Advanced Search

on conditions for connection to the gas system


Published: 2011
Read law translated into English here: https://www.global-regulation.com/translation/czech-republic/508098/on-conditions-for-connection-to-the-gas-system.html

Subscribe to a Global-Regulation Premium Membership Today!

Key Benefits:

Subscribe Now for only USD$40 per month.
62/2011 Coll. DECREE of 7 March 2011 on the conditions of connection to the gas system and amending Decree of the Ministry of Industry and Trade no. 251/2001 Coll., Laying down the rules of operation of transmission and distribution system operators in the gas sector, the Energy Regulatory Office pursuant to § 98a paragraph. 2 point. g) of the Act no. 458/2000 Coll., on business conditions and public administration in energy sectors and amending certain acts (the Energy Act), as amended by Act no. 158/2009 Coll .: FIRST PART conditions attached to the gas system § 1 Subject This Decree lays down conditions for the connection of gas distribution networks, underground gas storage and supply points of customers to the gas system and method for determining the proportion of costs associated with connecting and securing gas supplies. § 2 Definitions For the purposes of this Decree a) the applicant is a natural or legal person who requests a connection to the superior system and who is authorized to use the device on the basis of ownership or other rights; for the applicant shall be considered a natural or legal person in the territory intends to proceed with the construction of facilities, b) superior system transmission system, distribution system, underground gas storage or production pipeline, for which the applicant applies for connecting devices. § 3 Conditions for connecting devices applicant's Terms connecting gas production plant, distribution system, gas consuming equipment or underground gas storage facility ("the facility") are a) filing an application for connection, b) the fact that due to the connection of devices does not endanger safe and reliable operation of superior systems, c) the projected minimum output device corresponding to the total annual consumption equipment in the amount of 10 000 MWh, if desired device is connected to the transmission system, d) conclusion of a connection between the applicant and the operator of the superior system. § 4 Application for connection (1) The applicant submits an application to join the system and superior) before connecting new devices, b) secured before changing the overall minimum and maximum hourly capacity of an existing connected device, c) before connecting to a different pressure level. (2) If a change in the customer's existing supply point, there is no change of technical conditions for connection, the applicant merely submitted an application for a contract or a connection request to amend an existing connection agreements. (3) An application for connection shall be submitted for each supply or delivery point, or the sum of delivery points, where each of them separately specified in the request. (4) The particulars of the application for connection to the transmission system are given in Annex no. 1 hereto. (5) The particulars of the application for connection of the plant to the gas distribution system, gas or mining underground gas storage are given in Annex no. 2 hereto. (6) The requirements of the request for grid connection to another distribution system are shown in Annex no. 3 hereto. (7) Requirements for connection requests to the gas consuming equipment to the distribution system are shown in Annex no. 4 hereto. (8) The particulars of the application for connection of underground gas storage grid are shown in Annex no. 5 hereto. § 5 Examination of the connection (1) The superior system assesses the connection request with respect to a) the desired location, method and date of access, b) the technical feasibility of the desired connection, c) the size of the overall minimum and maximum hourly capacity indicated by the applicant in the connection request for the handover point sum of delivery points, or supply point (hereinafter referred to as "required capacity"), d) the extent and timing of supply or consumption of gas, e) the order of applications received f) compliance pressure conditions at the facilities of the applicant and superior service system, g) the effect of the connected device security and reliability superior operating system, h) qualitative characteristics of the gas to be supplied to the superior system of the connected device, and i) the planned development of the superior system. (2) If it is necessary for a proper assessment of the request for access, the superior system prompts the operator to connect the applicant within 14 days of receiving a request to supplement the information provided to the extent needed and shall fix a reasonable time limit. Simultaneously notifies the applicant that if underfill data to the extent required by the deadline will be assessed a request. (3) If a superior system, with the exception of the transmission system operator, based on the assessment of the connection request in accordance with paragraph 1, that connect devices does not endanger the safe and reliable operation of superior system to the applicant a draft contract for connection within 60 calendar days, the applicant from the category household customers or small customer within 30 calendar days of receiving a complete application for connection. Draft agreement on access is binding for a period of 12 calendar months from the date of receipt of the applicant. (4) If the transmission system operator based on the assessment of the connection request in accordance with paragraph 1, that connect devices does not endanger the safe and reliable operation of the transmission system and the condition is met connections under § 3 para. 1 point. c) the applicant shall submit the draft agreement