party to ensure that inspections of such facilities or areas can be carried out in accordance with the provisions of this Annex. If the State Party is unable to ensure access to those facilities or areas, it shall demonstrate that it took all necessary measures to ensure access. This paragraph shall not apply where the facilities or areas sought to be inspected are those of the State Party. Arrangements for use of non-scheduled aircraft. 22. For inspections pursuant to Article IX and for other inspections where timely travel is not feasible using scheduled commercial transport, an inspection team may need to utilize aircraft owned or chartered by the Technical Secretariat. Not later than 30 days after this Convention enters into force for it, each State Party shall inform the Technical Secretariat of the standing diplomatic clearance number for non-scheduled aircraft transporting inspection teams and equipment necessary for inspection into and out of the territory in which an inspection site is located. Aircraft routings to and from the designated point of entry shall be along established

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

international airways that are agreed upon between the States Parties and the Technical Secretariat as the basis for such diplomatic clearance. 23. When a non-scheduled aircraft is used, the Technical Secretariat shall provide the inspected State Party with a flight plan, through the National Authority, for the aircraft's flight from the last airfield prior to entering the airspace of the State in which the inspection site is located to the point of entry, not less than six hours before the scheduled departure time from that airfield. Such a plan shall be filed in accordance with the procedures of the International Civil Aviation Organization applicable to civil aircraft. For its owned or chartered flights, the Technical Secretariat shall include in the remarks section of each flight plan the standing diplomatic clearance number and the appropriate notation identifying the aircraft as an inspection aircraft. 24. Not less than three hours before the scheduled departure of the inspection team from the last airfield prior to entering the airspace of the State in which the inspection is to take place, the inspected State Party or Host State Party shall ensure that the flight plan filed in accordance with paragraph 23 is approved so that the inspection team may arrive at the point of entry by the estimated arrival time. 25. The inspected State Party shall provide parking, security protection, servicing and fuel as required by the Technical Secretariat for the aircraft of the inspection team at the point of entry when such aircraft is owned or chartered by the Technical Secretariat. Such aircraft shall not be liable for landing fees, departure tax, and similar charges. The Technical Secretariat shall bear the cost of such fuel, security protection and servicing. Administrative arrangements. 26. The inspected State Party shall provide or arrange for the amenities necessary for the inspection team such as communication means, interpretation services to the extent necessary for the performance of interviewing and other tasks, transportation, working space, lodging, meals and medical care. In this regard, the inspected State Party shall be reimbursed by the Organization for such costs incurred by the inspection team. Approved equipment. 27. Subject to paragraph 29, there shall be no restriction by the inspected State Party on the inspection team bringing onto the inspection site such equipment, approved in accordance with paragraph 28, which the Technical Secretariat has determined to be necessary to fulfil the inspection requirements. The Technical Secretariat shall prepare and, as appropriate, update a list of approved equipment, which may be needed for the purposes described above, and regulations governing such equipment which shall be

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

in accordance with this Annex. In establishing the list of approved equipment and these regulations, the Technical Secretariat shall ensure that safety considerations for all the types of facilities at which such equipment is likely to be used, are taken fully into account. A list of approved equipment shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 28. The equipment shall be in the custody of the Technical Secretariat and be designated, calibrated and approved by the Technical Secretariat. The Technical Secretariat shall, to the extent possible, select that equipment which is specifically designed for the specific kind of inspection required. Designated and approved equipment shall be specifically protected against unauthorized alteration. 29. The inspected State Party shall have the right, without prejudice to the prescribed time-frames, to inspect the equipment in the presence of inspection team members at the point of entry, i.e., to check the identity of the equipment brought in or removed from the territory of the inspected State Party or the Host State. To facilitate such identification, the Technical Secretariat shall attach documents and devices to authenticate its designation and approval of the equipment. The inspection of the equipment shall also ascertain to the satisfaction of the inspected State Party that the equipment meets the description of the approved equipment for the particular type of inspection. The inspected State Party may exclude equipment not meeting that description or equipment without the above- mentioned authentication documents and devices. Procedures for the inspection of equipment shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 30. In cases where the inspection team finds it necessary to use equipment available on site not belonging to the Technical Secretariat and requests the inspected State Party to enable the team to use such equipment, the inspected State Party shall comply with the request to the extent it can. D. PRE-INSPECTION ACTIVITIES. Notification. 31. The Director-General shall notify the State Party before the planned arrival of the inspection team at the point of entry and within the prescribed time-frames, where specified, of its intention to carry out an inspection. 32. Notifications made by the Director-General shall include the following information:

(a) The type of inspection;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) The point of entry; (c) The date and estimated time of arrival at the point of entry; (d) The means of arrival at the point of entry; (e) The site to be inspected; (f) The names of inspectors and inspection assistants; (g) If appropriate, aircraft clearance for special flights.

33. The inspected State Party shall acknowledge the receipt of a notification by the Technical Secretariat of an intention to conduct an inspection, not later than one hour after receipt of such notification. 34. In the case of an inspection of a facility of a State Party located on the territory of another State Party, both States Parties shall be simultaneously notified in accordance with paragraphs 31 and 32. Entry into the territory of the inspected State Party or Host State and transfer to the inspection site. 35. The inspected State Party or Host State Party which has been notified of the arrival of an inspection team, shall ensure its immediate entry into the territory and shall through an in-country escort or by other means do everything in its power to ensure the safe conduct of the inspection team and its equipment and supplies, from its point of entry to the inspection site(s) and to a point of exit. 36. The inspected State Party or Host State Party shall, as necessary, assist the inspection team in reaching the inspection site not later than 12 hours after the arrival at the point of entry. Pre-inspection briefing. 37. Upon arrival at the inspection site and before the commencement of the inspection, the inspection team shall be briefed by facility representatives, with the aid of maps and other documentation as appropriate, on the facility, the activities carried out there, safety measures and administrative and logistic arrangements necessary for the inspection. The time spent for the briefing shall be limited to the minimum necessary and in any event not exceed three hours. E. CONDUCT OF INSPECTIONS. General rules.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

38. The members of the inspection team shall discharge their functions in accordance with the provisions of this Convention, as well as rules established by the Director-General and facility agreements concluded between States Parties and the Organization. 39. The inspection team shall strictly observe the inspection mandate issued by the Director-General. It shall refrain from activities going beyond this mandate. 40. The activities of the inspection team shall be so arranged as to ensure the timely and effective discharge of its functions and the least possible inconvenience to the inspected State Party or Host State and disturbance to the facility or area inspected. The inspection team shall avoid unnecessarily hampering or delaying the operation of a facility and avoid affecting its safety. In particular, the inspection team shall not operate any facility. If inspectors consider that, to fulfil their mandate, particular operations should be carried out in a facility, they shall request the designated representative of the inspected facility to have them performed. The representative shall carry out the request to the extent possible. 41. In the performance of their duties on the territory of an inspected State Party or Host State, the members of the inspection team shall, if the inspected State Party so requests, be accompanied by representatives of the inspected State Party, but the inspection team must not thereby be delayed or otherwise hindered in the exercise of its functions. 42. Detailed procedures for the conduct of inspections shall be developed for inclusion in the inspection manual by the Technical Secretariat, taking into account guidelines to be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). Safety. 43. In carrying out their activities, inspectors and inspection assistants shall observe safety regulations established at the inspection site, including those for the protection of controlled environments within a facility and for personal safety. In order to implement these requirements, appropriate detailed procedures shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). Communications. 44. Inspectors shall have the right throughout the in-country period to communicate with the Headquarters of the Technical Secretariat. For this purpose they may use their own, duly certified, approved equipment and may request that the inspected State Party or Host State Party provide them with access to other telecommunications. The inspection team shall have the

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

right to use its own two-way system of radio communications between personnel patrolling the perimeter and other members of the inspection team. Inspection team and inspected State Party rights. 45. The inspection team shall, in accordance with the relevant Articles and Annexes of this Convention as well as with facility agreements and procedures set forth in the inspection manual, have the right to unimpeded access to the inspection site. The items to be inspected will be chosen by the inspectors. 46. Inspectors shall have the right to interview any facility personnel in the presence of representatives of the inspected State Party with the purpose of establishing relevant facts. Inspectors shall only request information and data which are necessary for the conduct of the inspection, and the inspected State Party shall furnish such information upon request. The inspected State Party shall have the right to object to questions posed to the facility personnel if those questions are deemed not relevant to the inspection. If the head of the inspection team objects and states their relevance, the questions shall be provided in writing to the inspected State Party for reply. The inspection team may note any refusal to permit interviews or to allow questions to be answered and any explanations given, in that part of the inspection report that deals with the cooperation of the inspected State Party. 47. Inspectors shall have the right to inspect documentation and records they deem relevant to the conduct of their mission. 48. Inspectors shall have the right to have photographs taken at their request by representatives of the inspected State Party or of the inspected facility. The capability to take instant development photographic prints shall be available. The inspection team shall determine whether photographs conform to those requested and, if not, repeat photographs shall be taken. The inspection team and the inspected State Party shall each retain one copy of every photograph. 49. The representatives of the inspected State Party shall have the right to observe all verification activities carried out by the inspection team. 50. The inspected State Party shall receive copies, at its request, of the information and data gathered about its facility(ies) by the Technical Secretariat. 51. Inspectors shall have the right to request clarifications in connection with ambiguities that arise during an inspection. Such requests shall be made promptly through the representative of the inspected State Party. The representative of the inspected State Party shall provide the inspection team,

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

during the inspection, with such clarification as may be necessary to remove the ambiguity. If questions relating to an object or a building located within the inspection site are not resolved, the object or building shall, if requested, be photographed for the purpose of clarifying its nature and function. If the ambiguity cannot be removed during the inspection, the inspectors shall notify the Technical Secretariat immediately. The inspectors shall include in the inspection report any such unresolved question, relevant clarifications, and a copy of any photographs taken. Collection, handling and analysis of samples. 52. Representatives of the inspected State Party or of the inspected facility shall take samples at the request of the inspection team in the presence of inspectors. If so agreed in advance with the representatives of the inspected State Party or of the inspected facility, the inspection team may take samples itself. 53. Where possible, the analysis of samples shall be performed on-site. The inspection team shall have the right to perform on-site analysis of samples using approved equipment brought by it. At the request of the inspection team, the inspected State Party shall, in accordance with agreed procedures, provide assistance for the analysis of samples on-site. Alternatively, the inspection team may request that appropriate analysis on-site be performed in its presence. 54. The inspected State Party has the right to retain portions of all samples taken or take duplicate samples and be present when samples are analysed on-site. 55. The inspection team shall, if it deems it necessary, transfer samples for analysis off-site at laboratories designated by the Organization. 56. The Director-General shall have the primary responsibility for the security, integrity and preservation of samples and for ensuring that the confidentiality of samples transferred for analysis off-site is protected. The Director-General shall do so in accordance with procedures, to be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i), for inclusion in the inspection manual. He shall:

(a) Establish a stringent regime governing the collection, handling,

transport and analysis of samples; (b) Certify the laboratories designated to perform different types of

analysis; (c) Oversee the standardization of equipment and procedures at

these designated laboratories, mobile analytical equipment and procedures, and monitor quality control and overall standards

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

in relation to the certification of these laboratories, mobile equipment and procedures; and

(d) Select from among the designated laboratories those which

shall perform analytical or other functions in relation to specific investigations.

57. When off-site analysis is to be performed, samples shall be analysed in at least two designated laboratories. The Technical Secretariat shall ensure the expeditious processing of the analysis. The samples shall be accounted for by the Technical Secretariat and any unused samples or portions thereof shall be returned to the Technical Secretariat. 58. The Technical Secretariat shall compile the results of the laboratory analysis of samples relevant to compliance with this Convention and include them in the final inspection report. The Technical Secretariat shall include in the report detailed information concerning the equipment and methodology employed by the designated laboratories. Extension of inspection duration. 59. Periods of inspection may be extended by agreement with the representative of the inspected State Party. Debriefing. 60. Upon completion of an inspection the inspection team shall meet with representatives of the inspected State Party and the personnel responsible for the inspection site to review the preliminary findings of the inspection team and to clarify any ambiguities. The inspection team shall provide to the representatives of the inspected State Party its preliminary findings in written form according to a standardized format, together with a list of any samples and copies of written information and data gathered and other material to be taken off-site. The document shall be signed by the head of the inspection team. In order to indicate that he has taken notice of the contents of the document, the representative of the inspected State Party shall countersign the document. This meeting shall be completed not later than 24 hours after the completion of the inspection. F. DEPARTURE. 61. Upon completion of the post-inspection procedures, the inspection team shall leave, as soon as possible, the territory of the inspected State Party or the Host State. G. REPORTS.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

62. Not later than 10 days after the inspection, the inspectors shall prepare a factual, final report on the activities conducted by them and on their findings. It shall only contain facts relevant to compliance with this Convention, as provided for under the inspection mandate. The report shall also provide information as to the manner in which the State Party inspected cooperated with the inspection team. Differing observations made by inspectors may be attached to the report. The report shall be kept confidential. 63. The final report shall immediately be submitted to the inspected State Party. Any written comments, which the inspected State Party may immediately make on its findings shall be annexed to it. The final report together with annexed comments made by the inspected State Party shall be submitted to the Director-General not later than 30 days after the inspection. 64. Should the report contain uncertainties, or should cooperation between the National Authority and the inspectors not measure up to the standards required, the Director-General shall approach the State Party for clarification. 65. If the uncertainties cannot be removed or the facts established are of a nature to suggest that obligations undertaken under this Convention have not been met, the Director-General shall inform the Executive Council without delay. H. APPLICATION OF GENERAL PROVISIONS. 66. The provisions of this Part shall apply to all inspections conducted pursuant to this Convention, except where the provisions of this Part differ from the provisions set forth for specific types of inspections in Parts III to XI of this Annex, in which case the latter provisions shall take precedence.

PART III

GENERAL PROVISIONS FOR VERIFICATION MEASURES PURSUANT TO ARTICLES IV, V AND VI, PARAGRAPH 3

A. INITIAL INSPECTIONS AND FACILITY AGREEMENTS 1. Each declared facility subject to on-site inspection pursuant to Articles IV, V, and VI, paragraph 3, shall receive an initial inspection promptly after the facility is declared. The purpose of this inspection of the facility shall be to verify information provided and to obtain any additional information needed for planning future verification activities at the facility, including on-site inspections and continuous monitoring with on-site instruments, and to work on the facility agreements.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

2. States Parties shall ensure that the verification of declarations and the initiation of the systematic verification measures can be accomplished by the Technical Secretariat at all facilities within the established time-frames after this Convention enters into force for them. 3. Each State Party shall conclude a facility agreement with the Organization for each facility declared and subject to on-site inspection pursuant to Articles IV, V, and VI, paragraph 3. 4. Facility agreements shall be completed not later than 180 days after this Convention enters into force for the State Party or after the facility has been declared for the first time, except for a chemical weapons destruction facility to which paragraphs 5 to 7 shall apply. 5. In the case of a chemical weapons destruction facility that begins operations more than one year after this Convention enters into force for the State Party, the facility agreement shall be completed not less than 180 days before the facility begins operation. 6. In the case of a chemical weapons destruction facility that is in operation when this Convention enters into force for the State Party, or begins operation not later than one year thereafter, the facility agreement shall be completed not later than 210 days after this Convention enters into force for the State Party, except that the Executive Council may decide that transitional verification arrangements, approved in accordance with Part IV (A), paragraph 51, of this Annex and including a transitional facility agreement, provisions for verification through on-site inspection and monitoring with on-site instruments, and the time-frame for application of the arrangements, are sufficient. 7. In the case of a facility, referred to in paragraph 6, that will cease operations not later than two years after this Convention enters into force for the State Party, the Executive Council may decide that transitional verification arrangements, approved in accordance with Part IV (A), paragraph 51, of this Annex and including a transitional facility agreement, provisions for verification through on-site inspection and monitoring with on-site instruments, and the time-frame for application of the arrangements, are sufficient. 8. Facility agreements shall be based on models for such agreements and provide for detailed arrangements which shall govern inspections at each facility. The model agreements shall include provisions to take into account future technological developments and shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 9. The Technical Secretariat may retain at each site a sealed container for photographs, plans and other information that it may wish to refer to in the course of subsequent inspections.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

B. STANDING ARRANGEMENTS. 10. Where applicable, the Technical Secretariat shall have the right to have continuous monitoring instruments and systems and seals installed and to use them, in conformity with the relevant provisions in this Convention and the facility agreements between States Parties and the Organization. 11. The inspected State Party shall, in accordance with agreed procedures, have the right to inspect any instrument used or installed by the inspection team and to have it tested in the presence of representatives of the inspected State Party. The inspection team shall have the right to use the instruments that were installed by the inspected State Party for its own monitoring of the technological process of the destruction of chemical weapons. To this end, the inspection team shall have the right to inspect those instruments that it intends to use for purposes of verification of the destruction of chemical weapons and to have them tested in its presence.

12. The inspected State Party shall provide the necessary preparation and support for the establishment of continuous monitoring instruments and systems. 13. In order to implement paragraphs 11 and 12, appropriate detailed procedures shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 14. The inspected State Party shall immediately notify the Technical Secretariat if an event occurs or may occur at a facility where monitoring instruments are installed, which may have an impact on the monitoring system. The inspected State Party shall coordinate subsequent actions with the Technical Secretariat with a view to restoring the operation of the monitoring system and establishing interim measures, if necessary, as soon as possible. 15. The inspection team shall verify during each inspection that the monitoring system functions correctly and that emplaced seals have not been tampered with. In addition, visits to service the monitoring system may be required to perform any necessary maintenance or replacement of equipment, or to adjust the coverage of the monitoring system as required. 16. If the monitoring system indicates any anomaly, the Technical Secretariat shall immediately take action to determine whether this resulted from equipment malfunction or activities at the facility. If, after this examination, the problem remains unresolved, the Technical Secretariat shall immediately ascertain the actual situation, including through immediate on-site inspection of, or visit to, the facility if necessary. The

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

Technical Secretariat shall report any such problem immediately after its detection to the inspected State Party which shall assist in its resolution. C. PRE-INSPECTION ACTIVITIES. 17. The inspected State Party shall, except as specified in paragraph 18, be notified of inspections not less than 24 hours in advance of the planned arrival of the inspection team at the point of entry. 18. The inspected State Party shall be notified of initial inspections not less than 72 hours in advance of the estimated time of arrival of the inspection team at the point of entry.

PART IV (A)

DESTRUCTION OF CHEMICAL WEAPONS AND ITS VERIFICATION PURSUANT TO ARTICLE IV

A. DECLARATIONS. Chemical weapons. 1. The declaration of chemical weapons by a State Party pursuant to Article III, paragraph 1 (a) (ii), shall include the following:

(a) The aggregate quantity of each chemical declared; (b) The precise location of each chemical weapons storage facility,

expressed by: (i) Name; (ii) Geographical coordinates; and (iii) A detailed site diagram, including a boundary map and

the location of bunkers/storage areas within the facility.

(c) The detailed inventory for each chemical weapons storage facility including–

(i) Chemicals defined as chemical weapons in accordance

with Article II; (ii) Unfilled munitions, sub-munitions, devices and

equipment defined as chemical weapons;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(iii) Equipment specially designed for use directly in connection with the employment of munitions, sub- munitions, devices or equipment specified in sub- subparagraph (ii);

(iv) Chemicals specifically designed for use directly in

connection with the employment of munitions, sub- munitions, devices or equipment specified in sub- subparagraph (ii).

2. For the declaration of chemicals referred to in paragraph 1 (c) (i) the following shall apply:

(a) Chemicals shall be declared in accordance with the Schedules

specified in the Annex on Chemicals; (b) For a chemical not listed in the Schedules in the Annex on

Chemicals the information required for possible assignment of the chemical to the appropriate Schedule shall be provided, including the toxicity of the pure compound. For a precursor, the toxicity and identity of the principal final reaction product(s) shall be provided;

(c) Chemicals shall be identified by chemical name in accordance

with current International Union of Pure and Applied Chemistry (IUPAC) nomenclature, structural formula and Chemical Abstracts Service registry number, if assigned. For a precursor, the toxicity and identity of the principal final reaction product(s) shall be provided;

(d) In cases involving mixtures of two or more chemicals, each

chemical shall be identified and the percentage of each shall be provided, and the mixture shall be declared under the category of the most toxic chemical. If a component of a binary chemical weapon consists of a mixture of two or more chemicals, each chemical shall be identified and the percentage of each provided;

(e) Binary chemical weapons shall be declared under the relevant

end product within the framework of the categories of chemical weapons referred to in paragraph 16. The following supplementary information shall be provided for each type of binary chemical munition/device:

(i) The chemical name of the toxic end-product; (ii) The chemical composition and quantity of each

component;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(iii) The actual weight ratio between the components; (iv) Which component is considered the key component; (v) The projected quantity of the toxic end-product

calculated on a stoichiometric basis from the key component, assuming 100 per cent yield. A declared quantity (in tonnes) of the key component intended for a specific toxic end-product shall be considered equivalent to the quantity (in tonnes) of this toxic end-product calculated on a stoichiometric basis assuming 100 per cent yield.

(f) For multicomponent chemical weapons, the declaration shall

be analogous to that envisaged for binary chemical weapons; (g) For each chemical the form of storage, i.e. munitions, sub-

munitions, devices, equipment or bulk containers and other containers shall be declared. For each form of storage the following shall be listed:

(i) Type; (ii) Size or calibre; (iii) Number of items; and (iv) Nominal weight of chemical fill per item.

(h) For each chemical the total weight present at the storage

facility shall be declared; (i) In addition, for chemicals stored in bulk, the percentage purity

shall be declared, if known. 3. For each type of unfilled munitions, sub-munitions, devices or equipment, referred to in paragraph 1 (c) (ii), the information shall include:

(a) The number of items; (b) The nominal fill volume per item; (c) The intended chemical fill.

Declarations of chemical weapons pursuant to Article III, paragraph 1 (a) (iii)

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

4. The declaration of chemical weapons pursuant to Article III, paragraph 1 (a) (iii), shall contain all information specified in paragraphs 1 to 3 above. It is the responsibility of the State Party on whose territory the chemical weapons are located to make appropriate arrangements with the other State to ensure that the declarations are made. If the State Party on whose territory the chemical weapons are located is not able to fulfil its obligations under this paragraph, it shall state the reasons therefor. Declarations of past transfers and receipts. 5. A State Party that has transferred or received chemical weapons since 1 January 1946 shall declare these transfers or receipts pursuant to Article III, paragraph 1 (a) (iv), provided the amount transferred or received exceeded 1 tonne per chemical per year in bulk and/or munitions form. This declaration shall be made according to the inventory format specified in paragraphs 1 and 2. This declaration shall also indicate the supplier and recipient countries, the dates of the transfers or receipts and, as precisely as possible, the current location of the transferred items. When not all the specified information is available for transfers or receipts of chemical weapons for the period between 1 January 1946 and 1 January 1970, the State Party shall declare whatever information is still available to it and provide an explanation as to why it cannot submit a full declaration. Submission of the general plan for destruction of chemical weapons. 6. The general plan for destruction of chemical weapons submitted pursuant to Article III, paragraph 1 (a) (v), shall provide an overview of the entire national chemical weapons destruction programme of the State Party and information on the efforts of the State Party to fulfil the destruction requirements contained in this Convention. The plan shall specify:

(a) A general schedule for destruction, giving types and

approximate quantities of chemical weapons planned to be destroyed in each annual destruction period for each existing chemical weapons destruction facility and, if possible, for each planned chemical weapons destruction facility;

(b) The number of chemical weapons destruction facilities existing

or planned to be operated over the destruction period; (c) For each existing or planned chemical weapons destruction

facility: (i) Name and location; and (ii) The types and approximate quantities of chemical

weapons, and the type (for example, nerve agent or blister agent) and approximate quantity of chemical fill, to be destroyed;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(d) The plans and programmes for training personnel for the

operation of destruction facilities; (e) The national standards for safety and emissions that the

destruction facilities must satisfy;

(f) Information on the development of new methods for destruction of chemical weapons and on the improvement of existing methods;

(g) The cost estimates for destroying the chemical weapons; and (h) Any issues which could adversely impact on the national

destruction programme. B. MEASURES TO SECURE THE STORAGE FACILITY AND STORAGE FACILITY PREPARATION. 7. Not later than when submitting its declaration of chemical weapons, a State Party shall take such measures as it considers appropriate to secure its storage facilities and shall prevent any movement of its chemical weapons out of the facilities, except their removal for destruction. 8. A State Party shall ensure that chemical weapons at its storage facilities are configured to allow ready access for verification in accordance with paragraphs 37 to 49. 9. While a storage facility remains closed for any movement of chemical weapons out of the facility other than their removal for destruction, a State Party may continue at the facility standard maintenance activities, including standard maintenance of chemical weapons; safety monitoring and physical security activities; and preparation of chemical weapons for destruction. 10. Maintenance activities of chemical weapons shall not include:

(a) Replacement of agent or of munition bodies; (b) Modification of the original characteristics of munitions, or

parts or components thereof. 11. All maintenance activities shall be subject to monitoring by the Technical Secretariat. C. DESTRUCTION. Principles and methods for destruction of chemical weapons.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

12. “Destruction of chemical weapons” means a process by which chemicals are converted in an essentially irreversible way to a form unsuitable for production of chemical weapons, and which in an irreversible manner renders munitions and other devices unusable as such. 13. Each State Party shall determine how it shall destroy chemical weapons, except that the following processes may not be used: dumping in any body of water, land burial or open-pit burning. It shall destroy chemical weapons only at specifically designated and appropriately designed and equipped facilities. 14. Each State Party shall ensure that its chemical weapons destruction facilities are constructed and operated in a manner to ensure the destruction of the chemical weapons; and that the destruction process can be verified under the provisions of this Convention. Order of destruction. 15. The order of destruction of chemical weapons is based on the obligations specified in Article I and the other Articles, including obligations regarding systematic on-site verification. It takes into account interests of States Parties for undiminished security during the destruction period; confidence-building in the early part of the destruction stage; gradual acquisition of experience in the course of destroying chemical weapons; and applicability irrespective of the actual composition of the stockpiles and the methods chosen for the destruction of the chemical weapons. The order of destruction is based on the principle of levelling out.

16. For the purpose of destruction, chemical weapons declared by each State Party shall be divided into three categories:

Category 1: Chemical weapons on the basis of Schedule 1 chemicals

and their parts and components; Category 2: Chemical weapons on the basis of all other chemicals

and their parts and components; Category 3: Unfilled munitions and devices, and equipment

specifically designed for use directly in connection with employment of chemical weapons.

17. A State Party shall start:

(a) The destruction of Category 1 chemical weapons not later than

two years after this Convention enters into force for it, and shall complete the destruction not later than 10 years after

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

entry into force of this Convention. A State Party shall destroy chemical weapons in accordance with the following destruction deadlines:

(i) Phase 1: Not later than two years after entry into force of

this Convention, testing of its first destruction facility shall be completed. Not less than 1 per cent of the Category 1 chemical weapons shall be destroyed not later than three years after the entry into force of this Convention;

(ii) Phase 2: Not less than 20 per cent of the Category 1

chemical weapons shall be destroyed not later than five years after the entry into force of this Convention;

(iii) Phase 3: Not less than 45 per cent of the Category 1

chemical weapons shall be destroyed not later than seven years after the entry into force of this Convention;

(iv) Phase 4: All Category 1 chemical weapons shall be

destroyed not later than 10 years after the entry into force of this Convention.

(b) The destruction of Category 2 chemical weapons not later than

one year after this Convention enters into force for it and shall complete the destruction not later than five years after the entry into force of this Convention. Category 2 chemical weapons shall be destroyed in equal annual increments throughout the destruction period. The comparison factor for such weapons is the weight of the chemicals within Category 2; and

(c) The destruction of Category 3 chemical weapons not later than

one year after this Convention enters into force for it, and shall complete the destruction not later than five years after the entry into force of this Convention. Category 3 chemical weapons shall be destroyed in equal annual increments throughout the destruction period. The comparison factor for unfilled munitions and devices is expressed in nominal fill volume (m3) and for equipment in number of items.

18. For the destruction of binary chemical weapons the following shall apply:

(a) For the purposes of the order of destruction, a declared

quantity (in tonnes) of the key component intended for a specific toxic end-product shall be considered equivalent to the quantity (in tonnes) of this toxic end-product calculated on a stoichiometric basis assuming 100 per cent yield.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) A requirement to destroy a given quantity of the key

component shall entail a requirement to destroy a corresponding quantity of the other component, calculated from the actual weight ratio of the components in the relevant type of binary chemical munition/device.

(c) If more of the other component is declared than is needed,

based on the actual weight ratio between components, the excess shall be destroyed over the first two years after destruction operations begin.

(d) At the end of each subsequent operational year a State Party

may retain an amount of the other declared component that is determined on the basis of the actual weight ratio of the components in the relevant type of binary chemical munition/device.

19. For multicomponent chemical weapons the order of destruction shall be analogous to that envisaged for binary chemical weapons. Modification of intermediate destruction deadlines. 20. The Executive Council shall review the general plans for destruction of chemical weapons, submitted pursuant to Article III, paragraph 1 (a) (v), and in accordance with paragraph 6, inter alia, to assess their conformity with the order of destruction set forth in paragraphs 15 to 19. The Executive Council shall consult with any State Party whose plan does not conform, with the objective of bringing the plan into conformity. 21. If a State Party, due to exceptional circumstances beyond its control, believes that it cannot achieve the level of destruction specified for Phase 1, Phase 2 or Phase 3 of the order of destruction of Category 1 chemical weapons, it may propose changes in those levels. Such a proposal must be made not later than 120 days after the entry into force of this Convention and shall contain a detailed explanation of the reasons for the proposal. 22. Each State Party shall take all necessary measures to ensure destruction of Category 1 chemical weapons in accordance with the destruction deadlines set forth in paragraph 17 (a) as changed pursuant to paragraph 21. However, if a State Party believes that it will be unable to ensure the destruction of the percentage of Category 1 chemical weapons required by an intermediate destruction deadline, it may request the Executive Council to recommend to the Conference to grant an extension of its obligation to meet that deadline. Such a request must be made not less than 180 days before the intermediate destruction deadline and shall contain a detailed explanation of the reasons for the request and the plans of the State Party for ensuring that it will be able to fulfil its obligation to meet the next intermediate destruction deadline.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

23. If an extension is granted, the State Party shall still be under the obligation to meet the cumulative destruction requirements set forth for the next destruction deadline. Extensions granted pursuant to this Section shall not, in any way, modify the obligation of the State Party to destroy all Category 1 chemical weapons not later than 10 years after the entry into force of this Convention. Extension of the deadline for completion of destruction. 24. If a State Party believes that it will be unable to ensure the destruction of all Category 1 chemical weapons not later than 10 years after the entry into force of this Convention, it may submit a request to the Executive Council for an extension of the deadline for completing the destruction of such chemical weapons. Such a request must be made not later than nine years after the entry into force of this Convention. 25. The request shall contain:

(a) The duration of the proposed extension; (b) A detailed explanation of the reasons for the proposed

extension; and (c) A detailed plan for destruction during the proposed extension

and the remaining portion of the original 10-year period for destruction.

26. A decision on the request shall be taken by the Conference at its next session, on the recommendation of the Executive Council. Any extension shall be the minimum necessary, but in no case shall the deadline for a State Party to complete its destruction of all chemical weapons be extended beyond 15 years after the entry into force of this Convention. The Executive Council shall set conditions for the granting of the extension, including the specific verification measures deemed necessary as well as specific actions to be taken by the State Party to overcome problems in its destruction programme. Costs of verification during the extension period shall be allocated in accordance with Article IV, paragraph 16. 27. If an extension is granted, the State Party shall take appropriate measures to meet all subsequent deadlines. 28. The State Party shall continue to submit detailed annual plans for destruction in accordance with paragraph 29 and annual reports on the destruction of Category 1 chemical weapons in accordance with paragraph 36, until all Category 1 chemical weapons are destroyed. In addition, not later than at the end of each 90 days of the extension period, the State Party shall report to the Executive Council on its destruction activity. The

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

Executive Council shall review progress towards completion of destruction and take the necessary measures to document this progress. All information concerning the destruction activities during the extension period shall be provided by the Executive Council to States Parties, upon request. Detailed annual plans for destruction. 29. The detailed annual plans for destruction shall be submitted to the Technical Secretariat not less than 60 days before each annual destruction period begins pursuant to Article IV, paragraph 7 (a), and shall specify:

(a) The quantity of each specific type of chemical weapon to be

destroyed at each destruction facility and the inclusive dates when the destruction of each specific type of chemical weapon will be accomplished;

(b) The detailed site diagram for each chemical weapons

destruction facility and any changes to previously submitted diagrams; and

(c) The detailed schedule of activities for each chemical weapons

destruction facility for the upcoming year, identifying time required for design, construction or modification of the facility, installation of equipment, equipment check-out and operator training, destruction operations for each specific type of chemical weapon, and scheduled periods of inactivity.

30. A State Party shall provide, for each of its chemical weapons destruction facilities, detailed facility information to assist the Technical Secretariat in developing preliminary inspection procedures for use at the facility. 31. The detailed facility information for each destruction facility shall include the following information:

(a) Name, address and location; (b) Detailed, annotated facility drawings; (c) Facility design drawings, process drawings, and piping and

instrumentation design drawings; (d) Detailed technical descriptions, including design drawings and

instrument specifications, for the equipment required for: removing the chemical fill from the munitions, devices, and containers; temporarily storing the drained chemical fill; destroying the chemical agent; and destroying the munitions, devices, and containers;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(e) Detailed technical descriptions of the destruction process,

including material flow rates, temperatures and pressures, and designed destruction efficiency;

(f) Design capacity for each specific type of chemical weapon; (g) A detailed description of the products of destruction and the

method of their ultimate disposal; (h) A detailed technical description of measures to facilitate

inspections in accordance with this Convention; (i) A detailed description of any temporary holding area at the

destruction facility that will be used to provide chemical weapons directly to the destruction facility, including site and facility drawings and information on the storage capacity for each specific type of chemical weapon to be destroyed at the facility;

(j) A detailed description of the safety and medical measures in

force at the facility; (k) A detailed description of the living quarters and working

premises for the inspectors; and (l) Suggested measures for international verification.

32. A State Party shall provide, for each of its chemical weapons destruction facilities, the plant operations manuals, the safety and medical plans, the laboratory operations and quality assurance and control manuals, and the environmental permits that have been obtained, except that this shall not include material previously provided. 33. A State Party shall promptly notify the Technical Secretariat of any developments that could affect inspection activities at its destruction facilities. 34. Deadlines for submission of the information specified in paragraphs 30 to 32 shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 35. After a review of the detailed facility information for each destruction facility, the Technical Secretariat, if the need arises, shall enter into consultation with the State Party concerned in order to ensure that its chemical weapons destruction facilities are designed to assure the destruction of chemical weapons, to allow advanced planning on how verification measures may be applied and to ensure that the application of

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

verification measures is consistent with proper facility operation, and that the facility operation allows appropriate verification. Annual reports on destruction. 36. Information regarding the implementation of plans for destruction of chemical weapons shall be submitted to the Technical Secretariat pursuant to Article IV, paragraph 7 (b), not later than 60 days after the end of each annual destruction period and shall specify the actual amounts of chemical weapons which were destroyed during the previous year at each destruction facility. If appropriate, reasons for not meeting destruction goals should be stated. D. VERIFICATION. Verification of declarations of chemical weapons through on-site inspection. 37. The purpose of the verification of declarations of chemical weapons shall be to confirm through on-site inspection the accuracy of the relevant declarations made pursuant to Article III. 38. The inspectors shall conduct this verification promptly after a declaration is submitted. They shall, inter alia, verify the quantity and identity of chemicals, types and number of munitions, devices and other equipment. 39. The inspectors shall employ, as appropriate, agreed seals, markers or other inventory control procedures to facilitate an accurate inventory of the chemical weapons at each storage facility. 40. As the inventory progresses, inspectors shall install such agreed seals as may be necessary to clearly indicate if any stocks are removed, and to ensure the securing of the storage facility during the inventory. After completion of the inventory, such seals will be removed unless otherwise agreed. Systematic verification of storage facilities. 41. The purpose of the systematic verification of storage facilities shall be to ensure that no undetected removal of chemical weapons from such facilities takes place. 42. The systematic verification shall be initiated as soon as possible after the declaration of chemical weapons is submitted and shall continue until all chemical weapons have been removed from the storage facility. It shall in accordance with the facility agreement, combine on-site inspection and monitoring with on-site instruments.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

43. When all chemical weapons have been removed from the storage facility, the Technical Secretariat shall confirm the declaration of the State Party to that effect. After this confirmation, the Technical Secretariat shall terminate the systematic verification of the storage facility and shall promptly remove any monitoring instruments installed by the inspectors. Inspections and visits. 44. The particular storage facility to be inspected shall be chosen by the Technical Secretariat in such a way as to preclude the prediction of precisely when the facility is to be inspected. The guidelines for determining the frequency of systematic on-site inspections shall be elaborated by the Technical Secretariat, taking into account the recommendations to be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 45. The Technical Secretariat shall notify the inspected State Party of its decision to inspect or visit the storage facility 48 hours before the planned arrival of the inspection team at the facility for systematic inspections or visits. In cases of inspections or visits to resolve urgent problems, this period may be shortened. The Technical Secretariat shall specify the purpose of the inspection or visit. 46. The inspected State Party shall make any necessary preparations for the arrival of the inspectors and shall ensure their expeditious transportation from their point of entry to the storage facility. The facility agreement will specify administrative arrangements for inspectors. 47. The inspected State Party shall provide the inspection team upon its arrival at the chemical weapons storage facility to carry out an inspection, with the following data on the facility:

(a) The number of storage buildings and storage locations; (b) For each storage building and storage location, the type and the

identification number or designation, shown on the site diagram; and

(c) For each storage building and storage location at the facility,

the number of items of each specific type of chemical weapon, and, for containers that are not part of binary munitions, the actual quantity of chemical fill in each container.

48. In carrying out an inventory, within the time available, inspectors shall have the right: To use any of the following inspection techniques:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) inventory all the chemical weapons stored at the facility; (b) inventory all the chemical weapons stored in specific

buildings or locations at the facility, as chosen by the inspectors; or

(c) inventory all the chemical weapons of one or more

specific types stored at the facility, as chosen by the inspectors; and (b) To check all items inventoried against agreed records.

49. Inspectors shall, in accordance with facility agreements:

(a) Have unimpeded access to all parts of the storage facilities

including any munitions, devices, bulk containers, or other containers therein. While conducting their activity, inspectors shall comply with the safety regulations at the facility. The items to be inspected will be chosen by the inspectors; and

(b) Have the right, during the first and any subsequent inspection

of each chemical weapons storage facility, to designate munitions, devices, and containers from which samples are to be taken, and to affix to such munitions, devices, and containers a unique tag that will indicate an attempt to remove or alter the tag. A sample shall be taken from a tagged item at a chemical weapons storage facility or a chemical weapons destruction facility as soon as it is practically possible in accordance with the corresponding destruction programmes, and, in any case, not later than by the end of the destruction operations.