on the connection of up to 120 calendar days from the date of receipt of a complete application for connection. The draft contract for connection to the transmission system is binding for a period of 60 calendar days of receipt of the applicant. (5) Along with the draft contract to join the superior system operator shall submit to the customer a written instruction on his right to free choice or change their gas supplier. (6) If you can not connect the device asylum on the grounds that it would result in the connection device endangering the safe and reliable operation of the system the parent or, if the condition of the connection under § 3 para. 1 point. c) superior system operator shall notify the applicant within the period referred to in paragraph 3 or 4, including specific reasons for which the applicant can not connect to the device. However, if the device can applicants join other circumstances and content of the application or the circumstances in which the application was made, it can be assumed that the applicant would have on such a connection interest, the operator of the superior system in writing such fact shall inform the applicant, including the reasons for which You can not be under the required conditions to join, and the applicant shall submit a draft agreement on the connection in accordance with paragraph 3 or 4. The required capacity is in this approach is the capacity indicated in the draft treaty of accession. (7) A superior system for applicants reserve capacity required for the binding nature of the draft contract for connection in accordance with paragraph 3 or 4. If the applicant does not accept the draft contract for connection within the period referred to in paragraph 3 or 4, reserving the required capacity expires. (8) The superior system suggests connections so that the technical performance connectivity devices based on the planned development of superior systems while taking into account the applicant's interest to minimize connection costs. § 6 Provision of the required capacity (1) provide the capacity required for the connection takes place in the event of termination of the contract of carriage of gas for a period of 60 months from the date of termination of the contract on gas transmission. If the contract on gas transmission was not concluded within 60 months from the date of connection stipulated in the connection agreement, to ensure the required capacity for connection point expires. (2) provide the capacity required for the connection takes place in the event of termination of gas distribution agreement for 36 months from the date of termination of the contract on gas distribution. If the contract on gas distribution was not concluded within 36 months from the date of connection stipulated in the connection agreement, to ensure the required capacity for connection point expires. § 7 The share of applicants to join the justifiable costs associated with connecting and securing gas supplies (1) Manufacturer of gas distribution system operator, or storage system operator pays eligible cost to the superior system associated with connecting the device to the superior system in full, Except in the case pursuant to paragraph 3 (2) Payment of share of eligible costs DSOs associated with connections do not apply when connecting gas consuming customer equipment to the grid. (3) The proportion of applicants to join the justifiable costs associated with connecting the device to the transmission system shall be determined in accordance with Annex no. 6 hereto. Reimbursement share of eligible costs Connection does not apply in the case of grid connection to the transmission system. (4) Eligible costs include only the necessary expenses corresponding to the amount of the secured amount of capacity, location and method of connecting devices applicant related to the acquisition, construction or reconstruction of superior systems that were caused by the requirement of the applicant in connection with the connection of its facilities, including the cost of acquisition of project documentation , geodetic surveying and easements. Eligible costs do not include the costs of installing gas connections. (5) If the customer is limited or interrupted gas supply points due to illegal consumption, transportation or distribution of gas paid by the customer is entitled to a cost to the superior system associated with the provision of gas supplies in full. Eligible costs associated with providing gas supply to include only the necessary costs associated with reconnecting client device corresponding to the amount of the secured amount of capacity, location and method of connecting devices. § 8 Transitional provisions (1) If the applicant filed an application for connection to the superior system and superior system operator did not issue a written opinion on the request before the effective date of this Decree, the procedure under this decree. (2) If the applicant filed an application for connection to the superior system, operator superior system issued to request a written opinion, but did not provide the applicant a draft contract for the connection before the effective date of this Order, submit to the applicant operator superior system draft contract for connection within 30 days of the effective date of this decree. PART TWO Amendment to the Decree of the Ministry of Industry and Trade no. 251/2001 Coll., Laying down the rules for the operation of the transmission system and distribution systems in gas § 9 The Decree no. 251/2001 Coll., Laying down the rules for the operation of the transmission system and distribution system in the gas sector, with § 2 and 3 and headings are deleted. PART THREE EFFECT § 10 This Decree shall take effect on 1 April 2011. The Chairman Ing. Fiřt Annex 1 TERMS OF APPLICATION FOR CONNECTION TO THE TRANSMISSION SYSTEM Part A - information about the applicant 1. Company (filled in by the applicant - an entrepreneur registered in the Commercial Register). 