Systematic verification of the destruction of chemical weapons 50. The purpose of verification of destruction of chemical weapons shall be:

(a) To confirm the identity and quantity of the chemical weapons

stocks to be destroyed; and (b) To confirm that these stocks have been destroyed.

51. Chemical weapons destruction operations during the first 390 days after the entry into force of this Convention shall be governed by transitional verification arrangements. Such arrangements, including a transitional facility agreement, provisions for verification through on-site inspection and monitoring with on-site instruments, and the time-frame for application of the arrangements, shall be agreed between the Organization and the

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

inspected State Party. These arrangements shall be approved by the Executive Council not later than 60 days after this Convention enters into force for the State Party, taking into account the recommendations of the Technical Secretariat, which shall be based on an evaluation of the detailed facility information provided in accordance with paragraph 31 and a visit to the facility. The Executive Council shall, at its first session, establish the guidelines for such transitional verification arrangements, based on recommendations to be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). The transitional verification arrangements shall be designed to verify, throughout the entire transitional period, the destruction of chemical weapons in accordance with the purposes set forth in paragraph 50, and to avoid hampering ongoing destruction operations. 52. The provisions of paragraphs 53 to 61 shall apply to chemical weapons destruction operations that are to begin not earlier than 390 days after the entry into force of this Convention. 53. On the basis of this Convention and the detailed destruction facility information, and as the case may be, on experience from previous inspections, the Technical Secretariat shall prepare a draft plan for inspecting the destruction of chemical weapons at each destruction facility. The plan shall be completed and provided to the inspected State Party for comment not less than 270 days before the facility begins destruction operations pursuant to this Convention. Any differences between the Technical Secretariat and the inspected State Party should be resolved through consultations. Any unresolved matter shall be forwarded to the Executive Council for appropriate action with a view to facilitating the full implementation of this Convention. 54. The Technical Secretariat shall conduct an initial visit to each chemical weapons destruction facility of the inspected State Party not less than 240 days before each facility begins destruction operations pursuant to this Convention, to allow it to familiarize itself with the facility and assess the adequacy of the inspection plan. 55. In the case of an existing facility where chemical weapons destruction operations have already been initiated, the inspected State Party shall not be required to decontaminate the facility before the Technical Secretariat conducts an initial visit. The duration of the visit shall not exceed five days and the number of visiting personnel shall not exceed 15. 56. The agreed detailed plans for verification, with an appropriate recommendation by the Technical Secretariat, shall be forwarded to the Executive Council for review. The Executive Council shall review the plans with a view to approving them, consistent with verification objectives and obligations under this Convention. It should also confirm that verification schemes for destruction are consistent with verification aims and are

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

efficient and practical. This review should be completed not less than 180 days before the destruction period begins. 57. Each member of the Executive Council may consult with the Technical Secretariat on any issues regarding the adequacy of the plan for verification. If there are no objections by any member of the Executive Council, the plan shall be put into action. 58. If there are any difficulties, the Executive Council shall enter into consultations with the State Party to reconcile them. If any difficulties remain unresolved they shall be referred to the Conference. 59. The detailed facility agreements for chemical weapons destruction facilities shall specify, taking into account the specific characteristics of the destruction facility and its mode of operation:

(a) Detailed on-site inspection procedures; and (b) Provisions for verification through continuous monitoring with

on-site instruments and physical presence of inspectors. 60. Inspectors shall be granted access to each chemical weapons destruction facility not less than 60 days before the commencement of the destruction, pursuant to this Convention, at the facility. Such access shall be for the purpose of supervising the installation of the inspection equipment, inspecting this equipment and testing its operation, as well as for the purpose of carrying out a final engineering review of the facility. In the case of an existing facility where chemical weapons destruction operations have already been initiated, destruction operations shall be stopped for the minimum amount of time required, not to exceed 60 days, for installation and testing of the inspection equipment. Depending on the results of the testing and review, the State Party and the Technical Secretariat may agree on additions or changes to the detailed facility agreement for the facility. 61. The inspected State Party shall notify, in writing, the inspection team leader at a chemical weapons destruction facility not less than four hours before the departure of each shipment of chemical weapons from a chemical weapons storage facility to that destruction facility. This notification shall specify the name of the storage facility, the estimated times of departure and arrival, the specific types and quantities of chemical weapons being transported, whether any tagged items are being moved, and the method of transportation. This notification may include notification of more than one shipment. The inspection team leader shall be promptly notified, in writing, of any changes in this information. Chemical weapons storage facilities at chemical weapons destruction facilities.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

62. The inspectors shall verify the arrival of the chemical weapons at the destruction facility and the storing of these chemical weapons. The inspectors shall verify the inventory of each shipment, using agreed procedures consistent with facility safety regulations, prior to the destruction of the chemical weapons. They shall employ, as appropriate, agreed seals, markers or other inventory control procedures to facilitate an accurate inventory of the chemical weapons prior to destruction. 63. As soon and as long as chemical weapons are stored at chemical weapons storage facilities located at chemical weapons destruction facilities, these storage facilities shall be subject to systematic verification in conformity with the relevant facility agreements. 64. At the end of an active destruction phase, inspectors shall make an inventory of the chemical weapons, that have been removed from the storage facility, to be destroyed. They shall verify the accuracy of the inventory of the chemical weapons remaining, employing inventory control procedures as referred to in paragraph 62. Systematic on-site verification measures at chemical weapons destruction facilities. 65. The inspectors shall be granted access to conduct their activities at the chemical weapons destruction facilities and the chemical weapons storage facilities located at such facilities during the entire active phase of destruction. 66. At each chemical weapons destruction facility, to provide assurance that no chemical weapons are diverted and that the destruction process has been completed, inspectors shall have the right to verify through their physical presence and monitoring with on-site instruments:

(a) The receipt of chemical weapons at the facility; (b) The temporary holding area for chemical weapons and the

specific type and quantity of chemical weapons stored in that area;

(c) The specific type and quantity of chemical weapons being

destroyed; (d) The process of destruction; (e) The end-product of destruction; (f) The mutilation of metal parts; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(g) The integrity of the destruction process and of the facility as a whole.

67. Inspectors shall have the right to tag, for sampling, munitions, devices, or containers located in the temporary holding areas at the chemical weapons destruction facilities. 68. To the extent that it meets inspection requirements, information from routine facility operations, with appropriate data authentication, shall be used for inspection purposes. 69. After the completion of each period of destruction, the Technical Secretariat shall confirm the declaration of the State Party, reporting the completion of destruction of the designated quantity of chemical weapons. 70. Inspectors shall, in accordance with facility agreements:

(a) Have unimpeded access to all parts of the chemical weapons

destruction facilities and the chemical weapons storage facilities located at such facilities, including any munitions, devices, bulk containers, or other containers, therein. The items to be inspected shall be chosen by the inspectors in accordance with the verification plan that has been agreed to by the inspected State Party and approved by the Executive Council;

(b) Monitor the systematic on-site analysis of samples during the

destruction process; and (c) Receive, if necessary, samples taken at their request from any

devices, bulk containers and other containers at the destruction facility or the storage facility thereat.

PART IV (B)

OLD CHEMICAL WEAPONS AND ABANDONED CHEMICAL

WEAPONS A. GENERAL. 1. Old chemical weapons shall be destroyed as provided for in Section B. 2. Abandoned chemical weapons, including those which also meet the definition of Article II, paragraph 5 (b), shall be destroyed as provided for in Section C. B. REGIME FOR OLD CHEMICAL WEAPONS.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

3. A State Party which has on its territory old chemical weapons as defined in Article II, paragraph 5 (a), shall, not later than 30 days after this Convention enters into force for it, submit to the Technical Secretariat all available relevant information, including, to the extent possible, the location, type, quantity and the present condition of these old chemical weapons. In the case of old chemical weapons as defined in Article II, paragraph 5 (b), the State Party shall submit to the Technical Secretariat a declaration pursuant to Article III, paragraph 1 (b) (i), including, to the extent possible, the information specified in Part IV (A), paragraphs 1 to 3, of this Annex. 4. A State Party which discovers old chemical weapons after this Convention enters into force for it shall submit to the Technical Secretariat the information specified in paragraph 3 not later than 180 days after the discovery of the old chemical weapons. 5. The Technical Secretariat shall conduct an initial inspection, and any further inspections as may be necessary, in order to verify the information submitted pursuant to paragraphs 3 and 4 and in particular to determine whether the chemical weapons meet the definition of old chemical weapons as specified in Article II, paragraph 5. Guidelines to determine the usability of chemical weapons produced between 1925 and 1946 shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 6. A State Party shall treat old chemical weapons that have been confirmed by the Technical Secretariat as meeting the definition in Article II, paragraph 5 (a), as toxic waste. It shall inform the Technical Secretariat of the steps being taken to destroy or otherwise dispose of such old chemical weapons as toxic waste in accordance with its national legislation. 7. Subject to paragraphs 3 to 5, a State Party shall destroy old chemical weapons that have been confirmed by the Technical Secretariat as meeting the definition in Article II, paragraph 5 (b), in accordance with Article IV and Part IV (A) of this Annex. Upon request of a State Party, the Executive Council may, however, modify the provisions on time-limit and order of destruction of these old chemical weapons, if it determines that doing so would not pose a risk to the object and purpose of this Convention. The request shall contain specific proposals for modification of the provisions and a detailed explanation of the reasons for the proposed modification. C. REGIME FOR ABANDONED CHEMICAL WEAPONS. 8. A State Party on whose territory there are abandoned chemical weapons (hereinafter referred to as the “Territorial State Party”) shall, not later than 30 days after this Convention enters into force for it, submit to the Technical Secretariat all available relevant information concerning the abandoned chemical weapons. This information shall include, to the extent

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

possible, the location, type, quantity and the present condition of the abandoned chemical weapons as well as information on the abandonment. 9. A State Party which discovers abandoned chemical weapons after this Convention enters into force for it shall, not later than 180 days after the discovery, submit to the Technical Secretariat all available relevant information concerning the discovered abandoned chemical weapons. This information shall include, to the extent possible, the location, type, quantity and the present condition of the abandoned chemical weapons as well as information on the abandonment. 10. A State Party which has abandoned chemical weapons on the territory of another State Party (hereinafter referred to as the “Abandoning State Party”) shall, not later than 30 days after this Convention enters into force for it, submit to the Technical Secretariat all available relevant information concerning the abandoned chemical weapons. This information shall include, to the extent possible, the location, type, quantity as well as information on the abandonment, and the condition of the abandoned chemical weapons. 11. The Technical Secretariat shall conduct an initial inspection, and any further inspections as may be necessary, in order to verify all available relevant information submitted pursuant to paragraphs 8 to 10 and determine whether systematic verification in accordance with Part IV (A), paragraphs 41 to 43, of this Annex is required. It shall, if necessary, verify the origin of the abandoned chemical weapons and establish evidence concerning the abandonment and the identity of the Abandoning State. 12. The report of the Technical Secretariat shall be submitted to the Executive Council, the Territorial State Party, and to the Abandoning State Party or the State Party declared by the Territorial State Party or identified by the Technical Secretariat as having abandoned the chemical weapons. If one of the States Parties directly concerned is not satisfied with the report it shall have the right to settle the matter in accordance with provisions of this Convention or bring the issue to the Executive Council with a view to settling the matter expeditiously. 13. Pursuant to Article I, paragraph 3, the Territorial State Party shall have the right to request the State Party which has been established as the Abandoning State Party pursuant to paragraphs 8 to 12 to enter into consultations for the purpose of destroying the abandoned chemical weapons in cooperation with the Territorial State Party. It shall immediately inform the Technical Secretariat of this request. 14. Consultations between the Territorial State Party and the Abandoning State Party with a view to establishing a mutually agreed plan for destruction shall begin not later than 30 days after the Technical Secretariat has been informed of the request referred to in paragraph 13. The mutually

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

agreed plan for destruction shall be transmitted to the Technical Secretariat not later than 180 days after the Technical Secretariat has been informed of the request referred to in paragraph 13. Upon the request of the Abandoning State Party and the Territorial State Party, the Executive Council may extend the time-limit for transmission of the mutually agreed plan for destruction. 15. For the purpose of destroying abandoned chemical weapons, the Abandoning State Party shall provide all necessary financial, technical, expert, facility as well as other resources. The Territorial State Party shall provide appropriate cooperation. 16. If the Abandoning State cannot be identified or is not a State Party, the Territorial State Party, in order to ensure the destruction of these abandoned chemical weapons, may request the Organization and other States Parties to provide assistance in the destruction of these abandoned chemical weapons. 17. Subject to paragraphs 8 to 16, Article IV and Part IV (A) of this Annex shall also apply to the destruction of abandoned chemical weapons. In the case of abandoned chemical weapons which also meet the definition of old chemical weapons in Article II, paragraph 5 (b), the Executive Council, upon the request of the Territorial State Party, individually or together with the Abandoning State Party, may modify or in exceptional cases suspend the application of provisions on destruction, if it determines that doing so would not pose a risk to the object and purpose of this Convention. In the case of abandoned chemical weapons which do not meet the definition of old chemical weapons in Article II, paragraph 5 (b), the Executive Council, upon the request of the Territorial State Party, individually or together with the Abandoning State Party, may in exceptional circumstances modify the provisions on the time-limit and the order of destruction, if it determines that doing so would not pose a risk to the object and purpose of this Convention. Any request as referred to in this paragraph shall contain specific proposals for modification of the provisions and a detailed explanation of the reasons for the proposed modification. 18. States Parties may conclude between themselves agreements or arrangements concerning the destruction of abandoned chemical weapons. The Executive Council may, upon request of the Territorial State Party, individually or together with the Abandoning State Party, decide that selected provisions of such agreements or arrangements take precedence over provisions of this Section, if it determines that the agreement or arrangement ensures the destruction of the abandoned chemical weapons in accordance with paragraph 17.

PART V

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

DESTRUCTION OF CHEMICAL WEAPONS PRODUCTION FACILITIES AND ITS VERIFICATION PURSUANT TO ARTICLE

V

A. DECLARATIONS Declarations of chemical weapons production facilities. 1. The declaration of chemical weapons production facilities by a State Party pursuant to Article III, paragraph 1 (c) (ii), shall contain for each facility:

(a) The name of the facility, the names of the owners, and the

names of the companies or enterprises operating the facility since 1 January 1946;

(b) The precise location of the facility, including the address,

location of the complex, location of the facility within the complex including the specific building and structure number, if any;

(c) A statement whether it is a facility for the manufacture of

chemicals that are defined as chemical weapons or whether it is a facility for the filling of chemical weapons, or both;

(d) The date when the construction of the facility was completed and the periods during which any modifications to the facility were made, including the installation of new or modified equipment, that significantly changed the production process characteristics of the facility;

(e) Information on the chemicals defined as chemical weapons that

were manufactured at the facility; the munitions, devices, and containers that were filled at the facility; and the dates of the beginning and cessation of such manufacture or filling:

(i) For chemicals defined as chemical weapons that were

manufactured at the facility, such information shall be expressed in terms of the specific types of chemicals manufactured, indicating the chemical name in accordance with the current International Union of Pure and Applied Chemistry (IUPAC) nomenclature, structural formula, and the Chemical Abstracts Service registry number, if assigned, and in terms of the amount of each chemical expressed by weight of chemical in tonnes;

(ii) For munitions, devices and containers that were filled at

the facility, such information shall be expressed in terms

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

of the specific type of chemical weapons filled and the weight of the chemical fill per unit;

(f) The production capacity of the chemical weapons production

facility: (i) For a facility where chemical weapons were

manufactured, production capacity shall be expressed in terms of the annual quantitative potential for manufacturing a specific substance on the basis of the technological process actually used or, in the case of processes not actually used, planned to be used at the facility;

(ii) For a facility where chemical weapons were filled,

production capacity shall be expressed in terms of the quantity of chemical that the facility can fill into each specific type of chemical weapon a year;

(g) For each chemical weapons production facility that has not

been destroyed, a description of the facility including: (i) A site diagram; (ii) A process flow diagram of the facility; and (iii) An inventory of buildings at the facility, and specialized

equipment at the facility and of any spare parts for such equipment;

(h) The present status of the facility, stating:

(i) The date when chemical weapons were last produced at

the facility; (ii) Whether the facility has been destroyed, including the

date and manner of its destruction; and (iii) Whether the facility has been used or modified before

entry into force of this Convention for an activity not related to the production of chemical weapons, and if so, information on what modifications have been made, the date such non-chemical weapons related activity began and the nature of such activity, indicating, if applicable, the kind of product;

(i) A specification of the measures that have been taken by

the State Party for closure of, and a description of the

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

measures that have been or will be taken by the State Party to inactivate the facility;

(j) A description of the normal pattern of activity for safety and security at the inactivated facility; and

(k) A statement as to whether the facility will be converted for the

destruction of chemical weapons and, if so, the dates for such conversions.

Declarations of chemical weapons production facilities pursuant to Article III, paragraph 1(c)(iii)

2. The declaration of chemical weapons production facilities pursuant to Article III, paragraph 1(c)(iii), shall contain all information specified in paragraph 1 above. It is the responsibility of the State Party on whose territory the facility is or has been located to make appropriate arrangements with the other State to ensure that the declarations are made. If the State Party on whose territory the facility is or has been located is not able to fulfil this obligation, it shall state the reasons therefor. Declarations of past transfers and receipts. 3. A State Party that has transferred or received chemical weapons production equipment since 1 January 1946 shall declare these transfers and receipts pursuant to Article III, paragraph 1 (c) (iv), and in accordance with paragraph 5 below. When not all the specified information is available for transfer and receipt of such equipment for the period between 1 January 1946 and 1 January 1970, the State Party shall declare whatever information is still available to it and provide an explanation as to why it cannot submit a full declaration. 4. Chemical weapons production equipment referred to in paragraph 3 means:

(a) Specialized equipment; (b) Equipment for the production of equipment specifically

designed for use directly in connection with chemical weapons employment; and

(c) Equipment designed or used exclusively for producing non-

chemical parts for chemical munitions. 5. The declaration concerning transfer and receipt of chemical weapons production equipment shall specify:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) Who received/transferred the chemical weapons production equipment;

(b) The identity of such equipment; (c) The date of transfer or receipt; (d) Whether the equipment was destroyed, if known; and (e) Current disposition, if known. Submission of general plans for

destruction 6. For each chemical weapons production facility, a State Party shall supply the following information:

(a) Envisaged time-frame for measures to be taken; and (b) Methods of destruction.

7. For each chemical weapons production facility that a State Party intends to convert temporarily into a chemical weapons destruction facility, the State Party shall supply the following information:

(a) Envisaged time-frame for conversion into a destruction

facility; (b) Envisaged time-frame for utilizing the facility as a chemical

weapons destruction facility; (c) Description of the new facility; (d) Method of destruction of special equipment; (e) Time-frame for destruction of the converted facility after it has

been utilized to destroy chemical weapons; and (f) Method of destruction of the converted facility.

Submission of annual plans for destruction and annual reports on destruction 8. The State Party shall submit an annual plan for destruction not less than 90 days before the beginning of the coming destruction year. The annual plan shall specify:

(a) Capacity to be destroyed;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) Name and location of the facilities where destruction will take place;

(c) List of buildings and equipment that will be destroyed at each

facility; and (d) Planned method(s) of destruction.

9. A State Party shall submit an annual report on destruction not later than 90 days after the end of the previous destruction year. The annual report shall specify:

(a) Capacity destroyed; (b) Name and location of each facility where destruction took

place; (c) List of buildings and equipment that were destroyed at each

facility; (d) Methods of destruction.

10. For a chemical weapons production facility declared pursuant to Article III, paragraph 1 (c) (iii), it is the responsibility of the State Party on whose territory the facility is or has been located to make appropriate arrangements to ensure that the declarations specified in paragraphs 6 to 9 above are made. If the State Party on whose territory the facility is or has been located is not able to fulfil this obligation, it shall state the reasons therefor. B. DESTRUCTION. General principles for destruction of chemical weapons production facilities. 11. Each State Party shall decide on methods to be applied for the destruction of chemical weapons production facilities, according to the principles laid down in Article V and in this Part. Principles and methods for closure of a chemical weapons production facility. 12. The purpose of the closure of a chemical weapons production facility is to render it inactive. 13. Agreed measures for closure shall be taken by a State Party with due regard to the specific characteristics of each facility. Such measures shall include, inter alia:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) Prohibition of occupation of the specialized buildings and standard buildings of the facility except for agreed activities;

(b) Disconnection of equipment directly related to the production

of chemical weapons, including, inter alia, process control equipment and utilities;

(c) Decommissioning of protective installations and equipment

used exclusively for the safety of operations of the chemical weapons production facility;

(d) Installation of blind flanges and other devices to prevent the

addition of chemicals to, or the removal of chemicals from, any specialized process equipment for synthesis, separation or purification of chemicals defined as a chemical weapon, any storage tank, or any machine for filling chemical weapons, the heating, cooling, or supply of electrical or other forms of power to such equipment, storage tanks, or machines; and

(e) Interruption of rail, road and other access routes for heavy

transport to the chemical weapons production facility except those required for agreed activities.

14. While the chemical weapons production facility remains closed, a State Party may continue safety and physical security activities at the facility. Technical maintenance of chemical weapons production facilities prior to their destruction. 15. A State Party may carry out standard maintenance activities at chemical weapons production facilities only for safety reasons, including visual inspection, preventive maintenance, and routine repairs. 16. All planned maintenance activities shall be specified in the general and detailed plans for destruction. Maintenance activities shall not include:

(a) Replacement of any process equipment; (b) Modification of the characteristics of the chemical process

equipment; (c) Production of chemicals of any type.

17. All maintenance activities shall be subject to monitoring by the Technical Secretariat. Principles and methods for temporary conversion of chemical weapons production facilities into chemical weapons destruction facilities.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

18. Measures pertaining to the temporary conversion of chemical weapons production facilities into chemical weapons destruction facilities shall ensure that the regime for the temporarily converted facilities is at least as stringent as the regime for chemical weapons production facilities that have not been converted. 19. Chemical weapons production facilities converted into chemical weapons destruction facilities before entry into force of this Convention shall be declared under the category of chemical weapons production facilities. They shall be subject to an initial visit by inspectors, who shall confirm the correctness of the information about these facilities. Verification that the conversion of these facilities was performed in such a manner as to render them inoperable as chemical weapons production facilities shall also be required, and shall fall within the framework of measures provided for the facilities that are to be rendered inoperable not later than 90 days after entry into force of this Convention. 20. A State Party that intends to carry out a conversion of chemical weapons production facilities shall submit to the Technical Secretariat, not later than 30 days after this Convention enters into force for it, or not later than 30 days after a decision has been taken for temporary conversion, a general facility conversion plan, and subsequently shall submit annual plans. 21. Should a State Party have the need to convert to a chemical weapons destruction facility an additional chemical weapons production facility that had been closed after this Convention entered into force for it, it shall inform the Technical Secretariat thereof not less than 150 days before conversion. The Technical Secretariat, in conjunction with the State Party, shall make sure that the necessary measures are taken to render that facility, after its conversion, inoperable as a chemical weapons production facility. 22. A facility converted for the destruction of chemical weapons shall not be more fit for resuming chemical weapons production than a chemical weapons production facility which has been closed and is under maintenance. Its reactivation shall require no less time than that required for a chemical weapons production facility that has been closed and is under maintenance. 23. Converted chemical weapons production facilities shall be destroyed not later than 10 years after entry into force of this Convention. 24. Any measures for the conversion of any given chemical weapons production facility shall be facility-specific and shall depend upon its individual characteristics.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

25. The set of measures carried out for the purpose of converting a chemical weapons production facility into a chemical weapons destruction facility shall not be less than that which is provided for the disabling of other chemical weapons production facilities to be carried out not later than 90 days after this Convention enters into force for the State Party. Principles and methods related to destruction of a chemical weapons production facility. 26. A State Party shall destroy equipment and buildings covered by the definition of a chemical weapons production facility as follows:

(a) All specialized equipment and standard equipment shall be

physically destroyed; (b) All specialized buildings and standard buildings shall be

physically destroyed. 27. A State Party shall destroy facilities for producing unfilled chemical munitions and equipment for chemical weapons employment as follows:

(a) Facilities used exclusively for production of non-chemical

parts for chemical munitions or equipment specifically designed for use directly in connection with chemical weapons employment, shall be declared and destroyed. The destruction process and its verification shall be conducted according to the provisions of Article V and this Part of this Annex that govern destruction of chemical weapons production facilities;

(b) All equipment designed or used exclusively for producing non-

chemical parts for chemical munitions shall be physically destroyed. Such equipment, which includes specially designed moulds and metal-forming dies, may be brought to a special location for destruction;

(c) All buildings and standard equipment used for such production

activities shall be destroyed or converted for purposes not prohibited under this Convention, with confirmation, as necessary, through consultations and inspections as provided for under Article IX;

(d) Activities for purposes not prohibited under this Convention

may continue while destruction or conversion proceeds. Order of destruction

28. The order of destruction of chemical weapons production facilities is based on the obligations specified in Article I and the other Articles of this Convention, including obligations regarding systematic on-site verification.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

It takes into account interests of States Parties for undiminished security during the destruction period; confidence- building in the early part of the destruction stage; gradual acquisition of experience in the course of destroying chemical weapons production facilities; and applicability irrespective of the actual characteristics of the facilities and the methods chosen for their destruction. The order of destruction is based on the principle of levelling out. 29. A State Party shall, for each destruction period, determine which chemical weapons production facilities are to be destroyed and carry out the destruction in such a way that not more than what is specified in paragraphs 30 and 31 remains at the end of each destruction period. A State Party is not precluded from destroying its facilities at a faster pace. 30. The following provisions shall apply to chemical weapons production facilities that produce Schedule 1 chemicals:

(a) A State Party shall start the destruction of such facilities not

later than one year after this Convention enters into force for it, and shall complete it not later than 10 years after entry into force of this Convention. For a State which is a Party at the entry into force of this Convention, this overall period shall be divided into three separate destruction periods, namely, years 2-5, years 6-8, and years 9-10. For States which become a Party after entry into force of this Convention, the destruction periods shall be adapted, taking into account paragraphs 28 and 29;

(b) Production capacity shall be used as the comparison factor for

such facilities. It shall be expressed in agent tonnes, taking into account the rules specified for binary chemical weapons;

(c) Appropriate agreed levels of production capacity shall be

established for the end of the eighth year after entry into force of this Convention. Production capacity that exceeds the relevant level shall be destroyed in equal increments during the first two destruction periods;

(d) A requirement to destroy a given amount of capacity shall

entail a requirement to destroy any other chemical weapons production facility that supplied the Schedule 1 facility or filled the Schedule 1 chemical produced there into munitions or devices;

(e) Chemical weapons production facilities that have been

converted temporarily for destruction of chemical weapons shall continue to be subject to the obligation to destroy capacity according to the provisions of this paragraph.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

31. A State Party shall start the destruction of chemical weapons production facilities not covered in paragraph 30 not later than one year after this Convention enters into force for it, and complete it not later than five years after entry into force of this Convention. Detailed plans for destruction. 32. Not less than 180 days before the destruction of a chemical weapons production facility starts, a State Party shall provide to the Technical Secretariat the detailed plans for destruction of the facility, including proposed measures for verification of destruction referred to in paragraph 33 (f), with respect to, inter alia:

(a) Timing of the presence of the inspectors at the facility to be

destroyed; and (b) Procedures for verification of measures to be applied to each

item on the declared inventory.

33. The detailed plans for destruction of each chemical weapons production facility shall contain:

(a) Detailed time schedule of the destruction process; (b) Layout of the facility; (c) Process flow diagram; (d) Detailed inventory of equipment, buildings and other items to

be destroyed; (e) Measures to be applied to each item on the inventory; (f) Proposed measures for verification; (g) Security/safety measures to be observed during the destruction

of the facility; and (h) Working and living conditions to be provided for inspectors.

34. If a State Party intends to convert temporarily a chemical weapons production facility into a chemical weapons destruction facility, it shall notify the Technical Secretariat not less than 150 days before undertaking any conversion activities. The notification shall:

(a) Specify the name, address, and location of the facility;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) Provide a site diagram indicating all structures and areas that will be involved in the destruction of chemical weapons and also identify all structures of the chemical weapons production facility that are to be temporarily converted;

(c) Specify the types of chemical weapons, and the type and

quantity of chemical fill to be destroyed; (d) Specify the destruction method; (e) Provide a process flow diagram, indicating which portions of

the production process and specialized equipment will be converted for the destruction of chemical weapons;

(f) Specify the seals and inspection equipment potentially affected

by the conversion, if applicable; and (g) Provide a schedule identifying: The time allocated to design,

temporary conversion of the facility, installation of equipment, equipment check-out, destruction operations, and closure.

35. In relation to the destruction of a facility that was temporarily converted for destruction of chemical weapons, information shall be provided in accordance with paragraphs 32 and 33. Review of detailed plans. 36. On the basis of the detailed plan for destruction and proposed measures for verification submitted by the State Party, and on experience from previous inspections, the Technical Secretariat shall prepare a plan for verifying the destruction of the facility, consulting closely with the State Party. Any differences between the Technical Secretariat and the State Party concerning appropriate measures should be resolved through consultations. Any unresolved matters shall be forwarded to the Executive Council for appropriate action with a view to facilitating the full implementation of this Convention. 37. To ensure that the provisions of Article V and this Part are fulfilled, the combined plans for destruction and verification shall be agreed upon between the Executive Council and the State Party. This agreement should be completed, not less than 60 days before the planned initiation of destruction. 38. Each member of the Executive Council may consult with the Technical Secretariat on any issues regarding the adequacy of the combined plan for destruction and verification. If there are no objections by any member of the Executive Council, the plan shall be put into action.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

39. If there are any difficulties, the Executive Council shall enter into consultations with the State Party to reconcile them. If any difficulties remain unresolved they shall be referred to the Conference. The resolution of any differences over methods of destruction shall not delay the execution of other parts of the destruction plan that are acceptable. 40. If agreement is not reached with the Executive Council on aspects of verification, or if the approved verification plan cannot be put into action, verification of destruction shall proceed through continuous monitoring with on-site instruments and physical presence of inspectors. 41. Destruction and verification shall proceed according to the agreed plan. The verification shall not unduly interfere with the destruction process and shall be conducted through the presence of inspectors on-site to witness the destruction. 42. If required verification or destruction actions are not taken as planned, all States Parties shall be so informed. C. VERIFICATION. Verification of declarations of chemical weapons production facilities through on-site inspection. 43. The Technical Secretariat shall conduct an initial inspection of each chemical weapons production facility in the period between 90 and 120 days after this Convention enters into force for the State Party. 44. The purposes of the initial inspection shall be:

(a) To confirm that the production of chemical weapons has

ceased and that the facility has been inactivated in accordance with this Convention;

(b) To permit the Technical Secretariat to familiarize itself with

the measures that have been taken to cease production of chemical weapons at the facility;

(c) To permit the inspectors to install temporary seals; (d) To permit the inspectors to confirm the inventory of buildings

and specialized equipment; (e) To obtain information necessary for planning inspection

activities at the facility, including use of tamper-indicating seals and other agreed equipment, which shall be installed pursuant to the detailed facility agreement for the facility; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(f) To conduct preliminary discussions regarding a detailed agreement on inspection procedures at the facility.

45. Inspectors shall employ, as appropriate, agreed seals, markers or other inventory control procedures to facilitate an accurate inventory of the declared items at each chemical weapons production facility. 46. Inspectors shall install such agreed devices as may be necessary to indicate if any resumption of production of chemical weapons occurs or if any declared item is removed. They shall take the necessary precaution not to hinder closure activities by the inspected State Party. Inspectors may return to maintain and verify the integrity of the devices. 47. If, on the basis of the initial inspection, the Director-General believes that additional measures are necessary to inactivate the facility in accordance with this Convention, the Director-General may request, not later than 135 days after this Convention enters into force for a State Party, that such measures be implemented by the inspected State Party not later than 180 days after this Convention enters into force for it. At its discretion, the inspected State Party may satisfy the request. If it does not satisfy the request, the inspected State Party and the Director-General shall consult to resolve the matter. Systematic verification of chemical weapons production facilities and cessation of their activities. 48. The purpose of the systematic verification of a chemical weapons production facility shall be to ensure that any resumption of production of chemical weapons or removal of declared items will be detected at this facility. 49. The detailed facility agreement for each chemical weapons production facility shall specify:

(a) Detailed on-site inspection procedures, which may include:

(i) Visual examinations; (ii) Checking and servicing of seals and other agreed

devices; and (iii) Obtaining and analysing samples;

(b) Procedures for using tamper-indicating seals and other agreed equipment to prevent the undetected reactivation of the facility, which shall specify:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(i) The type, placement, and arrangements for installation; and

(ii) The maintenance of such seals and equipment; and

(c) Other agreed measures.

50. The seals or other approved equipment provided for in a detailed agreement on inspection measures for that facility shall be placed not later than 240 days after this Convention enters into force for a State Party. Inspectors shall be permitted to visit each chemical weapons production facility for the installation of such seals or equipment. 51. During each calendar year, the Technical Secretariat shall be permitted to conduct up to four inspections of each chemical weapons production facility. 52. The Director-General shall notify the inspected State Party of his decision to inspect or visit a chemical weapons production facility 48 hours before the planned arrival of the inspection team at the facility for systematic inspections or visits. In the case of inspections or visits to resolve urgent problems, this period may be shortened. The Director- General shall specify the purpose of the inspection or visit. 53. Inspectors shall, in accordance with the facility agreements, have unimpeded access to all parts of the chemical weapons production facilities. The items on the declared inventory to be inspected shall be chosen by the inspectors. 54. The guidelines for determining the frequency of systematic on-site inspections shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). The particular production facility to be inspected shall be chosen by the Technical Secretariat in such a way as to preclude the prediction of precisely when the facility is to be inspected. Verification of destruction of chemical weapons production facilities. 55. The purpose of systematic verification of the destruction of chemical weapons production facilities shall be to confirm that the facility is destroyed in accordance with the obligations under this Convention and that each item on the declared inventory is destroyed in accordance with the agreed detailed plan for destruction. 56. When all items on the declared inventory have been destroyed, the Technical Secretariat shall confirm the declaration of the State Party to that effect. After this confirmation, the Technical Secretariat shall terminate the systematic verification of the chemical weapons production facility and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

shall promptly remove all devices and monitoring instruments installed by the inspectors. 57. After this confirmation, the State Party shall make the declaration that the facility has been destroyed. Verification of temporary conversion of a chemical weapons production facility into a chemical weapons destruction facility. 58. Not later than 90 days after receiving the initial notification of the intent to convert temporarily a production facility, the inspectors shall have the right to visit the facility to familiarize themselves with the proposed temporary conversion and to study possible inspection measures that will be required during the conversion. 59. Not later than 60 days after such a visit, the Technical Secretariat and the inspected State Party shall conclude a transition agreement containing additional inspection measures for the temporary conversion period. The transition agreement shall specify inspection procedures, including the use of seals, monitoring equipment, and inspections, that will provide confidence that no chemical weapons production takes place during the conversion process. This agreement shall remain in force from the beginning of the temporary conversion activity until the facility begins operation as a chemical weapons destruction facility. 60. The inspected State Party shall not remove or convert any portion of the facility, or remove or modify any seal or other agreed inspection equipment that may have been installed pursuant to this Convention until the transition agreement has been concluded. 61. Once the facility begins operation as a chemical weapons destruction facility, it shall be subject to the provisions of Part IV (A) of this Annex applicable to chemical weapons destruction facilities. Arrangements for the pre-operation period shall be governed by the transition agreement. 62. During destruction operations the inspectors shall have access to all portions of the temporarily converted chemical weapons production facilities, including those that are not directly involved with the destruction of chemical weapons. 63. Before the commencement of work at the facility to convert it temporarily for chemical weapons destruction purposes and after the facility has ceased to function as a facility for chemical weapons destruction, the facility shall be subject to the provisions of this Part applicable to chemical weapons production facilities.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

D. CONVERSION OF CHEMICAL WEAPONS PRODUCTION FACILITIES TO PURPOSES NOT PROHIBITED UNDER THIS CONVENTION. Procedures for requesting conversion. 64. A request to use a chemical weapons production facility for purposes not prohibited under this Convention may be made for any facility that a State Party is already using for such purposes before this Convention enters into force for it, or that it plans to use for such purposes. 65. For a chemical weapons production facility that is being used for purposes not prohibited under this Convention when this Convention enters into force for the State Party, the request shall be submitted to the Director- General not later than 30 days after this Convention enters into force for the State Party. The request shall contain, in addition to data submitted in accordance with paragraph 1 (h) (iii), the following information:

(a) A detailed justification for the request; (b) A general facility conversion plan that specifies:

(i) The nature of the activity to be conducted at the facility; (ii) If the planned activity involves production, processing,

or consumption of chemicals: the name of each of the chemicals, the flow diagram of the facility, and the quantities planned to be produced, processed, or consumed annually;

(iii) Which buildings or structures are proposed to be used

and what modifications are proposed, if any; (iv) Which buildings or structures have been destroyed or are

proposed to be destroyed and the plans for destruction; (v) What equipment is to be used in the facility; (vi) What equipment has been removed and destroyed and

what equipment is proposed to be removed and destroyed and the plans for its destruction;

(vii) The proposed schedule for conversion, if applicable; and (viii) The nature of the activity of each other facility operating

at the site; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) A detailed explanation of how measures set forth in subparagraph (b), as well as any other measures proposed by the State Party, will ensure the prevention of standby chemical weapons production capability at the facility.

66. For a chemical weapons production facility that is not being used for purposes not prohibited under this Convention when this Convention enters into force for the State Party, the request shall be submitted to the Director- General not later than 30 days after the decision to convert, but in no case later than four years after this Convention enters into force for the State Party. The request shall contain the following information:

(a) A detailed justification for the request, including its economic

needs; (b) A general facility conversion plan that specifies:

(i) The nature of the activity planned to be conducted at the facility;

(ii) If the planned activity involves production, processing,

or consumption of chemicals: the name of each of the chemicals, the flow diagram of the facility, and the quantities planned to be produced, processed, or consumed annually;

(iii) Which buildings or structures are proposed to be retained

and what modifications are proposed, if any; (iv) Which buildings or structures have been destroyed or are

proposed to be destroyed and the plans for destruction; (v) What equipment is proposed for use in the facility; (vi) What equipment is proposed to be removed and

destroyed and the plans for its destruction; (vii) The proposed schedule for conversion; and (viii) The nature of the activity of each other facility operating

at the site; and (c) A detailed explanation of how the measures set forth in

subparagraph (b), as well as any other measures proposed by the State Party, will ensure the prevention of standby chemical weapons production capability at the facility.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

67. The State Party may propose in its request any other measures it deems appropriate to build confidence. Actions pending a decision. 68. Pending a decision of the Conference, a State Party may continue to use for purposes not prohibited under this Convention a facility that was being used for such purposes before this Convention enters into force for it, but only if the State Party certifies in its request that no specialized equipment and no specialized buildings are being used and that the specialized equipment and specialized buildings have been rendered inactive using the methods specified in paragraph 13. 69. If the facility, for which the request was made, was not being used for purposes not prohibited under this Convention before this Convention enters into force for the State Party, or if the certification required in paragraph 68 is not made, the State Party shall cease immediately all activity pursuant to Article V, paragraph 4. The State Party shall close the facility in accordance with paragraph 13 not later than 90 days after this Convention enters into force for it. Conditions for conversion. 70. As a condition for conversion of a chemical weapons production facility for purposes not prohibited under this Convention, all specialized equipment at the facility must be destroyed and all special features of buildings and structures that distinguish them from buildings and structures normally used for purposes not prohibited under this Convention and not involving Schedule 1 chemicals must be eliminated. 71. A converted facility shall not be used:

(a) For any activity involving production, processing, or

consumption of a Schedule 1 chemical or a Schedule 2 chemical; or

(b) For the production of any highly toxic chemical, including any

highly toxic organophosphorus chemical, or for any other activity that would require special equipment for handling highly toxic or highly corrosive chemicals, unless the Executive Council decides that such production or activity would pose no risk to the object and purpose of this Convention, taking into account criteria for toxicity, corrosiveness and, if applicable, other technical factors, to be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i).