2. Information on the commercial registration, including the file number (filled in by the applicant - an entrepreneur registered in the Commercial Register). 3. Name, surname and any addendum or name (applicant fills unincorporated). 4. The date of birth (filled in by the applicant - individual). 5. Location of the division: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - legal entity). Place of business in the following categories: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual entrepreneurs). 6. Name and surname of the person who is the statutory body, or all persons who are members of the statutory body (filled in by the applicant - legal entity). 7. Residence broken: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual non-entrepreneurs). 8 series - telephone, e-mail. 9th Mailing Address into their own hands. 10th identification number, if assigned. 11th tax identification number, if assigned. Part B - data on the device 1. Identification of connected devices; information on whether the connection is gas production, underground gas storage, distribution system or the customer's supply point. 2. Required term connection. 3. The size of the required capacity. 4th Drawing and connected devices. Diagram of the connecting device, b. Address and cadastral territory of connected devices c. Proposal place and method (technology) connection to the connected device. 5. Information on the expected amount and timing of gas transmission and required conditions of connection (annual, daily, hourly maximum and minimum amounts of gas, the anticipated quarterly distribution amount of gas, the predominant character of the collection of gas - fuel or technology, the existence of bi-fuel system and the inventory of gas appliances) . 6. Prospective implementation deadlines construction of connected equipment and launch its operation (commencement and completion of construction, estimated term connections, admitting the gas and start-up or early use of the connected device). Annex 2 TERMS OF APPLICATION FOR CONNECTION gas production plant to the grid, the extractive gas pipelines or subterranean gas storage Part A - information about the applicant 1. Company (filled in by the applicant - an entrepreneur registered in the Commercial Register). 2. Information on the commercial registration, including the file number (filled in by the applicant - an entrepreneur registered in the Commercial Register). 3. Name, surname and any addendum or name (applicant fills unincorporated). 4. The date of birth (filled in by the applicant - individual). 5. Location of the division: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - legal entity). Place of business in the following categories: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual entrepreneurs). 6. Name and surname of the person who is the statutory body, or all persons who are members of the statutory body (filled in by the applicant - legal entity). 7. Residence broken: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual non-entrepreneurs). 8 series - telephone, e-mail. 9th Mailing Address into their own hands. 10th identification number, if assigned. 11th tax identification number, if assigned. Part B - data on the device 1. Location of gas production - county, municipality, cadastral territory, parcel numbers of the land on which the factory gas located, house number or registration number. 2. Address of the connection point. 3. The required deadline connection. 4. The size of the required capacity. 5. Basic information on gas production 5.1. Diagram of connected equipment. 2.5 Method of connection technology equipment to be connected. 3.5 Data on the expected amount and timing of gas supply and the required conditions of connection (annual, daily, hourly maximum and minimum amounts of gas in the quarterly distribution). 4.5 Expected construction completion deadlines connected equipment and launch its operation (commencement and completion of construction, expected date of connection and commencement of operations). 5.5 The composition and quality parameters of the delivered gas. Appendix 3 Requirements for application for grid connection to another distribution system Part A - information about the applicant 1. Company (filled in by the applicant - an entrepreneur registered in the Commercial Register). 2. Information on the commercial registration, including the file number (filled in by the applicant - an entrepreneur registered in the Commercial Register). 3. Name, surname and any addendum or name (applicant fills unincorporated). 4. The headquarters of the division: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - legal entity). Place of business in the following categories: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual entrepreneurs). 5. The name and surname of the person who is the statutory body, or all persons who are members of the statutory body (filled in by the applicant - legal entity). 6. The association - phone, e-mail. 7. Address for delivery into their own hands. 8. The identification number, if assigned. 9. Tax identification number, if assigned. Part B - data on the device 1. Device Location - county, municipality, cadastral territory, parcel numbers of the land on which the facility is situated distribution system, number or registration number. 2. Address of the connection point. 3. The required deadline connection. 4. The size of the required capacity. 5. Basic information about the device 5.1. Diagram of connected equipment. 2.5 Method of connection technology equipment to be connected. 3.5 Data on the expected amount and timing of distribution of gas and the required conditions of connection. 