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

72. Conversion of a chemical weapons production facility shall be completed not later than six years after entry into force of this Convention. Decisions by the Executive Council and the Conference. 73. Not later than 90 days after receipt of the request by the Director- General, an initial inspection of the facility shall be conducted by the Technical Secretariat. The purpose of this inspection shall be to determine the accuracy of the information provided in the request, to obtain information on the technical characteristics of the proposed converted facility, and to assess the conditions under which use for purposes not prohibited under this Convention may be permitted. The Director-General shall promptly submit a report to the Executive Council, the Conference, and all States Parties containing his recommendations on the measures necessary to convert the facility to purposes not prohibited under this Convention and to provide assurance that the converted facility will be used only for purposes not prohibited under this Convention. 74. If the facility has been used for purposes not prohibited under this Convention before this Convention enters into force for the State Party, and is continuing to be in operation, but the measures required to be certified under paragraph 68 have not been taken, the Director-General shall immediately inform the Executive Council, which may require implementation of measures it deems appropriate, inter alia, shut-down of the facility and removal of specialized equipment and modification of buildings or structures. The Executive Council shall stipulate the deadline for implementation of these measures and shall suspend consideration of the request pending their satisfactory completion. The facility shall be inspected promptly after the expiration of the deadline to determine whether the measures have been implemented. If not, the State Party shall be required to shut down completely all facility operations. 75. As soon as possible after receiving the report of the Director-General, the Conference, upon recommendation of the Executive Council, shall decide, taking into account the report and any views expressed by States Parties, whether to approve the request, and shall establish the conditions upon which approval is contingent. If any State Party objects to approval of the request and the associated conditions, consultations shall be undertaken among interested States Parties for up to 90 days to seek a mutually acceptable solution. A decision on the request and associated conditions, along with any proposed modifications thereto, shall be taken, as a matter of substance, as soon as possible after the end of the consultation period. 76. If the request is approved, a facility agreement shall be completed not later than 90 days after such a decision is taken. The facility agreement shall contain the conditions under which the conversion and use of the facility is permitted, including measures for verification. Conversion shall not begin before the facility agreement is concluded.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

Detailed plans for conversion. 77. Not less than 180 days before conversion of a chemical weapons production facility is planned to begin, the State Party shall provide the Technical Secretariat with the detailed plans for conversion of the facility, including proposed measures for verification of conversion, with respect to, inter alia:

(a) Timing of the presence of the inspectors at the facility to be

converted; and (b) Procedures for verification of measures to be applied to each

item on the declared inventory. 78. The detailed plan for conversion of each chemical weapons production facility shall contain:

(a) Detailed time schedule of the conversion process; (b) Layout of the facility before and after conversion; (c) Process flow diagram of the facility before, and as appropriate,

after the conversion; (d) Detailed inventory of equipment, buildings and structures and

other items to be destroyed and of the buildings and structures to be modified;

(e) Measures to be applied to each item on the inventory, if any; (f) Proposed measures for verification; (g) Security/safety measures to be observed during the conversion

of the facility; and (h) Working and living conditions to be provided for inspectors.

Review of detailed plans. 79. On the basis of the detailed plan for conversion and proposed measures for verification submitted by the State Party, and on experience from previous inspections, the Technical Secretariat shall prepare a plan for verifying the conversion of the facility, consulting closely with the State Party. Any differences between the Technical Secretariat and the State Party concerning appropriate measures shall be resolved through consultations. Any unresolved matters shall be forwarded to the Executive Council for

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

appropriate action with a view to facilitate the full implementation of this Convention. 80. To ensure that the provisions of Article V and this Part are fulfilled, the combined plans for conversion and verification shall be agreed upon between the Executive Council and the State Party. This agreement shall be completed not less than 60 days before conversion is planned to begin. 81. Each member of the Executive Council may consult with the Technical Secretariat on any issue regarding the adequacy of the combined plan for conversion and verification. If there are no objections by any member of the Executive Council, the plan shall be put into action. 82. If there are any difficulties, the Executive Council should enter into consultations with the State Party to reconcile them. If any difficulties remain unresolved, they should be referred to the Conference. The resolution of any differences over methods of conversion should not delay the execution of other parts of the conversion plan that are acceptable. 83. If agreement is not reached with the Executive Council on aspects of verification, or if the approved verification plan cannot be put into action, verification of conversion shall proceed through continuous monitoring with on-site instruments and physical presence of inspectors. 84. Conversion and verification shall proceed according to the agreed plan. The verification shall not unduly interfere with the conversion process and shall be conducted through the presence of inspectors to confirm the conversion. 85. For the 10 years after the Director-General certifies that conversion is complete, the State Party shall provide to inspectors unimpeded access to the facility at any time. The inspectors shall have the right to observe all areas, all activities, and all items of equipment at the facility. The inspectors shall have the right to verify that the activities at the facility are consistent with any conditions established under this Section, by the Executive Council and the Conference. The inspectors shall also have the right, in accordance with provisions of Part II, Section E, of this Annex to receive samples from any area of the facility and to analyse them to verify the absence of Schedule 1 chemicals, their stable by-products and decomposition products and of Schedule 2 chemicals and to verify that the activities at the facility are consistent with any other conditions on chemical activities established under this Section, by the Executive Council and the Conference. The inspectors shall also have the right to managed access, in accordance with Part X, Section C, of this Annex, to the plant site at which the facility is located. During the 10-year period, the State Party shall report annually on the activities at the converted facility. Upon completion of the 10-year period, the Executive Council, taking into account

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

recommendations of the Technical Secretariat, shall decide on the nature of continued verification measures. 86. Costs of verification of the converted facility shall be allocated in accordance with Article V, paragraph 19.

PART VI

ACTIVITIES NOT PROHIBITED UNDER THIS CONVENTION IN

ACCORDANCE WITH ARTICLE VI

REGIME FOR SCHEDULE 1 CHEMICALS AND FACILITIES RELATED TO SUCH CHEMICALS

A. GENERAL PROVISIONS 1. A State Party shall not produce, acquire, retain or use Schedule 1 chemicals outside the territories of States Parties and shall not transfer such chemicals outside its territory except to another State Party. 2. A State Party shall not produce, acquire, retain, transfer or use Schedule 1 chemicals unless:

(a) The chemicals are applied to research, medical, pharmaceutical

or protective purposes; and (b) The types and quantities of chemicals are strictly limited to

those which can be justified for such purposes; and (c) The aggregate amount of such chemicals at any given time for

such purposes is equal to or less than 1 tonne; and (d) The aggregate amount for such purposes acquired by a State

Party in any year through production, withdrawal from chemical weapons stocks and transfer is equal to or less than 1 tonne.

B. TRANSFERS. 3. A State Party may transfer Schedule 1 chemicals outside its territory only to another State Party and only for research, medical, pharmaceutical or protective purposes in accordance with paragraph 2. 4. Chemicals transferred shall not be retransferred to a third State. 5. Not less than 30 days before any transfer to another State Party both States Parties shall notify the Technical Secretariat of the transfer.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

6. Each State Party shall make a detailed annual declaration regarding transfers during the previous year. The declaration shall be submitted not later than 90 days after the end of that year and shall for each Schedule 1 chemical that has been transferred include the following information:

(a) The chemical name, structural formula and Chemical Abstracts

Service registry number, if assigned; (b) The quantity acquired from other States or transferred to other

States Parties. For each transfer the quantity, recipient and purpose shall be included.

C. PRODUCTION. General principles for production. 7. Each State Party, during production under paragraphs 8 to 12, shall assign the highest priority to ensuring the safety of people and to protecting the environment. Each State Party shall conduct such production in accordance with its national standards for safety and emissions. Single small-scale facility. 8. Each State Party that produces Schedule 1 chemicals for research, medical, pharmaceutical or protective purposes shall carry out the production at a single small-scale facility approved by the State Party, except as set forth in paragraphs 10, 11 and 12. 9. The production at a single small-scale facility shall be carried out in reaction vessels in production lines not configurated for continuous operation. The volume of such a reaction vessel shall not exceed 100 litres, and the total volume of all reaction vessels with a volume exceeding 5 litres shall not be more than 500 litres. Other facilities. 10. Production of Schedule 1 chemicals in aggregate quantities not exceeding 10 kg per year may be carried out for protective purposes at one facility outside a single small-scale facility. This facility shall be approved by the State Party. 11. Production of Schedule 1 chemicals in quantities of more than 100 g per year may be carried out for research, medical or pharmaceutical purposes outside a single small-scale facility in aggregate quantities not exceeding 10 kg per year per facility. These facilities shall be approved by the State Party.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

12. Synthesis of Schedule 1 chemicals for research, medical or pharmaceutical purposes, but not for protective purposes, may be carried out at laboratories in aggregate quantities less than 100 g per year per facility. These facilities shall not be subject to any obligation relating to declaration and verification as specified in Sections D and E. D. DECLARATIONS Single small-scale facility. 13. Each State Party that plans to operate a single small-scale facility shall provide the Technical Secretariat with the precise location and a detailed technical description of the facility, including an inventory of equipment and detailed diagrams. For existing facilities, this initial declaration shall be provided not later than 30 days after this Convention enters into force for the State Party. Initial declarations on new facilities shall be provided not less than 180 days before operations are to begin. 14. Each State Party shall give advance notification to the Technical Secretariat of planned changes related to the initial declaration. The notification shall be submitted not less than 180 days before the changes are to take place. 15. A State Party producing Schedule 1 chemicals at a single small-scale facility shall make a detailed annual declaration regarding the activities of the facility for the previous year. The declaration shall be submitted not later than 90 days after the end of that year and shall include:

(a) Identification of the facility; (b) For each Schedule 1 chemical produced, acquired, consumed

or stored at the facility, the following information: (i) The chemical name, structural formula and Chemical

Abstracts Service registry number, if assigned; (ii) The methods employed and quantity produced; (iii) The name and quantity of precursors listed in Schedules

1, 2, or 3 used for production of Schedule 1 chemicals; (iv) The quantity consumed at the facility and the purpose(s)

of the consumption; (v) The quantity received from or shipped to other facilities

in the State Party. For each shipment the quantity, recipient and purpose should be included;

(vi) The maximum quantity stored at any time during the

year; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(vii) The quantity stored at the end of the year; and

(c) Information on any changes at the facility during the year compared to previously submitted detailed technical descriptions of the facility including inventories of equipment and detailed diagrams.

16. Each State Party producing Schedule 1 chemicals at a single small-scale facility shall make a detailed annual declaration regarding the projected activities and the anticipated production at the facility for the coming year. The declaration shall be submitted not less than 90 days before the beginning of that year and shall include:

(a) Identification of the facility; (b) For each Schedule 1 chemical anticipated to be produced,

consumed or stored at the facility, the following information: (i) The chemical name, structural formula and Chemical

Abstracts Service registry number, if assigned; (ii) The quantity anticipated to be produced and the purpose

of the production; and (c) Information on any anticipated changes at the facility during

the year compared to previously submitted detailed technical descriptions of the facility including inventories of equipment and detailed diagrams.

Other facilities referred to in paragraphs 10 and 11 17. For each facility, a State Party shall provide the Technical Secretariat with the name, location and a detailed technical description of the facility or its relevant part(s) as requested by the Technical Secretariat. The facility producing Schedule 1 chemicals for protective purposes shall be specifically identified. For existing facilities, this initial declaration shall be provided not later than 30 days after this Convention enters into force for the State Party. Initial declarations on new facilities shall be provided not less than 180 days before operations are to begin. 18. Each State Party shall give advance notification to the Technical Secretariat of planned changes related to the initial declaration. The notification shall be submitted not less than 180 days before the changes are to take place. 19. Each State Party shall, for each facility, make a detailed annual declaration regarding the activities of the facility for the previous year. The

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

declaration shall be submitted not later than 90 days after the end of that year and shall include:

(a) Identification of the facility; (b) For each Schedule 1 chemical the following information:

(i) The chemical name, structural formula and Chemical Abstracts Service registry number, if assigned;

(ii) The quantity produced and, in case of production for

protective purposes, methods employed; (iii) The name and quantity of precursors listed in Schedules

1, 2, or 3, used for production of Schedule 1 chemicals;

(iv) The quantity consumed at the facility and the purpose of the consumption;

(v) The quantity transferred to other facilities within the

State Party. For each transfer the quantity, recipient and purpose should be included;

(vi) The maximum quantity stored at any time during the

year; and (vii) The quantity stored at the end of the year; and

(c) Information on any changes at the facility or its relevant parts during the year compared to previously submitted detailed technical description of the facility.

20. Each State Party shall, for each facility, make a detailed annual declaration regarding the projected activities and the anticipated production at the facility for the coming year. The declaration shall be submitted not less than 90 days before the beginning of that year and shall include:

(a) Identification of the facility; (b) For each Schedule 1 chemical the following information:

(i) The chemical name, structural formula and Chemical

Abstracts Service registry number, if assigned; and (ii) The quantity anticipated to be produced, the time periods

when the production is anticipated to take place and the purposes of the production; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) Information on any anticipated changes at the facility or its relevant parts, during the year compared to previously submitted detailed technical descriptions of the facility.

E. VERIFICATION. Single small-scale facility. 21. The aim of verification activities at the single small-scale facility shall be to verify that the quantities of Schedule 1 chemicals produced are correctly declared and, in particular, that their aggregate amount does not exceed 1 tonne. 22. The facility shall be subject to systematic verification through on-site inspection and monitoring with on-site instruments. 23. The number, intensity, duration, timing and mode of inspections for a particular facility shall be based on the risk to the object and purpose of this Convention posed by the relevant chemicals, the characteristics of the facility and the nature of the activities carried out there. Appropriate guidelines shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 24. The purpose of the initial inspection shall be to verify information provided concerning the facility, including verification of the limits on reaction vessels set forth in paragraph 9. 25. Not later than 180 days after this Convention enters into force for a State Party, it shall conclude a facility agreement, based on a model agreement, with the Organization, covering detailed inspection procedures for the facility. 26. Each State Party planning to establish a single small-scale facility after this Convention enters into force for it shall conclude a facility agreement, based on a model agreement, with the Organization, covering detailed inspection procedures for the facility before it begins operation or is used. 27. A model for agreements shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). Other facilities referred to in paragraphs 10 and 11. 28. The aim of verification activities at any facility referred to in paragraphs 10 and 11 shall be to verify that:

(a) The facility is not used to produce any Schedule 1 chemical,

except for the declared chemicals;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) The quantities of Schedule 1 chemicals produced, processed or consumed are correctly declared and consistent with needs for the declared purpose; and

(c) The Schedule 1 chemical is not diverted or used for other

purposes. 29. The facility shall be subject to systematic verification through on-site inspection and monitoring with on-site instruments. 30. The number, intensity, duration, timing and mode of inspections for a particular facility shall be based on the risk to the object and purpose of this Convention posed by the quantities of chemicals produced, the characteristics of the facility and the nature of the activities carried out there. Appropriate guidelines shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 31. Not later than 180 days after this Convention enters into force for a State Party, it shall conclude facility agreements with the Organization, based on a model agreement covering detailed inspection procedures for each facility. 32. Each State Party planning to establish such a facility after entry into force of this Convention shall conclude a facility agreement with the Organization before the facility begins operation or is used.

PART VII

ACTIVITIES NOT PROHIBITED UNDER THIS CONVENTION IN

ACCORDANCE WITH ARTICLE VI

REGIME FOR SCHEDULE 2 CHEMICALS AND FACILITIES RELATED TO SUCH CHEMICALS

A. DECLARATIONS. Declarations of aggregate national data. 1. The initial and annual declarations to be provided by each State Party pursuant to Article VI, paragraphs 7 and 8, shall include aggregate national data for the previous calendar year on the quantities produced, processed, consumed, imported and exported of each Schedule 2 chemical, as well as a quantitative specification of import and export for each country involved. 2. Each State Party shall submit:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) Initial declarations pursuant to paragraph 1 not later than 30 days after this Convention enters into force for it; and, starting in the following calendar year; and

(b) Annual declarations not later than 90 days after the end of the

previous calendar year. Declarations of plant sites producing, processing or consuming Schedule 2 chemicals

3. Initial and annual declarations are required for all plant sites that comprise one or more plant(s) which produced, processed or consumed during any of the previous three calendar years or is anticipated to produce, process or consume in the next calendar year more than:

(a) 1 kg of a chemical designated “*” in Schedule 2, part A; (b) 100 kg of any other chemical listed in Schedule 2, part A; or (c) 1 tonne of a chemical listed in Schedule 2, part B.

4. Each State Party shall submit:

(a) Initial declarations pursuant to paragraph 3 not later than 30

days after this Convention enters into force for it; and, starting in the following calendar year;

(b) Annual declarations on past activities not later than 90 days

after the end of the previous calendar year; (c) Annual declarations on anticipated activities not later than 60

days before the beginning of the following calendar year. Any such activity additionally planned after the annual declaration has been submitted shall be declared not later than five days before this activity begins.

5. Declarations pursuant to paragraph 3 are generally not required for mixtures containing a low concentration of a Schedule 2 chemical. They are only required, in accordance with guidelines, in cases where the ease of recovery from the mixture of the Schedule 2 chemical and its total weight are deemed to pose a risk to the object and purpose of this Convention. These guidelines shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 6. Declarations of a plant site pursuant to paragraph 3 shall include:

(a) The name of the plant site and the name of the owner,

company, or enterprise operating it; (b) Its precise location including the address; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) The number of plants within the plant site which are declared

pursuant to Part VIII of this Annex. 7. Declarations of a plant site pursuant to paragraph 3 shall also include, for each plant which is located within the plant site and which falls under the specifications set forth in paragraph 3, the following information:

(a) The name of the plant and the name of the owner, company, or

enterprise operating it; (b) Its precise location within the plant site including the specific

building or structure number, if any; (c) Its main activities; (d) Whether the plant:

(i) Produces, processes, or consumes the declared Schedule

2 chemical(s); (ii) Is dedicated to such activities or multi-purpose; and (iii) Performs other activities with regard to the declared

Schedule 2 chemical(s), including a specification of that other activity (e.g. storage); and

(e) The production capacity of the plant for each declared

Schedule 2 chemical. 8. Declarations of a plant site pursuant to paragraph 3 shall also include the following information on each Schedule 2 chemical above the declaration threshold:

(a) The chemical name, common or trade name used by the

facility, structural formula, and Chemical Abstracts Service registry number, if assigned;

(b) In the case of the initial declaration: the total amount produced,

processed, consumed, imported and exported by the plant site in each of the three previous calendar years;

(c) In the case of the annual declaration on past activities: the total

amount produced, processed, consumed, imported and exported by the plant site in the previous calendar year;

(d) In the case of the annual declaration on anticipated activities:

the total amount anticipated to be produced, processed or

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

consumed by the plant site in the following calendar year, including the anticipated time periods for production, processing or consumption; and

(e) The purposes for which the chemical was or will be produced,

processed or consumed: (i) Processing and consumption on site with a specification

of the product types; (ii) Sale or transfer within the territory or to any other place

under the jurisdiction or control of the State Party, with a specification whether to other industry, trader or other destination and, if possible, of final product types;

(iii) Direct export, with a specification of the States involved;

or (iv) Other, including a specification of these other purposes. Declarations on past production of Schedule 2 chemicals for chemical weapons purposes 9. Each State Party shall, not later than 30 days after this Convention enters into force for it, declare all plant sites comprising plants that produced at any time since 1 January 1946 a Schedule 2 chemical for chemical weapons purposes. 10. Declarations of a plant site pursuant to paragraph 9 shall include:

(a) The name of the plant site and the name of the owner,

company, or enterprise operating it; (b) Its precise location including the address; (c) For each plant which is located within the plant site, and which

falls under the specifications set forth in paragraph 9, the same information as required under paragraph 7, subparagraphs (a) to (e); and

(d) For each Schedule 2 chemical produced for chemical weapons

purposes: (i) The chemical name, common or trade name used by the

plant site for chemical weapons production purposes, structural formula, and Chemical Abstracts Service registry number, if assigned;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(ii) The dates when the chemical was produced and the quantity produced; and

(iii) The location to which the chemical was delivered and

the final product produced there, if known. Information to States Parties. 11. A list of plant sites declared under this Section together with the information provided under paragraphs 6, 7 (a), 7 (c), 7 (d) (i), 7 (d) (iii), 8 (a) and 10 shall be transmitted by the Technical Secretariat to States Parties upon request. B. VERIFICATION. General. 12. Verification provided for in Article VI, paragraph 4, shall be carried out through on-site inspection at those of the declared plant sites that comprise one or more plants which produced, processed or consumed during any of the previous three calendar years or are anticipated to produce, process or consume in the next calendar year more than:

(a) 10 kg of a chemical designated “*” in Schedule 2, part A; (b) 1 tonne of any other chemical listed in Schedule 2, part A; or (c) 10 tonnes of a chemical listed in Schedule 2, part B.

13. The programme and budget of the Organization to be adopted by the Conference pursuant to Article VIII, paragraph 21 (a) shall contain, as a separate item, a programme and budget for verification under this Section. In the allocation of resources made available for verification under Article VI, the Technical Secretariat shall, during the first three years after the entry into force of this Convention, give priority to the initial inspections of plant sites declared under Section A. The allocation shall thereafter be reviewed on the basis of the experience gained. 14. The Technical Secretariat shall conduct initial inspections and subsequent inspections in accordance with paragraphs 15 to 22. Inspection aims. 15. The general aim of inspections shall be to verify that activities are in accordance with obligations under this Convention and consistent with the information to be provided in declarations. Particular aims of inspections at plant sites declared under Section A shall include verification of:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) The absence of any Schedule 1 chemical, especially its production, except if in accordance with Part VI of this Annex;

(b) Consistency with declarations of levels of production,

processing or consumption of Schedule 2 chemicals; and (c) Non-diversion of Schedule 2 chemicals for activities prohibited

under this Convention.

Initial inspections 16. Each plant site to be inspected pursuant to paragraph 12 shall receive an initial inspection as soon as possible but preferably not later than three years after entry into force of this Convention. Plant sites declared after this period shall receive an initial inspection not later than one year after production, processing or consumption is first declared. Selection of plant sites for initial inspections shall be made by the Technical Secretariat in such a way as to preclude the prediction of precisely when the plant site is to be inspected. 17. During the initial inspection, a draft facility agreement for the plant site shall be prepared unless the inspected State Party and the Technical Secretariat agree that it is not needed. 18. With regard to frequency and intensity of subsequent inspections, inspectors shall during the initial inspection assess the risk to the object and purpose of this Convention posed by the relevant chemicals, the characteristics of the plant site and the nature of the activities carried out there, taking into account, inter alia, the following criteria:

(a) The toxicity of the scheduled chemicals and of the end-

products produced with it, if any; (b) The quantity of the scheduled chemicals typically stored at the

inspected site; (c) The quantity of feedstock chemicals for the scheduled

chemicals typically stored at the inspected site; (d) The production capacity of the Schedule 2 plants; and (e) The capability and convertibility for initiating production,

storage and filling of toxic chemicals at the inspected site. Inspections. 19. Having received the initial inspection, each plant site to be inspected pursuant to paragraph 12 shall be subject to subsequent inspections.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

20. In selecting particular plant sites for inspection and in deciding on the frequency and intensity of inspections, the Technical Secretariat shall give due consideration to the risk to the object and purpose of this Convention posed by the relevant chemical, the characteristics of the plant site and the nature of the activities carried out there, taking into account the respective facility agreement as well as the results of the initial inspections and subsequent inspections. 21. The Technical Secretariat shall choose a particular plant site to be inspected in such a way as to preclude the prediction of exactly when it will be inspected. 22. No plant site shall receive more than two inspections per calendar year under the provisions of this Section. This, however, shall not limit inspections pursuant to Article IX. Inspection procedures. 23. In addition to agreed guidelines, other relevant provisions of this Annex and the Confidentiality Annex, paragraphs 24 to 30 below shall apply. 24. A facility agreement for the declared plant site shall be concluded not later than 90 days after completion of the initial inspection between the inspected State Party and the Organization unless the inspected State Party and the Technical Secretariat agree that it is not needed. It shall be based on a model agreement and govern the conduct of inspections at the declared plant site. The agreement shall specify the frequency and intensity of inspections as well as detailed inspection procedures, consistent with paragraphs 25 to 29. 25. The focus of the inspection shall be the declared Schedule 2 plant(s) within the declared plant site. If the inspection team requests access to other parts of the plant site, access to these areas shall be granted in accordance with the obligation to provide clarification pursuant to Part II, paragraph 51, of this Annex and in accordance with the facility agreement, or, in the absence of a facility agreement, in accordance with the rules of managed access as specified in Part X, Section C, of this Annex. 26. Access to records shall be provided, as appropriate, to provide assurance that there has been no diversion of the declared chemical and that production has been consistent with declarations. 27. Sampling and analysis shall be undertaken to check for the absence of undeclared scheduled chemicals. 28. Areas to be inspected may include:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) Areas where feed chemicals (reactants) are delivered or stored; (b) Areas where manipulative processes are performed upon the

reactants prior to addition to the reaction vessels; (c) Feed lines as appropriate from the areas referred to in

subparagraph (a) or subparagraph (b) to the reaction vessels together with any associated valves, flow meters, etc.;

(d) The external aspect of the reaction vessels and ancillary

equipment; (e) Lines from the reaction vessels leading to long- or short-term

storage or to equipment further processing the declared Schedule 2 chemicals;

(f) Control equipment associated with any of the items under

subparagraphs (a) to (e); (g) Equipment and areas for waste and effluent handling; (h) Equipment and areas for disposition of chemicals not up to

specification. 29. The period of inspection shall not last more than 96 hours; however, extensions may be agreed between the inspection team and the inspected State Party. Notification of inspection. 30. A State Party shall be notified by the Technical Secretariat of the inspection not less than 48 hours before the arrival of the inspection team at the plant site to be inspected. C. TRANSFERS TO STATES NOT PARTY TO THIS CONVENTION. 31. Schedule 2 chemicals shall only be transferred to or received from States Parties. This obligation shall take effect three years after entry into force of this Convention. 32. During this interim three-year period, each State Party shall require an end-use certificate, as specified below, for transfers of Schedule 2 chemicals to States not Party to this Convention. For such transfers, each State Party shall adopt the necessary measures to ensure that the transferred chemicals shall only be used for purposes not prohibited under this Convention. Inter alia, the State Party shall require from the recipient State a certificate stating, in relation to the transferred chemicals:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) That they will only be used for purposes not prohibited under

this Convention; (b) That they will not be re-transferred; (c) Their types and quantities; (d) Their end-use(s); and (e) The name(s) and address(es) of the end-user(s).

PART VIII

ACTIVITIES NOT PROHIBITED UNDER THIS CONVENTION IN

ACCORDANCE WITH ARTICLE VI

REGIME FOR SCHEDULE 3 CHEMICALS AND FACILITIES RELATED TO SUCH CHEMICALS

A. DECLARATIONS Declarations of aggregate national data. 1. The initial and annual declarations to be provided by a State Party pursuant to Article VI, paragraphs 7 and 8, shall include aggregate national data for the previous calendar year on the quantities produced, imported and exported of each Schedule 3 chemical, as well as a quantitative specification of import and export for each country involved. 2. Each State Party shall submit:

(a) Initial declarations pursuant to paragraph 1 not later than 30

days after this Convention enters into force for it; and, starting in the following calendar year,

(b) Annual declarations not later than 90 days after the end of the

previous calendar year. Declarations of plant sites producing Schedule 3 chemicals. 3. Initial and annual declarations are required for all plant sites that comprise one or more plants which produced during the previous calendar year or are anticipated to produce in the next calendar year more than 30 tonnes of a Schedule 3 chemical. 4. Each State Party shall submit:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) Initial declarations pursuant to paragraph 3 not later than 30 days after this Convention enters into force for it; and, starting in the following calendar year;

(b) Annual declarations on past activities not later than 90 days

after the end of the previous calendar year; and (c) Annual declarations on anticipated activities not later than 60

days before the beginning of the following calendar year. Any such activity additionally planned after the annual declaration has been submitted shall be declared not later than five days before this activity begins.

5. Declarations pursuant to paragraph 3 are generally not required for mixtures containing a low concentration of a Schedule 3 chemical. They are only required, in accordance with guidelines, in such cases where the ease of recovery from the mixture of the Schedule 3 chemical and its total weight are deemed to pose a risk to the object and purpose of this Convention. These guidelines shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 6. Declarations of a plant site pursuant to paragraph 3 shall include:

(a) The name of the plant site and the name of the owner,

company, or enterprise operating it; (b) Its precise location including the address; and (c) The number of plants within the plant site which are declared

pursuant to Part VII of this Annex. 7. Declarations of a plant site pursuant to paragraph 3 shall also include, for each plant which is located within the plant site and which falls under the specifications set forth in paragraph 3, the following information:

(a) The name of the plant and the name of the owner, company, or

enterprise operating it; (b) Its precise location within the plant site, including the specific

building or structure number, if any; and (c) Its main activities.

8. Declarations of a plant site pursuant to paragraph 3 shall also include the following information on each Schedule 3 chemical above the declaration threshold:

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(a) The chemical name, common or trade name used by the facility, structural formula, and Chemical Abstracts Service registry number, if assigned;

(b) The approximate amount of production of the chemical in the

previous calendar year, or, in case of declarations on anticipated activities, anticipated for the next calendar year, expressed in the ranges: 30 to 200 tonnes, 200 to 1,000 tonnes, 1,000 to 10,000 tonnes, 10,000 to 100,000 tonnes, and above 100,000 tonnes; and

(c) The purposes for which the chemical was or will be produced.

Declarations on past production of Schedule 3 chemicals for chemical weapons purposes. 9. Each State Party shall, not later than 30 days after this Convention enters into force for it, declare all plant sites comprising plants that produced at any time since 1 January 1946 a Schedule 3 chemical for chemical weapons purposes. 10. Declarations of a plant site pursuant to paragraph 9 shall include:

(a) The name of the plant site and the name of the owner,

company, or enterprise operating it; (b) Its precise location including the address; (c) For each plant which is located within the plant site, and which

falls under the specifications set forth in paragraph 9, the same information as required under paragraph 7, subparagraphs (a) to (c); and

(d) For each Schedule 3 chemical produced for chemical weapons

purposes: (i) The chemical name, common or trade name used by the

plant site for chemical weapons production purposes, structural formula, and Chemical Abstracts Service registry number, if assigned;

(ii) The dates when the chemical was produced and the

quantity produced; and (iii) The location to which the chemical was delivered and

the final product produced there, if known. Information to States Parties

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

11. A list of plant sites declared under this Section together with the information provided under paragraphs 6, 7 (a), 7 (c), 8 (a) and 10 shall be transmitted by the Technical Secretariat to States Parties upon request. B. VERIFICATION. General. 12. Verification provided for in paragraph 5 of Article VI shall be carried out through on-site inspections at those declared plant sites which produced during the previous calendar year or are anticipated to produce in the next calendar year in excess of 200 tonnes aggregate of any Schedule 3 chemical above the declaration threshold of 30 tonnes. 13. The programme and budget of the Organization to be adopted by the Conference pursuant to Article VIII, paragraph 21 (a), shall contain, as a separate item, a programme and budget for verification under this Section taking into account Part VII, paragraph 13, of this Annex. 14. Under this Section, the Technical Secretariat shall randomly select plant sites for inspection through appropriate mechanisms, such as the use of specially designed computer software, on the basis of the following weighting factors:

(a) Equitable geographical distribution of inspections; and (b) The information on the declared plant sites available to the

Technical Secretariat, related to the relevant chemical, the characteristics of the plant site and the nature of the activities carried out there.

15. No plant site shall receive more than two inspections per year under the provisions of this Section. This, however, shall not limit inspections pursuant to Article IX. 16. In selecting plant sites for inspection under this Section, the Technical Secretariat shall observe the following limitation for the combined number of inspections to be received by a State Party per calendar year under this Part and Part IX of this Annex: the combined number of inspections shall not exceed three plus 5 per cent of the total number of plant sites declared by a State Party under both this Part and Part IX of this Annex, or 20 inspections, whichever of these two figures is lower. Inspection aims. 17. At plant sites declared under Section A, the general aim of inspections shall be to verify that activities are consistent with the information to be

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

provided in declarations. The particular aim of inspections shall be the verification of the absence of any Schedule 1 chemical, especially its production, except if in accordance with Part VI of this Annex. Inspection procedures. 18. In addition to agreed guidelines, other relevant provisions of this Annex and the Confidentiality Annex, paragraphs 19 to 25 below shall apply. 19. There shall be no facility agreement, unless requested by the inspected State Party. 20. The focus of the inspections shall be the declared Schedule 3 plant(s) within the declared plant site. If the inspection team, in accordance with Part II, paragraph 51, of this Annex, requests access to other parts of the plant site for clarification of ambiguities, the extent of such access shall be agreed between the inspection team and the inspected State Party. 21. The inspection team may have access to records in situations in which the inspection team and the inspected State Party agree that such access will assist in achieving the objectives of the inspection. 22. Sampling and on-site analysis may be undertaken to check for the absence of undeclared scheduled chemicals. In case of unresolved ambiguities, samples may be analysed in a designated off-site laboratory, subject to the inspected State Party's agreement. 23. Areas to be inspected may include:

(a) Areas where feed chemicals (reactants) are delivered or stored; (b) Areas where manipulative processes are performed upon the

reactants prior to addition to the reaction vessel; (c) Feed lines as appropriate from the areas referred to in

subparagraph (a) or subparagraph (b) to the reaction vessel together with any associated valves, flow meters, etc.;

(d) The external aspect of the reaction vessels and ancillary

equipment; (e) Lines from the reaction vessels leading to long- or short-term

storage or to equipment further processing the declared Schedule 3 chemicals;

(f) Control equipment associated with any of the items under

subparagraphs (a) to (e);

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(g) Equipment and areas for waste and effluent handling; (h) Equipment and areas for disposition of chemicals not up to

specification. 24. The period of inspection shall not last more than 24 hours; however, extensions may be agreed between the inspection team and the inspected State Party. Notification of inspection. 25. A State Party shall be notified by the Technical Secretariat of the inspection not less than 120 hours before the arrival of the inspection team at the plant site to be inspected. C. TRANSFERS TO STATES NOT PARTY TO THIS CONVENTION. 26. When transferring Schedule 3 chemicals to States not Party to this Convention, each State Party shall adopt the necessary measures to ensure that the transferred chemicals shall only be used for purposes not prohibited under this Convention. Inter alia, the State Party shall require from the recipient State a certificate stating, in relation to the transferred chemicals:

(a) That they will only be used for purposes not prohibited under

this Convention; (b) That they will not be re-transferred; (c) Their types and quantities; (d) Their end-use(s); and (e) The name(s) and address(es) of the end-user(s).

27. Five years after entry into force of this Convention, the Conference shall consider the need to establish other measures regarding transfers of Schedule 3 chemicals to States not Party to this Convention.

PART IX

ACTIVITIES NOT PROHIBITED UNDER THIS CONVENTION IN

ACCORDANCE WITH ARTICLE VI

REGIME FOR OTHER CHEMICAL PRODUCTION FACILITIES A. DECLARATIONS

List of other chemical production facilities.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

1. The initial declaration to be provided by each State Party pursuant to Article VI, paragraph 7, shall include a list of all plant sites that:

(a) Produced by synthesis during the previous calendar year more

than 200 tonnes of unscheduled discrete organic chemicals; or (b) Comprise one or more plants which produced by synthesis

during the previous calendar year more than 30 tonnes of an unscheduled discrete organic chemical containing the elements phosphorus, sulfur or fluorine (hereinafter referred to as “PSF- plants” and “PSF-chemical”).

2. The list of other chemical production facilities to be submitted pursuant to paragraph 1 shall not include plant sites that exclusively produced explosives or hydrocarbons. 3. Each State Party shall submit its list of other chemical production facilities pursuant to paragraph 1 as part of its initial declaration not later than 30 days after this Convention enters into force for it. Each State Party shall, not later than 90 days after the beginning of each following calendar year, provide annually the information necessary to update the list. 4. The list of other chemical production facilities to be submitted pursuant to paragraph 1 shall include the following information on each plant site:

(a) The name of the plant site and the name of the owner, company, or enterprise operating it;

(b) The precise location of the plant site including its address; (c) Its main activities; and (d) The approximate number of plants producing the chemicals

specified in paragraph 1 in the plant site. 5. With regard to plant sites listed pursuant to paragraph 1 (a), the list shall also include information on the approximate aggregate amount of production of the unscheduled discrete organic chemicals in the previous calendar year expressed in the ranges: under 1,000 tonnes, 1,000 to 10,000 tonnes and above 10,000 tonnes. 6. With regard to plant sites listed pursuant to paragraph 1 (b), the list shall also specify the number of PSF-plants within the plant site and include information on the approximate aggregate amount of production of PSF- chemicals produced by each PSF-plant in the previous calendar year

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

expressed in the ranges: under 200 tonnes, 200 to 1,000 tonnes, 1,000 to 10,000 tonnes and above 10,000 tonnes. Assistance by the Technical Secretariat. 7. If a State Party, for administrative reasons, deems it necessary to ask for assistance in compiling its list of chemical production facilities pursuant to paragraph 1, it may request the Technical Secretariat to provide such assistance. Questions as to the completeness of the list shall then be resolved through consultations between the State Party and the Technical Secretariat. Information to States Parties. 8. The lists of other chemical production facilities submitted pursuant to paragraph 1, including the information provided under paragraph 4, shall be transmitted by the Technical Secretariat to States Parties upon request. B. VERIFICATION. General. 9. Subject to the provisions of Section C, verification as provided for in Article VI, paragraph 6, shall be carried out through on-site inspection at:

(a) Plant sites listed pursuant to paragraph 1 (a); and (b) Plant sites listed pursuant to paragraph 1 (b) that comprise one

or more PSF-plants which produced during the previous calendar year more than 200 tonnes of a PSF-chemical.