4.5 Expected construction completion deadlines connected equipment and launch its operation (commencement and completion of construction, expected date of connection and commencement of operations). Annex 4 TERMS OF APPLICATION FOR CONNECTION gas consuming equipment to the grid Part A - information about the applicant 1. Company (filled in by the applicant - an entrepreneur registered in the Commercial Register). 2. Information on the commercial registration, including the file number (filled in by the applicant - an entrepreneur registered in the Commercial Register). 3. Name, surname and any addendum or name (applicant fills unincorporated). 4. The date of birth (filled in by the applicant - individual). 5. Location of the division: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - legal entity). Place of business in the following categories: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual entrepreneurs). 6. Name and surname of the person who is the statutory body, or all persons who are members of the statutory body (filled in by the applicant - legal entity). 7. Residence broken: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual non-entrepreneurs). 8 series - telephone, e-mail. 9. Name of the company or name and surname of the person and the address for service. 10th identification number, if assigned. 11th tax identification number, if assigned. Part B - data on the device 1. Location of gas consuming equipment - county, municipality with a zip code, street, house number, orientation number, the number of registration, cadastre, parcel numbers of the land on which it is or will offtake gas facility situated. 2. Required term connection. 3. The size of the required capacity and the estimated total annual gas consumption. 4. Basic data on gas consumption equipment: 1.4 In the case hitherto neplynofikovaného space situation of wider relations with marked supply point (scale 1: 1000 to 1: 5000) and situational drawing location of sample point with respect to the surrounding area on a scale which allows its unique location, incl. indication of the scale, the desired point connection and demarcation of land, buildings and description of adjacent land, buildings, roads, etc. 2.4 Features supply point (use supply point, the prevailing character of the collection and temporality). 3.4 Data on specific species, types, numbers and unit power consumption (m3.h-1 kW) of installed appliances (current, canceled, required) and the proportional minimum and maximum hourly consumption of gas (m3.h-1). 4.4 For the category of medium offtake and large data on the expected amount and timing of gas distribution in particular the expected maximum annual gas consumption (m3.r-1, MWh.r-1) broken down by nature of the demand and split the season from 01.04. to 9.30 and including from 1.10 to 31.03. including a maximum daily gas consumption (m3.d-1, MWh.d-1). 4.5 In the case of bi-fuel system of an expected part of daily distribution capacity that can be covered with the transition to alternative fuels, and the number of operating days for replacement fuel in subscriptions at the expected daily distribution capacity. 5. Specific requirements of applicants in terms of grid connection. Annex 5 TERMS OF APPLICATION FOR CONNECTION underground gas grid Part A - information about the applicant 1. Company (filled in by the applicant - an entrepreneur registered in the Commercial Register). 2. Information on the commercial registration, including the file number (filled in by the applicant - an entrepreneur registered in the Commercial Register). 3. Name, surname and any addendum or name (applicant fills unincorporated). 4. The date of birth (filled in by the applicant - individual). 5. Location of the division: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - legal entity). Place of business in the following categories: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual entrepreneurs). 6. Name and surname of the person who is the statutory body, or all persons who are members of the statutory body (filled in by the applicant - legal entity). 7. Residence broken: state, county, municipality with a postcode, street and house number or registration number (filled in by the applicant - individual non-entrepreneurs). 8 series - telephone, e-mail. 9th Mailing Address into their own hands. 10th identification number, if assigned. 11th tax identification number, if assigned. Part B - data on the device 1. Location of underground storage - county, municipality, cadastral territory, parcel numbers of the land on which it is located underground reservoir, house number or registration number. 2. Address of the connection point. 3. The required deadline connection. 4. The size of the required capacity. 5. Basic information about the device 5.1. Diagram of connected equipment. 2.5 Method of connection technology equipment to be connected. 3.5 Data on the expected amount and timing of deliveries or gas to and from the distribution system and the required conditions of connection. 4.5 Expected construction completion deadlines connected equipment and launch its operation (commencement and completion of construction, expected date of connection and commencement of operations). Appendix 6 SHARE OF APPLICANT FOR CONNECTION TO ELIGIBLE COSTS ASSOCIATED WITH CONNECTING THE EQUIPMENT TO THE TRANSMISSION SYSTEM The share of applicants for connection to the transmission grid PV in CZK for eligible costs associated with connecting the facility to the transmission system is determined by the formula: LC - 5 FA = (- -------) I x LC where LC [km] is the total length of the gas transmission system to be postavenza order to connect the applicant; Input value is rounded to three decimal places; I [CZK] is the device that is to be built to connect the applicant; Input value is rounded to 2 decimal places. The final stake in CZK is rounded to 2 decimal places. If the length of the gas transmission system, which is to be built to connect the applicant, less than 5 km, all costs associated with connecting TSO.