10. The programme and budget of the Organization to be adopted by the Conference pursuant to Article VIII, paragraph 21 (a), shall contain, as a separate item, a programme and budget for verification under this Section after its implementation has started. 11. Under this Section, the Technical Secretariat shall randomly select plant sites for inspection through appropriate mechanisms, such as the use of specially designed computer software, on the basis of the following weighting factors:

(a) Equitable geographical distribution of inspections; (b) The information on the listed plant sites available to the

Technical Secretariat, related to the characteristics of the plant site and the activities carried out there; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(c) Proposals by States Parties on a basis to be agreed upon in accordance with paragraph 25.

12. No plant site shall receive more than two inspections per year under the provisions of this Section. This, however, shall not limit inspections pursuant to Article IX. 13. In selecting plant sites for inspection under this Section, the Technical Secretariat shall observe the following limitation for the combined number of inspections to be received by a State Party per calendar year under this Part and Part VIII of this Annex: the combined number of inspections shall not exceed three plus 5 per cent of the total number of plant sites declared by a State Party under both this Part and Part VIII of this Annex, or 20 inspections, whichever of these two figures is lower. Inspection aims. 14. At plant sites listed under Section A, the general aim of inspections shall be to verify that activities are consistent with the information to be provided in declarations. The particular aim of inspections shall be the verification of the absence of any Schedule 1 chemical, especially its production, except if in accordance with Part VI of this Annex. Inspection procedures. 15. In addition to agreed guidelines, other relevant provisions of this Annex and the Confidentiality Annex, paragraphs 16 to 20 below shall apply. 16. There shall be no facility agreement, unless requested by the inspected State Party. 17. The focus of inspection at a plant site selected for inspection shall be the plant(s) producing the chemicals specified in paragraph 1, in particular the PSF-plants listed pursuant to paragraph 1 (b). The inspected State Party shall have the right to manage access to these plants in accordance with the rules of managed access as specified in Part X, Section C, of this Annex. If the inspection team, in accordance with Part II, paragraph 51, of this Annex, requests access to other parts of the plant site for clarification of ambiguities, the extent of such access shall be agreed between the inspection team and the inspected State Party. 18. The inspection team may have access to records in situations in which the inspection team and the inspected State Party agree that such access will assist in achieving the objectives of the inspection. 19. Sampling and on-site analysis may be undertaken to check for the absence of undeclared scheduled chemicals. In cases of unresolved

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

ambiguities, samples may be analysed in a designated off-site laboratory, subject to the inspected State Party's agreement. 20. The period of inspection shall not last more than 24 hours; however, extensions may be agreed between the inspection team and the inspected State Party. Notification of inspection. 21. A State Party shall be notified by the Technical Secretariat of the inspection not less than 120 hours before the arrival of the inspection team at the plant site to be inspected. C. IMPLEMENTATION AND REVIEW OF SECTION B. Implementation. 22. The implementation of Section B shall start at the beginning of the fourth year after entry into force of this Convention unless the Conference, at its regular session in the third year after entry into force of this Convention, decides otherwise. 23. The Director-General shall, for the regular session of the Conference in the third year after entry into force of this Convention, prepare a report which outlines the experience of the Technical Secretariat in implementing the provisions of Parts VII and VIII of this Annex as well as of Section A of this Part. 24. At its regular session in the third year after entry into force of this Convention, the Conference, on the basis of a report of the Director- General, may also decide on the distribution of resources available for verification under Section B between “PSF-plants” and other chemical production facilities. Otherwise, this distribution shall be left to the expertise of the Technical Secretariat and be added to the weighting factors in paragraph 11. 25. At its regular session in the third year after entry into force of this Convention, the Conference, upon advice of the Executive Council, shall decide on which basis (e.g. regional) proposals by States Parties for inspections should be presented to be taken into account as a weighting factor in the selection process specified in paragraph 11. Review. 26. At the first special session of the Conference convened pursuant to Article VIII, paragraph 22, the provisions of this Part of the Verification Annex shall be re-examined in the light of a comprehensive review of the overall verification regime for the chemical industry (Article VI, Parts VII

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

to IX of this Annex) on the basis of the experience gained. The Conference shall then make recommendations so as to improve the effectiveness of the verification regime.

PART X

CHALLENGE INSPECTIONS PURSUANT TO ARTICLE IX

A. DESIGNATION AND SELECTION OF INSPECTORS AND INSPECTION ASSISTANTS. 1. Challenge inspections pursuant to Article IX shall only be performed by inspectors and inspection assistants especially designated for this function. In order to designate inspectors and inspection assistants for challenge inspections pursuant to Article IX, the Director-General shall, by selecting inspectors and inspection assistants from among the inspectors and inspection assistants for routine inspection activities, establish a list of proposed inspectors and inspection assistants. It shall comprise a sufficiently large number of inspectors and inspection assistants having the necessary qualification, experience, skill and training, to allow for flexibility in the selection of the inspectors, taking into account their availability, and the need for rotation. Due regard shall be paid also to the importance of selecting inspectors and inspection assistants on as wide a geographical basis as possible. The designation of inspectors and inspection assistants shall follow the procedures provided for under Part II, Section A, of this Annex. 2. The Director-General shall determine the size of the inspection team and select its members taking into account the circumstances of a particular request. The size of the inspection team shall be kept to a minimum necessary for the proper fulfilment of the inspection mandate. No national of the requesting State Party or the inspected State Party shall be a member of the inspection team. B. PRE-INSPECTION ACTIVITIES. 3. Before submitting the inspection request for a challenge inspection, the State Party may seek confirmation from the Director-General that the Technical Secretariat is in a position to take immediate action on the request. If the Director-General cannot provide such confirmation immediately, he shall do so at the earliest opportunity, in keeping with the order of requests for confirmation. He shall also keep the State Party informed of when it is likely that immediate action can be taken. Should the Director-General reach the conclusion that timely action on requests can no longer be taken, he may ask the Executive Council to take appropriate action to improve the situation in the future. Notification.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

4. The inspection request for a challenge inspection to be submitted to the Executive Council and the Director-General shall contain at least the following information:

(a) The State Party to be inspected and, if applicable, the Host

State; (b) The point of entry to be used; (c) The size and type of the inspection site; (d) The concern regarding possible non-compliance with this

Convention including a specification of the relevant provisions of this Convention about which the concern has arisen, and of the nature and circumstances of the possible non-compliance as well as all appropriate information on the basis of which the concern has arisen; and

(e) The name of the observer of the requesting State Party.

The requesting State Party may submit any additional information it deems necessary. 5. The Director-General shall within one hour acknowledge to the requesting State Party receipt of its request. 6. The requesting State Party shall notify the Director-General of the location of the inspection site in due time for the Director-General to be able to provide this information to the inspected State Party not less than 12 hours before the planned arrival of the inspection team at the point of entry. 7. The inspection site shall be designated by the requesting State Party as specifically as possible by providing a site diagram related to a reference point with geographic coordinates, specified to the nearest second if possible. If possible, the requesting State Party shall also provide a map with a general indication of the inspection site and a diagram specifying as precisely as possible the requested perimeter of the site to be inspected. 8. The requested perimeter shall:

(a) Run at least a 10 metre distance outside any buildings or other

structures; (b) Not cut through existing security enclosures; and (c) Run at least a 10 metre distance outside any existing security

enclosures that the requesting State Party intends to include within the requested perimeter.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

9. If the requested perimeter does not conform with the specifications of paragraph 8, it shall be redrawn by the inspection team so as to conform with that provision. 10. The Director-General shall, not less than 12 hours before the planned arrival of the inspection team at the point of entry, inform the Executive Council about the location of the inspection site as specified in paragraph 7. 11. Contemporaneously with informing the Executive Council according to paragraph 10, the Director-General shall transmit the inspection request to the inspected State Party including the location of the inspection site as specified in paragraph 7. This notification shall also include the information specified in Part II, paragraph 32, of this Annex. 12. Upon arrival of the inspection team at the point of entry, the inspected State Party shall be informed by the inspection team of the inspection mandate. Entry into the territory of the inspected State Party or the Host State. 13. The Director-General shall, in accordance with Article IX, paragraphs 13 to 18, dispatch an inspection team as soon as possible after an inspection request has been received. The inspection team shall arrive at the point of entry specified in the request in the minimum time possible, consistent with the provisions of paragraphs 10 and 11. 14. If the requested perimeter is acceptable to the inspected State Party, it shall be designated as the final perimeter as early as possible, but in no case later than 24 hours after the arrival of the inspection team at the point of entry. The inspected State Party shall transport the inspection team to the final perimeter of the inspection site. If the inspected State Party deems it necessary, such transportation may begin up to 12 hours before the expiry of the time period specified in this paragraph for the designation of the final perimeter. Transportation shall, in any case, be completed not later than 36 hours after the arrival of the inspection team at the point of entry. 15. For all declared facilities, the procedures in subparagraphs (a) and (b) shall apply. (For the purposes of this Part, “declared facility” means all facilities declared pursuant to Articles III, IV, and V. With regard to Article VI, “declared facility” means only facilities declared pursuant to Part VI of this Annex, as well as declared plants specified by declarations pursuant to Part VII, paragraphs 7 and 10 (c), and Part VIII, paragraphs 7 and 10 (c), of this Annex.)

(a) If the requested perimeter is contained within or conforms with

the declared perimeter, the declared perimeter shall be considered the final perimeter. The final perimeter may,

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

however, if agreed by the inspected State Party, be made smaller in order to conform with the perimeter requested by the requesting State Party.

(b) The inspected State Party shall transport the inspection team to

the final perimeter as soon as practicable, but in any case shall ensure their arrival at the perimeter not later than 24 hours after the arrival of the inspection team at the point of entry.

Alternative determination of final perimeter. 16. At the point of entry, if the inspected State Party cannot accept the requested perimeter, it shall propose an alternative perimeter as soon as possible, but in any case not later than 24 hours after the arrival of the inspection team at the point of entry. In case of differences of opinion, the inspected State Party and the inspection team shall engage in negotiations with the aim of reaching agreement on a final perimeter. 17. The alternative perimeter should be designated as specifically as possible in accordance with paragraph 8. It shall include the whole of the requested perimeter and should, as a rule, bear a close relationship to the latter, taking into account natural terrain features and man-made boundaries. It should normally run close to the surrounding security barrier if such a barrier exists. The inspected State Party should seek to establish such a relationship between the perimeters by a combination of at least two of the following means:

(a) An alternative perimeter that does not extend to an area significantly greater than that of the requested perimeter;

(b) An alternative perimeter that is a short, uniform distance from

the requested perimeter; (c) At least part of the requested perimeter is visible from the

alternative perimeter. 18. If the alternative perimeter is acceptable to the inspection team, it shall become the final perimeter and the inspection team shall be transported from the point of entry to that perimeter. If the inspected State Party deems it necessary, such transportation may begin up to 12 hours before the expiry of the time period specified in paragraph 16 for proposing an alternative perimeter. Transportation shall, in any case, be completed not later than 36 hours after the arrival of the inspection team at the point of entry. 19. If a final perimeter is not agreed, the perimeter negotiations shall be concluded as early as possible, but in no case shall they continue more than 24 hours after the arrival of the inspection team at the point of entry. If no agreement is reached, the inspected State Party shall transport the inspection

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

team to a location at the alternative perimeter. If the inspected State Party deems it necessary, such transportation may begin up to 12 hours before the expiry of the time period specified in paragraph 16 for proposing an alternative perimeter. Transportation shall, in any case, be completed not later than 36 hours after the arrival of the inspection team at the point of entry. 20. Once at the location, the inspected State Party shall provide the inspection team with prompt access to the alternative perimeter to facilitate negotiations and agreement on the final perimeter and access within the final perimeter. 21. If no agreement is reached within 72 hours after the arrival of the inspection team at the location, the alternative perimeter shall be designated the final perimeter. Verification of location. 22. To help establish that the inspection site to which the inspection team has been transported corresponds to the inspection site specified by the requesting State Party, the inspection team shall have the right to use approved location-finding equipment and have such equipment installed according to its directions. The inspection team may verify its location by reference to local landmarks identified from maps. The inspected State Party shall assist the inspection team in this task. Securing the site, exit monitoring. 23. Not later than 12 hours after the arrival of the inspection team at the point of entry, the inspected State Party shall begin collecting factual information of all vehicular exit activity from all exit points for all land, air, and water vehicles of the requested perimeter. It shall provide this information to the inspection team upon its arrival at the alternative or final perimeter, whichever occurs first. 24. This obligation may be met by collecting factual information in the form of traffic logs, photographs, video recordings, or data from chemical evidence equipment provided by the inspection team to monitor such exit activity. Alternatively, the inspected State Party may also meet this obligation by allowing one or more members of the inspection team independently to maintain traffic logs, take photographs, make video recordings of exit traffic, or use chemical evidence equipment, and conduct other activities as may be agreed between the inspected State Party and the inspection team. 25. Upon the inspection team's arrival at the alternative perimeter or final perimeter, whichever occurs first, securing the site, which means exit monitoring procedures by the inspection team, shall begin.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

26. Such procedures shall include: the identification of vehicular exits, the making of traffic logs, the taking of photographs, and the making of video recordings by the inspection team of exits and exit traffic. The inspection team has the right to go, under escort, to any other part of the perimeter to check that there is no other exit activity. 27. Additional procedures for exit monitoring activities as agreed upon by the inspection team and the inspected State Party may include, inter alia:

(a) Use of sensors; (b) Random selective access; (c) Sample analysis.

28. All activities for securing the site and exit monitoring shall take place within a band around the outside of the perimeter, not exceeding 50 metres in width, measured outward. 29. The inspection team has the right to inspect on a managed access basis vehicular traffic exiting the site. The inspected State Party shall make every reasonable effort to demonstrate to the inspection team that any vehicle, subject to inspection, to which the inspection team is not granted full access, is not being used for purposes related to the possible non-compliance concerns raised in the inspection request. 30. Personnel and vehicles entering and personnel and personal passenger vehicles exiting the site are not subject to inspection. 31. The application of the above procedures may continue for the duration of the inspection, but may not unreasonably hamper or delay the normal operation of the facility. Pre-inspection briefing and inspection plan. 32. To facilitate development of an inspection plan, the inspected State Party shall provide a safety and logistical briefing to the inspection team prior to access. 33. The pre-inspection briefing shall be held in accordance with Part II, paragraph 37, of this Annex. In the course of the pre-inspection briefing, the inspected State Party may indicate to the inspection team the equipment, documentation, or areas it considers sensitive and not related to the purpose of the challenge inspection. In addition, personnel responsible for the site shall brief the inspection team on the physical layout and other relevant characteristics of the site. The inspection team shall be provided with a map or sketch drawn to scale showing all structures and significant geographic

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

features at the site. The inspection team shall also be briefed on the availability of facility personnel and records.

34. After the pre-inspection briefing, the inspection team shall prepare, on the basis of the information available and appropriate to it, an initial inspection plan which specifies the activities to be carried out by the inspection team, including the specific areas of the site to which access is desired. The inspection plan shall also specify whether the inspection team will be divided into subgroups. The inspection plan shall be made available to the representatives of the inspected State Party and the inspection site. Its implementation shall be consistent with the provisions of Section C, including those related to access and activities. Perimeter activities. 35. Upon the inspection team's arrival at the final or alternative perimeter, whichever occurs first, the team shall have the right to commence immediately perimeter activities in accordance with the procedures set forth under this Section, and to continue these activities until the completion of the challenge inspection. 36. In conducting the perimeter activities, the inspection team shall have the right to:

(a) Use monitoring instruments in accordance with Part II,

paragraphs 27 to 30, of this Annex; (b) Take wipes, air, soil or effluent samples; and (c) Conduct any additional activities which may be agreed

between the inspection team and the inspected State Party. 37. The perimeter activities of the inspection team may be conducted within a band around the outside of the perimeter up to 50 metres in width measured outward from the perimeter. If the inspected State Party agrees, the inspection team may also have access to any building or structure within the perimeter band. All directional monitoring shall be oriented inward. For declared facilities, at the discretion of the inspected State Party, the band could run inside, outside, or on both sides of the declared perimeter. C. CONDUCT OF INSPECTIONS. General rules. 38. The inspected State Party shall provide access within the requested perimeter as well as, if different, the final perimeter. The extent and nature of access to a particular place or places within these perimeters shall be

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

negotiated between the inspection team and the inspected State Party on a managed access basis. 39. The inspected State Party shall provide access within the requested perimeter as soon as possible, but in any case not later than 108 hours after the arrival of the inspection team at the point of entry in order to clarify the concern regarding possible non-compliance with this Convention raised in the inspection request. 40. Upon the request of the inspection team, the inspected State Party may provide aerial access to the inspection site. 41. In meeting the requirement to provide access as specified in paragraph 38, the inspected State Party shall be under the obligation to allow the greatest degree of access taking into account any constitutional obligations it may have with regard to proprietary rights or searches and seizures. The inspected State Party has the right under managed access to take such measures as are necessary to protect national security. The provisions in this paragraph may not be invoked by the inspected State Party to conceal evasion of its obligations not to engage in activities prohibited under this Convention. 42. If the inspected State Party provides less than full access to places, activities, or information, it shall be under the obligation to make every reasonable effort to provide alternative means to clarify the possible non- compliance concern that generated the challenge inspection. 43. Upon arrival at the final perimeter of facilities declared pursuant to Articles IV, V and VI, access shall be granted following the pre-inspection briefing and discussion of the inspection plan which shall be limited to the minimum necessary and in any event shall not exceed three hours. For facilities declared pursuant to Article III, paragraph 1 (d), negotiations shall be conducted and managed access commenced not later than 12 hours after arrival at the final perimeter. 44. In carrying out the challenge inspection in accordance with the inspection request, the inspection team shall use only those methods necessary to provide sufficient relevant facts to clarify the concern about possible non-compliance with the provisions of this Convention, and shall refrain from activities not relevant thereto. It shall collect and document such facts as are related to the possible non-compliance with this Convention by the inspected State Party, but shall neither seek nor document information which is clearly not related thereto, unless the inspected State Party expressly requests it to do so. Any material collected and subsequently found not to be relevant shall not be retained. 45. The inspection team shall be guided by the principle of conducting the challenge inspection in the least intrusive manner possible, consistent with

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

the effective and timely accomplishment of its mission. Wherever possible, it shall begin with the least intrusive procedures it deems acceptable and proceed to more intrusive procedures only as it deems necessary. Managed access. 46. The inspection team shall take into consideration suggested modifications of the inspection plan and proposals which may be made by the inspected State Party, at whatever stage of the inspection including the pre-inspection briefing, to ensure that sensitive equipment, information or areas, not related to chemical weapons, are protected. 47. The inspected State Party shall designate the perimeter entry/exit points to be used for access. The inspection team and the inspected State Party shall negotiate: the extent of access to any particular place or places within the final and requested perimeters as provided in paragraph 48; the particular inspection activities, including sampling, to be conducted by the inspection team; the performance of particular activities by the inspected State Party; and the provision of particular information by the inspected State Party. 48. In conformity with the relevant provisions in the Confidentiality Annex the inspected State Party shall have the right to take measures to protect sensitive installations and prevent disclosure of confidential information and data not related to chemical weapons. Such measures may include, inter alia:

(a) Removal of sensitive papers from office spaces; (b) Shrouding of sensitive displays, stores, and equipment; (c) Shrouding of sensitive pieces of equipment, such as computer

or electronic systems; (d) Logging off of computer systems and turning off of data

indicating devices; (e) Restriction of sample analysis to presence or absence of

chemicals listed in Schedules 1, 2 and 3 or appropriate degradation products;

(f) Using random selective access techniques whereby the

inspectors are requested to select a given percentage or number of buildings of their choice to inspect; the same principle can apply to the interior and content of sensitive buildings;

(g) In exceptional cases, giving only individual inspectors access

to certain parts of the inspection site.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

49. The inspected State Party shall make every reasonable effort to demonstrate to the inspection team that any object, building, structure, container or vehicle to which the inspection team has not had full access, or which has been protected in accordance with paragraph 48, is not used for purposes related to the possible non-compliance concerns raised in the inspection request. 50. This may be accomplished by means of, inter alia, the partial removal of a shroud or environmental protection cover, at the discretion of the inspected State Party, by means of a visual inspection of the interior of an enclosed space from its entrance, or by other methods. 51. In the case of facilities declared pursuant to Articles IV, V and VI, the following shall apply:

(a) For facilities with facility agreements, access and activities

within the final perimeter shall be unimpeded within the boundaries established by the agreements;

(b) For facilities without facility agreements, negotiation of access

and activities shall be governed by the applicable general inspection guidelines established under this Convention; and

(c) Access beyond that granted for inspections under Articles IV,

V and VI shall be managed in accordance with procedures of this section.

52. In the case of facilities declared pursuant to Article III, paragraph 1 (d), the following shall apply: if the inspected State Party, using procedures of paragraphs 47 and 48, has not granted full access to areas or structures not related to chemical weapons, it shall make every reasonable effort to demonstrate to the inspection team that such areas or structures are not used for purposes related to the possible non-compliance concerns raised in the inspection request. Observer. 53. In accordance with the provisions of Article IX, paragraph 12, on the participation of an observer in the challenge inspection, the requesting State Party shall liaise with the Technical Secretariat to coordinate the arrival of the observer at the same point of entry as the inspection team within a reasonable period of the inspection team's arrival. 54. The observer shall have the right throughout the period of inspection to be in communication with the embassy of the requesting State Party located in the inspected State Party or in the Host State or, in the case of absence of

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

an embassy, with the requesting State Party itself. The inspected State Party shall provide means of communication to the observer. 55. The observer shall have the right to arrive at the alternative or final perimeter of the inspection site, wherever the inspection team arrives first, and to have access to the inspection site as granted by the inspected State Party. The observer shall have the right to make recommendations to the inspection team, which the team shall take into account to the extent it deems appropriate. Throughout the inspection, the inspection team shall keep the observer informed about the conduct of the inspection and the findings. 56. Throughout the in-country period, the inspected State Party shall provide or arrange for the amenities necessary for the observer such as communication means, interpretation services, transportation, working space, lodging, meals and medical care. All the costs in connection with the stay of the observer on the territory of the inspected State Party or the Host State shall be borne by the requesting State Party.

Duration of inspection. 57. The period of inspection shall not exceed 84 hours, unless extended by agreement with the inspected State Party. D. POST-INSPECTION ACTIVITIES. Departure. 58. Upon completion of the post-inspection procedures at the inspection site, the inspection team and the observer of the requesting State Party shall proceed promptly to a point of entry and shall then leave the territory of the inspected State Party in the minimum time possible. Reports. 59. The inspection report shall summarize in a general way the activities conducted by the inspection team and the factual findings of the inspection team, particularly with regard to the concerns regarding possible non- compliance with this Convention cited in the request for the challenge inspection, and shall be limited to information directly related to this Convention. It shall also include an assessment by the inspection team of the degree and nature of access and cooperation granted to the inspectors and the extent to which this enabled them to fulfil the inspection mandate. Detailed information relating to the concerns regarding possible non- compliance with this Convention cited in the request for the challenge inspection shall be submitted as an Appendix to the final report and be

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

retained within the Technical Secretariat under appropriate safeguards to protect sensitive information. 60. The inspection team shall, not later than 72 hours after its return to its primary work location, submit a preliminary inspection report, having taken into account, inter alia, paragraph 17 of the Confidentiality Annex, to the Director-General. The Director-General shall promptly transmit the preliminary inspection report to the requesting State Party, the inspected State Party and to the Executive Council. 61. A draft final inspection report shall be made available to the inspected State Party not later than 20 days after the completion of the challenge inspection. The inspected State Party has the right to identify any information and data not related to chemical weapons which should, in its view, due to its confidential character, not be circulated outside the Technical Secretariat. The Technical Secretariat shall consider proposals for changes to the draft final inspection report made by the inspected State Party and, using its own discretion, wherever possible, adopt them. The final report shall then be submitted not later than 30 days after the completion of the challenge inspection to the Director-General for further distribution and consideration in accordance with Article IX, paragraphs 21 to 25.

PART XI

INVESTIGATIONS IN CASES OF ALLEGED USE OF CHEMICAL

WEAPONS A. GENERAL. 1. Investigations of alleged use of chemical weapons, or of alleged use of riot control agents as a method of warfare, initiated pursuant to Articles IX or X, shall be conducted in accordance with this Annex and detailed procedures to be established by the Director-General. 2. The following additional provisions address specific procedures required in cases of alleged use of chemical weapons. B. PRE-INSPECTION ACTIVITIES. Request for an investigation. 3. The request for an investigation of an alleged use of chemical weapons to be submitted to the Director-General, to the extent possible, should include the following information:

(a) The State Party on whose territory use of chemical weapons is

alleged to have taken place;

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(b) The point of entry or other suggested safe routes of access; (c) Location and characteristics of the areas where chemical

weapons are alleged to have been used; (d) When chemical weapons are alleged to have been used; (e) Types of chemical weapons believed to have been used; (f) Extent of alleged use; (g) Characteristics of the possible toxic chemicals; (h) Effects on humans, animals and vegetation; and (i) Request for specific assistance, if applicable.

4. The State Party which has requested an investigation may submit at any time any additional information it deems necessary. Notification 5. The Director-General shall immediately acknowledge receipt to the requesting State Party of its request and inform the Executive Council and all States Parties. 6. If applicable, the Director-General shall notify the State Party on whose territory an investigation has been requested. The Director-General shall also notify other States Parties if access to their territories might be required during the investigation. Assignment of inspection team. 7. The Director-General shall prepare a list of qualified experts whose particular field of expertise could be required in an investigation of alleged use of chemical weapons and constantly keep this list updated. This list shall be communicated, in writing, to each State Party not later than 30 days after entry into force of this Convention and after each change to the list. Any qualified expert included in this list shall be regarded as designated unless a State Party, not later than 30 days after its receipt of the list, declares its non-acceptance in writing. 8. The Director-General shall select the leader and members of an inspection team from the inspectors and inspection assistants already designated for challenge inspections taking into account the circumstances and specific nature of a particular request. In addition, members of the inspection team may be selected from the list of qualified experts when, in

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

the view of the Director-General, expertise not available among inspectors already designated is required for the proper conduct of a particular investigation. 9. When briefing the inspection team, the Director-General shall include any additional information provided by the requesting State Party, or any other sources, to ensure that the inspection can be carried out in the most effective and expedient manner. Dispatch of inspection team. 10. Immediately upon the receipt of a request for an investigation of alleged use of chemical weapons the Director-General shall, through contacts with the relevant States Parties, request and confirm arrangements for the safe reception of the team. 11. The Director-General shall dispatch the team at the earliest opportunity, taking into account the safety of the team. 12. If the inspection team has not been dispatched within 24 hours from the receipt of the request, the Director-General shall inform the Executive Council and the States Parties concerned about the reasons for the delay. Briefings. 13. The inspection team shall have the right to be briefed by representatives of the inspected State Party upon arrival and at any time during the inspection. 14. Before the commencement of the inspection the inspection team shall prepare an inspection plan to serve, inter alia, as a basis for logistic and safety arrangements. The inspection plan shall be updated as need arises. C. CONDUCT OF INSPECTIONS. Access. 15. The inspection team shall have the right of access to any and all areas which could be affected by the alleged use of chemical weapons. It shall also have the right of access to hospitals, refugee camps and other locations it deems relevant to the effective investigation of the alleged use of chemical weapons. For such access, the inspection team shall consult with the inspected State Party. Sampling. 16. The inspection team shall have the right to collect samples of types, and in quantities it considers necessary. If the inspection team deems it

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

necessary, and if so requested by it, the inspected State Party shall assist in the collection of samples under the supervision of inspectors or inspection assistants. The inspected State Party shall also permit and cooperate in the collection of appropriate control samples from areas neighbouring the site of the alleged use and from other areas as requested by the inspection team. 17. Samples of importance in the investigation of alleged use include toxic chemicals, munitions and devices, remnants of munitions and devices, environmental samples (air, soil, vegetation, water, snow, etc.) and biomedical samples from human or animal sources (blood, urine, excreta, tissue etc.). 18. If duplicate samples cannot be taken and the analysis is performed at off-site laboratories, any remaining sample shall, if so requested, be returned to the inspected State Party after the completion of the analysis. Extension of inspection site. 19. If the inspection team during an inspection deems it necessary to extend the investigation into a neighbouring State Party, the Director-General shall notify that State Party about the need for access to its territory and request and confirm arrangements for the safe reception of the team. Extension of inspection duration. 20. If the inspection team deems that safe access to a specific area relevant to the investigation is not possible, the requesting State Party shall be informed immediately. If necessary, the period of inspection shall be extended until safe access can be provided and the inspection team will have concluded its mission. Interviews. 21. The inspection team shall have the right to interview and examine persons who may have been affected by the alleged use of chemical weapons. It shall also have the right to interview eyewitnesses of the alleged use of chemical weapons and medical personnel, and other persons who have treated or have come into contact with persons who may have been affected by the alleged use of chemical weapons. The inspection team shall have access to medical histories, if available, and be permitted to participate in autopsies, as appropriate, of persons who may have been affected by the alleged use of chemical weapons. D. REPORTS. Procedures. 22. The inspection team shall, not later than 24 hours after its arrival on the territory of the inspected State Party, send a situation report to the Director-

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

General. It shall further throughout the investigation send progress reports as necessary. 23. The inspection team shall, not later than 72 hours after its return to its primary work location, submit a preliminary report to the Director-General. The final report shall be submitted to the Director-General not later than 30 days after its return to its primary work location. The Director-General shall promptly transmit the preliminary and final reports to the Executive Council and to all States Parties. Contents. 24. The situation report shall indicate any urgent need for assistance and any other relevant information. The progress reports shall indicate any further need for assistance that might be identified during the course of the investigation. 25. The final report shall summarize the factual findings of the inspection, particularly with regard to the alleged use cited in the request. In addition, a report of an investigation of an alleged use shall include a description of the investigation process, tracing its various stages, with special reference to:

(a) The locations and time of sampling and on-site analyses; and (b) Supporting evidence, such as the records of interviews, the

results of medical examinations and scientific analyses, and the documents examined by the inspection team.

26. If the inspection team collects through, inter alia, identification of any impurities or other substances during laboratory analysis of samples taken, any information in the course of its investigation that might serve to identify the origin of any chemical weapons used, that information shall be included in the report. E. STATES NOT PARTY TO THIS CONVENTION. 27. In the case of alleged use of chemical weapons involving a State not Party to this Convention or in territory not controlled by a State Party, the Organization shall closely cooperate with the Secretary-General of the United Nations. If so requested, the Organization shall put its resources at the disposal of the Secretary-General of the United Nations.

ANNEX ON THE PROTECTION OF CONFIDENTIAL

INFORMATION (“CONFIDENTIALITY ANNEX”) CONTENTS A. GENERAL PRINCIPLES FOR THE HANDLING OF CONFIDENTIAL INFORMATION.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

1. The obligation to protect confidential information shall pertain to the verification of both civil and military activities and facilities. Pursuant to the general obligations set forth in Article VIII, the Organization shall:

(a) Require only the minimum amount of information and data

necessary for the timely and efficient carrying out of its responsibilities under this Convention;

(b) Take the necessary measures to ensure that inspectors and

other staff members of the Technical Secretariat meet the highest standards of efficiency, competence, and integrity; and

(c) Develop agreements and regulations to implement the

provisions of this Convention and shall specify as precisely as possible the information to which the Organization shall be given access by a State Party.

2. The Director-General shall have the primary responsibility for ensuring the protection of confidential information. The Director-General shall establish a stringent regime governing the handling of confidential information by the Technical Secretariat, and in doing so, shall observe the following guidelines:

(a) Information shall be considered confidential if:

(i) It is so designated by the State Party from which the

information was obtained and to which the information refers; or

(ii) In the judgement of the Director-General, its unauthorized disclosure could reasonably be expected to cause damage to the State Party to which it refers or to the mechanisms for implementation of this Convention;

(b) All data and documents obtained by the Technical Secretariat

shall be evaluated by the appropriate unit of the Technical Secretariat in order to establish whether they contain confidential information. Data required by States Parties to be assured of the continued compliance with this Convention by other States Parties shall be routinely provided to them. Such data shall encompass:

(i) The initial and annual reports and declarations provided

by States Parties under Articles III, IV, V and VI, in accordance with the provisions set forth in the Verification Annex;

(ii) General reports on the results and effectiveness of

verification activities; and

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

(iii) Information to be supplied to all States Parties in

accordance with the provisions of this Convention; (c) No information obtained by the Organization in connection

with the implementation of this Convention shall be published or otherwise released, except, as follows:

(i) General information on the implementation of this

Convention may be compiled and released publicly in accordance with the decisions of the Conference or the Executive Council;

(ii) Any information may be released with the express

consent of the State Party to which the information refers;

(iii) Information classified as confidential shall be released

by the Organization only through procedures which ensure that the release of information only occurs in strict conformity with the needs of this Convention. Such procedures shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i);

(d) The level of sensitivity of confidential data or documents shall

be established, based on criteria to be applied uniformly in order to ensure their appropriate handling and protection. For this purpose, a classification system shall be introduced, which by taking account of relevant work undertaken in the preparation of this Convention shall provide for clear criteria ensuring the inclusion of information into appropriate categories of confidentiality and the justified durability of the confidential nature of information. While providing for the necessary flexibility in its implementation the classification system shall protect the rights of States Parties providing confidential information. A classification system shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i);

(e) Confidential information shall be stored securely at the

premises of the Organization. Some data or documents may also be stored with the National Authority of a State Party. Sensitive information, including, inter alia, photographs, plans and other documents required only for the inspection of a specific facility may be kept under lock and key at this facility;

(f) To the greatest extent consistent with the effective

implementation of the verification provisions of this

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

Convention, information shall be handled and stored by the Technical Secretariat in a form that precludes direct identification of the facility to which it pertains;

(g) The amount of confidential information removed from a

facility shall be kept to the minimum necessary for the timely and effective implementation of the verification provisions of this Convention; and

(h) Access to confidential information shall be regulated in

accordance with its classification. The dissemination of confidential information within the Organization shall be strictly on a need-to-know basis.

3. The Director-General shall report annually to the Conference on the implementation of the regime governing the handling of confidential information by the Technical Secretariat. 4. Each State Party shall treat information which it receives from the Organization in accordance with the level of confidentiality established for that information. Upon request, a State Party shall provide details on the handling of information provided to it by the Organization. B. EMPLOYMENT AND CONDUCT OF PERSONNEL IN THE TECHNICAL SECRETARIAT. 5. Conditions of staff employment shall be such as to ensure that access to and handling of confidential information shall be in conformity with the procedures established by the Director-General in accordance with Section A. 6. Each position in the Technical Secretariat shall be governed by a formal position description that specifies the scope of access to confidential information, if any, needed in that position. 7. The Director-General, the inspectors and the other members of the staff shall not disclose even after termination of their functions to any unauthorized persons any confidential information coming to their knowledge in the performance of their official duties. They shall not communicate to any State, organization or person outside the Technical Secretariat any information to which they have access in connection with their activities in relation to any State Party.

8. In the discharge of their functions inspectors shall only request the information and data which are necessary to fulfil their mandate. They shall not make any records of information collected incidentally and not related to verification of compliance with this Convention.

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

9. The staff shall enter into individual secrecy agreements with the Technical Secretariat covering their period of employment and a period of five years after it is terminated. 10. In order to avoid improper disclosures, inspectors and staff members shall be appropriately advised and reminded about security considerations and of the possible penalties that they would incur in the event of improper disclosure. 11. Not less than 30 days before an employee is given clearance for access to confidential information that refers to activities on the territory or in any other place under the jurisdiction or control of a State Party, the State Party concerned shall be notified of the proposed clearance. For inspectors the notification of a proposed designation shall fulfil this requirement. 12. In evaluating the performance of inspectors and any other employees of the Technical Secretariat, specific attention shall be given to the employee's record regarding protection of confidential information. C. MEASURES TO PROTECT SENSITIVE INSTALLATIONS AND PREVENT DISCLOSURE OF CONFIDENTIAL DATA IN THE COURSE OF ON-SITE VERIFICATION ACTIVITIES. 13. States Parties may take such measures as they deem necessary to protect confidentiality, provided that they fulfil their obligations to demonstrate compliance in accordance with the relevant Articles and the Verification Annex. When receiving an inspection, the State Party may indicate to the inspection team the equipment, documentation or areas that it considers sensitive and not related to the purpose of the inspection. 14. Inspection teams shall be guided by the principle of conducting on-site inspections in the least intrusive manner possible consistent with the effective and timely accomplishment of their mission. They shall take into consideration proposals which may be made by the State Party receiving the inspection, at whatever stage of the inspection, to ensure that sensitive equipment or information, not related to chemical weapons, is protected. 15. Inspection teams shall strictly abide by the provisions set forth in the relevant Articles and Annexes governing the conduct of inspections. They shall fully respect the procedures designed to protect sensitive installations and to prevent the disclosure of confidential data. 16. In the elaboration of arrangements and facility agreements, due regard shall be paid to the requirement of protecting confidential information. Agreements on inspection procedures for individual facilities shall also include specific and detailed arrangements with regard to the determination of those areas of the facility to which inspectors are granted access, the

Weapons of Mass Destruction

© Government of Gibraltar (www.gibraltarlaws.gov.gi)

2004-19

storage of confidential information on-site, the scope of the inspection effort in agreed areas, the taking of samples and their analysis, the access to records and the use of instruments and continuous monitoring equipment. 17. The report to be prepared after each inspection shall only contain facts relevant to compliance with this Convention. The report shall be handled in accordance with the regulations established by the Organization governing the handling of confidential information. If necessary, the information contained in the report shall be processed into less sensitive forms before it is transmitted outside the Technical Secretariat and the inspected State Party. D. PROCEDURES IN CASE OF BREACHES OR ALLEGED BREACHES OF CONFIDENTIALITY. 18. The Director-General shall establish necessary procedures to be followed in case of breaches or alleged breaches of confidentiality, taking into account recommendations to be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i). 19. The Director-General shall oversee the implementation of individual secrecy agreements. The Director-General shall promptly initiate an investigation if, in his judgement, there is sufficient indication that obligations concerning the protection of confidential information have been violated. The Director-General shall also promptly initiate an investigation if an allegation concerning a breach of confidentiality is made by a State Party. 20. The Director-General shall impose appropriate punitive and disciplinary measures on staff members who have violated their obligations to protect confidential information. In cases of serious breaches, the immunity from jurisdiction may be waived by the Director-General. 21. States Parties shall, to the extent possible, cooperate and support the Director-General in investigating any breach or alleged breach of confidentiality and in taking appropriate action in case a breach has been established. 22. The Organization shall not be held liable for any breach of confidentiality committed by members of the Technical Secretariat. 23. For breaches involving both a State Party and the Organization, a “Commission for the settlement of disputes related to confidentiality”, set up as a subsidiary organ of the Conference, shall consider the case. This Commission shall be appointed by the Conference. Rules governing its composition and operating procedures shall be adopted by the Conference at its first session.